Comment Sheet

Date Item Author Outcome

MSRA-Installation & Mohammed Khaja Abdul Wahed


08/07/2019 Commissioning of Hot Mechanical Engineer Code -B
Water Boiler Gulam Mustafa - ARE

Transmittal ID: KAFD-A1-CJ01-P503-CONT-TRA-00303


Submittal no: KAFD-RY-RIA1-P503-SCC-MEP-MES-00137-R0

S.no. Item Action Closed

1. Following Approval is conditional, subjected to construction contract Saudico

2. Provide material storage standards as per manufacturer recommendation Saudico

3. All material shall be inspected and approved before start of any work Saudico

4. Any material with corrosion or damage will not be accepted Saudico

5. Provide ITP submittal number mentioned SaudiCo

6. Provide manufacturer recommended procedure during inspection Saudico

7. Provide Approved Submittal and MIR with Inspection request. Saudico

8. Any missing items/test shall be provided by the contractor without extra Saudico
cost or time, following approval does not relieve contractor subjected to
project contract.

Page 1 of 1
This report does not relieve the Contractor of its obligations and liabilities under the Contract, or constitute
authorisation of any change to Contract, and therefore shall not imply any recognition whatsoever of additional time
or cost to the Contract. These comments are made on the documents as presented. The content remains the
responsibility of the author in all respects. Contractor to resubmit the concerned documents if there is any change
or consequence to the documents submitted.