Vous êtes sur la page 1sur 60

--------------------------------------------------------------------------------

CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 1
--------------------------------------------------------------------------------

* ******* ** ******* *******


*** ** ** ** ** ** ** **
** ** ****** ** ** ** ** ** **
** ** ** ** ** ***** ******* ** ******* *****
********* ** ** ** ** ** ** ** ** **
** ** ** ** ** ** ** ** ** ** **
** ** ***** ** ***** ** ** ** *******

Pipe Stress Analysis and Design Program

Version: 08.05.01.11

Edition: Plus-Win

Developed and Maintained by

BENTLEY SYSTEMS, INCORPORATED


1600 Riviera Ave., Suite 300
Walnut Creek, CA 94596
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 2
--------------------------------------------------------------------------------

************************************************************
** **
** AUTOPIPE SYSTEM INFORMATION **
** **
************************************************************

SYSTEM NAME : CQT3

PROJECT ID : LINHA DE VAPOR DE 21 BAR TURBOBOMBA


PROCKNOR - ETH - CONQUISTA DO PONTAL

DESCRIPTION :

PREPARED BY : ______________________________
ENG.HGS

CHECKED BY : ______________________________
ENG.HUGO

PIPING CODE : B31.3

VERTICAL AXIS : Y

AMBIENT TEMPERATURE : 70.0 deg F

COMPONENT LIBRARY : AUTOPIPE

MATERIAL LIBRARY : AUTOB313

MODEL REVISION NUMBER : 0


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 3
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

-------------------------------------------------------------------------------
*** SEGMENT A

-------------------------------------------------------------------------------
From A00 to A01, DX= 1.64 ft Run

PIPE DATA:
Pipe Id= 10SCH40, Material= A106-B, Poisson= 0.300, Nom Size= 10 in,
OD= 10.750 inch, Sch= 40, Wall Thk= 0.365 inch, Mill= 0.046 inch,
Cor= 0.060 inch, Pipe Density= 489.00 lb/cu.ft,
Pipe Unit Wgt= 40.44 lb/ft, Insul Thk= 4.000 inch,
Insul Material= MINERAL WOOL, Insul Density= 8.50 lb/cu.ft,
Insul Unit Wgt= 10.94 lb/ft, Lining Thk= 0 inch, Long Weld factor= 1.00,
Circ Weld factor= 1.00, Long Modulus= 29.50000 E6 psi,
Hoop Modulus= 29.50000 E6 psi, Shear Modulus= 11.34615 E6 psi,
Sc= 20000.0 psi, Syc= 35000.0 psi

OPERATING DATA:
P1= 300.00 psi, T1= 615.00 deg F, Exp1= 4.75600 in/100ft,
E1= 26.52000 E6 psi, Sh1= 17210.00 psi

POINT DATA:
A00, Coordinates, X= 0.00 ft, Y= 0.00 ft, Z= 0.00 ft
A00, Flange= BLIND, Rating= 300, Weight= 120.00 lb, End cond= NS joint,
SIF= 1.00, Perform ANSI check= No

-------------------------------------------------------------------------------
From A01 to A02, DX= 18.04 ft Tee

COMPONENT DATA (Tee Header, Center= A01):


B16.9 welding tee, SIFI= 2.11, SIFO= 2.49

POINT DATA:
A01, Coordinates, X= 1.64 ft, Y= 0.00 ft, Z= 0.00 ft

SUPPORT DATA:
A01, Incline, Support Id= A02 1, Connected to Ground, Dir= Global X,
Stiffness= RIGID, Gap-Minus= 0.00 inch, Gap-Plus= 0.00 inch,
Friction= 0.10, Gaps setting= Weightless
A01, V-Stop, Support Id= A02 2, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From A02 to A03, DX= 15.55 ft Run

POINT DATA:
A02, Coordinates, X= 19.69 ft, Y= 0.00 ft, Z= 0.00 ft

SUPPORT DATA:
A02, V-Stop, Support Id= A02 3, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 4
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

From A03 to A04, DY= -6.56 ft Bend

COMPONENT DATA (Bend, TIP= A03, Near= A03 N, Far= A03 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
A03, Coordinates, X= 35.24 ft, Y= 0.00 ft, Z= 0.00 ft
A03 N, Coordinates, X= 33.99 ft, Y= 0.00 ft, Z= 0.00 ft
A03 F, Coordinates, X= 35.24 ft, Y= -1.25 ft, Z= 0.00 ft

-------------------------------------------------------------------------------
From A04 to A05, DX= 2.51 ft Bend

COMPONENT DATA (Bend, TIP= A04, Near= A04 N, Far= A04 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
A04, Coordinates, X= 35.24 ft, Y= -6.56 ft, Z= 0.00 ft
A04 N, Coordinates, X= 35.24 ft, Y= -5.31 ft, Z= 0.00 ft
A04 F, Coordinates, X= 36.49 ft, Y= -6.56 ft, Z= 0.00 ft

-------------------------------------------------------------------------------
From A05 to A06, DX= 9.84 ft Run

POINT DATA:
A05, Coordinates, X= 37.75 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A05, V-Stop, Support Id= A05 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From A06 to A07, DX= 19.03 ft Run

POINT DATA:
A06, Coordinates, X= 47.59 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A06, V-Stop, Support Id= A06 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From A07 to A08, DX= 9.84 ft Run

POINT DATA:
A07, Coordinates, X= 66.62 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A07, V-Stop, Support Id= A07 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 5
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

-------------------------------------------------------------------------------
From A08 to A09, DX= 12.93 ft Run

POINT DATA:
A08, Coordinates, X= 76.46 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A08, V-Stop, Support Id= A08 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From A09 to A10, DX= 12.93 ft Run

POINT DATA:
A09, Coordinates, X= 89.39 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A09, V-Stop, Support Id= A09 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From A10 to A11, DX= 12.93 ft Run

POINT DATA:
A10, Coordinates, X= 102.31 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A10, V-Stop, Support Id= A10 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From A11 to A12, DX= 12.93 ft Run

POINT DATA:
A11, Coordinates, X= 115.24 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A11, V-Stop, Support Id= A11 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From A12 to A13, DX= 3.08 ft Run

POINT DATA:
A12, Coordinates, X= 128.17 ft, Y= -6.56 ft, Z= 0.00 ft

SUPPORT DATA:
A12, V-Stop, Support Id= A12 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 6
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

-------------------------------------------------------------------------------
From A13 to A14, DY= 3.28 ft Bend

COMPONENT DATA (Bend, TIP= A13, Near= A13 N, Far= A13 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
A13, Coordinates, X= 131.25 ft, Y= -6.56 ft, Z= 0.00 ft
A13 N, Coordinates, X= 130.00 ft, Y= -6.56 ft, Z= 0.00 ft
A13 F, Coordinates, X= 131.25 ft, Y= -5.31 ft, Z= 0.00 ft

-------------------------------------------------------------------------------
From A14 to A15, DZ= 9.51 ft Bend

COMPONENT DATA (Bend, TIP= A14, Near= A14 N, Far= A14 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
A14, Coordinates, X= 131.25 ft, Y= -3.28 ft, Z= 0.00 ft
A14 N, Coordinates, X= 131.25 ft, Y= -4.53 ft, Z= 0.00 ft
A14 F, Coordinates, X= 131.25 ft, Y= -3.28 ft, Z= 1.25 ft

-------------------------------------------------------------------------------
From A15 to A16, DY= -10.50 ft Bend

COMPONENT DATA (Bend, TIP= A15, Near= A15 N, Far= A15 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
A15, Coordinates, X= 131.25 ft, Y= -3.28 ft, Z= 9.51 ft
A15 N, Coordinates, X= 131.25 ft, Y= -3.28 ft, Z= 8.26 ft
A15 F, Coordinates, X= 131.25 ft, Y= -4.53 ft, Z= 9.51 ft

-------------------------------------------------------------------------------
From A16 to A17, DZ= 7.34 ft Bend

COMPONENT DATA (Bend, TIP= A16, Near= A16 N, Far= A16 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
A16, Coordinates, X= 131.25 ft, Y= -13.78 ft, Z= 9.51 ft
A16 N, Coordinates, X= 131.25 ft, Y= -12.53 ft, Z= 9.51 ft
A16 F, Coordinates, X= 131.25 ft, Y= -13.78 ft, Z= 10.76 ft

-------------------------------------------------------------------------------
From A17 to A18, DZ= 8.20 ft Run

POINT DATA:
A17, Coordinates, X= 131.25 ft, Y= -13.78 ft, Z= 16.85 ft

SUPPORT DATA:
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 7
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

A17, Guide, Support Id= A17 1, Connected to Ground, Stiffness= RIGID,


Gap-Down= 0.00 inch, Gap-Above= 100.00 inch, Gap-Left= 0.00 inch,
Gap-Right= 0.00 inch, Friction= 0.30, Gaps setting= Weightless

-------------------------------------------------------------------------------
From A18 to A19, DZ= 16.40 ft Tee

COMPONENT DATA (Tee Header, Center= A18):


B16.9 welding tee, SIFI= 2.11, SIFO= 2.49

POINT DATA:
A18, Coordinates, X= 131.25 ft, Y= -13.78 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From A19 to A20, DZ= 1.64 ft Run

POINT DATA:
A19, Coordinates, X= 131.25 ft, Y= -13.78 ft, Z= 41.46 ft
A20, Coordinates, X= 131.25 ft, Y= -13.78 ft, Z= 43.10 ft
A20, Flange= BLIND, Rating= 300, Weight= 120.00 lb, End cond= NS joint,
SIF= 1.00, Perform ANSI check= No

SUPPORT DATA:
A19, Guide, Support Id= A19 1, Connected to Ground, Stiffness= RIGID,
Gap-Down= 0.00 inch, Gap-Above= 100.00 inch, Gap-Left= 0.00 inch,
Gap-Right= 0.00 inch, Friction= 0.30, Gaps setting= Weightless

-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
*** SEGMENT B

-------------------------------------------------------------------------------
From A01 to B01, DY= 2.79 ft Tee

COMPONENT DATA (Tee Branch, Center= A01):


B16.9 welding tee, SIFI= 2.11, SIFO= 2.49

PIPE DATA:
Pipe Id= 10SCH40

POINT DATA:
A01, Coordinates, X= 1.64 ft, Y= 0.00 ft, Z= 0.00 ft

-------------------------------------------------------------------------------
From B01 to B13, DZ= -4.92 ft Bend

COMPONENT DATA (Bend, TIP= B01, Near= B01 N, Far= B01 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
B01, Coordinates, X= 1.64 ft, Y= 2.79 ft, Z= 0.00 ft
B01 N, Coordinates, X= 1.64 ft, Y= 1.54 ft, Z= 0.00 ft
B01 F, Coordinates, X= 1.64 ft, Y= 2.79 ft, Z= -1.25 ft
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 8
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

-------------------------------------------------------------------------------
From B13 to B02, DZ= -16.24 ft Run

POINT DATA:
B13, Coordinates, X= 1.64 ft, Y= 2.79 ft, Z= -4.92 ft

-------------------------------------------------------------------------------
From B02 to B03, DX= -14.80 ft Bend

COMPONENT DATA (Bend, TIP= B02, Near= B02 N, Far= B02 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
B02, Coordinates, X= 1.64 ft, Y= 2.79 ft, Z= -21.16 ft
B02 N, Coordinates, X= 1.64 ft, Y= 2.79 ft, Z= -19.91 ft
B02 F, Coordinates, X= 0.39 ft, Y= 2.79 ft, Z= -21.16 ft

SUPPORT DATA:
B02 F, V-Stop, Support Id= B02 F1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From B03 to B04, DX= 0 ft, DY= -17.19 ft, L= 17.19 ft Bend

COMPONENT DATA (Bend, TIP= B03, Near= B03 N, Far= B03 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
B03, Coordinates, X= -13.16 ft, Y= 2.79 ft, Z= -21.16 ft
B03 N, Coordinates, X= -11.91 ft, Y= 2.79 ft, Z= -21.16 ft
B03 F, Coordinates, X= -13.16 ft, Y= 1.54 ft, Z= -21.16 ft

-------------------------------------------------------------------------------
From B04 to B05, DZ= 4.45 ft Run

POINT DATA:
B04, Coordinates, X= -13.16 ft, Y= -14.40 ft, Z= -21.16 ft
B04, Added Weight= 600.00 lb

SUPPORT DATA:
B04, V-Stop, Support Id= B04 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.10,
Gaps setting= Weightless
B04, Incline, Support Id= B04 2, Connected to Ground, Dir= Global X,
Stiffness= RIGID, Gap-Minus= 0.00 inch, Gap-Plus= 0.00 inch,
Friction= 0.30, Gaps setting= Weightless

-------------------------------------------------------------------------------
From B05 to B14, DZ= 4.92 ft Run

POINT DATA:
B05, Coordinates, X= -13.16 ft, Y= -14.40 ft, Z= -16.72 ft
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 9
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

-------------------------------------------------------------------------------
From B14 to B06, DZ= 3.12 ft Run

POINT DATA:
B14, Coordinates, X= -13.16 ft, Y= -14.40 ft, Z= -11.79 ft

-------------------------------------------------------------------------------
From B06 to B07, DY= -2.79 ft Bend

COMPONENT DATA (Bend, TIP= B06, Near= B06 N, Far= B06 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
B06, Coordinates, X= -13.16 ft, Y= -14.40 ft, Z= -8.68 ft
B06 N, Coordinates, X= -13.16 ft, Y= -14.40 ft, Z= -9.93 ft
B06 F, Coordinates, X= -13.16 ft, Y= -15.65 ft, Z= -8.68 ft

-------------------------------------------------------------------------------
From B07 to B08, DY= -2.58 ft Valv

COMPONENT DATA (Valve):


GATE-F, Rating= 600, Length= 2.58 ft, Weight= 1550 lb,
Surface factor= 6.90, End cond= Weld neck, SIF= 1.00

POINT DATA:
B07, Coordinates, X= -13.16 ft, Y= -17.19 ft, Z= -8.68 ft
B07, Flange= SLIP-ON, Rating= 600, Weight= 165.00 lb, End cond= Slip-on,
SIF= 1.20, Perform ANSI check= No

-------------------------------------------------------------------------------
From B08 to B09, DY= -2.61 ft Valv

COMPONENT DATA (Valve):


GATE-F, Rating= 600, Length= 2.61 ft, Weight= 1550 lb,
Surface factor= 6.90, End cond= Weld neck, SIF= 1.00

POINT DATA:
B08, Coordinates, X= -13.16 ft, Y= -19.77 ft, Z= -8.68 ft
B08, Flange= SLIP-ON, Rating= 600, Weight= 165.00 lb, End cond= Slip-on,
SIF= 1.20, Perform ANSI check= No

-------------------------------------------------------------------------------
From B09 to B10, DY= -2.43 ft Run

POINT DATA:
B09, Coordinates, X= -13.16 ft, Y= -22.38 ft, Z= -8.68 ft
B09, Flange= SLIP-ON, Rating= 600, Weight= 165.00 lb, End cond= Slip-on,
SIF= 1.20, Perform ANSI check= No

-------------------------------------------------------------------------------
From B10 to B11, DX= 1.76 ft Bend

COMPONENT DATA (Bend, TIP= B10, Near= B10 N, Mid= B10 M, Far= B10 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg,
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 10
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

Mid point at 50.00 percent, End flanges= 0, Flex= 8.126, SIFI= 2.61,
SIFO= 2.17

POINT DATA:
B10, Coordinates, X= -13.16 ft, Y= -24.81 ft, Z= -8.68 ft
B10 N, Coordinates, X= -13.16 ft, Y= -23.56 ft, Z= -8.68 ft
B10 M, Coordinates, X= -12.79 ft, Y= -24.44 ft, Z= -8.68 ft
B10 F, Coordinates, X= -11.91 ft, Y= -24.81 ft, Z= -8.68 ft

SUPPORT DATA:
B10 M, Variable Spring Hanger, Support Id= B10 M1, Connected to Ground,
1 hanger(s), Stiffness= 3045 lb/in, Preload= 4748 lb

-------------------------------------------------------------------------------
From B11 to B12, DX= 0.91 ft Run

PIPE DATA:
Pipe Id= 5SCH40, Nom Size= 5 in, OD= 5.563 inch, Wall Thk= 0.258 inch,
Mill= 0.032 inch, Insul Density= 8.50 lb/cu.ft,
Insul Unit Wgt= 7.09 lb/ft

POINT DATA:
B11, Coordinates, X= -11.40 ft, Y= -24.81 ft, Z= -8.68 ft
B12, Coordinates, X= -10.50 ft, Y= -24.81 ft, Z= -8.68 ft
B12, Flange= SLIP-ON, Rating= 600, Weight= 58.00 lb, End cond= Slip-on,
SIF= 1.20, Perform ANSI check= No

SUPPORT DATA:
B12, Anchor, KTX= Rigid, KTY= Rigid, KTZ= Rigid, KRX= Rigid, KRY= Rigid,
KRZ= Rigid, Hanger design release= Y

-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
*** SEGMENT C

-------------------------------------------------------------------------------
From A18 to C01, DY= 3.28 ft Tee

COMPONENT DATA (Tee Branch, Center= A18):


B16.9 welding tee, SIFI= 2.11, SIFO= 2.49

PIPE DATA:
Pipe Id= 10SCH40, Nom Size= 10 in, OD= 10.750 inch, Wall Thk= 0.365 inch,
Mill= 0.046 inch, Insul Density= 8.50 lb/cu.ft,
Insul Unit Wgt= 10.94 lb/ft

POINT DATA:
A18, Coordinates, X= 131.25 ft, Y= -13.78 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From C01 to C02, DX= -1.64 ft Bend

COMPONENT DATA (Bend, TIP= C01, Near= C01 N, Far= C01 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 11
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

POINT DATA:
C01, Coordinates, X= 131.25 ft, Y= -10.50 ft, Z= 25.06 ft
C01 N, Coordinates, X= 131.25 ft, Y= -11.75 ft, Z= 25.06 ft
C01 F, Coordinates, X= 130.00 ft, Y= -10.50 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From C02 to C03, DX= -6.56 ft Run

POINT DATA:
C02, Coordinates, X= 129.61 ft, Y= -10.50 ft, Z= 25.06 ft

SUPPORT DATA:
C02, V-Stop, Support Id= C02 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From C03 to C04, DY= 15.95 ft Bend

COMPONENT DATA (Bend, TIP= C03, Near= C03 N, Far= C03 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
C03, Coordinates, X= 123.05 ft, Y= -10.50 ft, Z= 25.06 ft
C03 N, Coordinates, X= 124.30 ft, Y= -10.50 ft, Z= 25.06 ft
C03 F, Coordinates, X= 123.05 ft, Y= -9.25 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From C04 to C05, DY= 1.31 ft Run

PIPE DATA:
Pipe Id= 10SCH40S, Material= A335-P11, Long Modulus= 29.70000 E6 psi,
Hoop Modulus= 29.70000 E6 psi, Shear Modulus= 11.42308 E6 psi,
Syc= 30000.0 psi

OPERATING DATA:
E1= 26.81000 E6 psi, Sh1= 16550.00 psi

POINT DATA:
C04, Coordinates, X= 123.05 ft, Y= 5.45 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From C05 to C06, DX= 1.31 ft Bend

COMPONENT DATA (Bend, TIP= C05, Near= C05 N, Far= C05 F):
Long Elbow, Radius= 15.00 inch, Bend angle= 90.00 deg, End flanges= 0,
Flex= 8.126, SIFI= 2.61, SIFO= 2.17

POINT DATA:
C05, Coordinates, X= 123.05 ft, Y= 6.77 ft, Z= 25.06 ft
C05 N, Coordinates, X= 123.05 ft, Y= 5.52 ft, Z= 25.06 ft
C05 F, Coordinates, X= 124.30 ft, Y= 6.77 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 12
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

From C06 to C07, DX= 5.25 ft Run

OPERATING DATA:
T1= 896.00 deg F, Exp1= 7.76520 in/100ft, E1= 24.82880 E6 psi,
Sh1= 12936.00 psi

POINT DATA:
C06, Coordinates, X= 124.36 ft, Y= 6.77 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From C07 to C08, DX= 18.95 ft Run

POINT DATA:
C07, Coordinates, X= 129.61 ft, Y= 6.77 ft, Z= 25.06 ft

SUPPORT DATA:
C07, V-Stop, Support Id= C07 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From C08 to C09, DX= 4.68 ft Run

POINT DATA:
C08, Coordinates, X= 148.56 ft, Y= 6.77 ft, Z= 25.06 ft

SUPPORT DATA:
C08, V-Stop, Support Id= C08 1, Connected to Ground,
Gap-Below= 0.00 inch, Gap-Above= 100.00 inch, Friction= 0.30,
Gaps setting= Weightless

-------------------------------------------------------------------------------
From C09 to C10, DY= -6.76 ft Run

PIPE DATA:
Pipe Id= 6SCH160, Material= A335-P22, Nom Size= 6 in, OD= 6.625 inch,
Sch= 160, Wall Thk= 0.719 inch, Mill= 0.090 inch,
Insul Density= 8.50 lb/cu.ft, Insul Unit Wgt= 7.88 lb/ft,
Long Modulus= 30.60000 E6 psi, Hoop Modulus= 30.60000 E6 psi,
Shear Modulus= 11.76923 E6 psi

OPERATING DATA:
P1= 950.00 psi, T1= 970.00 deg F, Exp1= 8.56600 in/100ft,
E1= 24.90000 E6 psi, Sh1= 9600.00 psi

POINT DATA:
C09, Coordinates, X= 153.23 ft, Y= 6.77 ft, Z= 25.06 ft
C09, Added Weight= 800.00 lb

-------------------------------------------------------------------------------
From C10 to C11, DY= -2.31 ft Valv

COMPONENT DATA (Valve):


GATE-F, Rating= 1500, Length= 2.31 ft, Weight= 1400 lb,
Surface factor= 0.00, End cond= Weld neck, SIF= 1.00
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 13
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

POINT DATA:
C10, Coordinates, X= 153.23 ft, Y= 0.01 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From C11 to C12, DY= -3.08 ft Run

POINT DATA:
C11, Coordinates, X= 153.23 ft, Y= -2.30 ft, Z= 25.06 ft
C12, Coordinates, X= 153.23 ft, Y= -5.39 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
*** SEGMENT D

-------------------------------------------------------------------------------
From D00 to C12, DZ= 9.84 ft Run

PIPE DATA:
Pipe Id= 18SCH120, Nom Size= 18 in, OD= 18.000 inch, Sch= 120,
Wall Thk= 1.375 inch, Mill= 0.172 inch, Insul Thk= 8.000 inch,
Insul Density= 8.50 lb/cu.ft, Insul Unit Wgt= 38.57 lb/ft,
Sc= 15000.0 psi

OPERATING DATA:
Exp1= 8.67000 in/100ft, Sh1= 9680.00 psi

POINT DATA:
D00, Coordinates, X= 153.23 ft, Y= -5.39 ft, Z= 15.21 ft

SUPPORT DATA:
D00, Guide, Support Id= D00 3, Connected to Ground, Stiffness= RIGID,
Gap-Down= 0.00 inch, Gap-Above= 100.00 inch, Gap-Left= 0.00 inch,
Gap-Right= 0.00 inch, Friction= 0.30, Gaps setting= Weightless

-------------------------------------------------------------------------------
From C12 to D02, DZ= 4.92 ft Tee

COMPONENT DATA (Tee Header, Center= C12):


B16.9 welding tee, SIFI= 1.30, SIFO= 1.40

POINT DATA:
C12, Coordinates, X= 153.23 ft, Y= -5.39 ft, Z= 25.06 ft

-------------------------------------------------------------------------------
From D02 to D03, DZ= 9.84 ft Run

POINT DATA:
D02, Coordinates, X= 153.23 ft, Y= -5.39 ft, Z= 29.98 ft
D03, Coordinates, X= 153.23 ft, Y= -5.39 ft, Z= 39.82 ft

SUPPORT DATA:
D03, Anchor, KTX= Rigid, KTY= Rigid, KTZ= Rigid, KRX= Rigid, KRY= Rigid,
KRZ= Rigid

-------------------------------------------------------------------------------
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 14
--------------------------------------------------------------------------------

C O M P O N E N T D A T A L I S T I N G

Number of points in the system: 82

Weight of Empty Pipes + Weight of Contents = Total Weight of System


31096.4 lb + 0.0 lb = 31096.4 lb
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 15
--------------------------------------------------------------------------------

C O O R D I N A T E S D A T A L I S T I N G

POINT --------COORDINATE (ft )---------


NAME X Y Z
----- ----------- ----------- -----------
*** SEGMENT A
A00 0.00 0.00 0.00
A01 1.64 0.00 0.00
A02 19.69 0.00 0.00
A03 N 33.99 0.00 0.00
A03 35.24 0.00 0.00
A03 F 35.24 -1.25 0.00
A04 N 35.24 -5.31 0.00
A04 35.24 -6.56 0.00
A04 F 36.49 -6.56 0.00
A05 37.75 -6.56 0.00
A06 47.59 -6.56 0.00
A07 66.62 -6.56 0.00
A08 76.46 -6.56 0.00
A09 89.39 -6.56 0.00
A10 102.31 -6.56 0.00
A11 115.24 -6.56 0.00
A12 128.17 -6.56 0.00
A13 N 130.00 -6.56 0.00
A13 131.25 -6.56 0.00
A13 F 131.25 -5.31 0.00
A14 N 131.25 -4.53 0.00
A14 131.25 -3.28 0.00
A14 F 131.25 -3.28 1.25
A15 N 131.25 -3.28 8.26
A15 131.25 -3.28 9.51
A15 F 131.25 -4.53 9.51
A16 N 131.25 -12.53 9.51
A16 131.25 -13.78 9.51
A16 F 131.25 -13.78 10.76
A17 131.25 -13.78 16.85
A18 131.25 -13.78 25.06
A19 131.25 -13.78 41.46
A20 131.25 -13.78 43.10

*** SEGMENT B
A01 1.64 0.00 0.00
B01 N 1.64 1.54 0.00
B01 1.64 2.79 0.00
B01 F 1.64 2.79 -1.25
B13 1.64 2.79 -4.92
B02 N 1.64 2.79 -19.91
B02 1.64 2.79 -21.16
B02 F 0.39 2.79 -21.16
B03 N -11.91 2.79 -21.16
B03 -13.16 2.79 -21.16
B03 F -13.16 1.54 -21.16
B04 -13.16 -14.40 -21.16
B05 -13.16 -14.40 -16.72
B14 -13.16 -14.40 -11.79
B06 N -13.16 -14.40 -9.93
B06 -13.16 -14.40 -8.68
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 16
--------------------------------------------------------------------------------

C O O R D I N A T E S D A T A L I S T I N G

POINT --------COORDINATE (ft )---------


NAME X Y Z
----- ----------- ----------- -----------
B06 F -13.16 -15.65 -8.68
B07 -13.16 -17.19 -8.68
B08 -13.16 -19.77 -8.68
B09 -13.16 -22.38 -8.68
B10 N -13.16 -23.56 -8.68
B10 -13.16 -24.81 -8.68
B10 M -12.79 -24.44 -8.68
B10 F -11.91 -24.81 -8.68
B11 -11.40 -24.81 -8.68
B12 -10.50 -24.81 -8.68

*** SEGMENT C
A18 131.25 -13.78 25.06
C01 N 131.25 -11.75 25.06
C01 131.25 -10.50 25.06
C01 F 130.00 -10.50 25.06
C02 129.61 -10.50 25.06
C03 N 124.30 -10.50 25.06
C03 123.05 -10.50 25.06
C03 F 123.05 -9.25 25.06
C04 123.05 5.45 25.06
C05 N 123.05 5.52 25.06
C05 123.05 6.77 25.06
C05 F 124.30 6.77 25.06
C06 124.36 6.77 25.06
C07 129.61 6.77 25.06
C08 148.56 6.77 25.06
C09 153.23 6.77 25.06
C10 153.23 0.01 25.06
C11 153.23 -2.30 25.06
C12 153.23 -5.39 25.06

*** SEGMENT D
D00 153.23 -5.39 15.21
C12 153.23 -5.39 25.06
D02 153.23 -5.39 29.98
D03 153.23 -5.39 39.82
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 17
--------------------------------------------------------------------------------

P I P E D A T A L I S T I N G

Pipe ID/ Nom/ O.D. -----Thickness(inch)----- Spec Weight(lb/ft ) ZL/


Material Sch inch W.Th. Corr Mill Insu Ling Grav Pipe Other Total ZC
------------ ---- ----- ----- ---- ---- ---- ---- ---- ----- ----- ----- ----
10SCH40 10 10.750 0.365 0.06 0.05 4.00 0 0 40.44 10.94 51.38 1.00
A106-B 40 1.00

5SCH40 5 5.563 0.258 0.06 0.03 4.00 0 0 14.60 7.09 21.70 1.00
A106-B 40 1.00

10SCH40S 10 10.750 0.365 0.06 0.05 4.00 0 0 40.44 10.94 51.38 1.00
A335-P11 40 1.00

6SCH160 6 6.625 0.719 0.06 0.09 4.00 0 0 45.30 7.88 53.18 1.00
A335-P22 160 1.00

18SCH120 18 18.000 1.375 0.06 0.17 8.00 0 0 244 38.57 282 1.00
A335-P22 120 1.00
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 18
--------------------------------------------------------------------------------

M A T E R I A L D A T A L I S T I N G

Material Density Pois. Temper. Modulus E6 psi Expans.


Name Pipe ID lb/cu.ft Ratio deg F Axial Hoop Shear in/100ft
------------ -------- -------- ----- ------- -------- -------- -------- --------
A106-B 10SCH40 489.0 0.30 70.0 29.500 29.500 11.346
615.0 26.520 4.7560

A106-B 5SCH40 489.0 0.30 70.0 29.500 29.500 11.346


615.0 26.520 4.7560

A335-P11 10SCH40S 489.0 0.30 70.0 29.700 29.700 11.423


615.0 26.810 4.7560
896.0 24.829 7.7652

A335-P22 6SCH160 489.0 0.30 70.0 30.600 30.600 11.769


970.0 24.900 8.5660

A335-P22 18SCH120 489.0 0.30 70.0 30.600 30.600 11.769


970.0 24.900 8.6700
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 19
--------------------------------------------------------------------------------

M A T E R I A L A L L O W A B L E D A T A L I S T I N G

Material Temper. Allow. Yield


Name Pipe ID deg F psi psi
------------ -------- ------- -------- --------
A106-B 10SCH40 70.0 20000.0 35000.0
615.0 17210.0

A106-B 5SCH40 70.0 20000.0 35000.0


615.0 17210.0

A335-P11 10SCH40S 70.0 20000.0 30000.0


615.0 16550.0
896.0 12936.0

A335-P22 6SCH160 70.0 20000.0 30000.0


970.0 9600.0

A335-P22 18SCH120 70.0 15000.0 30000.0


970.0 9680.0
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 20
--------------------------------------------------------------------------------

TEMPERATURE AND PRESSURE DATA


STRESSES IN psi

POINT PRESS. TEMPER EXPAN. MODULUS ALLOW


NAME CASE psi deg F in/100ft E6 psi STRESS
---- ---- ------ ------ -------- ------- ------

*** SEGMENT A
A00 T1 300 615 4.756 26.520 17210
A20 Same as previous point.

*** SEGMENT B
A01 T1 300 615 4.756 26.520 17210
B12 Same as previous point.

*** SEGMENT C
A18 T1 300 615 4.756 26.520 17210
C04 T1 300 615 4.756 26.810 16550
C06 T1 300 896 7.765 24.829 12936
C09 T1 950 970 8.566 24.900 9600.0
C12 Same as previous point.

*** SEGMENT D
D00 T1 950 970 8.670 24.900 9680.0
D03 Same as previous point.

u User-defined value
* Non-code material for allowable stress;
Non-standard material for expansion and modulus
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 21
--------------------------------------------------------------------------------

THERMAL ANCHOR MOVEMENTS AND DISPLACEMENTS

POINT DX DY DZ RX RY RZ
NAME LOAD CASE (in ) (in ) (in ) (deg ) (deg ) (deg )
----- --------- -------- -------- -------- -------- -------- --------
D03 Thermal 1 0.00 0.00 0.83 0.000 0.000 0.000
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 22
--------------------------------------------------------------------------------

S U P P O R T D A T A L I S T I N G

Point Support Support Conn.to Stiff. Gap 1 Gap 2 Fric. GapSet Preload
Name Type ID /Dir (in) (in) Fact. /#hgr (lb)
----- -------- ------- ------- ---------- ------- ------- ----- ------ -------
A01 Incline A02 1 Ground Rigid 0.00 0.00 0.10
X-dir
A01 V-stop A02 2 Ground Rigid 0.00 100.00 0.30 Weightless
A02 V-stop A02 3 Ground Rigid 0.00 100.00 0.30 Weightless
A05 V-stop A05 1 Ground Rigid 0.00 100.00 0.30 Weightless
A06 V-stop A06 1 Ground Rigid 0.00 100.00 0.30 Weightless
A07 V-stop A07 1 Ground Rigid 0.00 100.00 0.30 Weightless
A08 V-stop A08 1 Ground Rigid 0.00 100.00 0.30 Weightless
A09 V-stop A09 1 Ground Rigid 0.00 100.00 0.30 Weightless
A10 V-stop A10 1 Ground Rigid 0.00 100.00 0.30 Weightless
A11 V-stop A11 1 Ground Rigid 0.00 100.00 0.30 Weightless
A12 V-stop A12 1 Ground Rigid 0.00 100.00 0.30 Weightless
A17 Guide-V A17 1 Ground Rigid 0.00 100.00 0.30 Weightless
Guide-H A17 1 Ground Rigid 0.00 0.00 0.30 Weightless
A19 Guide-V A19 1 Ground Rigid 0.00 100.00 0.30 Weightless
Guide-H A19 1 Ground Rigid 0.00 0.00 0.30 Weightless
B02 F V-stop B02 F1 Ground Rigid 0.00 100.00 0.30 Weightless
B04 V-stop B04 1 Ground Rigid 0.00 100.00 0.10 Weightless
B04 Incline B04 2 Ground Rigid 0.00 0.00 0.30
X-dir
B10 M Spring B10 M1 Ground 3045.000 1-Und 4748
C02 V-stop C02 1 Ground Rigid 0.00 100.00 0.30 Weightless
C07 V-stop C07 1 Ground Rigid 0.00 100.00 0.30 Weightless
C08 V-stop C08 1 Ground Rigid 0.00 100.00 0.30 Weightless
D00 Guide-V D00 3 Ground Rigid 0.00 100.00 0.30 Weightless
Guide-H D00 3 Ground Rigid 0.00 0.00 0.30 Weightless

NOTE 1: No soil supports present in the system.


Gap 1 : V-stop,Guide-V=down, Linestop,Incline,Tie/link=backward, Guide-H=Left
Gap 2 : V-stop,Guide-V=Up , Linestop,Incline,Tie/link=forward , Guide-H=Right
Stiffness units for rotation support: ft-lb/deg, all others: lb/in
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 23
--------------------------------------------------------------------------------

B E N D D A T A L I S T I N G

Point Bend Radius Angle OD tnom Material Flg/ SIF SIF Flex.
Name Type (in) (deg) (in) (in) Cuts in out (K)
----- ----- ------- ----- ------ ----- -------- ---- ----- ----- -----
A03 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
A04 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
A13 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
A14 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
A15 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
A16 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
B01 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
B02 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
B03 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
B06 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
B10 *Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
C01 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
C03 Elbow 15.00L 90.0 10.750 0.365 A106-B 0/0 2.61 2.17 8.13
C05 Elbow 15.00L 90.0 10.750 0.365 A335-P11 0/0 2.61 2.17 8.13

Pressure stiffening case: 0

* = Mid-point present
L = Long radius
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 24
--------------------------------------------------------------------------------

T E E D A T A L I S T I N G
Pipe Pipe **Crotch *Crotch
Point Point OD Thk. Material Tee Radius Thick SIF SIF
Name Seg-Type (in) (in) Type (in) (in) in out
----- -------- ------ ------ --------- -------- ------ ------ ----- -----
A01 A-Header 10.750 0.365 A106-B welding 2.11 2.49
B-Branch 10.750 0.365 A106-B

A18 A-Header 10.750 0.365 A106-B welding 2.11 2.49


C-Branch 10.750 0.365 A106-B

C12 D-Header 18.000 1.375 A335-P22 welding 1.30 1.40


C-Branch 6.625 0.719 A335-P22

* = Pad thickness for reinforced tee.


**= Fillet radius for Raised tee or discontinuity dist. for Thickened tee.
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 25
--------------------------------------------------------------------------------

V A L V E D A T A L I S T I N G
Size Type
Point Dnom Length Weight Weld Weld /Avg. /Max.
Name Type (in) Rating (ft) (lb) SAF Type SIF Taper (in) (in)
----- -------- ---- ------ -------- ------ ----- ---- ---- ----- ----- -----
B07 GATE-F 10 600 2.58 1550 6.90 WN 1.00
B08 GATE-F 10 600 2.61 1550 6.90 WN 1.00
C10 GATE-F 6 1500 2.31 1400 0.00 WN 1.00
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 26
--------------------------------------------------------------------------------

F L A N G E D A T A L I S T I N G
Size
Point FLG Dnom Weight Weld Weld /Avg. Max. ANSI
Name No. Type (in) Rating (lb) Type SIF Taper (in) (in) Check
----- ---- -------- ------ ------ ------ ---- ---- ----- ----- ----- -----
A00 1 BLIND 10 300 120.0 NS 1.00 No
A20 1 BLIND 10 300 120.0 NS 1.00 No
B07 1 SLIP-ON 10 600 165.0 SO 1.20 No
B08 1 SLIP-ON 10 600 165.0 SO 1.20 No
B09 1 SLIP-ON 10 600 165.0 SO 1.20 No
B12 1 SLIP-ON 5 600 58.0 SO 1.20 No
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 27
--------------------------------------------------------------------------------

U S E R - S I F D A T A L I S T I N G

Point Point Override Bend


Name Type SIF-in SIF-out All SIF Flexibility
----- ---------- ------- -------- -------- -----------
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 28
--------------------------------------------------------------------------------

R E D U C E R D A T A L I S T I N G
OD OD Thk Thk Cone
From To Length From To From To From Angle SIF
Point Point (ft) (in) (in) (in) (in) Material (deg)
----- ----- ------- ------- ------- ----- ----- -------- ----- ------
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 MODEL PAGE 29
--------------------------------------------------------------------------------

R I G I D P I P E D A T A L I S T I N G

From To Include Include Rigid


Point Point Weight Expansion Factor
----- ----- ------- --------- ------
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 1
--------------------------------------------------------------------------------

A N A L Y S I S S U M M A R Y

Current model revision number : 0

Static - Date and Time of analysis ............. Jun 5, 2009 11:26 AM


Model Revision Number ................. 0
Number of load cases .................. 3
Load cases analyzed ................... GR T1 P1
Gaps/Friction/Soil considered ......... Yes
Tolerance - Force, Displacement ....... 10.00 lb 0.0010 in
Friction - Scale Factor, Tolerance .... 1.00 0.10
Ignore friction for cases E1,E2,E3 .... Yes
Ignore friction for gravity case ...... No
Hanger design run ..................... No
Cut short included .................... No
Include Bourdon rotational effect ..... No
Pipe radius for Bourdon calculation ... Mean
Occasional load analysis type ......... Nonlinear
Non-linear analysis summary file ...... CQT3.LOG
Use default load sequence ............. Yes
Base load cases for nonlinear analysis
GR = None
T1 = GR
P1 = T1
Weight of contents included ........... Yes
Pressure stiffening case .............. 0
Water elevation for buoyancy loads .... Not considered
Hot modulus case used in analysis ..... 0
Use corroded thickness in analysis .... No
Rigid stiffness factor ................ 1000.0
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 2
--------------------------------------------------------------------------------

CODE COMPLIANCE COMBINATIONS

Allowable
Combination Category Method Load Factor M/S (psi) D/A/P
----------- ----------- -------- ------------ ------ --- --------- -------
GR + Max P Sustain Sum Gravity 1.00 Automatic Y Y Y
Max Long 1.00

Amb to T1 Expansion Sum Thermal 1 1.00 Automatic Y Y Y

Max Range Expansion Sum Temp. Range 1.00 Automatic Y Y Y

Max P Hoop Sum Max Hoop 1.00 Automatic Y Y Y

Notes:

D/A/P: [D]efault/[A]uto-Update/[P]rint options (Y=Yes, N=No)


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 3
--------------------------------------------------------------------------------

NON-CODE COMBINATIONS

Combination Method Load Factor D/A/P


----------- -------- ---------- ------ -------
GR Sum Gravity 1.00 N N Y

T1 Sum Thermal 1 1.00 N N Y

P1 Sum Press 1 1.00 N N Y

SUS Sum Gravity 1.00 N N Y


Press 1 1.00

OPE Sum SUS 1.00 N N Y


Thermal 1 1.00

Notes:

D/A/P: [D]efault/[A]uto-Update/[P]rint options (Y=Yes, N=No)


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 4
--------------------------------------------------------------------------------

CODE COMPLIANCE

Y - Factor ............................ 0.40


Weld efficiency factor ................ 1.00
Range reduction factor ................ 1.00
Design Pressure Factor ................ 1.00
Minimum stress ratio used in reports... 0.00
Number of stress points per span ...... 0
Include corrosion in stress calcs. .... Y
Include torsion in code stress ........ N
Include axial force in code stress .... N
Set sustained SIF to 1.00 ............. N
Apply cold/hot modulus ratio .......... N
No. of thermal ranges to report ....... 0
Include Max Range combination ......... Y
Total stress .......................... Octahedral
Direct shear .......................... None
Longitudinal pressure calculation ..... PD/4t
Include rigorous pressure ............. N
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 5
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------

*** Segment A begin ***

A00 GR 0.000 0.003 0.001 -0.006 0.000 -0.009


T1 -0.078 -0.006 -0.034 -0.075 -0.096 0.018
P1 -0.001 0.000 0.000 0.000 -0.001 0.000
SUS -0.001 0.003 0.000 -0.007 -0.001 -0.009
OPE -0.079 -0.003 -0.033 -0.082 -0.097 0.009

A01 GR 0.000 0.000 0.001 -0.006 0.000 -0.010


T1 0.000 0.000 -0.001 -0.075 -0.096 0.018
P1 0.000 0.000 0.000 0.000 -0.001 0.000
SUS 0.000 0.000 0.001 -0.007 -0.001 -0.009
OPE 0.000 0.000 0.000 -0.082 -0.097 0.009

A02 GR 0.000 0.000 0.000 -0.004 0.000 0.002


T1 0.855 0.278 0.176 -0.113 0.000 0.113
P1 0.006 0.002 0.001 -0.001 0.000 0.001
SUS 0.006 0.002 0.001 -0.004 0.000 0.003
OPE 0.861 0.281 0.178 -0.117 0.001 0.115

A03 N GR 0.000 -0.004 0.000 -0.001 0.000 0.003


T1 1.533 0.458 0.075 -0.143 0.066 -0.066
P1 0.010 0.003 0.000 -0.001 0.001 0.000
SUS 0.010 -0.001 0.000 -0.002 0.001 0.002
OPE 1.543 0.456 0.075 -0.145 0.066 -0.064

A03 F GR 0.000 -0.004 0.000 0.000 0.000 -0.001


T1 1.503 0.339 0.089 -0.140 0.097 -0.468
P1 0.010 0.002 0.000 -0.001 0.001 -0.002
SUS 0.010 -0.002 0.000 -0.001 0.001 -0.003
OPE 1.514 0.338 0.090 -0.142 0.098 -0.471

A04 N GR -0.001 -0.004 0.000 0.000 0.000 0.000


T1 1.090 0.146 0.212 -0.148 0.119 -0.472
P1 0.009 0.001 0.001 -0.001 0.001 -0.002
SUS 0.008 -0.003 0.001 -0.001 0.001 -0.002
OPE 1.098 0.144 0.213 -0.148 0.120 -0.474

A04 F GR 0.000 -0.002 0.000 0.001 0.000 0.007


T1 1.057 0.022 0.217 -0.148 0.149 -0.100
P1 0.009 0.000 0.001 -0.001 0.002 0.000
SUS 0.009 -0.002 0.001 0.000 0.002 0.007
OPE 1.065 0.020 0.218 -0.148 0.150 -0.094

A05 GR 0.000 0.000 0.000 0.001 0.000 0.006


T1 1.116 0.000 0.177 -0.151 0.154 -0.070
P1 0.009 0.000 0.001 -0.001 0.002 0.000
SUS 0.009 0.000 0.001 0.000 0.002 0.005
OPE 1.126 0.000 0.177 -0.151 0.156 -0.064
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 6
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
A06 GR 0.000 0.000 0.000 0.003 0.000 -0.006
T1 1.583 0.000 -0.181 -0.176 0.193 0.022
P1 0.012 0.000 -0.003 -0.001 0.002 0.000
SUS 0.012 0.000 -0.003 0.002 0.002 -0.006
OPE 1.595 0.000 -0.184 -0.174 0.195 0.017

A07 GR 0.000 0.000 0.000 0.006 0.000 0.005


T1 2.485 0.000 -1.063 -0.224 0.240 -0.004
P1 0.018 0.000 -0.012 -0.002 0.002 0.000
SUS 0.018 0.000 -0.012 0.004 0.002 0.005
OPE 2.503 0.000 -1.075 -0.220 0.242 0.001

A08 GR 0.000 0.000 0.000 0.007 0.000 -0.002


T1 2.952 0.000 -1.560 -0.249 0.237 0.001
P1 0.022 0.000 -0.016 -0.002 0.002 0.000
SUS 0.022 0.000 -0.016 0.006 0.002 -0.002
OPE 2.973 0.000 -1.576 -0.244 0.239 -0.001

A09 GR 0.000 0.000 0.000 0.009 0.000 0.001


T1 3.565 0.000 -2.144 -0.282 0.182 -0.001
P1 0.026 0.000 -0.021 -0.002 0.001 0.000
SUS 0.026 0.000 -0.021 0.007 0.001 0.001
OPE 3.591 0.000 -2.164 -0.275 0.183 0.000

A10 GR 0.000 0.000 0.000 0.011 0.000 0.000


T1 4.178 0.000 -2.472 -0.315 0.043 0.002
P1 0.030 0.000 -0.022 -0.002 0.000 0.000
SUS 0.030 0.000 -0.022 0.009 0.000 0.000
OPE 4.208 0.000 -2.494 -0.306 0.043 0.002

A11 GR 0.000 0.000 0.000 0.013 0.000 0.001


T1 4.791 0.017 -2.274 -0.348 -0.211 0.012
P1 0.034 0.000 -0.018 -0.002 -0.002 0.000
SUS 0.034 0.000 -0.018 0.011 -0.003 0.001
OPE 4.825 0.018 -2.292 -0.337 -0.214 0.014

A12 GR 0.000 0.000 -0.001 0.015 0.002 -0.005


T1 5.404 0.000 -1.208 -0.381 -0.600 -0.052
P1 0.038 0.000 -0.009 -0.003 -0.005 -0.001
SUS 0.038 0.000 -0.009 0.013 -0.002 -0.006
OPE 5.442 0.000 -1.217 -0.368 -0.602 -0.058

A13 N GR 0.000 -0.003 -0.002 0.016 0.003 -0.008


T1 5.491 -0.024 -0.965 -0.386 -0.666 -0.074
P1 0.039 0.000 -0.007 -0.003 -0.005 -0.001
SUS 0.039 -0.003 -0.009 0.013 -0.002 -0.009
OPE 5.530 -0.027 -0.974 -0.373 -0.668 -0.083
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 7
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
A13 F GR 0.003 -0.006 0.002 0.019 0.002 -0.011
T1 5.609 -0.005 -0.821 -0.241 -1.002 -0.331
P1 0.040 0.000 -0.006 -0.002 -0.007 -0.003
SUS 0.043 -0.006 -0.004 0.017 -0.006 -0.014
OPE 5.652 -0.011 -0.824 -0.224 -1.007 -0.344

A14 N GR 0.005 -0.006 0.005 0.019 0.001 -0.011


T1 5.664 0.032 -0.860 -0.242 -1.040 -0.349
P1 0.040 0.000 -0.006 -0.002 -0.008 -0.003
SUS 0.045 -0.006 -0.001 0.017 -0.006 -0.014
OPE 5.709 0.027 -0.861 -0.225 -1.046 -0.363

A14 F GR 0.007 -0.012 0.011 0.028 -0.001 -0.009


T1 5.485 0.155 -0.864 -0.237 -1.221 -0.470
P1 0.039 0.001 -0.006 -0.002 -0.009 -0.004
SUS 0.046 -0.011 0.005 0.026 -0.009 -0.013
OPE 5.531 0.144 -0.860 -0.211 -1.230 -0.483

A15 N GR 0.006 -0.052 0.011 0.024 -0.001 -0.008


T1 3.602 0.486 -0.531 -0.206 -1.289 -0.771
P1 0.026 0.004 -0.004 -0.002 -0.009 -0.006
SUS 0.032 -0.048 0.007 0.022 -0.010 -0.014
OPE 3.634 0.439 -0.524 -0.183 -1.299 -0.785

A15 F GR 0.004 -0.057 0.006 0.012 0.000 -0.007


T1 3.042 0.469 -0.439 -0.076 -1.287 -0.975
P1 0.022 0.004 -0.003 -0.001 -0.009 -0.007
SUS 0.026 -0.053 0.003 0.012 -0.009 -0.014
OPE 3.067 0.416 -0.436 -0.065 -1.296 -0.989

A16 N GR -0.006 -0.057 -0.005 -0.002 0.001 -0.004


T1 1.335 0.088 -0.354 -0.033 -1.100 -0.994
P1 0.009 0.001 -0.002 0.000 -0.008 -0.007
SUS 0.004 -0.056 -0.007 -0.002 -0.007 -0.012
OPE 1.339 0.033 -0.361 -0.035 -1.106 -1.006

A16 F GR -0.006 -0.049 0.000 -0.041 0.004 0.000


T1 0.865 0.031 -0.290 0.010 -0.788 -0.681
P1 0.006 0.001 -0.002 0.000 -0.006 -0.005
SUS 0.000 -0.048 -0.002 -0.041 -0.002 -0.005
OPE 0.865 -0.018 -0.292 -0.031 -0.790 -0.686

A17 GR 0.000 0.000 0.000 -0.025 0.005 0.003


T1 0.000 0.000 0.000 0.045 -0.526 -0.458
P1 0.000 0.000 0.000 0.001 -0.004 -0.004
SUS 0.000 0.000 0.000 -0.024 0.001 -0.001
OPE 0.000 0.000 0.000 0.021 -0.524 -0.458
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 8
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
A18 GR 0.008 0.008 0.000 0.005 0.001 0.008
T1 -0.509 -0.091 0.390 0.028 -0.089 -0.157
P1 -0.004 -0.001 0.003 0.000 -0.001 -0.002
SUS 0.004 0.007 0.002 0.006 0.001 0.006
OPE -0.505 -0.084 0.392 0.034 -0.089 -0.151

A19 GR 0.000 0.000 0.000 -0.006 -0.004 0.008


T1 0.000 0.000 1.170 -0.053 0.265 -0.157
P1 0.000 0.000 0.008 -0.001 0.002 -0.002
SUS 0.000 0.000 0.008 -0.006 -0.002 0.006
OPE 0.000 0.000 1.177 -0.060 0.263 -0.151

A20 GR -0.001 0.002 0.000 -0.005 -0.004 0.008


T1 0.091 0.018 1.248 -0.053 0.265 -0.157
P1 0.001 0.000 0.008 -0.001 0.002 -0.002
SUS -0.001 0.002 0.008 -0.006 -0.002 0.006
OPE 0.090 0.020 1.256 -0.059 0.263 -0.151

*** Segment A end ***

*** Segment B begin ***

A01 GR 0.000 0.000 0.001 -0.006 0.000 -0.010


T1 0.000 0.000 -0.001 -0.075 -0.096 0.018
P1 0.000 0.000 0.000 0.000 -0.001 0.000
SUS 0.000 0.000 0.001 -0.007 -0.001 -0.009
OPE 0.000 0.000 0.000 -0.082 -0.097 0.009

B01 N GR 0.003 0.000 -0.001 -0.007 -0.001 -0.010


T1 -0.004 0.073 -0.024 -0.072 -0.108 0.006
P1 0.000 0.000 0.000 0.000 -0.001 0.000
SUS 0.003 0.000 -0.001 -0.007 -0.001 -0.009
OPE -0.001 0.074 -0.026 -0.080 -0.109 -0.003

B01 F GR 0.006 -0.005 -0.005 -0.023 -0.001 -0.009


T1 0.045 0.119 -0.100 -0.043 -0.187 -0.082
P1 0.000 0.001 -0.001 0.000 -0.002 0.000
SUS 0.006 -0.004 -0.005 -0.023 -0.002 -0.009
OPE 0.051 0.115 -0.105 -0.066 -0.190 -0.091

B13 GR 0.006 -0.022 -0.005 -0.020 -0.001 -0.008


T1 0.196 0.088 -0.274 -0.039 -0.203 -0.114
P1 0.001 0.001 -0.002 0.000 -0.002 -0.001
SUS 0.008 -0.021 -0.006 -0.020 -0.002 -0.009
OPE 0.204 0.066 -0.281 -0.058 -0.206 -0.123

B02 N GR 0.002 -0.007 -0.004 0.025 0.005 -0.005


T1 0.864 -0.051 -0.987 -0.061 -0.205 -0.245
P1 0.007 0.000 -0.007 0.000 -0.001 -0.002
SUS 0.009 -0.008 -0.011 0.024 0.003 -0.007
OPE 0.872 -0.059 -0.999 -0.036 -0.201 -0.251
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 9
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
B02 F GR 0.000 0.000 -0.002 0.022 0.012 0.003
T1 0.852 0.000 -1.091 -0.067 -0.145 -0.289
P1 0.006 0.000 -0.007 0.000 -0.001 -0.002
SUS 0.006 0.000 -0.009 0.021 0.011 0.001
OPE 0.859 0.000 -1.100 -0.046 -0.134 -0.288

B03 N GR 0.000 -0.002 0.025 0.012 0.008 -0.005


T1 0.268 0.762 -1.413 -0.130 -0.111 -0.269
P1 0.003 0.005 -0.009 -0.001 0.000 -0.002
SUS 0.002 0.003 0.017 0.011 0.007 -0.007
OPE 0.270 0.765 -1.396 -0.119 -0.104 -0.276

B03 F GR -0.001 0.000 0.024 0.009 0.004 -0.003


T1 0.165 0.758 -1.400 -0.171 -0.082 -0.106
P1 0.002 0.005 -0.008 -0.001 0.000 -0.001
SUS 0.001 0.005 0.016 0.008 0.004 -0.004
OPE 0.165 0.763 -1.384 -0.162 -0.079 -0.110

B04 GR 0.000 0.000 0.000 0.007 -0.012 0.003


T1 0.000 0.000 -0.762 -0.202 -0.057 -0.019
P1 0.000 0.000 -0.005 -0.001 0.000 0.000
SUS 0.000 0.000 -0.005 0.007 -0.012 0.003
OPE 0.000 0.000 -0.767 -0.196 -0.069 -0.016

B05 GR -0.012 -0.006 0.000 0.005 -0.014 0.006


T1 -0.051 0.188 -0.551 -0.198 -0.052 -0.016
P1 0.000 0.001 -0.004 -0.001 0.000 0.000
SUS -0.012 -0.006 -0.004 0.004 -0.014 0.005
OPE -0.063 0.182 -0.555 -0.194 -0.066 -0.010

B14 GR -0.027 -0.008 0.000 -0.001 -0.014 0.008


T1 -0.101 0.385 -0.317 -0.182 -0.046 -0.012
P1 0.000 0.001 -0.002 -0.001 0.000 0.000
SUS -0.027 -0.007 -0.002 -0.002 -0.014 0.008
OPE -0.128 0.379 -0.319 -0.184 -0.060 -0.004

B06 N GR -0.032 -0.007 0.000 -0.002 -0.014 0.009


T1 -0.119 0.455 -0.228 -0.173 -0.044 -0.010
P1 0.000 0.002 -0.001 -0.001 0.000 0.000
SUS -0.033 -0.006 -0.002 -0.003 -0.014 0.009
OPE -0.151 0.449 -0.230 -0.176 -0.058 -0.001

B06 F GR -0.032 -0.006 0.000 0.001 -0.008 0.015


T1 -0.130 0.432 -0.138 -0.081 -0.030 0.000
P1 0.000 0.001 -0.001 0.000 0.000 0.000
SUS -0.033 -0.005 -0.001 0.000 -0.008 0.015
OPE -0.162 0.427 -0.139 -0.081 -0.039 0.015
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 10
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
B07 GR -0.027 -0.006 0.000 0.001 -0.007 0.016
T1 -0.129 0.359 -0.114 -0.072 -0.028 0.001
P1 0.000 0.001 -0.001 0.000 0.000 0.000
SUS -0.028 -0.006 -0.001 0.001 -0.008 0.016
OPE -0.157 0.353 -0.115 -0.072 -0.035 0.017

B08 GR -0.018 -0.006 -0.001 0.001 -0.007 0.016


T1 -0.129 0.236 -0.075 -0.072 -0.028 0.001
P1 -0.001 0.001 0.000 0.000 0.000 0.000
SUS -0.019 -0.006 -0.001 0.001 -0.008 0.016
OPE -0.148 0.231 -0.076 -0.072 -0.035 0.017

B09 GR -0.009 -0.006 -0.001 0.001 -0.007 0.016


T1 -0.128 0.112 -0.035 -0.072 -0.028 0.001
P1 -0.001 0.001 0.000 0.000 0.000 0.000
SUS -0.010 -0.006 -0.002 0.001 -0.008 0.016
OPE -0.138 0.106 -0.037 -0.072 -0.035 0.017

B10 N GR -0.005 -0.006 -0.002 0.001 -0.007 0.018


T1 -0.128 0.056 -0.018 -0.068 -0.026 0.002
P1 -0.001 0.000 0.000 0.000 0.000 0.000
SUS -0.006 -0.006 -0.002 0.001 -0.007 0.017
OPE -0.134 0.050 -0.020 -0.068 -0.033 0.019

B10 M GR -0.001 -0.004 -0.001 0.001 -0.006 0.020


T1 -0.110 0.014 -0.006 -0.045 -0.017 0.006
P1 -0.001 0.000 0.000 0.000 0.000 0.000
SUS -0.002 -0.004 -0.001 0.001 -0.006 0.020
OPE -0.112 0.010 -0.007 -0.044 -0.023 0.026

B10 F GR 0.000 -0.002 -0.001 0.002 -0.003 0.010


T1 -0.067 -0.002 -0.001 -0.036 -0.005 0.007
P1 0.000 0.000 0.000 0.000 0.000 0.000
SUS 0.000 -0.002 -0.001 0.002 -0.003 0.010
OPE -0.067 -0.003 -0.001 -0.035 -0.008 0.016

B11 GR 0.000 -0.001 0.000 0.002 -0.003 0.009


T1 -0.043 -0.001 0.000 -0.035 -0.004 0.007
P1 0.000 0.000 0.000 0.000 0.000 0.000
SUS 0.000 -0.001 0.000 0.002 -0.003 0.009
OPE -0.043 -0.002 -0.001 -0.033 -0.008 0.016

B12 GR 0.000 0.000 0.000 0.000 0.000 0.000


T1 0.000 0.000 0.000 0.000 0.000 0.000
P1 0.000 0.000 0.000 0.000 0.000 0.000
SUS 0.000 0.000 0.000 0.000 0.000 0.000
OPE 0.000 0.000 0.000 0.000 0.000 0.000

*** Segment B end ***

*** Segment C begin ***


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 11
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
A18 GR 0.008 0.008 0.000 0.005 0.001 0.008
T1 -0.509 -0.091 0.390 0.028 -0.089 -0.157
P1 -0.004 -0.001 0.003 0.000 -0.001 -0.002
SUS 0.004 0.007 0.002 0.006 0.001 0.006
OPE -0.505 -0.084 0.392 0.034 -0.089 -0.151

C01 N GR 0.004 0.008 0.002 0.004 0.000 0.009


T1 -0.454 0.006 0.401 0.023 -0.083 -0.101
P1 -0.003 -0.001 0.003 0.000 -0.001 -0.002
SUS 0.001 0.008 0.004 0.004 -0.001 0.007
OPE -0.453 0.013 0.405 0.027 -0.083 -0.094

C01 F GR 0.000 0.003 0.001 0.000 -0.004 0.032


T1 -0.527 0.024 0.383 0.008 -0.071 0.290
P1 -0.003 0.000 0.003 0.000 0.000 0.000
SUS -0.003 0.003 0.004 0.000 -0.004 0.031
OPE -0.530 0.027 0.387 0.008 -0.076 0.322

C02 GR 0.000 0.000 0.001 0.000 -0.004 0.033


T1 -0.545 0.000 0.378 0.007 -0.070 0.298
P1 -0.003 0.000 0.003 0.000 0.000 0.000
SUS -0.003 0.000 0.004 0.000 -0.004 0.032
OPE -0.548 0.000 0.381 0.007 -0.075 0.331

C03 N GR 0.000 -0.039 -0.003 0.000 -0.003 0.033


T1 -0.798 -0.380 0.308 -0.012 -0.054 0.371
P1 -0.005 0.000 0.002 0.000 0.000 0.000
SUS -0.005 -0.039 -0.001 0.000 -0.004 0.033
OPE -0.803 -0.419 0.307 -0.012 -0.058 0.404

C03 F GR -0.003 -0.045 -0.004 0.001 -0.003 0.002


T1 -0.968 -0.426 0.294 -0.020 -0.030 0.438
P1 -0.005 0.000 0.002 0.000 0.000 0.001
SUS -0.009 -0.044 -0.002 0.001 -0.003 0.002
OPE -0.977 -0.471 0.292 -0.019 -0.033 0.441

C04 GR 0.004 -0.045 -0.001 0.001 -0.001 0.004


T1 -2.246 0.272 0.201 -0.032 0.046 0.350
P1 -0.008 0.005 0.002 0.000 0.001 0.001
SUS -0.004 -0.040 0.000 0.001 -0.001 0.005
OPE -2.249 0.233 0.201 -0.031 0.045 0.355

C05 N GR 0.004 -0.045 -0.001 0.001 -0.001 0.004


T1 -2.250 0.275 0.200 -0.032 0.047 0.349
P1 -0.008 0.005 0.002 0.000 0.001 0.001
SUS -0.004 -0.040 0.000 0.001 -0.001 0.005
OPE -2.254 0.235 0.201 -0.031 0.046 0.354
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 12
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
C05 F GR 0.000 -0.038 -0.001 0.000 -0.001 0.036
T1 -2.261 0.388 0.176 -0.039 0.077 0.128
P1 -0.008 0.006 0.001 0.000 0.001 0.000
SUS -0.008 -0.032 0.001 0.000 0.000 0.036
OPE -2.269 0.356 0.177 -0.039 0.077 0.164

C06 GR 0.000 -0.037 -0.001 0.000 -0.001 0.036


T1 -2.258 0.390 0.175 -0.039 0.078 0.127
P1 -0.008 0.006 0.001 0.000 0.001 0.000
SUS -0.008 -0.032 0.001 0.000 0.000 0.036
OPE -2.266 0.358 0.176 -0.039 0.078 0.163

C07 GR 0.000 0.000 0.000 0.000 0.000 0.024


T1 -1.850 0.506 0.080 -0.031 0.094 0.098
P1 -0.006 0.005 0.000 0.000 0.001 0.000
SUS -0.006 0.005 0.000 0.000 0.001 0.024
OPE -1.856 0.511 0.080 -0.031 0.094 0.122

C08 GR 0.000 0.000 0.000 0.000 0.000 -0.017


T1 -0.379 0.930 -0.334 -0.002 0.102 0.114
P1 0.000 0.003 -0.004 0.000 0.001 -0.001
SUS 0.000 0.003 -0.004 0.000 0.001 -0.018
OPE -0.379 0.933 -0.338 -0.002 0.103 0.096

C09 GR 0.000 -0.021 0.000 0.000 0.000 -0.020


T1 -0.016 1.036 -0.429 0.005 0.092 0.092
P1 0.002 0.002 -0.005 0.000 0.001 -0.001
SUS 0.002 -0.019 -0.005 0.000 0.001 -0.020
OPE -0.015 1.017 -0.434 0.005 0.093 0.072

C10 GR -0.006 -0.021 0.000 0.000 0.000 0.006


T1 0.020 0.457 -0.444 0.011 0.029 -0.018
P1 0.000 0.001 -0.005 0.000 0.000 -0.001
SUS -0.005 -0.020 -0.005 0.000 0.000 0.005
OPE 0.015 0.437 -0.449 0.012 0.029 -0.013

C11 GR -0.003 -0.021 0.000 0.000 0.000 0.006


T1 0.011 0.260 -0.449 0.011 0.029 -0.018
P1 0.000 0.001 -0.006 0.000 0.000 -0.001
SUS -0.003 -0.020 -0.005 0.000 0.000 0.005
OPE 0.008 0.239 -0.454 0.011 0.029 -0.013

C12 GR -0.001 -0.021 0.000 0.001 0.000 0.001


T1 0.002 -0.005 -0.453 0.000 0.000 -0.004
P1 0.000 0.000 -0.006 0.000 0.000 0.000
SUS -0.001 -0.021 -0.006 0.001 0.000 0.001
OPE 0.002 -0.025 -0.459 0.001 0.000 -0.003

*** Segment C end ***

*** Segment D begin ***


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 13
--------------------------------------------------------------------------------

D I S P L A C E M E N T S

Point Load TRANSLATIONS (in ) ROTATIONS (deg )


name combination X Y Z X Y Z
------ ----------- ------ ------ ------ ------ ------ ------
D00 GR 0.000 0.000 0.000 0.015 0.000 0.001
T1 0.000 0.000 -1.306 0.003 0.001 -0.004
P1 0.000 0.000 -0.009 0.000 0.000 0.000
SUS 0.000 0.000 -0.009 0.015 0.000 0.001
OPE 0.000 0.000 -1.316 0.018 0.001 -0.003

C12 GR -0.001 -0.021 0.000 0.001 0.000 0.001


T1 0.002 -0.005 -0.453 0.000 0.000 -0.004
P1 0.000 0.000 -0.006 0.000 0.000 0.000
SUS -0.001 -0.021 -0.006 0.001 0.000 0.001
OPE 0.002 -0.025 -0.459 0.001 0.000 -0.003

D02 GR 0.000 -0.017 0.000 -0.008 0.000 0.001


T1 0.002 -0.004 -0.027 -0.002 -0.001 -0.003
P1 0.000 0.000 -0.004 0.000 0.000 0.000
SUS 0.000 -0.017 -0.004 -0.008 0.000 0.001
OPE 0.001 -0.020 -0.030 -0.009 -0.001 -0.002

D03 GR 0.000 0.000 0.000 0.000 0.000 0.000


T1 0.000 0.000 0.827 0.000 0.000 0.000
P1 0.000 0.000 0.000 0.000 0.000 0.000
SUS 0.000 0.000 0.000 0.000 0.000 0.000
OPE 0.000 0.000 0.827 0.000 0.000 0.000

*** Segment D end ***


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 14
--------------------------------------------------------------------------------

R E S T R A I N T R E A C T I O N S

Point Load FORCES (lb ) MOMENTS (ft-lb )


name combination X Y Z Result X Y Z Result
------ ----------- ------ ------ ------ ------ ------- ------- ------- -------

A01 Inclined [ID: A02 1]


GR -96 0 8 97 0 0 0 0
T1 -4878 0 125 4880 0 0 0 0
P1 -18 0 1 18 0 0 0 0
SUS -114 0 9 114 0 0 0 0
OPE -4992 0 134 4994 0 0 0 0

A01 V - Stop [ID: A02 2]


GR 0 -1276 313 1314 0 0 0 0
T1 0 336 -237 411 0 0 0 0
P1 0 4 0 4 0 0 0 0
SUS 0 -1273 313 1310 0 0 0 0
OPE 0 -937 76 940 0 0 0 0

A02 V - Stop [ID: A02 3]


GR -22 -1033 5 1034 0 0 0 0
T1 22 1033 -5 1034 0 0 0 0
P1 0 0 0 0 0 0 0 0
SUS -22 -1033 5 1034 0 0 0 0
OPE 0 0 0 0 0 0 0 0

A05 V - Stop [ID: A05 1]


GR 45 -963 2 964 0 0 0 0
T1 128 382 26 404 0 0 0 0
P1 -1 4 0 4 0 0 0 0
SUS 44 -959 1 960 0 0 0 0
OPE 171 -577 27 602 0 0 0 0

A06 V - Stop [ID: A06 1]


GR 27 -743 -2 743 0 0 0 0
T1 718 -1760 -83 1903 0 0 0 0
P1 2 -8 -1 8 0 0 0 0
SUS 30 -751 -3 751 0 0 0 0
OPE 748 -2511 -86 2621 0 0 0 0

A07 V - Stop [ID: A07 1]


GR 20 -843 0 844 0 0 0 0
T1 138 270 -68 311 0 0 0 0
P1 0 1 0 1 0 0 0 0
SUS 19 -842 0 843 0 0 0 0
OPE 158 -572 -68 598 0 0 0 0

A08 V - Stop [ID: A08 1]


GR 9 -460 0 460 0 0 0 0
T1 142 -110 -80 197 0 0 0 0
P1 0 0 0 0 0 0 0 0
SUS 8 -460 0 460 0 0 0 0
OPE 151 -570 -80 595 0 0 0 0
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 15
--------------------------------------------------------------------------------

R E S T R A I N T R E A C T I O N S

Point Load FORCES (lb ) MOMENTS (ft-lb )


name combination X Y Z Result X Y Z Result
------ ----------- ------ ------ ------ ------ ------- ------- ------- -------
A09 V - Stop [ID: A09 1]
GR 9 -699 1 699 0 0 0 0
T1 174 -12 -111 206 0 0 0 0
P1 0 -2 0 2 0 0 0 0
SUS 10 -701 0 701 0 0 0 0
OPE 183 -713 -110 745 0 0 0 0

A10 V - Stop [ID: A10 1]


GR 6 -678 -5 678 0 0 0 0
T1 170 -7 -99 197 0 0 0 0
P1 -1 4 0 4 0 0 0 0
SUS 5 -674 -5 674 0 0 0 0
OPE 176 -681 -104 711 0 0 0 0

A11 V - Stop [ID: A11 1]


GR 3 -572 34 573 0 0 0 0
T1 -3 572 -34 573 0 0 0 0
P1 0 0 0 0 0 0 0 0
SUS 3 -572 34 573 0 0 0 0
OPE 0 0 0 0 0 0 0 0

A12 V - Stop [ID: A12 1]


GR 3 -1009 -172 1023 0 0 0 0
T1 298 -21 104 317 0 0 0 0
P1 -1 2 0 2 0 0 0 0
SUS 3 -1007 -172 1022 0 0 0 0
OPE 301 -1028 -67 1074 0 0 0 0

A17 Guide [ID: A17 1]


GR 131 -1697 -72 1704 0 0 0 0
T1 4412 -2017 -373 4865 0 0 0 0
P1 25 -21 -1 33 0 0 0 0
SUS 155 -1719 -73 1727 0 0 0 0
OPE 4567 -3735 -446 5917 0 0 0 0

A19 Guide [ID: A19 1]


GR 23 -564 -31 566 0 0 0 0
T1 -1513 -350 751 1725 0 0 0 0
P1 -11 -5 5 13 0 0 0 0
SUS 12 -569 -25 570 0 0 0 0
OPE -1501 -919 726 1904 0 0 0 0

B02 F V - Stop [ID: B02 F1]


GR -23 -939 -294 984 0 0 0 0
T1 90 578 209 621 0 0 0 0
P1 -1 4 1 4 0 0 0 0
SUS -24 -935 -293 980 0 0 0 0
OPE 66 -357 -84 373 0 0 0 0
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 16
--------------------------------------------------------------------------------

R E S T R A I N T R E A C T I O N S

Point Load FORCES (lb ) MOMENTS (ft-lb )


name combination X Y Z Result X Y Z Result
------ ----------- ------ ------ ------ ------ ------- ------- ------- -------
B04 V - Stop [ID: B04 1]
GR 0 -2079 -60 2080 0 0 0 0
T1 0 -443 -192 482 0 0 0 0
P1 0 -6 -1 6 0 0 0 0
SUS 0 -2085 -61 2086 0 0 0 0
OPE 0 -2528 -253 2541 0 0 0 0

B04 Inclined [ID: B04 2]


GR -54 0 -5 54 0 0 0 0
T1 -350 0 -116 368 0 0 0 0
P1 -2 0 -1 2 0 0 0 0
SUS -56 0 -5 56 0 0 0 0
OPE -405 0 -122 423 0 0 0 0

B10 M Spring [ID: B10 M1]


GR 0 -4762 0 4762 0 0 0 0
T1 0 44 0 44 0 0 0 0
P1 0 0 0 0 0 0 0 0
SUS 0 -4761 0 4761 0 0 0 0
OPE 0 -4717 0 4717 0 0 0 0

B12 Anchor
GR 55 67 33 93 82 -173 481 517
T1 -1 -341 187 389 -1089 -179 263 1134
P1 0 1 -1 1 -11 -2 -5 13
SUS 55 68 32 94 71 -175 475 511
OPE 54 -273 220 354 -1018 -354 738 1306

C02 V - Stop [ID: C02 1]


GR 28 -1031 247 1061 0 0 0 0
T1 -189 377 -135 443 0 0 0 0
P1 5 21 -3 22 0 0 0 0
SUS 33 -1010 244 1040 0 0 0 0
OPE -156 -633 108 661 0 0 0 0

C07 V - Stop [ID: C07 1]


GR -23 -1484 -7 1484 0 0 0 0
T1 23 1484 7 1484 0 0 0 0
P1 0 0 0 0 0 0 0 0
SUS -23 -1484 -7 1484 0 0 0 0
OPE 0 0 0 0 0 0 0 0

C08 V - Stop [ID: C08 1]


GR 15 -1284 12 1284 0 0 0 0
T1 -15 1284 -12 1284 0 0 0 0
P1 0 0 0 0 0 0 0 0
SUS 15 -1284 12 1284 0 0 0 0
OPE 0 0 0 0 0 0 0 0
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 17
--------------------------------------------------------------------------------

R E S T R A I N T R E A C T I O N S

Point Load FORCES (lb ) MOMENTS (ft-lb )


name combination X Y Z Result X Y Z Result
------ ----------- ------ ------ ------ ------ ------- ------- ------- -------
D00 Guide [ID: D00 3]
GR -68 -3525 -1 3525 0 0 0 0
T1 195 -513 -1249 1364 0 0 0 0
P1 1 1 0 1 0 0 0 0
SUS -67 -3524 0 3524 0 0 0 0
OPE 128 -4036 -1249 4227 0 0 0 0

D03 Anchor
GR -89 -5522 -7 5523 -29817 642 556 29829
T1 438 -786 1385 1652 -5579 -2993 -1975 6632
P1 3 0 1 3 1 -18 -38 41
SUS -86 -5522 -6 5523 -29816 625 518 29827
OPE 352 -6308 1379 6467 -35395 -2368 -1457 35504
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 18
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------

*** Segment A begin ***

A00 Max P (3a) HOOP 6106 17210


GR + Max P 0 0 1.00 1.00 (18) SUST 2643 17210
Amb to T1 0 0 0 1.00 1.00 (17) DISP 0 29303
TR:AMB-T1 0 0 0 1.00 1.00 (17) DISP 0 29303

A01 - Max P (3a) HOOP 6106 17210


GR + Max P 266 0 2.11 2.49 (18) SUST 2909 17210
Amb to T1 0 0 0 2.11 2.49 (17) DISP 0 29303
TR:AMB-T1 0 0 0 2.11 2.49 (17) DISP 0 29303

A01 + Max P (3a) HOOP 6106 17210


GR + Max P 295 63 2.11 2.49 (18) SUST 2947 17210
Amb to T1 4577 3293 927 2.11 2.49 (17) DISP 5099 29303
TR:AMB-T1 4577 3293 927 2.11 2.49 (17) DISP 5099 29303

A02 Max P (3a) HOOP 6106 17210


GR + Max P 1734 22 1.00 1.00 (18) SUST 3462 17210
Amb to T1 1442 2843 927 1.00 1.00 (17) DISP 1332 29303
TR:AMB-T1 1442 2843 927 1.00 1.00 (17) DISP 1332 29303

A03 N- Max P (3a) HOOP 6106 17210


GR + Max P 21 17 1.00 1.00 (18) SUST 2656 17210
Amb to T1 15822 2415 927 1.00 1.00 (17) DISP 6433 29303
TR:AMB-T1 15822 2415 927 1.00 1.00 (17) DISP 6433 29303

A03 N+ Max P (3a) HOOP 6106 17210


GR + Max P 21 17 2.61 2.17 (18) SUST 2674 17210
Amb to T1 15822 2415 927 2.61 2.17 (17) DISP 16677 29303
TR:AMB-T1 15822 2415 927 2.61 2.17 (17) DISP 16677 29303

A03 F- Max P (3a) HOOP 6106 17210


GR + Max P 155 67 2.61 2.17 (18) SUST 2846 17210
Amb to T1 10935 965 2377 2.61 2.17 (17) DISP 11502 29303
TR:AMB-T1 10935 965 2377 2.61 2.17 (17) DISP 11502 29303

A03 F+ Max P (3a) HOOP 6106 17210


GR + Max P 67 155 1.00 1.00 (18) SUST 2723 17210
Amb to T1 965 10935 2377 1.00 1.00 (17) DISP 4507 29303
TR:AMB-T1 965 10935 2377 1.00 1.00 (17) DISP 4507 29303

A04 N- Max P (3a) HOOP 6106 17210


GR + Max P 68 418 1.00 1.00 (18) SUST 2843 17210
Amb to T1 1086 9847 2377 1.00 1.00 (17) DISP 4088 29303
TR:AMB-T1 1086 9847 2377 1.00 1.00 (17) DISP 4088 29303

A04 N+ Max P (3a) HOOP 6106 17210


GR + Max P 418 68 2.61 2.17 (18) SUST 3162 17210
Amb to T1 9847 1086 2377 2.61 2.17 (17) DISP 10381 29303
TR:AMB-T1 9847 1086 2377 2.61 2.17 (17) DISP 10381 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 19
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
A04 F- Max P (3a) HOOP 6106 17210
GR + Max P 179 17 2.61 2.17 (18) SUST 2864 17210
Amb to T1 14733 2340 1124 2.61 2.17 (17) DISP 15543 29303
TR:AMB-T1 14733 2340 1124 2.61 2.17 (17) DISP 15543 29303

A04 F+ Max P (3a) HOOP 6106 17210


GR + Max P 179 17 1.00 1.00 (18) SUST 2728 17210
Amb to T1 14733 2340 1124 1.00 1.00 (17) DISP 6003 29303
TR:AMB-T1 14733 2340 1124 1.00 1.00 (17) DISP 6003 29303

A05 Max P (3a) HOOP 6106 17210


GR + Max P 1045 16 1.00 1.00 (18) SUST 3137 17210
Amb to T1 13213 2302 1124 1.00 1.00 (17) DISP 5401 29303
TR:AMB-T1 13213 2302 1124 1.00 1.00 (17) DISP 5401 29303

A06 Max P (3a) HOOP 6106 17210


GR + Max P 1138 2 1.00 1.00 (18) SUST 3181 17210
Amb to T1 2432 2260 1124 1.00 1.00 (17) DISP 1406 29303
TR:AMB-T1 2432 2260 1124 1.00 1.00 (17) DISP 1406 29303

A07 Max P (3a) HOOP 6106 17210


GR + Max P 1300 1 1.00 1.00 (18) SUST 3257 17210
Amb to T1 815 598 1124 1.00 1.00 (17) DISP 607 29303
TR:AMB-T1 815 598 1124 1.00 1.00 (17) DISP 607 29303

A08 Max P (3a) HOOP 6106 17210


GR + Max P 381 0 1.00 1.00 (18) SUST 2823 17210
Amb to T1 162 930 1124 1.00 1.00 (17) DISP 589 29303
TR:AMB-T1 162 930 1124 1.00 1.00 (17) DISP 589 29303

A09 Max P (3a) HOOP 6106 17210


GR + Max P 790 1 1.00 1.00 (18) SUST 3016 17210
Amb to T1 26 3967 1124 1.00 1.00 (17) DISP 1654 29303
TR:AMB-T1 26 3967 1124 1.00 1.00 (17) DISP 1654 29303

A10 Max P (3a) HOOP 6106 17210


GR + Max P 745 7 1.00 1.00 (18) SUST 2995 17210
Amb to T1 268 8434 1124 1.00 1.00 (17) DISP 3416 29303
TR:AMB-T1 268 8434 1124 1.00 1.00 (17) DISP 3416 29303

A11 Max P (3a) HOOP 6106 17210


GR + Max P 520 55 1.00 1.00 (18) SUST 2890 17210
Amb to T1 646 14182 1124 1.00 1.00 (17) DISP 5715 29303
TR:AMB-T1 646 14182 1124 1.00 1.00 (17) DISP 5715 29303

A12 Max P (3a) HOOP 6106 17210


GR + Max P 1489 319 1.00 1.00 (18) SUST 3363 17210
Amb to T1 6366 20367 1124 1.00 1.00 (17) DISP 8575 29303
TR:AMB-T1 6366 20367 1124 1.00 1.00 (17) DISP 8575 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 20
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
A13 N- Max P (3a) HOOP 6106 17210
GR + Max P 472 58 1.00 1.00 (18) SUST 2868 17210
Amb to T1 7321 21054 1124 1.00 1.00 (17) DISP 8956 29303
TR:AMB-T1 7321 21054 1124 1.00 1.00 (17) DISP 8956 29303

A13 N+ Max P (3a) HOOP 6106 17210


GR + Max P 472 58 2.61 2.17 (18) SUST 3227 17210
Amb to T1 7321 21054 1124 2.61 2.17 (17) DISP 19879 29303
TR:AMB-T1 7321 21054 1124 2.61 2.17 (17) DISP 19879 29303

A13 F- Max P (3a) HOOP 6106 17210


GR + Max P 94 247 2.61 2.17 (18) SUST 2922 17210
Amb to T1 12162 656 21522 2.61 2.17 (17) DISP 15380 29303
TR:AMB-T1 12162 656 21522 2.61 2.17 (17) DISP 15380 29303

A13 F+ Max P (3a) HOOP 6106 17210


GR + Max P 247 94 1.00 1.00 (18) SUST 2768 17210
Amb to T1 656 12162 21522 1.00 1.00 (17) DISP 9923 29303
TR:AMB-T1 656 12162 21522 1.00 1.00 (17) DISP 9923 29303

A14 N- Max P (3a) HOOP 6106 17210


GR + Max P 358 79 1.00 1.00 (18) SUST 2817 17210
Amb to T1 364 14778 21522 1.00 1.00 (17) DISP 10477 29303
TR:AMB-T1 364 14778 21522 1.00 1.00 (17) DISP 10477 29303

A14 N+ Max P (3a) HOOP 6106 17210


GR + Max P 358 79 2.61 2.17 (18) SUST 3092 17210
Amb to T1 364 14778 21522 2.61 2.17 (17) DISP 15507 29303
TR:AMB-T1 364 14778 21522 2.61 2.17 (17) DISP 15507 29303

A14 F- Max P (3a) HOOP 6106 17210


GR + Max P 159 98 2.61 2.17 (18) SUST 2863 17210
Amb to T1 755 17333 18967 2.61 2.17 (17) DISP 16928 29303
TR:AMB-T1 755 17333 18967 2.61 2.17 (17) DISP 16928 29303

A14 F+ Max P (3a) HOOP 6106 17210


GR + Max P 159 98 1.00 1.00 (18) SUST 2731 17210
Amb to T1 755 17333 18967 1.00 1.00 (17) DISP 10315 29303
TR:AMB-T1 755 17333 18967 1.00 1.00 (17) DISP 10315 29303

A15 N- Max P (3a) HOOP 6106 17210


GR + Max P 442 31 1.00 1.00 (18) SUST 2853 17210
Amb to T1 4411 6172 18967 1.00 1.00 (17) DISP 8197 29303
TR:AMB-T1 4411 6172 18967 1.00 1.00 (17) DISP 8197 29303

A15 N+ Max P (3a) HOOP 6106 17210


GR + Max P 442 31 2.61 2.17 (18) SUST 3188 17210
Amb to T1 4411 6172 18967 2.61 2.17 (17) DISP 10397 29303
TR:AMB-T1 4411 6172 18967 2.61 2.17 (17) DISP 10397 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 21
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
A15 F- Max P (3a) HOOP 6106 17210
GR + Max P 456 79 2.61 2.17 (18) SUST 3210 17210
Amb to T1 4595 14778 10361 2.61 2.17 (17) DISP 14356 29303
TR:AMB-T1 4595 14778 10361 2.61 2.17 (17) DISP 14356 29303

A15 F+ Max P (3a) HOOP 6106 17210


GR + Max P 456 79 1.00 1.00 (18) SUST 2862 17210
Amb to T1 4595 14778 10361 1.00 1.00 (17) DISP 7473 29303
TR:AMB-T1 4595 14778 10361 1.00 1.00 (17) DISP 7473 29303

A16 N- Max P (3a) HOOP 6106 17210


GR + Max P 1597 227 1.00 1.00 (18) SUST 3405 17210
Amb to T1 1601 12025 10361 1.00 1.00 (17) DISP 6402 29303
TR:AMB-T1 1601 12025 10361 1.00 1.00 (17) DISP 6402 29303

A16 N+ Max P (3a) HOOP 6106 17210


GR + Max P 1597 227 2.61 2.17 (18) SUST 4622 17210
Amb to T1 1601 12025 10361 2.61 2.17 (17) DISP 11394 29303
TR:AMB-T1 1601 12025 10361 2.61 2.17 (17) DISP 11394 29303

A16 F- Max P (3a) HOOP 6106 17210


GR + Max P 937 77 2.61 2.17 (18) SUST 3799 17210
Amb to T1 1784 14550 16214 2.61 2.17 (17) DISP 14369 29303
TR:AMB-T1 1784 14550 16214 2.61 2.17 (17) DISP 14369 29303

A16 F+ Max P (3a) HOOP 6106 17210


GR + Max P 937 77 1.00 1.00 (18) SUST 3088 17210
Amb to T1 1784 14550 16214 1.00 1.00 (17) DISP 8771 29303
TR:AMB-T1 1784 14550 16214 1.00 1.00 (17) DISP 8771 29303

A17 Max P (3a) HOOP 6106 17210


GR + Max P 4322 190 1.00 1.00 (18) SUST 4686 17210
Amb to T1 4958 34954 16214 1.00 1.00 (17) DISP 15590 29303
TR:AMB-T1 4958 34954 16214 1.00 1.00 (17) DISP 15590 29303

A18 - Max P (3a) HOOP 6106 17210


GR + Max P 497 733 2.11 2.49 (18) SUST 3636 17210
Amb to T1 7309 26252 16214 2.11 2.49 (17) DISP 27682 29303
TR:AMB-T1 7309 26252 16214 2.11 2.49 (17) DISP 27682 29303

A18 + Max P (3a) HOOP 6106 17210


GR + Max P 1272 382 2.11 2.49 (18) SUST 3990 17210
Amb to T1 5735 24816 0 2.11 2.49 (17) DISP 25223 29303
TR:AMB-T1 5735 24816 0 2.11 2.49 (17) DISP 25223 29303

A19 Max P (3a) HOOP 6106 17210


GR + Max P 266 0 1.00 1.00 (18) SUST 2769 17210
Amb to T1 0 0 0 1.00 1.00 (17) DISP 0 29303
TR:AMB-T1 0 0 0 1.00 1.00 (17) DISP 0 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 22
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
A20 Max P (3a) HOOP 6106 17210
GR + Max P 0 0 1.00 1.00 (18) SUST 2643 17210
Amb to T1 0 0 0 1.00 1.00 (17) DISP 0 29303
TR:AMB-T1 0 0 0 1.00 1.00 (17) DISP 0 29303

*** Segment A end ***

*** Segment B begin ***

A01 Max P (3a) HOOP 6106 17210


GR + Max P 29 67 2.11 2.49 (18) SUST 2727 17210
Amb to T1 4577 927 3293 2.11 2.49 (17) DISP 4205 29303
TR:AMB-T1 4577 927 3293 2.11 2.49 (17) DISP 4205 29303

B01 N- Max P (3a) HOOP 6106 17210


GR + Max P 568 63 1.00 1.00 (18) SUST 2913 17210
Amb to T1 1062 4176 3293 1.00 1.00 (17) DISP 2176 29303
TR:AMB-T1 1062 4176 3293 1.00 1.00 (17) DISP 2176 29303

B01 N+ Max P (3a) HOOP 6106 17210


GR + Max P 568 63 2.61 2.17 (18) SUST 3345 17210
Amb to T1 1062 4176 3293 2.61 2.17 (17) DISP 4026 29303
TR:AMB-T1 1062 4176 3293 2.61 2.17 (17) DISP 4026 29303

B01 F- Max P (3a) HOOP 6106 17210


GR + Max P 293 35 2.61 2.17 (18) SUST 3006 17210
Amb to T1 969 2967 3850 2.61 2.17 (17) DISP 3177 29303
TR:AMB-T1 969 2967 3850 2.61 2.17 (17) DISP 3177 29303

B01 F+ Max P (3a) HOOP 6106 17210


GR + Max P 293 35 1.00 1.00 (18) SUST 2783 17210
Amb to T1 969 2967 3850 1.00 1.00 (17) DISP 1989 29303
TR:AMB-T1 969 2967 3850 1.00 1.00 (17) DISP 1989 29303

B13 Max P (3a) HOOP 6106 17210


GR + Max P 1227 47 1.00 1.00 (18) SUST 3223 17210
Amb to T1 374 2010 3850 1.00 1.00 (17) DISP 1749 29303
TR:AMB-T1 374 2010 3850 1.00 1.00 (17) DISP 1749 29303

B02 N- Max P (3a) HOOP 6106 17210


GR + Max P 247 381 1.00 1.00 (18) SUST 2858 17210
Amb to T1 2056 1900 3850 1.00 1.00 (17) DISP 1910 29303
TR:AMB-T1 2056 1900 3850 1.00 1.00 (17) DISP 1910 29303

B02 N+ Max P (3a) HOOP 6106 17210


GR + Max P 381 247 2.61 2.17 (18) SUST 3177 17210
Amb to T1 1900 2056 3850 2.61 2.17 (17) DISP 3089 29303
TR:AMB-T1 1900 2056 3850 2.61 2.17 (17) DISP 3089 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 23
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
B02 F- Max P (3a) HOOP 6106 17210
GR + Max P 2 735 2.61 2.17 (18) SUST 3396 17210
Amb to T1 2336 3647 2258 2.61 2.17 (17) DISP 4108 29303
TR:AMB-T1 2336 3647 2258 2.61 2.17 (17) DISP 4108 29303

B02 F+ Max P (3a) HOOP 6106 17210


GR + Max P 735 2 1.00 1.00 (18) SUST 2990 17210
Amb to T1 3647 2336 2258 1.00 1.00 (17) DISP 1960 29303
TR:AMB-T1 3647 2336 2258 1.00 1.00 (17) DISP 1960 29303

B03 N- Max P (3a) HOOP 6106 17210


GR + Max P 142 386 1.00 1.00 (18) SUST 2838 17210
Amb to T1 5449 845 2258 1.00 1.00 (17) DISP 2391 29303
TR:AMB-T1 5449 845 2258 1.00 1.00 (17) DISP 2391 29303

B03 N+ Max P (3a) HOOP 6106 17210


GR + Max P 142 386 2.61 2.17 (18) SUST 3076 17210
Amb to T1 5449 845 2258 2.61 2.17 (17) DISP 5815 29303
TR:AMB-T1 5449 845 2258 2.61 2.17 (17) DISP 5815 29303

B03 F- Max P (3a) HOOP 6106 17210


GR + Max P 211 322 2.61 2.17 (18) SUST 3063 17210
Amb to T1 5935 2107 693 2.61 2.17 (17) DISP 6476 29303
TR:AMB-T1 5935 2107 693 2.61 2.17 (17) DISP 6476 29303

B03 F+ Max P (3a) HOOP 6106 17210


GR + Max P 322 211 1.00 1.00 (18) SUST 2825 17210
Amb to T1 2107 5935 693 1.00 1.00 (17) DISP 2543 29303
TR:AMB-T1 2107 5935 693 1.00 1.00 (17) DISP 2543 29303

B04 - Max P (3a) HOOP 6106 17210


GR + Max P 182 228 1.00 1.00 (18) SUST 2781 17210
Amb to T1 174 343 693 1.00 1.00 (17) DISP 318 29303
TR:AMB-T1 174 343 693 1.00 1.00 (17) DISP 318 29303

B04 + Max P (3a) HOOP 6106 17210


GR + Max P 182 426 1.00 1.00 (18) SUST 2862 17210
Amb to T1 174 693 343 1.00 1.00 (17) DISP 318 29303
TR:AMB-T1 174 693 343 1.00 1.00 (17) DISP 318 29303

B05 Max P (3a) HOOP 6106 17210


GR + Max P 709 181 1.00 1.00 (18) SUST 2989 17210
Amb to T1 1147 687 343 1.00 1.00 (17) DISP 554 29303
TR:AMB-T1 1147 687 343 1.00 1.00 (17) DISP 554 29303

B14 Max P (3a) HOOP 6106 17210


GR + Max P 511 90 1.00 1.00 (18) SUST 2888 17210
Amb to T1 2610 681 343 1.00 1.00 (17) DISP 1091 29303
TR:AMB-T1 2610 681 343 1.00 1.00 (17) DISP 1091 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 24
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
B06 N- Max P (3a) HOOP 6106 17210
GR + Max P 110 193 1.00 1.00 (18) SUST 2748 17210
Amb to T1 3164 679 343 1.00 1.00 (17) DISP 1306 29303
TR:AMB-T1 3164 679 343 1.00 1.00 (17) DISP 1306 29303

B06 N+ Max P (3a) HOOP 6106 17210


GR + Max P 110 193 2.61 2.17 (18) SUST 2883 17210
Amb to T1 3164 679 343 2.61 2.17 (17) DISP 3363 29303
TR:AMB-T1 3164 679 343 2.61 2.17 (17) DISP 3363 29303

B06 F- Max P (3a) HOOP 6106 17210


GR + Max P 222 297 2.61 2.17 (18) SUST 3052 17210
Amb to T1 3302 341 677 2.61 2.17 (17) DISP 3475 29303
TR:AMB-T1 3302 341 677 2.61 2.17 (17) DISP 3475 29303

B06 F+ Max P (3a) HOOP 6106 17210


GR + Max P 222 297 1.00 1.00 (18) SUST 2818 17210
Amb to T1 3302 341 677 1.00 1.00 (17) DISP 1360 29303
TR:AMB-T1 3302 341 677 1.00 1.00 (17) DISP 1360 29303

B07 Max P (3a) HOOP 6106 17210


GR + Max P 171 382 1.20 1.20 (18) SUST 2880 17210
Amb to T1 3014 339 677 1.20 1.20 (17) DISP 1486 29303
TR:AMB-T1 3014 339 677 1.20 1.20 (17) DISP 1486 29303

B09 Max P (3a) HOOP 6106 17210


GR + Max P 2 667 1.20 1.20 (18) SUST 3022 17210
Amb to T1 2043 332 677 1.20 1.20 (17) DISP 1033 29303
TR:AMB-T1 2043 332 677 1.20 1.20 (17) DISP 1033 29303

B10 N- Max P (3a) HOOP 6106 17210


GR + Max P 41 732 1.00 1.00 (18) SUST 2990 17210
Amb to T1 1823 331 677 1.00 1.00 (17) DISP 792 29303
TR:AMB-T1 1823 331 677 1.00 1.00 (17) DISP 792 29303

B10 N+ Max P (3a) HOOP 6106 17210


GR + Max P 732 41 2.61 2.17 (18) SUST 3545 17210
Amb to T1 331 1823 677 2.61 2.17 (17) DISP 1648 29303
TR:AMB-T1 331 1823 677 2.61 2.17 (17) DISP 1648 29303

B10 M Max P (3a) HOOP 6106 17210


GR + Max P 875 127 2.61 2.17 (18) SUST 3728 17210
Amb to T1 221 1602 742 2.61 2.17 (17) DISP 1446 29303
TR:AMB-T1 221 1602 742 2.61 2.17 (17) DISP 1446 29303

B10 F- Max P (3a) HOOP 6106 17210


GR + Max P 683 220 2.61 2.17 (18) SUST 3513 17210
Amb to T1 81 443 1589 2.61 2.17 (17) DISP 750 29303
TR:AMB-T1 81 443 1589 2.61 2.17 (17) DISP 750 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 25
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
B10 F+ Max P (3a) HOOP 6106 17210
GR + Max P 683 220 1.00 1.00 (18) SUST 2982 17210
Amb to T1 81 443 1589 1.00 1.00 (17) DISP 663 29303
TR:AMB-T1 81 443 1589 1.00 1.00 (17) DISP 663 29303

B11 - Max P (3a) HOOP 6106 17210


GR + Max P 603 203 1.00 1.00 (18) SUST 2944 17210
Amb to T1 254 349 1589 1.00 1.00 (17) DISP 661 29303
TR:AMB-T1 254 349 1589 1.00 1.00 (17) DISP 661 29303

B11 + Max P (3a) HOOP 4907 17210


GR + Max P 603 203 1.00 1.00 (18) SUST 3874 17210
Amb to T1 254 349 1589 1.00 1.00 (17) DISP 3625 29303
TR:AMB-T1 254 349 1589 1.00 1.00 (17) DISP 3625 29303

B12 Max P (3a) HOOP 4907 17210


GR + Max P 481 173 1.20 1.20 (18) SUST 3809 17210
Amb to T1 563 179 1589 1.20 1.20 (17) DISP 3830 29303
TR:AMB-T1 563 179 1589 1.20 1.20 (17) DISP 3830 29303

*** Segment B end ***

*** Segment C begin ***

A18 Max P (3a) HOOP 6106 17210


GR + Max P 775 250 2.11 2.49 (18) SUST 3470 17210
Amb to T1 1574 16214 1437 2.11 2.49 (17) DISP 16236 29303
TR:AMB-T1 1574 16214 1437 2.11 2.49 (17) DISP 16236 29303

C01 N- Max P (3a) HOOP 6106 17210


GR + Max P 277 526 1.00 1.00 (18) SUST 2924 17210
Amb to T1 1583 15296 1437 1.00 1.00 (17) DISP 6198 29303
TR:AMB-T1 1583 15296 1437 1.00 1.00 (17) DISP 6198 29303

C01 N+ Max P (3a) HOOP 6106 17210


GR + Max P 526 277 2.61 2.17 (18) SUST 3350 17210
Amb to T1 15296 1583 1437 2.61 2.17 (17) DISP 16060 29303
TR:AMB-T1 15296 1583 1437 2.61 2.17 (17) DISP 16060 29303

C01 F- Max P (3a) HOOP 6106 17210


GR + Max P 1190 45 2.61 2.17 (18) SUST 4108 17210
Amb to T1 12425 1431 1589 2.61 2.17 (17) DISP 13064 29303
TR:AMB-T1 12425 1431 1589 2.61 2.17 (17) DISP 13064 29303

C01 F+ Max P (3a) HOOP 6106 17210


GR + Max P 1190 45 1.00 1.00 (18) SUST 3206 17210
Amb to T1 12425 1431 1589 1.00 1.00 (17) DISP 5059 29303
TR:AMB-T1 12425 1431 1589 1.00 1.00 (17) DISP 5059 29303
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 26
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
C02 Max P (3a) HOOP 6106 17210
GR + Max P 1362 51 1.00 1.00 (18) SUST 3287 17210
Amb to T1 11705 1429 1589 1.00 1.00 (17) DISP 4775 29303
TR:AMB-T1 11705 1429 1589 1.00 1.00 (17) DISP 4775 29303

C03 N- Max P (3a) HOOP 6106 17210


GR + Max P 988 38 1.00 1.00 (18) SUST 3110 17210
Amb to T1 3905 2124 1589 1.00 1.00 (17) DISP 1894 29303
TR:AMB-T1 3905 2124 1589 1.00 1.00 (17) DISP 1894 29303

C03 N+ Max P (3a) HOOP 6106 17210


GR + Max P 988 38 2.61 2.17 (18) SUST 3860 17210
Amb to T1 3905 2124 1589 2.61 2.17 (17) DISP 4527 29303
TR:AMB-T1 3905 2124 1589 2.61 2.17 (17) DISP 4527 29303

C03 F- Max P (3a) HOOP 6106 17210


GR + Max P 1120 26 2.61 2.17 (18) SUST 4021 17210
Amb to T1 1269 1425 2288 2.61 2.17 (17) DISP 2035 29303
TR:AMB-T1 1269 1425 2288 2.61 2.17 (17) DISP 2035 29303

C03 F+ Max P (3a) HOOP 6106 17210


GR + Max P 26 1120 1.00 1.00 (18) SUST 3172 17210
Amb to T1 1425 1269 2288 1.00 1.00 (17) DISP 1195 29303
TR:AMB-T1 1425 1269 2288 1.00 1.00 (17) DISP 1195 29303

C04 - Max P (3a) HOOP 6106 17210


GR + Max P 8 1290 1.00 1.00 (18) SUST 3253 17210
Amb to T1 500 8154 2288 1.00 1.00 (17) DISP 3404 29303
TR:AMB-T1 500 8154 2288 1.00 1.00 (17) DISP 3404 29303

C04 + Max P (3a) HOOP 6106 16550


GR + Max P 8 1290 1.00 1.00 (18) SUST 3253 16550
Amb to T1 500 8154 2288 1.00 1.00 (17) DISP 3404 29138
TR:AMB-T1 500 8154 2288 1.00 1.00 (17) DISP 3404 29138

C05 N- Max P (3a) HOOP 6106 16550


GR + Max P 9 1300 1.00 1.00 (18) SUST 3257 16550
Amb to T1 508 8194 2288 1.00 1.00 (17) DISP 3420 29138
TR:AMB-T1 508 8194 2288 1.00 1.00 (17) DISP 3420 29138

C05 N+ Max P (3a) HOOP 6106 16550


GR + Max P 1300 9 2.61 2.17 (18) SUST 4243 16550
Amb to T1 8194 508 2288 2.61 2.17 (17) DISP 8626 29138
TR:AMB-T1 8194 508 2288 2.61 2.17 (17) DISP 8626 29138

C05 F- Max P (3a) HOOP 6106 16550


GR + Max P 733 38 2.61 2.17 (18) SUST 3546 16550
Amb to T1 7160 2124 671 2.61 2.17 (17) DISP 7715 29138
TR:AMB-T1 7160 2124 671 2.61 2.17 (17) DISP 7715 29138
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 27
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
C05 F+ Max P (3a) HOOP 6106 16550
GR + Max P 733 38 1.00 1.00 (18) SUST 2990 16550
Amb to T1 7160 2124 671 1.00 1.00 (17) DISP 3009 29138
TR:AMB-T1 7160 2124 671 1.00 1.00 (17) DISP 3009 29138

C06 - Max P (3a) HOOP 6106 16550


GR + Max P 692 38 1.00 1.00 (18) SUST 2971 16550
Amb to T1 7068 2116 671 1.00 1.00 (17) DISP 2973 29138
TR:AMB-T1 7068 2116 671 1.00 1.00 (17) DISP 2973 29138

C06 + Max P (3a) HOOP 6106 12936


GR + Max P 692 38 1.00 1.00 (18) SUST 2971 12936
Amb to T1 7068 2116 671 1.00 1.00 (17) DISP 2973 28234
TR:AMB-T1 7068 2116 671 1.00 1.00 (17) DISP 2973 28234

C07 Max P (3a) HOOP 6106 12936


GR + Max P 3467 51 1.00 1.00 (18) SUST 4281 12936
Amb to T1 640 1429 671 1.00 1.00 (17) DISP 684 28234
TR:AMB-T1 640 1429 671 1.00 1.00 (17) DISP 684 28234

C08 Max P (3a) HOOP 6106 12936


GR + Max P 2146 31 1.00 1.00 (18) SUST 3657 12936
Amb to T1 351 925 671 1.00 1.00 (17) DISP 480 28234
TR:AMB-T1 351 925 671 1.00 1.00 (17) DISP 480 28234

C09 - Max P (3a) HOOP 6106 12936


GR + Max P 1344 3 1.00 1.00 (18) SUST 3278 12936
Amb to T1 5722 1560 671 1.00 1.00 (17) DISP 2395 28234
TR:AMB-T1 5722 1560 671 1.00 1.00 (17) DISP 2395 28234

C09 + Max P (3a) HOOP 5151 9600


GR + Max P 12 1344 1.00 1.00 (18) SUST 3348 9600
Amb to T1 671 5722 1560 1.00 1.00 (17) DISP 4019 27400
TR:AMB-T1 671 5722 1560 1.00 1.00 (17) DISP 4019 27400

C10 Max P (3a) HOOP 5151 9600


GR + Max P 38 287 1.00 1.00 (18) SUST 2595 9600
Amb to T1 247 1441 1560 1.00 1.00 (17) DISP 1440 27400
TR:AMB-T1 247 1441 1560 1.00 1.00 (17) DISP 1440 27400

C11 Max P (3a) HOOP 5151 9600


GR + Max P 54 74 1.00 1.00 (18) SUST 2453 9600
Amb to T1 560 22 1560 1.00 1.00 (17) DISP 1117 27400
TR:AMB-T1 560 22 1560 1.00 1.00 (17) DISP 1117 27400

C12 Max P (3a) HOOP 5151 9600


GR + Max P 77 556 1.30 1.40 (18) SUST 2781 9600
Amb to T1 979 1975 1560 1.30 1.40 (17) DISP 1772 27400
TR:AMB-T1 979 1975 1560 1.30 1.40 (17) DISP 1772 27400

*** Segment C end ***

*** Segment D begin ***


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 28
--------------------------------------------------------------------------------

ASME B31.3 (2002) CODE COMPLIANCE


(Moments in ft-lb ) (Stress in psi )
Point Load In-Pl. Out-Pl. Torsion S.I.F Eq. Load Code Code
name combination Moment Moment Moment In Out no. type Stress Allow.
------ ----------- ------- ------- ------- ---- ---- ---- ---- ------ ------
D00 Max P (3a) HOOP 7100 9680
GR + Max P 0 0 1.00 1.00 (18) SUST 3251 9680
Amb to T1 0 0 0 1.00 1.00 (17) DISP 0 21170
TR:AMB-T1 0 0 0 1.00 1.00 (17) DISP 0 21170

C12 - Max P (3a) HOOP 7100 9680


GR + Max P 21009 665 1.30 1.40 (18) SUST 4477 9680
Amb to T1 5047 1919 0 1.30 1.40 (17) DISP 307 21170
TR:AMB-T1 5047 1919 0 1.30 1.40 (17) DISP 307 21170

C12 + Max P (3a) HOOP 7100 9680


GR + Max P 20932 668 1.30 1.40 (18) SUST 4473 9680
Amb to T1 6027 3479 1975 1.30 1.40 (17) DISP 409 21170
TR:AMB-T1 6027 3479 1975 1.30 1.40 (17) DISP 409 21170

D02 Max P (3a) HOOP 7100 9680


GR + Max P 10856 231 1.00 1.00 (18) SUST 3737 9680
Amb to T1 2158 1322 1975 1.00 1.00 (17) DISP 139 21170
TR:AMB-T1 2158 1322 1975 1.00 1.00 (17) DISP 139 21170

D03 Max P (3a) HOOP 7100 9680


GR + Max P 29817 642 1.00 1.00 (18) SUST 4585 9680
Amb to T1 5579 2993 1975 1.00 1.00 (17) DISP 287 21170
TR:AMB-T1 5579 2993 1975 1.00 1.00 (17) DISP 287 21170

*** Segment D end ***


--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 29
--------------------------------------------------------------------------------

R E S U L T S U M M A R Y
----------------------------

Maximum displacements (in)


---------------------------

Maximum X : 5.709 Point : A14 N Load Comb.: OPE


Maximum Y : 1.036 Point : C09 Load Comb.: T1
Maximum Z : -2.494 Point : A10 Load Comb.: OPE
Max. total: 5.774 Point : A14 N Load Comb.: OPE

Maximum rotations (deg)


-----------------------

Maximum X : -0.386 Point : A13 N Load Comb.: T1


Maximum Y : -1.299 Point : A15 N Load Comb.: OPE
Maximum Z : -1.006 Point : A16 N Load Comb.: OPE
Max. total: 1.632 Point : A15 F Load Comb.: OPE

Maximum restraint forces (lb)


------------------------------

Maximum X : -4992 Point : A01 Load Comb.: OPE


Maximum Y : -6308 Point : D03 Load Comb.: OPE
Maximum Z : 1385 Point : D03 Load Comb.: T1
Max. total: 6467 Point : D03 Load Comb.: OPE

Maximum restraint moments (ft-lb)


----------------------------------

Maximum X : -35395 Point : D03 Load Comb.: OPE


Maximum Y : -2993 Point : D03 Load Comb.: T1
Maximum Z : -1975 Point : D03 Load Comb.: T1
Max. total: 35504 Point : D03 Load Comb.: OPE
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 30
--------------------------------------------------------------------------------

R E S U L T S U M M A R Y
----------------------------

Maximum sustained stress

Point : A17
Stress psi : 4686
Allowable psi : 17210
Ratio : 0.27
Load combination : GR + Max P

Maximum displacement stress

Point : A18
Stress psi : 27682
Allowable psi : 29303
Ratio : 0.94
Load combination : Amb to T1

Maximum hoop stress

Point : D00
Stress psi : 7100
Allowable psi : 9680
Ratio : 0.73
Load combination : Max P
--------------------------------------------------------------------------------
CQT3
06/05/2009 LINHA DE VAPOR DE 21 BAR TURBOBOMBA FLEXIHELP ENGENHARIA
11:26 AM PROCKNOR - ETH - CONQUISTA DO PONTAL AutoPIPE+8.51 RESULT PAGE 31
--------------------------------------------------------------------------------

R E S U L T S U M M A R Y
----------------------------

Maximum sustained stress ratio

Point : D03
Stress psi : 4585
Allowable psi : 9680
Ratio : 0.47
Load combination : GR + Max P

Maximum displacement stress ratio

Point : A18
Stress psi : 27682
Allowable psi : 29303
Ratio : 0.94
Load combination : Amb to T1

Maximum hoop stress ratio

Point : D00
Stress psi : 7100
Allowable psi : 9680
Ratio : 0.73
Load combination : Max P

* * * The system satisfies ASME B31.3 code requirements * * *


* * * for the selected options * * *