Detail Summary of the Repairs to Rich High School Campuses
Area Type School Extension
Facade East $ 1,280,600 Roofing East $ 4,908,700 Interiors East $ 5,185,000 Elevators East $ 183,500 Plumbing East $ 2,582,900 Fire Suppression East $ 1,777,200 HVAC East $ 8,596,200 Electrical East $ 25,643,700 Fire Alarm & Comm East $ 4,696,700 Equipment/Special East $ 1,872,500 Site Development East $ 1,743,600 Pavement East $ 751,500 Site Lighting East $ 230,300 Follow-up Studies East $ 17,700 $ 59,470,100
Structure South $ 84,600
Façade South $ 1,136,700 Roofing South $ 2,597,100 Interior South $ 5,164,200 Elevators South $ 135,400 Plumbing South $ 233,900 Fire Suppression South $ 67,600 HVAC South $ 8,383,600 Electrical South $ 7,467,100 Fire Alarm & Communication South $ 3,905,700 Equipment/Special South $ 555,800 Site Development South $ 801,200 Pavement South $ 1,042,000 Site Lighting South $ 167,000 Accessibility South $ 7,500 $ 31,749,400
Structure Central $ 16,400
Facade Central $ 551,200 Roofing Central $ 2,647,500 Interiors Central $ 8,697,400 Elevators Central $ 439,200 Plumbing Central $ 488,500 Fire Suppression Central $ 1,339,200 HVAC Central $ 9,460,700 Electrical Central $ 5,448,500 Fire Alarm & Comm Central $ 4,242,800 Equipment/Special Central $ 989,700 Site Development Central $ 3,004,400 Pavement Central $ 1,807,700 Site Lighting Central $ 231,600 Landscaping Central $ 330,000 Follow-up Studies Central $ 10,000 $ 39,704,800 Total $ 130,924,300
This information was produced in collaboration with EMG, Pepper Construction, and STR.