JUMLAH 26,436,363,636
PPN 10% 2,643,636,364
Total 29,080,000,000
500
PEKERJAAN REHABILITASI CATHODIC PROTECTION PLTG
PT PLN (Persero) UNIT PELAKSANA PEMBANGKITAN
Faktor Berat untuk Keseluruhan Proye
NO. DESKRIPSI
1 ENGINEERING
2 PROCUREMENT
TOTAL
ASI CATHODIC PROTECTION PLTGU BELAWAN
UNIT PELAKSANA PEMBANGKITAN BELAWAN
rat untuk Keseluruhan Proyek
BOBOT BERAT
HARGA
(%)
Rp 468,932,037 1.77%
Rp 18,904,612,086 71.51%
Rp 6,476,631,534 24.50%
Rp 390,794,823 1.48%
Rp 195,393,156 0.74%
Rp 26,436,363,636.00 100.00%
PEKERJAAN REHABILITASI CATHODIC PROTECTION PLTGU B
NO ITEM DESCRIPTION
Effective Date
1. ENGINEERING
Design Engineering
Transformer Rectifier
2. PROUREMENT
Spesial Design Anode for Condensor
15
16
11
New Transformer Rectifier and Service
10
17
18
Cable
12.a
12.b
Almunium Anode
13
14
3. CONSTRUCTION
Genaral
Transportasi Material to site
Instalasi kabel
TOTAL
N REHABILITASI CATHODIC PROTECTION PLTGU BELAWAN
ITEM DESCRIPTION
sign Engineering
Transformer Rectifier
REMENT
Spesial Design Anode for Condensor
Permanent Cu/CuS04
New Transformer Rectifier and Service
Positive SS 304 Juction Box, Casing : S/S 304, 2mm, Dim : 400 x 300 x 200 (with 10 terminals)
Cast Almunium Test Point, c/w 2 5 Terminal with 3" dia conduit 6ft long
AC Power 3 x 10 sq.mm
Almunium Anode
Almunium Anode Type ICS 70 AWB, Net Weight : 7kg, Gross Weight: 7,3 kg
Almunium Anode Type ICS 40 AWB, Net Weight : 4kg, Gross Weight: 4,4 kg
TRUCTION
Transportasi Material to site
Instalasi kabel
TOTAL
: PERIOD 26-MAY-2019
Year 2018
18-Nov
25-Nov
2-Dec
WF Sub-WF Actual Week
(%) (%) Progress
Week No. 1 2 3
0.44% Plan
Actual
0.31% Plan
0.03% Actual
0.12% Plan
0.01% Actual
49.60% Plan
Actual
44.79% Plan
3.34% Actual
2.44% Plan
0.12% Actual
2.37% Plan
0.24% Actual
8.86% Plan
Actual
8.56% Plan
0.00% Actual
0.29% Plan
0.03% Actual
4.25% Plan
Actual
1.33% Plan
0.13% Actual
1.87% Plan
0.19% Actual
0.33% Plan
0.03% Actual
0.53% Plan
0.05% Actual
0.19% Plan
0.09% Actual
5.72% Plan
Actual
0.63% Plan
0.06% Actual
2.62% Plan
0.26% Actual
1.48% Plan
0.15% Actual
0.99% Plan
0.10% Actual
2.64% Plan
Actual
0.67% Plan
0.37% Actual
1.97% Plan
1.08% Actual
1.08% Plan
Actual
0.49% Plan
0.01% Actual
0.30% Plan
0.15% Actual
0.30% Plan
0.07% Actual
1.72% Plan
Actual
1.72% Plan
0.00% Actual
21.69% Plan
Actual
9.58% Plan
0.00% Actual
0.39% Plan
0.00% Actual
0.34% Plan
0.00% Actual
4.49% Plan
0.00% Actual
0.25% Plan
0.00% Actual
0.94% Plan
0.00% Actual
2.12% Plan
0.00% Actual
3.59% Plan
2.06% Actual
1.48% Plan
Actual
1.48% Plan
0.00% Actual
0.74% Plan
Actual
0.74% Plan
0.00% Actual
Plan Actual
Cum. 0.00% 0.01% 0.02%
100% 100% 9.38%
Earn. 0.00% 0.00% 0.11%
Cum. 0.00% 0.00% 0.11%
2018
16-Dec
23-Dec
30-Dec
13-Jan
20-Jan
9-Dec
6-Jan
4 5 6 7 8 9 10
17-Feb
24-Feb
27-Jan
3-Mar
3-Feb
11 12 13 14 15 16 17
0.39% 0.39%
0.01% 0.01%
0.08% 0.08%
0.08% 0.08%
0.08% 0.12% 0.12% 0.25% 0.16% 0.68% 0.64%
0.41% 0.52% 0.64% 0.88% 1.05% 1.73% 2.37%
0.00% 0.09% 0.00% 0.00% 0.00% 0.00% 0.06%
0.35% 0.44% 0.44% 0.44% 0.44% 0.44% 0.50%
17-Mar
24-Mar
31-Mar
14-Apr
21-Apr
28-Apr
7-Apr
18 19 20 21 22 23 24
0.07% 0.07%
0.07% 0.07%
0.07% 0.07%
0.17%
0.40% 0.60% 0.60% 0.60% 0.81% 0.81% 1.41%
0.23%
0.10%
0.13%
19-May
26-May
5-May
2-Jun
9-Jun
25 26 27 28 29 30
0.04% 0.00%
0.03% 0.00%
0.01% 0.00%
15.41% 0.86% 1.07% 0.34% 0.51% 0.68%
3.70% 0.00%
14.93%
3.34% 0.00%
0.31% 0.61% 0.81%
0.12% 0.00%
0.17% 0.25% 0.25% 0.34% 0.51% 0.68%
0.24% 0.00%
71.78%
1.41% 1.41%
0.03% 0.00%
1.36% 1.36% 71.78%
0.00% 0.00%
0.05% 0.05% 9-Jun; 70.36%
0.03% 0.00%
0.23% 0.42% 0.42% 0.57% 0.80% 1.07%
0.13% 0.37% 0.00%
0.10% 0.14% 0.14% 0.19% 0.29% 0.38%
0.13% 0.00%
0.13% 0.20% 0.20% 0.27% 0.40% 0.53%
0.19% 0.00%
0.02% 0.02% 0.04% 0.04% 0.05%
0.03% 0.00% 0.00%
0.04% 0.04% 0.06% 0.06% 0.08%
0.05% 0.00%
0.01% 0.01% 0.02% 0.02% 0.03%
0.09% 0.00% 0.00%
0.14% 0.37% 0.19% 0.28% 0.28% 0.37%
0.57% 0.00%
0.14% 0.18%
0.06% 0.00%
0.19% 0.19% 0.28% 0.28% 0.37%
0.26% 0.00%
0.15% 0.00%
0.10% 0.00%
0.14% 0.19%
0.66% 0.66% 0.13% 0.00%
0.14% 0.19%
0.17% 0.17% 0.03% 0.00%
0.27% 0.27%
0.27% 0.27%
0.16%
9.38%
9.38%
71.78%
32
23-Jun
33
30-Jun
34
7-Jul
2019
35
14-Jul
36
21-Jul
71.78%
9-Jun; 70.36%
0.22% 0.30%
0.07% 0.10%
0.11% 0.15%
0.04% 0.05%
0.56% 0.75%
9.38%
9.38%
38
4-Aug
39
11-Aug
40
18-Aug
41
25-Aug
42
1-Sep
0.82%
0.49%
0.08%
0.42% 0.56%
0.42% 0.56%
0.07% 0.07%
0.04% 0.04%
0.03% 0.03%
0.05% 0.07%
0.03% 0.05%
44
15-Sep
45
22-Sep
46
29-Sep
47
6-Oct
48
13-Oct
1.11% 1.15% 0.13% 0.05% 0.06% 0.22%
0.10% 0.17%
0.27%
0.12%
0.67% 0.90%
1.11% 1.15% 0.13% 0.05% 0.06% 0.22%
93.08% 94.23% 94.36% 94.41% 94.47% 94.70%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9.38% 9.38% 9.38% 9.38% 9.38% 9.38%
49
20-Oct
50
27-Oct
51
3-Nov
52
10-Nov
53
17-Nov
54
24-Nov
0.18% 0.23% 0.54% 0.20% 0.20% 0.33%
56
8-Dec
57
15-Dec
58
22-Dec
59
29-Dec
60
5-Jan
0.15%
0.15%
1.48%
1.48%
0.25% 0.25%
0.25% 0.25%
62
19-Jan
63
26-Jan
2020
64
2-Feb
65
9-Feb
66
16-Feb
80%
90%
100%
70%
60%
50%
40%
40%
30%
20%
10%
0.25%
0.25%
0%
0.25% 0.00% 0.00% 0.00% 0.00% 0.00%
100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9.38% 9.38% 9.38% 9.38% 9.38% 9.38%
23-Feb
67
100%
90%
80%
70%
60%
50%
40%
40%
30%
20%
10%
0%
0.00%
100.0%
0.00%
9.38%
PEKERJAAN REHABILITASI CA
PT PLN (Persero) UNI
SUMMARY
PERIOD : 1
Contract No. : 047.Pj/KIT.03.02UIKSBU/2018
Date : 16-Jun-19
Amand. : 0
Revision : 0
1 ENGINEERING
2 PROCUREMENT
TOTAL
CONTRACTOR
Prepared by,
( )
PT SHAFTINDO ENERGI Page 61 of 81
TASI CATHODIC PROTECTION PLTGU BELAWAN
o) UNIT PELAKSANA PEMBANGKITAN BELAWAN
MMARY WEEKLY PROGRESS
RIOD : 10 June - 16 June 2019
COMPANY
Approved by,
44.38% -55.63%
8.80% -83.53%
9.36% -6.87%
0.00% 0.00%
0.00% 0.00%
9.38% -62.40%
Approved by,
2 PROCUREMENT
2.1 Spesial Design Anode for Condensor
15 Almunium Anode special design for condesor
16 Almunium Anode special design for condesor by pass pipe
2.2 ICCP & Deepweld Groundbed
4 Deepwell Groundbed dengan kedalaman 75 m
5 DeepWeld Groundbed dengan kedalaman 30m
11 Permanent Cu/CuS04
2.3 New Transformer Rectifier and Service
1 Transformer Rectifier Spesifikasi :
3 Transformer Rectifier Oil : type Shell S2ZUI
2.4 Junction Box and Miscellaneous Item
Positive SS 304 Juction Box, Casing : S/S 304, 2mm, Dimension : 400 x 300
8
x 200 (with 10 terminals)
10 Cast Almunium Test Point, c/w 2 5 Terminal with 3" dia conduit 6ft long
7 FRP (Fiber Rainforced Plastic) Support Dimension : 1" x 1200mm
17 AC Power 3 x 10 sq.mm
18 Miscellanous item (Nut, Bolt, Tape)
2.5 Cable
6 Mixed Metal Oxide Anode, Dimension 1" x 1m c/w cable HMWPE
9 Cable, Cable XLPE/PVC 1 x 70sq mm
12 Galvanized Conduit dia 1" x 4m
Accesories Conduit (Eibow,Sock)
2.6 Almunium Anode
13 Almunium Anode Type ICS 70 AWB, Net Weight : 7kg, Gross Weight: 7,3 kg
14 Almunium Anode Type ICS 40 AWB, Net Weight : 4kg, Gross Weight: 4,4 kg
Plan Progress
Estimated Overall Weight Sub Weight
Value (IDR) Factor (%) Factor (%) Cumm Last Cumm This
This Period
Period Period
DAFTAR DOKUMEN
Nomor Dokumen Ukuran
No. Judul Dokumen Hal
EQP. No. REQ. No. Rev Kertas
DESIGN ENGINEERING
1 Special Design Anode for Condensor (Sacraficial Anode)
047.PJ/UIKSBU2018/KSO-SACP E Kalkulasi SACP Pada Area Condensor dan Water Intake Blok I A4 5
047.PJ/UIKSBU2018/KSO-SACP E Kalkulasi SACP Pada Area Condensor dan Water Intake Blok II A4 5
047.PJ/UIKSBU2018/KSO-SACP E Gambar Installasi SACP Pada Condensor dan Water Intake di Blok I A3 6
047.PJ/UIKSBU2018/KSO-SACP E Gambar Installasi SACP Pada Condensor dan Water Intake di Blok II A3 6
2 Transformer Rectifier
Gambar panel Arrangement Transformer Rectifier A4
Gambar Panel Wiring Transformer Rectifier A3
3 ICCP & Deepweld, Cable & Bore Hole Layout dan Junction Box
047.PJ/UIKSBU2018/KSO-ICPP Kalkulasi Anoda Impress Current A4 2
KONSORSIUM PT KURNIA PURNAMATAMA –
PT TANEX MAKMUR PRIMAJAYA – PT SHAFTINDO ENERGI
PT. PLN (Persero)
V V Unit Induk Pembangkitan Sumatera Bagian Utara
P P
C C Rehabilitasi Cathodic Protection PLTGU Belawan
DAFTAR DOKUMEN
Nomor Dokumen Ukuran
No. Judul Dokumen Hal
EQP. No. REQ. No. Rev Kertas
Lokasi : Belawan
Progress
Jumlah Overall
Total Progress
Doc's Weight IFR IFA IFC
Aktual
IFR IFA IFC 50% 30% 20% 100.00%
15 100.00% 42.67%
4 26.67% 90.00%
28-Nov-18 13-Dec-18 03-May-19 1 6.67% 100% 100% 100% 100.00%
25-Apr-19 04-Jan-19
17-Jan-19
25-Apr-19
28-Nov-18 13-Dec-18 1 6.67% 100% 100% 0% 80.00%
25-Apr-19 04-Jan-19
12-Dec-18 19-Dec-18 03-May-19 1 6.67% 100% 100% 100% 100.00%
25-Apr-19 04-Jan-19
16-Jan-19
12-Dec-18 19-Dec-18 1 6.67% 100% 100% 0% 80.00%
25-Apr-19 16-Jan-19
2 13.33% 0.00%
1 6.67% 0% 0% 0% 0.00%
1 6.67% 0% 0% 0% 0.00%
4 26.67% 70.00%
1 6.67% 0% 0% 0% 0.00%
Nomor : 047.PJ/KSO-DL-01
Tanggal : 02-June-2019
Lokasi : Belawan
Progress
Jumlah Overall
Total Progress
Doc's Weight IFR IFA IFC
Aktual
IFR IFA IFC 50% 30% 20% 100.00%
07-Feb-19 14-Feb-19 1 6.67% 100% 100% 0% 80.00%
20-Feb-19
22-Feb-19
07-Mar-19
24-Mar-19 08-May-19 15-May-19 1 6.67% 100% 100% 100% 100.00%
08-Apr-19 02-May-19 15-May-19 1 6.67% 100% 100% 100% 100.00%
5 33.33% 0.00%
1 6.67% 0% 0% 0% 0.00%
1 6.67% 0% 0% 0% 0.00%
1 6.67% 0% 0% 0% 0.00%
1 6.67% 0% 0% 0% 0.00%
1 6.67% 0% 0% 0% 0.00%
PROCUREMENT MASTER SCHEDULE
PROJECT: Rehabilitasi Cathodic Protection
CLIENT: PLTU Belawan
CONTRACTOR: KOS KPI-Tanex-PTSE
CONTRACT NO.: 047.Pj/KIT.03.02UIKSBU/2018
CUT OF DATE: 16-Jun-19
A MATERIAL LIST
1 Transformer Rectifier Spesifikasi : unit 6
Type : Manual Setting
- Cooling : Air Cooled (Pendinginan Udara )
- Input AC: : 3 phase, 380VAC, 50 Hz, Output: 250 Amp-50 V
- Casing : SS 304, Outdoor Type : IP 43
unit
2 Servis Transformer Rectifier : 14
"
Pembersihan Transformer Rectifier : penggantian Diode, fuse, manual Volt meter, Amp meter dan Lampu,
Pengencangan mur baut, pengecekan kabel kabel, Pengecatan Casing
Consist of 6 Pes MMO anode dimension 1" x 1m c/w 150m leghth of 1 x 35 sq.mm HMWPE cable
Consist of 5 Pes MMO anode dimension 1" x 1m c/w 100m leghth of 1 x 35 sq.mm HMWPE cable
B. Material for Deepwell Anode lnstall (1 hole- 30 meter each), total 8 unit adalah :
Steel Pipe Casing 8" dia non schedule Pcs 20 PO-170
Loresco SC-3 Coke Breeze backsfill 501bs/bag Bag 120
Anode Centralizer ( u-clamp) Pcs 96
Nylon Rope meter 300
Breather pipa PVC dia 1" @4m length meter 300
Cover for casing pipe Pcs 8
6 Mixed Metal Oxide Anode, Dimension 1" x 1m c/w cable HMWPE
Length cable : 100m ( 10 pes), size 25sq.mm unit 10 PO-172
Length cable : 50m ( 5 pes), size 16sq.mm unit 5 PO-172
7 FRP (Fiber Rainforced Plastic) Support Dimension : 1" x 1200mm set 15 P0-004 03-May-19
8 Positive SS 304 Juction Box, Casing : S/S 304, 2mm, Dimension : 400 x 300 x 200 (with 10 terminals) unit 20 PO-167
9 Cable, Cable XLPE/PVC 1 x 70sq mm meter 3800 PO-166
10 Cast Almunium Test Point, c/w 2 5 Terminal with 3" dia conduit 6ft long unit 76 PO-167
11 Permanent Cu/CuS04 unit 80 PO-173
12 Galvanized Conduit dia 1" x 4m btg 1,000 PO-169
Accesories Conduit (Eibow,Sock) lot 4 PO-169
68 PO-122 &
13 Almunium Anode Type ICS 70 AWB, Net Weight : 7kg, Gross Weight: 7,3 kg Pcs 03-May-19 04-May-19 08-May-19 09-May-19
PO-164
400 PO-122 &
14 Almunium Anode Type ICS 40 AWB, Net Weight : 4kg, Gross Weight: 4,4 kg Pcs 03-May-19 04-May-19 08-May-19 09-May-19
PO-164
Almunium Anode special design for condesor, Nb: Dimensi sesuai anode eksiting, jumlah anode tergantung 850
15 dimensi Kg PO-162
Almunium Anode special design for condesor by pass pipe, Nb: Dimensi sesuai anode eksiting, jumlah anode 330
16 Kg PO-162
tergantung dimensi
17 AC Power 3 x 10 sq.mm meter 500 PO-165
18 Miscellanous item (Nut, Bolt, Tape) lot 1 PO-171 03-May-19 04-May-19 08-May-19 09-May-19
T MASTER SCHEDULE (PMS)
PO-122 &
Accepted 07-May-19 08-May-19 2.69% 04-May-19 09-May-19 08-May-19 100.00% 50.00% 50.00% 50.00% 55.00%
PO-164