Vous êtes sur la page 1sur 22

PROJECT QUALITY DASHBOARD

(Version 003)

Project Name: Fadhili Gas Program Project Project No: 605 (Overall) Date : 28 October to 03 Novembe

Client Contractor/Sub-Contractor(s) Project Progress (%) Procurement Sta

WEEKLY MONTHLY CUMULATIVE PO PO


Saudi Aramco TR/PCMC Planned Actual Planned Actual Planned Actual Planned Place

Project Quality Index (%) QA/QC Personnel's


PCMC Sub-Con
PROCUREMENT CONSTRUCTION SHOP CONSTRUCTION FIELD OVERALL Discipline
Planned Actual Variance Planned
Engineer's 6 4 2
Inspector's 36 36 0

Welding & NDT Status E & I Inspection and Testing Status Civil Test Status
Joint Basis Linear Basis (Inches) This Week Cumulative This Week Cu
Mechanical /
Test Description Description
Welding This Week Cumulative This Week Cumulative Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted
(%) (%) (%)

Welded 269 9162 13281.64 316701.10 Megger Test Field Density

Radiographed 169 1413 9194.00 46400.56 Continuity Test CCSDT

Rejection 10 51 2.19 27.58 Ground Rod Test Joint Test

Rejection Rate 5.92 3.609 0.02 0.06 High Pot Test Barcol Test

RT Backlog - 259 - - Loop Checking Other Test


RTFI Dispute (Nos.) Other Test

QMIS Status Quality Notifications


Request for Inspection Surveillance Non-Conformance Report Status
Violation (#) Proactive Notification This Week
Discipline Hold/Re- Ratio
Issued (#) Cancelled (#)
Scheduled
Accepted (#) Rejected (#) Acceptance % Project Phase By
Issued Closed Issued Closed Issued Closed CL: INT

Civil/Structural 8 0 0 0 0 Client Issued 0 0


Construction
Construction
Mech/ Welding / Piping/Painting 201 14 0 187 0 Internal 0 0

Electrical / Instrumentation 3 0 0 0 0 Design & Client Issued 0 0


Procurement Internal

Internal QA/QC Audit at or (Quarterly) Worksheet Status


Total For This Week 212 14 0 187 0
15% 30% 60% 90% Issued Close
Previous Total 3,077 163 75 2914 7

Cumulative 3,289 177 75 3101 7

MONITORING PACKAGES , QVD'S , QSR'S & NCR'S NARRATIVE QUALITY CONTROL ACTIVITIES

Structural Test Package Status


Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2
Zone 3
Overall

Mechanical/Piping Test Package Status


Total
Description Packages
Tested Reject Rejection %

Visual Test
Hydro Test
Pneumatic Test
Overall

Electrical / Instruments Test Package Status


Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2 MAJOR QUALITY CONCERN AND HIGHLIGHTS
Zone 3
Overall

QVD'S Status
Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2
Zone 3
Overall

OPEN RFI'S / SR / NCR'S AGE

Description 1 Week 2Week 3 Week 4 Week

RFI'S
Surveilance Report (Client)
NCR'S (Client)
PROJECT QUALITY DASHBOARD
(Version 003)

28 October to 03 November 2017

Procurement Status (#)

PO PO
Placed Received

QA/QC Personnel's
Sub-Contractor
Actual Variance

Civil Test Status


Cumulative
Rejection
Conducted Passed
(%)

Quality Notifications
Non-Conformance Report Status
Cumulative
Ratio
Issued Closed CL: INT

22 20
27 26

1 0

Worksheet Status

Closed Open

NARRATIVE QUALITY CONTROL ACTIVITIES

MAJOR QUALITY CONCERN AND HIGHLIGHTS


PROJECT QUALITY DASHBOARD
(Version 003)

Project Name: Fadhili Gas Program Project Project No: 605 (Shop) Date : 24 JUNE 2017 TO 30 JUNE 2

Client Contractor/Sub-Contractor(s) Project Progress (%) Procurement Sta


WEEKLY MONTHLY CUMULATIVE PO PO
Saudi Aramco TR/PCMC Planned Actual Planned Actual Planned Actual Planned Place

Project Quality Index (%) QA/QC Personnel's


PCMC Sub-Co
PROCUREMENT CONSTRUCTION SHOP CONSTRUCTION FIELD OVERALL Discipline
Planned Actual Variance Planned
Engineer's
Inspector's

Welding & NDT Status E & I Inspection and Testing Status Civil Test Status
Joint Basis Linear Basis This Week Cumulative This Week Cu
Mechanical /
Test Description Description
Welding This Week Cumulative This Week Cumulative Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted
(%) (%) (%)
Welded 142 1610 ─ Megger Test Field Density
Radiographed 12 181 1790.0 16533.76 Continuity Test CCSDT
Rejection 0 8 0.308 9.43 Ground Rod Test Joint Test
Rejection Rate 0.00 4.420 0.017 0.0570 High Pot Test Barcol Test
RT Backlog 5 28 Loop Checking Other Test
RTFI Dispute (Nos.) Other Test

QMIS Status Quality Notifications


Request for Inspection Surveillance Non-Conformance Report Status
Discipline Hold/Re- Violation (#) Proactive Notification
This Week Ratio
Issued (#) Cancelled (#)
Scheduled
Accepted (#) Rejected (#) Acceptance % Project Phase By
Issued Closed Issued Closed Issued Closed CL: INT

Civil/Structural 0 0 0 0 0 Client Issued


Construction
Mech/ Welding / Piping/Painting 108 8 0 100 0 Internal
Electrical / Instrumentation 0 0 0 0 0 Design & Client Issued
Procurement Internal

Internal QA/QC Audit at or (Quarterly) Worksheet Status


Total For This Week 108 8 0 100 0
Total For This Week 108 8 0 100 0
15% 30% 60% 90% Issued Close
Previous Total 701 52 35 609 5
Cumulative 809 60 35 709 5
MONITORING PACKAGES , QVD'S , QSR'S & NCR'S NARRATIVE QUALITY CONTROL ACTIVITIES

Structural Test Package Status


Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2
Zone 3
Overall

Mechanical/Piping Test Package Status


Total
Description Packages
Tested Reject Rejection %

Visual Test
Hydro Test
Pneumatic Test
Overall

Electrical / Instruments Test Package Status


Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2 MAJOR QUALITY CONCERN AND HIGHLIGHTS
Zone 3
Overall

QVD'S Status
Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2
Zone 3
Overall

OPEN RFI'S / SR / NCR'S AGE

Description 1 Week 2Week 3 Week 4 Week


Description 1 Week 2Week 3 Week 4 Week

RFI'S
Surveilance Report (Client)
NCR'S (Client)
PROJECT QUALITY DASHBOARD
(Version 003)

24 JUNE 2017 TO 30 JUNE 2017

Procurement Status (#)


PO PO
Placed Received

QA/QC Personnel's
Sub-Contractor
Actual Variance

Civil Test Status


Cumulative
Rejection
Conducted Passed
(%)

Quality Notifications
Non-Conformance Report Status
Ratio
Closed CL: INT

Worksheet Status
Closed Open
NARRATIVE QUALITY CONTROL ACTIVITIES

MAJOR QUALITY CONCERN AND HIGHLIGHTS


PROJECT QUALITY DASHBOARD
(Version 003)

Project Name: Fadhili Gas Program Project Project No: 605 (Field) Date : 24 JUNE 2017 TO 30 JUNE 201

Client Contractor/Sub-Contractor(s) Project Progress (%) Procurement Statu


WEEKLY MONTHLY CUMULATIVE PO PO
Saudi Aramco TR/PCMC Planned Actual Planned Actual Planned Actual Planned Placed

Project Quality Index (%) QA/QC Personnel's


PCMC Sub-Contr
PROCUREMENT CONSTRUCTION SHOP CONSTRUCTION FIELD OVERALL Discipline
Planned Actual Variance Planned Actua
Engineer's 3 1
Inspector's 16 8

Welding & NDT Status E & I Inspection and Testing Status Civil Test Status
Joint Basis Linear Basis This Week Cumulative This Week Cumu
Mechanical /
Test Description Description
Welding This Week Cumulative This Week Cumulative Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted Passed
Rejection
Conducted
(%) (%) (%)
Welded 13 55 270.47 1619.67 Megger Test Field Density
Radiographed 2 9 201.28 415.14 Continuity Test CCSDT
Rejection 0 3 1.607 7.76 Ground Rod Test Joint Test
Rejection Rate% 0 50 0 1.869 High Pot Test Barcol Test
RT Backlog 5 13 Loop Checking Other Test
RTFI Dispute (Nos.) Other Test

QMIS Status Quality Notifications


Request for Inspection Surveillance Non-Conformance Report Status
Discipline Hold/Re- Violation (#) Proactive Notification
This Week Ratio
Issued (#) Cancelled (#)
Scheduled
Accepted (#) Rejected (#) Acceptance % Project Phase By
Issued Closed Issued Closed Issued Closed CL: INT

Civil/Structural 0 0 0 0 0 Client Issued


Construction
Mech/ Welding / Piping/Painting 38 0 0 38 0 Internal
Electrical / Instrumentation 0 0 0 0 0 Design & Client Issued
Procurement Internal

Internal QA/QC Audit at or (Quarterly) Worksheet Status


Total For This Week 38 0 0 38 0
Total For This Week 38 0 0 38 0
15% 30% 60% 90% Issued Closed
Previous Total 168 16 6 144 2
Cumulative 206 16 6 182 2
MONITORING PACKAGES , QVD'S , QSR'S & NCR'S NARRATIVE QUALITY CONTROL ACTIVITIES

Structural Test Package Status


Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2
Zone 3
Overall

Mechanical/Piping Test Package Status


Total
Description Packages
Tested Reject Rejection %

Visual Test
Hydro Test
Pneumatic Test
Overall

Electrical / Instruments Test Package Status


Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2 MAJOR QUALITY CONCERN AND HIGHLIGHTS
Zone 3
Overall

QVD'S Status
Total
Description Packages
Tested Reject Rejection %

Zone 1
Zone 2
Zone 3
Overall

OPEN RFI'S / SR / NCR'S AGE


Description 1 Week 2Week 3 Week 4 Week

RFI'S
Surveilance Report (Client)
NCR'S (Client)
PROJECT QUALITY DASHBOARD
(Version 003)

24 JUNE 2017 TO 30 JUNE 2017

Procurement Status (#)


PO PO
Placed Received

QA/QC Personnel's
Sub-Contractor
Actual Variance

Civil Test Status


Cumulative
Rejection
Passed
(%)

Quality Notifications
Non-Conformance Report Status
Ratio
Closed CL: INT

Worksheet Status
Closed Open
NARRATIVE QUALITY CONTROL ACTIVITIES

MAJOR QUALITY CONCERN AND HIGHLIGHTS