BEME , EROSION CONTROL AND ROAD IMPROVEMENT WORKS ,UYANGA,AKAMKPA,CROSS RIVER STATE.

BILL OF ENGINEERING MEASUREMENT AND EVALUATION FOR FLOOD CONTROL AND SWAMP UPGRADING/ ROAD
IMPROVEMENT WORKS , AT IBBI ROAD GRA WUKARI, TARABA STATE.

BILL No. 1 - PRELIMINARY AND GENERAL WORKS


No ITEM DESCRIPTION QTY UNIT RATE(N) AMOUNT(N)

Provide for the cost of progress photograph


1.1 1 P.S
as directed by the Engineer.

1.2 Allow for Geotechnical 1 P.S


investigation/survey,soil and and concrete
tests as directed by the Engineer.
Allow for Survey works, labour, equipment
1.3 and stationaery for the Engineer's 1 P.S
Representative.
Provide office accommodation facilities with
1.4 maintenance for the Engineer's 1 P.S -
representative
Provide , furnish and maintain living
1.5 accommodation for the Engineer's 1 P.S -
representative.
Allow for payment of allowances to
1.6 Engineers representatives support staff as 1 P.S -
may be determine by the client.
Allow for mobilization and demobilization of
1.7 equipment , materials and human 1 P.S -
resources.
Allow for site meeting ,transportation and
1.8 1 P.S -
monitoring.
Allow for procurement Due diligence
1.9 1 P.S -
surpevision.
Provide for transport expenses / logistic of
1.10 the Engineer's representative on the project 1 P.S -
as directed.
1.11 Allow for Engineer's Training 1 P.S -

1.12 Allow for Handing over and commissioning 1 P.S -


in consultation with the client.
TOTAL FOR BILL NO 1 CARRIED TO SUMMARY -

ANGLELIGHT RESOURCES LTD.


BEME , EROSION CONTROL AND ROAD IMPROVEMENT WORKS ,UYANGA,AKAMKPA,CROSS RIVER STATE.

BILL NO 2 : SITE CLEARING AND


EARTHWORKS

No DESCRIPTION OF WORKS QTY UNIT RATE(N) AMOUNT(N)

Provide and erect project Notice board as


2.1 2 Nrs -
directed by the Engineer.

2.2 1 P.S -
Allow for access roads within the project
site.

Clear all bushes, grasses, trees and other


2.3 rubbish at work site and remove to spoil at 39800 sqm -
approve locations.

2.4 Cut and grub site of all trees excceeding 12 Nrs -


300mm in girth and dispose to spoil.
Provide from approved borrow pits
homogenous fill materials (laterite) for gully
2.5 reclmation.filling and compact in layers of 9880 cub.m -
150mm thickess including levelling and
shaping to specification.
provide from approved borrow pits
homogenous fill materials and use for road
embankment as specified.Filling and
2.6 compaction in layers of 25cm thickness 10260 cub.m -
including levelling and shaping to
specification.

Provide ,spread,shape and compact to100%


2.7 WASC approved wet mix stone base as base 9016 cub.m -
course ,thickness not exceeding 150mm on
carriage way.
General excavation on any material except
2.8 rock, to any depth and shape as may be 4205 cub.m -
required.a
Excavate for drains, detention pits,
2.9 chambers and outlet structures to formation 1806 cub.m -
levels.
Excavate for Box culverts, detention pits,
2.1 chambers and outlet structures to formation 496 cub.m -
levels.

2.11 Backfilling to all structure including drains, 3458 cub.m -


chambers .

2.12 Provide for dewatering from the construction 1 P.S -


right of way.

TOTAL FOR BILL NO 2 ; CARRIED TO SUMMARY


-

ANGLELIGHT RESOURCES LTD.


BEME , EROSION CONTROL AND ROAD IMPROVEMENT WORKS ,UYANGA,AKAMKPA,CROSS RIVER STATE.

BILL NO 3 : CULVERTS AND DRAIN


( CONCRETE WORKS)

DESCRIPTION OF WORKS QTY UNIT RATE(N)


ITEM
AMOUNT(N)
NO

Provide and place weak concrete grade ( u-


1500) for blinding to foundation of
3.01 structures including drains , chambers and 147 cub.m -
drop spillways (thickness not less than
50mm)

Provide and place reinforced oncrete grade


3.02 638 cub.m -
(U-2250) to storm water drains , outlet
structures and chambers .

3.03 Provide and place reinforced oncrete grade 219 cub.m -


(U-2250) to Box culverts , outlet structures .
Provide , cut , shape and place ,high tensile
steel reinfocements ( 10 -12mm) in
3.04 reinforced concrete drain structural 68.87 Tons -
elements as shown in the drawings or as
directed by the Engineer.
Provide , cut , shape and place ,high tensile
steel reinfocements ( 10 -16mm) in
3.05 reinforced concrete box culvert structural 19.63 Tons -
elements as shown in the drawings or as
directed by the Engineer.

3.06 143 cub.m -


Provide and place concrete grade (U-2250)
for access slab as directed .

Provide and place 300mm stone masonry


3.07 ( pitched) laid in cement mortar (1:3) mix, at 288 sq.m -
the channels of embankments to achieve
slope protection as directed.

3.08 2806 sq.m -


Fair face finish formwork to side of reiforced
concrete grade ( U-2250) generally

TOTAL FOR BILL NO 3 CARRIED TO SUMMARY


-

ANGLELIGHT RESOURCES LTD.


BEME , EROSION CONTROL AND ROAD IMPROVEMENT WORKS ,UYANGA,AKAMKPA,CROSS RIVER STATE.

BILL NO 4 : ROAD CONSTRUCTION AND REHABILITATION

PAVEMENT AND SURFACING


DESCRIPTION OF WORKS QTY UNIT RATE(N)
ITEM
AMOUNT(N)
NO
Provide and apply prime coat on carriage-
way using MC-1 cutback bitumen @0.9
5.1 litres/sq.m including blinding with sand or 29600 Sq.m -
quarry dust.

Provide and spread first coat surface


5.2 dressing using STV 125 cutback bitumen at 29600 Sq.m -
the rate of 1.3 litres/sqm and 18mm single
crushed rock chippings on carriageway.

Provide and lay asphaltic concrete wearing


5.3 course to a compacted thickness of 50mm as 29600 Sq.m -
over lay including tack coat.

5.4 Provide and lay lean asphaltic concrete 6580 Sq.m -


wearing course to a compacted thickness of
15mm as over lay including tack coat.

TOTAL FOR BILL NO 4; CARRIED TO


-
SUMMARY

BILL NO 5 : AGRONOMICAL MEASURESS & SOIL CONTROL

6.1 Cover cleared surfaces and reshape gully 1800 sq.m -


banks with top soil , manure and grassing.
Construct wicker work fences around
6.2 shoulders of concrete structures and other 2400 sq.m -
areas.

Allow for carrying out Environmental impact


6.3 assessement(EIA) for the project by an 1 PS -
indepent consultant appointed by the
Engineer.

TOTAL FOR BILL NO 5; CARRIED TO


SUMMARY -

ANGLELIGHT RESOURCES LTD.


BEME , EROSION CONTROL AND ROAD IMPROVEMENT WORKS ,UYANGA,AKAMKPA,CROSS RIVER STATE.

BILL OF ENGINEERING MEASUREMENT AND EVALUATION FOR FLOOD CONTROL AND ROAD IMPROVEMENTWORKS
AT IBBI ROAD WUKARI GRA ,TARABA STATE.

AMOUNT(N)
SUMMARY
BILL 1-PRELIMINARIES AND GENERAL
-
WORKS
BILL 2-SITE CLEARING AND
EARTHWORKS -

-
BILL 3-CULVERTS AND DRAINS.

BILL 4-ROAD CONSTRUCTION AND -


REHABILITATION.

-
BILL 5-AGRONOMIC MEASURES & SOIL
CONSERVATION

SUB TOTA 1 0.00

ADD CONTIGENCY 0.00

ADD 2.5% ADMIN CHARGES 0.00

SUB TOTAL 2 0.00

ADD 5% VAT 0.00

TOTAL CONTRACT SUM 0.00