Vous êtes sur la page 1sur 4
SCG BUILDING TELH FULFiLwall System Stay-in-place Lightweight Mortar Wall System From now on...Speed and Quality Will be standard that you can be confident in all of your projects. FULFiLwall System Stay-in-place Lightweight Concrete Wall System ee keen CaaS ete cco eu eke es Pickus kc) erro kien eee sR RCN Bere any hug ts cnc os + No need for lintel beam and tie column. + No problem of wall collapsing and non-perr Beeches uitest De ee eee Suna ae By earetere f walls between 40-61 STC Bec eters ae curr a Tine eau “Wi n, the construction is v Su Rae EI + Excellent strength (Severe Duty); resistant to force and adi + Special mortal wall casting; resistant to fire, s + Hanging weight; able to carry up to 50 kg, per point. Ree ie cu ker Weight s0kp/eam Soundproof Value Wall Thickness 4s sTC PAM eoig Ue eee Installation Speed (90-40 aqm/éay/oam (4 people) Severe Duty Strength Fire Protection (655234) eee) ra re feat |Eed ro Feral fall |e 7 0m conn A-100/S A-150/G A-200/C waste sosTe Sesto “The specification of soundproof value is calculated from the program.” Able to design the wall as high as needed, depending on the wall structure. 120mm —4 A-200/66 61 sTC “Atle tw design forthe highest sound vabie of 81 STC Installation Procedures FULFiLwall Determine the wall for installation. Lay the U-Frame along the line. Fixitto the bullaing floor and the under slab ‘of the upper oor with concrate belt, Than, fixthe C-Frame according to the height of partion wll Install Smart Board or gypsum board on another side of the frame. Then, fil the lightweight mortar into the wall Mortar wilinitally setin 1:20 min Put the fer glass insulation ito gap, ‘the mortar fling channels, at upper part of the wall 2 Install the Smart Board or gypsum board to the frame. =< stall the Srnart Board or gypsum board onthe ther side. Then, ask the project to complete IME System inside. tis suggested to install intha vertical ne, Close the top with the Smart Board or gypsum board. Then, conceal the joints, comer trims, and screw heads by using plastering joint compound the frame. Then, {il the lightweight mortar into the wall Cee eee eer ‘System Thickness (em.) +0 10 Weight (kg./sq.m) 90 90 ‘Wall System Wet System Semi-Dry System ‘Soundproof Value (STC) 37 40-61 Fire Protection Value (hrs)* hes. 2 hrs. 45 min Installation Speed 8 squm./person/day 10.sqmJperson/day ‘Surface Quality ough; Need Skimming ‘Smooth; Non-Skimming ‘System Installation (MBE) Groove the wal, Install ‘Able to work withthe system the systems, Repair ‘Wall System Strength (Partition Grade) | Severe duty ‘Severe duty lane Wall Quality High chance of fang Control the quality by laser ‘Tle Columns/Lintel (3-meter wall) Needed Not needed ‘Door/Window Frame Installation ‘After the wall bulging aay to install with the wall (Law: Minimum offre protection wali 2) Variety of Walls FULFiLwall To support the proper installation in wet area, the use of Smart Board in the installation is specified. ‘Sanpleot Srarboarnlaatenietalrcor

Vous aimerez peut-être aussi