1 Granit Tile 60x60 1.00 m2 125,000.00 -


2 Semen PC 1.00 zak 55,000.00 -
3 Pasir pasang 1.00 m3 250,000.00 -
4 Semen Warna / AM Grout 1.00 zak 25,000.00 -
5 Keramik 25 x 45 1.00 m2 - -
6 Keramik 30x30 1.00 m2 - -
7 Stepnozing granit 1.00 m2 - -
8 Granit Tile 60x60 Kolam Renang 1.00 m2 - -
9 Granit Tile 60x60, type Rock 1.00 m2 - -
10 Cat Traffic 1.00 m' - -
11 Paving Stone 1.00 m2 - -
12 Pattern Concrete 1.00 m2 - -
13 Bata merah 1.00 bh - -
14 Bata ringan, 60x20x10 1.00 bh - -
15 Mortar Utama ( MU-380 ) 1.00 zak - -
16 Keramik Dinding 30x30 1.00 m2 - -
17 Keramik Dinding 25x45 1.00 m2 - -
18 Siku L.40 pelindung kolom 1.00 kg - -
19 Besi d.12 angker 1.00 kg - -
20 Penutup plafond gypsum 1.00 m2 - -
21 Rangka plafond metal furing 1.00 m2 - -
22 Rangka plafond metal furing 1.00 m2 - -
23 List Gypsum minimalis 1.00 m' - -
24 Cat Dulux Weathershild ex-ICI 1.00 kg - -
25 Alkali resistant 1.00 kg - -
26 Plamir 1.00 kg - -
27 Kertas gosok 1.00 lbr - -
28 Cat Catylac 1.00 kg - -
29 Alkali resistant 1.00 kg - -
30 Plamir 1.00 kg - -
31 Cat zincromate 1.00 kg - -
32 Thineer 1.00 kg - -
33 Cat besi 1.00 kg - -
34 Thineer 1.00 kg - -
35 Closed monoblok type CW 421 J ex Toto 1.00 unit - -
36 Wastafel type LW 523 J ex Toto 1.00 unit - -
37 Wastafel type LW 642 CJ ex Toto 1.00 unit - -
38 Urinoir type U 57 M ex Toto 1.00 unit - -
39 Mirror 110x135 cm bevel ex Asahimas 1.00 m2 - -
40 Floor drain type TX 1 B ex Toto 1.00 unit - -
41 Shower spray type 19 CSNCR 1.00 unit - -
42 Jet Shower type TX 432 SH 1.00 unit - -
43 Skat urinoir A 100 ex Toto 1.00 unit - -
44 Dinding partisi pro Cubix 1.00 m2 - -
45 Pintu partisi pro Cubix 1.00 m2 - -
46 Meja wastafel granite 1.00 m2 - -
47 Door handle with towel bar type TX 10 B ex Toto 1.00 unit - -

01+049Dokumen Tender 07/09/2019HARGA BAHAN


HARGA JUMLAH
NO URAIAN VOL SAT
SATUAN HARGA
48 Paper holder type TX 703 AC ex Toto 1.00 unit - -
49 Hand Dryer Toto 1.00 unit - -
50 Pipa Stainless 2,5" 1.00 m' - -
51 Kusen UNP 10 1.00 m' - -
52 Kusen Aluminium 1.00 m' - -
53 Sealant 1.00 m' - -
54 Kaca Clear 5mm 1.00 m2 - -
55 Kaca Clear 10mm 1.00 m2 - -
56 Kaca Clear 12mm 1.00 m2 - -
57 Kaca Stopsol 1.00 m2 - -
58 Kaca Stopsol Blue Green 8mm 1.00 m2 - -
59 Pintu Frameless, 12mm tempered 1.00 m2 - -
60 Floor hinge 1.00 bh - -
61 Handle 1.00 bh - -
62 Kunci 1.00 bh - -
63 Fire Door 1.00 dn - -

01+049Dokumen Tender 07/09/2019HARGA BAHAN


DAFTAR HARGA UPAH

PROYEK : BUSINESS PARK GORONTALO


LOKASI : JL. BOTUTIHE NO. 08 GORONTALO
PEKERJAAN : ARSITEKTUR

UPAH KERJA
NO URAIAN SAT
Rp

1 Pekerja 1 hari 40,000.00


2 Tukang Batu 1 hari 50,000.00
3 Tukang Besi 1 hari 50,000.00
4 Tukang Kayu 1 hari 55,000.00
5 Tukang Listrik 1 hari 50,000.00
6 Mandor 1 hari 60,000.00
7 Operator Terampil 1 hari 60,000.00
8 Operator Semi Terampil 1 hari 50,000.00
9 Sopir 1 hari 60,000.00
10 Pembantu Sopir 1 hari 40,000.00
11 Mekanik terampil 1 hari 60,000.00
12 Pembantu Mekanik 1 hari 50,000.00

01+049Dokumen Tender 07/09/2019 UPAH KERJA


ANALISA HARGA SATUAN

PROYEK : BUSINESS PARK GORONTALO


LOKASI : JL. BOTUTIHE NO. 08 GORONTALO
PEKERJAAN : ARSITEKTUR

HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

A PEKERJAAN LANTAI
1 Lantai granit tile Coridor 60/60
Granit Tile 60x60 m2 1.050 125,000.00 - 131,250.00
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

131,250.00

2 Lantai granit tile Lift Lobby 60/60


Granit Tile 60x60 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

3 Lantai granit tile kamar 60 x 60


Granit Tile 60x60 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

4 Lantai keramik kamar mandi 25 x 45


Keramik 25 x 45 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

5 Lantai granit tile tangga 60/60


Granit Tile 60x60 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

6 Lantai keramik 30/30


Keramik 30x30 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

7 Step nosing tangga-granite tile


Stepnozing granit m2 0.200 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

8 Lantai Kayu area Kolam Renang


Granit Tile 60x60 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

9 Bak kolam renang


Granit Tile 60x60 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

10 Granit Tile Type Rock


Granit Tile 60x60 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

11 Car stopper beton


Beton + Pembesian m3 0.020 - - -
Plaster m2 0.330 - - -
Upah dan alat m' 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

12 Traffic Painting (marka)


Cat Traffic m' 1.000 - - -
Upah dan alat m' 1.000 - - -

13 Paving Stone
Paving Stone m2 1.015 - - -
Pasir + Pemadatan m3 0.100 - - -
Upah dan alat m2 1.000 - - -

14 Lantai screed stand


P.C zak 0.135 - - -
Pasir pasang m3 0.017 - - -
Upah Plaster m2 1.000 - - -
Upah dan alat m2 1.000 - - -

15 Lantai pattern concrete


Pattern Concrete m2 1.000 - - -
PC zak 0.017 - - -
Pasir pasang m3 0.100 - - -
Upah dan alat m2 1.000 - - -

B PEKERJAAN DINDING
1 Pasangan bata
Bata merah bh 50.000 - - -
Mortar Utama ( MU-380 ) zak 0.460 - - -
Practical concrete m3 0.005 - - -
Upah dan alat m3 1.000 - - -

2 Pasangan bata ringan


Bata ringan, 60x20x10 bh 8.500 - - -
Mortar Utama ( MU-380 ) zak 0.200 - - -
Practical concrete m3 0.005 - - -
Upah dan alat m2 1.000 - - -

3 Plesteran + acian dinding


P.C zak 0.135 - - -
Pasir pasang m3 0.017 - - -
Upah Plaster m2 1.000 - - -
Upah Acian m2 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

4 Benangan kolom+dinding
P.C zak 0.020 - - -
Pasir pasang m3 0.005 - - -
Upah dan alat m' 1.000 - - -

5 Dinding KM unit keramik 30x30


Keramik 30x30 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

Jumlah -

6 Dinding KM unit keramik 25x45


Keramik 25x45 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

7 Dinding granit tile lift lobby 60/60


Granit Tile 60x60 m2 1.050 - - -
Semen PC zak 0.100 - - -
Pasir pasang m3 0.030 - - -
Semen warna/ AM Grout zak 0.020 - - -
Upah dan alat m2 1.000 - - -

8 Siku pelindung kolom parkir L 40mm


Siku L.40 kg 2.512 - - -
Besi d.12 angker kg 0.444 - - -
Cat besi m2 0.100 - - -
Upah dan alat m' 1.000 - - -

C PEKERJAAN PLAFOND
1 Acian langit-langit beton
P.C zak 0.136 - - -
Upah dan alat m2 1.000 - - -

2 Plafond gypsum
Penutup plafond gypsum m2 1.000 - - -
Rangka plafond metal furing m2 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

3 Plafond gypsum lengkung / m2


Penutup plafond gypsum m2 1.000 - - -
Rangka plafond metal furing m2 1.000 - - -

4 List Gypsum minimalis


List Gypsum minimalis m' 1.000 - - -
Upah dan alat m' 1.000 - - -

5 Benangan Balok
P.C zak 0.020 - - -
Pasir pasang m3 0.005 - - -
Upah dan alat m' 1.000 - - -

D PEKERJAAN CAT
1 Cat dinding
Cat Dulux Weathershild ex-ICI kg 0.167 - - -
Alkali resistant kg 0.120 - - -
Plamir kg 0.015 - - -
Kertas gosok lbr 0.010 - - -
Upah dan alat m2 1.000 - - -

2 Cat Plafond
Cat Catylac kg 0.167 - - -
Alkali resistant kg 0.120 - - -
Plamir kg 0.015 - - -
Kertas gosok lbr 0.010 - - -
Upah dan alat m2 1.000 - - -

3 CAT ZINCROMATE / M2
Cat zincromate kg 0.220 - - -
Thineer kg 0.200 - - -
Kertas gosok lbr 0.200 - - -
Upah dan Alat m2 1.000 - - -

4 CAT BESI / M2
Cat besi kg 0.350 - - -
Thineer kg 0.200 - - -
Kertas gosok lbr 0.100 - - -
Upah dan Alat m2 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

5 Cat Tekstur Kolom


Cat Dulux Weathershild ex-ICI kg 0.333 - - -
Alkali resistant kg 0.200 - - -
Plamir kg 0.015 - - -
Kertas gosok lbr 0.010 - - -
Upah dan alat m2 1.000 - - -

E PEKERJAAN KAMAR MANDI WC


1 Closed monoblok type CW 421 J ex Toto
CW 421 J unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

2 Wastafel type LW 523 J ex Toto


LW 523 J unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

3 Wastafel type LW 642 CJ ex Toto


LW 642 CJ unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

4 Urinoir type U 57 M ex Toto


U 57 M unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

5 Mirror 110x135 cm bevel ex Asahimas


Mirror m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

6 Floor drain type TX 1 B ex Toto


TX 1 B unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

7 Shower spray type 19 CSNCR


19 CSNCR unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

8 Jet Shower type TX 432 SH


TX 432 SH unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

9 Skat urinoir A 100 ex Toto


A 100 unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

10 Dinding partisi pro Cubix


Partisi Cubical m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

11 Pintu partisi pro Cubix


Pintu Partisi Cubical m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

12 Meja wastafel granite


Meja wastafel granite m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

13 Door handle with towel bar type TX 10 B ex Toto


TX 10 B unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

14 Paper holder type TX 703 AC ex Toto


TX 703 AC unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

15 Hand Dryer Toto


Hand Dryer unit 1.000 - - -
Upah dan Alat unit 1.000 - - -

16 Bak Kontrol
Bak kontrol bh 1.000 - - -
Upah dan Alat bh 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

F PEKERJAAN RAILLING
1 Railling Tangga B stainless stell Ø 2.5”
Pipa Stainless 2,5" m' 1.000 - - -
Accsesories m' 1.000 - - -
Upah dan alat m' 1.000 - - -

2 Railling Tangga C stainless stell Ø 2.5”


Pipa Stainless 2,5" m' 1.000 - - -
Accsesories m' 1.000 - - -
Upah dan alat m' 1.000 - - -

G PEKERJAAN PINTU & JENDELA


1 Kusen Besi (Pintu SD2)
Kusen UNP 10 m' 1.000 - - -
Cat besi m' 1.000 - - -
Upah dan Alat m' 1.000 - - -

2 Kusen Aluminium
Kusen Aluminium m' 1.000 - - -
Upah dan Alat m' 1.000 - - -

3 Sealant
Sealant m' 1.000 - - -
Upah dan Alat m' 1.000 - - -

4 Kaca Clear 5mm


Kaca Clear 5mm m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

5 Kaca Clear 10mm


Kaca Clear 10mm m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

6 Kaca Clear 12mm


Kaca Clear 12mm m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

7 Kaca Stopsol Blue Green 5mm


Kaca Stopsol m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

8 Kaca Stopsol Blue Green 8mm


Kaca Stopsol m2 1.000 - - -
Upah dan Alat m2 1.000 - - -

9 Daun Pintu SD1


Daun Pintu (PLAT), uk 91,5x210 dn 1.000 - - -
Engsel bh 3.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

10 Daun Pintu SD2


Daun Pintu (PLAT), uk 79x210 dn 1.000 - - -
Engsel bh 3.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

11 Daun Pintu DW1


Pintu Frameless, 12mm tempered m2 2.772 - - -
Floor hinge bh 1.000 - - -
Handle bh 2.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

12 Daun Pintu DW2


Pintu Frameless, 12mm tempered m2 5.100 - - -
Floor hinge bh 2.000 - - -
Kunci bh 2.000 - - -
Handle bh 2.000 - - -
Upah dan Alat dn 1.000 - - -

13 Daun Pintu DW3


Pintu Frameless, 12mm tempered dn 1.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

14 Daun Pintu DWT


Pintu Frameless, 12mm tempered m2 1.365 - - -
Engsel bh 2.000 - - -
Kunci bh 1.000 - - -
Handle bh 2.000 - - -
Upah dan Alat dn 1.000 - - -

15 Daun Pintu D1
Daun Pintu (Panel),kaca + Accessories dn 1.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

16 Daun Pintu D2
Daun Pintu (Panel),kaca + Accessories dn 1.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

17 Daun Pintu D3
Daun Pintu (Panel),kaca + Accessories dn 1.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

18 Daun Pintu D4
Daun Pintu (Panel),kaca + Accessories dn 2.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

19 Daun Pintu D6
Daun Pintu dn 1.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

19 FD1(FIRE DOOR)
Fire Door dn 1.000 - - -

Jumlah -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


HARGA
JUMLAH HARGA
NO URAIAN SAT KOEF. MATERIAL UPAH
Rp. Rp. Rp.

20 Kusen type SHD1(SHAFT DOOR)


Daun Pintu dn 1.000 - - -
Hinge bh 2.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

Jumlah -

21 Kusen type SHD2(SHAFT DOOR)


Daun Pintu dn 1.000 - - -
Floor hinge bh 2.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

22 Daun Pintu DF1


Pintu Frameless, 12mm tempered dn 1.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

23 Daun Pintu DJ
Daun Pintu (PANEL),Jalusi dn 1.000 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

24 Jendela WDS
Frame Pintu Aluminium m' 6.200 - - -
Floor hinge bh 1.000 - - -
Kunci bh 1.000 - - -
Upah dan Alat dn 1.000 - - -

01+045 01+048Dokumen Tender 07/09/2019 ANALISA HARGA


MULTI CONSTRUCT INDONESIA
PROYEK BUSINESS PARK GORONTALO

REKAPITULASI PAKET PEKERJAAN V DAN VI


PEKERJAAN STRUKTUR DAN ARSITEKTUR

TOTAL
NO MATERIAL UPAH
Rp. Rp.

A BILL NO. 01 PRELIMINARIES - -


B BILL NO. 02 STRUKTUR BETON LT. 01 S/D ATAP - -
C BILL NO. 03 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( FAS. HOTEL ) - -
D BILL NO. 04 PEKERJAAN FINISHING DASAR LANTAI DASAR ( FAS. HOTEL ) - -
E BILL NO. 05 PEKERJAAN FINISHING DASAR LANTAI 03 ( FAS. HOTEL ) - -
F BILL NO. 06 PEKERJAAN FINISHING DASAR LANTAI 04 ( FAS. HOTEL ) - -
G BILL NO. 07 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( MALL ) - -
H BILL NO. 08 PEKERJAAN FINISHING DASAR LANTAI DASAR ( MALL ) - -
I BILL NO. 09 PEKERJAAN FINISHING DASAR LANTAI 01 ( MALL ) - -
J BILL NO. 10 PEKERJAAN FINISHING DASAR LANTAI 02 ( MALL ) - -
K BILL NO. 11 PEKERJAAN FINISHING DASAR LANTAI 03 ( MALL ) - -
L BILL NO. 12 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 01 & 03 ( HOTEL ) - -
M BILL NO. 13 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 02 & 04 ( HOTEL ) - -
N BILL NO. 14 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 05 ( HOTEL ) - -
O BILL NO. 15 PEKERJAAN FINISHING ATAP DAN GONDOLA - -
P BILL NO. 16 PEKERJAAN LANDSEKAP - -

TOTAL ( exclude ppn ) - -


Ppn 10% - -
TOTAL ( include ppn ) - -
-
DIBULATKAN -
-

01+048Dokumen Tender 07/09/2019BILL REKAP


BQ PAKET V DAN VI

A BILL. NO. 01 PRELIMINARIES

No JENIS PEKERJAAN SAT. KUANTITAS HARGA KETERANGAN

I. PEKERJAAN PERSIAPAN & PENUNJANG


1 PERALATAN
1 Bar Bender -
2 Bar Cutter -
3 Electric Concrete Vibrator -
4 Compressor -
5 Theodolite -
6 Waterpass -
7 Concrete Pump -
8 Concrete Tremie -
9 Drum -
10 Lifting Hoist -
11 Scafolding for Facade -
12 Concrete Mixer -
13 Summersible pump -
14 Cable & Lamp dll asesories elektrikal -
15 Mob. & Demob Of Equipments (except TC) -
16 Lain-lain -

2 Overhead, Site Facilities & Personnel Cost


1 Kontractor memelihara & melindungi fasilitas umum proyek -
2 Restricted used of site -
3 Akses sementara di lokasi -
4 Peninjauan lokasi sebelum pelelangan -
5 Drainase sementara & Pompa selama pelaksanaan -
7 Site Meeting selama pelaksanaan -
8 Test & Sample -
9 Site Management Costs -
10 Membuat laporan -
11 Faktor K3 termasuk barikade dalam pekerjaan -
12 Semua perijinan sehubungan pelaksanaan pekerjaan -
14 Pengukuran -
15 Kantor lapangan, gudang, barak pekerja dll -
16 Air kerja -
17 Jaring sementara sisi luar -
18 Pembersihan & pembuangan sampah selama pelaksanaan pekerjaan. -
19 Pembersihan lahan saat selesainya pekerjaan -
21 Shop drawings -
22 As Built drawings -
24 Photographs -
25 PLN + PDAM + Telp. for Site office (Connection + Monthly) -
27 Security -
28 Fire Extingueshers -
29 Sign Board -
30 Lain-lain segala sesuatu yang diperlukan untuk menunjang kelancaran -
pelaksanaan pekerjaan

01+048Dokumen Tender 07/09/2019BILL 01 PREMLIMINARIES


No JENIS PEKERJAAN SAT. KUANTITAS HARGA KETERANGAN

01+048Dokumen Tender 07/09/2019BILL 01 PREMLIMINARIES


No JENIS PEKERJAAN SAT. KUANTITAS HARGA KETERANGAN

Catatan :
1 Manajemen & cara kerja setiap kontraktor berbeda, karena itu kontraktor
harus memperkirakan sendiri segala hal yang diperlukan untuk menun-
jang kelancaran pelaksanaan & penyelesaian proyek sesuai dengan
rencana kerja masing-masing.
2 Daftar yang ada adalah untuk menolong mempercepat proses pembuatan
penawaran.

01+048Dokumen Tender 07/09/2019BILL 01 PREMLIMINARIES


BQ PAKET V PEKERJAAN STRUKTUR

B BILL. NO. 02 STRUKTUR BETON LT. 01 S/D ATAP

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I STRUKTUR BETON KOLOM KOMPOSIT


Referensi Gambar : No. FTD.1012 A S/D B Lt. Dasar
1 Beton Kolom K = 250 KG/M2 S/D LT. 05 m3 457.95 - - - -
Termasuk pembesian dan begesting

II STRUKTUR BETON TANGGA BETON


Referensi Gambar : No. ARS. Lt. Basement
1 Beton tebal Tangga K = 250 KG/M2 S/D LT. 05 m3 - - - -
Termasuk pembesian dan begesting

III STRUKTUR BETON SHEAR WALL


Referensi Gambar : No. FTD.1002D Lt. Basement
1 Beton Shear Wall K = 250 KG/M2 S/D LT. 05 m3 551.59 - - - -
Termasuk pembesian dan begesting

IV STRUKTUR BETON CORE WALL


Referensi Gambar : No. FTD.1506 D Lt. Basement
1 Beton Core Wall K = 250 KG/M2 S/D LT. 05 m3 372.06 - - - -
Termasuk pembesian dan begesting

V STRUKTUR BETON RAMP


Referensi Gambar : No. STR.1601 Lt. Basement
1 Plat Beton Ramp K = 250 KG/M2 S/D LT. DASAR m3 62.28 - - - -
Termasuk pembesian dan begesting
2 Balok Ramp 300/500 m3 6.72 - - - -
3 Balok Ramp 300/650 m3 40.44 - - - -

VI STRUKTUR BETON ATAP HOTEL


Referensi Gambar : No. ARS. Area Hotel
1 Plat Atap Beton Hotel K = 250 KG/M2 LT. 05 m3 192.00 - - - -
Termasuk pembesian dan begesting
2 Balok Beton Hotel K = 250 KG/M2 m3 246.24 - - - -
Termasuk pembesian dan begesting

VIII BETON SUMPIT


Referensi Gambar : No. FTD.8001 S/D 9014 Lt. Basement
1 Plat Beton Sumpit Grace trap & Pit Lift K = 250 KG/M2 m3 17.34 - - - -
Termasuk pembesian dan begesting

01+049Dokumen Tender 07/09/2019BILL 02


HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

IX PLAT LANTAI R. KM HOTEL


Referensi Gambar : No. FTD. Area Hotel
1 Plat Beton KM Hotel Lantai 01 S/D Lantai 05 LT. 01 S/D LT. 05 m3 129.46 - - - -
Termasuk pembesian dan begesting

01+049Dokumen Tender 07/09/2019BILL 02


BQ PAKET VI PEKERJAAN FINISHING

C BILL. NO. 03 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( FASILITAS HOTEL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel


Referensi Gambar : No. ARS. 1101-B Lt. Basement
1 Kolom Praktis m3 14.26 - - - -
2 Balok Praktis m3 5.63 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel


Referensi Gambar : No. ARS. Lt. Basement
1 Beton tebal 4 cm tanpa wire mesh m2 653.58 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Fasilitas Hotel


Referensi Gambar : No. ARS. 1101-B Lt. Basement
1 Pasangan Dinding Dalam Bata Ringan m2 2,081.25 - - - -
Spesi menggunakan MU
2 Plesteran & Acian m2 4,162.50 - - - -
3 Benangan kolom dan dinding m' 616.00 - - - -
4 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 582.42 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel


Referensi Gambar : No. ARS. 1101-B Lt. Basement
1 Waterprofing lantai KM m2 83.78 - - - -
2 Dinding Toilet Homogenous 60x60 m2 101.44 - - - -
3 Lantai Toilet Homogenus 60x60 m2 83.78 - - - -
4 Lantai Granite 60x60 m2 125.27 - - - -
5 Plint Lantai Granite 10x60 m' 72.15 - - - -
6 Lantai Keramik 40 x 40 m2 444.54 - - - -
7 Plint Lantai keramik 10x40 m' 385.13 - - - -
Untuk Lantai R. karaoke masuk pada Pekerjaan Interior

01+048Dokumen Tender 07/09/2019 BILL 03


BQ PAKET VI PEKERJAAN FINISHING

D BILL. NO. 04 PEKERJAAN FINISHING DASAR LANTAI DASAR ( FASILITAS HOTEL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel


Referensi Gambar : No. ARS. 1102-B Lt. Dasar
1 Kolom Praktis m3 3.03 - - - -
2 Balok Praktis m3 1.71 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel


Referensi Gambar : No. ARS. 1102-B Lt. Dasar
1 Beton tebal 4 cm tanpa wire mesh m2 217.21 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Fasilitas Hotel


Referensi Gambar : No. ARS. 1102-B Lt. Dasar
1 Pasangan Dinding Dalam Bata Ringan m2 431.10 - - - -
Spesi menggunakan MU
2 Plesteran & Acian m2 627.05 - - - -
3 Benangan kolom dan dinding m' 180.18 - - - -
4 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 118.88 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel


Referensi Gambar : No. ARS. 1102-B
1 Lantai Granite 60x60 Lt. Dasar m2 182.09 - - - -
2 Plint Lantai Granite 60x60 m' 73.05 - - - -
3 Lantai Homogenous 60x60 coridor luar m2 35.12 - - - -

01+049Dokumen Tender 07/09/2019 BILL 04


BQ PAKET VI PEKERJAAN FINISHING

E BILL NO. 05 PEKERJAAN FINISHING DASAR LANTAI 03 ( FASILITAS HOTEL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel Lt. 03


Referensi Gambar : No. ARS. 1105-B
1 Kolom Praktis m3 17.08 - - - -
2 Balok Praktis m3 7.28 - - - -
3 Meja beton dudukan washthafel m3 0.19 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel Lt. 03


Referensi Gambar : No. ARS. 1105-B
1 Beton tebal 4 cm tanpa wire mesh m2 656.64 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Fasilitas Hotel Lt. 03


Referensi Gambar : No. ARS. 1105-B
1 Pasangan Dinding Luar Bata merah m2 888.53 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Dalam bata ringan m2 1,147.41 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 2,961.36 - - - -
4 Benangan kolom dan dinding m' 408.75 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 572.57 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel Lt. 03


Referensi Gambar : No. ARS. 1105-B
1 Waterprofing lantai KM m2 98.71 - - - -
2 Dinding Toilet Homogenous 60x60 m2 85.96 - - - -
3 Lantai Toilet Homogenus 60x60 m2 31.20 - - - -
4 Lantai Granite 60x60 m2 213.84 - - - -
5 Plint Lantai Granite 10x60 m' 140.00 - - - -
6 Lantai Keramik 40 x 40 m2 321.80 - - - -
7 Plint Lantai keramik 10x40 m' 137.00 - - - -
8 Lantai Coridor Service Homogenous 40 x 40 m2 89.80 - - - -
9 Plint Lantai Homogenous 10x40 m' 87.00 - - - -

01+049Dokumen Tender 07/09/2019BILL 05


BQ PAKET VI PEKERJAAN FINISHING

F BILL NO. 06 PEKERJAAN FINISHING DASAR LANTAI 04 ( FASILITAS HOTEL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel Lt. 04


Referensi Gambar : No. ARS. 1106-B
1 Kolom Praktis m3 23.80 - - - -
2 Balok Praktis m3 10.14 - - - -
3 Meja beton dudukan washthafel m3 0.67 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel Lt. 04


Referensi Gambar : No. ARS. 1106-B
1 Beton tebal 4 cm tanpa wire mesh m2 2,837.85 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERA Fasilitas Hotel Lt. 04


Referensi Gambar : No. ARS. 1106-B
1 Pasangan Dinding Dalam Bata merah m2 2,065.64 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Luar bata ringan m2 777.15 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 4,134.96 - - - -
4 Benangan kolom dan dinding m' 556.00 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 1,245.16 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel Lt. 04


Referensi Gambar : No. ARS. 1106-B
1 Waterprofing lantai KM m2 147.16 - - - -
2 Dinding Toilet Homogenous 60x60 m2 166.32 - - - -
3 Dinding Swimming Pool Mozaik Keramik m2 51.25 - - - -
4 Lantai Swimming Pool Mozaik Keramik m2 140.27 - - - -
5 Lantai Toilet Homogenus 60x60 m2 71.24 - - - -
6 Lantai Pool Deck Homogeneus Rock 60x60 m2 192.22 - - - -
7 Plint Lantai Pool Deck Homogeneus 10x60 m' 45.48 - - - -
8 Lantai Keramik 40x40 m2 141.40 - - - -
9 Plint Lantai Keramik 10X40 m' 126.50 - - - -
10 Lantai Homogenius 60x60 m2 171.36 - - - -
11 Plint LantaiHomogenius 10x60 m' 163.50 - - - -
12 Lantai Granite 60x60 m2 2,121.36 - - - -
13 Plint Lantai Granite 10x60 m' 491.53 - - - -

01+049Dokumen Tender 07/09/2019BILL 06


BQ PAKET VI PEKERJAAN FINISHING

G BILL NO. 7 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( MALL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. Basement


Referensi Gambar : No. ARS. 1101
1 Kolom Praktis m3 10.64 - - - -
2 Balok Praktis m3 9.35 - - - -
3 Meja beton dudukan washthafel m3 0.35 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. Basement


Referensi Gambar : No. ARS. 1101
1 Beton tebal 4 cm tanpa wire mesh m2 347.79 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. Basement


Referensi Gambar : No. ARS. 1101
1 Pasangan Dinding Luar Bata merah m2 854.95 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Dalam bata ringan m2 439.70 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 2,071.44 - - - -
4 Benangan kolom dan dinding m' 341.94 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 765.77 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. Basement


Referensi Gambar : No. ARS. 1101
1 Waterprofing lantai KM m2 57.41 - - - -
2 Dinding Toilet Homogenous 60x60 m2 101.66 - - - -
3 Lantai Toilet Homogenus 60x60 m2 35.26 - - - -

V PEKERJAAN CAR STOPER


Referensi Gambar : No. ARS. 3611
1 Car Stoper beton uk. 200x150 Basement Un 146.00 - - - -
Besi stek D.22 Epoxy Zone 1 Dan Zone 2

2 Garis Pembatas Finish Cat Basement m' 483.00 - - - -


Zone 1 Dan Zone 2

VI PEKERJAAN CONNER GUARD


Referensi Gambar : No. ARS. 3611
1 Conner guard kolom ( Besi Siku L 50x50 ) Basement m' 177.00 - - - -
Finis Cat Zone 1 Dan Zone 2

2 Tali air m' 377.60 - - - -

VII PEKERJAAN PULAU PULAU


Referensi Gambar : No. ARS. 3611
1 Canstein cor 150/100 Basement m' 169.58 - - - -
Zone 1 Dan Zone 2
2 Urugan pasir padat m2 226.28 - - - -

3 Screed Finis trowel m2 226.28 - - - -

4 Tali air m' 508.73 - - - -


BQ PAKET VI PEKERJAAN FINISHING

H BILL NO. 08 PEKERJAAN FINISHING DASAR LANTAI DASAR ( MALL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. Dasar


Referensi Gambar : No. ARS. 1103
1 Kolom Praktis m3 10.38 - - - -
2 Balok Praktis m3 9.12 - - - -
3 Meja beton dudukan washthafel m3 0.35 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. Dasar


Referensi Gambar : No. ARS. 1103
1 Beton tebal 4 cm tanpa wire mesh m2 4,099.00 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. Dasar


Referensi Gambar : No. ARS. 1103
1 Pasangan Dinding Luar Bata merah m2 834.10 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Dalam bata ringan m2 2,677.70 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 5,618.89 - - - -
4 Benangan kolom dan dinding m' 500.40 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 1,120.64 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. Dasar


Referensi Gambar : No. ARS. 1103
1 Waterprofing lantai KM m2 65.72 - - - -
2 Dinding Toilet Homogenous 60x60 m2 127.01 - - - -
3 Lantai Toilet Homogenus 60x60 m2 48.80 - - - -

01+049Dokumen Tender 07/09/2019BILL 08


BQ PAKET VI PEKERJAAN FINISHING

I BILL NO. 09 PEKERJAAN FINISHING DASAR LANTAI 01 ( MALL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. 01


Referensi Gambar : No. ARS. 1105-A
1 Kolom Praktis m3 8.52 - - - -
2 Balok Praktis m3 4.99 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. 01


Referensi Gambar : No. ARS. 1106-B
1 Beton tebal 4 cm tanpa wire mesh m2 4,099.00 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. 01


Referensi Gambar : No. ARS. 1106-B
1 Pasangan Dinding Luar Bata merah m2 784.75 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Dalam bata ringan m2 351.76 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 1,818.42 - - - -
4 Benangan kolom dan dinding m' 417.00 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 933.87 - - - -

01+049Dokumen Tender 07/09/2019BILL 09


BQ PAKET VI PEKERJAAN FINISHING

J BILL NO. 10 PEKERJAAN FINISHING DASAR LANTAI 02 ( MALL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. 02


Referensi Gambar : No. ARS. 1105-A
1 Kolom Praktis m3 13.85 - - - -
2 Balok Praktis m3 11.11 - - - -
3 Meja beton dudukan washthafel m3 0.29 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. 02


Referensi Gambar : No. ARS. 1106-B
1 Beton tebal 4 cm tanpa wire mesh m2 347.79 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. 02


Referensi Gambar : No. ARS. 1106-B
1 Pasangan Dinding Luar Bata merah m2 734.50 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Dalam bata ringan m2 2,692.60 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 5,483.36 - - - -
4 Benangan kolom dan dinding m' 556.00 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 1,120.64 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. 02


Referensi Gambar : No. ARS. 1106-B
1 Waterprofing lantai KM m2 65.54 - - - -
2 Dinding Toilet Homogenous 60x60 m2 104.00 - - - -
3 Lantai Toilet Homogenus 60x60 m2 48.56 - - - -
4 Lantai Keramik 40x40 m2 442.46 - - - -
5 Plint Lantai Keramik 10X40 m' 78.70 - - - -

01+049Dokumen Tender 07/09/2019 BILL 10


BQ PAKET VI PEKERJAAN FINISHING

K BILL NO. 11 PEKERJAAN FINISHING DASAR LANTAI 03 ( MALL )

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. 03


Referensi Gambar : No. ARS. 1105-A
1 Kolom Praktis m3 10.38 - - - -
2 Balok Praktis m3 9.12 - - - -
3 Meja beton dudukan washthafel m3 0.35 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. 03


Referensi Gambar : No. ARS. 1106-B
1 Beton tebal 4 cm tanpa wire mesh m2 347.79 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. 03


Referensi Gambar : No. ARS. 1106-B
1 Pasangan Dinding Luar Bata merah m2 834.10 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Dalam bata ringan m2 439.70 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 2,038.08 - - - -
4 Benangan kolom dan dinding m' 333.60 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 747.10 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. 03


Referensi Gambar : No. ARS. 1106-B
1 Waterprofing lantai KM m2 53.80 - - - -
2 Dinding Toilet Homogenous 60x60 m2 127.01 - - - -
3 Lantai Toilet Homogenus 60x60 m2 52.81 - - - -
4 Lantai Keramik 40x40 m2 294.98 - - - -
5 Plint Lantai Keramik 10X40 m' 78.70 - - - -

01+049Dokumen Tender 07/09/2019BILL 11


BQ PAKET VI PEKERJAAN FINISHING

L BILL NO. 12 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 01 & 03 HOTEL

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Typikal Lt. 01 & 03


Referensi Gambar : No. ARS.1108 ( Hotel )
1 Kolom Praktis m3 7.17 - - - -
2 Balok Praktis m3 10.13 - - - -
3 Meja beton dudukan washthafel dan khitchen m3 3.37 - - - -

II PEKERJAAN COR TOPPING HCS Typikal Lt. 01 & 03


Referensi Gambar : No. ARS.1108 ( Hotel )
1 Beton tebal 5 cm menggunakan wire mesh m2 1,256.53 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Typikal Lt. 01 & 03


Referensi Gambar : No. ARS.1108 ( Hotel )
1 Pasangan Dinding Dalam Bata merah m2 1,588.99 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Luar bata ringan m2 352.32 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 3,358.15 - - - -
4 Benangan kolom dan dinding m' 384.42 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 2,800.42 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Typikal Lt. 01 & 03


Referensi Gambar : No. ARS.1108 ( Hotel )
1 Waterprofing lantai KM m2 346.89 - - - -
2 Dinding Toilet Marmer Travertine 60x60 m2 848.56 - - - -
3 Lantai Toilet Marmer Travertine 60x60 m2 165.57 - - - -
4 Lantai Ruang Tidur Homogenous 60x60 m2 908.63 - - - -
5 Plint Lantai Ruang Tidur Homogenous 10x60 m' 794.65 - - - -
6 Lantai Coridor Homogenous Tile 60x60 m2 142.06 - - - -
7 Plint Lantai Coridor Homogenous Tile 10x60 m' 220.40 - - - -
8 Lantai area lobby lift Granite 60x60 m2 31.58 - - - -
9 Plint Lantai area lobby lift Granite 10x60 m' 23.17 - - - -
10 Lantai R linen Keramik 40x40 m2 3.80 - - - -
11 Plint Lantai R linen Keramik 10x40 m' 7.00 - - - -
12 Lantai R ME Keramik 40x40 m2 4.90 - - - -

01+049Dokumen Tender 07/09/2019BILL 12


BQ PAKET VI PEKERJAAN FINISHING

M BILL NO. 13 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 02 & 04 HOTEL

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Typikal Lt. 02 & 04


Referensi Gambar : No. ARS.1111 ( Hotel )
1 Kolom Praktis m3 8.17 - - - -
2 Balok Praktis m3 11.43 - - - -
3 Meja beton dudukan washthafel dan khitchen m3 3.25 - - - -

II PEKERJAAN COR TOPPING HCS Typikal Lt. 02 & 04


Referensi Gambar : No. ARS.1111 ( Hotel )
1 Beton tebal 5 cm menggunakan wire mesh m2 1,217.41 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Typikal Lt. 02 & 04


Referensi Gambar : No. ARS.1111 ( Hotel )
1 Pasangan Dinding Dalam Bata merah m2 1,811.53 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Luar bata ringan m2 248.03 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 3,530.68 - - - -
4 Benangan kolom dan dinding m' 437.60 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 3,097.06 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Typikal Lt. 02 & 04


Referensi Gambar : No. ARS.1111 ( Hotel )
1 Waterprofing lantai KM m2 346.89 - - - -
2 Dinding Toilet Marmer Travertine 60x60 m2 848.56 - - - -
3 Lantai Toilet Marmer Travertine 60x60 m2 165.57 - - - -
4 Lantai Ruang Tidur Homogenous 60x60 m2 821.51 - - - -
5 Plint Lantai Ruang Tidur Homogenous 10x60 m' 751.09 - - - -
6 Lantai teras R. Tidur Homogenous 60x60 m2 48.00 - - - -
7 Plint Lantai teras R. Tidur Homogenous 60x60 m' 105.60 - - - -
8 Lantai Coridor Homogenous Tile 60x60 m2 142.06 - - - -
9 Plint Lantai Coridor Homogenous Tile 10x60 m' 220.40 - - - -
10 Lantai area lobby lift Granite 60x60 m2 31.58 - - - -
11 Plint Lantai area lobby lift Granite 10x60 m' 23.17 - - - -
12 Lantai R linen Keramik 40x40 m2 3.80 - - - -
13 Plint Lantai R linen Keramik 10x40 m' 7.00 - - - -
14 Lantai R ME Keramik 40x40 m2 4.90 - - - -

01+049Dokumen Tender 07/09/2019BILL 13


BQ PAKET VI PEKERJAAN FINISHING

N BILL NO. 14 PEKERJAAN FINISHING DASAR LANTAI 05 HOTEL

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Lantai 05 ( Hotel )


Referensi Gambar : No. ARS.1111A
1 Kolom Praktis m3 8.90 - - - -
2 Balok Praktis m3 8.83 - - - -
3 Meja beton dudukan washthafel dan khitchen m3 4.52 - - - -

II PEKERJAAN COR TOPPING HCS Lantai 05 ( Hotel )


Referensi Gambar : No. ARS.1111A
1 Beton tebal 5 cm menggunakan wire mesh m2 2,162.52 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Lantai 05 ( Hotel )


Referensi Gambar : No. ARS.1111A
1 Pasangan Dinding Dalam Bata merah m2 1,611.16 - - - -
Spesi menggunakan MU
2 Pasangan Dinding Luar bata ringan m2 487.32 - - - -
Spesi menggunakan MU
3 Plesteran & Acian m2 3,777.26 - - - -
4 Benangan kolom dan dinding m' 416.60 - - - -
5 Tali Air Dinding
kusen pintu , jendela dan plint Lantai m' 2,352.53 - - - -

- - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Lantai 05 ( Hotel )


Referensi Gambar : No. ARS.1111A
1 Waterprofing lantai KM m2 373.59 - - - -
2 Dinding Toilet Marmer Travertine 60x60 m2 811.09 - - - -
3 Lantai Toilet Marmer Travertine 60x60 m2 200.76 - - - -
4 Lantai Ruang Tidur Homogenous 60x60 m2 984.76 - - - -
5 Plint Lantai Ruang Tidur Homogenous 10x60 m' 717.53 - - - -
6 Lantai Coridor Homogenous Tile 60x60 m2 125.65 - - - -
7 Plint Lantai Coridor Homogenous Tile 10x60 m' 193.34 - - - -
8 Lantai area lobby lift Granite 60x60 m2 31.58 - - - -
9 Plint Lantai area lobby lift Granite 10x60 m' 23.17 - - - -
10 Lantai R linen Keramik 40x40 m2 3.80 - - - -
11 Plint Lantai R linen Keramik 10x40 m' 7.00 - - - -
12 Lantai R ME Keramik 40x40 m2 4.90 - - - -

01+049Dokumen Tender 07/09/2019BILL 14


BQ PAKET VI PEKERJAAN EKSTERIOR ( FINISHING )

O BILL NO. 15 PEKERJAAN FINISHING ATAP DAN GONDOLA

HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN DINDING PARAPET


Referensi Gambar : No. ARS.1111A LT. ATAP
1 Kolom 20/20 m3 8.32 - - - -
2 Balok Praktis 10/15 m3 4.16 - - - -
3 Dinding Parapet
Pasangan bata merah spesi menggunakan m2 332.64 - - - -
MU
4 Plesteran & Acian m2 665.28 - - - -
5 Benangan kolom dan dinding m' 362.80 - - - -

01+049Dokumen Tender 07/09/2019BILL 15


BQ PAKET VI PEKERJAAN LANDSEKAP

P BILL NO.16 PEKERJAAN LANDSEKAP


HARGA JUMLAH
NO URAIAN Area / Lantai SAT KUANTITAS MATERIAL UPAH MATERIAL UPAH
Rp. Rp. Rp. Rp.

I PEKERJAAN GARDU JAGA 6 M2 Dasar Ls 1.000 - - - -


Referensi Gambar No. ARS / 3612

II PEKERJAAN PAGAR & TAMAN ( TIANG BENDERA ) Dasar Ls 1.000 - - - -