Vous êtes sur la page 1sur 1

TABLE OF CONTENTS

GENERAL ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL


G-1 BILL OF QUANTITIES A-1 PERSPECTIVE, TABLE OF CONTENTS S-1 GENERAL NOTES P-1 GROUND FLOOR, TYPICAL SECOND & THIRD EE - 1 GENERAL NOTES, LEGEND,
G-2 BILL OF QUANTITIES FLOOR PLUMBING LAYOUT, FLUORESCENT LIGHT FIXTURE MOUNTING
G-3 BILL OF QUANTITIES A-2 KEY PLAN S-2 GENERAL NOTES GROUND FLOOR, TYPICAL SECOND & THIRD DETAIL, LOAD SCHEDULE, PANEL BOARD
FLOOR WATER LINE LAYOUT DIAGRAM AND ELECTRICAL RISER DIAGRAM ( 3-CL )
G-4 BILL OF QUANTITIES A-3 GROUND FLOOR PLAN, SECOND FLOOR & THIRD FLOOR PLAN, S-3 FOUNDATION PLAN, 2nd & 3rd FLOOR FRAMING PLAN
FRONT ELEVATION, SCHEDULE OF FINISH P-2 ISOMETRIC DRAINAGE LINE LAYOUT, EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 3-CL )
S-4 COLUMN SCHEDULE, SCHEDULE OF FOOTING, ROOF DRAINAGE LAYOUT,
A-4 REAR ELEVATION, LEFT & RIGHT ELEVATION, SCHEDULE FOOTING BEAMS, TYPICAL FOOTING DETAIL SECTION OF DRAIN PIPE EE - 1 GENERAL NOTES, LEGEND FLUORESCENT LIGHT
LONGITUDINAL SECTION & CROSS SECTION DETAIL, ELEVATION OF COLUMN & DETAIL OF WALL AND SPOT DETAIL FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
FOOTINGS PANEL BOARD DIAGRAM AND ELECTRICAL
A-5 GROUND FLOOR, SECOND FLOOR & THIRD FLOOR REFLECTED P-3 ISOMETRIC WATER LINE LAYOUT RISER DIAGRAM ( 6-CL )
CEILING PLAN, ROOF PLAN S-5 PLAN FOOTING F-3, ELEVATION FOOTING F-3, AND SEWER LINE LAYOUT
PLAN FOOTING CF-1 & TYPICAL ELEVATION OF EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 6-CL )
A-6 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN, MICRO-PILE P-4 PLAN OF SEPTIC TANK, LONGITUDINAL
ELEVATIONS & SECTION OF RAMP, SPOT DETAILS SECTION, CROSS SECTION DETAIL,
S-6 SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY MANHOLE COVER DETAIL, CATCH BASIN
A-7 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING, BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB DETAIL, LEGEND AND PLUMBING NOTES
CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION & ELEVATION, TYPICAL BEAM ELEVATION &
SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION TYPE OF STIRRUPS

A-8 STAIR DETAILS S-7 DETAIL OF STAIR, RAMP DETAIL,


DETAIL OF DC-1, DETAIL OF STAIR ON GRADE &
A-9 BAY SECTIONS, DOOR FRAME TYPICAL PLAN & DETAIL OF WALL ON FTB
SECTION, JALOUSIE DETAILS & FIRE ESCAPE DETAILS
S-8 ROOF FRAMING PLAN
A - 10 DETAIL PLAN OF TOILET & SECTION,
DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL S-9 ELEVATION OF END WALL FRAME,
DETAIL SECTION OF PC-1,
A - 11 DETAILS OF BLACKBOARD CONNECTION OF PURLINS TO RG-4,
CONCRETE SUN BREAKER DETAIL

S - 10 TRUSS DETAILS & CONNECTION DETAILS

S - 11 BASE PLATE DETAILS, ANCHOR BOLT DETAIL, ROOF


PANEL SIDE LAP DETAIL, J-BOLT TO PURLIN CONN.
DETAIL, J-BOLT SPACING, PURLIN CONN. DETAIL,
SECTION, TRUSS DETAIL AT GUTTER END

S - 12 FIRE ESCAPE ELEVATION

S - 13 FIRE ESCAPE DETAILS

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 5
NOTE : STANDARD THREE-STOREY TABLE OF CONTENTS A-1
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )