LABOR PRODUCTION TABLE

ITEM NO. WORK DESCRIPTION QTY. M.H./ UNIT

A. FORM WORKS INSTALLATION


WALL ON THE GROUND 1.00 SQ.M.
WALL ABOVER GROUND 1.00 SQ.M.
BEAMS 1.00 SQ.M.
COLUMN 1.00 SQ.M.
SUSPENDED SLAB
0 TO 18' 1.00 SQ.M.
18' TO 36' UP 1.00 SQ.M.
ELEVATED AND SHORED SLAB FORMING
FORMING ONLY 1.00 SQ.M.
FORMING AND SHORING 1.00 SQ.M.
WOOD WALL AND PARTITION 1.00 SQ.M.

B. FORMWORKS FABRICATION 1.00 SQ.M.

C. STRIPPING OF FORMS
WALL ON GROUND 1.00 SQ.M.
WALL ABOVE 10' 1.00 SQ.M.
BEAMS 1.00 SQ.M.
COLUMNS 1.00 SQ.M.
SUSPENDED SLAB 1.00 SQ.M.
0 TO 18' 1.00 SQ.M.
18' TO 36' UP 1.00 SQ.M.
ELEVATED AND SHORED SLAB FORMING 1.00 SQ.M.
STRIP OF FORMS 1.00 SQ.M.
FLOOR SLAB AT GRADE STRIP OF FORMS 1.00 SQ.M.

D INSTALLION OF CARPENTRY WORKS


PLYWOOD PARTITION 1.00 PC
T & G FLOORING AND SHORING 1.00 B.F.
CEILING FRAME 1.00 B.F.
SIDING FRAME 1.00 B.F.
FLOORING FRAME 1.00 B.F.
WOODEN POSS ERECTION 1.00 B.F.
TRUSS FABRICATION 1.00 B.F.
TRUSS INSTALLATION 1.00 B.F.
GIRTS INSTALLTION 1.00 B.F.
PLATES INSTALLATION 1.00 B.F.
PURLINS INSTALLATION 1.00 B.F.
FASCIA BOARD INSTALLATION 1.00 B.F.
1/4" or 3/4" thk PLYWOOD
CUTTING BY MANUAL 1.00 PC
ASSEMBLY 1.00 S.F.
CEILNG:
FRAME INSTALLATION 1.00 SQ.M.
PLYWOOD INSTALLLATION 1.00 SQ.M.
CABINET BOARDING 1.00 B.F.
CABINET FRAMING 1.00 B.F.
WOOD WALL PARTITION 1.00 SQ.M.
PANEL WALL 1.00 SQ.M.
FORMING WEIGHT ANCHOR BOLT 1.00 SQ.M.
WET FORMING 1.00 SQ.M.

E. DOORS AND WINDOWS


W-PANEL INSTALLATION 1.00 PC.
STEEL WINDOWS INSTALLATION 1.00 PC.
LOUVER WINDOWS INSTALLATION:
FIXED ASBESTOS 1.00 SQ.M.
FIXED METAL LOUVERS 1.00 SQ.M.
FIXED GI SHEETS 1.00 SQ.M.
FIXED GLASS 1.00 SQ.M.
FIXED WOODEN 1.00 SQ.M.
ALUMINUM FRAME WINDOWS 1.00 EACH
SLIDING GLASS DOOR 1.00 EACH
HOLLOW METAL DOOR 1.00 EACH
ROLLING DOORS 1.00 EACH
FIXED WINDOW 1.00 S.F.
DOOR LOCKSET 1.00 SET
DOOR JAMB FABRICATION 1.00 B.F.
DOOR JAMB INSTALLATION 1.00 B.F.
CYCLONE WIRE INSTALLATION 1.00 SQ.M.

F. TRADE MASONRY WORKS


GROUTING and TOL PLASTERING 1.00 SQ.M.
PEBBLE FINISHED 1.00 SQ.M.
MABLE INSTALLATION 1.00 SQ.M.
1/4" x 2' x 8" RED BRICKS 1.00 SQ.M.
GLAZED TILES 1.00 SQ.M.
UNGLAZED TILES 1.00 SQ.M.
GLAZED TILE WALL 1.00 SQ.M.
CONC. BLOCK INT. WALL 1.00 SQ.M.
CONC. BLOCK EXT. WALL 1.00 SQ.M.
BRICKWORK 1.00 SQ.M.
PLASTER WALL AND CEILING 1.00 SQ.M.
HOLLOW TILE WALL 1.00 SQ.M.
ACOUSTICAL TILE WALL 1.00 SQ.M.
VINYL FLOOR TILE 1.00 SQ.M.
UNGLAZED OR MOSAIC FLOOR TILE 1.00 SQ.M.
LAYING OF CHB & ADOBE 1.00 SQ.M.
CEMENT FINISH 1.00 SQ.M.
CONC. HOLLOW BLOCK LAYING:
6" CHB 10.00 SQ.M.
4" CHB 1.00 SQ.M.
8" CHB 1.00 SQ.M.
VIT. TILES FLOOR 1.00 SQ.M.
VIT. TILES WALL 1.00 SQ.M.

G. TINSMITHING WORK
CORR GI SHEETS:
LIFTING 1,000.00 SQ.M.
INSTALLATION 1.00 SQ.M.
INSTALLATION OF ASBESTOS ROOFING 1.00 SHT.
INSTALLATION OF ALUMINUM GI SHEET 1.00 SHT.
COPPER CLADDING ROOF DECK 1.00 L.M.
FAB, GI GUTTER 1.00 SHT.
GI SHEET ROOFING 1.00 SHT.
FAB OF GI GUTTER 1.00 L.M.
FAB. GI DOWNSPOUT 1.00 L.M.
GUTTER CUT & SHAPE 1.00 L.M.
INST. OF GUTTER 1.00 L.M.
DOWNSPOUT CUT AND SHAPE 1.00 L.M.
DOWNSPOUT INSTALLATION 1.00 L.M.
CORR. GI ROOFING 1.00 SQ.M.
CORR ALUMINUM ROOFING 1.00 SQ.M.
BUILT UP ROOFING 4 PLY 1.00 SQ.M.
PROTECTED METAL 1.00 SQ.M.
CORR. ASBESTOS INST., LIFTING & HAULING 1.00 SQ.M.
LEADERS & GUTTERS 1.00 SQ.M.

H CONCRETE AND REBAR WORKS


PLACING CONCRETE:
SLAB ON FILL 10.00 CU.M.
SLIP FORM 1.00 CU.M.
FLR FINISH UNHARDENED 1.00 SQ.M.
CONC. FINISH HARDENED 1.00 SQ.M.
REBAR WORKS:
GROUND FLR. INSTALLATION 1.00 KGS
UPPER FLR. INSTALLATION 1.00 KGS
FABRICATION 1.00 KGS
MIXING MANUAL 1.00 CU.M.
MIXING MACHINE CU.M.
MORE THAN 1.80 CU.M. POUR:
CHUTE FROM TRUCK 1.00 CU.M.
CRANE AND BUCKET 1.00 CU.M.
WHEELING 1.00 CU.M.
FINISHING 1.00 SQ.M.
CONCRETE POUR ON ELEVATED AND SHORED
SLAB FORMING CHUTE & BUCKET 1.00 CU.M.
PLACEMENT OF REBARS ON FOOTING 1.00 KGS
FIELD FABRICATION OF REBARS 1.00 KGS

I. EARTH WORKS
MACHINE EXCAVATION:
SAND 1.00 CU.M.
SAND AND MARL 1.00 CU.M.
MARL 1.00 CU.M.
GRANULAR BACKFILL 1.00 CU.M.
GRANULAR SOIL BACKFILL 1.00 CU.M.
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND 1.00 CU.M.
EXCAVATION OF SAND &MARL 1.00 CU.M.
EXCAVATION OF MARL 1.00 CU.M.
BACKFILL OF SAND 1.00 CU.M.
BACKFILL OF SAND &MARL 1.00 CU.M.
BACKFILL OF MARL 1.00 CU.M.
FLOOR SLAB & GRADE:
GRADING MANUAL 1.00 SQ.M.
EXCAVATION AND BACKFILL 1.00 CU.M.
FINE GRADING & FINISHING
GRADING MANUAL 1.00 SQ.M.
FINISHING SOIL SURFACE 1.00 SQ.M.
DIKES 1.00 CU.M.
J ROAD WORKS
BASE COURSE 1.00 SQ.M.
CURBS & GUTTER 1.00 CU.M.
4" THK ROAD 1.00 SQ.M.
6" THK ROAD 1.00 SQ.M.
8" THK ROAD 1.00 SQ.M.
TROWEL FINISH 1.00 SQ.M.
SPECIAL TOPPING 1.00 SQ.M.
4" STONE OR SHELL ROAD 1.00 SQ.M.
6" STONE OR SHELL ROAD 1.00 SQ.M.
8" STONE OR SHELL ROAD 1.00 SQ.M.
ACID PROOFING 1.00 CU.M.
ASPHALT PAVING:
FINE GRADING & FINISHING 1.00 SQ.M.
PLACE BASE COURSE 1.00 SQ.M.
ASPHALT 1.00 SQ.M.
ACID BLOCK OR PAVING BLOCK:
FIND GRADING 1.00 SQ.M.
INSTALL BRICK 1.00 SQ.M.
CRUSH STONE OR SHELL SURFACING
FINE GRADING 1.00 SQ.M.
PLACE SPREAD AND COMPACT STONE TO 4" 1.00 SQ.M.
OVER 9" THK 1.00 SQ.M.
TANK CUSHION
SAND CUSHION 1.00 CU.M.
APHALT RETAINER RING 1.00 SQ.M.
NON GRANULAR BACKFILL 1.00 CU.M.
EXCAVATION MANUAL:
COMMON EARTH 1.00 CU.M.
LOAN OF SAND 1.00 CU.M.
CLAY OR HEAVY SOIL ROCK 1.00 CU.M.
ROCK 1.00 CU.M.
MECHANICAL EXCAVATION
COMMON EARTH 1.00 CU.M.
ROCK W/ JACKHAMMER 1.00 CU.M.
BACKFILLING
COMMON MANUAL 1.00 CU.M.
GRAVEL FILL MANUAL 1.00 CU.M.
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL
FROM 0 TO 2 MTRS. DEPTH 1.00 L.M.
2 TO 3 1.00 L.M.
3 TO 4 1.00 L.M.
4 TO 5 1.00 L.M.
PLACING BINDER GRAVEL 1.00 CU.M.
ESCOMBRO BACKFILLING 1.00 CU.M.
SPREADING, TAMPING AND GRADING 1.00 SQ.M.
MECHANICAL COMPACTION, PLATE COMPACTION 1.00 CU.M.
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12" 1.00 SQ.M.
CLEARING UNDERGROWTH AND SHRUBS 1.00 SQ.M.
DISPOSAL OF SOIL 1.00 CU.M.
MAULING OF SOIL 1.00 CU.M.
GRAVEL FILL 1.00 CU.M.
EXCAVATION CRANE AND CLAMPSHELL
. WITH 8-MEN AND 2 CARPENTERS 1.00 CU.M.

K. TRADE: UNDERGROUND PIPING AND PLUMBING WORKS


1.00 LAYING ASBESTOS PIPES:
1//2Ø 30.00 L.M.
3/4" Ø 1.00 L.M.
1 1/4" 1.00 L.M.
1 1/2 TO 2" Ø 1.00 L.M.
2 1/2" Ø 1.00 L.M.
3" Ø 1.00 L.M.
3 1/2" Ø 1.00 L.M.
4" Ø 1.00 L.M.
2.00 CAST IRON PIPE
2" Ø 1.00 L.M.
4" Ø 1.00 L.M.
6" Ø 1.00 L.M.
8" Ø 1.00 L.M.
10" Ø 1.00 L.M.
12" Ø 1.00 L.M.
14" Ø 1.00 L.M.
16" Ø 1.00 L.M.
18" Ø 1.00 L.M.
20" Ø 1.00 L.M.
24" Ø 1.00 L.M.
30" Ø 1.00 L.M.
3.00 LAYING PVC PIPE
1/2 TO 3/4" Ø 1.00 L.M.
1 TO 1 1/4" Ø 1.00 L.M.
1 1/2 TO 2" Ø 1.00 L.M.
2 1/2" Ø 1.00 L.M.
3" Ø 1.00 L.M.
4" Ø 1.00 L.M.
5" Ø 1.00 L.M.
6" Ø 1.00 L.M.
4.00 LAYING RCP 8 MEN (1 TEAM)
24"Ø 1.00 L.M.
36"Ø 1.00 L.M.
48"Ø 1.00 L.M.
6-18"Ø 1.00 L.M.

LAVATORY 3.00 EACH


WATER CLOSET 1.00 EACH
URINAL UTILITY STALL 1.00 EACH
URINAL PEDESTRAL TYPE 1.00 EACH
SHOWER AND INSTALL 1.00 EACH
5 MAN GROUP SHOWER 1.00 EACH
BAH TUBS 1.00 EACH
SLOPE SINK 1.00 EACH
HOT WATER HEATER 1.00 EACH
16 PERSON WASH SINK 1.00 EACH
DRINKING FOUNTAIN 1.00 EACH
EYE WASH 1.00 EACH
MISC. FIXTURES 1.00 EACH
PARTITIONS 1.00 EACH
LAYING OF 24"Ø RCP 1.00 PIPE
LAYING OF 36"Ø RCP 1.00 PIPE
LAYING OF 48"Ø RCP 1.00 PIPE

L. TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS
FIELD FABRICATION INSULATION 1.00 S.M.
FIELD FABRICATION SHEET METAL COVER 1.00 S.M.
APPLY INSULATION 1.00 S.M.
APPLY SHEET METAL COVER 1.00 S.M.
PUMPS, COMPRESSORS & TURBINES
FABRICATE 1.00 S.M.
APPLY 1.00 S.M.
PIPINGS AND COMPONENT INSULATION
FIELD FABRICATE 1.00 FLG.
FIELD FABRICATESHEET METAL COVER 1.00 S.M.
APPLY INSULATION 1.00 L.M.
APPLY SHEET METAL COVER OR METAL COVER 1.00 EACH
FABRICATE INSTRUMENT COVER 1.00 EACH
INSTALL INSTRUMENT COVER 1.00 EACH
INSULATE PIPE HANGERS 1.00 EACH
FOR STREAM TRACED LINES 1.00 L.M.
REMOVAL OF OLD OR EXISTING INSTALLATION 1.00 L.M.

M. TRADE:FIRE PROOFING
INSTALL STUDS 1.00 EACH
INSTALL MESH 1.00 S.M.
POURED
FORMING 1.00 S.M.
STRIP FORMS 1.00 S.M.
POUR CONCRETE 1.00 S.M.
CURING/PATCHING 1.00 S.M.
FINISHING 1.00 S.M.
TROWEL, PLASTERED 1.00 S.M.
PNEUMATIC APPLICATION
GUNITE 1.00 S.M.
APPLY FINEBRICK OR BLOCK 1.00 PC.
REMOVAL OF EXISTING OR OLD FIREPROOFING 1.00 S.M.
APPLY FIREPROOFING PAINT 1.00 S.M.
FIRE PROTERCTION:
FIRE PROTECTION EQUIPMENT INSTALLATION:
MONITOR 1.00 EACH
HOSE REELS AND CARTS 1.00 EACH
FIRE EXTINGUISHERS 1.00 EACH
PERSONAL EQUIPMENT:
EYE WASH 1.00 EACH
SAFETY SHOWERS 1.00 EACH
BREATHING APPARATUS 1.00 EACH
SPRINKLER SYSTEM
SPRAY NOZZLES 1.00 EACH
WATER CANNONS 1.00 EACH

N. TRADE:PERMANENT FENCING
INSTALL FENCE 1.00 L.M.
INSTALL GATES 1.00 L.M.
TO RAIL 1.00 L.M.
BARBE WIRE, 3 STRANDS 1.00 L.M.

O. TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL 1.00 TON
OLD STRUCTURAL STEEL 1.00 S.M.
NEW FLAT FLAT PLATES 1.00 S.M.
SURFACE PREPARATION:
IN TERMS OF WEIGHT 1.00 TON
IN TERMS OF AREA 1.00 S.M.
SAND PREPARATION 1.00 TON

P. TRADE:HEATING VENTILATING AND CONDITIONING


HEAVY PIPING 1.00 L.M.
DUCT WORK INSTALL 1.00 S.M.
DUCT WORK FAB. 1.00 S.M.
PACKAGE UNIT AIR CONDITIONER 1.00 EACH
UNIT HEATER 1.00 EACH
FINNED CONVERTER 1.00 EACH
EXHAUST FAN PROPELLER 1.00 EACH
GRAVITY ROOF PAINT 1.00 L.M.
POWER ROOF VENT 1.00 EACH
ROUND ROOF VENT 1.00 EACH
PLUMBING PIPING 1.00 L.M.

Q. MISCELLANEOUS
WATER STOP INSTALLATION 1.00 L.M.
CAULKING SLAB JOINT 1.00 L.M.
ASPHALTING 1.00 S.M.
GROUTNG AND TOOL PLASTERING 1.00 S.M.
WATER PROOFING RUBBERIZED 1.00 S.M.
COPPER CLADDING ROOF DECK 1.00 L.M.
WATER PROOFING FLINKOTE 1.00 S.M.
DEMOLITION OF ADOBE WALL 1.00 CU.M.
PAINTING 1.00 S.M.
COPPER WATER STOP CUT AND SHAPE 1.00 L.M.
COPPER WATER STOP CUT AND INSTALLATION 1.00 L.M.
SETTING ANCHOR BOLT 1.00 KG
SETTING ANCHOR BOXES 1.00 CU.M.
MAN POWER (NO.)
EXTIMATED DAYS (8HRS) HRS

1.00 0.25 2.00


1.00 0.29 2.35
1.00 0.39 3.08
1.00 0.29 2.35

1.00 0.21 1.67


1.00 0.42 3.33

1.00 1.13 9.00


1.00 1.38 11.00
1.00 0.08 0.60

1.00 0.14 1.08

1.00 0.03 0.25


1.00 0.16 1.29
1.00 0.13 1.03
1.00 0.11 0.85
1.00 0.00 0.00
1.00 0.10 0.83
1.00 0.14 1.08
1.00 0.00 0.00
1.00 0.44 3.50
1.00 0.35 2.80

1.00 0.13 1.00


1.00 0.02 0.14
1.00 0.05 0.36
1.00 0.03 0.27
1.00 0.12 0.97
1.00 0.05 0.43
1.00 0.04 0.35
1.00 0.10 0.80
1.00 0.03 0.21
1.00 0.02 0.13
1.00 0.03 0.27
1.00 0.06 0.46

1.00 0.13 1.00


1.00 0.05 0.42
1.00 0.17 1.33
1.00 0.13 1.00
1.00 0.02 0.13
1.00 0.02 0.18
1.00 0.06 0.50
1.00 0.88 7.00
1.00 0.56 4.50
1.00 0.44 3.50

1.00 0.05 0.40


1.00 0.25 2.00

1.00 0.58 4.63


1.00 0.39 3.12
1.00 0.58 4.63
1.00 0.39 3.12
1.00 0.42 3.38
1.00 1.25 10.00
1.00 1.50 12.00
1.00 1.25 10.00
1.00 3.13 25.00
1.00 0.04 0.31
1.00 0.20 1.60
1.00 0.03 0.22
1.00 0.04 0.33
1.00 0.39 3.12

1.00 0.21 1.67


1.00 0.18 1.43
1.00 0.25 2.00
1.00 0.63 5.00
1.00 1.32 10.53
1.00 0.54 4.35
1.00 0.38 3.00
1.00 0.56 4.50
1.00 0.50 4.00
1.00 0.06 0.50
1.00 0.38 3.00
1.00 0.25 2.00
1.00 0.15 1.20
1.00 0.23 1.80
1.00 1.19 9.50
1.00 0.14 1.14
1.00 0.09 0.72

2.00 1.00 8.00


1.00 0.17 1.33
1.00 0.25 2.00
1.00 0.67 5.33
1.00 0.75 5.97

10.00 13.50 108.00


1.00 0.38 3.06
1.00 0.13 1.00
1.00 1.23 9.80
1.00 0.06 0.51
1.00 0.43 3.47
1.00 0.10 0.82
1.00 0.07 0.53
1.00 0.12 0.97
1.00 0.02 0.16
1.00 1.13 9.00
1.00 0.04 0.30
1.00 0.02 0.13
1.00 0.23 1.80
1.00 0.23 1.80
1.00 1.06 8.50
1.00 0.25 2.00
1.00 0.21 1.70
1.00 0.00 0.00

6.00 1.04 8.33


1.00 3.13 25.00
1.00 0.13 1.00
1.00 0.18 1.43

1.00 0.01 0.07


1.00 0.01 0.08
1.00 0.01 0.10
1.00 2.00 16.00
1.00 0.00 0.00

1.00 0.88 7.00


1.00 1.75 14.00
1.00 3.38 27.00

1.00 2.63 21.00


1.00 0.07 0.53
1.00 0.04 0.33

1.00 0.08 0.60


1.00 0.10 0.80
1.00 0.14 1.10
1.00 0.15 1.20
1.00 0.19 1.50

1.00 0.50 4.00


1.00 0.81 6.50
1.00 1.31 10.50
1.00 0.69 5.50
1.00 1.00 8.00
1.00 1.50 12.00

1.00 0.16 1.30


1.00 2.25 18.00

1.00 0.06 0.45


1.00 0.07 0.55
1.00 0.15 1.20

1.00 0.02 0.12


1.00 0.23 1.80
1.00 0.16 1.30
1.00 0.18 1.40
1.00 0.19 1.50
1.00 0.04 0.32
1.00 0.15 1.20
1.00 0.04 0.32
1.00 0.05 0.42
1.00 0.07 0.52
1.00 0.08 0.60

1.00 0.05 0.42


1.00 0.03 0.20
1.00 0.03 0.20

1.00 0.05 0.42


1.00 0.53 4.20

1.00 0.04 0.32


1.00 0.05 0.42
1.00 0.07 0.52

1.00 0.09 0.70


1.00 0.03 0.20
1.00 0.25 2.00

1.00 1.00 8.00


1.00 0.16 1.31
1.00 0.21 1.64
1.00 0.33 2.63
1.00 0.83 6.67
1.00 2.08 16.67

1.00 0.10 0.82


1.00 0.63 5.00

1.00 0.16 1.25


1.00 0.21 1.67
1.00 0.31 2.50
1.00 0.42 3.33
1.00 0.01 0.11
1.00 0.03 0.21
1.00 0.06 0.48
1.00 0.01 0.06

1.00 0.01 0.05


1.00 0.00 0.03
1.00 0.21 1.69
1.00 0.13 1.00
1.00 0.26 2.07

1.00 0.13 1.07

5.00 0.50 3.96


1.00 0.08 0.66
1.00 0.09 0.74
1.00 0.10 0.82
1.00 0.12 0.98
1.00 0.14 1.08
1.00 0.14 1.15
1.00 0.17 1.32

1.00 0.27 2.19


1.00 0.41 3.29
1.00 0.62 4.92
1.00 0.82 6.57
1.00 1.23 9.85
1.00 1.29 10.31
1.00 1.51 12.05
1.00 1.71 13.69
1.00 1.92 15.34
1.00 2.05 16.43
1.00 2.26 18.07
1.00 2.57 20.54

1.00 0.02 0.19


1.00 0.09 0.74
1.00 0.10 0.82
1.00 0.12 0.98
1.00 0.14 1.08
1.00 0.16 1.31
1.00 0.21 1.64
1.00 0.31 2.46

1.00 0.50 4.00


1.00 0.80 6.40
1.00 1.33 10.67
1.00 0.17 1.33

5.00 0.60 4.80


1.00 1.50 12.00
1.00 3.00 24.00
1.00 2.00 16.00
1.00 1.25 10.00
1.00 4.50 36.00
1.00 3.00 24.00
1.00 1.75 14.00
1.00 1.75 14.00
1.00 3.25 26.00
1.00 1.63 13.00
1.00 1.13 9.00
1.00 0.25 2.00
1.00 1.00 8.00
1.00 0.50 4.00
1.00 0.80 6.40
1.00 1.33 10.66

1.00 0.31 2.50


1.00 1.50 12.00
1.00 0.63 5.00
1.00 0.63 5.00

1.00 2.13 17.00


1.00 3.75 30.00

1.00 0.50 4.00


1.00 0.10 0.80
1.00 0.34 2.70
1.00 0.19 1.50
1.00 1.00 8.00
1.00 0.75 6.00
1.00 0.50 4.00
1.00 0.46 3.70
1.00 0.19 1.50

1.00 0.06 0.50


1.00 0.15 1.20

1.00 1.75 14.00


1.00 0.75 6.00
1.00 8.75 70.00
1.00 0.08 0.60
1.00 0.09 0.70
1.00 0.34 2.70

1.00 0.15 1.20


1.00 0.10 0.80
1.00 0.31 2.50
1.00 0.38 3.00

1.00 0.63 5.00


1.00 1.88 15.00
1.00 0.63 5.00

1.00 1.25 10.00


1.00 1.25 10.00
1.00 0.63 5.00

1.00 0.13 1.00


1.00 0.63 5.00

1.00 0.15 1.20


1.00 0.38 3.00
1.00 0.04 0.30
1.00 0.04 0.30

1.00 0.13 1.00


1.00 0.07 0.55
1.00 0.04 0.32

1.00 1.00 8.00


1.00 3.75 30.00
1.00 0.00 0.00

1.00 0.44 3.50


1.00 0.75 6.00
1.00 2.25 18.00
1.00 3.00 24.00
1.00 1.50 12.00
1.00 0.63 5.00
1.00 1.00 8.00
1.00 0.91 7.30
1.00 3.00 24.00
1.00 1.00 8.00
1.00 0.44 3.50

1.00 0.08 0.67


1.00 0.03 0.20
1.00 0.10 0.80
1.00 0.21 1.67
1.00 0.07 0.55
1.00 0.06 0.50
1.00 0.03 0.27
1.00 0.20 1.60
1.00 0.04 0.34
1.00 0.75 6.00
1.00 1.38 11.00
1.00 6.13 49.00
1.00 0.23 1.82
A. STRIPPING OF METAL FORMS

MANHOURS PER SQ. METER OF CONTACT AREA


WOOD SHORES 215 TO 316 FLOORS
FORM HEIGHT LOW AVERAGE HIGH
(METER)
3 TO 4 0.58 0.22 0.16
4 TO 5 0.59 0.23 0.16
5 TO 6 0.60 0.23 0.17
6 TO 7 0.61 0.24 0.17
7 TO 8 0.64 0.25 0.18

WOOD SHORES 368 TO 419 FLOORS


3 TO 4 0.60 0.23 0.17
4 TO 5 0.61 0.24 0.17
5 TO 6 0.64 0.25 0.18
6 TO 7 0.66 0.25 0.18
7 TO 8 0.68 0.26 0.19

CREW: TOOLS:
1 CARPENTER LEAD MAN 8 ONE LOT CARPENTRY TOOLS
3 CARPENTERS 24 8 TOOLS HOUR
6 HELPERS 48
10 MANDAYS 80 MANHOURS

B. STEEL ERECTION FOR MULTI STOREY BUILDING FRAME


PREFAB SECTIONS, HIGHLY MECHANIZED OPERATION

MANHOURS & EQUIPMENTHOUR PER TON ERECTED:

MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW
MEDIUM FRAME 36.00 13.85 10.00 7.00
HEAVY FRAME 32.73 12.63 9.11 6.36
STEEL JOIST 40.00 15.37 11.08 7.78

CREW: TOOLS:
1 LEAD MAN 8 0.50 TOWER CRANE
4 RIGGERS 32 2.00 WELDING TRANSFORME
4 FITTERS 32 1.00 LOT TOOLS
2 WELDERS 16 3.50
1 CRANE OPERATOR 8
6 HELPERS 48
18 MANDAYS 144 MANHOURS

MATERIALS : A36 WELDED CONNECTION


C. STEEL ERECTION FOR COMMERCIAL AND MILL BUILDING FRAME
PREFAB SECTIONS, HIGHLY MECHANIZED OPERATION

MANHOURS & EQUIPMENTHOUR PER TON ERECTED:

MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW

COMMERCIAL TYPE BUILDING:


LIGHT FRAME 46.67 18.06 13.02 18.33
MEDIUM FRAME 40.00 15.56 11.20 15.71
HEAVY FRAME 35.00 13.33 9.66 13.75
STEEL JOIST 43.08 16.47 11.91 16.92

MILL TYPE BUILDING:


LIGHT FRAME 35.00 13.33 9.66 13.75
MEDIUM FRAME 31.11 11.91 8.62 12.22
HEAVY FRAME 35.00 10.77 7.78 13.75
STEEL JOIST 32.94 12.27 9.18 12.94

CREW: TOOLS:
1 LEAD MAN 8 0.50 20 TON TOWER CRANE
2 RIGGERS 16 2.00 WELDING TRANSFORME
4 FITTERS 32 2.00 CUTTING OUTFIT
2 WELDERS 16 1.00 LOT TOOLS
1 CRANE OPERATOR 8 5.50 EQPT. DAYS
4 HELPERS 32
14 MANDAYS 112 MANHOURS

MATERIALS : A36 WELDED CONNECTION


CARPENTRY TOOLS
TOOLS HOUR

EQUIPMENT-HOURS
AVERAGE HIGH
2.69 1.94
2.46 1.77
2.98 2.15

TOWER CRANE 4.00


WELDING TRANSFORMER 16.00
LOT TOOLS 8.00
28.00 TOOL HOURS
EQUIPMENT-HOURS
AVERAGE HIGH

7.10 5.12
6.11 4.40
5.24 3.79
6.47 4.68

5.24 3.79
4.68 3.38
4.23 3.06
5.00 3.61

20 TON TOWER CRANE 4.00


WELDING TRANSFORMER 16.00
CUTTING OUTFIT 16.00
LOT TOOLS 8.00
EQPT. DAYS 44.00 EQPT. HOURS
UNIT COST DERIVATION FORM

PROJECT TITLE:
LOCATION:
ITEM NO. ITEM OF WORK:
ESTIMATED QUANTITIES: UNIT:
A. MATERIALS:
DESCRIPTION QTY. UNIT UNIT COST

B. LABOR/MANPOWER:
NO. DESCRIPTION NO. NO. DAYS DAILY RATE

C. EQUIPMENT/TOOLS:
NO. DESCRIPTION NO. NO.-DAYS HOURLY RATE
D TOTAL DIRECT COST (A+B+C)
E O.C.M. (% of D)
F CONTRACTIRS PROFIT (% OF D)
G VAT (10% Oof B+C)
H TOTAL COST (D+E+F+G)
I UNIT COST ( DIRECT)
AMOUNT

AMOUNT

AMOUNT
PROBABLE OUTPUT OF HEAVY EQUIPMENT

EQUIPMENT PROBABLE OUTPUT

A.1 DOZER 165 HP


Cutting & Stockpiling 30.00 cu.m./hr. 0.033 hr/m³
Clearing & Grubbing 300.00 sq.m./hr 0.003 hr/m²
A.2 DOZER D65P-7
Stripping 200.00 sq.m./hr 0.005 hr/m²
Excavation 25.00 cu.m./hr. 0.040 hr/m³
Quarrying 50.00 cu.m./hr. 0.020 hr/m³
Pushing 3.00 sq.m./hr 0.333 hr/m²

B.1 LOADER -1.91 CU.M.


Loading 70.00 cu.m./hr. 0.014 hr/m³
B.2 LOADER 950

C. DUMP TRUCK - 10 CU.M.


Hauling (dist. = 600M) 90.00 cu.m./hr. 0.011 hr/m³

D. GRADER- 130G
10 Passes 700.00 sq.m./hr 0.001 hr/m²
Subgrading 300.00 sq.m./hr 0.003 hr/m²
Spreading 40.00 cu.m./hr. 0.025 hr/m³

E.1 ROLLER VIBRATORY


10 Passes 600.00 sq.m./hr 0.002 hr/m²
SHEETS FOOT ROLLER
Static Rolling 12 passes-15m3 lift
Vibratory Rolling-4 pases-15m3 lift 135.00 cu.m./hr. 0.007 hr/m³
No.3W Road Roller-static rolling
4 passes-15 m3 lift 24.00 cu.m./hr. 0.042 hr/m³
Tractor Drawn Roller (1-d)
Static Rolling 6 passes-20m3 lift 240.00 cu.m./hr. 0.004 hr/m³
Tandem Roller-static rolling
6 passes-20 m3 lift 24.00 cu.m./hr. 0.042 hr/m³

E.2 VIBRATORY COMPACTOR CA25D

G. WATER TRUCK - 10 CU.M.


Watering 1,600.00 sq.m./hr 0.001 hr/m²

ASPHALT PAVER
ASPHALT DISTRIBUTOR SPRAYING PHALT
PLATE COMPACTOR
Grave Bedding 8.00 cu.m./hr. 0.125 hr/m³
Concrete Vibrator:
Vibrating Concrete 40.00 cu.m./hr. 0.025 hr/m³
MANPOWER:

MATERIALS:
Clearing & Grubbing Lot Grading (Cut & Fill) m3 Trench Excavation

300 30 m3/hr

232.55 m3/hr

232.55 m3/hr

384.62 m3/hr

303.03 m3/hr

769.23 m3/hr
cavation Disposal of Unsuitable Materials m3-km Road way Excavation (m3)

29.41 m3/hr

125.00 m3/hr

125.00 m3/hr
Embankment/Imported Backfill (m3) Subgrade Preparation (m2)

142.86 m3/hr 769.23 sq.m./hr

125.00 m3/hr 588.23 sq.m./hr

333.33 m3/hr 1,666.67 sq.m./hr


Aggregate Sub-base Course (m3) Aggregate Base Course (m3)

76.92 m3/hr 115.38 m3/hr

58.82 m3/hr 88.23 m3/hr

166.67 m3/hr 250.00 m3/hr


Bituminous Asphalt Pavement (MT) Concrete Pavement (m3)

65.00 MT/hr

32.50 MT/hr
300 SQ.M.
Asphalt Cutback MC Grade 70 MT
Asphalt prime coat, SS-1 (.042 drum/mt) drums

Note:1MT of asphalt conc. Covers 8 m2


of pavement 2" thick or 0.43 m3 of asphalt
concrete
Coverage = 2.33 MT/CM
Bitumil = 0.70 ltr/sq, 200 ltr/drum