INSPECTION AND TEST PLAN (ITP)

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

RESPONSIBLE PARTY RECORD REF


ITEM TASK ACTIVITY TOC (Work proc
NO. A B C D Quality Rec
1
1.1
1.1.1
1.1.1.1
1.1.1.2
1.1.1.3
1.1.1.4
1.1.1.5
1.1.1.6
1.1.1.7
1.1.1.8
1.1.1.9
1.1.1.10
1.1.1.11
1.1.1.12
1.1.1.12
1.1.2

1.1.2.1 D/R H S H S

1.1.2.1 D/R H S H S

1.1.3
1.1.3.1
1.2
1.2.1

1.2.1.1 R/I H S H S

1.2.2 I H S S S

2
INSPECTION AND TEST PLAN (ITP)

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

RESPONSIBLE PARTY RECORD REF


ITEM TASK ACTIVITY TOC (Work proc
NO. A B C D Quality Rec

2.1 I H W S S

2.2

2.2.1

2.2.1 I H S H S

2.3

2.3.1 R/I H W S w

2.3.2 R/I H W S w

2.3.3 R/I H S S w

2.3.4

2.3.4.1 R/I H S H S

2.3.5 I H S S S
2.3.6 I H S S S
INSPECTION AND TEST PLAN (ITP)

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

RESPONSIBLE PARTY RECORD REF


ITEM TASK ACTIVITY TOC (Work proc
NO. A B C D Quality Rec
2.3.7

2.3.7.1 R/I H S H S

2.3.7.2 R/I H S W S

2.3.8 I H S S S

2.4

2.4.1 R/I H W S S

2.4.2 R/I H W S S

2.4.3

2.4.3.1 R/I H S H S

2.4.3.2 R/I H S H S

2.4.4
2.4.4.1 I H S S S
2.4.4.2 R/I H S H S

2.4.4.3 R/I H S H S

2.4.5
2.4.5.1 R/I H S H S
2.4.5.2 I H S S S
2.4.5.3 R/I H S H S
2.4.5.4 I H S S S
2.4.5.5 R/I H S H S
2.4.5.6 I H S S S
2.4.5.7 R/I H S H S
2.4.6
INSPECTION AND TEST PLAN (ITP)

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

RESPONSIBLE PARTY RECORD REF


ITEM TASK ACTIVITY TOC (Work proc
NO. A B C D Quality Rec

2.4.6.1 I H S H S

2.4.6.2 I H S S S

2.4.6.3 I H S W S

2.4.6.4 I H S H S
2.4.7

2.4.7.1 I H S H S

2.4.7.2 I H S S S

2.4.7.3 I H S W S

2.4.7.4 I H S H S
2.4.8
2.4.8.1 I H S H S

2.4.8.2 I H S W S

2.4.9

2.4.9.1 I H S H S

2.4.9.2 I H S W S

2.4.9.3 I H S H S
2.4.10 I H S W S

2.4.10.1 I H S H S

2.4.10.2 I H S S S

2.4.10.3 I H S W S

2.4.10.4 I H S H S
2.4.11 I H S S S

2.5

2.5.1

2.5.1.1 I H S H S
INSPECTION AND TEST PLAN (ITP)

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

RESPONSIBLE PARTY RECORD REF


ITEM TASK ACTIVITY TOC (Work proc
NO. A B C D Quality Rec

2.5.1.2 I H S S S

2.6

2.6.1 R/I H S H W

2.6.1.1 R/I H S H W

2.6.1.2 R/I H S H W

2.6.2 I H S S S

2.6.3 R H S H H

2.6.3.1 R H S H H

2.6.3.2 R H S H H

Note:
Add more rows to complete the site activity inspection per task activity

Definition of inspection and test plan legends


Hold point: The organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out the organization's representative in attend

Witness point: The organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled even if the the orga
INSPECTION AND TEST PLAN (ITP)

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

RESPONSIBLE PARTY RECORD REF


ITEM TASK ACTIVITY TOC (Work proc
NO. A B C D Quality Rec
Surveillance: The organization to monitor work in progress without notice from contractor / implementor

Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been

Record: Documents required for record purpose shall be filed and retained for project quality records

Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be accordin

Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected. RFI may be requ

ITP RAISED BY:


Discipline Name Signature

Contact No(s):
Note:
Only the shaded blank space will be filled by the issuer of the ITP prior in submitting the document
YPE SEQUENTIAL NO REVISION
TP

RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP

RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP

RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP

RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)
YPE SEQUENTIAL NO REVISION
TP

RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)

esentative in attendance.

even if the the organization's representative is not present


YPE SEQUENTIAL NO REVISION
TP

RECORD REFERENCES
(Work procedures, ACCEPTANCE CRITERIA
Quality Records, etc)

ed until it has been approved by the top management.

tion will be according to its responsibility points

ed. RFI may be required as per agreement

Date
INSPECTION AND TEST PLAN (ITP)

DEPARTMENT PROJECT NUMBER DISCIPLINE


ITP number:
Project Name:
Department / Vendor / Contractor:
Project Location:

ASSESSMENT / RESULT:

o Notice of No-Objection subject to comments that must


o Notice of No-Objection(s) be addressed prior to implement

Comments (if any):


RELEASE SIGNATURES:
Discipline Name Signature
Construction Leader
Technical
Safety
Quality
PHILIPPINE ASSOCIATED SMELTING AND PRE-PRI-FM-050
REFINING CORP Rev.0, 26 Aug. 2017
ISABEL, LEYTE

TYPE SEQUENTIAL NO REVISION


ITP

T:

omments that must o Notice of Objection, please re-submit ITP


ement
S:
Signature Date
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: PMG ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

RESPONSIBLE PARTY RECORD REFER


ITEM TASK ACTIVITY TOC (Work proced
NO. A B C D Quality Record
"TITLE OF TASK ACTIVITY"

MATERIAL ACTIVITY INSPECTION


1.1 Material delivery, handling and storage D/I
1.2 Material sampling and testing (if necessary) T/R

SITE ACTIVITY INSPECTION


2.1 Task Launch/Tool Box Meeting D/R
2.2 "Activity 2.2"
2.3 "Activity 2.3"

Note:
Add more rows to complete the site activity inspection per task activity

Definition of inspection and test plan legends


Hold point: QAQC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out the QAQC representative in attendance.

Witness point: QAQC organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QAQC represen

Surveillance: QAQC organization to monitor work in progress without notice from contractor / implementor

Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been app

Record: Documents required for record purpose shall be filed and retained for project quality records

Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be according to

Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected

ITP RAISED BY:


Discipline Name Signature

Contact No(s):
Note:
Only the shaded blank space will be filled by the issuer of the ITP prior in submitting the document
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: PMG ITP
Project Name:
Department / Vendor / Contractor:
Project Location:

ASSESSMENT / RESULT:

o Notice of No-Objection subject to comments that must


o Notice of No-Objection(s) o Notice o
be addressed prior to implement

Comments (if any):

RELEASE SIGNATURES:
Discipline Name Signature
Project in-charge
Safety in-charge
QAQC Manager
Projects Team Manager
ASSOCIATED SMELTING AND PRE-PRI-FM-050
REFINING CORP Rev.0, 26 Aug. 2017
ISABEL, LEYTE

SEQUENTIAL NO REVISION

RD REFERENCES
k procedures, ACCEPTANCE CRITERIA
y Records, etc)

ndance.

QC representative is not present

as been approved by the QAQC organization.

according to its responsibility points

Date
ASSOCIATED SMELTING AND PRE-PRI-FM-050
REFINING CORP Rev.0, 26 Aug. 2017
ISABEL, LEYTE

SEQUENTIAL NO REVISION

Notice of Objection, please re-submit ITP

Date
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: PMG 190041 A ITP
Project Name: Construction of new building facility
Department / Vendor / Contractor: PASAR - Projects
Project Location: Bunker area

RESPONSIBLE PARTY RECORD REFER


ITEM TASK ACTIVITY TOC (Work proced
NO. A B C D Quality Record
WALL PLASTERING

MATERIAL ACTIVITY INSPECTION

PMG-A-MSDS-
1.1 Material delivery, handling and storage D/I H W W S PMG-A-MST-0

1.2 Material sampling and testing (if necessary) T/R W - H S PMG-A-TES-0

SITE ACTIVITY INSPECTION


EHSI-SAF-PR
2.1 Task Launch/Tool Box Meeting D/R H H S - PASAR-FM-00-P

EHSI-SAFT-PR
2.2 Scaffolding / platform (if more than 2m high) I H H S H PASAR-FM-02-HRASAF
PMG-G-MSDS-

PMG-A-MST-0
2.3 Accessories fixing and rush coat application prior to plastering I/R H S H S PMG-A-RFI-00
PMG-A-INS-0

2.4 Plastering application I H S W S PMG-A-MST-0


2.5 Curing I H - W S PMG-A-MST-0
PMG-A-MST-0
2.6 Final Inspection after the completion of plaster I/R H - H S PMG-A-RFI-00
PMG-A-INS-0

Note:
Add more rows to complete the site activity inspection per task activity

Definition of inspection and test plan legends


Hold point: The organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out the organization's representative in attendanc

Witness point: The organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled even if the the organiza

Surveillance: The organization to monitor work in progress without notice from contractor / implementor

Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been app
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: PMG 190041 A ITP
Project Name: Construction of new building facility
Department / Vendor / Contractor: PASAR - Projects
Project Location: Bunker area
Record: Documents required for record purpose shall be filed and retained for project quality records

Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be according to

Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected. RFI may be required

ITP RAISED BY:


Discipline Name Signature
Project Engineer Juan Dela Cruz
Contact No(s): 0957-012-3456
Note:
Only the shaded blank space will be filled by the issuer of the ITP prior in submitting the document
PHILIPPINE ASSOCIA
INSPECTION AND TEST PLAN (ITP) REFININ
ISABEL

DEPARTMENT PROJECT NUMBER DISCIPLINE TYPE


ITP number: PMG 190041 A ITP
Project Name: Construction of new building facility
Department / Vendor / Contractor: PASAR - Projects
Project Location: Bunker area

ASSESSMENT / RESULT:

o Notice of No-Objection subject to comments that must


o Notice of No-Objection(s) o Notice o
be addressed prior to implement

Comments (if any):

RELEASE SIGNATURES:
Discipline Name Signature
Project in-charge
Safety in-charge
QAQC Manager
Projects Team Manager
ASSOCIATED SMELTING AND
REFINING CORP
ISABEL, LEYTE

SEQUENTIAL NO REVISION
0003 0

RD REFERENCES
k procedures, ACCEPTANCE CRITERIA
y Records, etc)

approved MSDS
A-MSDS-0001-0 approved MST
-A-MST-0001-0 approved SPECS

-A-TES-0001-0 approved SPECS

I-SAF-PR-013 Tool Box Meeting


FM-00-PLW-001

-SAFT-PR-015 approved MSDS


02-HRASAF-006-Rev. 3
G-MSDS-0001-0 PASAR SAFETY

-A-MST-0001-0
-A-RFI-0001-0 approved MST
-A-INS-0001-0

-A-MST-0001-0 approved MST


-A-MST-0001-0 approved MST
-A-MST-0001-0
-A-RFI-0001-0 approved MST
-A-INS-0002-0

n attendance.

the organization's representative is not present

as been approved by the top management.


ASSOCIATED SMELTING AND
REFINING CORP
ISABEL, LEYTE

SEQUENTIAL NO REVISION
0003 0

according to its responsibility points

be required as per agreement

Date
9/9/2019
ASSOCIATED SMELTING AND
REFINING CORP
ISABEL, LEYTE

SEQUENTIAL NO REVISION
0003 0

Notice of Objection, please re-submit ITP

Date
PHILIPPINE ASSOCIATED SMELTING AND
INSPECTION AND TEST PLAN (ITP) REFINING CORP
ISABEL, LEYTE

RESPONSIBLE PARTY RECORD REFERENCES


ITEM TASK ACTIVITY TOC (Work procedures, ACCEPTANCE CRITERIA
NO. A B C D Quality Records, etc)
MATERIAL ACTIVITY INSPECTION

PMG-A-MSDS-0001-0 approved MSDS


1 Material delivery, handling and storage D/I H W W S approved MST
PMG-A-MST-0001-0 approved SPECS
2 Material sampling and testing T/R W - H S PMG-A-TES-0001-0 approved SPECS

SITE INSPECTION

1 Task Launch Meeting D/R H H S - EHSI-SAF-PR-013 Tool Box Meeting


PASAR-FM-00-PLW-001

2 Dissemination of risks to all workforce R H H S - EHSI-SAF-PR-013 Tool Box Meeting


PASAR-FM-00-PLW-001

EHSI-SAFT-PR-015 approved MSDS


3 Scaffolding / platform (if more than 2m high) I H H S H PASAR-FM-02-HRASAF-006-Rev. 3 PASAR SAFETY
PMG-G-MSDS-0001-0

PMG-A-MST-0001-0
4 Accessories fixing and rush coat application prior to plastering I/R H S H S PMG-A-RFI-0001-0 approved MST
PMG-A-INS-0001-0
5 Plastering application I H S W S PMG-A-MST-0001-0 approved MST
6 Curing I H - W S PMG-A-MST-0001-0 approved MST

PMG-A-MST-0001-0
7 Final Inspection after the completion of plaster I/R H - H S PMG-A-RFI-0001-0 approved MST
PMG-A-INS-0002-0

Definition of inspection and test plan legends


Hold point: QAQC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out the QAQC representative in attendance.

Witness point: QAQC organization shall be notified of the timing of inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QAQC representative is not present

Surveillance: QAQC organization to monitor work in progress without notice from contractor / implementor

Document review: Documents are to be submitted to the appropriate inspectorate for review. Note that a document is subject to approval and work shall not proceed until it has been approved by the QAQC organization.

Record: Documents required for record purpose shall be filed and retained for project quality records

Inspection: A point where all evaluation/verification is made before commencing subsequent activity unless rejected. RFI to inform is required. Visual inspection will be according to its responsibility points

Test: A point where all evaluation/verification is made through lab testing or equipment testing and shall commence subsequent activity unless rejected

Name: Company: Position: Signature: Date:


Prepared by:

Reviewed by:

Endorsed by:

Approved by: