Vous êtes sur la page 1sur 4

Guideline for Insert Pump Application

1. Basic String Configuration

Rev. 1 – Guideline for Insert Pump Application – DVZH 22-Nov-2015 Page 1


2. Tactical Team shall send 1 set of Insert Pump Assembly to designated location consist of Pump Assembly and
Seating Nipple for particular Pump Size.
Please follow general guideline below for string and rod size :
Rod Length
Insert Pump Size Tubular Size Seating Nipple Size Sucker Rod Size
(Insert Pump)
1-3/4” 2-7/8” 2-7/8” ¾” (*see note) 12’
2-1/4” 3-1/2” 3-1/2” ¾” (*see note) 12’
If Existing Sucker Rod size inside wellbore either 7/8” or 1”, and sucker rod x-over from ¾” to those size is available
at Material Team (Tactical), please use existing sucker rod size and request for the x-over (Not required to change
the sucker rod size into ¾”)

3. Schedule Interpretation :
Example :
Est
Well Proposed TP Set Loc PBTD Loc
Recommendation Recovery
Name TP Size (Feet) (Feet)
BOPD
LPD. Size down TP from 2.75" to
XX-XXX 2.25"x15'. POP - PLEASE USE 16.00 2.25" x 15 753 784
INSERT PUMP
Means :
 Use 2-1/4” Insert Pump (use Table at point no. 2 above as reference)
 Use 3-1/2” Tubing Size (use Table at point no. 2 above as reference)
 Seating Nipple Depth = PBTD – 40’ or if there is any note in recommendation please follow the written
recommendation.

4. Seating Nipple Picture :

Rev. 1 – Guideline for Insert Pump Application – DVZH 22-Nov-2015 Page 2


5. Trip In Hole and Trip Out Hole Procedure :
Please follow QSOP which has been developed by Rig’s Contractor

6. Insert Pump Picture :

Rev. 1 – Guideline for Insert Pump Application – DVZH 22-Nov-2015 Page 3


7. Precaution :
 Please be cautious during lifting and rigging process of the insert pump assembly  avoid pump rod bending.
 Ensure all the tally are approved and checked by WSM to avoid misperception during test pumping.
Identify root cause if test pumping process fail to get the pumping pressure whether it caused by :
1. Incorrect tally, or
2. Insert Pump not seat correctly on seating nipple.
 Ensure all the procedure are followed during execution.
 Ensure all tubing are rabbited with the correct size (minimum as same size as mechanical lock – top anchor size)

Rev. 1 – Guideline for Insert Pump Application – DVZH 22-Nov-2015 Page 4