This document provides a breakdown of general requirements for an SMP installation project located in Didipio, Nueva Viscaya, Philippines. It outlines costs for mobilization and demobilization, engineering plans, permits, bonds and insurance, safety equipment, temporary facilities, and site management over a 3.5 month period. Key costs include PHP 2.1 million for labor and equipment mobilization, PHP 358,280 for engineering designs, PHP 542,640 for bonds and insurance, and PHP 689,500 for site management staffing. The total budget for general requirements is PHP 4,840,508.
This document provides a breakdown of general requirements for an SMP installation project located in Didipio, Nueva Viscaya, Philippines. It outlines costs for mobilization and demobilization, engineering plans, permits, bonds and insurance, safety equipment, temporary facilities, and site management over a 3.5 month period. Key costs include PHP 2.1 million for labor and equipment mobilization, PHP 358,280 for engineering designs, PHP 542,640 for bonds and insurance, and PHP 689,500 for site management staffing. The total budget for general requirements is PHP 4,840,508.
This document provides a breakdown of general requirements for an SMP installation project located in Didipio, Nueva Viscaya, Philippines. It outlines costs for mobilization and demobilization, engineering plans, permits, bonds and insurance, safety equipment, temporary facilities, and site management over a 3.5 month period. Key costs include PHP 2.1 million for labor and equipment mobilization, PHP 358,280 for engineering designs, PHP 542,640 for bonds and insurance, and PHP 689,500 for site management staffing. The total budget for general requirements is PHP 4,840,508.
PROJECT : SMP INSTALLATION WORKS FOR GRAVITY CIRCUIT UPGRADE
LOCATION : Didipio Nueva Viscaya
DATE : June 27, 2019 SUBJECT : GENERAL REQUIREMENTS
DESCRIPTION QTY UNIT UNIT COST TOTAL AMOUNT
I. General Requirements 4,840,508.00
A. Mobilization and Demobilization 2,096,288.00 Labor 3,136.00 man hr 83.00 260,288.00 Equipment Mobilization Hauling of Tower Crane (manila to didipio) 8.00 set 105,000.00 840,000.00 Hauling of Tunnel Forms (manila to didipio) 6.00 set 105,000.00 630,000.00 Unloading of Equipment Rough Terrain Crane 120.00 eq hr 2,800.00 336,000.00 Boom truck (Mob/Demob) 1.00 lot 30,000.00 30,000.00
B. Architectural and Engineering Design Plans and as builts 358,280.00
Structural 2,000.00 sq.m 95.00 190,000.00 Electrical 238.00 units 260.00 61,880.00 Temporary Electrical 1.00 lot 35,000.00 35,000.00 Sanitary/Plumbing 238.00 units 300.00 71,400.00
C. Permits and Fees 178,500.00
Locational clearance 238.00 units 50.00 11,900.00 Barangay Clearance 238.00 units 700.00 166,600.00
D. Bond and Insurances 542,640.00
CARI 1.00 ls 226,100.00 226,100.00 Performance 1.00 ls 180,880.00 180,880.00 Surety 1.00 ls 135,660.00 135,660.00
E. Safety Personal Protective Equipment 242,700.00
Learn Python Programming for Beginners: Best Step-by-Step Guide for Coding with Python, Great for Kids and Adults. Includes Practical Exercises on Data Analysis, Machine Learning and More.
ChatGPT Side Hustles 2024 - Unlock the Digital Goldmine and Get AI Working for You Fast with More Than 85 Side Hustle Ideas to Boost Passive Income, Create New Cash Flow, and Get Ahead of the Curve
ChatGPT Money Machine 2024 - The Ultimate Chatbot Cheat Sheet to Go From Clueless Noob to Prompt Prodigy Fast! Complete AI Beginner’s Course to Catch the GPT Gold Rush Before It Leaves You Behind