Considering the connector position for various heights, span has been considered as per design.
Considering the connector position for various heights, span has been considered as per design.
Design Factored width of Reinforcement
Sr. Depth of Effective
No.
Height (in Moment at
Panel Depth 𝐹 𝐹 the panel provided
meter) end considered (sq.mm/m)
335
1 12.00 7.616 180 90 39.710 500 35 1000 200.95 (8 dia. 150 c/c)
335
2 10.00 6.537 180 90 36.790 500 35 1000 171.66
(8 dia. 150 c/c)
From above table, it has been clearly derived that for the height above 12 meter, panel reinforcement required is 8 mm dia @150 mm c/c in both direction.
Panel dimension: (for 12.0 meter height of design)
Sample calculation:
BM = 0.138 x σck x b x d2
7.616 𝑋 1 𝑋 10
𝑑 . =
1000 𝑋 0.138 𝑋 35
Hence OK.
Panel Steel required,
Hence OK.
Ultimate Tensile strength of Geogrid = 3000 kN/m with strip width of 250mm
Maximum tension in each grid 250mm wide = 39.56/ 1.5 = 26.37 KN (For 300 kN/m Tensile strength
Geogrid of 250mm width); where in 1.5 is to consider actual load on connector.
Hence, OK.
Hence, OK.
C) Development Length for Tie hook:
Where,
𝜏bd= Design bond stress = 1.7 (M35) (as per Table 26.2.1.1 of IS: 456)
.
𝐿 = = 165 𝑚𝑚
.
Provided full length of zig zag connection, hence the total resistance length is much more than above.
Diagram:
Tie hooks – 10mm dia (TMT 500) Connector (Toggle) -16mm dia. (MS Bar)
Considering the lifting hook position, span has been considered as below:
BM = 0.138 x σck x b x d2
Hence Ok.
At < 10 mm2
Provided 8 ∅ @ 150 mm c/c – both ways = 350mm2/m, which is greater than required.