Académique Documents
Professionnel Documents
Culture Documents
Providing and Fixing suitable size threaded mild steel cap or spot
5 24.13 welded plate to the top of bore well housing/ casing pipe, removable as
per requirement, all complete for borewell of:-
24.13.1 100 mm dia. each 1 156.90 156.90
Providing and Fixing M.S Clamp of required dia. to the top of casing/
6 24.14 housing pipe of tubewell as per IS:2800 (PART I), including necessary
bolts and nuts of required size complete.
24.14.1 100 mm clamp each 1 1,124.70 1,124.70
Providing and Fixing Bail plug/ Bottom plug of required dia. to the
7 24.15 bottom of pipe assembly of tubewell as per IS:2800 (PART I)
24.15.1 100 mm dia. each 1 198.80 198.80
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c
8 18.10 cutting and making good the walls etc.
18.10.1 15 mm dia nominal bore metre 100 177.80 17,780.00
18.10.2 20 mm dia nominal bore metre 50 215.90 10,795.00
18.10.5 40 mm dia nominal bore metre 75 383.30 28,747.50
Sr. Ref. Item Rate Amount
Description of Item Unit Quantity
No. Code (Rs) (Rs)
Approved
rates in
9 Municipal Supply and fix Submersible Pump- 2 H.P. with Pump Starter Nos. 1 20,910.00 20,910.00
Corporation
Biharsharif
BCD
Electrical 2 core, 10 sq. mm XLPE/PVC insulated PVC sheathed (Heavy duty)
10 SOR 2016 armoured electric cable with aluminium conductor metre 80 71.40 5,712.00
Item No.
2202
BCD SOR
11 Carriage of Gravels cum 7.07 1,355.66 9,584.52
Item
Providing and laying S&S C.I. standard specials such as tees, bends,
12 18.25 collars, tapers, caps etc. (Heavy class) :
18.25.1 Upto 300 mm dia. quintal 0.50 4,812.00 2,406.00
Total 223,126.67
or Say 223,127.00
COST ESTIMATE OF DRAINAGE AT ICCC BUILDING AREA
S.No. Ref. Item Length Breadth Depth/ Rate Amount
Description Unit No. Quantity
Code height (Rs) (Rs)
8 Carriage of Material
Coarse Sand cum 8.33 824.09 6,866.11
As per Brick %0 no. 10273 747.60 7,679.72
approved Cement MT 39.29 290.27 11,403.99
rate DUDA,
Nalanda Extra Cost of Materials due to increase of rates
Cement cum 39.29 283.40 11,134.08
Bricks %0 no. 10273 249.72 2,565.25
Total 303,201.66
Say 303,202.00
COST ESTIMATE FOR UNDERGROUND SERVICE RESERVOIR AT ICCC BUILDING AREA
Sr. BCD/DSR Rate
Description of item Unit N L B H Quantity
No. /NS (Rs.)
Amount (Rs.)
10,751.34
1,214.81
2,683.00
ROUND SERVICE RESERVOIR AT ICCC BUILDING AREA
Amount (Rs.)
107,997.00
806.00
42,103.00
5,750.00
125,208.00
3,067.00
12,755.00
1,555.00
1,519.00
315,409.00
Material Consumption Statement for Boundary Wall for CS
Brick
Consumption Cement Sand Stone
Sr no Item Quantity Unit MT (Cum) (Cum)
(nos.)
1 Brick #REF! cum #REF! - - -
2 PCC 1:3:6 #REF! cum - #REF! #REF! #REF!
3 RCC 1:1:2 #REF! cum - #REF! #REF! #REF!
TOTAL #REF! #REF! #REF! #REF!