Address:………………………… …………………………………………..
Divisional Engineer
Date:…………………………..
INSTUTE NAME
NATURE OF WORK
BILL OF QUANTITIES
Page 1
#N/A #N/A #N/A
Grand Total
Prepared By : Checked By :
Name : Name :
Designation: Designation:
Date : Date :
Total
Vat No.
Total amount in word Rupees:…………………………………………………………
……………………………………………………………………………………………..
Signature of Contractor
Date:
Witness (1)
Witness (2)
Page 2
………………..
………………..
Amount
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Page 3
#N/A
#N/A
………………………
………………………..
Page 4
Total Cost Estimate (TCE) for a work contract
Estimate for Development of School at Kotahena Methodist tamil Vidyalaya
Item No
4 (D)
5 (E)
6 (F)
7 (G)
8 (H)
9 (I)
10 (J)
I certify the rates adopted in pricing the BOQ are fair and reasonable and the Quantities are in commensurate with the Drawings.
Prepared by :-
Checked by :-
Date :
Total Cost Estimate (TCE) for a work contract
Estimate for Development of School at Kotahena Methodist tamil Vidyalaya
Description Amount
The increase in cost between the date of preparation of estimate and date of
preparation of rates applied to the engineer's estimate.
Direct Construction Cost (DCC) =
Procurement preparedness activities
Preparation of contour, Local authority approval 1% of DCC;
Design documentation
If A › Rs. 300m 2.5% DCC
If 300m › A › Rs. 100m 3.0% DCC
If 100m › A 3.5% DCC
Post Contract - award activities
Cost of resident supervision 1.5%
Administrative cost (Travelling, stationery, photocopy charges.) 0.5 - 1%
DCC 3%
Departmental Charges
Provision for the payment for water supply connection to NWS & DB
including VAT 15%
Provision for physical contingencies 10% of (D.C.C.)
Provision for price escallation 1.5% to 10% of (D.C.C.)
VAT 12% (A) + (I) + (H)
Total Cost Estimate
(A+ B + C + D + E + F + G + H + I + J )
g the BOQ are fair and reasonable and the Quantities are in commensurate with the Drawings.
Engineer H.D./PD/Secretary
Date : Date :
Total
Provincial Engineering Department , Divisional Engineering office Colombo 07.
Estimate for Proposed Water supply system at Ananda college
This estimate covers all the expenses of labour Size of the building:
material, tools,transport and overheads etc. for Floor area :
Number of floors:
Ananda college Proposed Water supply system
Drawing Number.
including water supply, electricity and other internal and BOQ Number :
external services.
Checked by :
(special grade) ………………………………………..
(Name and Designation) Name :
Divisional Engineer
…………………………………………
Approved
NCOE/TTC
of the building:
ber of floors:
ing Number.
Sub Total
…………………………………..
ional Engineer