C. STRIPPING OF FORMS
WALL ON GROUND 1.00 SQ.M.
WALL ABOVE 10' 1.00 SQ.M.
BEAMS 1.00 SQ.M.
COLUMNS 1.00 SQ.M.
SUSPENDED SLAB 1.00 SQ.M.
0 TO 18' 1.00 SQ.M.
18' TO 36' UP 1.00 SQ.M.
ELEVATED AND SHORED SLAB FORMING 1.00 SQ.M.
STRIP OF FORMS 1.00 SQ.M.
FLOOR SLAB AT GRADE STRIP OF FORMS 1.00 SQ.M.
G. TINSMITHING WORK
CORR GI SHEETS:
LIFTING 1,000.00 SQ.M.
INSTALLATION 1.00 SQ.M.
INSTALLATION OF ASBESTOS ROOFING 1.00 SHT.
INSTALLATION OF ALUMINUM GI SHEET 1.00 SHT.
COPPER CLADDING ROOF DECK 1.00 L.M.
FAB, GI GUTTER 1.00 SHT.
GI SHEET ROOFING 1.00 SHT.
FAB OF GI GUTTER 1.00 L.M.
FAB. GI DOWNSPOUT 1.00 L.M.
GUTTER CUT & SHAPE 1.00 L.M.
INST. OF GUTTER 1.00 L.M.
DOWNSPOUT CUT AND SHAPE 1.00 L.M.
DOWNSPOUT INSTALLATION 1.00 L.M.
CORR. GI ROOFING 1.00 SQ.M.
CORR ALUMINUM ROOFING 1.00 SQ.M.
BUILT UP ROOFING 4 PLY 1.00 SQ.M.
PROTECTED METAL 1.00 SQ.M.
CORR. ASBESTOS INST., LIFTING & HAULING 1.00 SQ.M.
LEADERS & GUTTERS 1.00 SQ.M.
I. EARTH WORKS
MACHINE EXCAVATION:
SAND 1.00 CU.M.
SAND AND MARL 1.00 CU.M.
MARL 1.00 CU.M.
GRANULAR BACKFILL 1.00 CU.M.
GRANULAR SOIL BACKFILL 1.00 CU.M.
MANUAL FOUNDATION EXCAVATION & BACKFILL:
SAND 1.00 CU.M.
EXCAVATION OF SAND &MARL 1.00 CU.M.
EXCAVATION OF MARL 1.00 CU.M.
BACKFILL OF SAND 1.00 CU.M.
BACKFILL OF SAND &MARL 1.00 CU.M.
BACKFILL OF MARL 1.00 CU.M.
FLOOR SLAB & GRADE:
GRADING MANUAL 1.00 SQ.M.
EXCAVATION AND BACKFILL 1.00 CU.M.
FINE GRADING & FINISHING
GRADING MANUAL 1.00 SQ.M.
FINISHING SOIL SURFACE 1.00 SQ.M.
DIKES 1.00 CU.M.
J ROAD WORKS
BASE COURSE 1.00 SQ.M.
CURBS & GUTTER 1.00 CU.M.
4" THK ROAD 1.00 SQ.M.
6" THK ROAD 1.00 SQ.M.
8" THK ROAD 1.00 SQ.M.
TROWEL FINISH 1.00 SQ.M.
SPECIAL TOPPING 1.00 SQ.M.
4" STONE OR SHELL ROAD 1.00 SQ.M.
6" STONE OR SHELL ROAD 1.00 SQ.M.
8" STONE OR SHELL ROAD 1.00 SQ.M.
ACID PROOFING 1.00 CU.M.
ASPHALT PAVING:
FINE GRADING & FINISHING 1.00 SQ.M.
PLACE BASE COURSE 1.00 SQ.M.
ASPHALT 1.00 SQ.M.
ACID BLOCK OR PAVING BLOCK:
FIND GRADING 1.00 SQ.M.
INSTALL BRICK 1.00 SQ.M.
CRUSH STONE OR SHELL SURFACING
FINE GRADING 1.00 SQ.M.
PLACE SPREAD AND COMPACT STONE TO 4" 1.00 SQ.M.
OVER 9" THK 1.00 SQ.M.
TANK CUSHION
SAND CUSHION 1.00 CU.M.
APHALT RETAINER RING 1.00 SQ.M.
NON GRANULAR BACKFILL 1.00 CU.M.
EXCAVATION MANUAL:
COMMON EARTH 1.00 CU.M.
LOAN OF SAND 1.00 CU.M.
CLAY OR HEAVY SOIL ROCK 1.00 CU.M.
ROCK 1.00 CU.M.
MECHANICAL EXCAVATION
COMMON EARTH 1.00 CU.M.
ROCK W/ JACKHAMMER 1.00 CU.M.
BACKFILLING
COMMON MANUAL 1.00 CU.M.
GRAVEL FILL MANUAL 1.00 CU.M.
TRENCHING AND BACKFILLING OF UNDERGROUND
PIPING USING EXCAVATION MATERIALS MANUAL
FROM 0 TO 2 MTRS. DEPTH 1.00 L.M.
2 TO 3 1.00 L.M.
3 TO 4 1.00 L.M.
4 TO 5 1.00 L.M.
PLACING BINDER GRAVEL 1.00 CU.M.
ESCOMBRO BACKFILLING 1.00 CU.M.
SPREADING, TAMPING AND GRADING 1.00 SQ.M.
MECHANICAL COMPACTION, PLATE COMPACTION 1.00 CU.M.
MANUAL CLEARING AND GRUBBING
CLEARING UNDERGROWTH AND TREES 12" 1.00 SQ.M.
CLEARING UNDERGROWTH AND SHRUBS 1.00 SQ.M.
DISPOSAL OF SOIL 1.00 CU.M.
MAULING OF SOIL 1.00 CU.M.
GRAVEL FILL 1.00 CU.M.
EXCAVATION CRANE AND CLAMPSHELL
. WITH 8-MEN AND 2 CARPENTERS 1.00 CU.M.
L. TRADE INSULATION
EQUIPMENT INSTALLATION
VESSEL, EXCHANGE & TANKS
FIELD FABRICATION INSULATION 1.00 S.M.
FIELD FABRICATION SHEET METAL COVER 1.00 S.M.
APPLY INSULATION 1.00 S.M.
APPLY SHEET METAL COVER 1.00 S.M.
PUMPS, COMPRESSORS & TURBINES
FABRICATE 1.00 S.M.
APPLY 1.00 S.M.
PIPINGS AND COMPONENT INSULATION
FIELD FABRICATE 1.00 FLG.
FIELD FABRICATESHEET METAL COVER 1.00 S.M.
APPLY INSULATION 1.00 L.M.
APPLY SHEET METAL COVER OR METAL COVER 1.00 EACH
FABRICATE INSTRUMENT COVER 1.00 EACH
INSTALL INSTRUMENT COVER 1.00 EACH
INSULATE PIPE HANGERS 1.00 EACH
FOR STREAM TRACED LINES 1.00 L.M.
REMOVAL OF OLD OR EXISTING INSTALLATION 1.00 L.M.
M. TRADE:FIRE PROOFING
INSTALL STUDS 1.00 EACH
INSTALL MESH 1.00 S.M.
POURED
FORMING 1.00 S.M.
STRIP FORMS 1.00 S.M.
POUR CONCRETE 1.00 S.M.
CURING/PATCHING 1.00 S.M.
FINISHING 1.00 S.M.
TROWEL, PLASTERED 1.00 S.M.
PNEUMATIC APPLICATION
GUNITE 1.00 S.M.
APPLY FINEBRICK OR BLOCK 1.00 PC.
REMOVAL OF EXISTING OR OLD FIREPROOFING 1.00 S.M.
APPLY FIREPROOFING PAINT 1.00 S.M.
FIRE PROTERCTION:
FIRE PROTECTION EQUIPMENT INSTALLATION:
MONITOR 1.00 EACH
HOSE REELS AND CARTS 1.00 EACH
FIRE EXTINGUISHERS 1.00 EACH
PERSONAL EQUIPMENT:
EYE WASH 1.00 EACH
SAFETY SHOWERS 1.00 EACH
BREATHING APPARATUS 1.00 EACH
SPRINKLER SYSTEM
SPRAY NOZZLES 1.00 EACH
WATER CANNONS 1.00 EACH
N. TRADE:PERMANENT FENCING
INSTALL FENCE 1.00 L.M.
INSTALL GATES 1.00 L.M.
TO RAIL 1.00 L.M.
BARBE WIRE, 3 STRANDS 1.00 L.M.
O. TRADE:PAINTING WORKS
NEW STRUCTURAL STEEL 1.00 TON
OLD STRUCTURAL STEEL 1.00 S.M.
NEW FLAT FLAT PLATES 1.00 S.M.
SURFACE PREPARATION:
IN TERMS OF WEIGHT 1.00 TON
IN TERMS OF AREA 1.00 S.M.
SAND PREPARATION 1.00 TON
Q. MISCELLANEOUS
WATER STOP INSTALLATION 1.00 L.M.
CAULKING SLAB JOINT 1.00 L.M.
ASPHALTING 1.00 S.M.
GROUTNG AND TOOL PLASTERING 1.00 S.M.
WATER PROOFING RUBBERIZED 1.00 S.M.
COPPER CLADDING ROOF DECK 1.00 L.M.
WATER PROOFING FLINKOTE 1.00 S.M.
DEMOLITION OF ADOBE WALL 1.00 CU.M.
PAINTING 1.00 S.M.
COPPER WATER STOP CUT AND SHAPE 1.00 L.M.
COPPER WATER STOP CUT AND INSTALLATION 1.00 L.M.
SETTING ANCHOR BOLT 1.00 KG
SETTING ANCHOR BOXES 1.00 CU.M.
MAN POWER (NO.)
EXTIMATED DAYS (8HRS) HRS
CREW: TOOLS:
1 CARPENTER LEAD MAN 8 ONE LOT CARPENTRY TOOLS
3 CARPENTERS 24 8 TOOLS HOUR
6 HELPERS 48
10 MANDAYS 80 MANHOURS
MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW
MEDIUM FRAME 36.00 13.85 10.00 7.00
HEAVY FRAME 32.73 12.63 9.11 6.36
STEEL JOIST 40.00 15.37 11.08 7.78
CREW: TOOLS:
1 LEAD MAN 8 0.50 TOWER CRANE
4 RIGGERS 32 2.00 WELDING TRANSFORME
4 FITTERS 32 1.00 LOT TOOLS
2 WELDERS 16 3.50
1 CRANE OPERATOR 8
6 HELPERS 48
18 MANDAYS 144 MANHOURS
MAN-HOURS EQUIPMENT-HOURS
LOW AVERAGE HIGH LOW
CREW: TOOLS:
1 LEAD MAN 8 0.50 20 TON TOWER CRANE
2 RIGGERS 16 2.00 WELDING TRANSFORME
4 FITTERS 32 2.00 CUTTING OUTFIT
2 WELDERS 16 1.00 LOT TOOLS
1 CRANE OPERATOR 8 5.50 EQPT. DAYS
4 HELPERS 32
14 MANDAYS 112 MANHOURS
EQUIPMENT-HOURS
AVERAGE HIGH
2.69 1.94
2.46 1.77
2.98 2.15
7.10 5.12
6.11 4.40
5.24 3.79
6.47 4.68
5.24 3.79
4.68 3.38
4.23 3.06
5.00 3.61
PROJECT TITLE:
LOCATION:
ITEM NO. ITEM OF WORK:
ESTIMATED QUANTITIES: UNIT:
A. MATERIALS:
DESCRIPTION QTY. UNIT UNIT COST
B. LABOR/MANPOWER:
NO. DESCRIPTION NO. NO. DAYS DAILY RATE
C. EQUIPMENT/TOOLS:
NO. DESCRIPTION NO. NO.-DAYS HOURLY RATE
D TOTAL DIRECT COST (A+B+C)
E O.C.M. (% of D)
F CONTRACTIRS PROFIT (% OF D)
G VAT (10% Oof B+C)
H TOTAL COST (D+E+F+G)
I UNIT COST ( DIRECT)
AMOUNT
AMOUNT
AMOUNT
PROBABLE OUTPUT OF HEAVY EQUIPMENT
D. GRADER- 130G
10 Passes 700.00 sq.m./hr 0.001 hr/m²
Subgrading 300.00 sq.m./hr 0.003 hr/m²
Spreading 40.00 cu.m./hr. 0.025 hr/m³
ASPHALT PAVER
ASPHALT DISTRIBUTOR SPRAYING PHALT
PLATE COMPACTOR
Grave Bedding 8.00 cu.m./hr. 0.125 hr/m³
Concrete Vibrator:
Vibrating Concrete 40.00 cu.m./hr. 0.025 hr/m³
MANPOWER:
MATERIALS:
Clearing & Grubbing Lot Grading (Cut & Fill) m3 Trench Excavation
300 30 m3/hr
232.55 m3/hr
232.55 m3/hr
384.62 m3/hr
303.03 m3/hr
769.23 m3/hr
cavation Disposal of Unsuitable Materials m3-km Road way Excavation (m3)
29.41 m3/hr
125.00 m3/hr
125.00 m3/hr
Embankment/Imported Backfill (m3) Subgrade Preparation (m2)
65.00 MT/hr
32.50 MT/hr
300 SQ.M.
Asphalt Cutback MC Grade 70 MT
Asphalt prime coat, SS-1 (.042 drum/mt) drums