Vous êtes sur la page 1sur 1

Media Production Risk Management Plan

Name  Sam Morris  Date  09/06/19  Event  Tom talks 

Position  Camera Operator  Venue/s  Inside Thomas Tallis school -  Description  Analysis and assessment of any potential 
studio  risks that may occur within the timeframe of 
active production. 

Organization  Tom talks - Dominic  Contact  smorris1 Ref:#  N/A 


Strevens interview   info.  @thomastallis.org.uk​,  
 
 
 
The Risk Likelihood Consequences Level of Pre-emptive Response
Risk

Burns Medium Minor to serious Medium No long physical contact with Cold water on afflicted body part and confirm the
burns equipment such as studio lights. neutralization of the fire / heated substance.

Tripping Medium Hurting Medium Tape down all cables to prevent Find the closest first aider to assess injury.
someone/breaking tripping and breaking.
equipment

Breaking of Low Reprimanded / Medium No nonsensical behavior around Test integrity of data stored on equipment or status of
equipment Fined, potential equipment, set-up or otherwise. it, working / damaged / broken, etc.
injuries. Always ensure equipment is Search for and locate all equipment.
accounted for and intact upon location
change.

Electrocution Very Low Potential injuries Low - Be aware of location / duration of time Treat afflicted area with water and restrict contact as
High in contact of paglight / potentially to reduce the probability of increased injury.
overheated device, phone , camera,
etc.

Page 1 of 1 

Vous aimerez peut-être aussi