Sr CO PrO Name of Experiment Planned Date Actual Date Remark
No From To
1 a,b Use switchgear testing kit.

2 a,b Identify various switchgears in the laboratory write their


specifications.
3 a,b Test HRC fuse by performing load test.

4 a,b Test MCB fuse by performing load test.

5 a,b Dismantle MCCB/ELCB and identify various parts.

6 a,b Carry out plug and time setting (with PSM, TSM) of induction
type electromagnetic.
7 c Test electromagnetic over current relay by performing load test.

8 c Simulate differential protection scheme for transformer on the


power system simulation kit part-I.
9 d Test the working of the single phasing preventer using a three
phase induction motor.
10 d Video show on/ dismantle thyrite type arrester and identify.

11 e Video show on/ demonstrate neutral earthing at different


substation/location part-I
12 e Video show on/ demonstrate neutral earthing at different
substation/location part-II

Name & Sign of Faculty Name & Sign of H.O.D


Sharad Institute of Technology Polytechnic, Yadrav
Ichalkaranji
LABORATORY PLANNING (LP)

Institute Code: 0968 Subject: SAP


Course and Code: EE5I Subject Code: 22524
Semester: V Name of Faculty: MS R R Patil
Batch: E2

Sr CO PrO Name of Experiment Planned Date Actual Date Remark


No From To
1 a,b Use switchgear testing kit.

2 a,b Identify various switchgears in the laboratory write their


specifications.
3 a,b Test HRC fuse by performing load test.

4 a,b Test MCB fuse by performing load test.

5 a,b Dismantle MCCB/ELCB and identify various parts.

6 a,b Carry out plug and time setting (with PSM, TSM) of induction
type electromagnetic.
7 c Test electromagnetic over current relay by performing load test.

8 c Simulate differential protection scheme for transformer on the


power system simulation kit part-I.
9 d Test the working of the single phasing preventer using a three
phase induction motor.
10 d Video show on/ dismantle thyrite type arrester and identify.

11 e Video show on/ demonstrate neutral earthing at different


substation/location part-I
12 e Video show on/ demonstrate neutral earthing at different
substation/location part-II