Vous êtes sur la page 1sur 8

KARNATAKA INDUSTRIAL AREAS DEVELOPMENT BOARD

INDUSTRIAL AREA-WISE TENTATIVE PRICE OF LAND AS ON 31.12.2016

Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE


No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
1 BENGALURU URBAN DIST:
1 Attibele 3/13/2012 100.00
2 Bommasandra 3/13/2012 200.00
3 Bommasandra IV Phase 3/13/2012 200.00
4 Bommasandra-Jigani Link Road 3/13/2012 200.00
5 DDK-Dyavasandra I & II 9/6/2007 200.00
6 Electronic City Phase II 9/6/2007 200.00
7 Electronic City Phase III 9/6/2007 200.00
8 EOIZ 9/6/2007 200.00
9 EPIP I & II Phase 9/6/2007 200.00
10 Jigani I & II Phase 3/13/2012 150.00
11 Kadugodi-Sadaramangala 9/6/2007 200.00
12 Kumbalagudu I & II Phase 3/13/2012 100.00
13 Peenya 9/6/2007 200.00
14 Veerasandra 3/13/2012 200.00
15 Kachanayakanahally 3/13/2012 200.00
16 Yarandahalli 3/13/2012 200.00
2 BENGALURU RURAL DIST:
1 Bengaluru Aerospace Park 5/25/2013 250.00
2 Bengaluru Aerospace -SEZ 5/25/2013 250.00
3 Bengaluru IT Park 5/25/2013 250.00
4 Bengaluru Hardware Park 5/25/2013 250.00
5 D.B.Pura Apparel Park I Phase 3/13/2012 80.00
6 D.B.Pura Apparel Park II Ph. 3/13/2012 80.00
7 Dobaspet 3/13/2012 70.00
8 Dobaspet II Phase 3/13/2012 70.00
9 Doddaballapura 3/13/2012 60.00
10 Obhadenahally 12/27/2012 129.00
11 Hoskote 3/13/2012 75.00
12 Sompura I & II Phases 3/11/2013 150.00
13 Avverahalli (Dobaspet IV Phase) 3/11/2013 150.00

1
Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE
No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
3 BELAGAVI DIST.
1 Gokak 2/1/2008 10.00
2 Honaga 3/13/2012 15.00
3 Kakati 3/13/2012 15.00
4 Kanabargi Auto Complex 3/13/2012 25.00
5 Kanabargi I.A 3/13/2012 25.00
6 Kangrali 3/13/2012 15.00
Kangrali Sub Layout 10/1/2013 85.00
7 Kittur 6/4/2016 Rs.52 lakhs per acre, including
cost of power, internal water
distribution lines, roads, drains
and street lights.

4 BELLARI DIST.
1 Ananthpur Road 3/13/2012 10.00
2 Hospet (Sanklapura) 3/13/2012 5.00
3 Sanklapura II Phase 9/29/2015 66.00
4 Mundaragi I Phase 3/13/2012 10.00
5 Mundaragi II Phase 3/13/2012 10.00
6 Mundaragi III Phase 3/13/2012 10.00
7 Mundaragi IV Phase[Appl.park] 8/17/2009 10.50
Housing Layout-Mundargi 8/10/2010 174.00
Kudithini I Phase IA 12/19/2015 43.00
5 BIDAR DIST.
1 Basavakalyan 8/10/2010 25.00
2 Basavakalyan Autonagar 8/10/2010 25.00
3 Humnabad 6/27/2013 28.00
Humnabad Sub-layout 6/27/2013 28.00
4 Kolhar 12/21/2013 37.00
5 Kolhar II Phase 12/21/2013 37.00
6 Naubad 8/10/2010 25.00
7 Naubad Auto Nagar 2/2/2011 15.00
8 Naubad Housing 8/10/2010 30.00
6 VIJAYAPURA DIST.
1 Aliabad (Mini G.C.) 12/27/2012 25.00
2 Aliabad -II Stage 12/27/2012 25.00
3 Mahalbagayat 12/27/2012 25.00
Mulawad (New IA) 6/4/2016 Rs.15 lakhs per acre excluding
the pro-rata cost of power,
water, road and other
infrastructure.

2
Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE
No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
7 BAGALKOT DIST.
1 Assangi 3/13/2012 5.00
2 Bagalkot - Navnagar-Food Park 8/17/2009 5.00
8 CHAMARAJANAGAR DIST
1 Badanekuppe-Kellamballi 6/4/2016 36.00
9 CHICKMAGALUR DIST.
1 Amble 11/15/2011 8.00
2 Amble II Phase 8/10/2012 13.50
10 CHIKKABALLAPUR DIST
1 Chikkaballapur 3/13/2012 30.00
2 Gowribidanur I Phase 6/4/2015
Industrial Area 42.00
Housing Area 42.00
3 Gowribidanur II Phase 6/4/2015 42.00
4 Mastenahalli 6/4/2016 Rs.45 lakhs per acre, excluding
the pro-rata cost of power,
water, road and other
infrastructure
11 CHITRADURGA DIST
1 Kelkote 3/13/2012 5.00
12 DAKSHINA KANNADA.
1 Baikampady 8/14/2015 100.00
2 EPIP, Ganjimutt IA 3/12/2012 40.00
3 IT, SEZ, Mangalore. 3/13/2012 50.00
4 Karnad 3/13/2012 15.00
5 Puttur 12/7/2005 0.52
6 Thannirbhavi 8/14/2015 100.00
7 Canara 9/27/2010 50.00
13 DAVANAGERE DIST.
1 Davanagere 3/13/2012 8.00
2 Hangavadi 11/19/2016 30.40
3 Harlapur I Phase 8/10/2010 22.75
4 Harlapur II Phase 8/10/2010 22.75
5 Karur 3/31/2008 30.00
14 DHARWAD DIST.
1 Dharwad G.C.
a) Belur I Phase 8/14/2015 65.00
b) Belur II Phase 8/14/2015 65.00
c) Belur III Phase 8/14/2015 65.00

3
Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE
No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
d) Sub-Layout - reserved for N.K. SC/ST SSI 3/13/2012 25.00
Entrepreneurs Assoc.
2 Gokul 3/13/2012 25.00
3 Lakkammanahally 3/13/2012 25.00
4 Rayapura 3/13/2012 25.00
5 Rayapura II Stage 3/13/2012 25.00
6 Sattur 3/13/2012 25.00
7 Tarihal I Phase 3/13/2012 25.00
8 Tarihal II Phase 3/13/2012 25.00
Tarihal Sub-layout Plot No.126 9/15/2012 22.50
9 Mummigatti & Narendra 6/4/2016 Rs.26 lakhs per acre, excluding
the pro-rata cost of power,
water, road and other
infrastructure
10 Gamanagatti I Phase
Industrial Area 3/2/2013 61.00
Bulk allotment 9/27/2010 32.00
KSSIDC 9/27/2010 30.00
11 Gamanagatti II Phase 3/2/2013 61.00
12 Gamanagatti IA – Housing Sites
6.10M x 9.14M (55.75 Sqmtrs) 4/5/2006 Rs.4500/- per Sqmtr
9.14M x 12.19M (111.42 Sqmtrs) 05.04.2006 Rs.4600/- per Sqmtr
6.14M x 15.24M (139.29 qmtrs) 05.04.2006 Rs.4700/- per Sqmtr
12.19M x 18.29M (222.96 Sqmtrs) 05.04.2006 Rs.4800/- per Sqmtr
Housing Tenements
1 BHK (39.48 Sqmtrs Plinth Area) 05.04.2006 (GF) Rs.11,00,000/-
(FF) Rs.10,50,000/-
(SF) Rs.10,10,000/-
2 BHK (53.51 Sqmtrs Plinth Area) 05.04.2006 (GF) Rs.14,50,000/-
(FF) Rs.14,00,000/-
(SF) Rs.13,70,000/-
15 GADAG DIST.
1 Narasapura (Mini Growth Centre) 3/13/2012 10.00
16 KALABURAGI DIST.
1 Kapnoor I & II Phase 3/13/2012 20.00
Kapnoor Sub Layout 8/17/2009 20.00
2 Kapnoor III Phase 3/11/2013 64.15
3 Nandur Kesartigi 3/13/2012 15.00
4 Nandur Kesartagi II Phase 9/29/2015 51.50

4
Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE
No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
17 HASSAN DIST.
1 B Kattihalli 3/13/2012 7.50
Growth Centre- Sub-layout 11/15/2011 28.00
2 Growth Centre 11/15/2011 28.00
Housing Area-Growth Centre 11/15/2011 28.00
Sub Layout (IOCL land) 11/15/2011 28.00
Sub-Layout (G.C.) 11/15/2011 28.00
3 SEZ-Textile Zone 8/19/2008 21.75
4 SEZ-Food Processing Zone 8/19/2008 21.75
5 SEZ-Bio-Technology & Pharma 8/19/2008 21.75
6 Holenarasipur 3/13/2012 5.00
7 Thimmenahalli 3/13/2012 10.00
18 KODAGU DIST.
1 Kushalanagar 3/13/2012 15.00
19 KOPPAL DIST.
1 Kustagi 3/13/2012 7.50
20 KOLAR DISTRICT
1 Bangarpet 3/13/2012 15.00
2 Malur I & II Phase 3/13/2012 69.00
3 Malur III Phase 3/13/2012 69.00
4 Malur IV Phase 6/4/2016 Rs.102 lakhs per acre,
excluding the pro-rata cost of
water supply scheme
Malur IV Phase Sublayout 11/24/2014 117.50
5 Tamaka 3/13/2012 30.00
6 Narasapura
Industrial Area 11/24/2014 131.00
KSSIDC (Bulk Allotment) 8/10/2010 48.00
Housing Area (Bulk) 11/24/2014 131.00
7 Housing Layout at Narasapura IA
EWS Plot – 6 x 9 M 4/5/2016 Rs.10,200/- Per Sqmtr
LIG Plot – 9 x 12 M 4/5/2016 Rs.10,700/- Per Sqmtr
MIG Plot – 12 x 18 M 4/5/2016 Rs.11,400/- Per Sqmtr
HIG-1 Plot – 15 x 24 M 4/5/2016 Rs.12,000/- Per Sqmtr
8 Jakkasandra 6/4/2016 Rs.88 lakhs per acre excluding
pro-rata cost of independent
water supply scheme

9 Vemagal 6/4/2016 Rs.101 lakhs per acre,


excluding the pro-rata cost of
independent water supply
scheme
5
Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE
No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
21 MANDYA DISTRICT
1 Hebbal 2nd Phase 3/13/2012 50.00
2 Mandya(Tubinakere) 3/13/2012 30.00
3 Somanahally 3/13/2012 30.00
4 Gejjalagere 11/19/2016 42.00
22 MYSURU DISTRICT
1 Belagola/Metagalli 3/13/2012 50.00
2 Belawadi 3/13/2012 50.00
3 Hebbal / Electronic City 3/13/2012 50.00
4 Hebbal (Housing) 3/13/2012 50.00
5 Hootagalli 3/13/2012 50.00
6 Kadakola 2/2/2011 70.00
7 Koorgally 3/13/2012 50.00
Koorgally Sub Layout 12/19/2009 50.00
8 Nanjangud 3/13/2012 25.00
9 Thandya 3/13/2012 25.00
10 Kallahalli 6/27/2013 75.00
11 Adakanahalli 6/4/2016 Rs.60 lakhs per acre, including
cost of power, internal water
distribution lines, roads, drains
and street lights

12 Immavu & Thandavapura II Stage 6/4/2016 Rs.35 lakhs per acre


(Undeveloped land) excluding
the pro-rata cost of power,
water, road and other
infrastructure.
23 RAICHUR DIST.
1 Deosugur 3/13/2012 3.00
2 Manvi 5/24/2007 16.00
3 Manvi Auto Complex 5/24/2007 24.00
4 Raichur 3/13/2012 5.00
5 Yemarus (New IA) 6/4/2016 55.00
6 Raichur Growth Centre 6/4/2016 40.00
Raichur GC - Housing Sites
EWS – 6M x 9M (54 Sqmtrs) 4/5/2016 Rs.5380/- Per Sqmtr
LIG – 9M x 12M (108 Sqmtrs) 05.04.2016 Rs.6455/- Per Sqmtr
MIG – 9M x 15M (135 Sqmtrs) 05.04.2016 Rs.6995/- Per Sqmtr
HIG– 12M x 18M (216 Sqmtrs) 05.04.2016 Rs.8070/- Per Sqmtr
Housing Tenements
LIG- 9Mx12M (56.54 Sqmtr Built-up Area) 05.04.2016 Rs.25,00,000/-
MIG- 9Mx15M (66.89 Sqmtr Built-up Area) 05.04.2016 Rs.31,50,000/-

6
Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE
No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
HIG- 12Mx18M (105.92 Sqmtr Built-up Area) 05.04.2016 Rs.46,50,000/-

24 RAMANAGAR DIST.
1 Bidadi 3/13/2012 78.00
2 Bidadi II Phase-Sector-I 6/28/2010 78.00
3 Bidadi II Phase-Sector-II 10/5/2009 78.00
4 Harohally I Phase 7/16/2016 150.00
5 Harohally II Phase 7/16/2016 150.00
6 Harohally III Phase 7/16/2016 150.00
25 SHIVAMOGGA DIST.
1 Auto Complex Kallahalli 3/13/2012 150.00 per Sft.
2 Mandli-Kallur 3/13/2012 6.00
3 Shimoga-Bhadravathi 3/13/2012 10.00
4 Nidige 8/27/2016 28.00
5 Sanda 3/13/2012 26.00
6 Devakathikoppa 9/29/2015 65.50
7 Mangalabeesu Auto Complex 9/19/2014 69.56
26 TUMAKURU DIST.
1 Antharasanahally I Phase 3/2/2013 68.00
2 Antharasanahally II Phase 3/2/2013 68.00
3 Hirehally 3/2/2013 68.00
4 Kunigal 3/2/2013 68.00
5 Kunigal II Phase 3/2/2013 68.00
6 Sathyamangala 3/2/2013 68.00
7 Vasantha Narasapura I Phase 3/2/2013 68.00
8 Vasantha Narasapura II Phase 3/2/2013 68.00
9 Vasantha Narasapura III Phase 7/16/2016 70.00
10 Vasanthanarasapura III Phase-Housing Sites
9M x 6M (54 Sqmtrs) 4/5/2016 Rs. 9,815/- per sqmtr
9M x 12M (108 Sqmtrs) 4/5/2016 Rs.10,916/- per sqmtr
9M x 15 (135 Sqmtrs) 4/5/2016 Rs.12,000/- per sqmtr
Housing Tenements
9M x 12M (52.20 Sqmt Plinth Area) 4/5/2016 Rs.28,50,000/-
9M x 15M (78.95 Sqmt Plinth Area) 4/5/2016 Rs.36,50,000/-
12M x 18M (99.86 Sqmt Plinth Area) 4/5/2016 Rs.44,00,000/-
11 Sira (New IA) 6/4/2016 Rs.30 lakhs per acre, only for
anchor industries requiring
minimum 100 acres with an
investment of Rs.1000 crores.
12 Integrated Machine Tool Park at 8/27/2016 113.00
Vasanthanarasapura

7
Sl. INDUSTRIAL AREA Date of PREVAILING PRICE/ACRE
No. Revision (RS. IN LAKHS)
(B.M.Date)
1 2 3 4
27 UDIPI DIST..
1 Shivally 3/13/2012 10.00
2 Nandikur 2/2/2011 61.50
3 Belupu 4/28/2014 53.50
4 Miyaru 6/4/2015 42.00
28 UTTARA KANNADA DIST.
1 Shirwad 3/13/2012 5.00
29 YADGIR DIST.
1 Yadgir 3/13/2012 5.00
2 Kadechuru MSME Layout 6/4/2016 19.50
3 Kadechuru IA 6/4/2016 19.50

Vous aimerez peut-être aussi