1.1.2.1 D/R H S H S
1.1.2.1 D/R H S H S
1.1.3
1.1.3.1
1.2
1.2.1
1.2.1.1 R/I H S H S
1.2.2 I H S S S
2
INSPECTION AND TEST PLAN (ITP)
2.1 I H W S S
2.2
2.2.1
2.2.1 I H S H S
2.3
2.3.1 R/I H W S w
2.3.2 R/I H W S w
2.3.3 R/I H S S w
2.3.4
2.3.4.1 R/I H S H S
2.3.5 I H S S S
2.3.6 I H S S S
INSPECTION AND TEST PLAN (ITP)
2.3.7.1 R/I H S H S
2.3.7.2 R/I H S W S
2.3.8 I H S S S
2.4
2.4.1 R/I H W S S
2.4.2 R/I H W S S
2.4.3
2.4.3.1 R/I H S H S
2.4.3.2 R/I H S H S
2.4.4
2.4.4.1 I H S S S
2.4.4.2 R/I H S H S
2.4.4.3 R/I H S H S
2.4.5
2.4.5.1 R/I H S H S
2.4.5.2 I H S S S
2.4.5.3 R/I H S H S
2.4.5.4 I H S S S
2.4.5.5 R/I H S H S
2.4.5.6 I H S S S
2.4.5.7 R/I H S H S
2.4.6
INSPECTION AND TEST PLAN (ITP)
2.4.6.1 I H S H S
2.4.6.2 I H S S S
2.4.6.3 I H S W S
2.4.6.4 I H S H S
2.4.7
2.4.7.1 I H S H S
2.4.7.2 I H S S S
2.4.7.3 I H S W S
2.4.7.4 I H S H S
2.4.8
2.4.8.1 I H S H S
2.4.8.2 I H S W S
2.4.9
2.4.9.1 I H S H S
2.4.9.2 I H S W S
2.4.9.3 I H S H S
2.4.10 I H S W S
2.4.10.1 I H S H S
2.4.10.2 I H S S S
2.4.10.3 I H S W S
2.4.10.4 I H S H S
2.4.11 I H S S S
2.5
2.5.1
2.5.1.1 I H S H S
INSPECTION AND TEST PLAN (ITP)
2.5.1.2 I H S S S
2.6
2.6.1 R/I H S H W
2.6.1.1 R/I H S H W
2.6.1.2 R/I H S H W
2.6.2 I H S S S
2.6.3 R H S H H
2.6.3.1 R H S H H
2.6.3.2 R H S H H
Note:
Add more rows to complete the site activity inspection per task activity
Witness point: The organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled even if the the orga
INSPECTION AND TEST PLAN (ITP)
Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been
Record: Documents required for record purpose shall be filed and retained for project quality records
Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be accordin
Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected. RFI may be requ
Contact No(s):
Note:
Only the shaded blank space will be filled by the issuer of the ITP prior in submitting the document
YPE SEQUENTIAL NO REVISION
TP
RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP
RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP
RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP
RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP
RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
esentative in attendance.
RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
Date
INSPECTION AND TEST PLAN (ITP)
ASSESSMENT / RESULT:
T:
Note:
Add more rows to complete the site activity inspection per task activity
Witness point: QAQC organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QAQC represen
Surveillance: QAQC organization to monitor work in progress without notice from contractor / implementor
Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been app
Record: Documents required for record purpose shall be filed and retained for project quality records
Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be according to
Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected
Contact No(s):
Note:
Only the shaded blank space will be filled by the issuer of the ITP prior in submitting the document
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL
ASSESSMENT / RESULT:
RELEASE SIGNATURES:
Discipline Name Signature
Project in-charge
Safety in-charge
QAQC Manager
Projects Team Manager
ASSOCIATED SMELTING AND PRE-PRI-FM-050
REFINING CORP Rev.0, 26 Aug. 2017
ISABEL, LEYTE
SEQUENTIAL NO REVISION
RD REFERENCES
k procedures, ACCEPTANCE CRITERIA
y Records, etc)
ndance.
Date
ASSOCIATED SMELTING AND PRE-PRI-FM-050
REFINING CORP Rev.0, 26 Aug. 2017
ISABEL, LEYTE
SEQUENTIAL NO REVISION
Date
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL
PMG-A-MSDS-
1.1 Material delivery, handling and storage D/I H W W S PMG-A-MST-0
EHSI-SAFT-PR
2.2 Scaffolding / platform (if more than 2m high) I H H S H PASAR-FM-02-HRASAF
PMG-G-MSDS-
PMG-A-MST-0
2.3 Accessories fixing and rush coat application prior to plastering I/R H S H S PMG-A-RFI-00
PMG-A-INS-0
Note:
Add more rows to complete the site activity inspection per task activity
Witness point: The organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled even if the the organiza
Surveillance: The organization to monitor work in progress without notice from contractor / implementor
Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been app
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL
Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be according to
Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected. RFI may be required
ASSESSMENT / RESULT:
RELEASE SIGNATURES:
Discipline Name Signature
Project in-charge
Safety in-charge
QAQC Manager
Projects Team Manager
ASSOCIATED SMELTING AND
REFINING CORP
ISABEL, LEYTE
SEQUENTIAL NO REVISION
0003 0
RD REFERENCES
k procedures, ACCEPTANCE CRITERIA
y Records, etc)
approved MSDS
A-MSDS-0001-0 approved MST
-A-MST-0001-0 approved SPECS
-A-MST-0001-0
-A-RFI-0001-0 approved MST
-A-INS-0001-0
n attendance.
SEQUENTIAL NO REVISION
0003 0
Date
9/9/2019
ASSOCIATED SMELTING AND
REFINING CORP
ISABEL, LEYTE
SEQUENTIAL NO REVISION
0003 0
Date
PHILIPPINE ASSOCIATED SMELTING AND
INSPECTION AND TEST PLAN (ITP) REFINING CORP
ISABEL, LEYTE
SITE INSPECTION
PMG-A-MST-0001-0
4 Accessories fixing and rush coat application prior to plastering I/R H S H S PMG-A-RFI-0001-0 approved MST
PMG-A-INS-0001-0
5 Plastering application I H S W S PMG-A-MST-0001-0 approved MST
6 Curing I H - W S PMG-A-MST-0001-0 approved MST
PMG-A-MST-0001-0
7 Final Inspection after the completion of plaster I/R H - H S PMG-A-RFI-0001-0 approved MST
PMG-A-INS-0002-0
Witness point: QAQC organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QAQC representative is not present
Surveillance: QAQC organization to monitor work in progress without notice from contractor / implementor
Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been approved by the QAQC organization.
Record: Documents required for record purpose shall be filed and retained for project quality records
Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be according to its responsibility points
Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected
Reviewed by:
Endorsed by:
Approved by: