OPERATION COST FOR GAS POWER PLANT
1x MWM TCG 2020 V16 K, Capacity 1,500 kW
1. GENERAL
Actual Factory Power Demand kWe 1,350.00
Actual Installed Transformer Capacities KVA 1,875.00
Factory main distribution voltage Volt 400.00
Annual Plant operation hours hr/year 8,000.00
Current Exchange Rate of Indonesia Rupiah Rp/ Euro 11,500.00
Total Spare Parts Cost over 64,000 Operating Hours Euro 536,500.00
Total Operating hours Hrs 64,000.00
Total Spare part cost per hour Euro/hr 8.38
Total Spare part cost per hour Rp/hr 96,402.34
Total Spare Parts Cost per kWh Rp/kWh 67.41
Total Spare part cost per Year Rp/year 771,218,750.00
4. SUMMARY