Activity type No Scope Scope Note 1 Site key management & access S R Display a valid ID for site access 2 Get permission from Idea Site In-charges for access & perform R activity Receive and acknowledge of Material Receipt in good If not, same will be 3 condition from Transporter and Reporting VIL immediately S R debit from vendor. in case of any shortages / Damages. Eg. Safety belt & cap Supply of Adequate skilled manpower, standard & Safety 4 R are mandatory for tools working on tower Obtaining and sharing Snap shots of existing HOP Rx level 5 and Serial Numbers of IDU/ODU 1+0, 1+1, WS card, Modem R card and interface card etc. De-installation of existing ODU & Installation of new ODU & If misaligned, 6 earthing without disturbing antenna and proper R alignment to be weatherproofing corrected. 7 Stickering of ODU Site Name & Site ID R Commissioning of IDU with New SPOT frequency and retaining all other parameters unchanged. Snap shots of HOP 8 Rx level is to be attached and it shall be remain or improved R RX level only, No Degradation is allowed. Ensure NMS connectivity. 9 Snapshot of dismantle equipment S R Ensure Proper packing of all removed materials and Handing 10 S R over to IDEA Representative 11 Ensuring HSW Compliance, PTW and TT before activity R