Académique Documents
Professionnel Documents
Culture Documents
(Version 003)
Project Name: Fadhili Gas Program Project Project No: 605 (Overall) Date : 28 October to 03 Novembe
Welding & NDT Status E & I Inspection and Testing Status Civil Test Status
Joint Basis Linear Basis (Inches) This Week Cumulative This Week Cu
Mechanical /
Test Description Description
Welding This Week Cumulative This Week Cumulative Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted
(%) (%) (%)
Rejection Rate 5.92 3.609 0.02 0.06 High Pot Test Barcol Test
MONITORING PACKAGES , QVD'S , QSR'S & NCR'S NARRATIVE QUALITY CONTROL ACTIVITIES
Zone 1
Zone 2
Zone 3
Overall
Visual Test
Hydro Test
Pneumatic Test
Overall
Zone 1
Zone 2 MAJOR QUALITY CONCERN AND HIGHLIGHTS
Zone 3
Overall
QVD'S Status
Total
Description Packages
Tested Reject Rejection %
Zone 1
Zone 2
Zone 3
Overall
RFI'S
Surveilance Report (Client)
NCR'S (Client)
PROJECT QUALITY DASHBOARD
(Version 003)
PO PO
Placed Received
QA/QC Personnel's
Sub-Contractor
Actual Variance
Quality Notifications
Non-Conformance Report Status
Cumulative
Ratio
Issued Closed CL: INT
22 20
27 26
1 0
Worksheet Status
Closed Open
Project Name: Fadhili Gas Program Project Project No: 605 (Shop) Date : 24 JUNE 2017 TO 30 JUNE 2
Welding & NDT Status E & I Inspection and Testing Status Civil Test Status
Joint Basis Linear Basis This Week Cumulative This Week Cu
Mechanical /
Test Description Description
Welding This Week Cumulative This Week Cumulative Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted
(%) (%) (%)
Welded 142 1610 ─ Megger Test Field Density
Radiographed 12 181 1790.0 16533.76 Continuity Test CCSDT
Rejection 0 8 0.308 9.43 Ground Rod Test Joint Test
Rejection Rate 0.00 4.420 0.017 0.0570 High Pot Test Barcol Test
RT Backlog 5 28 Loop Checking Other Test
RTFI Dispute (Nos.) Other Test
Zone 1
Zone 2
Zone 3
Overall
Visual Test
Hydro Test
Pneumatic Test
Overall
Zone 1
Zone 2 MAJOR QUALITY CONCERN AND HIGHLIGHTS
Zone 3
Overall
QVD'S Status
Total
Description Packages
Tested Reject Rejection %
Zone 1
Zone 2
Zone 3
Overall
RFI'S
Surveilance Report (Client)
NCR'S (Client)
PROJECT QUALITY DASHBOARD
(Version 003)
QA/QC Personnel's
Sub-Contractor
Actual Variance
Quality Notifications
Non-Conformance Report Status
Ratio
Closed CL: INT
Worksheet Status
Closed Open
NARRATIVE QUALITY CONTROL ACTIVITIES
Project Name: Fadhili Gas Program Project Project No: 605 (Field) Date : 24 JUNE 2017 TO 30 JUNE 201
Welding & NDT Status E & I Inspection and Testing Status Civil Test Status
Joint Basis Linear Basis This Week Cumulative This Week Cumu
Mechanical /
Test Description Description
Welding This Week Cumulative This Week Cumulative Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted
(%) (%) (%)
Welded 13 55 270.47 1619.67 Megger Test Field Density
Radiographed 2 9 201.28 415.14 Continuity Test CCSDT
Rejection 0 3 1.607 7.76 Ground Rod Test Joint Test
Rejection Rate% 0 50 0 1.869 High Pot Test Barcol Test
RT Backlog 5 13 Loop Checking Other Test
RTFI Dispute (Nos.) Other Test
Zone 1
Zone 2
Zone 3
Overall
Visual Test
Hydro Test
Pneumatic Test
Overall
Zone 1
Zone 2 MAJOR QUALITY CONCERN AND HIGHLIGHTS
Zone 3
Overall
QVD'S Status
Total
Description Packages
Tested Reject Rejection %
Zone 1
Zone 2
Zone 3
Overall
RFI'S
Surveilance Report (Client)
NCR'S (Client)
PROJECT QUALITY DASHBOARD
(Version 003)
QA/QC Personnel's
Sub-Contractor
Actual Variance
Quality Notifications
Non-Conformance Report Status
Ratio
Closed CL: INT
Worksheet Status
Closed Open
NARRATIVE QUALITY CONTROL ACTIVITIES