Vous êtes sur la page 1sur 49

MANUAL TESTING

1) Q. Why did you choose testing ?

Ans: 1) Scope of getting the job is very very high.

2) No need of depend upon any technology.

3) Testing is going to be there forever.

4) I want consistence through out my life.

2) Q. What exactly we need to get a job?

Ans: 1) Stuff

2) Communication skills [reading+ writing + speaking+ lesion]

3) Confidence

4) Dynamism

3) Q. Why explicitly the test engineers are been recruiting in to the software
companies?

Ans: 1) Once person cannot perform two tasks efficient at a time.

2) Sentimental attachments.

4) Q. Who can get testing job?

Ans: Any graduate who is creative can get testing job very easily

5) Q. Why explicitly the testing engineers are been recruited into the software
companies?

Ans: 1) One person can’t perform two task efficiently at a time.

2) Sentimental Attachment.

• PROJECT:-

Project is something that is developed based on the particular customers


requirements and used by that particular customers only.

1
• PRODUCT:-

Product is something that is developed base on the companies specification


and used by the multiple customers.

NOTE:- The company will decide the specification by picking the common requirements of
customer.

6) Q.Classical definition of quality?

Ans: Quality is defined has justification of all the requirements of a customer in a product.
NOTE: Quality is not defined in the product it is defined in the customer mind.

• DEFECT: Defect is defined as deviation from the requirements.

7) Q. Latest definition of quality?

Ans: Quality is defined as not only the justification of the requirements but also presence of
the value [value ..means ..user friendly]

8) Q. What is testing?

Ans: Testing is a process in the defects are Identified, Isolated[separately],Subject for


Rectification[sending] Ensure that the product is defect free in order to produce a quality
product in the end and hence customer satisfaction.

9)Q. What is bidding the project?

Ans: Bidding the project is defined as request are proposal, estimation and signing
off(official-agreement).

• KICK OF MEETING:- Kick off meeting is the initial meeting conducted in


the software company soon after the project is signed off in order discuss the
overview of the project once select project manager for that project.

Us ally

• High level management [HLM]

• Project managers [PM]

• Quality managers [QM]

• Technical managers [TM]

• Development leads & Test leads

Will be involved in this meeting Apart from them many times customer representations also
2
Will be involved in this meeting.

NOTE:- Apart from this meeting any other start up meeting in also called as “kick off
meeting”.

• PIN [ Project Initiation Note]:- PIN It is a mail prepared by the project


manager and sent the CEO of software company as well as to all of his core
team members in order to intimate then that they are about to start the actual
project activities.

CEO=Chief Executive Officer

COO=Chief Of Officer

SDLC [Software Development Life Cycle]:-


It contains 6 Phase

• Initial or Requirement Phase

• Analysis Phase

• Designed Phase

• Coding Phase (or) Programming phase

• Testing Phase

• Deliver and maintenance Phase

Initial or Requirement Phase:-


Task:-Interacting with the customer and gathering the requirements.

Roles:- i) Business Analyst [BA]

ii) Engagement manager [EM]

Process:- First of all the Business Analyst can Appointment . from the customer, collects
the template from the company meet the customer an the appointment date gathers the
requirements with the help of the template and come back to the company with the
requirement documentary.

The Engagement manager will go through the requirements document. If at all he


finds any extra requirements hence he will deal with the excess cast of project. If it is any
confession of requirements then the will ask the consult team to develop the prototype he
will demonstrates to the customer gather the clean requirements and finally hand over the
requirements document to the business analyst.

Proof:- Proof of this phase is “Requirements Document”.


3
This document is called with different name in different companies

FRS (Functional Requirements Specification)

CRS (Client or Customer Requirements Specification)

URS (User Requirements Specification)

BDD (Business Design Document)

BD (Business Document)

BRS (Business Requirement Specification)

NOTE:-Some companies may maintains two documents in the initial phase, one is for High
level business flow information and the other in for Detail function information.

But some companies may maintains both the intimation in a single document.

• Template:- Template in a predefined format which is used for preparing the


document easily and perfectly

• Prototype:- Prototype is a roughly and rapidly developed model which is


used is for demonstration to the customer in order to gather the clear
requirement and also to win his confidence of the customer.

Analysis phase:-
Task:-

• Feasibility study

• Tentative planning

• Technology selection & Environment conformation

• Requirement analysis

Roles:-

• System Analyst [SA]

• Project Manager [PM]

• Team &Technical Manager [TM]

Process:-

Feasibility study:- (possibility) It is a detailed study conducted on requirement in order to


conform whether all of those requirements are possible with in the given time budget and
resources are not.
4
Tentative planning (Temporary):- The resource planning as well as scheduling will be
temporary planned section.

Technology selection & Environment conformation:- The list of all the technologies that
are required to accomplish this project successfully will be enlisted as well as the client
environment will be conformed here in this section.

Requirement analysis:- The list of all the requirements that are required by the company
like human resource , software and hardware to accomplish that project ,successful will be
enlisted and mentioned here in this section.

Proof: The proof document if the analysis phase is SRS (System Requirement
Specification )

Designed Phase:-
Task:- i) High Level Designing [HLD]

ii) Low Level Designing [LLD]

Roles:- i) Chief architect (CA) : is responsible for high level designing.

ii) Technical Lead (TA): is responsible for low level designing.

Process:- The chief architect will divided whole project into modules ,by drawing some
diagrams using a language UML(Unified Modeling Language)

 The technical lead will divided the modules into sub modules by drawing some
diagrams using the same UML.

 Apart from this takes GUI design also will be done in this phase.

 Some time pseudo code also will be developed in this phase.

Proof:- The proof document of this phase is TDD (Technical Design Document)

• Pseudo code:-It is set of English statement which used for developing in the
actual code very easily and comfortably.

Coding Phase:-
Task:- coding (or) programming

Roles:-Developers (or) programming

Process:- The developers will develop the actual source code with the support of technical
design document as well as by following the coding standards.
5
Example for coding standards:

 Proper indentation

 Color coding.

 Proper commenting.

Proof:- The proof document of the coding phase SCD (Source Code Document).

Testing phase:-
Task:- Testing

Roles:- Test engineers

Process:-

 Test engineers will receive the requirement document and will start
understanding the requirement.

 While understanding the requirement if at all the get any doubt then they will
list out all the doubt in the requirements clarification note and will send it to
the author of the requirement doubt BA(Business Analyst).

 Once the clarification are given if still more clarification are required then they
will conduct a review meeting and will get all the clarification.

 Once all the requirement are clearly understood then they will take the Test
case template and will write the test cases.

 Once the 1st Build is released they will execute the test cases.

 If at all any defects are found they will list out then in the defect profile and
will send it to the development department .

 Once the next Build is released they will re execute the required test case.

 If at all any more defect are found they will update the defect profile and will
send it to the development department.

 Once the next Build is released the same process will be continued.

 This process will be continued again and again till the product is defect free.

Proof:- The proof the testing phase is Quality Product .

• Test Case:- If is an Idea of test engineer to test something based on the


requirements.

6
Delivery & Maintains Phase:-
Delivery:-

Task:- Hand overring the application to the client .

Roles:- Deployment Engineers or Installation Engineers

Process:- Deployment engineers will go to the clients place , install the application into the
original customer ,Environment and finally hand over’s the software to the customer.

Proof:- The final official argument made between the company and the customer is the
proof document this phase.

Maintains:- Once the customer start using the application if at all any problem occurs then
that problem will become the task ,based on the task corresponding roles will be appointed
,these roles will define the process, solves the problem and final get the Application latter.

Some customer many request for continuo’s maintenance in that situation the
company will send a team of member to the customer place continuously in order to take care
of that software.

Q. where exactly testing comes in to picture?

Which sort of testing you are expecting?

How many sort or testing are there?

Ans:- They are two sort of testing

i) Un convectional testing.

ii) Convectional testing.

Un convectional testing:- It is a sort of testing in which the quality assurances people. Will
check each and every role in the organization in order to conform weather they are doing
their work according to the companies proper guidelines are not. Right form the staring of the
SDLC to the end of it.

Convectional testing:- It is a sort of testing in which the test engineers will check the
developed application (or) its related parts are working according to the expectation or not
from the coding phase to the end of the “SDLC”

Methods of the testing (or) testing techniques:-


Basically there are two methods of testing.

i) Black Box testing.


7
ii) White Box Testing (or) Glass Box Testing (or) Clear Box Testing

Black Box Testing:- It is a method of testing in which one will perform testing only on the
Functional part of an application with out on the having the knowledge of structural part.

Usually the black box Test engineers will perform it.

White Box Testing:- It is a method of testing in which one will perform testing on the
Structural part of an application .

Usually developers (or) White box testers will perform it.

Gray Box testing:- It is a method of testing in which one will perform testing on both the
functional part as well as the structural part of an application.

Usually the test engineers who have the knowledge of structural part will perform it.

Levels of Testing:-
There are five levels of testing

• Unit level testing.

• Module level testing.

• Integration level testing.

• System level testing.

• User acceptance level testing.

Unit level testing:-

Unit:- Unit is defined as smallest part of an application.(program)

In this stage the white box testing will test each and every developed program
and also the combination of programs.

Module level testing:-

Module:- Module is defined as a group of related features to perform a major task in the
application.

In this stage the Black box test engineers will test the functional part of the
module.

Integration level testing:- In this stage the developers of will develop some
interface(linking program) in order to integrate the modules this interface will be tested by
white box testers. Developers will follow any one of the approaches white integration the
module.

8
 Top down approaches

 Bottom up approaches

 Hybrid approaches (or) Sand rive approached

 Big-Bang approaches

• Top down approaches:- In this approaches the parent modules will be


developed first and then the corresponding child modules will be developed
and integrated.

STUB:- While integrating the modules in top down approach if at all any mandatory
modules are missing then that mandatory modules will be replace with a temporary
program.

9
• Bottom up approach:- In this approached the child modules will be
developed first and will be integrated to the corresponding parent modules.

DRIVER:- While integrating the module in bottom up approached if at all any mandatory
modules is missing then that modules is replaced with a temporary program “DRIVER”

• Hybrid approach (or) San drive approach:- This a mixed approach of Both
top down and bottom up approaches.

10
• Big-Bang approach:- In this approach one will wait till all the modules are
developed and finally will integrate then at a time.

System level testing:-

System:- Once the software application is installed in to an environment then as a whole we


will call it as a system.

In this stage the block box test engineers will conduct many type of testing like
load testing, performance testing, stress testing, comparability testing, system integration
testing……..ect.

• System integration testing:- It is a type of testing in which on will perform


some action on module and check for the reflections in all the related are as of
the application.

User acceptance level testing:- In this stage the block box test engineer will perform testing
on the user desired areas in the presence of accept the application happy.

Environment:-
Environment defined as group of hardware compounds with some basic
software (OS) where one can install the Presentation Logic, Business Logic, Data Base
Logic.

[or]

Environment defends as combinations of three layer that is Presentation


Layer, Business Layer, Data Base Layer. Where once can install the Presentation Logic,
Business Logic, Data Base Logic.

11
Type Of Environment:-

 Stand Alone Environment (or) One Tier Architecture.

 Client Sever Environment (or) Two Tier Architecture.

 Web Based Environment (or) Three Tier Architecture.

 Distributed Environment (or) N-Tier Architecture.

Stand Alone Environment (or) One Tier Architecture:-

In this environment only one tier will be there. Presentation layer, business layer,
data base layer will be present in the same tier.

When ever the application need to be used by single user at time


then environment will be suggested.

Client Sever Environment (or) Two Tier Architecture:- In this environment two tier will
be there .one is for client and another is for data base server. Presentation layer and the
business layer will be available is each and every client and the data base player will be
present in data base server.

When ever the application need be used single premises and there is no
problem with the security of the. Business logic as well as the application need accessed very
fast lye then this environment be suggested.

12
Web Based Environment (or) Three Tier Architecture:- In this environment three tier will
be there one is for clients, the middle is one is for application sever and the other is for data
base sever. presentation layer available in the client business layer will be available in the
application server. data base sever.

When ever the application need to be used all over the world by limited
numbers of user and wounds the business logic will be secured and function updaters to be
easily them the in environment can be suggested.

13
• WEB SERVER:- Web server is a software which provides web services to
the client.

EX:- IIS(Internet Information Services)

Distributed Environment (or) N-Tier Architecture:-This environment is same as web


environment more the one application sever is introduced in separate hers in order to
distributed the load and increase the performance.

When ever the application needs to be use by huge number of user then this
environment can be suggested.

• THIN CLIENT:- If at all the client machine is having only the .presentation
logic then it is know as thin client.

• THICK CLIENT:- If at all the client machine is having both presentation


logic as well as business logic then it is known as thick client.

• APPLICATION:- It is a Presentation Layer, Business Layer, Data Base


Layer.

SOFTWARE DEVELOPMENT PROCESS MODELS:-

 Waterfall Model

 Prototype Model

 Evolutionary Model

 Spiral Model

 Fish Model

 V-Model

Waterfall Model:-
14
Phase Activity Outcome

REQ &
INTIAL GATHER BRS
INGNG

SYS,
ANALYAIA SRS
DESIGN

S/W
DESIGN TDD,GUI
DESIGN

UNIT TEST UTR


IMPLIM
CODING ENTATI INT .TEST ITR
ON

MTR
MOD TEST
BLOCK STR
TESTING SYS TEST
BOX
UATR
TESTING UAT

DELIVER &
DELIVERY TO CLIENT
MAINENENCE

Advantages:- It is a simple model and easy to implement.

Project Monterey and maintains is very easily.

Draw Back:- Can’t accept the new requirements in the middle of the process.

Prototype Model:-

15

CLIENT ENVIRONMENT
SRS DOC. BASED LINED
CONFORMATION
S/W PROTOTYPE
PROTOTYPE
UN CLEAR REQ. H/W
BRS PROTOTYPE
DOC. BASE LINED DEMO
DEMO
REQ. TO
ARETOCLIENT
CLIENT
REFINED
Advantage:- when ever the customer is not clear with his requirement. Them this is best
suitable model

Draw Back:- Is not a compiled develop process model.

It’s a still time consumer model.

Company should where the cost of prototype

User may limit requirement by sticking into the project.

Evolutionary Model:-

16
INITIAL REQ.

FEED BACK WITH


N
NEW REQ.
DEVELOP O

APPLICATION USER USER


VALEDATION ACCEP
T

YE
S
APPLICATION

BASE LINE

Advantage:- when ever the customer is evolution the requirement then this is the Best
suitable model

Draw Back:- time consuming model

Costly model

Deed lines can’t properly define.

No transference.

Project monetary any maintenance is very difficult.

Spiral Model:-

17
1) DEINING THE OBJECTVES /WORK ANALYSIS/CONSTRAINTS

4)REFINIG &

PLANNING 2) RISK ROOT

FOR THE NEXT CYLE CAUSE

ANALYSIS

ESTIMATION

3) IMPLEMENATION CONTINGENCIES

Advantage:- When ever the project highly risk based then this is the best suitable model.

Draw Back:- Time consuming model.

Costly model.

Risk root cause analysis is nota easy task.

Fish Model:-

REQ ANAYSIS DESIGN CODING DELIVERY


MAI-GATHERING SYSTEM Testing Maintan
18
SRS HLD SCD

BRS REVIEW LLD BLOCK Box Testing

Test S/W

SRS REVIEW TDD REVIEW WHIT BOX TESTING Changes

Advantage:- As both the verification are done the outcome will be a quality product.

Draw Back:- Time consuming.

Costly model.

V-Model:-

Verification Validation

INITIAL & BRS PREPARING PROJECT PLANNING


ANALYIS SRS PREPARING TEST PLANNING

DESIGN & TDD DESIGN PHASE TESTING


CODING SCD PROGRAM PHASE TESTING

TESTING S/W BUILD SYSTEM TESTING


TEST MANAGEMT PROCESS
USER ACCEPTANCE TESTING

DEVIVER & PORT TESTING


MANINTENANCE S/W EFFICIENCY DRE= A
TEST S/W CHANGS A+B

A= Defects found by the testing team.


B= Defects raised by the customer.
Advantage:- As both the verification and validation is done and test management process is
maintained. The outcome will be quality product.
Draw Back:- It is time consuming model.
It is a costly model.

• Verification:- Verification is a process of checking whether the product is being


developing in a right manner or not.

• Validation:- Validation is a process of checking whether the develop product is right


or not.

19
TYPE OF TESTING:-

• Build acceptance testing (or) Build verification testing (or) Sanity


testing

• Regression testing

• Re testing

• Half- testing

• B-testing

• Static testing

• Dynamic testing

• Instillation testing

• Compatibility testing

• Exploratory testing

• End-To-End Testing

• Security testing

• Usability testing

• Reliability testing

• Mutation testing

• Adhoc testing

Build acceptance testing (or) Build verification testing (or) Sanity testing:-

It is a type of testing in which one will conduct overall testing one the released build in
order to conform where the proper of not for conducting detailed testing

In this type of testing us ally they check the following.

20
i) Weather the build can be properly installed in to environment or not

ii) Weather one can navigate to all the pages of the application or not.

iii) Weather all the important feature are available or not.

iv) Weather all the requirement connections are properly established or not.

In some company they will call this types of testing as Smoke testing also
but in some companies they say that just before releasing the build the developer will check
weather the build is proper or not i.e. know as Smoke testing.

Once the build is released the testing engineers will once again check weather
the build is proper or not i.e. knows as BAT (or) BVT (or) sanity testing.

Regression testing:- It is a type of testing in which one will perform testing on the ready
testing functionality again and again us allay it is done in two servicers.

i) When even some defects are identified raised to the development department once
the next build is released the testing engineers will check the defect functionality as
well as the related functionality once again.

ii) When ever some new feature are added i.e. the application next build is released to
the testing department then the test engineers will check all the related feature’s of
those new feature’s once again.

NOTE: - Testing new features for the first time not regression testing.

Some companies may do Random testing at the end that also will fall under
regression testing only.

Retesting: - It is a type of testing in which one will perform testing on the same functionality
again and again with multiple sets of data in order come to a conclusion weather the
functionality is working fine or not.

NOTE:-

i) Regression testing starts form the 2nd build and continue up to the last
build.

ii) Re testing starts from the 1st build and continuous up to the last build.

21
iii) During regression testing also re testing will be conducted that is the reason
some people even call it as Re and Regression testing.

Half testing: - It is a type of testing user accepting testing conducting in the soft ware
company by the test engineers just before the delivery.

B-testing: - It is a type of testing user accepting testing conducting in the client place either
by the end user (or) by the third party testing experts just before actual implementation of a
application.

Static testing: - It is types of testing in which one will perform testing on the application on
its related factors without perform any action.

EX: - GUI testing, Document testing, code--------------ect

Dynamic testing: - It is types of testing in which one will perform testing on the application
on its related factors by perform some action.

EX: - retesting, functionality testing…….ect.

Instillation testing :- It is a type of testing in which one will trey to instillation the
application by following the guide ling provided in the deployment document in order to
conform whether those guidelines really suitable for instillation the application comfortable
(or) not.

Compatibility testing:- It is type of testing in which one will install the application into
multiple environment prepared with different .combation in order to check .whether it is
suitable with those environment (or) not.

Monkey testing: - It is type of testing in which one will intentionally perform some action
in order to check stability of the application.

Port testing: - It is type of testing in which one will install the application into the original
customers environment and check whether it is comprisable with that environment (or) not.

Exploratory testing:- It is type of testing in which Do many expert will check the
functionality of the application which out having the knowledge of requirement just by
parallel exploring the functionality.

• Exploratory: - Have in the base knowledge of some concept doing something and
more about it is knows as exploratory.

End-To-End testing: - It is type of testing in which one will perform testing on all the end to
end sceneries of the application.

22
Ex:- login

Balance enquiry ----10,000

With draw -------3,000

Balance stmt ----------7,000

Logout

Security testing:- It is type of testing in which one will perform testing on the application in
order to conform whether it is properly protected (or)not.

i) Authentication testing : It is a type of security testing in which one will enter


different combination of user names and password .and check whether only
authorized people are able to access the application (or)not.

ii) Direct URL testing: It is type of security testing in which one will enter the direct
URL’s if secured pages and check whether they access (or) not.

URL [Uniform Resource Location]

iii) Fire wall leakage testing (or)User realized testing :- It is type of testing in
which one will enter into the application as a authorized user and will try to access
bye and his limited in order to conform whether he can access (or)not.

Usability testing:- It is type of testing in which one will check the user friendly of the
application.

Reliability testing (or) Socking testing:- It is type of testing in which one will use the
application continues for long period of time in order to set the stability of the application.

Mutation testing:- It is type of testing in which one will perform testing on the application
or its related factors after doing some changes to them.

Adhoc testing:-It is a type of testing in which one will perform testing on the application in
the there own style after understanding requirement very clearly.

Us ally this type of testing will be encouraged after formal testing.

SOFTWARE TESTING LIFY CYCLE (STLC):- STLC contain 6 phase

i) TEST PLANNING

ii) TEST DEVELEPOMENT

iii) TEST EXECUTION


23
iv) RESULT ANALYSIS

v) BUG TRACKING

vi) REPORT

Test planning:- Test plan is strategic document which contains some information that
describes how to perform testing on that application in a effective ,efficient and optimized
way.

• Plan:- Plan is a strategic document which contain some information that describe how
to perform task in a effective, efficient and optimization.

• Optimization:- Optimization is a process are utilizing the available resources to their


level best and getting the maximum possible out put.

Index of test plan (or) Contents of test plan:-

1.0) Introduction

1.1) objective

1.2) reference document

2.0) Coverage testing

2.1) features be testing

2.2) features not be testing

3.0) Test strategic

3.1) levels of testing

3.2) type of testing

3.3) test design techniques

3.4) configuration management

3.5) test metrics

3.6) terminology

3.7) automation plan

3.8) list of automated tools

4.0) Base criteria

4.1) acceptance criteria

24
4.2) suspension criteria

5.0) Test deliverables

6.0) Test environment

7.0) Resources planning

8.0) Scheduling

9.0) Staffing and training

10.0) Risk and consistencies

11.0) Assumption

12.0) Approval information

1.0) INTRODUCTION:-

• Objective: - Purpose of the document will be clearly described here in this


section.

• Reference document:- The list of the document that are referred will
preparing this documents will be listed out here in this section

EX: - SRS, Project plan

2.0) COVERAGE TESTING:-

• Features are tested: - The list of all the features with in the scope which are
to be tested will be listed out here in this section.

• Features not be tested:- The list of all the features that are not planed for
testing will be listed out here in this section.

EX:- i) Out of scope features

ii) Low risk features

iii) Features that are planed to be incorporated in feature

iv) Features that are skipped based on the time constrains.

3.0) TEST STRATEGE:- (defines)

Test strategic is an organization level term which is common for all the
project in that organization.

• Test Plan:- Test plan is a project level term which is specific for that project only.
25
• Level of testing: - the list of all the levels of testing that are maintained in the
company will be listed out here in this section.

• Type of testing: - The list of all the type of testing that all perform in that company
will be listed out here in this section.

• Test design techniques: - The list of all the techniques that used in that company
while designing test cases will be listed out here in this section.

EX: - BVA, ECP

• Configuration management:-

• Test Metrics: - The list of all the metrics that are maintained on the company doing
the test process will be listed out here in this section.

Ex: - Defect Metric

Test case Metric

• Terminology: - The list of all the terms used in that company along with their
meaning will be listed out here in this section.

• Automation plan: - The list of all the areas that are planned for automation in that
company will be listed out here in this section.

• List of automated tools: - The list of all the automated tools that are used in that
company will be listed out here in this section.

4.0) Base criteria:-

• Acceptance criteria: - When to stop testing will be clearly described in this section.

• Suspense criteria: - When to suspense testing will be clearly described here in this
section.

5.0) Test deliverables: - The list of all the document that are to be developed of delivery
doing testing process testing process will be mentioned here on this section.

26
6.0) Test environment:-The details of environment that is about to be used for testing will be
clearly mentioned here in this section.

7.0) Resource planning:- Who has to do what will be clearly described here in this section.

8.0) Scheduling (or) Time planning:- The starting dates and ending dates of each and ever
task will be clearly planed and mention in this section.

9.0)Staffing and training:- To accomplish that project sues fully if at all any staff
requirement and if at all any training requirement then that detailed will be clearly mention
here in this section.

10.0) Risk and Continence:- This list of all the potential risk and continence solution plan
will be clearly mentioned here in this section.

Ex:- Employee may leave the company the middle of the project?

Ans. Employee need to mint on benched.

Unable to de clearly project with in the deadline project?

Ans. Proper plan insurance.

Costumer may impose the deadline?

Ans. What not be tested should planned.

Unable to test all the feature with in the given time?

Ans. Priority based the execution.

11.0) Assumptions: - The listed of all the think that are be assumed by the test engineer will
be clearly mentioned here in this section.

12.0) Approached information:- Who has approval this document when it is approval will
be clearly described in this section.

ii)Test development phase:-

Requirement Documentation

HLI

LLI
L USE CASES
SCREEN
SHORT
27
Use cases:- Use case describes of the functionality of certain application terms of
action response.

Login
User Name

Password

Login Clear Cancel

i) Functional requirement

ii) Special requirement

Functional requirement:-

 Login screen should contain user name, password connect to fields login, clear, cancel
button.

 Connect fields is not mandatory but it should be allow user to select the data base option
when ever require.

 Upon entering valid user name, password and clicking on login button corresponding
page must be displayed.

 Upon entering in to any of the fields and clicking on clearly button all the fields must be
cleared and courser should he display in the user name.

 Upon clicking on cancel button login screen must be closed.

Special requirement:-

 Initial when ever the login page invoked login and when ever and clear button is
disabled.

 Cancel button must be all ways enable.

 Upon entering some information in to and of the fields clear button must be enabling.

 Upon entering some information in to both user name and password field’s login
button must be enabling.

28
 Tabbing order must be user name, password, connect to, login, clearer, cancel.

Use case template:-

i) Name of the use case

ii) Brief description of the use case

iii) Action in valued

iv) Special requirement

v) Pre condition

vi) post condition

Vii)Flow condition

Use Case Document:-

Name of the use case:-

i) Name of the use case: Login use case

ii) Brief description the use case: This use case describes the functionality of all the
features present in the login screen.

iii) Actors involved: Normal user and Add mine user.

iv) Special requirement: two types

 Explicitly requirement

 Implicitly requirement

• Explicitly requirement:- The requirement the explicitly given by the customer are know
as explicitly requirement.

• Implicitly requirement: The requirement that are analyzed by the business analyst which
will add some value to the application with out disturbing any of the original customer
requirements.

Explicitly requirement:-

 Install when ever the login page invoked login and clear button is disables.

 Cancel button must be any way enable.

 Open entering some information into any the field’s clear button must be enabling.

 Upon entering some information into both user name and password field’s login button
must be enable.

 Tabbing order must be user name password connect to login clear cancel.

29
Implicitly requirement:-

 Open entering invalid user name valid password and click on login button the following
error message must be displayed. “Invalid user name please try again”.

 Upon entering valid user name in valid password and click on login button following error
message must be displayed. ”invalid password please try again”

 Upon entering invalid user name invalid password and click on login button following error
message must be displayed. ”invalid user name and password please try again”

 Initial when ever the login screen is invoked the curser must be display on the user name
fields.

• Precondition:- login screen must available.

• Post condition:- Either home page (or) add mine and error message for invalid user.

Flow of events:- Two types

i) Main flow

ii) Alternative flow

Main flow:-

Action

 Actors invoke the application.

 Actors entrees valid user name valid password and click on login button.

 Actors entrees valid user name valid password select a data base also and click on login
button.

 Actors entrees invalid user name valid password and click on login button.

 Actors entrees invalid password valid user name and click on login button.

 Actors entrees invalid user name invalid password and click on login button.

 Actors entrees some information into any of the field and click on clear button.

 Actors click on cancel button.

30
Response

 Application display the login screen with the following fields user name, password, connect
to, login, clear, cancel.

 Authentication, application display either home page (or)admin page depending upon the
actor entered.

 Authentication, application display either home page (or)admin page depending upon the
actor entered with the mentioned data base connections .

 Go to Alternative flow Table 1 (Invalid user name)

 Go to Alternative flow Table 2 (invalid password)

 Go to Alternative flow Table 3 (invalid user name and password).

 Go to Alternative flow Table 4 (clear click).

 Go to Alternative flow Table 5 (cancel click).

31
Alternative flow Table 1:-

Action

 Actors enters invalid user name valid password and click on login button.

Alternative flow Table 2:-

 Actors enters in valid password valid user name and click on login button.

Alternative flow Table 3:-

 Actors enters invalid user name invalid password and click on login button.

Alternative flow Table 4:-

 Actors enter some information into any of the fields and click on clear button.

Alternative flow Table 1:-

 Actors click on the cancel button.

32
Response

 Authentication, Application displace, the following error message invalid user name please
try again.

 Authentication, Application displace, the following error message invalid password please try
again.

 Authentication, Application displace, the following error message invalid user name and
invalid password please try again.

 Application clears all the fields’ login screen and displaces the cursor in the user name fields.

 Application clicks the login screen.

Guide line to be followed by test engineers soon after the receive the document :-

 Identify the module to which the use case belong to?

Ans: Security module

 Identify the functionality of the use case with respect total functionality ?

Ans : Authentication .

 Identify the functionality point and prepare the functionality point document?

Ans: Where ever user perform some actions on the application that is called functional point.

 Identify the input requirement to perform testing ?

Ans: Valid and invalid user name and password .

 Identify the actors invalid ?

Ans: Normal user and admin user.

 Identify the weather the use case linked with any other use case ?

Ans: Home pager and admin page use case.


33
 Identify the precondition?

Ans: Login screen must be available

 Identify the post condition ?

Ans: Either home page and admin user and error.

 Understand main flow of the application ?

 Understand the alternative of the application?

 Understand the special requirement ?

 Document the test cases for the main flow ?

 Document the test cases for the alternative ?

 Document the test cases of special requirement?

 Prepare the traceability matrix (or) curser reference matrix?

• Functional point :- The point where the user can perform some action in the application is
know as functional point.

Testing process related document:-

UCD FPD TSD DTCD DTD

Use Case Functional Test Detail Test Defect Point


Document Point Scenario Case Document
Document Document Document

Traceability matrix :-It is a document which contains table of linking information used for
traceability back for the reference in any kind of confusion (or)questionable situation.

EX1:- (CTM) Complete Traceability Matrix.

UCID TPID TSID TCID DID

3 4 8 10 2

6 99 86 36 3

20 30 45 55 4

34
EX2:- RTM ( Requirement Traceability Matrix).

TCID REQUIREMENT ID

1 1.0

2 1.0

3 2.0

4 2.0

5 3.0

EX3:-DTM(Defect Traceability matrix).

DTD TCID

1 2.3

2 4.6

3 7.5

5 8.5

Type of test case:- Test case are broadly divided in 3 types.

i) GUI test case

ii) Functional test case (two types)

a) +Ve test case

b) –Ve test case

iii) Non-Functional test cases

Guide line for the writing GUI test case:-

Any idea a test engineer with which he feels that we can test something with out doing any
action will follow under GUI test case.

EX:-
35
 Check for the available of all the object .

 Check for the consistence for the object.

 Check for the allayment of the object

 If at all the customer requirement are given.

 Check for the spelling and grammar.

Guide line for the writing the +Ve test case:-

 Test engineer should have +Ve mind set.

 He should consider the +Ve flow of the application

 He must use only the valid input from the point of the functionality.

36
Requi Test Cat Prere Description\ Expected value Test data Actual value
r ego Test steps Resul Buil
case ry quisit t d No
ement Id e

C00 • Invo
1 ke • Login • Login screen is Pass
-NA- the screen display.
+V appli should
e catio be
n. display

LOT • All the objects


available as per
the LOT Pass
• Chec • All the
k for object
the must be
C00 avail available
2 -NA- login
abilit
y of screen as
GU all for the • All the object
I the LOT. are consisted
objec with each other
tive
in
login Pass
scree
n as • All the spelling
for • All the are correct.
the Objects
LOT must be
. consiste • Initially the
C00 -NA-
nt with cursor position
• Chec
3 each in the connect to
k for
other. fields.
the Pass
GU • Login, clear,
cano
I nistic cancel button
of all are to enable.
the
-NA- • All the
objec
spelling
C00 t in Fail
must be
the
4 correct.
login
GU scree
n.
I • Initially
• Chec • Clear button is
the
k for enable.
-NA- cursor
the
must Fail
spelli
position
C00 ng in
in the
5 the
user
login
name. 37
GU scree
• Initially
I n.
login,
-NA- • Chec
clearly
k for
button
the
must be
LOT(Login Object Table):-

S.No Object Name Object Type

1 User name Text box

2 Password Text box

3 Connect to Combo box

4 Login Button

5 Clear Button

6 Cancel Button

VIT (Valid Input Table )

S.No User Name Password Excepted Actual Value Result


Value

Admin page
1 Suresh QTP Admin page Pass
Home page
2 Nag Amal Nag home Pass
page

Home page Chiru home


3 Chiru Sridevi page Pass

Ntr home Pass


Home page page
4 Ntr Balakrishna

Venky home Pass


page
Home page
5 Venky Illu

Pass
Admin page
Admin page
6 Admin Admin

38
IVIT(Invalid Input Table)

S.No User Name Password Expected Actual Value Result


Page

Invalid user
1 Sure Qtp name plz tray Admin page Fail
again

Invalid user
2 Chirutha Sridevi Plz entry pass
name plz tray valid user
again name
3 Ntr Balakr Invalid pass
Plz entry
password plz valid
tray again Password
4 Nag Tab Invalid
password plz
Pass
tray again Plz entry
valid
Invalid Password
5 Jvreddy JVR password plz Fail
tray again

Plz entry
valid User
Invalid user name
6 Upendra Anu name and Fail
password plz
tray again
Invalid
password plz
tray again

Guide line for the writing the –Ve test case :-

 Test engineer should have –Ve mind set.

 He should consider the –Ve flow of the application

 He must at list one invalid input in each set of data.

Test execution phase:- In this phase test engineer will do the following.

 He will perform the action as it is described in the description Colum.

 He will observer the actual behavior of the application.

39
 He will document observer value under the actual value Colum.

Result analysis :- In this phase test engineer will compare the expected value with actual values and
if both are matching they will decide result as pass other wise fail.

If at all the test if not executed then they will decide the result as blocked.

Bug tracking:- Bug tracking is processes which defect are isolate, identify, and managed.

Def Te Issue Reprod B D Bu Vers Defe Defe Defect F Fi Fi Dat


ect st descript ucible y at ild ion ct ct ix x x a
ca ion e Resol da bu
se Seve Prio ution B te ild Clo
ID rity rity y ser

Initially
the
C0 cursor is
1 J 1 2.3.6
05 position v
ed in the Not r
connect applicab
to filed . le

Initially
login
and
clear 1 2.3.6
Not
button
applicab
2 are J
C0 le.
enable v
06
instead r
of begin
display.

Upon
clicking
>Enter
on clear
some
button
informat
40
all the ion any
field are of
3 C0 clear but fields. 1 2.3.6
11 the
cursor is >click
nit on clear
position button.
in the J
>observ
user v
e that all
name r
the
filed. fields
are
cleared
but the
cursor is
not
display
in the
user
name.

Upon 1 2.3.6
entering
user
>Enter
name,
4 user
passwor
name
d as per
DVIT.
C0 DIVT
14 and >Enter J
clicking the v
on login passwor r
button d DVIT.
correspo
nding >Click
error on login
message button
are not
display >observ
as per e that
the correspo
DIVT. nding
error
message
is not
41
display
the
5 Upon DVIT.
entering
some 1
informat
C0 2.3.6
ion
15
>Enter
some
only
into user
name
filed
only
J
into the
v
passwor
Only r
d filed.
6 into 1 2.3.6
user
name
field
(or) >
C0
only observe
16
into that
passwor login
d filed button is
login enable
button instead
is of being
enabled display. J
misted v
of r
display.

42
DIVIT(Defect Invalid Input Table)

S.No User Name Password Expect Actual Value

1 Suresh QTP Plz enter valid Plz enter valid


user name user name

Plz enter valid Plz enter valid


2 Uma Jvr user name user name
&password

Plz enter valid


3 Uprndra Anu Plz enter valid
user name
&password user name

• Defect ID:- The sequence of the defect no will be mentioned her in this section.

• Test case ID:- The test case id based on the which defect is found will be mentioned her in
this section.

• Issue Description:- What exactly the defect is will be clearly described here in this section.

• Reproducible stops:- The list of all the step which are followed by the test engineer in
order to identify the feature will be mention here in this section.

• Defection By:- The name of test engineer who has the defect are defect in this section.

• Defection Date:- The date are on which will be mention her in this section.

• Defection Build:- The build number in which the defect will be mention in this section.

Defection Version:- The version number in which the defect is found will be mention in this section.

• Severity:- Severity describes the severity of the defect severity is classified in to 4 types.

• Fatal (or) s1 (or) sev1 (or) 1.

• Major (or) s2 (or) sev2 (or) 2.

• Minor (or) s2 (or) sev3 (or) 3.

• Suggestion (or) s4(or)sev4 (or)4.

Fatal:- It at all the related to the navigational block on available by of main functionality then such
type of problems are treated as fatal defects.

EX:-
Page Page Page Page Not
openi
1 2 3 4 ng
43
Val1

Val2

ResultAdd

Major defect:- If at all the problem are related to the working the major functionality them such type
of problem are treated a major defect.

EX:-

10
Val 1
20
Val 2

Result -10

add

Minor Defect :-If at all the problem some related to the and feel of the application then such type of
problem are treated as minor defect.

Ex:-

Val 1

Val 2

Result

BAD

Suggestion :- If at all the problem are related to the value of the application then such type of
problems are treated as suggestion.

Ex:- +Ve
$

44
Invalid entry please tray again

Invalid entry please enter +Ve integer


Not user friendly message

User friendly

message

Priority :- Priority describes the sequence in which defect need to be rectify.

Priority is classified in to 4 types.

i) Critical (or) pri 1(or) p1

ii) High (or) pri 2(or) p2

iii) Medium (or)pri 3(or)p3

iv) Low (or) pri 4(or) p4

 Generally the fatal defect will be given critical priority, major defect will be given, high
priority, minor defect will be given medium priority, but dependence on the situation priority
will be changed.

Low severity high priority case:-

When ever there is a customer visit all the look and feel defects will be given highest priority
even though they are less serious.

High severity low priority case:-

When ever some part of model if development, reminding part is testing


department, the test engineer will raise that part is fatal issue but the development will given
low priority given it.

Hold
Bug life cycle:- Require
Rejected
ment
No
As per design

Is it
IsDeveloper
defect
45 really a Open
really
defect
rectificati
on If
Application
Testing
defect Stop the testing Rectification
New
No Yes Closed Fixed
Yes

Build 1 Build 2

Yes No

Re opened

• New:- When ever the defect is newly identified by the test engineer then the status is new.

• Open:- When ever the developer the accepts then

• Deferred:- When ever the developer the accepts the defect but wants some time for rectifying
the defect the will set the status is deferred.

• Fixed:- When ever the defect is rectified the developer will set the status as fixed.

• Reopened and Close:- Once the next build released the test engineer will check whether
defect is relay rectified (or)not if at all they feel relay rectified then they will set the status as
closed other wise reopened.

• Hold:- When ever the developer is configured to accept or reject the defect they will set the
status is hold.

When ever the defect is hold status as they will be a meeting on that defect (Triage
meeting) and if at all consoled as a defect the developer will open it other wise the tester will closed
it.

• Rejected:-When ever the developer is conformed it is not a defect there he will status is
rejected.

46
When ever the defect is rejected status the test engineer will once again check if at all he
also feels it is a not a defect then he will set the status as closed other he will reopened.

• As per design:- (it is a rare case only)

When ever the developer feels the tester has raised the defect with out having
knowledge of latest requirement then he will check the status as As per design.

When ever the defect in as per design status the test engineer will go to the new
requirement if at all he also feel it is as per design only then he will set the status is closed
other wise reopened.

Reporting phase:-

Classical Bug reporting process :-

Test lead Develop lead

Tester Developers

Draw Back:-

 Redundancy

 Time consuming

 No transparency

 No security

Common repository oriented bug repotting process:-

Test lead Common repository Develop lead

47
Bug tracking tool oriented Bug Reporting process :-

Common repository

BTT

Bug tracking tools :- Bug tracking tool is soft ware application which can be accessed only by the
etherized people which provides all the facility for bug tracking tools.

EX:- Bug zilla, issues tracking

Test closer Activity :- This a finely activity done in the process the test summary report which
contain some following information .

No.of cycles execution.

Devotion in of each cycle.

No.of test case are execution in which cycle.

No.of test case are passed are failed .

No.of defect are found in each cycle and extra.

Way of testing:- there or two type.

i) Manual testing.

48
ii) Automation testing.

Manual testing:- Manual testing is a process in which all the phase of software testing life cycle like
test planning, test development, test execution, result analysis, bug tracking and report or accomplish
successful manually with human efforts.

Draw back of manual testing:-

• Time consuming.

• Less accuracy.

• Tiredness.

• Simulations action are all most impossible .

• Con’t repeat the same task again and again with some interest.

• More no.of human resources are required.

49

Vous aimerez peut-être aussi