HOJA DE CALCULOS NODOS R1

PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO


LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-1 4,044.60 Zone Demand 0 Fixed 0 4,123.42
J-2 4,045.25 Zone Demand 1.08 Fixed 1.08 4,123.41
J-3 4,046.85 Zone Demand 0 Fixed 0 4,123.13
J-4 4,062.55 Zone Demand 1.08 Fixed 1.08 4,122.51
J-5 4,067.90 Zone Demand 0 Fixed 0 4,122.51
J-7 4,052.10 Zone Demand 1.08 Fixed 1.08 4,122.19
J-9 4,065.65 Zone Demand 1.08 Fixed 1.08 4,121.46
J-10 4,068.50 Zone Demand 0 Fixed 0 4,121.46
J-12 4,059.45 Zone Demand 1.08 Fixed 1.08 4,121.44
J-13 4,063.85 Zone Demand 1.08 Fixed 1.08 4,121.17
J-14 4,065.63 Zone Demand 0 Fixed 0 4,121.09
J-15 4,073.85 Zone Demand 1.08 Fixed 1.08 4,120.59
J-16 4,071.90 Zone Demand 0 Fixed 0 4,120.59
J-17 4,070.15 Zone Demand 1.08 Fixed 1.08 4,120.93
J-18 4,076.10 Zone Demand 1.08 Fixed 1.08 4,120.79
J-19 4,081.55 Zone Demand 1.08 Fixed 1.08 4,120.36
J-20 4,086.85 Zone Demand 1.08 Fixed 1.08 4,120.16
J-21 4,093.35 Zone Demand 1.08 Fixed 1.08 4,120.10
J-22 4,095.75 Zone Demand 0 Fixed 0 4,120.10
J-23 4,043.55 Zone Demand 1.08 Fixed 1.08 4,120.55
J-24 4,040.65 Zone Demand 1.08 Fixed 1.08 4,116.84
J-25 4,037.75 Zone Demand 1.08 Fixed 1.08 4,114.87
J-26 4,036.65 Zone Demand 0 Fixed 0 4,113.83
J-27 4,035.25 Zone Demand 1.08 Fixed 1.08 4,110.90
J-28 4,030.45 Zone Demand 1.08 Fixed 1.08 4,110.10
J-29 4,029.60 Zone Demand 0 Fixed 0 4,110.10
J-30 4,034.90 Zone Demand 1.08 Fixed 1.08 4,111.89
J-31 4,032.80 Zone Demand 1.08 Fixed 1.08 4,109.87
J-32 4,030.50 Zone Demand 1.08 Fixed 1.08 4,107.04
J-33 4,027.85 Zone Demand 1.08 Fixed 1.08 4,104.03
J-34 4,024.45 Zone Demand 1.08 Fixed 1.08 4,099.06
J-35 4,022.45 Zone Demand 1.08 Fixed 1.08 4,091.52
J-36 4,021.20 Zone Demand 1.08 Fixed 1.08 4,093.91
J-37 4,018.45 Zone Demand 1.08 Fixed 1.08 4,085.34
J-38 4,017.00 Zone Demand 1.08 Fixed 1.08 4,088.53
J-39 4,014.85 Zone Demand 1.08 Fixed 1.08 4,082.26
J-40 4,014.10 Zone Demand 1.08 Fixed 1.08 4,083.33
J-41 4,012.90 Zone Demand 1.08 Fixed 1.08 4,081.65
J-42 4,011.35 Zone Demand 1.08 Fixed 1.08 4,070.14
J-43 4,010.55 Zone Demand 0 Fixed 0 4,067.52
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-44 4,009.60 Zone Demand 0 Fixed 0 4,063.57
J-45 4,009.06 Zone Demand 1.08 Fixed 1.08 4,055.46
J-46 4,007.75 Zone Demand 1.08 Fixed 1.08 4,051.06
J-47 4,006.10 Zone Demand 1.08 Fixed 1.08 4,049.43
J-48 4,004.85 Zone Demand 1.08 Fixed 1.08 4,049.00
J-49 4,004.70 Zone Demand 0 Fixed 0 4,049.00
J-50 4,008.85 Zone Demand 1.08 Fixed 1.08 4,056.52
J-51 4,008.50 Zone Demand 0 Fixed 0 4,053.94
J-52 4,007.95 Zone Demand 1.08 Fixed 1.08 4,043.53
J-53 4,006.50 Zone Demand 1.08 Fixed 1.08 4,050.08
J-54 4,005.10 Zone Demand 1.08 Fixed 1.08 4,046.66
J-55 4,005.10 Zone Demand 1.08 Fixed 1.08 4,042.92
J-56 4,003.85 Zone Demand 1.08 Fixed 1.08 4,040.45
J-57 4,003.00 Zone Demand 0 Fixed 0 4,040.05
J-58 4,008.75 Zone Demand 1.08 Fixed 1.08 4,043.88
J-59 4,007.45 Zone Demand 1.08 Fixed 1.08 4,044.49
J-60 4,007.25 Zone Demand 0 Fixed 0 4,044.49
J-61 4,006.00 Zone Demand 1.08 Fixed 1.08 4,039.97
J-62 4,004.95 Zone Demand 1.08 Fixed 1.08 4,046.53
J-63 4,004.10 Zone Demand 1.08 Fixed 1.08 4,042.79
J-64 4,003.10 Zone Demand 1.08 Fixed 1.08 4,040.32
J-65 4,002.10 Zone Demand 1.08 Fixed 1.08 4,038.18
J-66 4,001.90 Zone Demand 1.08 Fixed 1.08 4,037.04
J-67 4,001.30 Zone Demand 1.08 Fixed 1.08 4,036.55
J-68 4,001.25 Zone Demand 0 Fixed 0 4,036.55
J-69 4,007.25 Zone Demand 1.08 Fixed 1.08 4,041.57
J-70 4,005.90 Zone Demand 1.08 Fixed 1.08 4,039.60
J-71 4,005.65 Zone Demand 0 Fixed 0 4,039.60
J-72 4,004.75 Zone Demand 1.08 Fixed 1.08 4,037.88
J-73 4,003.85 Zone Demand 1.08 Fixed 1.08 4,041.64
J-74 4,003.15 Zone Demand 1.08 Fixed 1.08 4,040.38
J-75 4,002.70 Zone Demand 1.08 Fixed 1.08 4,038.71
J-76 4,002.35 Zone Demand 1.08 Fixed 1.08 4,036.83
J-77 4,001.70 Zone Demand 1.08 Fixed 1.08 4,036.36
J-78 4,000.90 Zone Demand 1.08 Fixed 1.08 4,035.75
J-80 4,000.35 Zone Demand 1.08 Fixed 1.08 4,034.25
J-81 3,999.75 Zone Demand 1.08 Fixed 1.08 4,032.82
J-82 3,999.80 Zone Demand 0 Fixed 0 4,032.95
J-83 3,999.25 Zone Demand 1.08 Fixed 1.08 4,032.16
J-84 3,999.75 Zone Demand 1.08 Fixed 1.08 4,032.32
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-85 3,999.90 Zone Demand 0 Fixed 0 4,032.32
J-86 4,005.60 Zone Demand 1.08 Fixed 1.08 4,040.93
J-87 4,004.65 Zone Demand 1.08 Fixed 1.08 4,037.29
J-88 4,004.10 Zone Demand 1.08 Fixed 1.08 4,036.72
J-89 4,003.85 Zone Demand 0 Fixed 0 4,036.72
J-90 4,003.60 Zone Demand 1.08 Fixed 1.08 4,038.83
J-91 4,003.15 Zone Demand 1.08 Fixed 1.08 4,038.07
J-92 4,002.65 Zone Demand 1.08 Fixed 1.08 4,036.62
J-93 4,002.20 Zone Demand 1.08 Fixed 1.08 4,036.00
J-94 4,001.35 Zone Demand 1.08 Fixed 1.08 4,035.45
J-95 4,000.60 Zone Demand 1.08 Fixed 1.08 4,034.24
J-96 4,000.50 Zone Demand 1.08 Fixed 1.08 4,033.70
J-97 4,000.00 Zone Demand 1.08 Fixed 1.08 4,033.26
J-98 3,999.65 Zone Demand 1.08 Fixed 1.08 4,032.76
J-99 3,999.35 Zone Demand 0 Fixed 0 4,032.76
J-100 4,004.40 Zone Demand 1.08 Fixed 1.08 4,036.57
J-101 4,003.85 Zone Demand 1.08 Fixed 1.08 4,036.08
J-102 4,003.75 Zone Demand 1.08 Fixed 1.08 4,038.19
J-103 4,002.95 Zone Demand 1.08 Fixed 1.08 4,037.43
J-104 4,002.25 Zone Demand 1.08 Fixed 1.08 4,035.63
J-105 4,002.50 Zone Demand 1.08 Fixed 1.08 4,035.31
J-106 4,001.40 Zone Demand 1.08 Fixed 1.08 4,034.15
J-107 4,001.50 Zone Demand 1.08 Fixed 1.08 4,034.60
J-108 4,000.85 Zone Demand 1.08 Fixed 1.08 4,033.60
J-109 4,000.75 Zone Demand 0 Fixed 0 4,033.60
J-110 4,000.70 Zone Demand 1.08 Fixed 1.08 4,033.96
J-111 4,000.60 Zone Demand 0 Fixed 0 4,033.96
J-112 4,000.15 Zone Demand 1.08 Fixed 1.08 4,033.06
J-113 4,000.15 Zone Demand 0 Fixed 0 4,033.06
J-114 4,023.85 Zone Demand 0 Fixed 0 4,098.10
J-115 4,023.50 Zone Demand 1.08 Fixed 1.08 4,095.73
J-116 4,022.40 Zone Demand 1.08 Fixed 1.08 4,093.70
J-117 4,019.85 Zone Demand 1.08 Fixed 1.08 4,092.01
J-118 4,017.85 Zone Demand 1.08 Fixed 1.08 4,091.75
J-119 4,016.00 Zone Demand 1.08 Fixed 1.08 4,089.43
J-120 4,014.95 Zone Demand 1.08 Fixed 1.08 4,089.16
J-121 4,013.00 Zone Demand 1.08 Fixed 1.08 4,088.71
J-122 4,012.10 Zone Demand 1.08 Fixed 1.08 4,088.45
J-123 4,011.35 Zone Demand 0 Fixed 0 4,088.45
J-124 4,017.20 Zone Demand 0 Fixed 0 4,091.37
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-125 4,018.05 Zone Demand 0 Fixed 0 4,086.29
J-126 4,019.10 Zone Demand 1.08 Fixed 1.08 4,085.16
J-127 4,020.50 Zone Demand 1.08 Fixed 1.08 4,081.66
J-128 4,024.50 Zone Demand 1.08 Fixed 1.08 4,081.63
J-129 4,020.70 Zone Demand 1.08 Fixed 1.08 4,080.33
J-130 4,022.50 Zone Demand 1.08 Fixed 1.08 4,079.97
J-131 4,023.40 Zone Demand 0 Fixed 0 4,079.97
J-132 4,021.80 Zone Demand 1.08 Fixed 1.08 4,081.61
J-133 4,020.45 Zone Demand 1.08 Fixed 1.08 4,081.25
J-134 4,021.20 Zone Demand 0 Fixed 0 4,081.25
J-135 4,023.10 Zone Demand 1.08 Fixed 1.08 4,081.60
J-136 4,030.15 Zone Demand 1.08 Fixed 1.08 4,081.60
J-137 4,043.85 Zone Demand 1.08 Fixed 1.08 4,081.60
J-138 4,061.45 Zone Demand 1.08 Fixed 1.08 4,081.59
J-139 4,068.45 Zone Demand 0 Fixed 0 4,081.59
J-140 4,021.35 Zone Demand 1.08 Fixed 1.08 4,080.40
J-141 4,022.85 Zone Demand 1.08 Fixed 1.08 4,079.17
J-142 4,023.10 Zone Demand 0 Fixed 0 4,075.92
J-143 4,023.70 Zone Demand 1.08 Fixed 1.08 4,075.76
J-144 4,024.45 Zone Demand 0 Fixed 0 4,075.76
J-145 4,020.65 Zone Demand 1.08 Fixed 1.08 4,073.48
J-146 4,018.45 Zone Demand 1.08 Fixed 1.08 4,065.14
J-147 4,017.15 Zone Demand 1.08 Fixed 1.08 4,068.49
J-148 4,014.45 Zone Demand 1.08 Fixed 1.08 4,059.90
J-149 4,011.85 Zone Demand 1.08 Fixed 1.08 4,048.43
J-150 4,011.20 Zone Demand 0 Fixed 0 4,046.88
J-151 4,010.25 Zone Demand 1.08 Fixed 1.08 4,043.57
J-152 4,009.65 Zone Demand 1.08 Fixed 1.08 4,042.78
J-153 4,009.25 Zone Demand 0 Fixed 0 4,042.78
J-154 4,010.15 Zone Demand 1.08 Fixed 1.08 4,043.42
J-155 4,009.35 Zone Demand 1.08 Fixed 1.08 4,044.26
J-156 4,008.90 Zone Demand 0 Fixed 0 4,044.26
J-157 4,008.08 Zone Demand 1.08 Fixed 1.08 4,042.78
J-158 4,007.65 Zone Demand 0 Fixed 0 4,042.78
J-159 4,008.35 Zone Demand 1.08 Fixed 1.08 4,042.59
J-160 4,008.10 Zone Demand 0 Fixed 0 4,042.59
J-161 4,020.75 Zone Demand 1.08 Fixed 1.08 4,071.77
J-162 4,019.30 Zone Demand 1.08 Fixed 1.08 4,069.95
J-163 4,016.75 Zone Demand 1.08 Fixed 1.08 4,069.30
J-164 4,016.12 Zone Demand 0 Fixed 0 4,069.30
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-165 4,019.35 Zone Demand 1.08 Fixed 1.08 4,066.16
J-166 4,019.40 Zone Demand 0 Fixed 0 4,065.24
J-167 4,018.90 Zone Demand 1.08 Fixed 1.08 4,061.63
J-168 4,014.75 Zone Demand 1.08 Fixed 1.08 4,052.22
J-169 4,012.00 Zone Demand 1.08 Fixed 1.08 4,046.92
J-170 4,011.10 Zone Demand 1.08 Fixed 1.08 4,046.88
J-171 4,009.85 Zone Demand 1.08 Fixed 1.08 4,046.28
J-172 4,008.90 Zone Demand 1.08 Fixed 1.08 4,046.24
J-173 4,008.75 Zone Demand 0 Fixed 0 4,046.24
J-174 4,016.60 Zone Demand 1.08 Fixed 1.08 4,062.50
J-175 4,011.75 Zone Demand 1.08 Fixed 1.08 4,053.34
J-176 4,010.80 Zone Demand 1.08 Fixed 1.08 4,051.53
J-177 4,012.45 Zone Demand 1.08 Fixed 1.08 4,050.44
J-178 4,012.60 Zone Demand 0 Fixed 0 4,049.44
J-179 4,012.15 Zone Demand 1.08 Fixed 1.08 4,047.71
J-180 4,013.20 Zone Demand 1.08 Fixed 1.08 4,046.66
J-181 4,013.35 Zone Demand 1.08 Fixed 1.08 4,046.15
J-182 4,013.25 Zone Demand 0 Fixed 0 4,046.15
J-183 4,014.75 Zone Demand 1.08 Fixed 1.08 4,060.65
J-184 4,014.85 Zone Demand 1.08 Fixed 1.08 4,058.88
J-185 4,014.65 Zone Demand 0 Fixed 0 4,050.06
J-186 4,014.35 Zone Demand 1.08 Fixed 1.08 4,049.75
J-187 4,013.70 Zone Demand 1.08 Fixed 1.08 4,047.11
J-188 4,013.10 Zone Demand 1.08 Fixed 1.08 4,046.48
J-189 4,013.08 Zone Demand 1.08 Fixed 1.08 4,045.84
J-190 4,012.08 Zone Demand 1.08 Fixed 1.08 4,044.98
J-191 4,011.35 Zone Demand 1.08 Fixed 1.08 4,043.49
J-192 4,010.60 Zone Demand 1.08 Fixed 1.08 4,043.08
J-193 4,010.30 Zone Demand 0 Fixed 0 4,043.08
J-194 4,013.45 Zone Demand 1.08 Fixed 1.08 4,046.08
J-195 4,013.10 Zone Demand 0 Fixed 0 4,046.08
J-196 4,013.75 Zone Demand 1.08 Fixed 1.08 4,049.39
J-197 4,013.30 Zone Demand 0 Fixed 0 4,049.10
J-198 4,012.75 Zone Demand 1.08 Fixed 1.08 4,048.49
J-199 4,012.25 Zone Demand 1.08 Fixed 1.08 4,047.64
J-200 4,011.71 Zone Demand 1.08 Fixed 1.08 4,046.38
J-201 4,010.90 Zone Demand 1.08 Fixed 1.08 4,045.63
J-202 4,010.28 Zone Demand 1.08 Fixed 1.08 4,044.92
J-203 4,009.65 Zone Demand 1.08 Fixed 1.08 4,044.14
J-204 4,009.35 Zone Demand 1.08 Fixed 1.08 4,042.54
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-205 4,008.60 Zone Demand 1.08 Fixed 1.08 4,042.13
J-206 4,009.05 Zone Demand 0 Fixed 0 4,043.69
J-207 4,009.61 Zone Demand 1.08 Fixed 1.08 4,043.30
J-208 4,008.85 Zone Demand 0 Fixed 0 4,043.30
J-209 4,008.90 Zone Demand 1.08 Fixed 1.08 4,043.62
J-210 4,008.41 Zone Demand 1.08 Fixed 1.08 4,043.17
J-211 4,007.61 Zone Demand 1.08 Fixed 1.08 4,042.55
J-212 4,006.98 Zone Demand 1.08 Fixed 1.08 4,041.42
J-213 4,006.70 Zone Demand 1.08 Fixed 1.08 4,040.40
J-214 4,006.08 Zone Demand 1.08 Fixed 1.08 4,038.47
J-215 4,005.00 Zone Demand 1.08 Fixed 1.08 4,036.93
J-216 4,003.35 Zone Demand 1.08 Fixed 1.08 4,036.08
J-217 4,003.16 Zone Demand 1.08 Fixed 1.08 4,035.84
J-218 4,003.50 Zone Demand 1.08 Fixed 1.08 4,035.69
J-219 4,002.60 Zone Demand 1.08 Fixed 1.08 4,035.13
J-220 4,001.70 Zone Demand 1.08 Fixed 1.08 4,034.97
J-221 4,001.50 Zone Demand 1.08 Fixed 1.08 4,034.46
J-222 4,001.40 Zone Demand 1.08 Fixed 1.08 4,033.95
J-223 4,001.33 Zone Demand 1.08 Fixed 1.08 4,033.52
J-224 4,000.55 Zone Demand 1.08 Fixed 1.08 4,032.61
J-225 4,000.38 Zone Demand 1.08 Fixed 1.08 4,032.51
J-226 3,999.65 Zone Demand 1.08 Fixed 1.08 4,032.17
J-227 3,999.45 Zone Demand 1.08 Fixed 1.08 4,032.33
J-228 3,999.35 Zone Demand 0 Fixed 0 4,032.26
J-229 3,999.25 Zone Demand 1.08 Fixed 1.08 4,031.86
J-230 3,999.20 Zone Demand 0 Fixed 0 4,031.86
J-231 3,998.85 Zone Demand 1.08 Fixed 1.08 4,032.05
J-232 3,999.25 Zone Demand 1.08 Fixed 1.08 4,031.81
J-233 3,999.45 Zone Demand 1.08 Fixed 1.08 4,031.45
J-234 3,999.05 Zone Demand 0 Fixed 0 4,031.45
J-323 4,017.94 Zone Demand 1.08 Fixed 1.08 4,077.80
J-324 4,015.10 Zone Demand 1.08 Fixed 1.08 4,064.30
J-325 4,015.87 Zone Demand 1.08 Fixed 1.08 4,072.05
J-326 4,013.65 Zone Demand 1.08 Fixed 1.08 4,056.45
J-327 4,010.55 Zone Demand 1.08 Fixed 1.08 4,046.25
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-328 4,008.92 Zone Demand 1.08 Fixed 1.08 4,042.43
J-329 4,007.90 Zone Demand 1.08 Fixed 1.08 4,042.37
J-330 4,006.50 Zone Demand 1.08 Fixed 1.08 4,040.13
J-331 4,006.45 Zone Demand 1.08 Fixed 1.08 4,041.73
J-332 4,005.65 Zone Demand 1.08 Fixed 1.08 4,039.49
J-333 4,005.45 Zone Demand 0 Fixed 0 4,039.49
J-334 4,020.55 Zone Demand 1.08 Fixed 1.08 4,070.13
J-335 4,020.12 Zone Demand 1.08 Fixed 1.08 4,069.26
J-336 4,017.95 Zone Demand 1.08 Fixed 1.08 4,066.11
J-337 4,016.71 Zone Demand 1.08 Fixed 1.08 4,068.54
J-338 4,015.07 Zone Demand 1.08 Fixed 1.08 4,059.59
J-339 4,010.40 Zone Demand 1.08 Fixed 1.08 4,052.37
J-340 4,009.97 Zone Demand 0 Fixed 0 4,050.31
J-341 4,009.65 Zone Demand 1.08 Fixed 1.08 4,044.12
J-342 4,009.32 Zone Demand 0 Fixed 0 4,043.99
J-343 4,009.31 Zone Demand 1.08 Fixed 1.08 4,042.85
J-344 4,007.86 Zone Demand 1.08 Fixed 1.08 4,043.94
J-345 4,007.32 Zone Demand 1.08 Fixed 1.08 4,040.54
J-346 4,006.75 Zone Demand 1.08 Fixed 1.08 4,043.30
J-347 4,006.25 Zone Demand 1.08 Fixed 1.08 4,039.90
J-348 4,006.05 Zone Demand 0 Fixed 0 4,039.90
J-349 4,007.72 Zone Demand 0 Fixed 0 4,043.81
J-350 4,008.05 Zone Demand 1.08 Fixed 1.08 4,043.48
J-351 4,007.56 Zone Demand 0 Fixed 0 4,043.48
J-368 4,008.56 Zone Demand 0 Fixed 0 4,042.13
J-371 4,057.25 Zone Demand 0 Fixed 0 4,117.51
J-373 4,035.10 Zone Demand 0 Fixed 0 4,112.30
J-375 4,029.60 Zone Demand 0 Fixed 0 4,107.04
J-376 4,034.10 Zone Demand 0 Fixed 0 4,111.89
J-377 4,039.50 Zone Demand 0 Fixed 0 4,116.84
J-379 4,012.45 Zone Demand 0 Fixed 0 4,081.65
J-380 4,012.35 Zone Demand 0 Fixed 0 4,088.71
J-382 4,004.20 Zone Demand 0 Fixed 0 4,036.57
J-383 4,008.15 Zone Demand 0 Fixed 0 4,046.32
J-384 4,005.35 Zone Demand 0 Fixed 0 4,040.93
J-385 4,004.10 Zone Demand 0 Fixed 0 4,036.08
J-386 4,003.30 Zone Demand 0 Fixed 0 4,038.19
J-387 4,002.80 Zone Demand 0 Fixed 0 4,037.43
J-388 4,005.85 Zone Demand 0 Fixed 0 4,049.43
J-390 4,002.50 Zone Demand 0 Fixed 0 4,035.31
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-391 4,004.25 Zone Demand 0 Fixed 0 4,041.44
J-392 4,001.40 Zone Demand 0 Fixed 0 4,034.28
J-393 4,002.60 Zone Demand 0 Fixed 0 4,037.61
J-394 4,001.30 Zone Demand 0 Fixed 0 4,035.37
J-396 3,999.40 Zone Demand 0 Fixed 0 4,032.46
HOJA DE CALCULOS NODOS R1
PROYECTOMEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO
DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO
OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA ABRIL DE 2016 REVISADO:

Calculate
Base Demand
Elevatio Patter d
Label Zone Type Flow (Calculated)
n (m) n Hydraulic
(l/s) (l/s)
Grade (m)
J-397 4,019.05 Zone Demand 0 Fixed 0 4,070.50
J-398 4,015.98 Zone Demand 0 Fixed 0 4,068.54
J-399 4,015.85 Zone Demand 0 Fixed 0 4,072.05
J-400 4,016.20 Zone Demand 0 Fixed 0 4,072.22
J-401 4,006.15 Zone Demand 0 Fixed 0 4,041.73
J-402 4,009.25 Zone Demand 0 Fixed 0 4,043.48
J-403 4,006.45 Zone Demand 0 Fixed 0 4,043.30
J-404 4,009.45 Zone Demand 0 Fixed 0 4,045.28
J-405 4,016.55 Zone Demand 0 Fixed 0 4,068.49
J-406 4,018.86 Zone Demand 0 Fixed 0 4,068.84
J-407 4,009.75 Zone Demand 0 Fixed 0 4,043.10
J-408 4,010.40 Zone Demand 0 Fixed 0 4,044.57
J-409 4,013.25 Zone Demand 0 Fixed 0 4,048.02
J-410 4,009.55 Zone Demand 0 Fixed 0 4,046.28
J-411 4,012.00 Zone Demand 0 Fixed 0 4,051.89
J-412 4,011.05 Zone Demand 0 Fixed 0 4,051.53
J-413 4,012.85 Zone Demand 0 Fixed 0 4,047.95
J-414 4,012.18 Zone Demand 0 Fixed 0 4,047.71
J-415 4,004.55 Zone Demand 0 Fixed 0 4,036.25
J-416 4,003.00 Zone Demand 0 Fixed 0 4,034.97
J-417 4,000.00 Zone Demand 0 Fixed 0 4,032.66
J-435 4,023.10 Zone Demand 0 Fixed 0 4,096.79
J-436 4,039.75 Zone Demand 0 Fixed 0 4,117.30
J-381 4,021.75 Zone Demand 0 Fixed 0 4,094.65
J-374 4,030.60 Zone Demand 0 Fixed 0 4,107.44
J-437 4,048.65 Zone Demand 1.08 Fixed 1.08 4,118.23
J-11 4,055.85 Zone Demand 1.08 Fixed 1.08 4,117.51
J-8 4,053.70 Zone Demand 0 Fixed 0 4,121.99
J-79 4,001.05 Zone Demand 0 Fixed 0 4,035.14
J-395 4,000.60 Zone Demand 0 Fixed 0 4,034.83
J-389 4,004.60 Zone Demand 0 Fixed 0 4,044.54
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

7.7135
7.6497
7.4649
5.868
5.3444
6.8596
5.4624
5.1835
6.0672
5.6103
5.428
4.5746
4.7654
4.9701
4.3734
3.7984
3.26
2.6184
2.3835
7.5354
7.4571
7.5473
7.5532
7.4042
7.7949
7.8781
7.5349
7.5427
7.4906
7.4561
7.3023
6.7594
7.1162
6.5469
7.0009
6.5971
6.775
6.7286
5.7535
5.5759
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

5.2816
4.5412
4.2388
4.2407
4.3207
4.3354
4.6656
4.4471
3.482
4.2655
4.067
3.7017
3.5816
3.6265
3.438
3.6248
3.6444
3.3244
4.069
3.7866
3.6428
3.5307
3.439
3.45
3.4549
3.3591
3.2982
3.3227
3.2422
3.6985
3.6437
3.5239
3.3744
3.3924
3.4105
3.3176
3.2362
3.2441
3.2207
3.1872
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

3.1725
3.458
3.1949
3.1921
3.2165
3.4481
3.418
3.3245
3.3083
3.3371
3.2923
3.2489
3.2554
3.2409
3.2703
3.1675
3.1539
3.3709
3.375
3.2672
3.2114
3.2053
3.2391
3.2052
3.215
3.2548
3.2646
3.2206
3.2206
7.2663
7.069
6.9781
7.0626
7.2327
7.1862
7.2633
7.4096
7.4721
7.5455
7.2591
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

6.679
6.4654
5.9854
5.5909
5.8361
5.6249
5.5368
5.8534
5.9504
5.877
5.7253
5.035
3.6941
1.9716
1.2865
5.7791
5.5122
5.1689
5.0953
5.0219
5.1704
4.5696
5.0247
4.4485
3.5798
3.4921
3.2612
3.2429
3.282
3.2562
3.4166
3.4607
3.3964
3.4385
3.3512
3.3757
4.9937
4.9574
5.1428
5.2045
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

4.5811
4.4868
4.1821
3.6671
3.4172
3.5015
3.565
3.6542
3.6689
4.4919
4.0703
3.9865
3.7177
3.605
3.4802
3.2743
3.2101
3.2199
4.4923
4.3094
3.4652
3.4645
3.2699
3.267
3.2064
3.2195
3.1648
3.1783
3.2077
3.1932
3.2274
3.4882
3.5042
3.4978
3.4636
3.393
3.3988
3.3906
3.3758
3.2483
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

3.2813
3.3907
3.2973
3.3717
3.3981
3.402
3.4192
3.3707
3.2981
3.1698
3.1594
3.2036
3.1981
3.1698
3.1841
3.2565
3.2259
3.1852
3.1504
3.1772
3.1449
3.1823
3.2174
3.2208
3.1915
3.1964
3.2497
3.1867
3.1518
3.1714
5.8587
4.8154
5.4978
4.1891
3.494
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

3.2798
3.373
3.291
3.4524
3.3116
3.3311
4.8526
4.8092
4.713
5.0728
4.3575
4.1075
3.9484
3.3738
3.3933
3.292
3.5309
3.2776
3.577
3.2933
3.3129
3.5318
3.4679
3.5158
3.2852
5.8978
7.555
7.5786
7.6133
7.5696
6.7726
7.4732
3.1675
3.7359
3.4825
3.1295
3.4149
3.3897
4.2652
3.2114
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

3.64
3.2181
3.4267
3.3341
3.2359
DE RIEGO TECNIFICADO
HUANACOMARCA, DISTRITO

01
HEMQ
GRP

Pressure
(bars)

5.0353
5.1442
5.4998
5.4827
3.4817
3.3501
3.6063
3.5063
5.0834
4.8912
3.2639
3.3445
3.403
3.5944
3.9036
3.9621
3.4348
3.4773
3.1509
3.144
3.1967
7.2116
7.5897
7.1345
7.5203
6.8097
6.0348
6.6836
3.3363
3.3498
3.9088
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-1 776.94 361.80 PVC 150 false 2.13 Open 219.29 4130.00
P-2 47.85 361.80 PVC 150 false 0.13 Open 12.96 4123.42
P-3 45.11 126.60 PVC 150 false 0.94 Open 11.88 4123.41
P-4 189.28 58.40 PVC 150 false 0.40 Open 1.08 4123.13
P-5 45.11 58.40 PVC 150 false 0.00 Open 0.00 4122.51
P-8 45.11 58.40 PVC 150 false 0.00 Open 0.00 4121.46
P-9 110.03 129.80 PVC 150 false 0.57 Open 7.56 4121.44
P-10 45.11 129.80 PVC 150 false 0.49 Open 6.48 4121.17
P-11 153.31 58.40 PVC 150 false 0.40 Open 1.08 4121.09
P-12 45.11 58.40 PVC 150 false 0.00 Open 0.00 4120.59
P-13 121.01 129.80 PVC 150 false 0.41 Open 5.40 4121.09
P-14 168.86 129.80 PVC 150 false 0.33 Open 4.32 4120.93
P-15 110.03 85.60 PVC 150 false 0.56 Open 3.24 4120.79
P-16 110.03 85.60 PVC 150 false 0.38 Open 2.16 4120.36
P-17 110.03 85.60 PVC 150 false 0.19 Open 1.08 4120.16
P-18 45.11 85.60 PVC 150 false 0.00 Open 0.00 4120.10
P-19 118.57 285.00 PVC 150 false 3.23 Open 206.32 4123.42
P-20 45.11 285.00 PVC 150 false 3.15 Open 200.92 4114.87
P-21 220.07 57.00 PVC 150 false 0.42 Open 1.08 4110.90
P-22 45.11 57.00 PVC 150 false 0.00 Open 0.00 4110.10
P-33 229.21 285.00 PVC 150 false 3.05 Open 194.44 4104.03
P-34 45.11 148.40 PVC 150 false 3.44 Open 59.42 4070.14
P-35 68.28 148.40 PVC 150 false 3.44 Open 59.42 4067.52
P-36 230.43 148.40 PVC 150 false 2.62 Open 45.37 4063.57
P-37 45.11 59.80 PVC 150 false 0.00 Open 0.00 4049.00
P-38 106.07 83.40 PVC 150 false 2.57 Open 14.05 4063.57
P-39 45.11 83.40 PVC 150 false 2.37 Open 12.97 4056.52
P-40 45.11 152.00 PVC 150 false 1.25 Open 22.69 4040.45
P-41 45.11 59.80 PVC 150 false 0.00 Open 0.00 4044.49
P-42 45.11 59.80 PVC 150 false 0.00 Open 0.00 4036.55
P-43 45.11 59.80 PVC 150 false 0.00 Open 0.00 4039.60
P-44 45.11 59.80 PVC 150 false 0.38 Open -1.08 4032.82
P-46 45.11 59.80 PVC 150 false 0.00 Open 0.00 4032.32
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-47 45.11 71.20 PVC 150 false 0.00 Open 0.00 4036.72
P-48 45.11 59.80 PVC 150 false 0.00 Open 0.00 4032.76
P-49 45.11 59.80 PVC 150 false 0.00 Open 0.00 4033.60
P-50 45.11 59.80 PVC 150 false 0.00 Open 0.00 4033.96
P-51 45.11 59.80 PVC 150 false 0.00 Open 0.00 4033.06
P-52 45.11 285.00 PVC 150 false 3.03 Open 193.36 4099.06
P-54 45.11 58.40 PVC 150 false 0.00 Open 0.00 4088.45
P-55 45.11 285.00 PVC 150 false 1.83 Open 116.66 4091.75
P-56 195.68 226.20 PVC 150 false 2.90 Open 116.66 4091.37
P-57 67.97 226.20 PVC 150 false 2.28 Open 91.82 4086.29
P-58 242.32 231.80 PVC 150 false 2.15 Open 90.74 4085.16
P-59 135.64 231.80 PVC 150 false 0.23 Open 9.72 4081.66
P-60 110.03 58.40 PVC 150 false 0.81 Open 2.16 4081.63
P-61 110.03 58.40 PVC 150 false 0.40 Open 1.08 4080.33
P-62 45.11 58.40 PVC 150 false 0.00 Open 0.00 4079.97
P-63 159.11 231.80 PVC 150 false 0.15 Open 6.48 4081.63
P-64 110.03 58.40 PVC 150 false 0.40 Open 1.08 4081.61
P-65 45.11 58.40 PVC 150 false 0.00 Open 0.00 4081.25
P-66 169.77 231.80 PVC 150 false 0.10 Open 4.32 4081.61
P-67 110.03 231.80 PVC 150 false 0.08 Open 3.24 4081.60
P-68 110.03 231.80 PVC 150 false 0.05 Open 2.16 4081.60
P-69 110.03 231.80 PVC 150 false 0.03 Open 1.08 4081.60
P-70 45.11 231.80 PVC 150 false 0.00 Open 0.00 4081.59
P-71 110.03 231.80 PVC 150 false 1.89 Open 79.93 4081.66
P-72 110.03 231.80 PVC 150 false 1.87 Open 78.85 4080.40
P-73 299.62 231.80 PVC 150 false 1.84 Open 77.77 4079.17
P-74 46.63 58.40 PVC 150 false 0.40 Open 1.08 4075.92
P-75 45.11 58.40 PVC 150 false 0.00 Open 0.00 4075.76
P-76 229.82 231.80 PVC 150 false 1.82 Open 76.69 4075.92
P-77 45.11 71.20 PVC 150 false 1.63 Open 6.48 4048.43
P-78 45.11 59.80 PVC 150 false 0.00 Open 0.00 4042.78
P-79 45.11 59.80 PVC 150 false 0.00 Open 0.00 4044.26
P-80 45.11 59.80 PVC 150 false 0.00 Open 0.00 4042.78
P-81 45.11 59.80 PVC 150 false 0.00 Open 0.00 4042.59
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-82 220.07 231.80 PVC 150 false 1.54 Open 64.81 4073.48
P-83 154.84 58.40 PVC 150 false 0.81 Open 2.16 4071.77
P-84 201.17 58.40 PVC 150 false 0.40 Open 1.08 4069.95
P-85 45.11 58.40 PVC 150 false 0.00 Open 0.00 4069.30
P-86 268.22 185.40 PVC 150 false 2.28 Open 61.57 4071.77
P-87 45.11 185.40 PVC 150 false 2.24 Open 60.49 4066.16
P-88 105.46 71.20 PVC 150 false 1.63 Open 6.48 4065.24
P-89 164.59 59.80 PVC 150 false 1.92 Open 5.40 4061.63
P-90 45.11 59.80 PVC 150 false 0.00 Open 0.00 4046.24
P-91 167.34 185.40 PVC 150 false 2.00 Open 54.01 4065.24
P-92 267.31 71.20 PVC 150 false 1.63 Open 6.48 4062.50
P-93 174.04 59.80 PVC 150 false 0.38 Open 1.08 4046.66
P-94 45.11 59.80 PVC 150 false 0.00 Open 0.00 4046.15
P-95 45.11 59.80 PVC 150 false 1.15 Open 3.24 4050.44
P-96 168.25 190.20 PVC 150 false 1.63 Open 46.44 4062.50
P-97 168.55 190.20 PVC 150 false 1.60 Open 45.36 4060.65
P-98 879.04 190.20 PVC 150 false 1.56 Open 44.28 4058.88
P-99 211.23 152.00 PVC 150 false 0.48 Open 8.64 4050.06
P-100 142.04 85.60 PVC 150 false 1.31 Open 7.56 4049.75
P-101 45.11 85.60 PVC 150 false 1.13 Open 6.48 4047.11
P-102 96.93 85.60 PVC 150 false 0.75 Open 4.32 4046.48
P-103 224.03 85.60 PVC 150 false 0.56 Open 3.24 4045.84
P-104 142.04 59.80 PVC 150 false 0.77 Open 2.16 4044.98
P-105 142.04 59.80 PVC 150 false 0.38 Open 1.08 4043.49
P-106 45.11 59.80 PVC 150 false 0.00 Open 0.00 4043.08
P-107 139.29 59.80 PVC 150 false 0.38 Open 1.08 4046.48
P-108 45.11 59.80 PVC 150 false 0.00 Open 0.00 4046.08
P-109 99.06 190.20 PVC 150 false 1.25 Open 35.64 4050.06
P-110 45.11 190.20 PVC 150 false 1.22 Open 34.56 4049.39
P-111 96.93 190.20 PVC 150 false 1.22 Open 34.56 4049.10
P-112 142.04 190.20 PVC 150 false 1.18 Open 33.48 4048.49
P-113 224.03 190.20 PVC 150 false 1.14 Open 32.40 4047.64
P-114 142.04 190.20 PVC 150 false 1.10 Open 31.32 4046.38
P-115 142.04 190.20 PVC 150 false 1.06 Open 30.24 4045.63
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-116 168.55 190.20 PVC 150 false 1.03 Open 29.16 4044.92
P-117 153.01 59.80 PVC 150 false 0.77 Open 2.16 4044.14
P-118 142.04 59.80 PVC 150 false 0.38 Open 1.08 4042.54
P-119 120.40 190.20 PVC 150 false 0.91 Open 25.92 4044.14
P-120 135.64 59.80 PVC 150 false 0.38 Open 1.08 4043.69
P-121 45.11 59.80 PVC 150 false 0.00 Open 0.00 4043.30
P-122 21.64 190.20 PVC 150 false 0.87 Open 24.84 4043.69
P-123 142.04 190.20 PVC 150 false 0.84 Open 23.76 4043.62
P-124 214.58 190.20 PVC 150 false 0.80 Open 22.68 4043.17
P-125 142.04 152.00 PVC 150 false 1.19 Open 21.60 4042.55
P-126 142.04 152.00 PVC 150 false 1.13 Open 20.52 4041.42
P-127 296.27 152.00 PVC 150 false 1.07 Open 19.44 4040.40
P-128 262.13 152.00 PVC 150 false 1.01 Open 18.36 4038.47
P-129 122.83 133.00 PVC 150 false 0.78 Open 10.80 4034.46
P-130 122.83 133.00 PVC 150 false 0.70 Open 9.72 4033.95
P-131 45.11 104.60 PVC 150 false 0.38 Open 3.24 4032.33
P-132 45.11 59.80 PVC 150 false 0.00 Open 0.00 4031.86
P-133 140.21 104.60 PVC 150 false 0.38 Open 3.24 4032.26
P-134 353.87 104.60 PVC 150 false 0.25 Open 2.16 4032.05
P-135 122.83 59.80 PVC 150 false 0.38 Open 1.08 4031.81
P-136 45.11 59.80 PVC 150 false 0.00 Open 0.00 4031.45
P-190 118.57 102.00 PVC 150 false 3.04 Open 24.85 4086.29
P-191 297.79 71.20 PVC 150 false 1.63 Open 6.48 4056.45
P-192 44.81 59.80 PVC 150 false 0.00 Open 0.00 4039.49
P-193 303.58 85.60 PVC 150 false 1.50 Open 8.64 4059.59
P-194 45.11 71.20 PVC 150 false 1.90 Open 7.56 4052.37
P-195 45.11 59.80 PVC 150 false 0.38 Open 1.08 4044.12
P-196 45.11 59.80 PVC 150 false 0.00 Open 0.00 4039.90
P-197 45.11 59.80 PVC 150 false 0.38 Open 1.08 4043.94
P-198 45.11 59.80 PVC 150 false 0.00 Open 0.00 4043.48
P-208 45.11 59.80 PVC 150 false 0.00 Open 0.00 4042.13
P-212 174.96 126.60 PVC 150 false 0.86 Open 10.80 4123.13
P-216 110.34 57.00 PVC 150 false 0.42 Open -1.08 4111.89
P-217 105.16 57.00 PVC 150 false 0.85 Open 2.16 4112.30
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-220 45.11 57.00 PVC 150 false 0.00 Open 0.00 4107.04
P-221 45.11 57.00 PVC 150 false 0.00 Open 0.00 4111.89
P-222 45.11 57.00 PVC 150 false 0.00 Open 0.00 4116.84
P-224 220.07 180.80 PVC 150 false 2.44 Open 62.66 4093.91
P-225 220.07 180.80 PVC 150 false 2.40 Open 61.58 4088.53
P-226 220.07 148.40 PVC 150 false 3.50 Open 60.50 4083.33
P-229 220.07 58.40 PVC 150 false 0.81 Open 2.16 4092.01
P-230 220.07 58.40 PVC 150 false 0.40 Open 1.08 4089.43
P-231 45.11 58.40 PVC 150 false 0.00 Open 0.00 4088.71
P-232 220.07 57.00 PVC 150 false 1.27 Open 3.24 4091.52
P-233 233.17 57.00 PVC 150 false 0.85 Open 2.16 4085.34
P-234 165.20 57.00 PVC 150 false 0.42 Open 1.08 4082.26
P-235 45.11 57.00 PVC 150 false 0.00 Open 0.00 4081.65
P-237 220.07 285.00 PVC 150 false 1.88 Open 119.90 4093.70
P-238 220.07 58.40 PVC 150 false 0.81 Open 2.16 4091.75
P-239 220.07 58.40 PVC 150 false 0.40 Open 1.08 4089.16
P-240 166.42 148.40 PVC 150 false 2.25 Open 38.89 4055.46
P-241 155.45 59.80 PVC 150 false 0.77 Open 2.16 4051.06
P-242 149.05 59.80 PVC 150 false 0.38 Open 1.08 4049.43
P-244 220.07 59.80 PVC 150 false 1.15 Open 3.24 4044.49
P-245 220.07 59.80 PVC 150 false 0.77 Open 2.16 4039.60
P-246 251.16 59.80 PVC 150 false 0.38 Open 1.08 4037.29
P-247 45.11 59.80 PVC 150 false 0.00 Open 0.00 4036.57
P-248 110.03 59.80 PVC 150 false 1.15 Open 3.24 4046.32
P-249 220.07 59.80 PVC 150 false 0.77 Open 2.16 4043.88
P-250 220.07 59.80 PVC 150 false 0.38 Open 1.08 4041.57
P-251 45.11 59.80 PVC 150 false 0.00 Open 0.00 4040.93
P-252 114.30 71.20 PVC 150 false 1.36 Open 5.40 4046.32
P-253 220.07 71.20 PVC 150 false 1.09 Open 4.32 4043.53
P-254 220.07 71.20 PVC 150 false 0.81 Open 3.24 4039.97
P-255 259.08 71.20 PVC 150 false 0.54 Open 2.16 4037.88
P-256 220.07 59.80 PVC 150 false 0.38 Open 1.08 4036.72
P-257 45.11 59.80 PVC 150 false 0.00 Open 0.00 4036.08
P-258 220.07 71.20 PVC 150 false 1.36 Open 5.40 4055.46
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-259 220.07 71.20 PVC 150 false 1.09 Open 4.32 4050.08
P-260 220.07 59.80 PVC 150 false 1.15 Open 3.24 4046.53
P-261 267.92 59.80 PVC 150 false 0.77 Open 2.16 4041.64
P-262 220.07 59.80 PVC 150 false 0.38 Open 1.08 4038.83
P-263 45.11 59.80 PVC 150 false 0.00 Open 0.00 4038.19
P-264 220.07 152.00 PVC 150 false 1.96 Open 35.65 4051.06
P-266 253.90 71.20 PVC 150 false 0.81 Open 3.24 4042.79
P-267 220.07 59.80 PVC 150 false 0.77 Open 2.16 4040.38
P-268 220.07 59.80 PVC 150 false 0.38 Open 1.08 4038.07
P-269 45.11 59.80 PVC 150 false 0.00 Open 0.00 4037.43
P-270 45.11 59.80 PVC 150 false 0.00 Open 0.00 4049.43
P-273 245.06 85.60 PVC 150 false 0.75 Open 4.32 4040.32
P-274 220.07 71.20 PVC 150 false 0.81 Open 3.24 4038.71
P-275 220.07 71.20 PVC 150 false 0.54 Open 2.16 4036.62
P-276 110.03 59.80 PVC 150 false 0.38 Open 1.08 4035.63
P-277 45.11 59.80 PVC 150 false 0.00 Open 0.00 4035.31
P-278 105.46 152.00 PVC 150 false 1.31 Open -23.77 4040.45
P-279 45.11 59.80 PVC 150 false 0.38 Open 1.08 4034.28
P-280 216.71 152.00 PVC 150 false 1.25 Open 22.69 4040.05
P-282 220.07 104.60 PVC 150 false 0.63 Open 5.40 4036.83
P-283 223.72 104.60 PVC 150 false 0.50 Open 4.32 4036.00
P-284 220.07 85.60 PVC 150 false 0.56 Open 3.24 4035.45
P-286 108.51 59.80 PVC 150 false 0.38 Open 1.08 4034.60
P-287 140.21 152.00 PVC 150 false 0.83 Open -15.12 4037.04
P-288 220.07 152.00 PVC 150 false 0.71 Open 12.96 4037.04
P-289 235.00 152.00 PVC 150 false 0.65 Open 11.88 4036.36
P-291 220.07 59.80 PVC 150 false 0.38 Open 1.08 4034.24
P-294 220.07 59.80 PVC 150 false 0.38 Open 1.08 4033.70
P-296 220.07 71.20 PVC 150 false 0.54 Open 2.16 4034.25
P-297 171.60 59.80 PVC 150 false 0.38 Open 1.08 4033.26
P-298 137.16 71.20 PVC 150 false 0.81 Open 3.24 4034.25
P-299 107.90 71.20 PVC 150 false 0.54 Open 2.16 4032.95
P-302 220.07 85.60 PVC 150 false 1.69 Open 9.72 4066.11
P-303 220.07 58.40 PVC 150 false 0.40 Open 1.08 4069.26
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-304 45.11 58.40 PVC 150 false 0.00 Open 0.00 4068.54
P-306 45.11 58.40 PVC 150 false 0.00 Open 0.00 4072.05
P-307 119.79 69.40 PVC 150 false 2.28 Open 8.64 4072.22
P-308 172.21 71.20 PVC 150 false 1.90 Open 7.56 4064.30
P-310 220.07 59.80 PVC 150 false 0.38 Open 1.08 4042.37
P-311 45.11 59.80 PVC 150 false 0.00 Open 0.00 4041.73
P-312 110.34 71.20 PVC 150 false 0.81 Open 3.24 4043.48
P-313 220.07 59.80 PVC 150 false 0.77 Open 2.16 4042.43
P-314 220.07 59.80 PVC 150 false 0.38 Open 1.08 4040.13
P-315 174.96 59.80 PVC 150 false 0.38 Open 1.08 4043.81
P-316 45.11 59.80 PVC 150 false 0.00 Open 0.00 4043.30
P-318 47.24 59.80 PVC 150 false 2.69 Open 7.56 4050.31
P-319 127.71 59.80 PVC 150 false 0.77 Open 2.16 4045.28
P-320 220.07 59.80 PVC 150 false 0.77 Open 2.16 4042.85
P-321 220.07 59.80 PVC 150 false 0.38 Open 1.08 4040.54
P-322 174.96 59.80 PVC 150 false 0.38 Open 1.08 4043.99
P-324 45.11 58.40 PVC 150 false 0.00 Open 0.00 4068.49
P-325 110.03 83.40 PVC 150 false 1.78 Open 9.72 4068.84
P-326 220.07 85.60 PVC 150 false 1.50 Open 8.64 4065.14
P-327 251.76 71.20 PVC 150 false 1.90 Open 7.56 4059.90
P-328 45.11 59.80 PVC 150 false 0.77 Open 2.16 4043.57
P-329 108.51 59.80 PVC 150 false 0.38 Open 1.08 4043.10
P-330 174.65 59.80 PVC 150 false 0.38 Open 1.08 4043.10
P-331 67.36 71.20 PVC 150 false 1.63 Open 6.48 4046.88
P-332 107.90 59.80 PVC 150 false 0.38 Open 1.08 4044.57
P-333 105.46 71.20 PVC 150 false 0.81 Open 3.24 4044.57
P-334 110.03 59.80 PVC 150 false 0.77 Open 2.16 4044.57
P-335 219.46 59.80 PVC 150 false 0.38 Open 1.08 4043.42
P-337 220.07 59.80 PVC 150 false 0.38 Open 1.08 4046.88
P-339 220.07 59.80 PVC 150 false 0.38 Open 1.08 4046.92
P-340 45.11 59.80 PVC 150 false 0.00 Open 0.00 4046.28
P-341 59.44 71.20 PVC 150 false 1.36 Open 5.40 4053.34
P-342 89.61 71.20 PVC 150 false 1.09 Open 4.32 4051.89
P-343 121.31 59.80 PVC 150 false 0.38 Open -1.08 4051.53
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-344 45.11 59.80 PVC 150 false 0.00 Open 0.00 4051.53
P-345 67.06 59.80 PVC 150 false 1.15 Open 3.24 4049.44
P-346 123.14 59.80 PVC 150 false 0.77 Open 2.16 4047.95
P-347 81.38 59.80 PVC 150 false 0.38 Open -1.08 4047.71
P-348 45.11 59.80 PVC 150 false 0.00 Open 0.00 4047.71
P-349 228.60 152.00 PVC 150 false 0.71 Open 12.96 4035.84
P-350 256.95 152.00 PVC 150 false 0.65 Open 11.88 4035.13
P-351 131.06 152.00 PVC 150 false 0.95 Open 17.28 4036.93
P-352 114.60 152.00 PVC 150 false 0.77 Open 14.04 4036.25
P-353 110.95 104.60 PVC 150 false 0.38 Open 3.24 4036.25
P-354 216.71 85.60 PVC 150 false 0.38 Open 2.16 4036.08
P-355 245.67 59.80 PVC 150 false 0.38 Open 1.08 4035.69
P-356 45.11 59.80 PVC 150 false 0.00 Open 0.00 4034.97
P-357 245.67 133.00 PVC 150 false 0.31 Open 4.32 4032.51
P-358 308.15 133.00 PVC 150 false 0.62 Open 8.64 4033.52
P-359 128.32 133.00 PVC 150 false 0.39 Open 5.40 4032.66
P-360 109.73 133.00 PVC 150 false 0.23 Open 3.24 4032.66
P-361 245.67 85.60 PVC 150 false 0.38 Open 2.16 4032.61
P-362 245.67 71.20 PVC 150 false 0.27 Open 1.08 4032.17
P-414 167.94 59.80 PVC 150 false 0.38 Open 1.08 4037.04
P-578 60.96 285.00 PVC 150 false 3.03 Open 193.36 4098.10
P-579 110.03 285.00 PVC 150 false 1.96 Open 125.30 4096.79
P-580 114.00 180.80 PVC 150 false 2.48 Open -63.74 4093.91
P-581 110.34 57.00 PVC 150 false 1.69 Open 4.32 4096.79
P-582 138.07 285.00 PVC 150 false 3.18 Open 203.08 4120.55
P-583 104.55 285.00 PVC 150 false 3.17 Open 202.00 4117.30
P-584 124.05 57.00 PVC 150 false 0.42 Open -1.08 4116.84
P-585 114.30 285.00 PVC 150 false 1.95 Open 124.22 4095.73
P-586 105.77 58.40 PVC 150 false 1.21 Open 3.24 4094.65
P-587 105.16 285.00 PVC 150 false 1.90 Open -120.98 4093.70
P-588 109.73 285.00 PVC 150 false 3.08 Open 196.60 4109.87
P-589 155.45 285.00 PVC 150 false 3.06 Open 195.52 4107.44
P-590 110.03 57.00 PVC 150 false 0.42 Open -1.08 4107.04
P-591 174.96 57.00 PVC 150 false 0.85 Open 2.16 4120.55
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-592 220.37 58.40 PVC 150 false 0.40 Open 1.08 4118.23
P-593 44.81 58.40 PVC 150 false 0.00 Open 0.00 4117.51
P-6 45.11 126.60 PVC 150 false 0.77 Open 9.72 4122.19
P-7 161.85 58.40 PVC 150 false 0.40 Open 1.08 4121.99
P-594 174.96 129.80 PVC 150 false 0.65 Open -8.64 4121.44
P-596 81.99 133.00 PVC 150 false 0.62 Open 8.64 4035.37
P-600 110.03 104.60 PVC 150 false 0.75 Open 6.48 4034.83
P-601 112.17 133.00 PVC 150 false 0.62 Open 8.64 4035.14
P-602 107.90 59.80 PVC 150 false 0.77 Open 2.16 4034.83
P-603 173.13 152.00 PVC 150 false 0.60 Open 10.80 4035.75
P-604 107.59 59.80 PVC 150 false 0.77 Open 2.16 4035.37
P-606 109.42 152.00 PVC 150 false 1.67 Open -30.25 4042.92
P-607 111.86 152.00 PVC 150 false 1.90 Open 34.57 4046.66
P-608 108.20 71.20 PVC 150 false 1.09 Open 4.32 4044.54
P-609 107.29 152.00 PVC 150 false 1.61 Open 29.17 4042.92
P-610 112.47 85.60 PVC 150 false 0.94 Open 5.40 4041.44
P-611 71.02 152.00 PVC 150 false 1.19 Open 21.61 4038.18
P-612 149.05 104.60 PVC 150 false 0.75 Open 6.48 4037.61
P-613 110.03 83.40 PVC 150 false 2.57 Open 14.04 4077.80
P-614 105.46 58.40 PVC 150 false 0.81 Open 2.16 4070.50
P-615 112.47 58.40 PVC 150 false 0.40 Open -1.08 4070.13
P-616 107.59 83.40 PVC 150 false 1.98 Open 10.80 4070.50
P-617 166.12 83.40 PVC 150 false 1.78 Open 9.72 4077.80
P-618 53.95 58.40 PVC 150 false 0.40 Open 1.08 4072.22
P-619 113.39 71.20 PVC 150 false 1.36 Open 5.40 4046.25
P-620 106.38 59.80 PVC 150 false 0.77 Open 2.16 4043.48
P-621 109.42 59.80 PVC 150 false 1.15 Open 3.24 4045.28
P-622 110.03 59.80 PVC 150 false 0.77 Open 2.16 4045.28
P-338 105.46 59.80 PVC 150 false 0.77 Open 2.16 4048.02
P-623 110.95 59.80 PVC 150 false 1.54 Open 4.32 4052.22
P-624 109.12 59.80 PVC 150 false 0.77 Open 2.16 4048.02
P-637 50.90 59.80 PVC 150 false 0.38 Open -1.08 4032.32
P-638 105.16 59.80 PVC 150 false 0.38 Open 1.08 4032.46
P-285 220.07 59.80 PVC 150 false 0.38 Open 1.08 4034.60
HOJA DE CALCULOS TUBERIAS R1

PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA . SO
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REG

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAH HOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR:HEMQ
FECHA DICIEMBRE DEL 2015 REVISADO: GRP

Upstream
Hazen-
Length Diameter Materi Check Velocity Control Discharg Structure
Label Williams
(m) (mm) al Valve? (m/s) Status e (l/s) Hydraulic
C
Grade (m)

P-639 61.57 71.20 PVC 150 false 3.26 Open 12.97 4053.94
P-640 113.39 71.20 PVC 150 false 1.09 Open 4.32 4046.32
P-641 113.69 83.40 PVC 150 false 1.98 Open 10.80 4073.48
P-642 106.38 58.40 PVC 150 false 0.40 Open 1.08 4068.84
P-643 66.45 285.00 PVC 150 false 3.15 Open 200.92 4113.83
P-644 108.51 285.00 PVC 150 false 3.10 Open 197.68 4112.30
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4123.42 6.58 8.48


4123.41 0.00 0.05
4123.13 0.29 6.37
4122.51 0.62 3.26
4122.51 0.00 0.00
4121.46 0.00 0.00
4121.17 0.27 2.44
4121.09 0.08 1.84
4120.59 0.50 3.26
4120.59 0.00 0.00
4120.93 0.16 1.31
4120.79 0.15 0.87
4120.36 0.43 3.87
4120.16 0.20 1.83
4120.10 0.06 0.51
4120.10 0.00 0.00
4120.55 2.87 24.21
4113.83 1.04 23.04
4110.10 0.81 3.67
4110.10 0.00 0.00
4099.06 4.97 21.69
4067.52 2.61 57.96
4063.57 3.96 57.96
4055.46 8.10 35.17
4049.00 0.00 0.00
4056.52 7.04 66.40
4053.94 2.58 57.26
4040.05 0.39 8.67
4044.49 0.00 0.00
4036.55 0.00 0.00
4039.60 0.00 0.00
4032.95 0.13 2.90
4032.32 0.00 0.00
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4036.72 0.00 0.00


4032.76 0.00 0.00
4033.60 0.00 0.00
4033.96 0.00 0.00
4033.06 0.00 0.00
4098.10 0.97 21.46
4088.45 0.00 0.00
4091.37 0.38 8.42
4086.29 5.08 25.95
4085.16 1.13 16.65
4081.66 3.50 14.46
4081.63 0.03 0.23
4080.33 1.29 11.76
4079.97 0.36 3.26
4079.97 0.00 0.00
4081.61 0.02 0.11
4081.25 0.36 3.26
4081.25 0.00 0.00
4081.60 0.01 0.05
4081.60 0.00 0.03
4081.60 0.00 0.01
4081.59 0.00 0.01
4081.59 0.00 0.00
4080.40 1.26 11.44
4079.17 1.23 11.15
4075.92 3.26 10.87
4075.76 0.15 3.26
4075.76 0.00 0.00
4073.48 2.43 10.59
4046.88 1.55 34.27
4042.78 0.00 0.00
4044.26 0.00 0.00
4042.78 0.00 0.00
4042.59 0.00 0.00
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4071.77 1.71 7.75


4069.95 1.82 11.76
4069.30 0.66 3.26
4069.30 0.00 0.00
4066.16 5.62 20.94
4065.24 0.91 20.26
4061.63 3.61 34.26
4052.22 9.41 57.19
4046.24 0.00 0.00
4062.50 2.75 16.42
4053.34 9.16 34.26
4046.15 0.51 2.90
4046.15 0.00 0.00
4049.44 1.00 22.20
4060.65 1.85 10.97
4058.88 1.77 10.50
4050.06 8.83 10.04
4049.75 0.31 1.45
4047.11 2.64 18.58
4046.48 0.63 13.96
4045.84 0.64 6.59
4044.98 0.87 3.87
4043.49 1.49 10.48
4043.08 0.41 2.90
4043.08 0.00 0.00
4046.08 0.40 2.90
4046.08 0.00 0.00
4049.39 0.67 6.72
4049.10 0.29 6.35
4048.49 0.61 6.34
4047.64 0.85 5.98
4046.38 1.26 5.63
4045.63 0.75 5.29
4044.92 0.70 4.95
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4044.14 0.78 4.63


4042.54 1.60 10.48
4042.13 0.41 2.90
4043.69 0.45 3.73
4043.30 0.39 2.90
4043.30 0.00 0.00
4043.62 0.07 3.44
4043.17 0.45 3.17
4042.55 0.62 2.91
4041.42 1.12 7.92
4040.40 1.02 7.20
4038.47 1.93 6.51
4036.93 1.54 5.86
4033.95 0.52 4.20
4033.52 0.43 3.46
4032.26 0.07 1.46
4031.86 0.00 0.00
4032.05 0.20 1.46
4031.81 0.24 0.69
4031.45 0.36 2.91
4031.45 0.00 0.00
4077.80 8.49 71.62
4046.25 10.20 34.26
4039.49 0.00 0.00
4052.37 7.22 23.80
4050.31 2.06 45.58
4043.99 0.13 2.90
4039.90 0.00 0.00
4043.81 0.13 2.90
4043.48 0.00 0.00
4042.13 0.00 0.00
4122.19 0.94 5.35
4112.30 0.41 3.67
4110.90 1.39 13.23
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4107.04 0.00 0.00


4111.89 0.00 0.00
4116.84 0.00 0.00
4088.53 5.38 24.44
4083.33 5.21 23.66
4070.14 13.19 59.93
4089.43 2.59 11.76
4088.71 0.72 3.26
4088.71 0.00 0.00
4085.34 6.17 28.04
4082.26 3.09 13.24
4081.65 0.61 3.67
4081.65 0.00 0.00
4091.75 1.95 8.86
4089.16 2.59 11.76
4088.45 0.72 3.26
4051.06 4.40 26.44
4049.43 1.63 10.49
4049.00 0.43 2.91
4039.60 4.89 22.21
4037.29 2.31 10.48
4036.57 0.73 2.90
4036.57 0.00 0.00
4043.88 2.44 22.20
4041.57 2.31 10.48
4040.93 0.64 2.91
4040.93 0.00 0.00
4043.53 2.79 24.45
4039.97 3.56 16.18
4037.88 2.09 9.50
4036.72 1.16 4.49
4036.08 0.64 2.91
4036.08 0.00 0.00
4050.08 5.38 24.44
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4046.53 3.56 16.16


4041.64 4.89 22.20
4038.83 2.81 10.48
4038.19 0.64 2.91
4038.19 0.00 0.00
4046.66 4.41 20.02
4040.38 2.41 9.49
4038.07 2.31 10.48
4037.43 0.64 2.91
4037.43 0.00 0.00
4049.43 0.00 0.00
4038.71 1.61 6.59
4036.62 2.09 9.49
4035.63 0.99 4.48
4035.31 0.32 2.91
4035.31 0.00 0.00
4041.44 1.00 9.45
4034.15 0.13 2.90
4038.18 1.88 8.67
4036.00 0.83 3.75
4035.45 0.56 2.48
4034.60 0.85 3.87
4034.28 0.31 2.90
4037.61 0.57 4.09
4036.36 0.68 3.08
4035.75 0.61 2.62
4033.60 0.64 2.91
4033.06 0.64 2.91
4033.26 0.99 4.48
4032.76 0.50 2.90
4032.95 1.30 9.49
4032.46 0.48 4.48
4059.59 6.51 29.59
4068.54 0.72 3.26
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4068.54 0.00 0.00


4072.05 0.00 0.00
4064.30 7.92 66.11
4056.45 7.85 45.58
4041.73 0.64 2.91
4041.73 0.00 0.00
4042.43 1.05 9.49
4040.13 2.31 10.48
4039.49 0.64 2.91
4043.30 0.51 2.90
4043.30 0.00 0.00
4045.28 5.04 106.63
4043.94 1.34 10.48
4040.54 2.31 10.48
4039.90 0.64 2.91
4043.48 0.51 2.90
4068.49 0.00 0.00
4065.14 3.70 33.60
4059.90 5.24 23.80
4048.43 11.48 45.58
4043.10 0.47 10.48
4042.78 0.31 2.90
4042.59 0.51 2.90
4044.57 2.31 34.27
4044.26 0.31 2.90
4043.57 1.00 9.49
4043.42 1.15 10.48
4042.78 0.64 2.90
4046.24 0.64 2.91
4046.28 0.64 2.91
4046.28 0.00 0.00
4051.89 1.45 24.44
4050.44 1.45 16.17
4051.89 0.35 2.91
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4051.53 0.00 0.00


4047.95 1.49 22.21
4046.66 1.29 10.48
4047.95 0.24 2.90
4047.71 0.00 0.00
4035.13 0.70 3.07
4034.46 0.67 2.62
4036.25 0.69 5.24
4035.84 0.41 3.57
4036.08 0.16 1.46
4035.69 0.40 1.83
4034.97 0.71 2.91
4034.97 0.00 0.00
4032.33 0.19 0.77
4032.66 0.86 2.78
4032.51 0.15 1.16
4032.61 0.05 0.45
4032.17 0.45 1.83
4031.86 0.31 1.24
4036.55 0.49 2.90
4096.79 1.31 21.46
4095.73 1.06 9.61
4096.79 2.88 25.22
4091.52 5.27 47.77
4117.30 3.25 23.51
4114.87 2.43 23.28
4117.30 0.45 3.67
4094.65 1.08 9.46
4092.01 2.63 24.91
4094.65 0.95 9.01
4107.44 2.43 22.14
4104.03 3.41 21.91
4107.44 0.40 3.67
4118.23 2.31 13.23
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4117.51 0.72 3.26


4117.51 0.00 0.00
4121.99 0.20 4.40
4121.46 0.53 3.26
4121.99 0.55 3.13
4035.14 0.23 2.78
4034.25 0.58 5.26
4034.83 0.31 2.78
4033.70 1.13 10.48
4035.37 0.38 2.20
4034.24 1.13 10.48
4044.54 1.62 14.77
4044.54 2.12 18.91
4042.79 1.75 16.17
4041.44 1.48 13.81
4040.32 1.12 9.96
4037.61 0.56 7.92
4036.83 0.78 5.26
4070.50 7.30 66.37
4069.26 1.24 11.76
4070.50 0.37 3.26
4066.11 4.39 40.83
4072.22 5.58 33.60
4072.05 0.18 3.26
4043.48 2.77 24.44
4042.37 1.12 10.48
4042.85 2.43 22.20
4044.12 1.15 10.48
4046.92 1.11 10.48
4048.02 4.20 37.84
4046.88 1.14 10.48
4032.46 0.15 2.91
4032.16 0.31 2.90
4033.96 0.64 2.91
FICADO LLANCCACCAHUA . SORA EN LOS
, PROVINCIA DE MELGAR, REGION PUNO

Downstream Pressure
Headloss
Structure Pipe
Gradient
Hydraulic Headloss
(m/km)
Grade (m) (m)

4046.32 7.62 123.71


4044.49 1.83 16.18
4068.84 4.64 40.84
4068.49 0.35 3.26
4112.30 1.53 23.04
4109.87 2.43 22.36
HOJA DE CALCULOS RESERVORIOS R1

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO
LLANCCACCAHUA . SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA,
DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO

OBRA : INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA HOJA NRO:
UMACHIRI - MELGAR - PUNO HECHO POR:
FECHA : ABRIL DE 2016 REVISADO:

Calculated
Elevatio Inflow
Label Zone Hydraulic
n (m) (l/s)
Grade (m)
R-1 4,130.00 Zone 219.29 4,130.00
E RIEGO TECNIFICADO
ORA Y HUANACOMARCA,
PUNO

01
HEMQ
GRP
HOJA DE CALCULOS NODOS R2

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA
EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVIN
MELGAR, REGION PUNO

OBRA : INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA


UMACHIRI - MELGAR - PUNO
FECHA : ABRIL DE 2016

Demand
Elevatio Base Flow
Label Zone Type Pattern (Calculated)
n (m) (l/s)
(l/s)
J-235 4,036.60 Zone Demand 0 Fixed 0
J-236 4,037.50 Zone Demand 1.08 Fixed 1.08
J-237 4,039.65 Zone Demand 1.08 Fixed 1.08
J-242 4,036.00 Zone Demand 1.08 Fixed 1.08
J-243 4,034.50 Zone Demand 1.08 Fixed 1.08
J-244 4,031.90 Zone Demand 1.08 Fixed 1.08
J-245 4,030.50 Zone Demand 1.08 Fixed 1.08
J-246 4,029.70 Zone Demand 0 Fixed 0
J-247 4,028.70 Zone Demand 1.08 Fixed 1.08
J-248 4,029.65 Zone Demand 1.08 Fixed 1.08
J-249 4,030.75 Zone Demand 0 Fixed 0
J-250 4,027.65 Zone Demand 1.08 Fixed 1.08
J-251 4,025.75 Zone Demand 1.08 Fixed 1.08
J-252 4,025.10 Zone Demand 0 Fixed 0
J-253 4,028.35 Zone Demand 1.08 Fixed 1.08
J-254 4,026.55 Zone Demand 1.08 Fixed 1.08
J-255 4,025.12 Zone Demand 1.08 Fixed 1.08
J-256 4,023.15 Zone Demand 1.08 Fixed 1.08
J-257 4,022.30 Zone Demand 0 Fixed 0
J-258 4,020.20 Zone Demand 1.08 Fixed 1.08
J-259 4,018.85 Zone Demand 1.08 Fixed 1.08
J-260 4,018.35 Zone Demand 1.08 Fixed 1.08
J-261 4,018.05 Zone Demand 0 Fixed 0
J-262 4,016.90 Zone Demand 1.08 Fixed 1.08
J-263 4,015.00 Zone Demand 1.08 Fixed 1.08
J-264 4,014.40 Zone Demand 0 Fixed 0
J-265 4,014.30 Zone Demand 1.08 Fixed 1.08
J-266 4,012.70 Zone Demand 1.08 Fixed 1.08
J-267 4,011.50 Zone Demand 1.08 Fixed 1.08
J-268 4,010.50 Zone Demand 0 Fixed 0
J-269 4,016.50 Zone Demand 1.08 Fixed 1.08
J-270 4,011.85 Zone Demand 1.08 Fixed 1.08
J-271 4,009.00 Zone Demand 1.08 Fixed 1.08
J-272 4,008.08 Zone Demand 1.08 Fixed 1.08
J-273 4,007.85 Zone Demand 1.08 Fixed 1.08
J-274 4,006.55 Zone Demand 1.08 Fixed 1.08
J-275 4,006.10 Zone Demand 0 Fixed 0
J-276 4,006.35 Zone Demand 1.08 Fixed 1.08
J-277 4,005.98 Zone Demand 0 Fixed 0
HOJA DE CALCULOS NODOS R2

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA
EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVIN
MELGAR, REGION PUNO

OBRA : INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA


UMACHIRI - MELGAR - PUNO
FECHA : ABRIL DE 2016

Demand
Elevatio Base Flow
Label Zone Type Pattern (Calculated)
n (m) (l/s)
(l/s)
J-278 4,006.35 Zone Demand 1.08 Fixed 1.08
J-279 4,006.05 Zone Demand 1.08 Fixed 1.08
J-280 4,004.85 Zone Demand 1.08 Fixed 1.08
J-281 4,004.30 Zone Demand 1.08 Fixed 1.08
J-282 4,003.00 Zone Demand 1.08 Fixed 1.08
J-283 4,005.06 Zone Demand 1.08 Fixed 1.08
J-284 4,003.25 Zone Demand 1.08 Fixed 1.08
J-285 4,002.35 Zone Demand 1.08 Fixed 1.08
J-286 4,002.37 Zone Demand 0 Fixed 0
J-287 4,003.85 Zone Demand 1.08 Fixed 1.08
J-288 4,003.60 Zone Demand 0 Fixed 0
J-289 4,002.98 Zone Demand 1.08 Fixed 1.08
J-290 4,002.65 Zone Demand 0 Fixed 0
J-291 4,002.35 Zone Demand 1.08 Fixed 1.08
J-292 4,002.08 Zone Demand 0 Fixed 0
J-293 4,002.15 Zone Demand 1.08 Fixed 1.08
J-294 4,000.85 Zone Demand 1.08 Fixed 1.08
J-295 4,000.60 Zone Demand 1.08 Fixed 1.08
J-296 4,000.20 Zone Demand 1.08 Fixed 1.08
J-297 3,999.65 Zone Demand 1.08 Fixed 1.08
J-298 3,999.30 Zone Demand 1.08 Fixed 1.08
J-299 3,998.73 Zone Demand 1.08 Fixed 1.08
J-300 3,998.15 Zone Demand 1.08 Fixed 1.08
J-301 3,997.90 Zone Demand 0 Fixed 0
J-302 4,021.48 Zone Demand 1.08 Fixed 1.08
J-303 4,019.15 Zone Demand 1.08 Fixed 1.08
J-304 4,018.05 Zone Demand 1.08 Fixed 1.08
J-305 4,015.85 Zone Demand 1.08 Fixed 1.08
J-306 4,014.80 Zone Demand 1.08 Fixed 1.08
J-307 4,012.85 Zone Demand 1.08 Fixed 1.08
J-308 4,012.65 Zone Demand 1.08 Fixed 1.08
J-309 4,010.65 Zone Demand 1.08 Fixed 1.08
J-310 4,008.85 Zone Demand 1.08 Fixed 1.08
J-311 4,008.20 Zone Demand 1.08 Fixed 1.08
J-312 4,006.09 Zone Demand 1.08 Fixed 1.08
J-313 4,004.32 Zone Demand 1.08 Fixed 1.08
J-314 4,003.50 Zone Demand 1.08 Fixed 1.08
J-315 4,003.25 Zone Demand 1.08 Fixed 1.08
J-316 4,003.45 Zone Demand 0 Fixed 0
J-317 4,003.13 Zone Demand 1.08 Fixed 1.08
HOJA DE CALCULOS NODOS R2

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA
EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVIN
MELGAR, REGION PUNO

OBRA : INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA


UMACHIRI - MELGAR - PUNO
FECHA : ABRIL DE 2016

Demand
Elevatio Base Flow
Label Zone Type Pattern (Calculated)
n (m) (l/s)
(l/s)
J-318 4,002.35 Zone Demand 1.08 Fixed 1.08
J-319 4,001.90 Zone Demand 1.08 Fixed 1.08
J-320 4,002.15 Zone Demand 0 Fixed 0
J-321 4,001.08 Zone Demand 1.08 Fixed 1.08
J-322 4,000.85 Zone Demand 0 Fixed 0
J-352 4,001.60 Zone Demand 1.08 Fixed 1.08
J-353 4,001.70 Zone Demand 1.08 Fixed 1.08
J-354 4,001.30 Zone Demand 1.08 Fixed 1.08
J-355 4,000.31 Zone Demand 1.08 Fixed 1.08
J-356 4,000.05 Zone Demand 1.08 Fixed 1.08
J-357 3,999.23 Zone Demand 1.08 Fixed 1.08
J-358 3,999.06 Zone Demand 1.08 Fixed 1.08
J-359 3,998.25 Zone Demand 1.08 Fixed 1.08
J-360 3,998.02 Zone Demand 1.08 Fixed 1.08
J-361 3,997.60 Zone Demand 1.08 Fixed 1.08
J-362 3,997.50 Zone Demand 0 Fixed 0
J-363 4,015.50 Zone Demand 1.08 Fixed 1.08
J-364 4,013.12 Zone Demand 1.08 Fixed 1.08
J-365 4,012.00 Zone Demand 0 Fixed 0
J-366 4,007.85 Zone Demand 1.08 Fixed 1.08
J-367 4,008.25 Zone Demand 0 Fixed 0
J-369 4,040.30 Zone Demand 0 Fixed 0
J-418 4,031.08 Zone Demand 0 Fixed 0
J-419 4,029.70 Zone Demand 0 Fixed 0
J-420 4,027.45 Zone Demand 0 Fixed 0
J-421 4,028.30 Zone Demand 0 Fixed 0
J-422 4,012.00 Zone Demand 0 Fixed 0
J-423 4,020.85 Zone Demand 0 Fixed 0
J-424 4,015.85 Zone Demand 0 Fixed 0
J-425 4,012.18 Zone Demand 0 Fixed 0
J-426 4,013.80 Zone Demand 0 Fixed 0
J-427 4,004.98 Zone Demand 0 Fixed 0
J-428 4,005.15 Zone Demand 0 Fixed 0
J-429 4,003.10 Zone Demand 0 Fixed 0
J-430 4,004.70 Zone Demand 0 Fixed 0
J-431 3,999.90 Zone Demand 0 Fixed 0
J-432 3,997.90 Zone Demand 0 Fixed 0
J-433 4,000.12 Zone Demand 0 Fixed 0
J-434 3,999.15 Zone Demand 0 Fixed 0
J-441 4,006.00 Zone Demand 0 Fixed 0
HOJA DE CALCULOS NODOS R2

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA
EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVIN
MELGAR, REGION PUNO

OBRA : INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORA


UMACHIRI - MELGAR - PUNO
FECHA : ABRIL DE 2016

Demand
Elevatio Base Flow
Label Zone Type Pattern (Calculated)
n (m) (l/s)
(l/s)
J-442 4,006.55 Zone Demand 0 Fixed 0
J-443 4,002.15 Zone Demand 0 Fixed 0
J-444 4,001.75 Zone Demand 0 Fixed 0
J-445 4,011.10 Zone Demand 0 Fixed 0
J-446 4,007.25 Zone Demand 0 Fixed 0
J-447 4,026.90 Zone Demand 0 Fixed 0
EGO TECNIFICADO LLANCCACCAHUA . SORA
CA, DISTRITO DE UMACHIRI, PROVINCIA DE

HOJA NRO: 01
HECHO POR: HEMQ
REVISADO: GRP

Calculated
Pressure
Hydraulic
(bars)
Grade (m)
4,069.24 3.1946
4,069.24 3.1065
4,069.24 2.896
4,068.10 3.1412
4,067.84 3.2627
4,067.46 3.4806
4,065.63 3.4382
4,065.19 3.4729
4,062.78 3.3357
4,062.42 3.2074
4,062.42 3.0998
4,061.97 3.3586
4,061.80 3.5279
4,061.80 3.5915
4,062.00 3.2934
4,063.82 3.6479
4,057.91 3.2093
4,062.31 3.8326
4,061.42 3.8288
4,057.60 3.6604
4,055.66 3.6029
4,055.20 3.6064
4,055.20 3.6357
4,055.39 3.7672
4,053.37 3.7555
4,053.00 3.7776
4,053.18 3.8055
4,052.13 3.8588
4,052.54 4.0162
4,052.54 4.114
4,051.39 3.4145
4,050.26 3.7592
4,048.64 3.8793
4,048.23 3.9293
4,048.11 3.9406
4,047.09 3.9677
4,046.96 3.9989
4,046.59 3.9378
4,046.59 3.974
EGO TECNIFICADO LLANCCACCAHUA . SORA
CA, DISTRITO DE UMACHIRI, PROVINCIA DE

HOJA NRO: 01
HECHO POR: HEMQ
REVISADO: GRP

Calculated
Pressure
Hydraulic
(bars)
Grade (m)
4,046.33 3.9128
4,045.62 3.8727
4,045.62 3.9901
4,045.46 4.0287
4,042.64 3.8791
4,041.08 3.525
4,040.37 3.6331
4,040.95 3.7776
4,041.08 3.7884
4,037.64 3.3069
4,037.28 3.2965
4,036.28 3.2593
4,035.96 3.2598
4,034.97 3.1921
4,034.78 3.1999
4,035.18 3.2322
4,034.72 3.3149
4,034.06 3.2748
4,032.46 3.1576
4,032.53 3.2184
4,031.82 3.1831
4,031.55 3.2119
4,030.91 3.2061
4,030.91 3.2306
4,054.59 3.2402
4,057.77 3.7795
4,052.40 3.3613
4,056.04 3.9336
4,048.84 3.3312
4,051.20 3.7529
4,048.20 3.479
4,047.02 3.5592
4,044.22 3.462
4,042.32 3.3393
4,040.37 3.3552
4,038.89 3.3835
4,036.50 3.23
4,036.13 3.2182
4,036.13 3.1986
4,035.36 3.154
EGO TECNIFICADO LLANCCACCAHUA . SORA
CA, DISTRITO DE UMACHIRI, PROVINCIA DE

HOJA NRO: 01
HECHO POR: HEMQ
REVISADO: GRP

Calculated
Pressure
Hydraulic
(bars)
Grade (m)
4,034.60 3.1562
4,034.27 3.1682
4,034.27 3.1535
4,033.69 3.1912
4,033.69 3.2137
4,033.92 3.163
4,034.15 3.1761
4,033.85 3.1852
4,033.51 3.2493
4,032.76 3.2013
4,032.50 3.2563
4,031.77 3.2017
4,031.52 3.2558
4,031.13 3.2409
4,030.88 3.2568
4,030.88 3.2666
4,048.12 3.1923
4,047.55 3.3695
4,047.55 3.4792
4,041.92 3.3343
4,041.92 3.2952
4,069.24 2.8324
4,067.46 3.5608
4,062.78 3.2378
4,062.12 3.3933
4,064.63 3.5552
4,048.20 3.5426
4,058.77 3.7109
4,054.33 3.7663
4,052.13 3.9097
4,052.44 3.7818
4,045.94 4.0086
4,045.62 3.9607
4,041.40 3.7481
4,041.08 3.5602
4,032.91 3.2309
4,031.13 3.2526
4,032.96 3.2136
4,031.82 3.1978
4,046.50 3.9635
EGO TECNIFICADO LLANCCACCAHUA . SORA
CA, DISTRITO DE UMACHIRI, PROVINCIA DE

HOJA NRO: 01
HECHO POR: HEMQ
REVISADO: GRP

Calculated
Pressure
Hydraulic
(bars)
Grade (m)
4,046.33 3.8932
4,035.49 3.2634
4,035.18 3.2713
4,049.94 3.8016
4,048.23 4.0106
4,061.97 3.432
HOJA DE CALCULOS TUBERIAS R2
PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA .
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR,

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUAHOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR: HEMQ
FECHA ABRIL DE 2016 REVISADO: GRP

Hazen- Veloci
Length Diamete Materi Check Control Discharg
Label William ty
(m) r (mm) al Valve? Status e (l/s)
s C (m/s)

P-137 366.67 337.60 PVC 150 false 0.95 Open 85.34


P-138 41.45 337.60 PVC 150 false 0.02 Open 2.16
P-139 172.82 237.60 PVC 150 false 0.02 Open 1.08
P-140 109.42 59.80 PVC 150 false 0.77 Open 2.16
P-141 45.11 237.60 PVC 150 false 1.78 Open 78.86
P-142 148.44 71.20 PVC 150 false 1.09 Open 4.32
P-143 45.11 59.80 PVC 150 false 0 Open 0.00
P-144 45.11 59.80 PVC 150 false 0 Open 0.00
P-145 45.11 190.20 PVC 150 false 2.24 Open 63.73
P-147 185.01 59.80 PVC 150 false 0.77 Open 2.16
P-148 159.72 59.80 PVC 150 false 0.38 Open 1.08
P-149 45.11 59.80 PVC 150 false 0 Open 0.00
P-150 220.07 190.20 PVC 150 false 1.56 Open 44.29
P-151 45.11 190.20 PVC 150 false 1.41 Open 39.97
P-152 45.11 59.80 PVC 150 false 0 Open 0.00
P-153 150.57 190.20 PVC 150 false 1.33 Open 37.81
P-155 140.82 59.80 PVC 150 false 0.38 Open 1.08
P-157 170.99 190.20 PVC 150 false 1.18 Open 33.49
P-158 45.11 59.80 PVC 150 false 0.38 Open 1.08
P-159 128.93 59.80 PVC 150 false 0.38 Open 1.08
P-160 45.11 59.80 PVC 150 false 0 Open 0.00
P-163 236.22 152.00 PVC 150 false 1.49 Open 27.01
P-164 45.11 59.80 PVC 150 false 0.38 Open -1.08
P-165 315.16 152.00 PVC 150 false 1.25 Open 22.68
P-166 45.11 152.00 PVC 150 false 1.19 Open 21.60
P-167 126.19 152.00 PVC 150 false 1.19 Open 21.60
P-168 45.11 152.00 PVC 150 false 1.13 Open 20.52
P-170 45.11 133.00 PVC 150 false 0.78 Open 10.80
P-173 125.27 104.60 PVC 150 false 0.75 Open 6.48
P-174 220.07 59.80 PVC 150 false 0.38 Open 1.08
P-175 45.11 59.80 PVC 150 false 0 Open 0.00
P-176 172.82 104.60 PVC 150 false 1.38 Open 11.88
P-177 140.51 104.60 PVC 150 false 1.26 Open 10.80
P-178 217.32 104.60 PVC 150 false 1.01 Open 8.64
HOJA DE CALCULOS TUBERIAS R2
PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA .
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR,

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUAHOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR: HEMQ
FECHA ABRIL DE 2016 REVISADO: GRP

Hazen- Veloci
Length Diamete Materi Check Control Discharg
Label William ty
(m) r (mm) al Valve? Status e (l/s)
s C (m/s)

P-179 211.53 104.60 PVC 150 false 0.88 Open 7.56


P-180 170.99 85.60 PVC 150 false 1.13 Open 6.48
P-181 127.71 59.80 PVC 150 false 0.38 Open 1.08
P-182 45.11 59.80 PVC 150 false 0 Open 0.00
P-183 174.04 85.60 PVC 150 false 0.75 Open 4.32
P-184 195.68 85.60 PVC 150 false 0.56 Open 3.24
P-185 179.53 85.60 PVC 150 false 0.38 Open 2.16
P-186 45.11 85.60 PVC 150 false 0 Open 0.00
P-187 201.17 59.80 PVC 150 false 0.38 Open 1.08
P-188 45.11 59.80 PVC 150 false 0 Open 0.00
P-199 188.37 71.20 PVC 150 false 0.27 Open -1.08
P-200 110.03 133.00 PVC 150 false 0.62 Open 8.64
P-201 154.23 133.00 PVC 150 false 0.54 Open 7.56
P-202 45.11 59.80 PVC 150 false 0 Open 0.00
P-203 160.63 71.20 PVC 150 false 0.54 Open 2.16
P-204 195.99 59.80 PVC 150 false 0.38 Open 1.08
P-205 45.11 59.80 PVC 150 false 0 Open 0.00
P-206 138.07 59.80 PVC 150 false 0.38 Open 1.08
P-207 45.11 59.80 PVC 150 false 0 Open 0.00
P-209 45.11 59.80 PVC 150 false 0 Open 0.00
P-363 135.03 237.60 PVC 150 false 1.83 Open 81.02
P-364 217.63 237.60 PVC 150 false 1.8 Open 79.94
P-365 217.63 59.80 PVC 150 false 0.38 Open 1.08
P-366 45.11 59.80 PVC 150 false 0 Open 0.00
P-367 124.05 59.80 PVC 150 false 0.38 Open 1.08
P-368 45.11 59.80 PVC 150 false 0 Open 0.00
P-369 63.09 59.80 PVC 150 false 0.77 Open 2.16
P-370 111.86 59.80 PVC 150 false 0.38 Open 1.08
P-371 53.04 59.80 PVC 150 false 0.38 Open -1.08
P-372 220.07 237.60 PVC 150 false 1.46 Open 64.81
P-373 62.79 237.60 PVC 150 false 1.68 Open 74.54
P-374 112.17 237.60 PVC 150 false 1.49 Open 65.89
P-375 110.34 85.60 PVC 150 false 1.5 Open 8.64
P-376 220.07 85.60 PVC 150 false 1.31 Open 7.56
P-377 238.05 85.60 PVC 150 false 1.13 Open 6.48
HOJA DE CALCULOS TUBERIAS R2
PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA .
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR,

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUAHOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR: HEMQ
FECHA ABRIL DE 2016 REVISADO: GRP

Hazen- Veloci
Length Diamete Materi Check Control Discharg
Label William ty
(m) r (mm) al Valve? Status e (l/s)
s C (m/s)

P-378 220.07 85.60 PVC 150 false 0.94 Open 5.40


P-379 220.07 71.20 PVC 150 false 1.09 Open 4.32
P-380 220.07 59.80 PVC 150 false 0.38 Open 1.08
P-381 45.11 59.80 PVC 150 false 0 Open 0.00
P-382 220.07 133.00 PVC 150 false 1.09 Open 15.12
P-383 220.07 104.60 PVC 150 false 1.63 Open 14.04
P-384 220.07 104.60 PVC 150 false 1.51 Open 12.96
P-385 134.72 190.20 PVC 150 false 2.24 Open 63.73
P-386 112.17 133.00 PVC 150 false 1.17 Open 16.20
P-387 101.80 190.20 PVC 150 false 1.67 Open 47.53
P-389 222.50 59.80 PVC 150 false 0.38 Open 1.08
P-390 110.03 190.20 PVC 150 false 1.44 Open 41.05
P-391 45.11 59.80 PVC 150 false 0 Open 0.00
P-392 67.06 190.20 PVC 150 false 1.41 Open 39.97
P-393 107.90 59.80 PVC 150 false 0.38 Open 1.08
P-394 133.50 190.20 PVC 150 false 1.37 Open -38.89
P-396 110.03 59.80 PVC 150 false 0.38 Open -1.08
P-397 45.11 59.80 PVC 150 false 0 Open 0.00
P-400 45.11 59.80 PVC 150 false 0 Open 0.00
P-401 148.44 133.00 PVC 150 false 0.78 Open 10.80
P-403 220.07 71.20 PVC 150 false 0.54 Open 2.16
P-404 220.07 59.80 PVC 150 false 0.38 Open 1.08
P-405 105.16 104.60 PVC 150 false 0.38 Open 3.24
P-406 220.07 71.20 PVC 150 false 0.54 Open 2.16
P-407 220.07 59.80 PVC 150 false 0.38 Open 1.08
P-408 45.11 59.80 PVC 150 false 0 Open 0.00
P-410 220.07 71.20 PVC 150 false 0.54 Open 2.16
P-411 109.73 71.20 PVC 150 false 0.54 Open 2.16
P-412 220.07 59.80 PVC 150 false 0.38 Open 1.08
P-413 45.11 59.80 PVC 150 false 0 Open 0.00
P-625 110.34 190.20 PVC 150 false 1.52 Open 43.21
P-626 109.73 59.80 PVC 150 false 0.77 Open 2.16
P-627 110.03 59.80 PVC 150 false 0.38 Open -1.08
P-628 110.03 190.20 PVC 150 false 0.99 Open 28.09
P-629 111.56 152.00 PVC 150 false 1.43 Open 25.93
HOJA DE CALCULOS TUBERIAS R2
PROYECTO:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA .
SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA DE MELGAR,

OBRA INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUAHOJA NRO: 01


UMACHIRI - MELGAR - PUNO HECHO POR: HEMQ
FECHA ABRIL DE 2016 REVISADO: GRP

Hazen- Veloci
Length Diamete Materi Check Control Discharg
Label William ty
(m) r (mm) al Valve? Status e (l/s)
s C (m/s)

P-630 108.51 152.00 PVC 150 false 1.31 Open 23.76


P-631 110.03 59.80 PVC 150 false 0.38 Open 1.08
P-632 109.73 59.80 PVC 150 false 0.38 Open 1.08
P-633 110.95 85.60 PVC 150 false 0.94 Open 5.40
P-634 108.81 85.60 PVC 150 false 0.56 Open 3.24
P-635 113.69 104.60 PVC 150 false 0.75 Open 6.48
P-636 106.07 85.60 PVC 150 false 0.56 Open 3.24
P-646 57.91 59.80 PVC 150 false 0.38 Open 1.08
P-647 45.11 59.80 PVC 150 false 0 Open 0.00
P-648 64.31 152.00 PVC 150 false 1.13 Open 20.52
P-649 110.64 104.60 PVC 150 false 0.88 Open 7.56
P-650 110.03 59.80 PVC 150 false 0.38 Open -1.08
P-651 105.46 133.00 PVC 150 false 0.86 Open 11.88
P-652 45.11 59.80 PVC 150 false 0 Open 0.00
P-653 44.50 190.20 PVC 150 false 1.29 Open 36.73
P-654 124.66 59.80 PVC 150 false 0.77 Open 2.16
P-655 288.34 190.20 PVC 150 false 1.22 Open 34.57
P-656 45.11 59.80 PVC 150 false 0 Open 0.00
P-657 112.17 190.20 PVC 150 false 1.1 Open 31.33
P-658 112.78 190.20 PVC 150 false 1.06 Open 30.25
P-659 45.11 59.80 PVC 150 false 0 Open 0.00
R2

EGO TECNIFICADO LLANCCACCAHUA . SORA EN LOS


UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO

Downstre
Upstream
am
Structur Pressure
Structur Headloss
e Pipe
e Gradient
Hydrauli Headloss
Hydrauli (m/km)
c Grade (m)
c Grade
(m)
(m)
4070.00 4069.24 0.76 2.07
4069.24 4069.24 0.00 0.00
4069.24 4069.24 0.00 0.00
4069.24 4068.10 1.15 10.47
4065.63 4065.19 0.45 9.88
4065.19 4062.78 2.40 16.18
4062.42 4062.42 0.00 0.00
4061.80 4061.80 0.00 0.00
4062.32 4061.43 0.89 19.71
4057.61 4055.67 1.94 10.48
4055.67 4055.21 0.46 2.91
4055.21 4055.21 0.00 0.00
4057.61 4055.40 2.21 10.04
4053.38 4053.01 0.37 8.30
4052.54 4052.54 0.00 0.00
4051.39 4050.27 1.13 7.49
4048.64 4048.24 0.41 2.90
4048.12 4047.10 1.02 5.98
4047.10 4046.97 0.13 2.90
4046.97 4046.59 0.37 2.90
4046.59 4046.59 0.00 0.00
4045.47 4042.64 2.83 11.97
4040.95 4041.09 0.13 2.90
4040.38 4037.65 2.73 8.67
4037.65 4037.29 0.36 7.92
4037.29 4036.29 1.00 7.92
4036.29 4035.96 0.33 7.21
4034.97 4034.78 0.19 4.20
4034.73 4034.07 0.66 5.26
4031.56 4030.92 0.64 2.91
4030.92 4030.92 0.00 0.00
4047.02 4044.23 2.79 16.16
4044.23 4042.33 1.90 13.55
4042.33 4040.38 1.95 8.96
R2

EGO TECNIFICADO LLANCCACCAHUA . SORA EN LOS


UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO

Downstre
Upstream
am
Structur Pressure
Structur Headloss
e Pipe
e Gradient
Hydrauli Headloss
Hydrauli (m/km)
c Grade (m)
c Grade
(m)
(m)
4040.38 4038.90 1.48 7.00
4038.90 4036.51 2.39 13.97
4036.51 4036.14 0.37 2.90
4036.14 4036.14 0.00 0.00
4036.51 4035.36 1.15 6.59
4035.36 4034.61 0.76 3.87
4034.61 4034.28 0.33 1.83
4034.28 4034.28 0.00 0.00
4034.28 4033.69 0.58 2.90
4033.69 4033.69 0.00 0.00
4033.93 4034.16 0.23 1.24
4034.16 4033.85 0.31 2.78
4033.85 4033.52 0.33 2.17
4030.88 4030.88 0.00 0.00
4048.84 4048.12 0.72 4.48
4048.12 4047.55 0.57 2.90
4047.55 4047.55 0.00 0.00
4042.33 4041.93 0.40 2.90
4041.93 4041.93 0.00 0.00
4069.24 4069.24 0.00 0.00
4069.24 4067.84 1.40 10.39
4067.84 4065.63 2.21 10.14
4068.10 4067.46 0.63 2.90
4067.46 4067.46 0.00 0.00
4062.78 4062.42 0.36 2.91
4062.78 4062.78 0.00 0.00
4062.78 4062.12 0.66 10.49
4062.12 4061.80 0.32 2.90
4061.97 4062.12 0.15 2.90
4063.83 4062.32 1.51 6.88
4065.19 4064.63 0.56 8.91
4064.63 4063.83 0.80 7.09
4064.63 4062.00 2.63 23.79
4062.00 4057.91 4.09 18.58
4057.91 4054.59 3.32 13.97
R2

EGO TECNIFICADO LLANCCACCAHUA . SORA EN LOS


UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO

Downstre
Upstream
am
Structur Pressure
Structur Headloss
e Pipe
e Gradient
Hydrauli Headloss
Hydrauli (m/km)
c Grade (m)
c Grade
(m)
(m)
4054.59 4052.40 2.19 9.96
4052.40 4048.84 3.56 16.17
4048.84 4048.20 0.64 2.91
4048.20 4048.20 0.00 0.00
4057.77 4056.05 1.73 7.84
4056.05 4051.20 4.85 22.02
4051.20 4047.02 4.18 18.99
4061.43 4058.77 2.65 19.70
4058.77 4057.77 1.00 8.91
4058.77 4057.61 1.17 11.45
4053.19 4052.54 0.65 2.91
4054.34 4053.38 0.96 8.72
4052.14 4052.14 0.00 0.00
4053.01 4052.45 0.56 8.31
4052.45 4052.14 0.31 2.90
4051.39 4052.45 1.05 7.89
4045.63 4045.95 0.32 2.90
4045.63 4045.63 0.00 0.00
4041.08 4041.08 0.00 0.00
4034.78 4034.16 0.62 4.21
4032.51 4031.52 0.99 4.48
4031.52 4030.88 0.64 2.91
4032.92 4032.77 0.15 1.46
4032.77 4031.78 0.99 4.48
4031.78 4031.14 0.64 2.91
4031.14 4031.14 0.00 0.00
4032.54 4031.56 0.99 4.48
4032.96 4032.47 0.49 4.48
4032.47 4031.83 0.64 2.91
4031.83 4031.83 0.00 0.00
4055.40 4054.34 1.06 9.60
4054.34 4053.19 1.15 10.48
4045.63 4045.95 0.32 2.90
4045.95 4045.47 0.48 4.32
4042.64 4041.40 1.24 11.10
R2

EGO TECNIFICADO LLANCCACCAHUA . SORA EN LOS


UMACHIRI, PROVINCIA DE MELGAR, REGION PUNO

Downstre
Upstream
am
Structur Pressure
Structur Headloss
e Pipe
e Gradient
Hydrauli Headloss
Hydrauli (m/km)
c Grade (m)
c Grade
(m)
(m)
4041.40 4040.38 1.03 9.45
4041.40 4041.08 0.32 2.91
4041.40 4041.09 0.32 2.90
4034.07 4032.96 1.11 9.96
4032.96 4032.54 0.42 3.87
4033.52 4032.92 0.60 5.26
4032.92 4032.51 0.41 3.87
4046.50 4046.34 0.17 2.90
4046.34 4046.34 0.00 0.00
4035.96 4035.50 0.46 7.20
4035.50 4034.73 0.77 7.00
4035.18 4035.50 0.32 2.90
4035.50 4034.97 0.53 5.02
4035.18 4035.18 0.00 0.00
4050.27 4049.95 0.32 7.10
4049.95 4048.64 1.31 10.48
4049.95 4048.12 1.83 6.35
4048.24 4048.24 0.00 0.00
4047.10 4046.50 0.59 5.29
4046.50 4045.95 0.56 4.96
4061.97 4061.97 0.00 0.00
HOJA DE CALCULOS RESERVORIOS R2

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA .
SORA EN LOS SECTORES DE LLANCCACCAHUA, TREBOL, SORA Y HUANACOMARCA, DISTRITO DE UMACHIRI, PROVINCIA
DE MELGAR, REGION PUNO
OBRA : INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO LLANCCACCAHUA - SORAHOJA NRO: 01
UMACHIRI - MELGAR - PUNO HECHO POR: HEMQ
FECHA : ABRIL DE 2016 REVISADO: GRP

Calculated
Elevatio Inflow
Label Zone Hydraulic
n (m) (l/s)
Grade (m)
R-2 4,070.00 Zone 85.34 4,070.00
CADO LLANCCACCAHUA .
O DE UMACHIRI, PROVINCIA