BACK FLUSH
Object
To describe the procedure for Sodium Hypocholrite shock dossing in safe working practice onto caisson of Seawater,
Service Water and Fire Water pumps.
Scope of application
PM3, BRA
Framework regulations
Nil
© REPSOL, S. A., 2016. All rights reserved. This document is the exclusive property of Repsol, S. A. and may only be used by the companies of the Repsol Group and their staff, in the exercise of their respective roles as employees of
the Repsol Group, except with the express written consent of Repsol, S. A. It may not be revealed to third parties, copied, distributed, reproduced, made public and/or modified, totally or partially, without the express written consent of
Repsol, S. A. Repsol reserves the right to take appropriate action against any violation of the terms in this section.
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
Table of contents
1. Introduction ........................................................................................................................................................... 3
1.1. System .................................................................................................................................................. 3
1.2. Purpose / Background........................................................................................................................... 3
2. Reference ............................................................................................................................................................... 3
3. Hazardous and Precaution ................................................................................................................................... 3
3.1. Hazard ................................................................................................................................................... 3
3.2. General Precautions ............................................................................................................................. 3
3.3. Job Specific PPE ................................................................................................................................... 4
4. Pre-Requisites / Competencies Requirement .................................................................................................... 4
5. Special Equipment’s / Tools / Material Required ............................................................................................... 4
6. Overview ................................................................................................................................................................ 4
7. Applied Procedure ................................................................................................................................................ 5
8. Appendices .......................................................................................................................................................... 10
Approval .................................................................................................................................................................... 111
© Repsol, S.A., 2016.
2 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
1. Introduction
1.1. System
Non Hazardous Utility System
2. Reference
3 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
Nil
Full PPE
Drum pump
Sodium Hypochlorite 10% concentration (25 liters drum)
Chemical resistant glove (nitril glove)
Respiratory protection
6. Overview
To prevent marine growth in seawater, seawater heat exchangers, firewater caissons, and service water caissons,
occasional manual shock dosing of sodium hypochlorite into the pump caissons is required. Sodium hypochlorite
10% in concentration is manually dosed into the funnel using drum pump. This process is carried out on a weekly
basis in the firewater caissons during the firewater pump test runs.
On the seawater and service water system manual dosing should be carried out weekly on the running pump. If
hypochlorinator package is down for maintenance / repairs, the dosing can be carried out daily on the running pump
to minimize buildup of marine growth.
© Repsol, S.A., 2016.
4 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
7. Applied Procedure
SECTION 1: PREPARATION FOR SODIUM HYPOCHLORITE MANUAL DOSING ON SEAWATER SYSTEM.
SECTION 2: SODIUM HYPOCHLORITE MANUAL DOSING ON SEAWATER SYSTEM.
SECTION 3: PREPARATION FOR SODIUM HYPOCHLORITE MANUAL DOSING ON SERVICE WATER SYSTEM.
SECTION 4: SODIUM HYPOCHLORITE MANUAL DOSING ON SERVICE WATER SYSTEM.
SECTION 5: PREPARATION FOR SODIUM HYPOCHLORITE MANUAL DOSING ON FIREWATER SYSTEM.
SECTION 6: PREPARATION FOR SODIUM HYPOCHLORITE MANUAL DOSING ON SEAWATER SYSTEM.
© Repsol, S.A., 2016.
5 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
6 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
2 Remove the chemical drum cap. Secure and lock the drum pump into NOTE: Shock dosing is only
the chemical drum and connect a hose to the drum pump. carried out on a running pump
to ensure the hypochlorite is
transferred throughout the
seawater system
3 All the valve positions for Service Water Lift system should be as
follows by default:
7 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
5 After completed, disconnect the hose from the drum pump. Flush the Note: Hypochlorite at this
hose and drum pump with water to wash away traces of sodium concentration is extremely
hypochlorite. corrosive.
2 Remove the chemical drum cap. Secure and lock the drum pump into NOTE: Shock dosing is only
the chemical drum and connect a hose to the drum pump. carried out on a running pump
to ensure the hypochlorite is
transferred throughout the
seawater system
3 All the valve positions for Service Water Lift system should be as Note: Shock dosing is only
follows by default: carried out on a running pump
during weekly pump test runs.
8 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
2 Slowly open MV-52060 (Pump #1) or MV-52066 (Pump #2). Ref PID BRA-DR-F-0370
Ref PID BRA-DR-F-0371
3 Connect the hose from the drum pump to manual dosing funnel.
4 Stroke the drum pump to transfer sodium hypochlorite 10% to the Site Operator to hold the hose
funnel. to secure the hose position.
5 After completed, disconnect the hose from the drum pump. Flush the Note: Hypochlorite at this
hose and drum pump with water to wash away traces of sodium concentration is extremely
hypochlorite. corrosive.
6 Flush water into the open funnel with water for 30 seconds. This will flush traces of
Hypochlorite on the GRE
piping to the caisson.
7 Close MV-52060 (Pump #1) or MV-52066 (Pump #2). Ref PID BRA-DR-F-0370
Ref PID BRA-DR-F-0371
© Repsol, S.A., 2016.
9 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
8. Appendices
Seawater Caisson (1x daily) Service Water Caisson (1x weekly) Firewater Caisson (1x weekly)
Date P-4800A/B Done by P-4900A/B Done by P-5200/5210 Done by Remarks
1-Feb-15 Pump A Nigel Cross example.
2-Feb-15 Pump A Nigel Cross example.
3-Feb-15 Pump A Nigel Cross
4-Feb-15 Pump A Nigel Cross Pump B Nigel Cross P-5200 & P-5210 Nigel Cross example.
5-Feb-15 Pump A Nigel Cross
6-Feb-15 Pump A Nigel Cross
7-Feb-15
8-Feb-15
9-Feb-15
10-Feb-15
11-Feb-15 Pump B Nigel Cross P-5200 & P-5210 Nigel Cross example.
12-Feb-15
13-Feb-15
14-Feb-15
15-Feb-15
16-Feb-15
17-Feb-15
18-Feb-15
19-Feb-15
20-Feb-15
21-Feb-15
22-Feb-15
23-Feb-15
24-Feb-15
25-Feb-15
26-Feb-15
27-Feb-15
28-Feb-15
1-Mar-15
2-Mar-15
3-Mar-15
4-Mar-15
5-Mar-15
6-Mar-15
7-Mar-15
8-Mar-15
9-Mar-15
10-Mar-15
© Repsol, S.A., 2016.
10 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
Approval
Validity
This Site Specific Procedure will become valid on the Three (3) years working day after the date of its approval.
Revoked regulation
Nil
Nil
Revision A1 Approved by
11 / 12
MY / OPERATIONS
MANUAL SHOCK DOSE SODIUM HYPOCHLORITE INTO SEAWATER, SERVICE AND FWP
Type: Site Specific Procedure Scope: PM3, BRA Code: PM3-OPS-BRA-PR-F-0133
Revision History
Rev. Approval Date Author Description of Change
A1 22/10/2018 MKA Periodically Review and Format Change
Document Administration
Document Administrator Operation, Engineering & Inspection Document Controller
Paper Master File Operation, Engineering & Inspection Document Controller
Electronic Master File FUSION, Native Format / TMS, Pdf Format
© Repsol, S.A., 2016.
12 / 12