Vous êtes sur la page 1sur 4

NOTES:

1.Excavation to be confirmed by the Engineer before concrete


blinding is laid.

2. Weak pockets of bearing strata to be dug out and filled


with 1:4:8 mass concrete.
3. CONCRETE MIXES
(a) Mass concrete to have a minimum works cube strength
of 15N/mm^2 at 28days with 40mm Aggregate size.
(b) Reinforced concrete to have a minimum works cube

strength of 25N/mm^2 at 28days with 20mm maximum


aggregate size.

2
4. REINFORCEMENT

B1
(a) High Yield bars to be square twisted cold formed bars to

B1
B1
B1
B1
B1
B1
BS4461 and are marked 'Y'on these drawings.

A
C1
C1
C1
C1
C1
C1
C1
(b) Mild steel bars Marked 'R' on these dwgs to be round bars

2
to BS 4483.

5.MINIMUM COVER TO ALL STEEL IN


(i) Foundation, stubcolumns, column bases & ground beams =40mm
(ii)Beams =25mm
(iii) Slabs = 40mm
(iv) Columns =30mm
(v) Bot. slab =20mm

5000
6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE
CONSTRUCTION

B1
B1
B1

B
C2
C2
C2
200 150

1
1

5000
SITE DIMENSIONS
50 230

690

B1
B1
B1

SECTION 2-2 THRU

C
C2
C2
C2

FOUNDATION
200 150

5000
SITE DIMENSIONS

B1
B1
B1
B1
B1
B1
B1

D
C1
C1
C1
C1
C1
C1
C1
50 230

690

SECTION 1-1 THRU


FOUNDATION
5000 5000 5000 5000 5000 5000

30000

STRUCTURAL & CIVIL ENGINEERS

2
3
6
7

1
PROPOSED WAREHOUSE AND SUPPORT FACILITIES
5

PROJECT AT PLOT............, BLOCK .........., MBALE.

CLIENT Ms OSILO GRACE, P.O.BOX........., TEL..................

TITLE FOUNDATION LAYOUT DETAILS

ARCHITECT ................................
FOUNDATION LAY OUT DESIGNED

DRAWN

SCALE 1:50, 1:25 DATE JUNE 2010

DRG NO. 19012008 SHEET NO. 01


NOTES:
1.Excavation to be confirmed by the Engineer before concrete
blinding is laid.

2. Weak pockets of bearing strata to be dug out and filled


with 1:4:8 mass concrete.
3. CONCRETE MIXES
(a) Mass concrete to have a minimum works cube strength
of 15N/mm^2 at 28days with 40mm Aggregate size.
(b) Reinforced concrete to have a minimum works cube

strength of 25N/mm^2 at 28days with 20mm maximum


aggregate size.
4. REINFORCEMENT
(a) High Yield bars to be square twisted cold formed bars to
BS4461 and are marked 'Y'on these drawings.

A
(b) Mild steel bars Marked 'R' on these dwgs to be round bars
to BS 4483.

5.MINIMUM COVER TO ALL STEEL IN


(i) Foundation, stubcolumns, column bases & ground beams =40mm
(ii)Beams =25mm
(iii) Slabs = 40mm
(iv) Columns =30mm
(v) Bot. slab =20mm

6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE


CONSTRUCTION

TRUSS T1
TRUSS T1

TRUSS T1

TRUSS T1
TRUSS T1

TRUSS T1
15000
TRUSS T1
2Y16
R8-200C/C
300

2Y16

230

TYP. SECTION THRU


RING BEAM

D
5000 5000 5000 5000 5000 5000

30000

STRUCTURAL & CIVIL ENGINEERS

PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

2
3
6
7

1
PROPOSED WAREHOUSE AND SUPPORT FACILITIES
5

PROJECT AT PLOT............, BLOCK .........., MBALE.

CLIENT Ms OSILO GRACE, P.O.BOX........., TEL..................

TITLE

ARCHITECT ................................
ROOF AND RING BEAM LAY OUT DESIGNED

DRAWN

SCALE 1:50, 1:10 DATE JUNE 2010

DRG NO. 19012008 SHEET NO. 04


NOTES:
1.Excavation to be confirmed by the Engineer before concrete
blinding is laid.

2. Weak pockets of bearing strata to be dug out and filled


with 1:4:8 mass concrete.
3. CONCRETE MIXES
(a) Mass concrete to have a minimum works cube strength
of 15N/mm^2 at 28days with 40mm Aggregate size.
(b) Reinforced concrete to have a minimum works cube

strength of 25N/mm^2 at 28days with 20mm maximum


aggregate size.
4. REINFORCEMENT
(a) High Yield bars to be square twisted cold formed bars to
BS4461 and are marked 'Y'on these drawings.

A
(b) Mild steel bars Marked 'R' on these dwgs to be round bars
to BS 4483.

. 2x3Y10-16-300 T . 5.MINIMUM COVER TO ALL STEEL IN


(i) Foundation, stubcolumns, column bases & ground beams =40mm

M
(ii)Beams =25mm
(iii) Slabs = 40mm
(iv) Columns =30mm
(v) Bot. slab =20mm

5000
5000
6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE
CONSTRUCTION

B.S No.A142
B.R.C MESH
2x2Y10-17 B

B
1

B.S No.A142
B.R.C MESH

5000
2Y16

34Y16-1/R-18-ALT
1
R8-200C/C

6900
2
. 2x3Y10-16-300 T . 3
400

5
2Y16
6

C
7
230
8

B.S No.A142
B.R.C MESH
TYP. SECTION THRU
grid A(1-7),D(1-7),7(A-D)

5000
2x2Y10-17 B

2985

D
5000 5000 5000 5000 5000 5000

STRUCTURAL & CIVIL ENGINEERS

30000 PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

2
3
6
7

1
PROPOSED WAREHOUSE AND SUPPORT FACILITIES
5

PROJECT AT PLOT............, BLOCK .........., MBALE.

CLIENT Ms OSILO GRACE, P.O.BOX........., TEL..................

TITLE SUSPENDED SLA, BEAMS AND SECTION DETAILS

REINFORCEMENT DETAILS - SUSPENDED FLOOR SLAB ARCHITECT ................................

DESIGNED

DRAWN

SCALE 1:50 , 1:10 DATE JUNE 2010

DRG NO. 19012008 SHEET NO. 02


NOTES:
1.Excavation to be confirmed by the Engineer before concrete
blinding is laid.
2. Weak pockets of bearing strata to be dug out and filled
1Y16-04-at column 1Y16-04-at column
X 2Y16-02
connection
2Y16-02 Y connection
2Y16-03 with 1:4:8 mass concrete.
3. CONCRETE MIXES
(a) Mass concrete to have a minimum works cube strength
25R8-01-200C/C 25R8-01-200C/C 25R8-01-200C/C of 15N/mm^2 at 28days with 40mm Aggregate size.
(b) Reinforced concrete to have a minimum works cube
strength of 25N/mm^2 at 28days with 20mm maximum
3Y16-02 3Y16-02 3Y16-02 aggregate size.
X 5000 5000 Y 5000 4. REINFORCEMENT
(a) High Yield bars to be square twisted cold formed bars to
BS4461 and are marked 'Y'on these drawings.
(b) Mild steel bars Marked 'R' on these dwgs to be round bars
B E A M ( 230 X 500) on grid 1(A-D), grid 2(A-D). 50 55

400
190 55 50
to BS 4483.
B.S No.142 B.R.C MESH
60x30x3mm SHS from Truss 1 5.MINIMUM COVER TO ALL STEEL IN

38
(i) Foundation, stubcolumns, column bases & ground beams =40mm
-Gauge 28 roof sheeting

230

200
125
18 18 18 18 18 18 18 (ii)Beams =25mm
-40x40x3mm ties and struts 5mm PLATE
(iii) Slabs = 40mm
18Ø HOLES

37
125 125 -60x40x3mm rafter and tie beam TO RECEIVE 4M16mm J-BOLTS
(iv) Columns =30mm
3414 1023 -150mm Z-purlins 5mm welds
(v) Bot. slab =20mm
SECTION THRU MAXPAN SLAB M-M 1000 6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE
0 1000 1000 Plan A connection detail. CONSTRUCTION
1991
1327
03 03
1630

200
572
01

300
1577 976 985 985 985 985 1008
A
15000 TRUSS T1
02 02 02
2400 900 2400 1200 230

200 150
75Y12-06-200C/C
TYP. SECTION THRU X-X

SITE DIMENSIONS

XR8-04-175C/C

300
6Y12-01-200c/c

6Y12-02-200c/c

6Y12-03-200c/c

6Y12-04-200c/c

6Y12-05-200c/c

6Y12-07-200c/c

6Y12-08-200c/c

6Y12-09-200c/c

6Y12-10-200c/c
4Y20-03
1100

grid 1(A-D),2(A-D)

300
230
04 04
Y12-02 4Y16-04

230
01
6Y16-04+2Y12-05 Z Z 04 04
03 04 03

12R8-01-175C/C
50 300
Y12-01 SECTION THRU Z-Z
STAIR CASE 1 PLAN

2000
12R8-01-175C/C
400

200
Z Z 04 05 04

2000
1500

230
04 04
2400 900 2400 1200 TYP. SECTION THRU
04 05 04
SECTION THRU Z-Z
01
LEVEL 2 COLUMN BASE B1

300
13Y12-06-200C/C
TREADS 300mm. Y12-10 10Y12-01-150C/C
02 02 02

400
Y12-09
RISERS 150mm.

10Y12-02-150C/C

400
WAIST 150mm. Y12-08 03 03
230
1350

1500
04
Y12-07
C/C 03 03
X X
00
LANDING 6-2 C2
2-0 X X
Y1
24
9Y12-06-200C/C 230
TYP. SECTION THRU Y-Y

14R8-01-175C/C
Y12-05 4Y20-02 02 02

230
grid 1(A-D),2(A-D)

200 150

14R8-01-175C/C
01
6Y16-02+2Y12-03

2300
Y12-04
COLUMN BASE B1 02 02

2300
(1500X1500) 6 No.s thus. 400
SECTION THRU X-X
1350

02 03 02

SITE DIMENSIONS
Y12-03

1200

XR8-04-175C/C

230
/C 02 02
0C
-20 6Y16-03+2Y12-05
-06
02 03 02
2 10Y12-01-150C/C
Y1 SECTION THRU X-X
Y12-02 29
STRUCTURAL & CIVIL ENGINEERS

10Y12-02-150C/C
Y12-02 03 05 03

15075
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

200 150

1500
04

15075
LEVEL 1 06 06 PROPOSED WAREHOUSE AND SUPPORT FACILITIES

50 300
03 05 03
Y12-01 PROJECT
Y12-01 C1 AT PLOT............, BLOCK .........., MBALE.
SITE DIMENSIONS
06 06 06 1500 CLIENT Ms OSILO GRACE, P.O.BOX........., TEL..................

50 230
TITLE FDNS,BEAMS,COLUMNS,TRUSS AND SECTION DETAILS
TYP. SECTION THRU COLUMN TYPE C2
690 COLUMN BASE B1 COLUMN BASE B1 COLUMN TYPE C1 (6No.) 230x230mm ARCHITECT ................................
(1500X1500) 14 Nos thus. (14No.) 400x230mm DESIGNED
SECTION THRU STAIRCASE 1 PLAN DRAWN
SCALE 1:25,1:10 DATE JUNE 2010
DRG NO. 19012008 SHEET NO. 03