Académique Documents
Professionnel Documents
Culture Documents
Require Contractors of Local Government Projects to Properly Inform the Public Before the
Commencement of Road Projects
CONSOLIDATED REPORT
4th Quarter, CY 2018
MUNICIPALITY OF ANAO
Action/s Done by
the LGU against
Name of those contractor/s
Mode of
Contractors who (a) did not
Name of Information
Required to inform the public
Contractors Provided by the
Coordinate before the
Required to Contractors (i.e.
with the commencement of
Name of LGU Inform the Public tarpaulins, posters,
Local Traffic their road projects
Before the signages,
Management and (b) did not
Commencement installation of
Group or its coordinate with the
of Project warning signages
Equivalent local traffic
and the like)
Unit management group
or its equivalent
unit
NONE FOR
THE PERIOD
Prepared by:
Noted by:
________________________
(Provincial/City Director)