LAMPIRAN 4

3/6

PRICE SCHEDULE
OUTSIDE PLANT (OSP) BACKBONE JAWA
SECTION: CIKAMPEK ‐ SEMARANG

NO. DESCRIPTION  QTY  UNIT  UNIT PRICE (IDR)   AMOUNT (IDR) 

A. MATERIAL
Fiber Optic Cable, Single Mode G.652D, Duct 
A.1 m
Application, 96 cores
HDPE pipe having 40 mm outside diameter and 3.5 mm 
A.2 m                                  ‐
thickness (40/33 mm)
Universal (straight/branch) 4‐holes joint closure for 
A.3 pcs                                  ‐
single mode fiber optic cable, 96 cores
Optical Termination Box, ETSI 19" rack mounted type,
A.4 fully equiped with 2 m pigtails using FC/PC adaptor, 96 pcs                                  ‐
cores
A.5 Ball Marker pcs                                  ‐
A.6 Open rack 19" for OTB placement pcs                                  ‐
A.7 Warning tape, metalized 15 cm wide m                                  ‐
SUBTOTAL MATERIAL (A)                                  ‐
B. CIVIL WORKS & INSTALLATION
Construction of handhole, concrete K225/ 20cm 
B.1 thickness  ‐ LxWxH: 110 x 120 x 150 cm with complete  unit                                  ‐
accessories
Excavation, trenching, & backfilling for duct placement, 
B.2 m                                  ‐
120 cm depth in, on ALL CONDITIONS
Installation of HDPE pipe having 40 cm outside diameter 
& 3.5 mm thickness for fiber optic cable with sand 
B.3 m                                  ‐
surround and warning tape, applicable for normal depth 
of trench
B.4 Reinstatement on ALL CONDITIONS m                                  ‐
Machine boring using HDPE pipe having 125 mm OD & 
B.5 m                                  ‐
7.4 mm thickness
Manual boring using PVC pipe having 4" or 5" inside 
B.6 m                                  ‐
diameter & 5.5 mm thickness
Railway crossing by machine boring using HDPE pipe 
B.7 m                                  ‐
having 125 mm OD & 7.4 mm thickness 
River crossing by new steel duct bridge using self 
B.8 m                                  ‐
supporting or steel wire
Duct Slump using PVC pipe having 4" inside diameter & 
B.9 m                                  ‐
5.5 mm thickness
B.10 Installation of fiber optic cable m                                  ‐
B.11 Jointing of fiber optic cable, 96 cores pcs                                  ‐
Testing & Commissioning of Fiber Optik Link (from OTB 
B.12 link                                  ‐
to OTB), 
SUBTOTAL CIVIL WORKS & INSTALLATION (B)                                  ‐
C DESIGN & PROJECT MANAGEMENT
C.1 Site Survey & Design lot                                  ‐
Project Management, including: warehouse, transport, 
C.2 lot                                  ‐
supervision, acceptance test, etc.
C.3 As‐Built drawing set                                  ‐
SUBTOTAL DESIGN & PROJECT MANAGEMENT (C )                                  ‐

GRAND TOTAL (A+B+C)                                  ‐

COMPANY NAME:

SIGNATURE:
LAMPIRAN 4
4/6

PRICE SCHEDULE
OUTSIDE PLANT (OSP) BACKBONE JAWA
SECTION: SEMARANG ‐ SOLO

NO. DESCRIPTION  QTY  UNIT  UNIT PRICE (IDR)   AMOUNT (IDR) 

A. MATERIAL
Fiber Optic Cable, Single Mode G.652D, Duct 
A.1 m
Application, 96 cores
HDPE pipe having 40 mm outside diameter and 3.5 mm 
A.2 m                                 ‐
thickness (40/33 mm)
Universal (straight/branch) 4‐holes joint closure for 
A.3 pcs                                 ‐
single mode fiber optic cable, 96 cores
Optical Termination Box, ETSI 19" rack mounted type,
A.4 fully equiped with 2 m pigtails using FC/PC adaptor, 96 pcs                                 ‐
cores
A.5 Ball Marker pcs                                 ‐
A.6 Open rack 19" for OTB placement pcs                                 ‐
A.7 Warning tape, metalized 15 cm wide m                                 ‐
SUBTOTAL MATERIAL (A)                                 ‐
B. CIVIL WORKS & INSTALLATION
Construction of handhole, concrete K225/ 20cm 
B.1 thickness  ‐ LxWxH: 110 x 120 x 150 cm with complete  unit                                 ‐
accessories
Excavation, trenching, & backfilling for duct placement, 
B.2 m                                 ‐
120 cm depth in, on ALL CONDITIONS
Installation of HDPE pipe having 40 cm outside 
diameter & 3.5 mm thickness for fiber optic cable with 
B.3 m                                 ‐
sand surround and warning tape, applicable for normal 
depth of trench
B.4 Reinstatement on ALL CONDITIONS m                                 ‐
Machine boring using HDPE pipe having 125 mm OD & 
B.5 m                                 ‐
7.4 mm thickness
Manual boring using PVC pipe having 4" or 5" inside 
B.6 m                                 ‐
diameter & 5.5 mm thickness
Railway crossing by machine boring using HDPE pipe 
B.7 m                                 ‐
having 125 mm OD & 7.4 mm thickness 
River crossing by new steel duct bridge using self 
B.8 m                                 ‐
supporting or steel wire
Duct Slump using PVC pipe having 4" inside diameter & 
B.9 m                                 ‐
5.5 mm thickness
B.10 Installation of fiber optic cable m                                 ‐
B.11 Jointing of fiber optic cable, 96 cores pcs                                 ‐
Testing & Commissioning of Fiber Optik Link (from OTB 
B.12 link                                 ‐
to OTB), 
SUBTOTAL CIVIL WORKS & INSTALLATION (B)                                 ‐
C DESIGN & PROJECT MANAGEMENT
C.1 Site Survey & Design lot                                 ‐
Project Management, including: warehouse, transport, 
C.2 lot                                 ‐
supervision, acceptance test, etc.
C.3 As‐Built drawing set                                 ‐
SUBTOTAL DESIGN & PROJECT MANAGEMENT (C )                                 ‐

GRAND TOTAL (A+B+C)                                 ‐

COMPANY NAME:

SIGNATURE: