Rich Township High School District 227

Detail Summary of the Repairs to Rich High School Campuses

Area Type School Extension


Facade East $ 1,280,600
Roofing East $ 4,908,700
Interiors East $ 5,185,000
Elevators East $ 183,500
Plumbing East $ 2,582,900
Fire Suppression East $ 1,777,200
HVAC East $ 8,596,200
Electrical East $ 25,643,700
Fire Alarm & Comm East $ 4,696,700
Equipment/Special East $ 1,872,500
Site Development East $ 1,743,600
Pavement East $ 751,500
Site Lighting East $ 230,300
Follow-up Studies East $ 17,700 $ 59,470,100

Structure South $ 84,600


Façade South $ 1,136,700
Roofing South $ 2,597,100
Interior South $ 5,164,200
Elevators South $ 135,400
Plumbing South $ 233,900
Fire Suppression South $ 67,600
HVAC South $ 8,383,600
Electrical South $ 7,467,100
Fire Alarm & Communication South $ 3,905,700
Equipment/Special South $ 555,800
Site Development South $ 801,200
Pavement South $ 1,042,000
Site Lighting South $ 167,000
Accessibility South $ 7,500 $ 31,749,400

Structure Central $ 16,400


Facade Central $ 551,200
Roofing Central $ 2,647,500
Interiors Central $ 8,697,400
Elevators Central $ 439,200
Plumbing Central $ 488,500
Fire Suppression Central $ 1,339,200
HVAC Central $ 9,460,700
Electrical Central $ 5,448,500
Fire Alarm & Comm Central $ 4,242,800
Equipment/Special Central $ 989,700
Site Development Central $ 3,004,400
Pavement Central $ 1,807,700
Site Lighting Central $ 231,600
Landscaping Central $ 330,000
Follow-up Studies Central $ 10,000 $ 39,704,800
Total $ 130,924,300

This information was produced in collaboration with EMG, Pepper Construction, and STR.