DOST Form No. 14 Revor -aR08
CAPSULE RESEARCH & DEVELOPMENT PROPOSAL
(For the Whole Program)
Program Title: Total Duration
|Coordinator! Gender: Nell J. Melencion, PhD / Male
JAgency/Address: PCA-Zamboanga Research Center
Htelephone/Fax/Emall: (062) 982 0302
Project Tite: Duration:
} . Suitability Assessment On 3 months,
‘The Use Of Single-Use Plastics - Asphalt Road Pavement
as a means to Mitigate Plastics Pollution in Zamboanga City.
Prastic waste pollution inland and in oceans is currently recognized to have reached criss level worldwide. Recently, Philipines ranks third
Jamong the nations as the major source of plastic wastes (in terms of volume) of oceans ( Jambeck, etal. 2015; Ovean Conservancy
IMckinsey Center for Business and Environment (2018). Itis therefore necessary to find alternative ways to curve plastic pollution by fining
alternative application of less-recycled plastics lke plastic bags. One way to fx and utlized waste plastics isto use them as co-binder with
loitumen in hotmix asphalt road pavements.
Jwnile some counties tke india has been studying waste plasic-bitumen road pavement for some time, the said technology has not reached
this country and thus necessitating this proposal to evaluate its sultabilty in asphalt road pavements in the Philippines and its sultabllty as a
|means to mitigate plastic pollution in Zamboanga City.
(Please see attached sheet for the full summa
[() Budget Summary for the whole program
‘Total Budget
Source
of Fund Ps. MOoE co TOTAL
200,602.80 210,000.00 382,000.00 801,602.60
Total
Y1 Budget
Source
of Fund Ps MOE co TOTAL
‘Note: To be submitted together with the detallod R &
projects. See guidelinesidefinitions at the back