Atalanti participated in several cable laying projects between 2010-2013:
1) In 2010-2011, they provided cable transportation, installation and protection services for two phases of the Kahramaa Project in Doha, Qatar, laying 21,000m of 3x220kV power cables.
2) In 2012, they performed simultaneous cable laying and burial services for the HelWin I and BorWin II grid connection projects in Germany, installing over 67,000m and 30,000m of HVDC and HVAC cables respectively.
3) In 2013, they laid over 90,000m of 320kV HVDC cables for the SylWin I project in Germany providing transportation, laying and
Atalanti participated in several cable laying projects between 2010-2013:
1) In 2010-2011, they provided cable transportation, installation and protection services for two phases of the Kahramaa Project in Doha, Qatar, laying 21,000m of 3x220kV power cables.
2) In 2012, they performed simultaneous cable laying and burial services for the HelWin I and BorWin II grid connection projects in Germany, installing over 67,000m and 30,000m of HVDC and HVAC cables respectively.
3) In 2013, they laid over 90,000m of 320kV HVDC cables for the SylWin I project in Germany providing transportation, laying and
Atalanti participated in several cable laying projects between 2010-2013:
1) In 2010-2011, they provided cable transportation, installation and protection services for two phases of the Kahramaa Project in Doha, Qatar, laying 21,000m of 3x220kV power cables.
2) In 2012, they performed simultaneous cable laying and burial services for the HelWin I and BorWin II grid connection projects in Germany, installing over 67,000m and 30,000m of HVDC and HVAC cables respectively.
3) In 2013, they laid over 90,000m of 320kV HVDC cables for the SylWin I project in Germany providing transportation, laying and