Vous êtes sur la page 1sur 194








PSMM
Philippine Standard Method of
Measurement of Building Works

Eighth Edition, 2 0 1 6

(Langdon
(Langdon && Seah
Seah Philippines
Philippines Inc.)
Inc.)
(Langdon & Seah Philippines Inc.)
PSMM
PHILIPPINE STANDARD METHOD OF
MEASUREMENT OF BUILDING WORKS
EIGHTH EDITION, 2016
ARCADIS
(Langdon & Seah Philippines Inc.)
Langdon & Seah Philippines Inc.
th
4 Floor King’s Court I
2129 Chino Roces Avenue,
Makati City, Philippines
Tel. +63 2 811 2971
Email. info-ph@arcadis.com
Philippine Copyright 2016 by Arcadis
(Langdon & Seah Philippines Inc.) ©
All rights reserved by Arcadis (Langdon & Seah Philippines Inc.). No part of this publication may be used,
reproduced or copied in any form without written permission from Arcadis
FOREWORD
The Philippine Standard Method of Measurement of Building Works was first
published in 1997.
The Eight Edition adapts the rebranding of the company as Arcadis (currently
registered at the SEC as Langdon & Seah Philippines Inc.).
The Philippine Standard Method of Measurement of Building Works has been
utilized on a number of major construction and development projects
throughout the Philippines and to that extent has become an industry
standard.
No part of this publication may be used, reproduced or copied in any form
without written permission from Arcadis.
Contents
Preface 07 20 00 Thermal Protection
General Principles 07 26 00 Vapor Retarders
01 53 00 Temporary Construction 07 30 00 Steep Slope Roofing
02 40 00 Demolition and Structure Moving 07 40 00 Roofing and Siding Panels
03 11 00 Concrete Forming 07 50 00 Membrane Roofing (see 07 10 00)
03 15 00 Concrete Accessories 07 92 00 Joint Sealants
03 20 00 Concrete Reinforcing 08 11 00 Metal Doors and Frames
03 23 00 Stressing Tendons 08 14 00 Wood Doors and Frames
03 30 00 Cast in Place Concrete 08 15 00 Plastic Doors and Frames (see 08 11 00)
03 35 00 Concrete Finishing 08 41 00 Entrances and Storefronts
03 41 00 Precast Structural Concrete 08 44 00 Curtain Wall and Glazed Assemblies
03 45 00 Precast Architectural Concrete 08 51 00 Metal Windows
03 50 00 Cast Decks and Underlayment 08 52 00 Wood Windows
04 20 00 Unit Masonry 08 53 00 Plastic Windows (see 08 51 00)
05 10 00 Structural Metal Framing 08 60 00 Roof Windows and Skylights (see 08 51 00)
05 50 00 Metal Fabrications 08 70 00 Hardware
05 70 00 Decorative Metal (see 05 50 00) 08 80 00 Glazing
06 10 00 Rough Carpentry 08 90 00 Louvers and Vents
06 16 00 Sheathing 09 20 00 Plaster and Render
06 20 00 Finish Carpentry 09 21 16 Wall Assemblies and Cladding
06 40 00 Architectural Woodwork 09 22 36 Lath
06 60 00 Plastic Fabrications (see 05 50 00) 09 30 00 Tile and Slab Finishes
07 10 00 Dampproofing and Waterproofing 09 50 00 Ceiling Systems
09 62 00 Specialty Flooring 26 00 00 Electrical (see 25 00 00)
09 64 00 Wood Flooring 27 00 00 Communications (see 25 00 00)

Copyright : Arcadis
Copyright : Arcadis
EighthEighth
Edition, 2016 ©
Edition, 2016 ©
Contents
09 65 00 Resilient Flooring (see 09 62 00) 28 00 00 Electronic Safety and Security (see 25 00 00)
09 68 00 Carpeting (see 09 62 00) 31 10 00 Site Clearing
09 69 00 Access Flooring 31 20 00 Earth Moving
09 72 00 Wall and Ceiling Coverings 31 41 00 Shoring
09 90 00 Painting and Coating 31 41 16 Sheet Piling
10 14 00 Signage 31 50 00 Excavation Support and Protection
10 21 00 Compartments and Cubicles 31 62 00 Precast Concrete Piles
10 22 00 Partitions 31 62 13 Cast in Place Concrete Piles
10 28 00 Toilet, Bath and Laundry Accessories 31 62 16 Steel Piles
10 44 00 Fire Protection Specialties 31 63 00 Bored Piles
11 00 00 Equipment 31 66 16 Diaphragm Walls

11 24 00 Maintenance Equipment 32 10 00 Bases, Ballasts and Paving


12 30 00 Casework 32 31 00 Fences and Gates
12 40 00 Furnishings and Accessories 32 90 00 Planting
12 93 00 Site Furnishings 33 10 00 Water Utilities
14 00 00 Conveying Equipment (see 11 24 00) 33 30 00 Sanitary Sewerage Utilities (see 33 10 00)
21 00 00 Fire Suppression 33 40 00 Storm Drainage Utilities (see 33 10 00)
22 00 00 Plumbing (see 21 00 00) 33 50 00 Fuel Distribution Utilities (see 33 10 00)
22 40 00 Plumbing Fixtures 33 70 00 Electrical Utilities
23 00 00 Heating, Ventilating and Air Conditioning (HVAC) 33 80 00 Communication Utilities
25 00 00 Integrated Automation Index

Copyright : Arcadis
Copyright : Arcadis
EighthEighth
Edition, 2016 ©
Edition, 2016 ©
Preface
In recent years Quantity Surveying has become a well recognised and increasingly important profession in the construction industry in the Philippines.
With Bills of Quantities being used more extensively for tender documentation it has become necessary to produce a local Standard Method of
Measurement with the following aims in mind:

(a) To produce a method of measurement which is based on local construction techniques and using local terminology

(b) To produce a method of measurement based on local estimating methods

(c) To produce a method of measurement that is consistent and easy to understand

This method of measurement is related to the published "MasterFormat, 2004 Edition Numbers and Titles for the Construction Industry" produced by
the Construction Specifications Institute (Canada) and Construction Specifications Canada. This will make a move towards greater uniformity in the
production of information on construction projects making it more clearly and easily understood by everyone involved.

The launch of PSMM hopes that estimators will be able to price tenders accurately and with confidence and the administration of contracts will
become easier. The PSMM was first published in March 1997, the second in September 1999 and the third in August 2007. The fourth edition adopted
the used of 49 division of MasterFormat, 2004 and six–digit numbering system in place of the familiar five-digit system. Some titles were renamed
but with essentially the same scope as Masterformat, 1995. The fifth edition incorporated comments and suggestion made to the fourth edition.
The sixth and seventh editions integrated the corporate brand of Langdon & Seah and some updates on tabulated rules for the preparation of Bill of
Quantities. The Eight Edition adapts the rebranding of the company as Arcadis (currently registered at the SEC as Langdon & Seah Philippines Inc.).

In an effort to continuously improve this PSMM we welcome comments and suggestion from clients, consultants, contractors and interested bodies.

This PSMM is produced exclusively for use by Langdon & Seah and expressed written permission should be obtained from us should any third party
wish to make use of it.

January 2016

Copyright : Arcadis
Copyright : Arcadis
EighthEighth
Edition, 2016 ©
Edition, 2016 ©
General Principles 2.2
Horizontal lines divide the classification tables and supplementary rules
into zones to which different rules apply.
1. Introduction
1.1 Classification Tables
This Standard Method of Measurement provides a uniform basis for 2.3
measuring building works and embodies the essentials of good practice. Bills In referring to columns in classification tables, the measurement unit
of Quantities shall fully describe and accurately represent the quantity and column has been disregarded. The remaining four columns are herein
quality of the works to be carried out. More detailed information than is referred to as the first, second, third and fourth columns.
required by these rules shall be given where necessary in order to define the
nature and extent of the required work. 2.4
The left hand column of the classification table lists descriptive features
1.2 commonly encountered in building works. The next column lists further
The rules apply to measurement of proposed work and executed work. sub-groups into which each main group of items shall be divided and
1.3 similarly the third column provides for further division. The lists in these
Work is held to be carried out in accordance with the relevant Specification columns are not intended to be exhaustive.
Clauses and drawings as though they were fully set out in the bills of 2.5
quantities. Each item description shall identify the work with respect to one
2. Use of the tabulated rules descriptive feature drawn from each of the first three columns in the
classification table and as many of the descriptive features in the fourth
Generally column as are applicable to the item.
2.1
The rules in this document are set out in tables. Each table is split into three 2.6
parts: Within the classification table, where a broken line is shown, the rules
(a) Information to be provided which lists any information which is required to given above and below the broken line may be used as alternatives.
be provided with the bills of quantities Supplementary rules
(b) Classification table where the main components of the description are
contained 2.7
(c) Supplementary rules for the preparation of the bills of quantities which are Within the supplementary rules everything above the bold horizontal line,
separated into four types; measurement rules, definition rules, coverage which is immediately above the classification table heading, is applicable
rules and supplementary information throughout that table.

Copyright : Arcadis
Copyright : Arcadis
EighthEighth
Edition, 2016 ©
Edition, 2016 ©
2.8 are within the boundaries of measured areas. Openings, block-outs or
Measurement rules set out when work shall be measured and the method by wants which are at the boundaries of measured areas shall always be
which quantities shall be computed. the subject of deduction irrespectively of size.

2.9 3.5
Definition rules define the extent and limits of the work represented by a word The requirement to measure separate items for widths or girths not
or expression used. exceeding a stated limit shall not apply where these widths are caused
by voids.
2.10
Coverage rules draw attention to particular incidental work which are held to 4. Descriptions
be included in items.
4.1
2.11 Where work is required to be described as curved it should further be
Supplementary Information defines information which is to be given in described as applicable where the curve is in more than one plane such
descriptions in addition to that contained in the classification table. as domed work.

3. Quantities Curved work is held to include:


(a) all junctions between straight and curved work
3.1 (b) work which is flewing except as otherwise provided
Work is measured net as fixed in position except where otherwise stated in a (c) for any radius
measurement rule applicable to the work.
4.2
3.2 Where sizes are required to be given in descriptions they may be given
Dimensions used in calculating quantities shall be taken to the nearest 10mm in ranges where appropriate.
(i.e. 5mm and over shall be regarded as 10mm and less than 5mm shall be
disregarded). 4.3
Work in repairs should be given separately and described as "in repairs"
3.3 or further described as necessary to convey the nature of the repair
Quantities shall be given to the nearest whole unit except that any quantity work.
less than one unit shall be given as one unit.
4.4
3.4 Dimensions are stated in descriptions generally in the sequence length,
Unless otherwise stated, where minimum deductions for voids are dealt with width, height. Where ambiguity could arise, the dimensions shall be
in this document they shall refer only to openings, block-outs or wants which identified.

Copyright : Arcadis
Copyright : Arcadis
EighthEighth
Edition, 2016 ©
Edition, 2016 ©
4.5 4.10
Information required by the rules of this method of measurement may be The use of a hyphen between two dimensions signifies a range of
given in documents separate from the bills of quantities (e.g. drawings or dimensions exceeding the first dimension stated but not exceeding the
specification). second.
To assist the estimator a precise and unique cross reference should be given
in place of the information within the description of the item concerned. 4.11
Unless otherwise specifically stated in the bills of quantities, the following
4.6 shall be held to be included with all items:
Where information required by the rules of this method of measurement are (a) Labor and all costs in connection therewith
not included in descriptions, that part of the work is held to be at the (b) Materials, goods and all costs in connection therewith
Contractor's discretion unless noted otherwise in drawings or specifications. (c) Assembling, hoisting, fitting and fixing materials and goods in
position
4.7 (d) Plant and all costs in connection therewith
Additional information should be given in descriptions in respect of any (e) Cutting
particular requirements or restrictions on the method of carrying out the work (f) Waste and consumables
which are not otherwise required by the rules of this method of measurement. (g) Design to the extent required by the specification and drawings
(h) Establishment charges, overhead charges, profit, taxes and surtaxes
4.8
Where the nature of base is required to be stated the following general terms 4.12
may be used: Where items are described as "fix only" the rates are held to include (a)
(a) Timber which is held to include plywood, blockboard and all other to (h) above but excluding (b). The rate is also to allow for taking
manufactured building boards delivery on site, unloading, unpacking, returning packing and storing the
(b) Metal which is held to include any type of metal materials and for all sundry materials for fixing such as adhesives,
(c) Concrete which is held to include concrete unit masonry, cementitious mortar for bedding, grouting materials, tying wire, bolts, nails, screws
toppings and cementitious plaster and ties and all consumables.

4.9 4.13
Work is held to include for fixing through any types of finishes applied to the Work is held to include:
surface of the base including glass, stone, ceramic and any other vulnerable (a) All temporary work as necessary and its subsequent removal
materials. including scaffolding, supports, protective screens and the like
unless otherwise required by the rules
(b) All permanent work as necessary in supports, fixings and the like
which is not designed but required to carry out the items

Copyright : Arcadis
Copyright : Arcadis
EighthEighth
Edition, 2016 ©
Edition, 2016 ©
(c) Working in confined spaces 7.1
(d) Giving all necessary notices to government department and utility Where work can be described and given in items in accordance with
companies these rules but the quantity of work required cannot be accurately
(e) Obtaining all necessary licences and paying all fees and charges as determined, an estimate of the quantity shall be given and identified as a
necessary provisional quantity.

5. Catalogued or Standard Components 7.2


Where work cannot be described and given in items in accordance with
5.1 these rules it shall be given as a provisional sum.
A precise and unique cross-reference to a catalogue or to a standard
specification may be given in an item description instead of the description 7.3
required by the rules. Where provisional sums are given the Contractor will be deemed to have
made due allowance in programming, planning and pricing preliminaries.
5.2
Where work is specified by, or referred to, a manufacturer or proprietary 7.4
product it is held to be fixed and include all accessories in accordance with Where prime cost sums for the supply of materials are included in
the manufacturer's recommendations unless described otherwise. descriptions they are held to be the material cost delivered to street level
of the site and the Contractor is to allow in the overall rate for waste on
6. Work of Special Types such materials and for all ancillary materials required for fixing such as
mortar for bedding and jointing, adhesives, screws and other
6.1 consumables. The prime cost will be expended at the discretion of the
Work of each of the following special types shall be separately identified: Project Manager and the adjustment to the overall rate will be the net
(a) Work on or in existing building. difference between the prime cost sum stated in the description and the
(b) Work to be carried out and subsequently removed (other than temporary actual price paid per unit of measurement applied to the net quantity of
works). the particular material as fixed in position.
(c) Work outside the curtilage of the site.
(d) Work carried out in or under water shall be so described stating whether 8. Symbols and Abbreviations
canal, river or sea water and (where applicable) the mean sea levels of
high and low water. 8.1
The following symbols and abbreviations are used in this method of
7. Procedure where the drawn and specification measurement:
information required by these rules is not available

Copyright : Arcadis
Copyright : Arcadis
EighthEighth
Edition, 2016 ©
Edition, 2016 ©
m = meter 9. Definitions
m² = square meter
m3 = cubic meter 9.1
mm = millimeter Where SMM rules describe work as "designed by the Structural
No = number Engineer" or "designed by the Mechanical Engineer" or "designed by the
kg = kilogram Electrical Engineer" it is defined as work which is fully designed and
t = tonne shown on plans and elevations in sufficient detail to measure the
pc sum = prime cost sum quantities and accurately describe the work.
prov sum = provisional sum
< = not exceeding 9.2
> = exceeding Where SMM rules describe "labors" they are defined as work in cutting,
bending, drilling, shaping and the like.
8.2
Cross reference within the classification tables are given in the form: 9.3
The term “measured separately” in an item description is a convention
Number Number Number Number meaning “not to be priced here”.
Section from first from second from third from fourth
Number : column . column . column . column 9.4
The term “by Others” shall mean works to be carried out by contractors
Example:
(either the main contractor or other nominated sub-contractor or
31 20 00.1.4.1.1
statutory authorities).
31 20 00 Earth Moving
9.5
Excavating
The term “equal and approved equivalent” shall mean materials or
Trenches
equipment equal or better in quality/performance criteria to that stated in
Maximum depth < 2.00m
the specification and/or bidding drawings and subject to the approval of
Commencing level stated
the Architect/Design Consultants.
8.3
An asterisk within a cross reference represents all entries in the column in 9.6
which it appears. The term “extra”, “extra for” or “extra over for” preceding any item
description shall mean additional item over and above what is already
8.4 provided. It is deemed to exclude the price of item for which the extra
The digit 0 within a cross reference represents no entries in the column in item will replace.
which it appears.
Copyright : Arcadis
Copyright : Arcadis
Eighth Edition, 2016 ©
Eighth Edition, 2016 ©
01 53 00 Temporary Construction
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Temporary C1 Work is held to S1 Kind and quality of


construction may be include: materials
measured in this (a) all necessary
Section at the incidental work for the
discretion of the proper execution of the
Surveyor. All item
temporary construction (b) clearing away
necessary, but not (c) making good all
measured separately work disturbed
in this Section, is held (d) adapting and
to be included within altering during the
the Preliminaries progress of the
Section of the Bills of permanent
Quantities construction works
(e) maintenance

CLASSIFICATION TABLE

1 Temporary 1 Dimensioned m² 1 Maintaining, S2 Details of the


screens description duration stated following:
m (a) weatherproofing
2 Temporary roofs 2 Adapting, (b) dustproofing
No details stated (c) insulation
3 Temporary (d) fire rating
walkways 3 Disposing of (e) doors and
rainwater, windows
details stated (f) rainwater
installations
4 Providing (g) finishes
openings,
details stated

4 Erosion item
Sedimentation
Control

Copyright : Arcadis 01 53 00/1


Eighth Edition, 2016 ©
02 40 00/1
02 40 00 Demolition and Structure Moving
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 This section is for D1 Materials arising C1 Work is held to S1 Location


work to existing from demolitions shall include:
buildings involving the become the property (a) breaking up and S2 Any repairs or
removal of existing of the Contractor pulling down unwanted adaptations required
materials (other than unless stated structures and their for work to be set
for bonding purposes), otherwise associated aside
unless stated substructures
otherwise D2 Making good (b) carrying out work in S3 Limits on making
includes all labors such a way as to ensure good where new work
M2 Descriptions shall and materials the safety of and cause is included separately
identify the scope and necessary to bring as little inconvenience or is otherwise not
nature of the work, but the disturbed area to as possible to adjoining required as part of
the Contractor shall the same face, color properties and the item
ascertain the actual and texture and in the occupants, the public in
extent of works on site same materials as general, passing S4 Owner's
and allow in the rates the surrounding work vehicles and workmen restrictions on
for everything but excludes painting (c) shoring, needling, method of carrying
necessary or incidental and decorating strutting and all other out the work
to completing the work unless otherwise necessary supports including:
whether specifically described including cutting away (a) method of
mentioned or not existing structures and disposal of materials
finishes as necessary (b) method of shoring
and making good after (c) scaffolding to be
M3 Dimensions given removal used
in the descriptions of (d) dustproof screens,
work are approximate watering debris and all S5 Where work is
and the rates for such other work necessary to known to involve the
work will not be subject keep dust nuisance to a removal of materials
to adjustment if the minimum containing asbestos,
actual dimensions (e) removal, relocation toxic, dangerous or
vary. or adaptation of all other hazardous
attached and associated materials it is so
M4 Inserting new work services, fixtures, described
is described following fittings, finishes and all
the rules in the other work affected
relevant Sections (f) disconnection of
services
(g) preparing for and
jointing new work to
existing

Copyright : Arcadis
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally (continued) (h) preparing exposed


surfaces to receive new
work
(i) wedging and pinning
(j) cutting out fixings
(k) cutting back
reinforcement
(l) disposal of materials
(m) making good all
work disturbed
(n) allowance for any
credit for materials
becoming the property
of the Contractor
(o) all necessary
incidental work for the
proper completion of the
item
C2 Work is held to
include the removal of
asbestos, toxic,
dangerous or other
hazardous materials
including all protective
work or measures as
necessary for their safe
removal and for
disposing to a dump site
approved for the
purpose

C3 Setting aside
includes for:
(a) carefully removing,
disconnecting,
dismantling and
reassembling
(b) cleaning, oiling and
adjusting
(c) repairing damage
caused during removal
(d) provision of suitable
storage

Copyright : Arcadis 02 40 00/2


Eighth Edition, 2016 ©
02 40 00 Demolition and Structure Moving (continued) 02 40 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

1 Demolitions 1 Structures 1 Dimensioned item 1 Setting aside


description materials to
2 Parts of sufficient for remain the
structures identification and property of the
levels to which Owner
structures are
demolished 2 Setting aside
materials for re-
use

3 Leaving parts of
existing structures
temporarily in
position to act as
buttresses

2 Removing 1 Structures 1 Dimensioned m² 1 Inserting new M5 Work in removing D3 Structures C4 Removing


description work, details walls and partitions is include walls, plumbing mechanical
2 Finishes sufficient for m stated measured over integral partitions, floors, and electrical
identification doors, windows, roofs, beams, installations is held to
3 Coverings No 2 Setting aside screens and the like columns, staircases include removing
materials to and includes for their and the like, each of sleeves, filling all holes
4 Fixtures and fittings remain the removal with the wall which are given and capping or sealing
item property of the or partition separately off ends of pipework to
5 Plumbing, Owner remain
mechanical and D4 Finishes include
electrical 3 Setting aside floor, wall, ceiling C5 Removing finishes
installations materials for re- and staircase is held to include
use finishes, removing associated
baseboards and the trims, division strips,
like, each of which nosings and the like
are given separately
C6 Removing
structures should
includes provision for
protecting existing
structures from dust
migration

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

2 Removing
(continued) D5 Coverings
include roof
coverings,
waterproofing and
the like, each of
which are given
separately

D6 Fixtures and
fittings include
doors, windows,
counters, cabinets,
plumbing fixtures
and the like, each of
which are given
separately

3 Alterations 1 Cutting and forming 1 Dimensioned No 1 Extending finishes, M6 New doors,


openings description details stated windows, screens and
sufficient for the like are measured
2 Cutting back identification 2 Inserting new work, in the relevant sections
projections details stated

3 Filling openings

4 Adapting openings

Copyright : Arcadis 02 40 00/4


Eighth Edition, 2016 ©
03 11 00/1
03 11 00 Concrete Forming
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Formwork in post D1 Formwork left in is C1 Formwork is held to S1 Kind and quality of
tensioned work is given that which is not include: materials
under a separate designed to remain in (a) all necessary
heading position but is materials and work for S2 Kind and quality of
nonetheless erecting, easing, fair finishes required
M2 Formwork is impossible to remove striking and removal
measured to concrete and for re-propping as
surfaces which require D2 Permanent required
temporary support formwork is that (b) adaptation to
during casting, except which is designed to accommodate
where otherwise stated remain in position projecting pipes,
in this section reinforcing bars and
the like
M3 Formwork is (c) notching
measured the actual (d) coating with release
surface in contact with agents
the concrete (e) additional formwork
to ends of ground
M4 No deduction is beams, beams,
made for voids upstands, upstand
< 1.00m² beams, channels,
grooves, rebates,
M5 Formwork is not drips, recesses,
measured to surfaces rebates and the like
which are cast against
faces of excavations C2 Refer to Section 03
30 00 - Cast in Place
M6 The area of Concrete, Rule C1, for
intersections of ends of formwork held to be
footings, ground included with cast in
beams, beams, walls, place concrete
upstands, curbs and C3 Formwork to
upstand beams with produce a fair finish is
formwork measured in held to include for all
m² is not deducted necessary sheet lining
materials, forms or
M7 Lintels and linings and treating the
stiffeners in masonry finished face of the
walls are measured in concrete to produce
Section 04 20 00 - Unit the required formed
Masonry finish

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Sides of footings m² 1 Left in D3 Footings include


column bases, isolated
2 Sides of wall 2 Permanent footings, pedestals and
footings the like
3 Sloping
3 Sides of pile caps D4 Ground beams
4 Curved include tie beams and
4 Sides of ground the like
beams
D5 Edges of mat
5 Edges of mat foundations includes
foundations sides of lift pits and the
like formed within the
mat foundation

6 Columns m² M8 Where columns are D6 Columns include


attached to walls and casings to structural
the concrete is the steel columns
same grade in both,
formwork to columns is
measured to the
projecting faces and
margins of the columns
only

M9 If the width of a
column is > four times
its thickness it is
classified as a wall

7 Walls m² M10 Formwork is C4 Forming


measured to both triangular fillets
8 Retaining walls faces of walls

9 Parapet walls and


planter walls

Copyright : Arcadis 03 11 00/2


Eighth Edition, 2016 ©
03 11 00 Concrete Forming (continued) 03 11 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

10 Soffits of slabs 1 Slab thickness 1 Height to soffit m² 1 Left in D7 Formwork to soffits


< 200mm < 3.50m of slabs include:
11 Soffits of landings 2 Permanent (a) soffits of ramp
2 Slab thickness 2 Thereafter in 1.50m slabs
12 Soffits of spiral > 200mm, stages 3 Sloping (b) soffits of landings
ramps thickness stated in occurring at floor level
further stages of 3 Strutting over lift or 4 Curved (c) slabs to watertank
200mm duct shafts (d) including removal
including temporary at restricted opening
bearers or
platforms D8 Soffits of landings
are soffits of
intermediate landings
to staircases

13 Soffits of waffle 1 Size of recesses 1 Height to soffit m² M11 Measured the flat D9 Soffits of waffle and
slabs and profile, centers < 3.50m area of the soffit with troughed slabs include
of recesses and no allowance for the margins whose width is
14 Soffits of troughed overall slab 2 Thereafter in 1.50m profile of the recesses < 500mm
slabs thickness stated stages

15 Sides and soffits 1 Height to soffit m²


of stepped-slab < 3.50m

16 Soffits of 2 Thereafter in 1.50m


staircases stages

17 Soffits of spiral
staircases

18 Sides and soffits 1 Depth < 0.75m 1 Height to soffit m² M12 Edges of D10 Depths of beams S3 Curved beams are
of beams and < 3.50m suspended slabs and girders attached to separated by those
girders 2 Depth > 0.75m associated with slabs are measured curved on plan and
2 Thereafter in 1.50m attached beams and from the soffit of the those curved on
stages girders at slab slab elevation
perimeters are
included with the D11 Beams and
beams and girders girders include casings
to structural steel
beams and girders

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

19 Edges of walls 1 Width > 300mm m² 1 Left in D12 Edges of walls


20 Soffits of walls includes edges of
2 Permanent projections on walls
2 Width < 300mm m
21 Edges of slab on and are measured to
3 Sloping both edges in all cases
grade, beds and
the like 4 Curved D13 Edges of slab on
22 Edges of grade include edges of
suspended slabs thicknessing and the
width is based on the
23 Edges of landings overall thickness of
slab on grade and
24 Edges of machine thicknessing
bases and plinths
D14 Edges of
25 Sides of upstand suspended slabs
beams exclude those
associated with
26 Sides of curbs, attached beams and
upstands, zocalos girders at slab
and the like perimeters

27 Edges of drop D15 Steps in soffits


panels includes edges of
thickenings to
28 Steps in top suspended slabs
surfaces
29 Steps in soffits

30 Risers 1 Undercut 1 Width < 150mm m 1 Curved

2 Thereafter in
stages of 150mm

31 Open strings 1 Extreme width m 1 Curved


< 150mm

2 Thereafter in
stages of 150mm
M13 Top formwork is
32 Top formwork m² 1 Curved measured to surfaces
sloping > 15º or where
otherwise specifically
required

Copyright : Arcadis 03 11 00/4


Eighth Edition, 2016 ©
03 11 00 Concrete Forming (continued) 03 11 00/5
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

33 Channels 1 Cross sectional m 1 Curved C4 Channels are held


size and shape to include outlets

34 Sunbreakers, fins, m² 1 Curved M14 Work is not


hoods, fascias, differentiated between
cantilevered m horizontal, vertical and
planter boxes and sloping surfaces
the like No

35 Copings

36 Corbels

37 Counters, shelves
and the like

38 Louvers

39 Rounded edges 1 Size and shape m 1 Curved


stated
40 Molded edges

41 Ornamental 1 Grooves 1 Size and shape m 1 Curved M15 Ornamental


features to fair stated features are only
faced concrete 2 Rebates measured to formwork
to produce a fair faced
3 Drips finish

4 Chamfers and
splays

5 Recesses

42 Sump pits 1 Dimensioned No 1 Left in


description
43 Complex shapes 2 Permanent

Copyright : Arcadis
Eighth Edition, 2016 ©
03 15 00 Concrete Accessories
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Concrete D1 Joints include S1 Kind and quality


accessories in post control joints, of materials
tensioned work are construction joints,
given under a separate expansion joints and
heading contraction joints

CLASSIFICATION TABLE

1 Designed joints 1 Dimensioned m 1 Curved M2 Locations should C1 Waterstops are S2 Details of


description and follow the held to include welded (a) fillers and
location 2 Waterstops classifications in joints and special sealants
Section 03 30 00 - fittings at ends, angles (b) waterstops
3 Sealants Cast in Place Concrete and intersections (c) dowel bars
(where measured as
4 Formwork C2 Cutting and fitting part of the joint)
around reinforcement
and dowel bars are
held to be included

2 Joints not designed M3 This item is C3 Joints are held to


by the Structural item included in the bills of include:-
Engineer quantities, even if (a) formwork
joints are designed by (b) fillers and sealants
the Structural (c) waterstops
Engineer, so that any (d) dowel bars
additional joints (e) additional
required for the reinforcement required
Contractor's method of due to the joint
working can be allowed (f) all other necessary
for work

Copyright : Arcadis 03 15 00/1


Eighth Edition, 2016 ©
03 20 00/1
03 20 00 Concrete Reinforcing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Reinforcement in C1 The following are S1 Kind and quality


post tensioned work is held to be included: of materials
given under a separate (a) tying wire
heading (b) special joints where
not designed by the
M2 Bar reinforcement Structural Engineer
will be calculated at the (c) cutting and bending
following weights per (d) additional
metre: reinforcement around
holes for pipes and
Diameter Kg/m around openings
6mm 0.222 < 1.00m² sectional
8mm 0.395 area
10mm 0.616 (e) provision of test
12mm 0.888 certificates and
16mm 1.579 reinforcement for
20mm 2.466 testing
25mm 3.854
28mm 4.833
32mm 6.313
36mm 7.991
40mm 9.864
44mm 11.926
50mm 15.413
56mm 19.318

M3 Where locations
are required they
should follow the
classifications in
Section 03 30 00 -
Cast in Place Concrete

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Bar 1 General 1 Diameter stated kg 1 Bent to suit curved D1 Where bars are C2 The contractor is to
reinforcement and location concrete shown in lengths allow in his rates for
> 12m they are any additional
2 Links, stirrups and 2 Helical measured in 12m laps/slices required to
binders lengths with suit his construction
3 > 12m in length, allowance for laps at methodology
3 Spacers and chairs given in stages of joints unless
designed by the 3m specifically required
Structural Engineer by the Structural
Engineer to be in
other lengths

D2 Bar reinforcement
includes dowel bars
4 Spacers and chairs item M4 This item is
not designed by the included in the bills of
Structural Engineer quantities, even if
spacers and chairs are
designed by the
Structural Engineer, so
that any additional
spacers and chairs
required by the
Contractor can be
allowed for

5 Special joints 1 In vertical bars No D3 Special joints


designed by the include welded or
Structural Engineer 2 In horizontal bars screwed sleeve joints

Copyright : Arcadis 03 20 00/2


Eighth Edition, 2016 ©
03 20 00 Concrete Reinforcing (continued) 03 20 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

2 Fabric 1 Dimensioned 1 Minimum laps m² 1 Bent to suit curved M5 Fabric is measured C3 Fabric
description or concrete work the net area covered reinforcement is held
weight per “m²” and with no allowance for to include:
location 2 In casings to laps (a) notching around
structural steel, obstructions
columns, beams M6 No deduction is (b) extra material for
and girders made for voids laps
< 1.00m² (c) spacers and chairs
whether designed by
the Structural Engineer
or not

C4 Fabric in casings to
structural steel,
columns, beams and
girders is held to
include welding to the
structural steel
member

Copyright : Arcadis
Eighth Edition, 2016 ©
03 23 00 Stressing Tendons
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally S1 Kind and quality


P1 Particulars of whether tendons are to be of materials
(a) pre-tensioned
(b) post tensioned
(c) tensioned as the load is applied.

CLASSIFICATION TABLE

1 Tendons 1 In suspended slabs 1 Number and m² 1 Curved M1 Lengths are given C1 Work is held to S2 Details of:
diameter of strand, as a straight line include: (a) ultimate tensile
wire or bars which between outer faces of (a) ducts and grouting strength and jacking
make up the anchorages with no to ducts force applied to
tendons allowance for (b) anchorages tendons
undulations along the including anchor (b) duct type and
length of the tendon plates, cones, wedges size
and the like (c) type of grout
(c) sheathing (d) anchorages
(d) supports to the (e) type of sheathing
material used in the (if any)
formation of ducts
(e) forming and
grouting of air holes
2 In beams 2 Number, length No (f) degreasing,
and diameter of straightening, cutting to
strand, wire or bars lengths and
which make up the assembling tendons
tendons and cutting off ends
after tensioning
(g) formwork to form
recesses for
2 Contractor’s 1 In suspended slabs 1 Jacking force m²
anchorages and filling
Designed Tendons applied and
with grout
reference

2 In beams 2 Jacking force No


applied, length and
reference

Copyright : Arcadis 03 23 00/1


Eighth Edition, 2016 ©
03 23 00 Stressing Tendons (continued) 03 23 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

3 Production of item C2 Design information S3 Details of


design information is held to include: drawings and other
(a) design drawings design information
(b) working drawings required
(c) structural
calculations
(d) all other information
necessary to evaluate
the Contractor's design
(e) presentation of
design information to
the Project Manager
and Structural
Engineer and
incorporating any
design revisions as
requested

Copyright : Arcadis
Eighth Edition, 2016 ©
03 30 00 Cast in Place Concrete
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Concrete in post C1 Work is held to S1 Composition and


tensioned work is given include: mix or strength
under a separate (a) forming or cutting requirements
heading grooves, rebates,
drips, chamfers, S2 If reinforced
M2 Concrete volume is splays, recesses and
measured net except the like (other than in
that no deductions are fair faced concrete to
made for: form ornamental
(a) openings < 1.00m² features)
(b) reinforcement (b) forming or cutting
(c) steel sections chases, mortices and
(d) cast in accessories notches
(e) conduits, pipes, (c) forming or cutting
ducts and the like holes for pipes
(d) forming or cutting
M3 Slabs, beds and openings < 1.00m²
the like include sectional area
thickenings thereto (e) infilling to formed or
unless required to be cut openings <1.00m²
given separately with concrete including
all necessary additional
M4 Walls, beams and formwork
the like include (f) grouting in
projections thereto balusters, bolts,
unless required to be dowels, cramps and
given separately the like with cement
(g) casting in of fixings,
M5 Lintels and inserts, sleeves and
stiffeners in masonry accessories and
walls are measured in forming blockouts for
Section 04 20 00 - Unit all other trades as
Masonry necessary, including
those not forming part
of the contract,
including curtain
walling, mechanical,
electrical, elevator,
structural steelwork
and gondola
installations

Copyright
Copyright : Arcadis
: Arcadis 03 30 00/1
Eighth
Eighth Edition,
Edition, 2016
2016 ©©
03 30 00 Cast in Place Concrete (continued) 03 30 00/2

INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

Generally (continued) (h) making good


(i) sampling, testing
and curing
requirements
(j) laying in bays
(k) finishing with a
tamped finish
(l) sundry items of a
like nature
C2 Reinforced
concrete is held to
include for vibration

CLASSIFICATION TABLE

1 Blinding beds 1 Thickness stated m³ 1 Sloping < 15º C3 Blinding beds are
held to include:
2 Sloping > 15º (a) formwork
(b) casting against face
3 Vertical of excavations

2 Wall footings and m³ 1 Casting against M6 Wall footings are D1 Ground beams
the like faces of measured between include tie beams
excavations attached column bases and the like
3 Column bases,
isolated footings, M7 No deduction in the
pedestals and the volume of pile caps for
like the volume occupied
4 Pile caps by the piles

5 Ground beams

6 Mat foundations

7 Columns m³ M8 If the width of a


column is > four times
8 Casings to its thickness it is
structural steel classified as a wall
columns
M9 Columns are
measured through the
slabs

Copyright
Copyright : Arcadis
: Arcadis
Eighth
Eighth Edition,
Edition, 2016
2016 ©©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

9 Walls 1 Thickness stated m³ 1 Casting against M10 Walls are D2 The stated C4 Laying or finishing
faces of measured between thickness is that of to falls, currents or
10 Retaining walls 2 Average thickness excavations columns the general area cambers are held to be
stated and excludes included
11 Parapet walls and M11 Partition walls are thickenings,
planter walls measured up to soffit projections and
of slabs or beams recesses

12 Slab on grade, 1 Casting against M12 The measurement D3 Average


beds and the like faces of of suspended slabs are thickness is only
excavations taken across attached stated if the slab or
2 Sloping < 15º beams except where wall is constantly
beams are of a varying
3 Sloping > 15º different mix
D4 Walls include
M13 Where two triangular fillets
different thickness of
13 Suspended slabs 1 Sloping < 15º slab crosses an D5 The stated
attached beam the thickness of waffle
14 Waffle slabs 2 Sloping > 15º smaller slab will govern and troughed slabs
except where beams is the overall
15 Troughed slabs are of a different mix thickness
16 Machine bases M14 Where there are
two suspended slabs D6 Suspended
and plinths slabs include:
that crosses / abut a
beam at two different (a) ramp slabs
m³ location only the top (b) landings at floor
17 Stepped slab level
most slab will be
deducted from the (c) attached drop
beam except where panels
beams are of a
different mix D7 Stepped slabs
M15 Waffle and are measured
troughed slabs include regardless of their
margins whose width is thickness
< 500mm. Wider
margins are included D8 Support beams
with suspended slabs to stepped slab are
M16 Volume of measured under
waffles/troughs are to 03 30 00.18
be deducted

Copyright : Arcadis 03 30 00/3


Eighth Edition,:2016
Copyright ©
Arcadis
Eighth Edition, 2016 ©
03 30 00 Cast in Place Concrete (continued) 03 30 00/4

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

18 Beams and m³ M17 Work is measured


girders between columns

19 Casings to
structural steel
beams and girders

20 Upstand beams

21 Staircases m³ C5 Staircases include


steps, strings,
intermediate landings
and aprons

C6 Support beams are


measured under 03 30
00.18

22 Shoulders of 1 Extra over slabs m³ 1 Permanent mesh to D7 Shoulders to C7 Additional formwork


different mix or form shoulders beams and slabs to form shoulders is
grade of concrete 2 Extra over beams are only measured held to be included
where designed by
the Structural
Engineer

23 Curbs, upstands, m³
zocalos and the
like

24 Sunbreakers, fins,
hoods, fascias,
cantilevered
planter boxes and
the like

Copyright
Copyright : Arcadis
: Arcadis
Eighth
Eighth Edition,
Edition, 2016
2016 ©©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

25 Copings

26 Corbels

28 Counters, shelves
and the like

29 Louvers

Copyright
Copyright : Arcadis
: Arcadis 03 30 00/5
Eighth
Eighth Edition,
Edition, 2016
2016 ©©
03 35 00/1
03 35 00 Concrete Finishing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 No deduction is S1 Kind and quality


made for voids of materials
< 1.00m²

CLASSIFICATION TABLE

1 Surface finishes to 1 Power floating m² 1 Sloping > 15º C1 Surface finishes


unset concrete are held to include
2 Trowelling 2 Curved work to falls, currents
and slopes < 15º
3 Wood floating 3 Surface treatment,
details stated
4 Broom finishing

2 Surface finishes to 1 Rubbed finish 1 Floors m² 1 Surface treatment, D1 Beams attached C2 Floors are held to S2 Description of
set concrete details stated to ceilings are include work to falls, finish required and
2 Hacking 2 Landings classified as the currents and slopes method of achieving
same height to soffit
3 Grinding 3 Walls and columns as the ceiling where
the finish is the same
4 Sandblasting 4 Treads, risers and in nature
strings

5 Ceilings and beams m² 1 Height to soffit


> 3.50m above
6 Soffits of staircases floor in stages of
and landings 1.50m

2 Curved

3 Surface treatment,
details stated

Copyright : Arcadis
Eighth Edition, 2016 ©
03 41 00 Precast Structural Concrete
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Large precast


P1 A general description of the prestressed precast units and the system and method of tensioning concrete units such as
slabs, wall, stair and
P2 Particulars of: the like are included in
(a) Tendons and any preparatory treatment this section
(b) Whether tendons are to be pre-tensioned or post tensioned or tensioned as the load is applied.
(c) Maturity of concrete before pre-tensioning is released or post-tensioning is applied
(d) Tests to be applied
P3 Work is given under the following headings:
(a) Pre-tensioned in the mould
(b) Post-tensioned on the ground after casting
(c) Cast in sections, assembled and post-tensioned before erection
(d) Cast in sections for assembly in-situ and post tensioned after erection
(e) Post-tensioned after hoisting but capable of self support
(f) Post-tensioned after hoisting but requiring support until tensioning is complete

CLASSIFICATION TABLE

1 Type or name 1 Dimensioned m² M2 Precast Structural C1 Work is held to


stated description units are measured in include for special
m accordance with fittings
Section 03 45 00 -
No Precast Architectural
Concrete

Copyright : Arcadis 03 41 00/1


Eighth Edition, 2016 ©
03 45 00/1
03 45 00 Precast Architectural Concrete
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Small prestressed C1 Work is held to S1 Kind and quality


precast concrete units include: of materials
such as copings, cills (a) moulds
and the like are (b) reinforcement S2 Method of fixing
included in this (c) all work in bedding
Section. and fixing S3 Surface finishes
(d) temporary supports
M2 Lintels in masonry (e) cast-in accessories S4 Reinforcement
walls are measured in (f) pretensioning details
Section 04 20 00 - Unit (g) additional
Masonry reinforcement not S5 Details of any
designed but cast-in accessories
necessary for handling
purposes S6 Pretensioning
materials and
stresses

CLASSIFICATION TABLE

1 Type or name 1 Dimensioned m² 1 Curved


stated description

No

2 Extra over for 1 Special fittings 1 Dimensioned m 1 Curved M3 Special fittings are D1 Special fittings are
description only measured on ends, angles and
No items measured “m” or intersections which
“m²”, where applicable differ from the general
design

Copyright : Arcadis
Eighth Edition, 2016 ©
03 50 00 Cast Decks and Underlayment
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Work is measured D1 The thickness C1 Work is held to S1 Kind, quality,


that in contact with the stated is the include: composition and mix
base and no deduction nominal thickness (a) fair joints to all of materials including
is made for voids types of work including waterproofing agents
< 0.50m² to existing and other admixtures
(b) fair edges, angles
and intersections S2 Fabric or other
(c) rounded edges, reinforcement
angles and required
intersections
(d) throats, drips, S3 Number of coats
grooves and the like
(e) working into S4 Method of
recessed duct and application
manhole covers
(f) dishing to outlets S5 Nature of base
and gullies
(g) working up to S6 Surface finish or
flashings and frames materials to be
(h) forming or working received
into channels < 50mm
deep
(i) working over and
around obstructions
(j) preparing bases
including hacking
concrete to form a key
(k) laying in bays
(l) bonding agents
where necessary or
required
(m) internal angle fillets
(n) temporary formwork
to edges
(o) sundry items of a
like nature

Copyright : Arcadis 03 50 00/1


Eighth Edition, 2016 ©
03 50 00 Cast Decks and Underlayment (continued) 03 50 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Floors 1 Thickness m² 1 Sloping > 15º D2 Floors include to C2 Floors and roofs
floors within roof are held to include for
2 Landings 2 Curved spaces laying to falls, currents
3 Roofs and slopes
3 Patterned, details < 15º
stated

4 Worktops, vanity 1 Thickness m² 1 Curved


tops, seats and the
like 2 Patterned, details
stated
5 Watertank sides
and bases

6 Baseboards 1 Dimensioned m 1 Curved M2 Linings to channels C3 Linings to channels


description are only measured and coverings to curbs
7 Treads 2 Patterned, details where > 50mm deep are held to include
8 Risers stated additional work to ends

9 Strings
10 Splashbacks
11 Fascias
12 Linings to
channels
13 Coverings to
curbs
14 Cappings

15 Angle fillets 1 Cross sectional m D3 (Isolated) Angle


size fillets are those not
associated with
cementitious decks
and toppings. Those
associated with
toppings are held to
be included by C1 (m)

Copyright : Arcadis
Eighth Edition, 2016 ©
04 20 00 Unit Masonry
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 This section is for: C1 Work is held to S1 Kind and quality


(a) concrete hollow include: of materials
blocks (a) all cutting
(b) solid concrete (b) projecting and
blocks recessed courses
(c) bricks (c) packing at heads
(d) glass blocks (d) raking out joints to
form a key
M2 No deductions are (e) raking out joints for
made for: flashings, asphalt nibs
(a) voids < 1.00m² and the like and
(b) the area taken up pointing
by lintels and cills (f) cutting and bonding
together walls of
M3 Block and brick different construction
walls are measured the (g) forming square,
mean length rebated and irregular
reveals, ends and
angles
(h) forming openings
< 1.00m² including
providing lintels
(i) forming, leaving or
cutting chases,
grooves, rebates,
throats, splays,
chamfers, notches,
holes and mortices
(j) cutting and pinning
ends of steel beams
and the like
(k) obtaining and
building in position all
inserts including bolts,
fixings, cores, pipes,
sleeves and the like
(supply of inserts
included elsewhere)
(l) making good
(m) sundry items of a
like nature

Copyright : Arcadis 04 20 00/1


Eighth Edition, 2016 ©
04 20 00 Unit Masonry (continued) 04 20 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Concrete hollow 1 Walls, thickness 1 Built fair and m² 1 Curved D1 Walls are held to C2 Concrete hollow S2 Composition and
block stated pointed one side be vertical and of block walls are held to mix of mortar
constant thickness include for:
2 Solid concrete 2 Built fair and unless otherwise (a) reinforcement S3 Type of pointing
block pointed both sides described including dowel bars where built fair
and starter bars
3 Brick (b) filling cavities with S4 For concrete
mortar hollow block walls,
4 Glass block (c) cast in place details of:
concrete stiffeners and (a) reinforcement
lintel beams including (b) concrete
formwork and stiffeners
reinforcement and
precast concrete
hollow beam blocks
forming lintel beams
(lintels over openings
are measured
separately.
See 04 20 00.10)

C3 Concrete hollow
block walls and solid
concrete block walls
are held to include:
(a) blocks of special
shape and size at
ends, angles or as
otherwise required
(b) concrete infilling
around inserts and
protrusions or as
otherwise necessary

5 Projections 1 Size stated 1 Vertical m 1 Shape described if


other than
2 Horizontal rectangular

2 Built fair and


pointing

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

6 Bonding to existing 1 Thickness of wall m C4 Work is held to S5 Method of


stated include for all labor and bonding
materials in bonding
new walls to existing

7 Mesh reinforcement 1 Width 1 Minimum laps m 1 Horizontal M4 Work is measured C5 Work is held to
in joints of block or the net length covered include extra material
brick walls 2 Vertical with no allowance for for laps
laps
3 Curved
8 Damp-proof
courses

9 Designed joints 1 Dimensioned m 1 Sealants M5 Joints are only C6 Joints not designed S6 Details of
description measured where by the Structural (a) fillers and
2 Curved designed by the Engineer are held to be sealants
Structural Engineer included (b) ties and fixings

10 Lintels 1 Cast in place 1 Dimensioned m M6 Cast in place lintels D2 Lintels are C7 Cast in place lintels
description are given as composite isolated lintels over are held to include:
items and described openings. Lintel (a) reinforcement
giving the information beams in concrete (b) formwork
in the following hollow block walls are
sections as necessary: held to be included C8 Concrete hollow
(a) Section 03 10 00 - with the walls. See beam blocks forming
2 Precast concrete 1 Dimensioned m Concrete Forming 04 20 00.C2 lintels are held to
description (b) Section 03 20 00 - include:
Concrete Reinforcing (a) reinforcement
(c) Section 03 30 00 - including dowel bars
Cast in Place Concrete and starter bars
(d) Section 03 35 00 - (b) filling cavities with
Concrete Finishing mortar
3 Concrete hollow 1 Dimensioned m (c) blocks of special
beam blocks description M7 Precast concrete shape and size at
lintels are measured in ends, angles or as
accordance with otherwise required
Section 03 45 00 - (d) temporary support
Precast Architectural
Concrete

Copyright : Arcadis 04 20 00/3


Eighth Edition, 2016 ©
04 20 00 Unit Masonry (continued) 04 20 00/4

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

11 Bracing to head 1 Height and spacing 1 Thickness of wall m C9 Work is held to S7 Details of
of walls of bracing include for: bracing
(a) all fixing materials
(b) sealants S8 Method of fixing
S9 Nature of base

Copyright : Arcadis
Eighth Edition, 2016 ©
05 10 00 Structural Metal Framing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work is separated D1 Ordinary bolts are C1 Work is held to S1 Types and
P1 The following information is shown on drawings which accompany the bills of quantities into individual plain steel bolts used include: grades of materials
(a) the position of the work in relation to other parts of the work and of the proposed buildings structures each given to join steel members (a) all cutting including
(b) the types and sizes of structural members and their positions in relation to each other under a suitable together and include cutting holes and S2 Surface
(c) details of connections or of the reactions, moments and axial loads at connection points heading to identify the high strength bolts perforations treatments off site
work (b) notching, drilling prior to delivery,
D2 Surface and countersinking details stated
treatments prior to (c) welds, rivets and
erection include blast ordinary bolts with S3 Surface
cleaning, galvanising associated nuts and treatments on site
and protective washers prior to erection,
painting. Painting details stated
after erection is
included in Section
09 90 00 – Painting
and Coating

CLASSIFICATION TABLE

1 Columns 1 Cross sectional 1 Weight per meter kg 1 Curved M2 The mass of


shape and members is measured
2 Beams dimensions 2 Cambered from their overall
lengths with no
3 Purlins 3 Tapered deductions for splay
cuts or mitered ends or
4 Rails 4 Cranked for the mass of metal
removed to form
5 Bracing 5 Castellated notches, holes and
perforations
6 Members of roof
trusses, reference M3 No allowance is
and number stated made for rolling
margins or for the
7 Members of portal mass of weld fillets,
frames, reference ordinary bolts, nuts,
and number stated washers, rivets and
protective coatings
M4 The mass of steel
is taken for
measurement as 7850
Kg/m3

Copyright : Arcadis 05 10 00/1


Eighth Edition, 2016 ©
05 10 00 Structural Metal Framing (continued) 05 10 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

8 Wires and cables kg M5 Connections, caps C2 Tie rods and the


and bases are all like are held to include:
9 Tie rods and the grouped together (a) threaded ends
like irrespective of the type (b) nuts, washers and
or of the member to all other accessories
10 Connections, caps which they are (c) drilling or cutting
and bases attached and include holes in any material
plates, brackets,
cleats, fillets, stiffeners,
packing pieces and
gussets

11 Anchor bolts 1 Details stated No M6 The length of a bolt D3 Special bolts and C3 Work is held to
is measured the length fasteners are those include:
12 Special bolts and of the shaft other than ordinary (a) all labors in
fasteners bolts and anchor bolts fabricating and fixing
(b) nuts, washers and
all other accessories
(c) drilling or cutting
holes in any material
(d) casting in or
building in

13 Permanent 1 Type and method of m² 1 Curved M7 Permanent D4 Permanent


formwork fixing stated formwork includes formwork is that
edges at perimeter and which is structurally
around openings integral with the
framing

14 Cold rolled 1 Purlins 1 Type and method of m 1 Curved M8 Cold rolled


members fixing stated members may also be
2 Cladding rails 2 Cambered measured in ‘kg’

3 Tapered

4 Cranked

15 Wedging and 1 Column bases 1 Size stated No


grouting

16 Filling hollow 1 Concrete 1 Size stated m


sections

Copyright : Arcadis
Eighth Edition, 2016 ©
05 50 00 Metal Fabrications
05 70 00 Decorative Metal
06 60 00 Plastic Fabrications
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Pointing around C1 Work is held to S1 Kind and quality


frames and the like include: of materials
with sealant is (a) bolts, screws,
measured in Section brackets, ties and all S2 Method of
07 92 00 - Joint other fixings, jointing or form of
Sealants, unless noted fastenings and construction
otherwise supports including
drilling or cutting holes S3 Method of fixing
in any material
(b) drilling and S4 Nature of base
plugging concrete,
masonry and the like S5 Surface
with hardwood or treatments and
proprietary plugs for finishes applied
fixing with screws before delivery
(c) notching and holes
(d) bedding in mortar
(e) filling behind
frames with
concrete/mortar
including all necessary
formwork
(f) finishes where part
of the components as
delivered
(g) all necessary
incidental work for the
proper execution of the
item
(h) sundry items of a
like nature

Copyright : Arcadis 05 50 00/1


Eighth Edition, 2016 ©
05 50 00 Metal Fabrications (continued) 05 50 00/2
05 70 00 Decorative Metal (continued)
06 60 00 Plastic Fabrications (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Staircases 1 Dimensioned No M2 Work made up of C2 Work is held to


description structural steel include associated:
2 Ladders members is measured (a) linings, nosings,
in Section 05 10 00 - trims and the like
3 Walkways Structural Metal (b) soffit linings,
Framing spandrel panels and
the like
M3 Balustrades and
handrails are
measured separately,
unless noted otherwise
in descriptions

4 Balustrades 1 Horizontal m 1 Curved C3 Ends, angles,


bends and all other
5 Railings 2 Sloping changes in direction
are held to be included

6 Isolated handrails 1 Brackets C4 Balustrades and


railings include
associated handrails
unless noted otherwise
in descriptions

7 Extra over 1 Special features, No D1 Special features


balustrades for details stated are decorative ends,
decorative angles and
8 Extra over railings other similar features
for which differ
substantially from the
9 Extra over isolated general design
handrails for

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

10 Handrail brackets 1 Dimensioned No M4 Handrail brackets


description are only measured
separately here where
to timber isolated
handrails. Timber
isolated handrails are
measured in Section
06 40 00 -
Architectural
Woodwork

11 Grilles 1 Dimensioned No 1 Hardware


description
12 Gratings

13 Expansion joint 1 Dimensioned m


covers description

14 Column guards

15 Trims, division
strips, cover fillets
and the like

16 Nosings

17 Cappings

18 Baseboards 1 Dimensioned m C5 Ends, angles,


description bends and all other
19 Window boards changes in direction
are held to be included

Copyright : Arcadis 05 50 00/3


Eighth Edition, 2016 ©
06 10 00/1
06 10 00 Rough Carpentry
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally D1 All sizes are C1 Work is held to S1 Kind and quality


nominal sizes unless include: of materials
described as finished (a) all labors
sizes (b) nailing, screwing S2 For solid timber
and gluing if rough or dressed
(c) drilling and plugging and if kiln dried
concrete, masonry and
the like with hardwood S3 Method of
or proprietary plugs for jointing or form of
fixing with nails or construction
screws
(d) punching in nail S4 Method of fixing
heads and covering
with approved wood S5 Nature of base,
filler where other than
(e) countersinking timber
screw and bolt heads
and covering with S6 Preservatives
approved wood filler or treatments applied
wood pellets as part of the
(f) selecting and production process
keeping clean for clear
finishes S7 Surface
(g) notching and holes treatments applied
(h) fair, chamfered, as part of the
splayed and rounded production process
edges
(i) ends, shaped ends, S8 Forest
miters, angles and Stewardship Council
intersections Accreditation
(j) joints including
additional materials
(k) planing one or more
surfaces as necessary
to obtain a level fixing
surface
(l) priming backs,
applying coal tar or
similar protective
coatings prior to fixing

Copyright : Arcadis
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally (continued) (m) provision for wood


preservative treatment
(n) sundry items of a
like nature

CLASSIFICATION TABLE

1 Structural members 1 Floor members 1 Cross sectional m 1 Curved M1 Bridging is D2 Floor members C2 Work is held to
size measured over joists and flat roof members include gusset plates
2 Wall or partition include joists and and the like
members beams

3 Members of roof D3 Members of roof


trusses, reference trusses include top
and number stated and bottom chords,
collar plates,
4 Pitched roof kingposts, web
members members and wood
connectors
5 Flat roof members D4 Pitched roof
members include
6 Plates struts, purlins, rafters,
hip and valley rafters,
7 Bridging ridges, ceiling joists,
binders, cleats and
bracing
D5 Plates are those
to structural elements
only and include
bearers and girts

Copyright : Arcadis 06 10 00/2


Eighth Edition, 2016 ©
06 10 00 Rough Carpentry (Continued) 06 10 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

2 Individual supports 1 Grounds 1 Cross sectional m 1 Curved


size
2 Battens
3 Bearers
4 Packings
5 Fillets
6 Upstands and
curbs
7 Ceiling joist
hangers

3 Framework, surface 1 To floors 1 Size and spacing m² 1 Curved M2 No deduction is C3 Work is held to
fixed made for voids include:
2 To walls and < 1.00 m² (a) additional members
columns at ends, angles,
2 Size, spacing and m intersections,
3 To ceilings and width abutments and for
beams trimming around
openings, projections
4 To soffits of and into recesses
staircases and (b) additional members
landings for fixing partitions,
suspended ceilings,
fixtures, fittings and for
all other fixings as
otherwise required
(c) fixing to any type of
base at abutments

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

4 Framework, self 1 To fascias 1 Size and spacing m² 1 Curved


supporting
2 To eaves soffits
2 Size, spacing and m
3 To vertical pipe width
casings and false
columns

4 To horizontal pipe
casings and false
beams

5 To steel columns

6 To steel beams

7 To suspended
ceilings

8 To bulkheads in
suspended ceilings

9 To light coves 1 Dimensioned m 1 Curved


description

5 Bolts 1 Dimensioned No M3 The length of a bolt C4 Work is held to


description is measured the length include:
6 Tie rods of the shaft (a) all labors in
fabricating and fixing
7 Others, details (b) nuts, washers and
stated all other accessories
(c) drilling or cutting
holes in any material
(d) casting in or
building in

Copyright : Arcadis 06 10 00/4


Eighth Edition, 2016 ©
06 16 00/1
06 16 00 Sheathing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Wood flooring D1 All sizes are C1 Work is held to S1 Kind and quality
when designed as a nominal sizes unless include: of materials
finished surface is described as finished (a) all labors, except as
measured in Section sizes otherwise required S2 For solid timber
09 64 00 - Wood (b) breather paper if rough or dressed
Flooring lining/sheathing and if kiln dried
(c) nailing, screwing
and gluing S3 Method of
(d) drilling and jointing or form of
plugging concrete, construction
masonry and the like
with hardwood or S4 Method of fixing
proprietary plugs for
fixing with nails or S5 Nature of base,
screws where other than
(e) punching in nail timber
heads and covering
with approved wood S6 Preservatives
filler treatments applied
(f) countersinking as part of the
screw and bolt heads production process
and covering with
approved wood filler or S7 Surface
wood pellets treatments applied
(g) selecting and as part of the
keeping clean for clear production process
finishes
(h) notching and holes S8 Size of boards
(i) fair, chamfered, and thickness of
splayed and rounded sheets
edges S9 Low Volatile
(j) ends, shaped ends, Organic Compound
miters, angles and Agrifiber Product
intersections
(k) joints including
additional materials
(l) bands and margins
set out to different
arrangement or pattern
(m) providing panels of
the sizes indicated on
the drawings

Copyright : Arcadis
Copyright : Arcadis
Eighth Edition, 2016 ©
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally (continued) (n) priming backs,


applying coal tar or
similar protective
coatings prior to fixing
(o) provision for wood
preservatives
treatment
(p) sundry items of a
like nature

CLASSIFICATION TABLE

1 Floors 1 Dimensioned m² 1 Curved M2 No deduction is D2 Floors include to C2 Floors and roofs


description made for voids floors within roof are held to include
2 Walls and columns 2 Patterned, details < 1.00m² spaces and to laying to falls, currents
stated landings and slopes
3 Roofs M3 Fascias and eaves
soffits made up of solid D3 Walls and
4 Fascias wood, other than columns include:
boarding, are (a) edges of openings
5 Eaves soffits measured in Section and recesses in walls
06 20 00 - Finish and columns
6 Vertical pipe Carpentry (b) attached pipe
casings, false casings, false
columns and columns and casings
casings to steel to steel columns
columns where they are the
same in nature
7 Horizontal pipe 1 Dimensioned m² 1 Height to soffit D4 Ceilings and
casings, false description > 3.50m above beams include:
beams and casings floor in stages of (a) edges of openings
to steel beams 1.50m and recesses in
ceilings and beams
8 Ceilings and beams 2 Curved (b) bulkheads and
light coves
9 Soffits of staircases 3 Patterned, details (c) attached pipe
and landings stated casings, false beams
and casings to steel
10 Soffits of spiral beams where they
staircases are the same in
nature

Copyright : Arcadis
Copyright : Arcadis
Eighth Edition, 2016 © 06 16 00/2
Eighth Edition, 2016 ©
06 16 00 Sheathing (continued) 06 16 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

11 Soffits of helical D5 Beams attached


m² to ceilings are
ramps
classified as the
same height to soffit
as the ceiling, where
they are the same in
nature

12 Treads 1 Dimensioned 1 Width stated m 1 Curved


description
13 Risers 2 Patterned, details
stated
14 Strings

15 Extra over for 1 Access panels 1 Dimensioned No


description

Copyright : Arcadis
Eighth Edition, 2016 ©
06 20 00 Finish Carpentry
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work is only D1 All sizes are C1 Work is held to S1 Kind and quality
measured nominal sizes unless include: of materials
independently in this described as finished (a) nailing, screwing
section where not sizes and gluing S2 For solid timber
included as part of (b) drilling and if rough or dressed
work measured in plugging concrete, and if kiln dried
accordance with other masonry and the like
sections with hardwood or S3 Method of
proprietary plugs for jointing or form of
fixing with nails or construction
screws
(c) punching in nail S4 Method of fixing
heads and covering
with approved wood S5 Nature of base,
filler where other than
(d) countersinking timber
screw and bolt heads
and covering with S6 Preservatives
approved wood filler or treatments applied
wood pellets as part of the
(e) selecting and production process
keeping clean for clear
finishes S7 Surface
(f) notching and holes treatments applied
(g) fair edges as part of the
(h) ends, shaped ends, production process
miters, angles and
intersections S8 Forest
(i) joints including Stewardship Council
additional materials Accreditation
(j) priming backs,
applying coal tar or
similar protective
coatings prior to fixing
(k) provision for wood
preservative treatment
(l) sundry items of a
like nature

Copyright : Arcadis
Copyright : Arcadis 06 20 00/1
Eighth Edition, 2016 ©
Eighth Edition, 2016 ©
06 20 00 Finish Carpentry (continued) 06 20 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Baseboards 1 Cross sectional m 1 Curved M2 Fascias and eaves


size and shape soffits made up of
2 Dado rails, wood sheet or wood
moldings and the 2 Built up members, boarding are measured
like to walls size of components in Section 06 16 00 -
stated Sheathing
3 Cornices

4 Moldings and the


like to ceilings

5 Trims, cover fillets


and the like

6 Beads

7 Nosings

8 Cappings

9 Window sills

10 Window boards

11 Window casings

12 Fascias

13 Eaves soffits

14 Duct covers

15 Treads

16 Risers

No
17 Isolated features 1 Dimensioned
description
18 Trellis

Copyright : Arcadis
Eighth Edition, 2016 ©
06 40 00 Architectural Woodwork
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally D1 All sizes are C1 Work is held to S1 Kind and quality


nominal sizes unless include: of materials
described as finished (a) all labors
sizes (b) nailing, screwing, S2 For solid timber
gluing, bolting, fixing if rough or dressed
with brackets, ties and and if kiln dried
all other fixings and
fastenings including S3 Method of
drilling or cutting holes jointing or form of
in any material construction
(c) drilling and plugging
concrete, masonry and S4 Method of fixing
the like with hardwood
or proprietary plugs for S5 Nature of base,
fixing with nails or where other than
screws timber
(d) punching in nail
heads and covering S6 Preservatives
with approved wood treatments applied
filler as part of the
(e) countersinking production process
screw and bolt heads
and covering with S7 Surface
approved wood filler or treatments applied
wood pellets as part of the
(f) selecting and production process
keeping clean for clear
finishes S8 Forest
(g) notching and holes Stewardship Council
(h) fair, chamfered, Accreditation
splayed and rounded
edges
(i) ends, shaped ends,
miters, angles and
intersections
(j) joints including
additional materials
(k) bedding in mortar

Copyright : Arcadis 06 40 00/1


Eighth Edition, 2016 ©
06 40 00 Architectural Woodwork (continued) 06 40 00/2

INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

Generally (continued) (l) filling behind frames


with concrete/mortar
including all necessary
formwork
(m) priming backs,
applying coal tar or
similar protective
coatings prior to fixing
(n) provision for wood
preservative treatment
(o) sundry items of a
like nature

CLASSIFICATION TABLE

1 Staircases 1 Dimensioned No 1 Associated M1 Balustrades and C2 Staircases are held


description balustrades and handrails are to include:
handrails measured separately, (a) linings, nosings,
unless noted otherwise cover moulds, trims
in descriptions and the like where part
of the component
(b) soffit lining,
spandrel panels and
the like where part of
the component
(c) ancillary supports,
components,
blockings, wedges and
the like

2 Balustrades 1 Horizontal m 1 Curved M2 Metal brackets to C3 Ends, angles,


isolated handrails are bends and all other
3 Railings 2 Sloping measured in one of the changes in direction
following sections as are held to be included
4 Isolated handrails applicable:
(a) Section 05 50 00 - C4 Balustrades include
Metal Fabrications associated handrails
(b) Section 05 70 00 - unless noted otherwise
Decorative Metal in descriptions

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

5 Extra over 1 Special features, No D2 Special features


balustrades for details stated are newel posts,
ornamental ends,
6 Extra over railings ornamental angles
for and other similar
features which differ
7 Extra over isolated substantially from the
handrails for general design

8 Louvers 1 Dimensioned No 1 Hardware M3 Louvers of any C5 Work is held to


description material other than include all ancillary
wood are measured in trims, supports,
Section 08 90 00 - components and the
Louvers and Vents like

Copyright : Arcadis 06 40 00/3


Eighth Edition, 2016 ©
07 10 00/1
07 10 00 Dampproofing and Waterproofing
07 50 00 Membrane Roofing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work is measured C1 Work is held to S1 Kind and quality


the net area covered include: of materials
with no allowance for (a) fair joints to all including underlays
laps types of work
(b) internal angle fillets S2 Nature of base
M2 All types of (c) dressing over tilting
waterproofing are fillets S3 Number of coats
included in Section (d) fair and rounded
07 10 00 - edges, angles and S4 Method of
Dampproofing and drips application
Waterproofing except (e) turning into grooves
for membrane to roof including additional S5 Treatment of
areas which is materials joints and minimum
measured in Section (f) working into laps
07 50 00 - Membrane recessed duct and
Roofing manhole covers S6 LEED
(g) dishing to outlets Compliance
M3 No deduction is and gullies
made for voids (h) working up to
< 0.50m² flashings and frames
(i) forming or working
into channels < 50mm
deep
(j) working over and
around obstructions
(k) laps, cutting,
notching and bending
(l) preparing bases
including hacking
concrete surfaces to
form a key
(m) rubbing surfaces
with a wood float with
clean sand if required
(n) jointing between
sections where the
nature of the work
requires it to be carried
out in sections
(o) sundry items of a
like nature

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Floors m² 1 Curved D1 Floors include to C2 Floors, landings


floors within roof and roofs are held to
2 Landings 2 Floors, landings spaces include for laying to
or roofs sloping falls, currents and
3 Roofs > 15º D2 Walls and slopes
columns include
4 Walls and columns edges of openings,
recesses and
5 Substructures projections on walls
and columns
6 Water tanks

7 Ceilings and beams m² 1 Height to soffit D3 Ceilings and


> 3.50m above beams include edges
8 Soffits of staircases floor in stages of of openings, recesses
and landings 1.50m and projections on
ceilings and beams
2 Curved
D4 Beams attached
to ceilings are
classified as the
same height to soffit
as the ceiling where
the finish is the same
in nature

9 Turning up at 1 Dimensioned m 1 Curved M4 Linings to channels C3 Linings to gutters


edges description are only measured and channels and
where > 50mm deep coverings to curbs
10 Treads are held to include
M5 Turning up at additional
11 Risers edges > 300mm wide waterproofing to ends
is classified as walls
12 Strings and columns

13 Fascias and
aprons

14 Linings to gutters

15 Linings to
channels

16 Coverings to
curbs

Copyright : Arcadis 07 10 00/2


Eighth Edition, 2016 ©
07 10 00 Dampproofing and Waterproofing (continued) 07 10 00/3
07 50 00 Membrane Roofing (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

17 Linings to 1 Dimensioned No
cesspools, sumps description
and the like

18 Collars around
pipes, railings,
standards and the
like

19 Guarantees 1 Details stated 1 Duration stated item

Copyright : Arcadis
Eighth Edition, 2016 ©
07 20 00 Thermal Protection
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work is measured C1 Work is held to S1 Kind and quality


the net area covered include: of materials
with no allowance for (a) all jointing materials
laps (b) all fixing materials S2 Method of fixing
including bedding
M2 Work includes all mortars, adhesives and S3 Nature of base
types of insulation mechanical fixings
(c) all cutting and fitting S4 Treatment of
M3 No deduction is over and around joints
made for voids obstructions
< 0.50m² (d) cutting holes S5 Extent of laps
(e) preparing bases
(f) extra material for
laps
(g) sundry items of a
like nature

CLASSIFICATION TABLE

1 Floors 1 Thickness m² 1 Across members, D1 Floors include C2 Floors and roofs


centers of floors within roof are held to include
2 Roofs members stated spaces laying to falls, currents
and slopes
3 Walls and columns 2 Between members, D2 Walls and
centers of columns include
members stated edges of openings,
recesses and
3 Curved projections on walls
and columns

4 Ceilings and beams 1 Thickness m² 1 Across members, D3 Ceilings and


centers of beams include edges
5 Soffits of staircases members stated of openings, recesses
and landings and projections on
2 Between members, ceilings and beams
centers of
members stated D4 Beams attached
3 Height to soffit to ceilings are
> 3.50m above classified as the
floor in stages of same height to soffit
1.50m as the ceiling where
the finish is the same
4 Curved in nature

Copyright : Arcadis 07 20 00/1


Eighth Edition, 2016 ©
07 26 00/1
07 26 00 Vapor Retarders
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 No deduction is C1 Work is held to S1 Kind and quality


made for voids include: of materials
< 0.50m² (a) laying to falls,
currents, slopes and to S2 Method of
M2 Work is measured vertical surfaces jointing
the net area covered (b) sealing at joints
with no allowance for (c) extra material for
laps laps

CLASSIFICATION TABLE

1 Vapor barriers 1 Thickness 1 Minimum laps m²

2 Guarantees 1 Details stated 1 Duration stated item

Copyright : Arcadis
Eighth Edition, 2016 ©
07 30 00 Steep Slope Roofing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Work is measured C1 Work is held to S1 Kind, quality and


the net area covered include: size of materials
with no allowance for (a) additional materials
laps for laps S2 Method of fixing
(b) sealants, bedding
M2 Work includes and pointing S3 Nature of base
shingles, shakes, roof (c) fixings
tiles, natural covering (d) special shaped units S4 Minimum laps
and the like (e) all necessary
M3 No deduction is ancillary work
made for voids
< 0.50m²

CLASSIFICATION TABLE

1 Roof coverings 1 Pitch stated 1 Battens m² 1 Counter battens C2 Coverings are held to S5 Spacing of
include: battens and counter
2 Underlay (a) work in forming voids battens
and holes < 0.50m²
3 Curved (b) cutting, fitting and
making good around
outlets, pipes and the
like
(c) additional battens at
ends, angles and the like

2 Ridges 1 Dimensioned m 1 Curved M4 Work to perimeter C3 Work is held to


description of voids is only include:
3 Hips measured where the (a) undercloaks
4 Valleys void is > 0.50 m² (b) tiles and shingles of
special size and shape
5 Eaves to suit the location
(c) bedding and pointing
6 Gables (d) ends, angles and
intersections including
7 Abutments special shaped tiles and
shingles as necessary

8 Special Fittings 1 Dimensioned m D1 Special fittings


description include ventilators,
No finials and the like

9 Guarantees 1 Details stated 1 Duration stated item

Copyright : Arcadis 07 30 00/1


Eighth Edition, 2016 ©
07 40 00/1
07 40 00 Roofing and Siding Panels
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work is measured C1 Work is held to S1 Kind, quality and


the net area covered include: size of materials
with no allowance for (a) additional materials
laps for laps S2 Method of fixing,
(b) sealants, bedding jointing and sealing
M2 No deduction is and pointing
made for voids (c) fixings S3 Nature of base
< 0.50m² (d) special shaped
units S4 Minimum laps
(e) all necessary
ancillary work

CLASSIFICATION TABLE

1 Roof coverings 1 Pitch stated m² 1 Underlay C2 Coverings are held S5 Spacing of


to include: structural supports,
2 Wall coverings 2 Curved (a) work in forming where applicable
voids and holes
< 0.50m²
(b) cutting, fitting and
making good around
outlets, pipes and the
like

3 Ridges 1 Dimensioned m 1 Curved M3 Work to perimeter of C3 Work is held to


description voids is only measured include:
4 Hips where the void is (a) sheets of special
5 Valleys > 0.50 m² size and shape to suit
the location
6 Eaves (b) ends, angles and
intersections including
7 Gables special shaped
8 Abutments flashings, cappings,
junction pieces and the
9 Flashings like as necessary
10 Gutters
11 Filler pieces

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

12 Special fittings 1 Dimensioned m D1 Special fittings


description include:
No (a) ventilators, finials
and the like
(b) translucent sheets
(c) louvers

13 Guarantees 1 Details stated 1 Duration stated item

Copyright : Arcadis 07 40 00/2


Eighth Edition, 2016 ©
07 92 00/1
07 92 00 Joint Sealants
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally

CLASSIFICATION TABLE

1 Joints 1 Dimensioned m 1 Backing rods C1 Work is held to S1 Kind and quality


description include preparation, of materials
2 Pointing cleaners, primers and
sealers appropriate to S2 Method of
the base application

S3 Nature of base

S4 LEED
Compliance

Copyright : Arcadis
Eighth Edition, 2016 ©
08 11 00 Metal Doors and Frames
08 15 00 Plastic Doors and Frames
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 The following are C1 Work is held to S1 Kind and quality of


measured in other include: materials
sections unless noted (a) bolts, screws,
otherwise: brackets, ties and all S2 Method of jointing
(a) pointing around other fixings, or form of
frames and the like fastenings and construction
with sealant in Section supports including
07 92 00 - Joint drilling or cutting holes S3 Method of fixing
Sealants in any material
(b) glazing in Section (b) drilling and S4 Nature of base
08 80 00 - Glazing plugging concrete,
masonry and the like S5 Surface
with hardwood or treatments and
proprietary plugs for finishes applied
fixing with screws before delivery
(c) notching and holes
(d) bedding in mortar
(e) filling behind
frames with
concrete/mortar
including all necessary
formwork
(f) finishes where part
of the components as
delivered
(g) all necessary
incidental work for the
proper execution of the
item
(h) sundry items of a
like nature

Copyright : Arcadis 08 11 00/1


Eighth Edition, 2016 ©
08 11 00 Metal Doors and Frames (continued) 08 11 00/2
08 15 00 Plastic Doors and Frames (continued)
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

1 Doors and frames 1 Dimensioned No 1 Glazing beads M2 Where door and


description frame are of the same
2 Doors 2 Trims material, they may be
measured as
3 Door frames 3 Weather stripping composite item.
4 Roller shutters and Otherwise it will be
frames measured in 08 11 00 -
Metal Doors and
5 Access hatches Frames, 08 15 00 -
and frames Plastic Doors and
Frames or 08 14 00 –
Wood Doors and
Frames

Copyright : Arcadis
Eighth Edition, 2016 ©
08 14 00 Wood Doors and Frames
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 The following are D1 All sizes are C1 Work is held to S1 Kind and quality of
measured in other nominal sizes include: materials
sections unless noted unless described as (a) all labors
otherwise: finished sizes (b) nailing, screwing, S2 For solid timber if
(a) hardware in Section gluing, bolting, fixing with rough or dressed and
08 70 00 - Hardware brackets, ties and all other if kiln dried
(b) pointing around fixings and fastenings
frames and the like including drilling or cutting S3 Method of jointing
with sealant in Section holes in any material or form of
07 92 00 - Joint (c) drilling and plugging construction
Sealants concrete, masonry and the
(c) glazing in Section like with hardwood or S4 Method of fixing
08 80 00 - Glazing proprietary plugs for fixing
with nails or screws S5 Nature of base,
(d) punching in nail heads where other than
and covering with timber
approved wood filler
(e) countersinking screw S6 Preservative
and bolt heads and treatment applied as
covering with approved part of the production
wood filler or wood pellets process
(f) selecting and keeping
clean for clear finishes S7 Surface
(g) notching and holes treatments applied as
(h) fair, chamfered, part of the production
splayed and rounded process
edges
(i) ends, shaped ends,
miters, angles and S8 Forest
intersections Stewardship Council
(j) joints including Accreditation
additional materials
(k) bedding in mortar
(l) filling behind frames
with concrete/mortar
including all necessary
formwork

Copyright
Copyright : Arcadis
: Arcadis 08 14 00/1
Eighth
Eighth Edition,
Edition, 20162016
© ©
08 14 00 Wood Doors and Frames (continued) 08 14 00/2

INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

Generally (continued) (m) priming backs of


frames, applying coal tar
or similar protective
coatings prior to fixing
(n) provision for wood
preservative treatment
(o) sundry items of a like
nature

CLASSIFICATION TABLE

1 Doors and frames 1 Dimensioned No 1 Glazing beads M2 Where door and


description frame are of the same
2 Doors 2 Weather stripping material, they may be
measured as
3 Door frames 3 Architrave composite item.
Otherwise it will be
4 Access hatches measured in 08 11 00 -
and frames Metal Doors and
Frames, 08 15 00 -
Plastic Doors and
Frames

5 Architraves 1 Dimensioned m M3 Architraves are


description measured separately
unless noted otherwise
in descriptions

Copyright
Copyright : Arcadis
: Arcadis
Eighth
Eighth Edition,
Edition, 20162016
© ©
08 41 00 Entrances and Storefronts
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Pointing around C1 Work is held to S1 Kind and quality of


frames and the like include: materials
with sealant is (a) bolts, screws,
measured in Section brackets, ties and all S2 Method of jointing
07 92 00 - Joint other fixings, or form of
Sealants, unless noted fastenings and construction
otherwise supports including
drilling or cutting holes S3 Method of fixing
in any material
(b) drilling and S4 Nature of base
plugging concrete,
masonry and the like S5 Surface
with hardwood or treatments and
proprietary plugs for finishes applied
fixing with screws before delivery
(c) notching and holes
(d) bedding in mortar
(e) filling behind
frames with
concrete/mortar
including all necessary
formwork
(f) finishes where part
of the components as
delivered
(g) all necessary
incidental work for the
proper execution of the
item
(h) sundry items of a
like nature

Copyright : Arcadis 08 41 00/1


Eighth Edition, 2016 ©
08 41 00 Entrances and Storefronts (continued) 08 41 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

1 Entrance screens 1 Dimensioned 1 Type and thickness No 1 Hardware


description of glass
2 Shopfronts 2 Glazing beads

3 Frameless glass 3 Trims


doors
4 Weatherstripping
4 Frameless glass
windows

Copyright : Arcadis
Eighth Edition, 2016 ©
08 44 00 Curtain Wall and Glazed Assemblies
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 No deduction is C1 Work is held to


P1 The following information is provided: made for voids include framework,
(a) the scope, location and layout of the work < 1.00m² fixings, glazing and all
(b) component drawings necessary incidental
work for the proper
execution of the
installation

CLASSIFICATION TABLE

1 Curtain walling 1 Dimensioned m² 1 Sloping M2 Curtain walling is C2 Work is held to S1 Kind and quality
description described as include: of materials
2 Contractor 2 Curved Contractor designed (a) all necessary
designed curtain where the design is not additional work at S2 Method of
walling 3 Flat panes set to completed by the ends, angles, jointing or form of
curve Owner and is left to be intersections, construction
completed by the abutments and the like
3 Extra over for 1 Spandrel panels 1 Dimensioned m² 1 Sloping Contractor (b) bolts, screws, S3 Method of fixing
description brackets, ties and all
2 Curved M3 Window boards are other fixings, S4 Nature of base
only measured in this fastenings and
3 Flat panels set to section where part of supports including S5 Bedding, jointing
curve the curtain walling drilling or cutting holes and pointing
system in any material and compounds
2 Closers around m 1 Curved casting into concrete
door and window (c) trimming around S6 Surface
openings projections treatments and
(d) holes finishes applied
3 Closers at floors (e) bedding in mortar before delivery
(f) sealants and
4 Window boards pointing
(g) finishes where part
of the components as
5 Opening lights No 1 Hardware delivered

6 Doors

Copyright : Arcadis 08 44 00/1


Eighth Edition, 2016 ©
08 44 00 Curtain Wall and Glazed Assemblies (continued) 08 44 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

3 Extra over for C3 Opening lights and


(continued) doors are held to
include:
(a) glazing beads
(b) architraves and
trims
(c) frames
(d) weatherstripping

4 Production of 1 Details given item M4 This item is C4 Design information S7 Details of


design information measured for is held to include: drawings and other
Contractor designed (a) completing all design information
curtain walling only aspects of the design required
not completed by the
Owner
(b) design drawings
(c) working drawings
(d) structural
calculations
(e) all other information
necessary to evaluate
the Contractor's design
(f) presentation of
design information to
the Project Manager
and Structural
Engineer and
incorporating any
design revisions as
requested

5 Tests 1 Details stated item

6 Guarantees 1 Details stated 1 Duration stated item

Copyright : Arcadis
Eighth Edition, 2016 ©
08 51 00 Metal Windows
08 53 00 Plastic Windows
08 60 00 Roof Windows and Skylights
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 The following are C1 Work is held to S1 Kind and quality


measured in other include: of materials
sections unless noted (a) bolts, screws,
otherwise: brackets, ties and all S2 Method of
(a) pointing around other fixings, jointing or form of
frames and the like fastenings and construction
with sealant in Section supports including
07 92 00 - Joint drilling or cutting holes S3 Method of fixing
Sealants in any material
(b) glazing in Section (b) drilling and S4 Nature of base
08 80 00 - Glazing plugging concrete,
masonry and the like S5 Surface
with hardwood or treatments and
proprietary plugs for finishes applied
fixing with screws before delivery
(c) notching and holes
(d) bedding in mortar
(e) filling behind
frames with
concrete/mortar
including all necessary
formwork
(f) finishes where part
of the components as
delivered
(g) all necessary
incidental work for the
proper execution of the
item
(h) sundry items of a
like nature

Copyright : Arcadis 08 51 00/1


Eighth Edition, 2016 ©
08 51 00 Metal Windows (continued) 08 51 00/2
08 53 00 Plastic Windows (continued)
08 60 00 Roof Windows and Skylights (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Windows 1 Dimensioned No 1 Hardware M2 Work contained in


description the fourth column of
2 Window shutters 2 Glazing beads the classification table
3 Rooflights, skylights 3 Trims are only included if
and roof windows supplied with the
4 Weatherstripping component. Otherwise
4 Screens they are measured
5 Glazing separately

M3 Where frames to
windows are of the
same material, they
may be measured as
composite item.
Otherwise it will be
measured in 06 20 00
– Finish Carpentry

Copyright : Arcadis
Eighth Edition, 2016 ©
08 52 00 Wood Windows
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 The following are D1 All sizes are C1 Work is held to include: S1 Kind and quality
measured in other nominal sizes unless (a) all labors of materials
sections unless noted described as finished (b) nailing, screwing,
otherwise: sizes gluing, bolting, fixing with S2 For solid timber
(a) hardware in Section brackets, ties and all other if rough or dressed
08 70 00 - Hardware fixings and fastenings and if kiln dried
(b) pointing around including drilling or cutting
frames and the like holes in any material S3 Method of
with sealant in Section (c) drilling and plugging jointing or form of
07 92 00 - Joint concrete, masonry and the construction
Sealants like with hardwood or
(c) glazing in Section proprietary plugs for fixing S4 Method of fixing
08 80 00 - Glazing with nails or screws
(d) punching in nail heads S5 Nature of base,
and covering with where other than
approved wood filler timber
(e) countersinking screw
and bolt heads and S6 Preservatives
covering with approved treatments applied
wood filler or wood pellets as part of the
(f) selecting and keeping production process
clean for clear finishes
(g) notching and holes S7 Surface
(h) fair, chamfered, treatments applied
splayed and rounded as part of the
edges production process
(i) ends, shaped ends,
miters, angles and
intersections S8 Forest
(j) joints including Stewardship Council
additional materials Accreditation
(k) bedding in mortar
(l) filling behind frames
with concrete/mortar
including all necessary
formwork

Copyright : Arcadis 08 52 00/1


Eighth Edition, 2016 ©
08 52 00 Wood Windows (continued) 08 52 00/2

INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

Generally (continued) (m) priming backs of


frames, applying coal tar or
similar protective coatings
prior to fixing
(n) provision for wood
preservative treatment
(o) sundry items of a like
nature

CLASSIFICATION TABLE

1 Windows 1 Dimensioned No 1 Glazing beads M2 Where frames to


description windows are of the
2 Window shutters 2 Architraves same material, they
may be measured as
3 Rooflights, skylights 3 Weatherstripping composite item.
and roof windows Otherwise it will be
measured in 08 51 00
4 Screens – Metal Windows or 08
53 00 – Plastic
Windows

Copyright : Arcadis
Eighth Edition, 2016 ©
08 70 00 Hardware
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 Work is held to S1 Kind and quality


include: of materials
(a) providing screws,
bolts, nails, pins and all S2 Surface finish
other fixings as
necessary to match the
hardware
(b) all fitting, cutting,
sinking, boring and
mortising to any
backgrounds and
making good
(c) plugging concrete,
masonry and the like
(d) oiling, easing and
adjusting and leaving
in working order at
completion

CLASSIFICATION TABLE

1 Type of item, unit or 1 Nature of base No D1 The nature of C2 Work is held to


set stated stated base is the material of include fixing to any
the main component other backgrounds as
to which it is fixed necessary, even
though the material of
the main component is
the only one stated

Copyright : Arcadis 08 70 00/1


Eighth Edition, 2016 ©
08 80 00/1
08 80 00 Glazing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 Glazing is held to S1 Kind and quality


include: of materials
(a) removing and refixing
glazing beads S2 Method of
(b) raking and curved glazing including
cutting and cutting details of glazing
notches and the like but compound, sealants,
excluding holes gaskets, bedding
(c) provision of glazing strips and the like
compound, sealants,
gaskets, bedding strips, S3 Nature of frame
nails, pins, clips and all or surround
other ancillary glazing
materials but excluding
glazing beads

CLASSIFICATION TABLE

1 Glass 1 Thickness stated 1 Panes < 0.10m² m² 1 Irregular shaped M1 Panes of irregular D1 The following
panes shape are classified glass is enumerated
2 Panes 0.10 - and measured in items 08 80 00.2-4
0.50m² 2 Decorative finish, according to the below:
described smallest rectangular (a) bent or curved
3 Panes 0.50 - area from which the (b) glass with
1.00m² 3 Ground edges pane can be obtained bevelled edges

4 Panes thereafter in 4 Polished edges M2 Glass with a D2 Decorative


1.00m² stages decorative finish is patterns to glass
5 Sandblasted edges measured here where which are not regular
it is a regular finish across the whole
across the whole of the pane are measured
pane as extra over the
glass in item
08 80 00.7.2

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

2 Bent glass 1 Thickness stated 1 Size of pane and No 1 Curved C2 Bevelled edges are
shape where not held to include miters
3 Curved glass rectangular 2 Bent

4 Glass with bevelled 3 Ground edges


edges
4 Polished edges
5 Louvers
5 Sandblasted edges
6 Shelves
6 Bevelled edges

7 Extra over for 1 Holes 1 Size No

2 Decorative No M3 Decorative patterns


patterns, described to glass are measured
here where they are
not a regular pattern
across the whole of the
pane

8 Hacking out 1 Type of surround m 1 Beads for re-use, M4 Hacking out


existing glass and and method of details stated existing glass and
preparing rebates glazing stated preparing rebates is
together with type measured the
of glass perimeter of the pane

Copyright : Arcadis 08 80 00/2


Eighth Edition, 2016 ©
08 90 00/1
08 90 00 Louvers and Vents
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Wood louvers are C1 Work is held to S1 Kind and quality


measured in Section include: of materials
06 40 00 - Architectural (a) bolts, screws,
Woodwork brackets, ties and all S2 Method of
other fixings, jointing or form of
M2 Pointing around fastenings and construction
frames and the like supports including
with sealant is drilling or cutting holes S3 Method of fixing
measured in Section in any material
07 92 00 - Joint (b) drilling and S4 Nature of base
Sealants, unless noted plugging concrete,
otherwise masonry and the like S5 Surface
with hardwood or treatments and
proprietary plugs for finishes applied
fixing with screws before delivery
(c) notching and holes
(d) bedding in mortar
(e) filling behind
frames with
concrete/mortar
including all necessary
formwork
(f) finishes where part
of the components as
delivered
(g) all necessary
incidental work for the
proper execution of the
item
(h) sundry items of a
like nature

CLASSIFICATION TABLE

1 Louvers 1 Dimensioned No 1 Hardware


description
2 Vents 2 Trims

Copyright : Arcadis
Eighth Edition, 2016 ©
09 20 00 Plaster and Render
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

M1 Work is measured D1 Work is held to be C1 Work is held to S1 Kind, quality,


that in contact with the internal unless include: composition and mix
base and no deduction described as external (a) fair joints to all of materials
is made for voids types of work including including
< 0.50m² or for D2 The thickness to existing waterproofing
grounds stated is the nominal (b) fair edges, angles agents and other
thickness and intersections admixtures
(c) rounded edges,
D3 Work is classified angles and S2 Fabric or other
as curved where intersections where reinforcement
> 25mm radius < 25mm radius required
(d) throats, drips,
grooves and the like S3 Number of coats
(e) working into
recessed duct and S4 Method of
manhole covers application
(f) working up to
flashings and frames S5 Nature of base
(g) working over and
around obstructions S6 Surface finish or
(h) preparing bases materials to be
including hacking received
concrete to form a key
(i) laying in bays
(j) bonding agents
where necessary or
required
(k) internal angle fillets
(l) angle and stop
beads
(m) temporary
formwork to edges
(n) sundry items of a
like nature

Copyright : Arcadis 09 20 00/1


Eighth Edition, 2016 ©
09 20 00/2
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Walls and columns 1 Thickness m² 1 Curved D4 Walls and


columns include:
2 Patterned, details (a) edges of
stated openings, recesses
and projections on
3 External walls and columns
(b) tops of walls and
2 Ceilings and beams 1 Thickness m² 1 Height to soffit columns
> 3.50m above
3 Soffits of staircases floor in stages of D5 Ceilings and
and landings 1.50m beams include edges
of openings, recesses
2 Curved and projections on
ceilings and beams
3 Patterned, details
stated D6 Beams attached
to ceilings are
4 External classified as the
same height to soffit
as the ceiling where
the finish is the same
in nature

4 Baseboards 1 Dimensioned m 1 Curved M2 Measured where it D7 Where


description forms part of this baseboard, strings,
5 Strings 2 Patterned, details finishes. If it forms as splashback and
stated backing, it is measured fascia forms part of
6 Splashbacks under Section 03 50 00 the finish, it will be
3 External - Cast Decks and measured under this
7 Fascias Underlayment section. If it is a
backing to skirting,
string, splashback
fascia to receive tiles,
marbles and wood
then it will be
measured under
Section 03 50 00 -
Cast Decks and
Underlayment

8 Cornices 1 Dimensioned m 1 Curved


description
9 Moldings 2 Patterned, details
stated
3 External

Copyright : Arcadis
Eighth Edition, 2016 ©
09 21 16 Wall Assemblies and Cladding
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 No deduction is D1 Work is held to be C1 Work is held to S1 Kind and quality


made for voids < internal unless include: of materials
0.50m² described as external (a) framing members
(b) additional members S2 Method of fixing
M2 Work is measured D2 Work is only at ends, angles,
the net area covered classified as curved intersections, S3 Nature of base
with no allowance for where > 25mm abutments and for
laps radius trimming around S4 Treatment of
openings, projections joints
and into recesses
M3 Wall Assemblies (c) fixing to any surface S5 Extent of laps
includes the following; by any means
(a) all lightweight wall including bolting, S6 Thickness and
panels screwing, ties, cramps surface finish or
(b) EIFS and the like materials to be
(d) rounded edges, received
(c) dry wall partition angles and
(d) FGC panel intersections where < S7 Forest
(e) Wood assemblies 25mm radius Stewardship
(e) fair joints to all Council
(f) Other wall
types of work including Accreditation
assemblies
to existing
(f) all jointing materials S8 Low Volatile
M4 The above items (g) fair edges, angles Organic Compound
are measured and intersections
composite items (h) all cutting and fitting
over and around
obstructions including
cutting and fitting up to
frames and around
pipes, brackets and the
like
(i) cutting holes
(j) preparing bases
(k) angle and stop
beads
(l) all necessary
incidental work for the
proper execution of the
item

Copyright : Arcadis 09 21 16/1


Eighth Edition, 2016 ©
09 21 16 Wall Assemblies and Cladding (continued) 09 21 16/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Wall Assemblies 1 Thickness 1 Size, spacing and m² 1 Curved D3 Walls and


type of support columns include
2 External edges of openings,
2 Cladding recesses and
projections on walls
and columns

Copyright : Arcadis
Eighth Edition, 2016 ©
09 22 36 Lath
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 No deduction is D1 Work is held to be C1 Work is held to S1 Kind and quality


made for voids internal unless include: of materials
< 0.50m² described as external (a) framing
(b) mechanical fixings, S2 Method of fixing
M2 Work is measured D2 Work is only steel rods, stirrups,
the net area covered classified as curved spacer rods and S3 Nature of base
with no allowance for where > 100mm hangers
laps radius (c) screws, staples, S4 Treatment of
clips, clout nails, wire joints
ties, steel banding and
all other fixings S5 Extent of laps
(d) additional support
and trimming for
fittings
(e) rounded edges,
angles and
intersections
< 100mm radius
(f) fair joints to all types
of work including to
existing
(g) all jointing materials
(h) fair edges, angles
and intersections
(i) all cutting and fitting
over and around
obstructions including
cutting and fitting up to
frames and around
pipes, brackets and the
like
(j) cutting holes
(k) preparing bases
(l) angle and stop
beads
(m) sundry items of a
like nature

Copyright : Arcadis 09 22 36/1


Eighth Edition, 2016 ©
09 22 36 Lath (continued) 09 22 36/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Walls and columns 1 Dimensioned m² 1 Curved D3 Walls and


description columns include
2 External edges of openings,
recesses and
projections on walls
and columns

D4 Ceilings and
beams include edges
of openings, recesses
and projections on
ceilings and beams

D5 Beams attached
2 Ceilings and beams m² 1 Height to soffit to ceilings are
> 3.50m above classified as the
3 Soffits of staircases floor in stages of same height to soffit
and landings 1.50m as the ceiling where
the finish is the same
2 Curved in nature

3 External

4 Cornices 1 Dimensioned m 1 Curved C2 Work is held to


description include fair, rounded
5 Moldings 2 External and coved ends,
angles, intersections
and sundry items of a
like nature

6 Metal lathing 1 Dimensioned 1 Depth of m² 1 Height to soffit M3 Metal lathing


suspended ceilings description suspension < > 3.50m above suspended ceilings are
300mm floor in stages of measured in
1.50m accordance with
2 and thereafter in Section 09 50 00 -
300mm stages 2 Curved Ceiling Systems

3 External

2 Bulkheads 1 Dimensioned m 1 Curved


description
2 External

Copyright : Arcadis
Eighth Edition, 2016 ©
09 30 00 Tile and Slab Finishes
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work is measured D1 Work in this C1 Work is held to S1 Kind and quality
that in contact with the section includes rigid include: of materials
base and no deduction tile and slab finishes (a) fair joints to all
is made for voids such as ceramic, types of work including S2 Size and
< 0.50m² mosaic, quarry, to existing thickness and
concrete and stone (b) all jointing materials shape if other than
tiles and slabs (c) all fixing materials rectangular and
including bedding square
D2 Work is held to be mortars, adhesives and
internal unless mechanical fixings S3 Method of fixing
described as external (d) cleaning, sealing
and polishing S4 Nature of base
D3 The thickness (e) fair edges, angles
stated is the nominal and intersections S5 Treatment of
thickness (f) cutting and fitting joints
into recessed duct and
manhole covers
(g) dishing to outlets
and gullies
(h) all cutting and fitting
over and around
obstructions including
cutting and fitting up to
frames and around
pipes, brackets and the
like
(i) cutting holes
(j) preparing bases
including hacking
concrete to form a key
(k) bonding agents
where necessary or
required
(l) sundry items of a
like nature

C2 Stone tiles and


slabs are held to
include:

Copyright : Arcadis 09 30 00/1


Eighth Edition, 2016 ©
09 30 00 Tile and Slab Finishes (continued) 09 30 00/2

INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

Generally (continued) (a) grinding and


polishing surfaces
(b) rounding off sharp
external angles

C3 Ceramic tiles are


held to include:
(a) plastic trims and
sealant at edges,
angles and
intersections
(b) spacers

CLASSIFICATION TABLE

1 Floors 1 Dimensioned m² 1 Floors or roofs M2 Contrasting bands D4 Floors include to C4 Floors and roofs
description sloping >15º and margins are only floors within roof are held to include for
2 Landings measured separately in spaces laying to falls, currents
2 Curved meters where and slopes
3 Walls and columns < 300mm wide. D5 Walls and < 15º
3 Flat rigid tiles or Where bands and columns include
4 Roofs 2 Contrasting bands m slabs set to curve margins are > 300mm edges of openings,
and margins < wide they are recesses and
5 Worktops, vanity 300mm wide, width 4 Patterned, details measured as general projections on walls
tops, seats and the stated stated areas of finishes in and columns
like “m²”
5 External D6 Ceilings and
6 Watertank sides M3 The area occupied beams include edges
and bases by contrasting bands of openings, recesses
and margins are and projections on
deducted from the ceilings and beams
7 Ceilings and beams 1 Dimensioned m² 1 Height to soffit general areas
description > 3.50m above D7 Beams attached
8 Soffits of staircases floor in stages of to ceilings are
and landings 1.50m M4 Worktops, vanity classified as the
tops, seats and the like same height to soffit
2 Curved which comprise a as the ceiling where
2 Contrasting bands m single slab of marble, the finish is the same
and margins 3 Flat rigid tiles or granite or the like are in nature
< 300mm wide, enumerated
slabs set
width stated
4 Patterned, details
stated

5 External

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

9 Baseboards 1 Dimensioned m 1 Curved C5 Linings to channels


description and coverings to curbs
10 Treads 2 Flat rigid tiles or are held to include
slabs set to curve additional finishes to
11 Risers ends
3 Patterned, details
12 Strings stated

13 Splashbacks 4 External

14 Fascias

15 Linings to
channels

16 Coverings to
curbs

17 Cappings

18 Cornices

19 Extra over for 1 Special patterns 1 Dimensioned m 1 Curved M5 Large feature D8 Special units
description patterns may include units with
2 Special units No 2 Flat rigid tiles or alternatively be rounded or other
slabs set to curve measured net and not shaped edge(s)
extra over
3 Patterned, details
stated

4 External

20 Movement joints 1 Dimensioned m


description

Copyright : Arcadis 09 30 00/3


Eighth Edition, 2016 ©
09 50 00/1
09 50 00 Ceiling Systems
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally S1 Kind and quality


of materials

CLASSIFICATION TABLE

1 Ceilings 1 Dimensioned 1 Depth of m² 1 Height to soffit M1 The following are D1 Work is held to be C1 Work is held to S2 Size and
description suspension > 3.50m above measured in other internal unless include: thickness of panels
< 300mm floor in stages of sections: described as external (a) all jointing materials
2 Soffits of staircases 1.50m (a) Metal lathing (b) suspension and S3 Thickness of
and landings 2 and thereafter in suspended ceilings D2 Integral fittings framing members sheet linings
300mm stages 2 Integral fittings, (Section 09 22 36 - include special including fixings, trims
details stated Lath panels, diffusers, and the like S4 Details of
3 Curved (b) Insulation (Section grilles and the like (c) all cutting and fitting framing and
07 20 00 - Thermal over and around suspension system
4 Patterned, details Protection) obstructions including
stated cutting and fitting up to S5 Method of fixing
M2 No deduction is frames and around
5 External made for voids pipes, brackets and the S6 Nature of base
< 0.50m² like
(d) cutting holes S7 Treatment of
3 Bulkheads 1 Dimensioned m 1 Integral fittings, M3 Integral fittings are (e) preparing bases joints and surface
description details stated included with the (f) additional supports finish or materials to
4 Light coves ceiling where part of and all other work to be received for
2 Curved the suspended ceiling provide space for sheet linings
system and they also services in the
3 Patterned, details follow a regular layout. suspended ceiling void S8 Forest
stated Where fittings are not (g) additional supports, Stewardship
part of the suspended trims and accessories Council
4 External ceiling system or do as necessary to Accreditation
not follow a regular fittings, partitions,
layout they are access panels, S9 Low Volatile
5 Extra over for 1 Access panels 1 Dimensioned No 1 External
measured separately in diffusers, grilles, light Organic Compound
description
accordance with 09 50 fittings, fixtures, signs
2 Special panels
00.4.*.*.* and the like
(h) all necessary
3 Diffusers
incidental works for the
proper execution of the
4 Grilles
item

6 Special details at m
abutments

Copyright : Arcadis
Eighth Edition, 2016 ©
09 62 00 Specialty Flooring
09 65 00 Resilient Flooring
09 68 00 Carpeting
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work is D1 Work is held to C1 Work is held to S1 Kind and quality


measured that in be internal unless include: of materials
contact with the described as (a) laying to rounded
base and no external edges, angles and S2 Thickness
deduction is made intersections where
for voids < 1.00m² D2 The thickness < 100mm radius S3 Method of fixing
stated is the nominal except where formed
thickness with special units S4 Nature of base
which are measured
D3 Rounded angles separately S5 Treatment of
> 100mm radius are (b) fair joints to all joints
classified as curved types of work
work including to existing S6 Low Volatile
(c) all jointing Organic Compound
materials
(d) all fixing materials
including bedding
mortars, adhesives
and mechanical
fixings
(e) cleaning, sealing
and polishing
(f) cutting and fitting
into recessed duct
and manhole covers
(g) dishing to outlets
and gullies

Copyright : Arcadis 09 62 00/1


Eighth Edition, 2016 ©
09 62 00 Specialty Flooring (continued) 09 62 00/2
09 65 00 Resilient Flooring (continued)
09 68 00 Carpeting (continued)

INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

Generally (continued) (h) all cutting and


fitting over and
around obstructions
including cutting and
fitting up to
frames and around
pipes, brackets and
the like
(i) cutting holes
(j) preparing bases
including hacking
concrete to form a key
(k) bonding agents
where necessary or
required
(l) sundry items of a
like nature
(m) adhesive with
VOC limit of 50g/L
(n) carpet cushion
compliant to CRI
Green Label

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Floors 1 Dimensioned m² 1 Floors sloping > 15º M2 Contrasting D4 Floors include to C2 Floors are held to
description bands and margins floors within roof include for laying to
2 Landings 2 Curved are only measured spaces falls, currents and
separately in slopes < 15º
3 Walls and columns 3 Patterned, details stated meters where D5 Walls and
< 300mm wide. columns include
4 Worktops, vanity 4 External Where bands and edges of openings,
tops, seats and the margins are recesses and
like > 300mm wide they projections on walls
are measured as and columns
general areas of
finishes in square
2 Contrasting bands m
meters “m²”
and margins
< 300mm wide,
M3 The area
width stated
occupied by
contrasting bands
and margins are
deducted from the
general areas

5 Baseboards 1 Dimensioned m 1 Curved C3 Linings to


description channels and
6 Treads 2 Patterned, details stated coverings to curbs are
held to include
7 Risers 3 External additional finishes to
ends
8 Strings

9 Linings to channels

10 Coverings to
curbs

11 Extra over for 1 Special patterns 1 Dimensioned m 1 Curved M4 Large feature D6 Special units
description patterns may include special units
2 Special units 2 Patterned, details stated alternatively be to provide rounded
No measured net and edges, angles and
3 External not extra over intersections

Copyright : Arcadis 09 62 00/3


Eighth Edition, 2016 ©
09 64 00/1
09 64 00 Wood Flooring
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Wood flooring D1 All sizes are C1 Work is held to S1 Kind and quality
when designed as a nominal sizes unless include: of materials
finished surface is described as finished (a) all labors
measured in this sizes (b) selecting and S2 If kiln dried
Section. Wood keeping clean for clear
flooring designed to be finishes S3 Size and
covered is measured in (c) notching and holes thickness
Section 06 16 00 - (d) fair, chamfered,
Sheathing splayed and rounded S4 Method of
edges jointing or form of
M2 No deduction is (e) ends, shaped ends, construction
made for voids miters, angles and
< 1.00m² intersections S5 Method of fixing
(f) joints including
additional materials S6 Nature of base
(g) bands and margins
set out to different S7 Preservative
arrangement or pattern treatments applied
(h) working over and as part of the
around obstructions production process
(i) providing panels of
the sizes indicated on S8 Surface
the drawings treatments applied
(j) cork or other as part of the
compression strips at production process
the perimeter of work
(k) provision for wood S9 Pattern for block
preservatives and parquet flooring
treatment
(l) sundry items of a S10 Forest
like nature Stewardship Council
Accreditation
C2 Work is held to be
dressed timber S11 Describe as
composite wood or
agrifiber no added
urea formaldehyde
resin

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Floors 1 Dimensioned m² M3 Polishing, D2 Floors include C3 Work is held to


description varnishing and the like landings include:
2 Landings are measured in (a) laying to falls,
Section 09 90 00 - slopes and currents
Painting and Coating (b) sanding after laying
3 Treads 1 Width stated m

4 Risers

Copyright : Arcadis 09 64 00/2


Eighth Edition, 2016 ©
09 69 00/1
09 69 00 Access Flooring
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 No deduction is D1 Work is held to be C1 Work is held to S1 Kind and quality


made for voids internal unless include: of materials
< 0.50m² described as external (a) all jointing materials
(b) all necessary S2 Size and
supporting structures, thickness of panels
adhesives, bearing
pads, fixings, trims and S3 Details of
the like framing and
(c) all cutting and fitting supporting systems
over and around
obstructions including S4 Method of fixing
cutting and fitting up to
frames and around S5 Nature of base
pipes, brackets and the
like
(d) cutting holes
(e) preparing bases
(f) additional supports
and all other work to
provide space for
services in the floor
void
(g) additional supports,
trims and accessories
to fittings, partitions,
access panels, fixtures
and the like
(h) sundry items of a
like nature
(i) including repairing
all damage
waterproofing
membranes due to
method of fixing

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Access Flooring 1 Dimensioned 1 Height of cavity m² 1 Integral fittings, M2 Integral fittings are D2 Integral fittings C2 Work is held to
description stated details stated included with the floor include special panels include for laying to
where part of the and the like falls, currents and
2 Sloping > 15º raised floor system and slopes < 15º
they also follow a
3 Patterned, details regular layout. Where
stated fittings are not part of
the raised floor system
4 External or do not follow a
regular layout they are
measured separately in
2 Downstands 1 Dimensioned m 1 Integral fittings, accordance with
description details stated 09 69 00.6.*.*.*
3 Steps in surfaces
2 Curved M3 Finishes to access
flooring where not part
3 Patterned, details of the system are
stated measured in their
respective sections
4 External

4 Ramps 1 Dimensioned No 1 Integral fittings,


description details stated
5 Steps
2 Patterned, details
stated

3 External

6 Extra over for 1 Access panels 1 Dimensioned No 1 External


description
2 Special panels

7 Baseboards 1 Dimensioned m 1 Curved M4 Baseboards which C3 Work is held to


description are part of the raised include fair ends,
2 External floor system are angles and
measured here. intersections
Baseboards not part of
the raised floor system
are measured in the
relevant sections

Copyright : Arcadis 09 69 00/2


Eighth Edition, 2016 ©
09 72 00/1
09 72 00 Wall and Ceiling Coverings
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 No deduction is D1 Work is held to be C1 Work is held to S1 Kind and quality


made for voids internal unless include: of materials
< 0.50m² described as external (a) preparation of
surfaces S2 Nature of base
D2 Preparation (b) removing fixtures,
includes all fittings, equipment and S3 Preparatory work
preparation the like and replacing
necessary to the after wall covering S4 Method of fixing
surface to receive the (c) cutting or fitting and jointing
wall covering around obstructions,
described including intrusions or
putty, fillers, sealers projections
and the like

CLASSIFICATION TABLE

1 Walls and columns m² 1 External

2 Ceilings and beams m² 1 Height to soffit


> 3.50m above
3 Soffits of staircases floor in stages of
and landings 1.50m

2 External

4 Border strips m 1 External C2 Border strips are


held to include miters
and intersections

5 Corners No 1 External

6 Motifs

Copyright : Arcadis
Eighth Edition, 2016 ©
09 90 00 Painting and Coating
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 The area or girth D1 Work is held to be C1 Work is held to S1 Kind and quality
measured is the area internal unless include: of materials
or girth covered described as external (a) preparation of
including allowances surfaces S2 Nature of base
for the extra girth of D2 Where reference (b) rubbing down
edges, mouldings, is made to painting it between coats S3 Preparatory work
panels, sinkings, is held to include (c) cutting to line
corrugations, carvings clear finishing and (d) painting to S4 Priming or
and the like, except polishing corrugated, fluted, sealing coats (No)
where otherwise stated panelled, carved,
D3 Preparation ornamental or other S5 Undercoats (No)
M2 No deduction is includes all irregular surfaces
made for voids preparation (e) removing hardware S6 Finishing coats
< 0.50m² necessary to the and the like and (No) and surface
surface to receive the replacing after painting finish
paint system (f) painting hinges,
described including fastenings, fixings and S7 Method of
putty, fillers, sealers the like application
and the like
S8 If moulded,
panelled, corrugated
or carved surfaces
are measured flat
this is stated in the
description

S9 Low Volatile
Organic Compound

Copyright : Arcadis
Eighth Edition,
Copyright 2016 ©
: Arcadis 09 90 00/1
Eighth Edition, 2016 ©
09 90 00 Painting and Coating (continued) 09 90 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Floors 1 Girth > 300mm m² 1 External M3 Doors, windows D4 Baseboards, dado C2 Painting to glazed
and screens are rails, cornices, coves surfaces are held to
2 Roofs 2 On site before measured flat both and the like include: include:
fixing sides and include (a) window boards (a) work to edges of
3 Landings integral louvers (b) mouldings to walls opening lights
2 Girth < 300mm m and ceilings (b) work to the
4 Walls and columns M4 Doors with viewing (c) all similar linear surrounding frame
panels only are items caused by opening
5 Doors described as doors lights
and not glazed doors (c) cutting in next to
6 Glazed doors glass
M5 Area occupied by (d) work on glazing
7 Glazed windows glazing panels are not beads
and screens deducted from the
main area of painting
8 Door frames,
linings and cills
M6 Louvers and grilles
9 Louvers and grilles are measured flat both
sides
10 Baseboards, dado
rails, cornices,
coves and the like

11 Fascias and
eaves soffits

12 Treads, risers and


strings

13 Cabinets,
wardrobes and the
like

14 Ceilings and 1 Girth > 300mm m² 1 Height to soffit D5 Beams attached


beams > 3.50m above to ceilings are
2 Girth < 300mm m floor in stages of classified as the
15 Soffits of 1.50m same height to soffit
staircases and as the ceiling where
landings 2 External the finish is the same
in nature
3 On site before
fixing

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

16 Structural 1 General surfaces m² 1 External M7 Painting on site C3 Work to structural


metalwork prior to erection is metalwork is held to
measured in Section include the additional
2 Intumescent 1 Fire rating and 05 10 00 - Structural area due to:
coatings cross sectional Metal Framing (a) attached bolts, clips
shape, size and and the like
weight per meter (b) connections, caps
and bases

2 Number of coats

17 Balustrades, 1 Plain open type 1 Girth > 300mm m² 1 External M8 Work described as
railings, fences plain open type is
and gates 2 On site before classified according to
2 Girth < 300mm m fixing the size of the
individual members

M9 Work described as
2 Close type 1 Girth > 300mm m² close type, mesh
covered or ornamental
3 Mesh covered or are measured flat both
ornamental sides

18 Pipes, conduit and 1 Girth > 300mm m² 1 External D6 Pipes, conduit and C4 Pipes, conduit and
the like the like include the like are held to
2 On site before cables, ducting and include work to:
19 Gutters fixing trunking (a) supports
(b) conduit boxes and
other fittings
(c) pipe fittings and
2 Girth < 300mm m accessories

C5 Gutters are held to


include work to
supports and
fittings

20 Signwriting 1 Lines 1 Width stated m 1 Broken M10 Broken lines are


measured over gaps
2 Curved

1 Letters, shapes and 1 Dimensioned No


symbols description
2 Arrow heads or tails

Copyright : Arcadis 09 90 00/3


Eighth Edition, 2016 ©
10 14 00/1
10 14 00 Signage
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally D1 Work is held to be C1 Work is held to S1 Kind and quality


internal unless include: of materials
described as external (a) providing screws,
bolts, nails, pins and all S2 Surface finish
other fixings as
necessary to match the
signs
(b) all fitting, cutting,
sinking, boring and
morticing to any
backgrounds and
making good
(c) plugging concrete,
masonry and the like
(d) oiling, easing and
adjusting and leaving
in working order at
completion

CLASSIFICATION TABLE

1 Signwriting 1 Dimesioned No 1 External D2 The nature of C2 Work is held to


description; nature base is the material of include fixing to any
2 Door signs of base stated the main component other backgrounds as
to which it is fixed necessary, even
3 Engraved signs though the material of
the main component is
4 Illuminated signs the only one stated

5 Non-illuminated
signs

6 Post and
panel/pylon signs

7 Electronic message
signs

Copyright : Arcadis
Eighth Edition, 2016 ©
10 21 00 Compartments and Cubicles
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 Work is held to S1 Kind and quality of


include: materials
(a) all components,
trims, framing, S2 Method of jointing
connections, fixings, or form of
fastenings and the like construction
(b) supporting legs and
brackets S3 Method of fixing
(c) doors and frames
(d) hardware S4 Nature of base
(e) architraves
(f) notching and S5 Surface
framing around treatments applied as
projections part of the production
(g) holes process
(h) finishes where part
of the component as S6 Details of frames,
delivered linings, hardware,
(i) all other ancillary architraves, glazing
trims, supports, beads, glass and the
components and like
incidental work for the S7 Low Volatile
proper execution of the Organic Compound
item

CLASSIFICATION TABLE

1 Cubicle partition 1 Dimensioned No


sets description

2 Urinal
Compartment

3 Urinal Partition

Copyright : Arcadis 10 21 00/1


Eighth Edition, 2016 ©
10 22 00/1
10 22 00 Partitions
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 All movable C1 Work is held to S1 Kind and quality


partitions are include: of materials
measured here. Fixed (a) all components,
partitions are trims, fixings, S2 Method of
measured under fastenings and the like jointing or form of
Section – 09 21 16 (b) fixing to concrete, construction
Wall Assemblies and concrete hollow blocks
Cladding and any other S3 Method of fixing
materials by any
means including S4 Nature of base
bolting, screwing, ties,
cramps and the like S5 Surface
(c) notching and treatments applied
framing around as part of the
projections production process
(d) holes
(e) finishes where part S6 Low Volatile
of the component as Organic Compound
delivered
(f) all necessary S7 Forest
incidental work for the Stewardship Council
proper execution of the Accreditation
item

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Demountable 1 Height and 1 Dimensioned m 1 Baseboards one M2 Work is measured


partitions thickness stated description side over obstructions

2 Portable Partitions 2 Baseboards both M3 Baseboards are


sides only included where
3 Operable Partitions supplied with the
3 Flat panels set out partition system
4 Sliding Partitions to a curve

5 Folding Partitions 4 Curved

2 Stop ends 1 Dimensioned m


description
3 Angles

4 Three way
intersections

5 Four way
intersections

6 Abutments with
walls and columns

7 Extra over for doors 1 Dimensioned No C2 Work is held to S8 Details of


description include frames, linings,
8 Extra over for (a) frames and linings hardware,
glazed screens (b) hardware architraves, glazing
(c) architraves beads, glass and
9 Extra over for blank (d) glazing beads the like
openings (e) glass
(f) all other ancillary
trims, supports,
components and
incidental work for the
proper execution of the
item

Copyright : Arcadis 10 22 00/2


Eighth Edition, 2016 ©
10 22 00/1
10 22 00 Partitions
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 All movable C1 Work is held to S1 Kind and quality


partitions are include: of materials
measured here. Fixed (a) all components,
partitions are trims, fixings, S2 Method of
measured under fastenings and the like jointing or form of
Section – 09 21 16 (b) fixing to concrete, construction
Wall Assemblies and concrete hollow blocks
Cladding and any other S3 Method of fixing
materials by any
means including S4 Nature of base
bolting, screwing, ties,
cramps and the like S5 Surface
(c) notching and treatments applied
framing around as part of the
projections production process
(d) holes
(e) finishes where part S6 Low Volatile
of the component as Organic Compound
delivered
(f) all necessary S7 Forest
incidental work for the Stewardship Council
proper execution of the Accreditation
item

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Demountable 1 Height and 1 Dimensioned m 1 Baseboards one M2 Work is measured


partitions thickness stated description side over obstructions

2 Portable Partitions 2 Baseboards both M3 Baseboards are


sides only included where
3 Operable Partitions supplied with the
3 Flat panels set out partition system
4 Sliding Partitions to a curve

5 Folding Partitions 4 Curved

2 Stop ends 1 Dimensioned m


description
3 Angles

4 Three way
intersections

5 Four way
intersections

6 Abutments with
walls and columns

7 Extra over for doors 1 Dimensioned No C2 Work is held to S8 Details of


description include frames, linings,
8 Extra over for (a) frames and linings hardware,
glazed screens (b) hardware architraves, glazing
(c) architraves beads, glass and
9 Extra over for blank (d) glazing beads the like
openings (e) glass
(f) all other ancillary
trims, supports,
components and
incidental work for the
proper execution of the
item

Copyright : Arcadis 10 22 00/2


Eighth Edition, 2016 ©
10 28 00/1
10 28 00 Toilet, Bath and Laundry Accessories
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 Work is held to S1 Kind and quality


include: of materials
(a) providing screws,
bolts, nails, pins and all S2 Nature of base
other fixings as
necessary to match the
accessories
(b) all fitting, cutting,
sinking, boring and
morticing to any
backgrounds and
making good
(c) plugging concrete,
masonry and the like
(d) oiling, easing and
adjusting and leaving
in working order at
completion

CLASSIFICATION TABLE

1 Type of item, unit or 1 Dimensioned No S3 Surface finish


set stated description

2 Mirrors 1 Dimensioned No S4 Details of


description protective backings

S5 Method of fixing

Copyright : Arcadis
Eighth Edition, 2016 ©
10 44 00 Fire Protection Specialties
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally C1 Work is held to be S1 Kind and quality of


carried out in materials
accordance with all
relevant codes of S2 Method of jointing
practice and statutory
regulations S3 Surface
treatments applied
C2 Work is held to before delivery
include:
(a) providing
everything necessary
for jointing
(b) clips, brackets,
saddles, hangers,
screws, bolts and all
other fixings and
supports
(c) fixing to any
material by any means
necessary
(d) patterns, moulds,
templates and the like
(e) packing
(f) finishes where part
of the components as
delivered
(g) sundry items of a
like nature

Copyright : Arcadis 10 44 00/1


Eighth Edition, 2016 ©
10 44 00 Fire Protection Specialties (continued) 10 44 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Fire extinguisher 1 Dimensioned No


cabinets description

2 Fire extinguishers

3 Fire blankets and


cabinets

4 Fire extinguisher
accessories

item
5 Identification, color
coding and labelling

6 Marking positions item


of holes, mortices,
chases and the like
in the structure

7 Cutting holes, item


mortices, chases
and the like,
grouting and
making good after
installation

8 Providing all item


necessary spares
and tools

Copyright : Arcadis
Eighth Edition, 2016 ©
11 00 00 Equipment
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

C1 Work is held to be S1 Kind and quality of


Generally carried out in materials
accordance with all
relevant codes of S2 Method of jointing
practice and statutory
regulations S3 Surface
treatments applied
C2 Work is held to before delivery
include:
(a) providing
everything necessary
for jointing
(b) clips, brackets,
saddles, hangers,
straps, screws, bolts
and all other fixings
and supports
(c) fixing to any
material by any means
necessary
(d) patterns, moulds,
templates and the like
(e) packing
(f) finishes where part
of the components as
delivered
(g) anti-vibration fixings
and mountings, spring
compensated and
seismic restraints,
vibration isolators and
isolating components
(h) sundry items of a
like nature

Copyright : Arcadis 11 00 00/1


Eighth Edition, 2016 ©
11 00 00 Equipment (continued) 11 00 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

1 Vehicle and 1 Dimensioned No


Pedestrian description
Equipment
2 Type and size
2 Commercial
Equipment

3 Residential
Equipment

4 Foodservice
Equipment

5 Educational and
Scientific Equipment

6 Athletic and
Recreational
Equipment

7 Healthcare
Equipment

8 Collection and
Disposal Equipment

9 Entertainment
Equipment

10 Providing all 1 Details stated item C3 Testing and


necessary spares commissioning is held
and tools to include:
(a) provision of water,
11 Testing and fuel, gas, electricity
commissioning and other supplies
(b) provision of test
certificates
(c) making good all
defects and re-testing
as necessary

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

12 Preparing 1 Information item


drawings required required and
by the Owner number of copies
stated
13 Operating and
maintenance
manuals

14 Temporary 1 Details stated 1 Duration stated item C4 Provision of water,


operation of fuel, gas, electricity
installations to and other supplies are
Owner's held to be included
requirements

15 Instruction of
Owner's
representatives in
operation,
maintenance,
preventive
maintenance and
service of
completed
installation

16 Maintenance 1 Details stated 1 Duration stated item S4 Details of:


(a) servicing
requirements and
frequency
(b) requirements for
emergency call outs
(c) requirements in
respect of repairs and
who pays for
damaged or
replacement parts

Copyright : Arcadis 11 00 00/3


Eighth Edition, 2016 ©
11 24 00/1
11 24 00 Maintenance Equipment
14 00 00 Conveying Equipment
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

M1 Maintenance C1 Work is held to be S1 Kind and quality of


Generally equipment is given carried out in materials
under one of the accordance with all
following headings: relevant codes of S2 Method of jointing
(a) (a) Maintenance practice and statutory
Equipment regulations S3 Surface
(b) Others, stated treatments applied
C2 Work is held to before delivery
M2 Conveying system include:
is given under one of (a) providing
the following headings: everything necessary
(a) Dumbwaiters for jointing
(b) Elevators (b) clips, brackets,
(c) Escalators and saddles, hangers,
Moving walls straps, screws, bolts
(d) Others, stated and all other fixings
and supports
(c) fixing to any
material by any means
necessary
(d) patterns, moulds,
templates and the like
(e) packing
(f) finishes where part
of the components as
delivered
(g) anti-vibration fixings
and mountings, spring
compensated and
seismic restraints,
vibration isolators and
isolating components
(h) sundry items of a
like nature

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

1 Window washing 1 Dimensioned No D1 Window washing C3 Window washing


equipment description equipment includes equipment is held to
track mounted type, include metal track
2 Type and size trackless type and rails, cradle or
the like platform, roof trolley,
jib, suspension ropes,
electrical system,
controls, safety
devices, restraints
inserts, gondola
machinery and the like

2 Dumbwaiters D2 Elevators C4 Elevators are held


include passenger, to include cars, doors,
3 Elevators service and the like jambs, controls, safety
equipment, hoistway
4 Escalators and equipment, rails,
Moving walks elevator machinery and
the like.
C5 Dumbwaiters,
escalators and moving
walks are held to
include associated
components,
hardware, controls,
safety equipment and
the like

5 Identification, 1 Details stated item


color coding and
labelling

6 Marking positions 1 Details stated item


of holes, mortices,
chases and the
like in the
structure

Copyright : Arcadis 11 24 00/2


Eighth Edition, 2016 ©
11 24 00 Maintenance Equipment (continued) 11 24 00/3
14 00 00 Conveying Equipment (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

7 Cutting holes, 1 Details stated item


mortices, chases
and the like,
grouting and
making good after
installation

8 Providing all
sleeves for fixing
through slabs,
walls, beams and
the like

9 Wrapping
conduits, cables
or trunking pipes
in felt or similar
protection where
they pass through
slabs, walls,
beams and the
like

10 Sealing, packing
and fireproofing
where work pass
through slabs,
walls, beams and
the like

11 Providing all
necessary spares
and tools

Copyright : Arcadis
Eighth Edition, 2016 ©
12 30 00 Casework
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Work includes D1 All sizes are C1 Work is held to S1 Kind and quality
cabinets, kitchen nominal sizes unless include: of materials
cabinets, vanity described as finished (a) all labors
counter, reception sizes (b) nailing, screwing, S2 For solid timber
counters, wardrobes, gluing, bolting, fixing if rough or dressed
shelves, bookcase and with brackets, ties and and if kiln dried
the like all other fixings and
fastenings including S3 Method of
drilling or cutting holes jointing or form of
in any material construction
(c) drilling and plugging
concrete, masonry and S4 Method of fixing
the like with hardwood
or proprietary plugs for S5 Nature of base,
fixing with nails or where other than
screws timber
(d) punching in nail
heads and covering S6 Preservatives
with approved wood treatments applied
filler as part of the
(e) countersinking production process
screw and bolt heads
and covering with S7 Surface
approved wood filler or treatments applied
wood pellets as part of the
(f) selecting and production process
keeping clean for clear
finishes S8 Low Volatile
(g) notching and holes Organic Compound
(h) fair, chamfered,
splayed and rounded S9 Forest
edges Stewardship Council
(i) ends, shaped ends, Accreditation
miters, angles and
intersections
(j) joints including
additional materials
(k) bedding in mortar

Copyright : Arcadis 12 30 00/1


Eighth Edition, 2016 ©
12 30 00 Casework (continued) 12 30 00/2

INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

Generally (continued) (l) filling behind frames


with concrete/mortar
including all necessary
formwork
(m) priming backs,
applying coal tar or
similar protective
coatings prior to fixing
(n) provision for wood
preservative treatment
(o) sundry items of a
like nature
(p) all hardware
(q) finishes

CLASSIFICATION TABLE

1 Fixtures and 1 Dimensioned No D2 Fixtures and C2 Work is held to


fittings description fittings include include all ancillary
cabinets, counters, trims, supports,
wardrobes, shelves components and the
and the like like

Copyright : Arcadis
Eighth Edition, 2016 ©
12 40 00 Furnishings and Accessories
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Only items of D1 Work is held to be C1 Work is held to S1 Kind and quality
movable furniture and internal unless include: of materials
furnishing accessories described as external (a) labor
are measured in this (b) finishes including S2 Surface finish
section. painting, varnishing or
other protective coating S3 Method of
(c) fixing accessories jointing or form of
(d) nailing, screwing, construction
gluing, bolting, fixing
with brackets, ties and S4 Nature of base
other fixings and
fastenings including S5 Preservative
drilling or cutting holes treatments applied
in any material as part of the
(e) all jointing materials production process
(f) cleaning, sealing
and polishing S6 Surface
(g) fair, chamfered treatments applied
splayed and rounded as part of the
edges protection process
(h) provision for
preservation treatment S7 Low Volatile
(i) sundry items of a Organic Compound
like nature
S8 Forest
Stewardship Council
Accreditation

CLASSIFICATION TABLE

1 Type of item or unit 1 Dimensioned No C2 Work is held to


stated description; nature include fixing to any
of base stated other backgrounds as
necessary, even
though the material of
the main component is
the only one stated

Copyright : Arcadis 12 40 00/1


Copyright
Eighth : Arcadis
Edition, 2016 ©
Eighth Edition, 2016 ©
12 93 00/1
12 93 00 Site Furnishings
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 Excavation is held S1 Forest


to include: Stewardship
(a) excavating in any Council
ground encountered Accreditation
(b) getting out
excavated materials by
any means necessary
(c) grubbing up old
roots
(d) levelling bottoms
and trimming to vertical
and sloping sides
(e) compacting
bottoms and sides
(f) additional
excavation to provide
working space and
backfilling thereto
(g) earthwork support
(h) removal of water by
pumping or otherwise

CLASSIFICATION TABLE

1 Fixtures and fittings M1 Work is measured C2 Work is held to S2 Type and size of
in accordance with the include: footings to supports
2 Balustrades following as applicable: (a) excavating holes for
(a) 05 50 00 - Metal supports S3 Where not
3 Railings Fabrications (b) backfilling with supported by
(b) 06 40 00 - selected excavated footings, method of
4 Handrails Architectural material or as fixing and nature of
Woodwork otherwise described base
(c) 06 60 00 - Plastic (c) disposal of surplus
Fabrications excavated material off S4 Backfilling
site material where other
(d) formwork to than selected
footings excavated material
(e) all necessary
supports, fixings and
ancillary work

Copyright : Arcadis
Eighth Edition, 2016 ©
21 00 00 Fire Suppression
22 00 00 Plumbing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Fire suppression is C1 Work is held to be S1 Kind and quality of


given under one of the carried out in materials
following headings: accordance with all
(a) Water-Based Fire relevant codes of S2 Method of jointing
Suppression Systems practice and statutory
(b) Fire Extinguishing regulations S3 Surface
Systems treatments applied
(c) Fire Pumps C2 Work is held to before delivery
(d) Fire Suppression include:
Water Storage (a) providing S4 Low Volatile
(e) Others, stated everything necessary Organic Compound
for jointing
M2 Fire extinguishers (b) clips, brackets,
are measured in saddles, hangers,
Section - 10 44 00 Fire screws, bolts and all
Protection Specialties other fixings and
supports
M3 Plumbing is given (c) fixing to any
under one of the material by any means
following headings: necessary
(a) Plumbing Piping (d) patterns, moulds,
and Pumps templates and the like
(b) Facility Potable (e) packing
Water Storage Tanks (f) finishes where part
(c) Facility Sanitary of the components as
Sewerage delivered
(d) Facility Storm (g) anti-vibration fixings
Drainage and mountings, spring
(e) Plumbing compensated and
Equipment seismic restraints,
(f) Pool and Fountain vibration isolators and
Plumbing Systems isolating components
(g) Others, stated (h) sundry items of a
like nature
M4 Plumbing fixtures
are measured in
Section - 22 40 00
Plumbing Fixtures

Copyright : Arcadis 21 00 00/1


Eighth Edition, 2016 ©
21 00 00 Fire Suppression (continued) 21 00 00/2
22 00 00 Plumbing (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

1 Pipes 1 Nominal size stated m 1 Wrapping M5 Pipes are C3 Pipes are held to
measured over all include:
fittings (a) joints in the running
length
M6 Trenches, (b) joints to fittings,
chambers and beds for ancillaries, fixtures and
underground pipes are equipment
measured in (c) all labors including
accordance with made bends
Section 33 10 00 (d) supports of any
Water Utilities length or type
(e) sundry items of a
like nature

C4 Pipes are held to


include:
(a) casting into
concrete, plaster,
toppings and the like
(b) cutting chases in
any materials and
making good

C5 Pipes < 60mm


nominal size are held
to include all fittings

2 Extra over pipes for 1 Fittings 1 Dimensioned No M7 Fittings on pipes D1 Fittings on pipes C6 Fittings are held to
description are only measured include bends, include providing
2 Special joints and where > 60mm junctions, reducers, fittings with outlets at
connections diameter offsets, access pipes, any angle as required
designed by the boss joints, end caps
Mechanical / M8 Reducing fittings and the like
Sanitary Engineer are measured extra
over the largest of the
3 Flexible pipes on which they
connectors, flexible occur and include for
pipes and separate reducers
expansion loops where a fitting of the
designed by the required sizes is not
Mechanical / available
Sanitary Engineer

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

2 Extra over pipes for 4 Flexible item M9 This item is D2 Special joints and
(continued) connectors, flexible included in the bills of connections are:
pipes, expansion quantities, even if the (a) joints which differ
loops and special work is designed by from those generally
joints and the Mechanical / occurring in the
connections not Sanitary Engineer, so running length
designed by the that any additional (b) connections to
Mechanical / work required by the pipes of a different
Sanitary Engineer Contractor can be profile or material
allowed for (c) connections to
existing utilities

3 Ancillaries 1 Dimensioned No D3 Ancillaries include C7 Work to ancillaries


description drains, cleanouts, and equipment is held
4 Equipment 2 Type, size and sprinkler heads, to include insulation
capacity valves, meters and
the like

D4 Equipment
includes boilers,
cisterns, cylinders,
tanks, pumps and the
like

5 Insulation 1 To pipes 1 Thickness and m M10 Insulation to C8 Insulation is held to


nominal size of pipe fittings on pipes is include:
stated deemed to be included (a) smoothing the
in length of pipes materials and working
around supports
(b) working around
pipe flanges
(c) working around
fittings < 60mm
diameter

Copyright : Arcadis 21 00 00/3


Eighth Edition, 2016 ©
21 00 00 Fire Suppression (continued) 21 00 00/4
22 00 00 Plumbing (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

6 Marking positions 1 Details stated item


of holes, mortices,
chases and the
like in the
structure

7 Cutting holes,
mortices, chases
and the like,
grouting and
making good after
installation

8 Providing all pipe,


conduit or cable
sleeves for fixing
through slabs,
walls, beams and
the like

9 Wrapping pipes,
conduit, cables or
trunking in felt or
similar protection
where they pass
through slabs,
walls, beams and
the like

10 Sealing, packing
and fireproofing
where pipes,
conduits, cables or
trunking pass
through slabs,
walls, beams and
the like

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

11 Providing all 1 Details stated item D5 Treatment of


necessary spares completed
and tools installations includes
disinfecting water
12 Treatment of distribution systems
completed
installations

Copyright : Arcadis 21 00 00/5


Eighth Edition, 2016 ©
22 40 00/1
22 40 00 Plumbing Fixtures
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Toilet accessories C1 Work is held to S1 Kind and quality of


are measured in include: materials
Section 10 28 00 - (a) bolts, screws,
Toilet, Bath and connectors, flanges, S2 Method of jointing
Laundry Accessories brackets, ties and all or form of
other fixings, construction
fastenings and
supports S3 Surface
(b) drilling and treatments and
plugging concrete, finishes applied
masonry and the like before delivery
with hardwood or
proprietary plugs for S4 Energy power
fixing with screws saving feature
(c) cutting holes,
mortices, chases and S5 Low Volatile
the like in any material, Organic Compound
grouting and making
good after installation
(d) bedding in mortar
(e) bedding and
pointing with sealant
(f) packing
(g) finishes where part
of the components as
delivered
(h) all necessary
incidental work for the
proper execution of the
item
(i) sundry items of a
like nature

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

1 Fixtures 1 Dimensioned No D1 Fixtures include


description water closets,
2 Faucets urinals, lavatories,
sinks, bathtubs,
3 Flush valves drinking fountains,
water coolers and
4 Shower heads the like
5 Shower valves

Copyright : Arcadis 22 40 00/2


Eighth Edition, 2016 ©
23 00 00/1
23 00 00 Heating, Ventilating and Air Conditioning (HVAC)
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

M1 Work is given C1 Work is held to be S1 Kind and quality of


Generally under one of the carried out in materials
following headings: accordance with all
(a) HVAC Insulation relevant codes of S2 Method of jointing
(b) Facility Fuel practice and statutory
Systems regulations S3 Surface
(c) HVAC Piping and treatments applied
Pumps C2 Work is held to before delivery
(d) HVAC Air include:
Distribution (a) providing S4 Low Volatile
(e) Central Heating everything necessary Organic Compound
Equipment for jointing
(f) Central Cooling (b) clips, brackets,
Equipment saddles, hangers,
(g) Central HVAC straps, screws, bolts
Equipment and all other fixings
(h) Decentralized and supports
HVAC Equipment (c) fixing to any
(i) Others, stated material by any means
necessary
(d) patterns, moulds,
templates and the like
(e) packing
(f) finishes where part
of the components as
delivered
(g) anti-vibration fixings
and mountings, spring
compensated and
seismic restraints,
vibration isolators and
isolating components
(h) sundry items of a
like nature

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

1 Rectangular ducts 1 Gauge/thickness of m² M2 Ducts are C3 Ducts are held to


sheet material measured over all include:
fittings (a) bending, forming
bolted joints, brazing,
M3 Rectangular ducts welding and all other
are measured the net labors in fabrication
area of the duct with no and erection
allowance for laps (b) curved ducts
(c) joints in the running
length
(d) joints to fittings,
ancillaries and
2 Circular ducts 1 Nominal size m equipment
(e) connections to
ducts of different
profile or material
(f) flexible joints and
flexible connectors
(g) flexible ducts not
designed by the
Mechanical Engineer
but required for the
installation
3 Flexible ducts 1 Shape and nominal 1 Length in stages of No (h) stiffeners
designed by the size 0.50m (i) test holes
Mechanical (j) supports of any
Engineer length or type
(k) sundry items of a
like nature

C4 Rectangular ducts
are held to include:
(a) bends, junctions
and all other fittings
(b) turning vanes,
splitters and access
doors
(c) sundry items of a
like nature

Copyright : Arcadis 23 00 00/2


Eighth Edition, 2016 ©
23 00 00 Heating, Ventilating and Air Conditioning (HVAC) (continued) 23 00 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

4 Extra over 1 Connections to 1 Dimensioned No


rectangular ducts existing ducts description
for

5 Extra over circular 1 Connections to 1 Dimensioned No M4 Reducing fittings D1 Fittings include C5 Fittings are held to
ducts for existing ducts description are measured extra bends, junctions, include stiffeners,
over the largest of the reducers and the turning vanes, splitters,
2 Fittings ducts on which they like access doors and the
occur like

6 Ancillaries 1 Dimensioned D2 Ancillaries C6 Ancillaries and


description No include diffusers, equipment are held to
7 Equipment 2 Type and size dampers designed include:
by the Mechanical (a) supporting frames
Engineer, grilles, (b) anti vibration
louvers and the like mountings
3 Volume control item M5 These item are (c) sound insulating
dampers and fire included in the bills of D3 Equipment materials
dampers not quantities even if includes chillers, (d) insulation where
designed by the volume control cooling towers, air supplied with the unit
Mechanical dampers and fire handling units, fans, (e) controls and
Engineer dampers are designed boilers, tanks, heat switches where
by the Mechanical exchangers, pumps supplied with the unit
Engineer, so that any and the like (f) wires and conduit to
additional volume controls and switches
control dampers and
fire dampers required
by the Contractor can
be allowed for

4 Linear diffusers 1 Dimensioned m C7 Linear diffusers are


description held to include ends,
capped ends, angles
No and intersections

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

8 Hydronic pipework m M6 Trenches,


(i.e. refrigerant, chambers and beds for
chilled water, underground pipes are
condensate, measured in
fuel oil pipes, etc.) accordance with
Section 33 10 00 -
Water Utilities

M7 Work is measured
in accordance with
Section 22 00 00 -
Plumbing

9 Insulation 1 To rectangular 1 Thickness m² M8 Insulation to C8 Insulation is held to


ducts, stating rectangular ducts is the include smoothing the
whether to internal measured duct surface materials and working
or external surfaces area around supports

C9 Insulation to
rectangular ducts is
held to include working
around fittings
2 To circular ducts, 1 Thickness and m
stating whether to nominal size of duct
internal or stated
external surfaces

3 To fittings on No
circular ducts, type
stated

4 To pipes 1 Thickness and m C10 Insulation is held


nominal size of pipe to include:
stated (a) smoothing the
materials and working
M9 Insulation to fittings around supports
5 To ancillaries on No on pipes and pipework
pipes, type stated (b) working around
ancillaries are deemed pipe flanges
to be included in length (c) working around
of pipes fittings <60mm
diameter
6 Equipment No

Copyright : Arcadis 23 00 00/4


Eighth Edition, 2016 ©
23 00 00 Heating, Ventilating and Air Conditioning (HVAC) (continued) 23 00 00/5

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

10 Marking positions 1 Details stated item


of holes, mortices,
chases and the
like in the
structure

11 Cutting holes,
mortices, chases
and the like,
grouting and
making good after
installation

12 Providing all pipe,


duct, conduit or
cable sleeves for
fixing through
slabs, walls,
beams and the
like

13 Wrapping pipes,
ducts, conduits,
cables or trunking
in felt or similar
protection where
they pass through
slabs, walls,
beams and the
like

14 Sealing, packing
and fireproofing
where pipes,
ducts, conduits,
cables or trunking
pass through
slabs, walls,
beams and the
like

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

15 Providing all 1 Details stated item C11 Testing and


necessary spares commissioning is held
and tools to include:
(a) provision of water,
fuel, gas, electricity
and other supplies
(b) provision of test
certificates
(c) making good all
defects and re-testing
as necessary

Copyright : Arcadis 23 00 00/6


Copyright
Eighth : Arcadis
Edition, 2016 ©
Eighth Edition, 2016 ©
25 00 00/1
25 00 00 Integrated Automation
26 00 00 Electrical
27 00 00 Communications
28 00 00 Electronic Safety and Security
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Electrical D1 Work is held to C1 Work is held to be S1 Kind and quality of


installations are given be internal unless carried out in materials
under one of the described as accordance with all
following headings: external relevant codes of S2 Method of jointing
(a) Incoming Main and practice and statutory
Main Switch Gear regulations S3 Surface
(b) Standby Power treatments applied
Generation C2 Work is held to before delivery
(c) Mains and Sub- include:
mains Distribution (a) providing S4 Low Volatile
(d) General Lighting everything necessary Organic Compound
and Power for jointing
(e) Grounding and (b) clips, brackets,
Lightning Protection saddles, cleats,
(f) Others, stated hangers, straps,
screws, bolts and all
M2 Communication other fixings and
installation are given supports
under one of the (c) fixing to any
following headings: material by any means
(a) Telephone system necessary
(b) CATV/MATV (d) patterns, moulds,
system templates and the like
(c) Background Music (e) packing
and Paging system (f) finishes where part
(d) Others, stated of the components as
delivered
M3 Electronic Safety (g) anti-vibration fixings
and Security are given and mountings, spring
under one of the compensated and
following headings: seismic restraints,
(a) Security System vibration isolators and
(each system given isolating components
under a suitable (h) sundry items of a
heading) like nature
(b) Fire Detection and
Alarm Systems
(c) Others, stated

Copyright : Arcadis
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally (continued) M4 Integrated


Automation/Building
Management System
for facility equipment,
conveying equipment,
fire-suppression
systems, plumbing,
HVAC, electrical
systems,
communications
systems, electronic
safety and security
systems

CLASSIFICATION TABLE

1 Conduits 1 Type and size 1 In concrete m 1 Wrapping M5 Conduit is D2 Surface fixed C3 Conduit is held to
pedestals measured over all conduit includes: include:
2 External fittings and boxes (a) conduit fixed to (a) pull wires
2 Encased in surfaces which are (b) joints in the running
concrete M6 Trenches, subsequently length
chambers and beds for covered by (c) joints to boxes and
3 Surface fixed underground services suspended ceilings, distribution boards
are measured in raised floors, access (d) expansion joints,
4 Embedded Section 33 70 00 - panels and the like flexible conduits and
Electrical Utilities (b) conduit fixed in adaptors
5 In trenches and 33 80 00 – ducts or pipe (e) bends,
Communications Utility chases junctions/utility box and
(c) conduit generally all other fittings (except
surface fixed but for boxes designed by
embedded for short the Electrical Engineer)
parts of their lengths (f) boxes where
as required by the necessary but not
installation designed by the
Electrical Engineer
(g) all labors including
made bends
(h) components for
grounding
(i) sundry items of a
like nature

Copyright : Arcadis 25 00 00/2


Eighth Edition, 2016 ©
25 00 00 Integrated Automation (continued) 25 00 00/3
26 00 00 Electrical (continued)
27 00 00 Communications (continued)
28 00 00 Electronic Safety and Security (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

1 Conduits C4 Embedded conduit


(continued) is held to include:
(a) casting into
concrete, plaster and
toppings
(b) cutting chases in
any materials and
making good

C5 Conduit encased in
concrete is held to
include:
(a) concrete
(b) reinforcement
(c) excavation and
breaking out as
necessary
(d) backfilling with
selected excavated
material or as
otherwise specified
(e) disposal of surplus
excavated material
and/or spoil off site
(f) all other necessary
work

2 Boxes 1 Type and size No 1 External M7 Boxes are only D3 Boxes include
measured separately pull boxes, junction
where designed by the boxes, adaptable
Electrical Engineer. boxes, floor trap
Where not designed boxes, purpose
but necessary for the made boxes,
installation they are flameproof boxes
held to be included and all other special
with the conduit by boxes
Rule C3(f)

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

3 Wireways 1 Type and size 1 Surface fixed m 1 External M8 Wireways, cable D4 Surface fixed C6 Wireways, cable
ladders, cable trays, wireways, cable ladders, cable trays
underfloor ducts are ladders and cable and underfloor ducts
4 Cable ladders 2 Number of held to include end trays include: are held to include:
compartments closers, bends, tees, (a) connections to
(a) fixed to surfaces
5 Cable trays crosses, reducers and which are equipment
the like. subsequently (b) joints in the running
covered by length
suspended ceilings, (c) joints to conduit and
6 Underfloor ducts 1 Mounted on m distribution boards
concrete floors raised floors, access
panels and the like (d) joints to fittings
2 Embedded in (b) fixed in ducts or (e) hangers, supports
concrete and pipe chases and the like
concrete toppings (c) generally surface (f) all labors
fixed but embedded (g) components for
for short parts of grounding
their lengths as
required by the
installation

7 Busducts 1 Type, rated m D5 Fittings include C7 Connections to


capacity and end caps, bends, equipment
number of busbars tees, crosses,
reducers and the
C8 Busduct are held
like
to include:
8 Extra over busducts 1 Fittings No 1 External (a) joints in the running
for length
2 Tap off units (b) joints to
3 Feeder units accessories and
equipment
4 Plug in circuit (c) joints to fittings
breakers, ampacity (d) hangers, supports
rating stated and the like
(e) all labors including
5 Expansion joints cutting openings
6 Flexible busduct (f) components for
grounding
7 Special fittings
8 Connections to
equipment

Copyright : Arcadis 25 00 00/4


Eighth Edition, 2016 ©
25 00 00 Integrated Automation (continued) 25 00 00/5
26 00 00 Electrical (continued)
27 00 00 Communications (continued)
28 00 00 Electronic Safety and Security (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

9 Cables 1 Type and size 1 Drawn into m 1 External M9 Cable is measured D6 Surface fixed C9 Cables are held to
conduits, ducts or the net length following cables include: include:
wireways the shortest distance (a) cables fixed to (a) all labors
between points in surfaces which are (b) all joints where not
2 Drawn into existing straight lines except subsequently designed by the
conduits, ducts or that the following covered by Electrical Engineer but
trunking allowances are added suspended ceilings, required for the
for tails: raised floors, access installation
3 Fixed to cable trays (a) 0.30m on each panels and the like (c) color coding or
or ladders cable entering lighting (b) cables generally other identification
fixtures and surface fixed but markings
4 Surface fixed accessories drawn into conduits,
(b) 0.60m on each ducts or wireways, C10 Cables drawn into
5 Embedded cable entering fixed to cable trays existing conduit, ducts
equipment and control or embedded for or wireways are held to
6 Wrapping around gear (i.e. motors, short parts of their include removing and
pipework or transformers, lengths as required replacing existing
equipment panelboards, by the installation covers, inspection lids
disconnect switches, and the like
7 Laid in trenches enclosed circuit C11 Embedded cables
breakers and the like). are held to include:
(a) casting into
concrete, plaster and
toppings
(b) cutting chases in
any materials and
making good

10 Extra over cables 1 Joints designed by No 1 Shrouds S5 Details of joint


for the Electrical boxes, sealing boxes
Engineer 2 External and the like
2 Line taps
3 Termination kit

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

11 Grounding 1 Type and size m 1 External C12 Grounding


conductors conductors are held to
include:
(a) all labors
(b) all joints
(c) color coding or
other identification
markings

12 Air terminals 1 Type and size No 1 External

13 Electrodes 1 Type and size No 1 Driving into the


ground

14 Ground wells 1 Details stated No

15 Final circuits 1 Cables 1 Lighting points, No 1 Surface fixed M10 Final circuits are D7 Surface fixed C13 Final circuits are
stating whether wall measured on an include: held to include:
2 Conduits or ceiling mounted 2 Embedded enumerated points (a) work fixed to (a) providing
and whether basis where they form surfaces which are distribution diagrams
3 Cables and centrally or locally 3 External part of a domestic or subsequently and location drawings
conduits controlled similar simple covered by showing the layout of
installation from suspended ceilings, the points
2 Switch points, distribution boards and raised floors, access (b) all conduit fittings
stating whether one the like panels and the like and accessories
or two way and the (b) work generally necessary for the
number of gangs M11 Each lighting surface fixed but installation
3 Intermediate switch point is measured as embedded for short (c) all cable fittings and
points one point irrespective parts of their lengths accessories necessary
of the number of lamps as required by the for the installation
4 Socket outlet points installation (d) all work to conduits
M12 Socket outlet included in Rule C3
5 Immersion heater points, switch points (e) all work to cables
points and the like are included in Rule C9.
measured as one point
irrespective of the
number of gangs

Copyright : Arcadis 25 00 00/6


Eighth Edition, 2016 ©
25 00 00 Integrated Automation (continued) 25 00 00/7
26 00 00 Electrical (continued)
27 00 00 Communications (continued)
28 00 00 Electronic Safety and Security (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

15 Final circuits 6 Cooker points C14 Embedded final


(continued) circuits are held to
7 Fan points include:
8 Air conditioner (a) casting into
points concrete, plaster and
toppings
9 Others, stated (b) cutting chases in
any materials and
making good

16 Equipment 1 Type and size No 1 External D8 Equipment C15 Work is held to S6 Details of links,
includes motors, include fuses, circuit
17 Panelboards batteries, (a) all necessary breakers, gland
18 Disconnect transformers and supports plates, terminal boxes
switches the like (b) connections to and the like
conduit, wireways,
19 Enclosed circuit cable trays and cables
breakers

20 Lighting fixtures 1 Type and size No 1 External D9 Accessories and C16 Work is held to S7 Lighting fixtures
field devices include include: are to include details
21 Field devices switches, socket (a) boxes, connector of reflectors, shades,
22 Accessories outlets, thermostats, blocks lamps and the like
bell pushes, signal (b) connections to
indicating units, conduit, wireways, S8 Accessories are to
clocks, telephones, cable trays and cable state number of
alarm bells, (c) all necessary gangs where
loudspeakers, door ancillary work including appropriate
status, CCTV bushes, nipples,
camera, smoke locknuts and the like
detectors, heat (d) grounding
detectors, CATV, (e) all supports as
intercoms and the necessary for fixing
like

23 Identification, item
color coding and
labelling

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

24 Marking positions 1 Details stated item


of holes, mortices,
chases and the
like in the
structure

25 Cutting holes,
mortices, chases
and the like,
grouting and
making good after
installation

26 Providing all
sleeves for fixing
through slabs,
walls, beams and
the like

27 Wrapping
conduits, cables
or trunking in felt
or similar
protection where
work passes
through slabs,
walls, beams and
the like

28 Sealing, packing
and fireproofing
where work
passes through
slabs, walls,
beams and the
like

Copyright : Arcadis 25 00 00/8


Eighth Edition, 2016 ©
25 00 00 Integrated Automation (continued) 25 00 00/9
26 00 00 Electrical (continued)
27 00 00 Communications (continued)
28 00 00 Electronic Safety and Security (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

29 Providing all 1 Details stated item C17 Testing and


necessary spares commissioning is held
and tools to include:
(a) provision of water,
30 Testing and fuel, gas, electricity
commissioning and other supplies
(b) provision of test
certificates
(c) making good all
defects and re-testing
as necessary

31 Preparing 1 Information item


drawings required required and
by the Owner number of copies
stated
32 Operating and
maintenance
manuals

33 Temporary 1 Details stated 1 Duration stated item C18 Provision of water,


operation of fuel, gas, electricity
installations to and other supplies are
Owner's held to be included
requirements
34 Instruction of
Owner's
representatives in
operation,
maintenance,
preventive
maintenance and
service of
completed
installation

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

35 Maintenance 1 Details stated 1 Duration stated item S9 Details of:


(a) servicing
requirements and
frequency
(b) requirements for
emergency call outs
(c) requirements in
respect of repairs and
who pays for
damaged or
replacement parts

Copyright : Arcadis 25 00 00/10


Eighth Edition, 2016 ©
31 10 00/1
31 10 00 Site Clearing
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTAR
RULES Y INFORMATION

Generally M1 Relocation of C1 Work is held to S1 Kind and quality


existing trees, shrubs include: of materials
and plants are (a) grubbing up S2 Filling material
measured in Section roots where other than
32 90 00 - Planting (b) disposal of selected excavated
materials off site material
(c) filling voids with
selected excavated
material or as
otherwise described

CLASSIFICATION TABLE

1 Site clearance 1 Removing trees 1 Girth < 0.60m No M2 Tree girths are
measured at a height
2 Removing tree 2 Girth in further stages of of 1.00m above
stumps 0.60m ground
M3 Tree stump girths
are measured at the
top
M4 Removing trees
and tree stumps girth
< 0.60m are only
measured where an
item of clearing site
vegetation (31 10
00.1.3.1.*) is not
measured

Copyright : Arcadis
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTAR
RULES Y INFORMATION

1 Site clearance 3 Clearing site 1 Approximate area item D1 Site vegetation is


(continued) vegetation, loose grass, shrubs,
rubbish and debris bushes, undergrowth,
groundcover, hedges
and the like and trees
and tree stumps
< 0.60m girth

2 Protection of 1 Detailed description No


trees to remain

Copyright : Arcadis 31 10 00/2


Eighth Edition, 2016 ©
31 20 00/1
31 20 00 Earth Moving
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Base and sub C1 Work is held to S1 Kind and quality


P1 The following information is provided, where available: base courses to include: of materials
(a) soil investigation results roads, sidewalks, (a) excavating in any
(b) ground water level and the date when it was established walkways and ground encountered
(c) location of underground services pavements are except as otherwise
measured in Section provided in this
32 10 00 - Bases, section
Ballasts and Paving (b) excavating
around existing
M2 Topsoil filling for services
landscaping is (c) temporary
measured in Section support to existing
32 90 00 - Planting services
(d) removal of dead
services
(e) getting out
excavated materials
by any means
necessary
(f) grubbing up old
roots
(g) levelling or
grading bottoms,
trimming to slopes
and trimming to
vertical and sloping
sides (trimming to
surfaces against
which concrete is
directly cast is
measured in
accordance with
31 20 00.10.1.*.*)
(h) compacting
bottoms and sides
(i) protection to
sloping surfaces
(j) additional
excavation to
provide working
space and
backfilling thereto

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTAR
RULES Y INFORMATION

1 Excavating 1 Topsoil 1 State average depth m² M3 The quantities D1 Excavating to C2 Trenches for
given are the volume reduce levels underground
before excavating includes excavating services are
and no allowance is to form cuttings and included in the
2 To reduce levels 1 < 0.30m average depth m3 made for subsequent excavating into banks following sections:
variations to volume (a) 33 10 00 - Water
2 > 0.30m average depth D2 Trenches include Utilities
M4 Trenches excavation for (b) 33 30 00 -
3 Basements and the 1 Maximum depth < 2.00m m3 1 Commencing level attached to pile caps thickenings to slab on Sanitary Sewerage
like stated or pits are measured grade, beds and the Utilities
2 Maximum depth in between the pile caps like (c) 33 40 00 - Storm
4 Trenches further stages of 2.00m or pits Drainage Utilities
D3 Pits include (d) 33 50 00 - Fuel
5 Pile caps stanchion, column or Distribution Utilities
pier bases, isolated (e) 33 70 00 -
6 Pits footings, lift pits and Electrical Utilities
the like (f) 33 80 00 -
Communication
Utilities

2 Extra over any 1 Breaking out existing 1 Rock m3 D4 Rock is defined as


type of excavation materials naturally occuring
2 Concrete hard material which
necessitates its
3 Reinforced concrete and m² removal by means of
2 Breaking up existing
hard surfaces, concrete hollow blocks explosives,
thickness stated if pneumatic
known 4 Coated macadam or equipment, wedges
asphalt or chemical cracking
and where its volume
> 1.00m3
3 Excavating for soft m3
spots including
disposal and
backfilling with
approved granular
material

Copyright : Arcadis 31 20 00 /2
Eighth Edition, 2016 ©
31 20 00 Earth Moving (continued) 31 20 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTAR


RULES Y INFORMATION

3 Disposal 1 Topsoil 1 Deposited on site m3 1 Specified M5 The quantities C3 The work is held
locations, details given are the volume to include for all
2 Excavated materials 2 Off site stated before excavating multi-handling to
and no allowance is and from temporary
made for subsequent spoil heaps as and if
variations to volume necessary

C4 Disposal is held
to include any type
of excavated
material or broken
out materials-

1 Topsoil from m3 1 Selected, details M6 Filling is D5 All materials from C5 Work is held to
4 Backfilling to 1 < 0.30m average S2 Method of
excavations depth excavations stated measured as equal to excavations are held include: consolidation
the volume of the void to be suitable for (a) all multi-handling
5 Filling to make up 2 > 0.30m average 2 Excavated material 2 Soil poisoning to be filled filling. Where to and from S3 Depositing in
levels depth other than topsoil admixture, details materials from temporary spoil layers stating
stated M7 The thickness of excavations are not heaps as and if thickness of layers
6 Filling into planters 3 Imported materials, filling is measured as suitable the work is necessary
and the like, details stated the thickness after held to include (b) temporary
position stated if compaction approved imported retaining boards to
not at ground level materials as a edges and slopes
M8 Topsoil filling as substitute and (c) levelling, grading,
part of soft disposal off site of trimming and
landscaping is unsuitable material compacting
7 Filling to beds 1 Thickness stated m3 measured in Section (d) handpacking as
32 90 00 - Planting D6 Filling to make up necessary
levels is filling where (e) laying to falls,
the thickness varies slopes and contours
< 15º
D7 Filling to beds is
filling of a constant C6 Filling to make
thickness up levels is held to
include for forming
D8 Filling to beds embankments or
includes blinding terraces
beds

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTAR
RULES Y INFORMATION

7 Filling to beds C7 Filling to beds


(continued) and filling to make
up levels are held to
include providing
sand or other fine
material across the
surface to receive
vapor barriers,
concrete, asphalt
and the like

8 Formation of m² M9 Formation of
slopes >15º to slopes are only
filling materials measured where the
slope is >15º from
horizontal and >15º
from vertical

9 Formation of m² D9 Battered faces are


vertical and faces <15º from
battered faces to vertical
filling materials

10 Surface 1 Trimming to surfaces 1 Horizontal m² M10 Trimming to D10 Battered faces


treatments of excavations to surfaces of are faces <15º from
receive concrete 2 Sloping < 15º excavations is only vertical
measured to those
2 Trimming exposed 3 Sloping > 15º surfaces where
surfaces of rock to concrete is cast
produce fair face 4 Vertical and battered directly against the
surface of the
excavation

3 Soil poisoning m² S4 Method of


treatment

11 Removal of 1 Keeping the site and item


water all excavations
thereon free from
water by pumping or
otherwise

Copyright : Arcadis 31 20 00 /4
Eighth Edition, 2016 ©
31 41 00/1
31 41 00 Shoring
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Shoring associated C1 Work is held to S1 Kind and quality


with demolitions are include: of materials
held to be included (a) all necessary
with the demolitions wedges, cramps,
items included in fastenings and bolts
Section 02 40 00 - (b) welding and
Demolition and painting
Structure Moving (c) all necessary
incidental work for the
proper execution of the
item
(d) clearing away
(e) making good all
work disturbed

CLASSIFICATION TABLE

1 Shoring 1 Position and type of item 1 Maintaining,


shoring and nature duration stated
of structure
2 Adapting, details
stated

3 Cutting away
existing structures,
details stated

Copyright : Arcadis
Eighth Edition, 2016 ©
31 41 16 Sheet Piling
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Sheet piling is C1 Work is held to S1 Kind and quality


P1 The following information is provided, where available: measured the net include strutting and of materials
(a) soil investigation results elevation area (not shoring to sheet piling
(b) ground water level and the date when it was established developed) along the during subsequent
(c) location of underground services center line of the piling excavation and
(d) any particular requirement regarding phasing or sequence of piling foundation work

C2 Withdrawn piles
become the property of
the Contractor unless
otherwise described

C3 Piles described as
withdrawn are held to
include:
(a) cost of withdrawing
(b) allowance for any
credit for withdrawn
piles which become the
property of the
Contractor

CLASSIFICATION TABLE

1 Providing plant and item C4 Providing plant and


equipment on Site equipment is held to
include the subsequent
removal

2 Supplying piles 1 Dimensioned 1 Design length m² 1 Subsequently


description stated withdrawing

2 Trial piles

Copyright : Arcadis 31 41 16/1


Eighth Edition, 2016 ©
31 41 16 Sheet Piling (continued) 31 41 16/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

3 Driving piles 1 Dimensioned 1 Commencing level m² 1 Battered M2 The depth is C5 Driving is held to
description stated measured from the include:
2 Subsequently formation level of the (a) initial trenching
withdrawing ground to the bottom (b) strutting, waling,
edge of the piling ties and other supports
3 Set to curve (c) jointing to extend
piling vertically
4 Trial piles (d) driving through any
ground encountered
(e) driving through
rock, concrete,
reinforced concrete,
roots and all other
obstructions including
excavation and
breaking out as
necessary
(f) disposal of spoil off
site

4 Extra over for 1 Corner piles 1 Dimensioned m 1 Battered


special piles description
2 Junction piles 2 Subsequently
withdrawing
3 Other special piles
3 Trial piles

5 Cutting off surplus m 1 Trial piles C6 Offcuts become the


lengths property of the
Contractor unless
otherwise described

6 Cutting holes 1 Size and shape No 1 Trial piles


through piling

7 Pile tests 1 Details stated No 1 Trial piles C7 Temporary pile


caps and provision of
all anchors, platforms,
loading materials and
the like are held to be
included

Copyright : Arcadis
Eighth Edition, 2016 ©
31 50 00 Excavation Support and Protection
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Sheet piling is S1 Kind and quality of


P1 The following information is provided, where available: measured in Section materials
(a) soil investigation results 31 41 16 - Sheet Piling
(b) ground water level and the date when it was established
(c) location of underground services

CLASSIFICATION TABLE

1 Rock anchors 1 Dimensioned No 1 Trial anchors M2 The lengths of C1 Work is held to


description tendons are measured include:
2 Soil nails between the outer (a) drilling through any
ends of anchorages ground encountered
including concrete,
reinforced concrete,
roots and all other
obstructions and
drilling at various
depths and elevations
(b) disposal of spoil off
site
(c) ducts, grouting,
spacers and grout
tubes
(d) anchors, bolts,
plates and the like
(e) sheathing
(f) stressing and
distressing
(g) protective coatings
(h) all necessary
incidental work for its
proper execution
(i) dismantling and
clearing away

2 Tests 1 Details stated No C2 Provision of


anchors, loading
materials and all other
work necessary for
testing are held to be
included

Copyright : Arcadis 31 50 00/1


Eighth Edition, 2016 ©
31 50 00 Excavation Support and Protection (continued) 31 50 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

3 Shotcreting 1 Dimensioned 1 Vertical m² 1 Subsequently D1 Horizontal C3 Work is held to


description removed includes slopes < 15o include:
2 Horizontal from horizontal (a) reinforcement
(b) ties and supports
3 Sloping D2 Vertical includes (c) trimming to
slopes <15o from excavation faces
vertical (d) additional
excavation and
D3 Sloping is defined disposal off site
as slopes >15o from (e) all necessary
horizontal and >15o incidental work for its
from vertical proper execution

C4 Removal includes
disposal off site

4 Excavation support 1 To faces of item M3 This item is C5 Excavation support


where not designed excavations included in the bills of is held to include for
by the Structural quantities, even if designing and
Engineer excavation support is providing everything
designed by the necessary to uphold
Structural Engineer, so and maintain the sides
that any additional of excavations
support required by the including soil nails,
Contractor can be rock anchors, steel
allowed for sheet piling, shoring
sheets, shotcreting and
M4 Excavation support timber strutting and for
designed by the any extra excavation
Structural Engineer is required therefore
measured in
accordance with the
rules of this section or
of the other relevant
sections

Copyright : Arcadis
Eighth Edition, 2016 ©
31 62 00 Precast Concrete Piles
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally C1 Rates for precast S1 Kind and quality of


P1 The following information is provided, where available: concrete pile shall materials
(a) soil investigation results include:
(b) ground water level and the date when it was established (a) non-reusable cut-
(c) location of underground services off lengths and
(d) any particular requirement regarding phasing or sequence of piling removal from site
(b) redriving of heaved
pile
(c) replacement of
incorrectly driven piles,
damaged pile and piles
which fail under tests
(payment will be based
on the original design
of the pile as if it had
been carried out
correctly)
(d) penalty piles
(e) all necessary
excavation, filling and
removal of spoil
incidental to piling
(f) preparation and
submission of piling
records and as-built
drawings
(g) sundry work of a
like nature

Copyright: Arcadis
: Arcadis
Copyright
Eighth Edition, 2016 ©
31 62 00/1
Eighth Edition, 2016 ©
31 62 00 Precast Concrete Piles (continued) 31 62 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

1 Providing plant and item C2 Providing plant and


equipment on Site equipment is held to
include the;
(a) Subsequent
removal
(b) provision of staging
and working platforms
of any type and all
other temporary
associated works and
subsequently clearing
and removing,
including making good
work disturbed
(c) all necessary
levelling or other
preparations including
excavation and filling in
2 Supplying piles 1 Size of cross 1 Design length No 1 Trial piles M1 The payable length C3 Supplying piles is
section stated stated for supply of piles shall held to include:
be based on the actual (a) molds
2 Initial piles number and length (b) reinforcement
3 Extension piles delivered and (c) pretensioning
subsequently (d) heads, shoes and
incorporated into the rock shoes where not
works. However designed by the
payment shall be Structural Engineer
based on initial and (e) all necessary joint
extension piles being to extension piles
supplied in the most
economic commercially C4 Preparing tops to
available lengths to receive pile extensions
suit the required is held to be included
overall length of the
designed pile subject
always to the
instructions of the
Project Manager

3 Driving piles 1 Commencing level m 1 Battered M2 Measured from the C5 Driving is held to
stated shoe point in contact include:
2 Trial piles with the ground when (a) driving through any
pitched to the shoe ground encountered
point

Copyright : Arcadis
Eighth Edition, 2016 ©
Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

3 Driving piles (b) driving through


(continued) rock, concrete,
reinforced concrete,
roots and all other
obstructions including
excavation and
breaking out as
necessary
(c) disposal of spoil off
site

4 Pre-boring 1 Size of cross 1 Maximum depth m 1 Trial piles M3 Pre-boring is only C6 Pre-boring is held S2 Type of grout
section stated stated measured where it is to include;
specifically required (a) grouting up voids
between sides of piles
and bores
(b) boring through any
ground encountered
(c) boring through rock,
concrete, reinforced
concrete, roots and all
other obstructions
(d) disposal of
excavated material off
site

5 Heads 1 Dimensioned No 1 Trial piles M4 Heads, shoes and


description rock shoes are only
6 Shoes measured where
designed by the
7 Rock shoes Structural Engineer

8 Cutting off tops of No 1 Trial piles C7 Cutting off tops of


piles piles is held to include:
(a) integration of
reinforcement into pile
caps or ground beams
including cleaning,
cutting and bending
(b) disposal

9 Pile tests 1 Details stated No 1 Trial piles C8 Temporary pile


caps and provision of
all anchors, platforms,
loading materials and
the like are held to be
included

Copyright : Arcadis
Eighth Edition, 2016 ©
Copyright : Arcadis 31 62 00/3
Eighth Edition, 2016 ©
31 62 13/1
31 62 13 Cast in Place Concrete Piles
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 Withdrawn pile S1 Kind and quality


P1 The following information is provided, where available: casings become the of materials
(a) soil investigation results property of the
(b) ground water level and the date when it was established Contractor unless
(c) location of underground services otherwise described
(d) any particular requirement regarding phasing or sequence of piling
C2 The cost of
withdrawing is held to
be included with pile
casings so described

CLASSIFICATION TABLE

1 Providing plant and item C3 Providing plant and


equipment on Site equipment is held to
include the subsequent
removal

2 Supplying pile 1 Internal size of 1 Design length No 1 Subsequently C4 Supplying piles is


casings casing stated stated withdrawing held to include heads,
shoes and rock shoes
2 Trial piles where not designed by
the Structural Engineer

3 Driving pile casings 1 Internal size of 1 Commencing level m 1 Battered M1 Measured from the C5 Driving is held to
casing stated stated shoe point in contact include:
2 Subsequently with the ground when (a) driving through any
withdrawing pitched to the shoe ground encountered
point when driven (b) driving through
3 Trial piles rock, concrete,
reinforced concrete,
roots and all other
obstructions including
excavation and
breaking out as
necessary
(c) excavation within
casings
(d) disposal of spoil off
site

Copyright : Arcadis
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

4 Concrete filling 1 Internal size of m 1 Trial piles M2 Measured from the C6 Concrete filling is
casing stated bottom of the driven held to include:
casing to the cut-off (a) additional concrete
level of the pile which is subsequently
cut off
(b) additional concrete
for filling fissures
encountered during
piling

5 Heads 1 Dimensioned No 1 Trial piles M3 Heads, shoes and


description rock shoes are only
6 Shoes measured where
designed by the
7 Rock shoes Structural Engineer

8 Extra over for 1 Formation of 1 Nominal diameter No 1 Trial piles C7 Enlarging bases is
enlarged bases stated held to include:
(a) additional
excavation and
disposal
(b) additional concrete

9 Reinforcement kg 1 Trial piles M4 Reinforcement is


measured in
accordance with
Section 03 20 00 -
Concrete Reinforcing

10 Cutting off tops of 1 Nominal diameter No 1 Trial piles C8 Cutting off tops of
piles stated piles is held to include:
(a) integration of
reinforcement into pile
caps or ground beams
including cleaning,
cutting and bending
(b) disposal

11 Pile tests 1 Details stated No 1 Trial piles C9 Temporary pile


caps and provision of
all anchors, platforms,
loading materials and
the like are held to be
included

Copyright : Arcadis 31 62 13/2


Eighth Edition, 2016 ©
31 62 16/1
31 62 16 Steel Piles
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 Withdrawn piles S1 Kind and quality


P1 The following information is provided, where available: become the property of of materials
(a) soil investigation results the Contractor unless
(b) ground water level and the date when it was established otherwise described
(c) location of underground services
(d) any particular requirement regarding phasing or sequence of piling C2 Piles described as
withdrawn are held to
include:
(a) cost of withdrawing
(b) allowance for any
credit for withdrawn
piles which become the
property of the
Contractor

CLASSIFICATION TABLE

1 Providing plant and item C3 Providing plant and


equipment on Site equipment is held to
include the subsequent
removal

2 Supplying piles 1 Cross sectional 1 Design length No 1 Coatings, details


shape, dimensions stated stated
and weight per
meter 2 Subsequently
withdrawing

3 Trial piles

3 Driving piles 1 Cross sectional 1 Commencing level m 1 Battered M1 Measured from the C4 Driving is held to
shape, dimensions stated point in contact with include:
and weight per 2 Subsequently the ground to the point (a) jointing to extend
meter withdrawing when driven piles
(b) driving through any
3 Trial piles ground encountered

Copyright : Arcadis
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

3 Driving piles (c) driving through


(continued) rock, concrete,
reinforced concrete,
roots and all other
obstructions including
excavation and
breaking out as
necessary
(d) disposal of spoil off
site

5 Cutting off tops of 1 Cross sectional No 1 Trial piles C5 Cutting off tops of
piles shape, dimensions piles is held to include
and weight per disposal
meter

6 Pile tests 1 Details stated No 1 Trial piles C6 Temporary pile


caps and provision of
all anchors, platforms,
loading materials and
the like are held to be
included

Copyright : Arcadis 31 62 16/2


Eighth Edition, 2016 ©
31 63 00/1
31 63 00 Bored Piles
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally S1 Kind and quality


P1 The following information is provided, where available: of materials
(a) soil investigation results
(b) ground water level and the date when it was established
(c) location of underground services
(d) any particular requirement regarding phasing or sequence of piling

CLASSIFICATION TABLE

1 Providing plant and item C1 Providing plant and


equipment on Site equipment is held to
include the subsequent
removal

2 Boring pile holes 1 Nominal diameter 1 Maximum depth m 1 Support fluid M1 Measured from the C2 Boring pile holes is
stated and commencing point of entry into the held to include:
level stated 2 Battered ground to the bottom of (a) boring through any
the bore ground encountered
3 Trial piles (b) boring through rock,
M2 Support fluid is concrete, reinforced
included in the concrete, roots and all
description where other obstructions
designed by the (c) disposal of
Structural Engineer excavated material off
site
(d) supports to sides of
excavations including
support fluid

3 Concrete filling m 1 Trial piles M3 Measured from the C3 Concrete filling is


bottom of the bore to held to include:
the cut-off level of the (a) additional concrete
pile which is subsequently
cut off
(b) additional concrete
for filling fissures
encountered during
boring

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

4 Extra over for 1 Formation of 1 Nominal diameter No 1 Trial piles C4 Enlarging bases is
enlarged bases stated held to include:
(a) additional
excavation and
disposal
(b) additional concrete

5 Reinforcement kg 1 Trial piles M4 Reinforcement is


measured in
accordance with
Section 03 24 00 -
Concrete Reinforcing

6 Cutting off tops of 1 Nominal diameter No 1 Trial piles C7 Cutting off tops of
piles stated piles is held to include:
(a) integration of
reinforcement into pile
caps or ground beams
including cleaning,
cutting and bending
(b) disposal

7 Contractor 1 Load to be carried 1 Commencing level No 1 Designed length M5 Lengths and C5 Contractor S2 Types of piles,
designed piles stated and depth of stated depths are measured designed piles are held method of driving or
top of piles below to the cut off levels of to include: boring and other
commencing level 2 Battered the piles (a) driving or boring Structural
through any ground Engineer's
3 Trial piles M6 Lengths are only encountered requirements
given where designed (b) driving or boring
by the Structural through rock, concrete,
Engineer reinforced concrete,
roots and all other
obstructions including
excavation and
breaking out as
necessary
(c) disposal of spoil off
site
(d) all work included in
Sections 31 41 16 to
31 63 00 as applicable

Copyright : Arcadis 31 63 00/2


Eighth Edition, 2016 ©
31 63 00 Bored Piles (continued) 31 63 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

8 Production of item C6 Design information S3 Details of


design information is held to include: drawings and other
(a) design drawings design information
(b) working drawings required
(c) structural
calculations
(d) all other information
necessary to evaluate
the Contractor's design
(e) presentation of
design information to
the Project Manager
and Structural
Engineer and
incorporating any
design revisions as
requested

9 Pile tests 1 Details stated No 1 Trial piles C8 Temporary pile


caps and provision of
all anchors, platforms,
loading materials and
the like are held to be
included

Copyright : Arcadis
Eighth Edition, 2016 ©
31 66 16 Diaphragm Walls
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally S1 Kind and quality


P1 The following information is provided, where available: of materials
(a) soil investigation results
(b) ground water level and the date when it was established
(c) location of underground services

CLASSIFICATION TABLE

1 Providing plant and item C1 Providing plant and


equipment on site equipment is held to
include the subsequent
removal

2 Excavating and 1 Thickness of wall, 1 Support fluid, m3 M1 The quantities C2 The following are S2 Details of
disposal maximum depth details stated given are the volume held to be included: support fluid
and commencing before excavating and (a) support fluid
level stated no allowance is made (b) subsequent disposal S3 Limitations on
for subsequent of support fluid method of disposal
variations to volume (c) disposal of
excavated material off
site
(d) excavating in any
ground encountered
except as otherwise
provided in this section
(e) removal of dead
services
(f) getting out excavated
materials by any means
necessary
(g) grubbing up old
roots

Copyright
Copyright : Arcadis
: Arcadis 31 66 16/1
Eighth
Eighth Edition,
Edition, 20162016
© ©
31 66 16 Diaphragm Walls (continued) 31 66 16/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

3 Extra over 1 Breaking out 1 Rock m3 D1 Rock is defined as


excavation existing materials naturally occurring
2 Concrete hard material which
necessitates its
2 Breaking up 3 Reinforced m² removal by means of
existing hard concrete and explosives,
surfaces, thickness concrete hollow pneumatic
stated if known blocks equipment, wedges
or chemical cracking
4 Coated macadam and where its volume
or asphalt >1.00m3

4 Backfilling empty m3 M2 Backfilling is


trenches measured in
accordance with
Section 31 20 00 -
Earthmoving

5 Concrete 1 Thickness of wall m3 M3 Concrete is C3 Concrete is held to


stated measured in include:
accordance with (a) additional concrete
Section 03 30 00 - which is subsequently
Cast in Place Concrete cut off
(b) cast in pockets or
M4 The volume of chases at junctions
concrete is calculated
using the nominal
lengths and
thicknesses of the
walls and the depths
from the bottom of the
excavation to the cut
off level

6 Reinforcement kg M5 Reinforcement is
measured in
accordance with
Section 03 20 00 -
Concrete Reinforcing

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

7 Pre cast 1 Thickness of wall m² M6 Precast units are C4 Work is held to


stated measured in include for all special
accordance with fittings
03 41 00 Precast
Structural Concrete

8 Cutting off tops of 1 Thickness of wall m C5 Cutting off tops of


walls stated walls is held to include:
(a) excavation to
provide working space
and backfilling thereto
(b) disposal of surplus
excavated material

9 Trimming and 1 Details stated m²


cleaning face of
diaphragm wall

10 Construction m M7 Construction joints C6 Construction joints


joints are measured in not designed by the
accordance with Structural Engineer and
Section 03 15 00 - required for the
Concrete Accessories Contractor's method of
working are held to be
M8 Construction joints included and include for
are only measured associated formwork,
where designed by the fillers, sealants,
Structural Engineer waterstops and all other
necessary work

11 Guide walls 1 One side 1 Limitations on m 1 Subsequently M9 The lengths C7 Work is held to
design and removed measured for guide include excavation,
2 Both sides construction stated walls are those of the disposal, concrete,
diaphragm walls reinforcement, formwork
and all other necessary
work for the proper
execution of the item

12 Tests 1 Details stated No C8 Provision of


platforms, loading
materials and all other
work necessary are held
to be included

Copyright : Arcadis 31 66 16/3


Eighth Edition, 2016 ©
32 10 00/1
32 10 00 Bases, Ballasts and Paving
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally M1 Excavation and S1 Kind and quality


filling to make up levels of materials
are measured in
Section 31 20 00 -
Earth Moving

CLASSIFICATION TABLE

1 Base courses 1 To roads M2 Work is measured D1 Walkways and


in accordance with the pavements include all
2 Sub base courses 2 To sidewalks rules in the appropriate hard surfaces other
sections than roads and
3 Concrete formwork 3 To walkways and sidewalks
pavements M3 Macadam is
4 Concrete measured in
reinforcement 4 To flights of steps accordance with the
rules for asphalt in
5 Cast in place Section 07 10 00 –
concrete Dampproofing and
Waterproofing
6 Designed joints
M4 Toppings are
7 Concrete finishing measured in
accordance with
8 Asphalt Section 03 50 00 -
Cast Decks and
9 Macadam Underlayment

10 Topping M5 Tile and slab


finishes measured in
11 Tile and slab accordance with
Section 09 30 00 - Tile
finishes and Slab Finishes

12 Curbs 1 Dimensioned m 1 Foundations M6 Precast concrete C1 Work is held to S2 Size of


description curbs, edgings, wheel include ends, angles foundations
13 Edgings 2 Haunching one side stops and channels are and intersections
3 Haunching both measured in S3 Details of
14 Wheel stops accordance with the C2 Channels are held reinforcement,
sides
rules in Section 03 45 to include outlets surface finishes and
15 Channels 4 Excavating 00 - Precast joints
trenches Architectural Concrete
5 Curved

Copyright : Arcadis
Eighth Edition, 2016 ©
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

12 Curbs (continued) M7 Cast in place C3 Cast in place


concrete curbs, concrete work is held
13 Edgings edgings, wheel stops to include
(continued) and channels are reinforcement,
measured as formwork, joints and
14 Wheel stops composite items surface finishes
(continued)
C4 Excavating
15 Channels trenches is held to
(continued) include disposal of
excavated material,
backfilling, earthwork
support and
consolidating bottoms
of trenches

16 Channel covers m M8 Precast concrete C5 Work is held to


channel covers are include ends, angles
measured in and intersections
accordance with
Section 03 45 00 -
Precast Architectural
Concrete
M9 Metal channel
covers are measured
in accordance with
Section 05 50 00 -
Metal Fabrications

17 Geotextiles m² M10 No deduction is C6 Work is held to


made for voids include:
< 0.50m² (a) laying to falls,
currents, slopes and to
M11 Geotextiles are vertical surfaces
measured the net area (b) extra material for
covered with no laps
allowance for laps

18 Surface markings 1 Lines M12 Surface markings


are measured in
2 Letters, shapes and accordance with the
symbols rules in Section 09 90
00 - Painting and
3 Arrow heads or Coating
tails

Copyright : Arcadis 32 10 00/2


Eighth Edition, 2016 ©
32 31 00/1
32 31 00 Fences and Gates
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally D1 Surface C1 Excavation is held S1 Kind and quality


treatments prior to to include: of materials
erection includes (a) excavating in any
painting ground encountered S2 Surface
including excavating treatments prior to
through rock, concrete, erection stating
reinforced concrete whether on or off
and all other site
obstructions except as
otherwise provided in
this section
(b) getting out
excavated materials by
any means necessary
(c) grubbing up old
roots
(d) levelling bottoms
and trimming to vertical
and sloping sides
(e) compacting
bottoms and sides
(f) additional
excavation to provide
working space and
backfilling thereto
(g) earthwork support
(h) removal of water by
pumping or otherwise

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Fencing 1 Dimensioned 1 Type, spacing, m 1 Fencing set out to a D2 The height of C2 Work is held to S3 Type and size of
description height and depth of curve but straight fencing is measured include: footings to supports
supports between posts from the surface of (a) ends, angles,
the ground (or other bends and all other S4 Where not
2 Curved fencing, stated base) to the changes in direction supported by
radii stated top of the infilling or, (b) excavating holes for footings, method of
where there is no supports fixing and nature of
3 Fencing to ground infilling, to the top (c) backfilling with base
sloping > 15º from wire or rail selected excavated
the horizontal material or as S5 Backfilling
D3 Curved fencing is otherwise described material where other
fencing curved (d) disposal of surplus than selected
between supports excavated material off excavated material
2 Extra over for 1 Type stated 1 Size, height and No
site
special supports depth stated
D4 Special supports (e) formwork to
are end posts, angle footings
3 Extra over for
posts and the like (f) all necessary
integral gate posts
which differ in nature supports, fixings and
to the general design ancillary work
4 Independent gate
posts
D5 Integral gate posts C3 Gate posts are
are those integral with held to include stops,
the fencing fixings and all other
accessories
D6 The height of
supports is the height
above the surface of
the ground or other
stated base

D7 The depth of
supports is the depth
below the surface of
the ground or other
stated base

Copyright : Arcadis 32 31 00/2


Eighth Edition, 2016 ©
32 31 00 Fences and Gates (continued) 32 31 00/3

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

5 Gates 1 Dimensioned No 1 Hardware, stated C4 Gates are held to


description include gate stops,
gate catches and
independent gate stays
and their associated
works

6 Extra over 1 Breaking up 1 Roads No 1 Reinstating to


excavating holes existing hard match existing
for supports for surfaces, thickness 2 Sidewalks
stated if known
3 Walkways and
pavements

Copyright : Arcadis
Eighth Edition, 2016 ©
32 90 00 Planting
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

Generally M1 Excavation and S1 Kind and quality


filling to make up levels of materials
are measured in
Section 31 20 00 -
Earth Moving

CLASSIFICATION TABLE

1 Topsoil M2 Topsoil is
measured in
accordance with
Section 31 20 00 –
Earth Moving

2 Cultivating 1 Depth stated m² 1 Weeding, details D1 Surface C1 Cultivating is held to


stated applications include include the removal of
herbicides, selective stones
weedkillers, peat,
manure, compost, C2 Surface applications
fertiliser, sand and are held to include
3 Surface 1 Type and rate per the like working in if required
applications m² stated

4 Seeding 1 Rate stated m² 1 Preparatory work, C3 Seeding and turfing S2 Method of


details stated are held to include work securing turves
to contours and slopes
2 Sloping > 15º <15º

5 Turfing C4 Seeding is held to


include raking or
harrowing in and rolling

6 Turfing edges of 1 Width stated


seeded areas

Copyright : Arcadis 32 90 00/1


Eighth Edition, 2016 ©
32 90 00 Planting (continued) 32 90 00/2

CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY


RULES RULES INFORMATION

7 Trees 1 Botanical name 1 Girth and height No C5 Work is held to S3 Size of pits,
include: holes and trenches,
(a) excavating or forming excavated or formed
pits, holes or trenches
8 Young nursery 1 Height No (b) backfilling with S4 Details of any
stock trees selected excavated supports, ties,
material or as otherwise guards, wrapping
9 Shrubs described and other sundry
(c) disposal of surplus work
excavated material
10 Hedge plants 1 Height stated No
(d) removal of surface S5 Backfilling
and ground water material where other
(e) watering in than selected
(f) initial cutting back excavated material
2 Height, spacing, m (g) labelling
number of rows, S6 For relocation of
and layout stated C6 Relocation is held to trees, shrubs and
include maintenance of plants details of:
the trees, shrubs or (a) existing and new
plants until replanted locations
11 Herbaceous 1 Size stated No (b) temporary
plants storage including
details of nurseries
2 Size and number m² and duration of
per m² stated storage

12 Bulbs and tubers 1 Size stated No

2 Number per m² m²
stated

13 Relocate existing 1 Girth and height No


trees

14 Relocate existing 1 Height stated No


shrubs

15 Relocate existing
plants

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION COVERAGE RULES SUPPLEMENTARY
RULES RULES INFORMATION

16 Removal of dead 1 Height stated No


trees

17 Retain and protect No


existing trees

18 Mulching after 1 Around individual 1 Thickness and area No


planting plants stated

2 Beds 1 Thickness stated m²

19 Boulders 1 Type of boulder, No


Dimensioned
description,
method of placing
and securing in
20 Pebbles position m²

21 Temporary 1 Duration and M3 Temporary fencing


fencing ultimate ownership, is only measured here
details stated where specifically
required and then in
accordance with
Section 32 31 00 -
Fences and Gates

22 Maintenance of 1 Duration stated item C7 Work is held to S7 Specific


trees, plants and include: requirements for
grass (a) watering, fertilisation, watering,
cultivation, cutting, fertilisation,
pruning and all other cultivation, cutting
work to maintain the and pruning
trees, plants and grass
for the duration stated
(b) replacing dead,
damaged, diseased or
otherwise defective
trees, plants and grass

Copyright : Arcadis 32 90 00/3


Eighth Edition, 2016 ©
33 10 00/1
33 10 00 Water Utilities
33 30 00 Sanitary Sewerage Utilities
33 40 00 Storm Drainage Utilities
33 50 00 Fuel Distribution Utilities
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 All excavation is S1 Kind and quality of


P1 The following information is provided, where available: M1 Maintenance held to include: materials
(a) soil investigation results equipment is given (a) excavating in any
(b) ground water level and the date when it was established under one of the ground encountered
(c) location of underground services following headings: except as otherwise
a) Water Utilities provided in this section
b) Sanitary Sewerage (b) excavating around
Utilities existing services
c) Storm Drainage (c) temporary support
Utilities to existing services
d) Fuel Distribution (d) removal of dead
Utilities services
e) Others, stated (e) getting out
excavated materials by
any means necessary
(f) grubbing up old
roots
(g) levelling or grading
bottoms, trimming to
slopes and trimming to
vertical and sloping
sides
(h) compacting
bottoms and sides
(i) additional
excavation to provide
working space and
backfilling thereto
(j) earthwork support
(k) removal of water by
pumping or otherwise

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Excavating 1 Pipes < 200mm 1 Average depth m 1 Commencing level C2 Work is held to S2 Backfilling
trenches diameter 250mm include: material where other
2 Curved (a) backfilling with than selected
2 Pipes > 200mm 2 and thereafter in selected excavated excavated material
diameter, size stages of 250mm material or as
stated otherwise described
(b) disposal of surplus
3 More than one excavated material off
pipe, sizes stated site

2 Beds 1 Width and 1 Nominal diameter m 1 Curved C3 Work is held to


thickness of pipe stated include formwork
of bed

3 Beds and
haunchings

4 Beds and surrounds 1 Width and


thickness
of bed and
thickness of
surround

5 Vertical casings 1 Thickness of m


surround

6 Pipes 1 Nominal size 1 In trenches m 1 Wrapping M3 Pipes are C4 Pipes are held to S3 Method of jointing
measured over all include for: pipes
2 Other, stated 2 Vertical bends, junctions and (a) all jointing
similar fittings materials
3 Curved pipes (b) brackets for fixing
to walls, manhole
4 Straight pipes set sides and the like
out to curve (c) concrete thrust
blocks

Copyright : Arcadis 33 10 00/2


Eighth Edition, 2016 ©
33 10 00 Water Utilities (continued) 33 10 00/3
33 30 00 Sanitary Sewerage Utilities (continued)
33 40 00 Storm Drainage Utilities (continued)
33 50 00 Fuel Distribution Utilities (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

7 Extra over pipes for 1 Fittings 1 Dimensioned No 1 Wrapping M4 Reducing fittings D1 Fittings include C5 Fittings are held to S4 Method of jointing
description are measured extra bends, junctions, include: to pipes if different to
over the largest of the reducers, connectors, (a) extra joints on general pipes
pipes on which they adaptors and the like pipes
occur and include for (b) concrete thrust
separate reducers blocks
where a fitting of the
required sizes is not
available

8 Pipe accessories 1 Dimensioned No D2 Accessories C6 Accessories are


description include catch basins, held to include:
area drains, ground (a) connections to
clean outs, valves, pipes and bedding in
9 Equipment hydrants, grease concrete
interceptors and the (b) concrete thrust
like blocks
D3 Equipment
includes tanks,
pumps and the like

10 Manholes 1 Dimensioned 1 Commencing level No 1 Backdrops D4 The depth given is C7 Work is held to S5 Backfilling
description and of excavation that from the cover include: material where other
11 Inspection depth to invert stated level to the invert (a) excavation than selected
chambers level (b) backfilling with excavated material
selected excavated
12 Septic Tanks material or as
otherwise described
(c) disposal of surplus
excavated material
(d) connections of
pipes
(e) all work necessary
to complete the
manhole, chamber or
septic tank

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

13 Extra over any 1 Breaking out 1 Rock m3 M5 The volume of D5 Rock is defined as
type of excavation existing materials breaking out existing naturally occurring
2 Concrete materials in trenches is hard material which
based on the width of necessitates its
3 Reinforced the beds in the removal by means of
concrete and trenches. Where there explosives,
concrete hollow are no beds the width pneumatic
blocks to be taken is the equipment, wedges
nominal size of the or chemical cracking
pipe plus 300mm and where its volume
>1.00m3

2 Breaking up 1 Roads m 1 Reinstating to M6 Lengths are C8 Removal and S6 Type and


existing hard match existing measured across reinstatement of curbs thickness of
surfaces, pipe 2 Sidewalks manholes and other and channels are held surfacing, base and
diameter stated chambers to be included sub-base courses, if
3 Paths and pavings known
C9 Work is held to
include additional
breaking up and
reinstatement to and
around manholes and
other chambers

14 Works to existing 1 Details stated No


manholes

15 Connections with 1 Details stated 1 Depth to invert No D6 Public mains


public mains include water,
drainage, sewer and
the like

16 Testing and 1 Details stated item D7 Treatment of C10 Testing and


commissioning completed commissioning is held
installations includes to include:
disinfecting water (a) provision of
17 Treatment of distribution system
completed water, fuel, gas,
installations electricity and
other supplies
(b) provision of test
certificates
(c) making good all
defects and re-
testing as
necessary

Copyright : Arcadis 33 10 00/4


Eighth Edition, 2016 ©
33 70 00/1
33 70 00 Electrical Utilities
33 80 00 Communications Utilities
INFORMATION TO BE PROVIDED MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

Generally C1 All excavation is S1 Kind and quality of


P1 The following information is provided, where available: held to include: materials
(a) soil investigation results (a) excavating in any
(b) ground water level and the date when it was established ground encountered
(c) location of underground services except as otherwise
provided in this section
(b) excavating around
existing services
(c) temporary support
to existing services
(d) removal of dead
services
(e) getting out
excavated materials by
any means necessary
(f) grubbing up old
roots
(g) levelling or grading
bottoms, trimming to
slopes and trimming to
vertical and sloping
sides
(h) compacting
bottoms and sides
(i) additional
excavation to provide
working space and
backfilling thereto
(j) earthwork support
(k) removal of water by
pumping or otherwise

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

1 Excavating 1 Pipe, size stated 1 Average depth m 1 Commencing level D1 If ducting is used, C2 Work is held to S2 Backfilling
trenches 250mm the diameter of the include: material where other
2 More than one 2 Curved duct is stated (a) backfilling with than selected
pipe, sizes stated 2 and thereafter in selected excavated excavated material
stages of 250mm material or as
otherwise described
(b) disposal of surplus
excavated material off
site

2 Beds 1 Width and 1 Nominal diameter m 1 Curved D2 If ducting is used, C3 Work is held to
thickness of bed of pipe stated the diameter of the include formwork
duct is stated
3 Beds and
haunchings

4 Beds and 1 Width and


surrounds thickness
of bed and
thickness of
surround
5 Vertical casings 1 Thickness of
surround

6 Pipes 1 Nominal size 1 In trenches m 1 Wrapping M1 Pipes are C4 Pipes are held to S3 Method of jointing
measured over all include for: pipes
2 Other, stated 2 Vertical bends, junctions and (a) all jointing
similar fittings materials
3 Curved pipes (b) brackets for fixing
to walls, manhole
4 Straight pipes set sides and the like
out to curve (c) concrete thrust
blocks

7 Extra over pipes for 1 Fittings 1 Dimensioned No 1 Wrapping D3 Fittings include C5 Fittings are held S4 Method of jointing
description bends, junctions, to include: to pipes if different to
reducers, connectors, (a) extra joints on general pipes
adaptors and the like pipes
(b) concrete thrust
blocks

Copyright : Arcadis 33 70 00/2


Eighth Edition, 2016 ©
33 70 00 Electrical Utilities (continued) 33 70 00/3
33 80 00 Communications Utilities (continued)

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION

8 Pipe accessories 1 Dimensioned No D4 Accessories C6 Accessories are


description include end bell, held to include:
service entrance cap (a) connections to
and the like pipes

9 Equipment No D5 Equipment
includes switchgear,
transformers,
generator sets and the
like

10 Manholes 1 Dimensioned 1 Commencing level No 1 Backdrops C7 Work is held to S5 Backfilling


description of excavation include: material where other
stated (a) excavation than selected
(b) backfilling with excavated material
selected excavated
material or as
otherwise described
(c) disposal of surplus
excavated material
(d) connections of
pipes
(e) all work necessary
to complete the
manhole and
chambers

11 Extra over any 1 Breaking out 1 Rock m3 M2 The volume of D6 Rock is defined as
type of excavation existing materials breaking out existing naturally occurring
2 Concrete materials in trenches is hard material which
based on the width of necessitates its
3 Reinforced the beds in the removal by means of
concrete and trenches. Where there explosives, pneumatic
concrete hollow are no beds the width equipment, wedges or
blocks to be taken is the chemical cracking and
nominal size of the where its volume
pipe plus 300mm >1.00m3

Copyright : Arcadis
Eighth Edition, 2016 ©
CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
RULES INFORMATION

11 Extra over any 2 Breaking up 1 Roads m 1 Reinstating to M3 Lengths are C8 Removal and S6 Type and
type of excavation existing hard match existing measured across reinstatement of curbs thickness of
surfaces, pipe 2 Sidewalks manholes and other and channels are held surfacing, base and
(continued) diameter stated chambers to be included sub-base courses, if
3 Paths and pavings known
C9 Work is held to
include additional
breaking up and
reinstatement to and
around manholes and
other chambers

12 Works to existing 1 Details stated No


manholes

13 Connections with 1 Details stated 1 Depth to invert No D7 Public mains


public mains include electricity,
telephone, CATV and
the like

Copyright : Arcadis 33 70 00/4


Eighth Edition, 2016 ©
Index
Item Division Page Item Division Page Item Division Page
Access flooring 09 69 00 1 Carpet 09 68 00 1 Doors, plastic 08 15 00 1
Access hatches, metal 08 11 00 1 Casework 12 30 00 1 Doors, metal 08 11 00 1
Access hatches, wood 08 14 00 2 Cast in place concrete to roads 32 10 00 1 Doors, frameless glass 08 41 00 1
Alterations 02 40 00 3 Ceramic tiles 09 30 00 1 Drainage, underground 33 30 00 1
Air terminals 26 00 00 6 CHB walls 04 20 00 1 Duct covers, wood 06 20 00 2
Anchor bolts, to structural steel 05 10 00 2 Cladding 09 21 16 1 Ducts, circular 23 00 00 2
Angle fillets, cement 03 50 00 2 Cladding rails, cold rolled metal 05 10 00 2 Ducts, flexible 23 00 00 2
Asphalt, roofs 07 10 00 1 Cleaning equipment 26 00 00 1 Ducts, rectangular 23 00 00 2
Asphalt, waterproofing 07 10 00 1 Clearing site vegetation 31 10 00 1 Dumbwaiters 14 00 00 2
Column guards, plastic 06 60 00 2
Balustrades, plastic 06 60 00 2 Column guards, metal 05 50 00 2 Earth Moving 31 20 00 1
Balustrades, plain metal 05 50 00 2 Communications 27 00 00 1 Eaves soffits, wood sheet and board 06 16 00 2
Balustrades, decorative metal 05 70 00 2 Compartments 10 21 00 1 Eaves soffits, solid wood 06 20 00 2
Balustrades, external 12 93 00 1 Concrete, cast in place 03 30 00 1 Electrical installations 26 00 00 1
Balustrades, wood 06 40 00 2 Concrete, surface finishes 03 35 00 1 Electrodes 26 00 00 6
Bar reinforcement 03 20 00 1 Concrete slabs and tiles 09 30 00 1 Electronic Safety and Security 28 00 00 1
Baseboards, plastic 06 60 00 2 Concrete, filling steel hollow sections 05 10 00 2 Elevators 14 00 00 2
Baseboards, wood 06 20 00 2 Concrete, joints 03 15 00 1 Enclosed circuit breakers 26 00 00 7
Baseboards, metal 05 50 00 2 Concrete, precast architectural 03 45 00 1 Equipment, drainage 33 30 00 2
Bases, Ballasts and Paving 32 10 00 1 Concrete, precast structural 03 41 00 1 Equipment, electrical 26 00 00 7
Bathroom accessories 10 28 00 1 Corbels 03 30 00 3 Equipment, fire suppression 21 00 00 3
Battens, wood 06 10 00 2 Conduit 26 00 00 2 Equipment, mechanical 23 00 00 3
Boarding, wood 06 16 00 2 Conveying systems 14 00 00 1 Equipment, maintenance 11 24 00 1
Bolts, for wood 06 10 00 3 Cornices, wood 06 20 00 2 Escalators 14 00 00 2
Boxes, electrical 26 00 00 3 Cubicles 10 21 00 1 Excavating, drainage trenches 33 30 00 2
Brick walls 04 20 00 1 Cultivating ground 32 90 00 1 Excavating 31 20 00 2
Broom finish to concrete 03 35 00 1 Curtain walls 08 44 00 1 Excavation support systems 31 50 00 1
Busducts 26 00 00 3 Cutting and forming openings 02 40 00 3 Expansion joint covers, metal 05 50 00 2
Expansion joint covers, plastic 06 60 00 2
Cabinets 12 30 00 1 Dado rails, wood 06 20 00 2
Cables 26 00 00 5 Dampproofing and Waterproofing 07 10 00 1 Fabric reinforcement 03 20 00 1
Cable ladders 26 00 00 3 Demolition and Structure Moving 02 40 00 1 Fascias, solid wood 06 20 00 2
Cable trays 26 00 00 4 Demountable partitions 10 22 00 2 Fascias, wood sheet and board 06 16 00 2
Cappings 06 20 00 2 Diaphragm walls 31 66 16 1 Faucets 15 44 00 1
Carpentry, architectural woodwork 06 40 00 1 Disconnect switches 26 00 00 7 Fencing, temporary 01 53 00 1
Carpentry, rough 06 10 00 1 Doors, wood 08 14 00 1 Fencing, temporary for planting 32 90 00 3

Copyright
Copyright : Arcadis
: Arcadis
EighthEighth Edition,
Edition, 2016 ©2016 ©
Index
Item Division Page Item Division Page Item Division Page
Fencing 32 31 00 1 Handrail brackets, plastic 06 60 00 2 Metal, Decorative 05 70 00 1
Field devices 26 00 00 7 Handrail brackets, decorative metal 05 70 00 2 Metal Lathing 09 22 36 1
Filling existing openings 02 40 00 3 Handrail brackets, plain metal 05 50 00 2 Mirrors 10 28 00 1
Filling, to excavations 31 20 00 3 Handrails, external 12 93 00 1 Mosaic tiles 09 30 00 1
Filling, base courses to roads etc 32 10 00 1 Handrails, decorative metal 05 70 00 2 Mouldings, wood 06 62 00 2
Finish Carpenty 32 10 00 1 Handrails, plain metal 05 50 00 2 Moving walks 14 00 00 2
Fire extinguishers 10 44 00 1 Handrails, wood 06 40 00 2 Mulch 32 90 00 3
Fire Suppression 21 00 00 1 Handrails, plastic 06 60 00 2
Fixtures & fittings, decorative metal 05 70 00 2 Hardware 08 70 00 1 Nosings, metal 05 50 00 2
Fixtures and fittings, plain metal 05 50 00 2 Heating,Ventilating & Air Conditioning 23 00 00 1 Nosings, wood 06 20 00 2
Fixtures and fittings, plastic 06 60 00 2 Hedge plants 32 90 00 2
Fixtures and fittings, wood 06 40 00 2 Painting lines and symbols 09 90 00 3
Flush valves 22 40 00 1 Inspection chambers, drainage 33 40 00 3 Painting and Coating 09 90 00 1
Folding partitions 10 22 00 1 Insulation 07 20 00 1 Panelboards 26 00 00 7
Formwork 03 11 00 1 Insulation, mechanical 23 00 00 4 Panelling, wood 06 16 00 1
Framework, wood 06 10 00 3 Insulation, plumbing 21 00 00 4 Paperhanging 09 72 00 1
Furnishings, Site 12 93 00 1 Integrated Automation 25 00 00 1 Parquet flooring 09 64 00 1
Partitions 10 22 00 1
Gates 32 31 00 1 Joints in concrete 03 15 00 1 Partitions, sliding/folding, wood 10 22 00 2
Geotextiles, to roads etc 32 10 00 2 Joints, sealants 07 92 00 1 Piling, bored 31 63 00 1
Glass, hacking out existing glass 08 80 00 2 Joists, wood 06 10 00 2 Piling, contractor designed 31 63 00 2
Glass block walls 04 20 00 1 Piling, precast concrete 31 62 00 1
Glass 08 80 00 1 Ladders, plain metal 05 50 00 1 Piling, sheet 31 41 16 1
Gondola 11 24 00 2 Ladders, decorative metal 05 70 00 1 Piling, cast in place concrete 31 62 13 1
Grass turfing 32 90 00 1 Lath 09 22 36 1 Piling, steel 31 62 16 1
Grass seeding 32 90 00 1 Light coves 09 50 00 1 Pipes 22 00 00 2
Gratings, plastic 06 60 00 2 Lighting fixtures 26 00 00 7 Pipe casings, sheet and board 06 16 00 2
Gratings, decorative metal 05 70 00 2 Lintels 04 20 00 3 Pipes, chilled water 23 00 00 4
Gratings, plain metal 05 50 00 2 Louvers, wood 06 40 00 2 Pipes, condensate 23 00 00 4
Grilles, decorative metal 05 70 00 2 Louvers, other than wood 08 90 00 1 Pipes, condenser water 23 00 00 4
Grilles, plain metal 05 50 00 2 Louvers, glass 08 80 00 1 Pipes, fire suppression 21 00 00 2
Grilles, plastic 06 60 00 2 Pipes, for underground drainage 33 30 00 1
Ground wells 26 00 00 6 Manholes 33 30 00 2 Pipes, fuel 23 00 00 4
Grounds, wood 06 10 00 2 Marble 09 30 00 1 Pipes, refrigerant 23 00 00 4
Grouting under steel column bases 05 10 00 2 Mechanical installations 23 00 00 1 Planting 32 90 00 1
Grounding conductors 26 00 00 6 Metal fabrications 05 50 00 1 Plants, relocating 32 90 00 2

Copyright
Copyright : Arcadis
: Arcadis
EighthEighth Edition,
Edition, 2016 ©2016 ©
Index
Item Division Page Item Division Page Item Division Page
Plants 32 90 00 1 Screens, plastic 08 53 00 2 Toilet accessories 10 28 00 1
Plaster 09 20 00 1 Screens, metal 08 51 2 Toppings, cement 03 50 00 1
00
Plastic fabrications 06 60 00 1 Sealers 07 92 00 1 Topsoil, general filling 31 20 00 3
Plumbing 22 00 00 1 Seeding 32 90 00 1 Topsoil, planting 32 90 00 1
Plumbing fixtures 22 40 00 1 Septic tanks 33 10 00 3 Trees, protecting 31 10 00 1
Pointing, sealants 07 92 00 1 Sewerage 33 10 00 1 Trims (wood) 06 20 00 2
Portal frames, steel 05 10 00 1 Sheathing 06 16 00 1 Trowelling to concrete 03 35 00 1
Power floating to concrete 03 35 00 1 Shelves, glass 08 80 00 2 Trusses, steel 05 10 00 1
Purlins, cold rolled metal 05 10 00 2 Shelves, wood 12 30 00 1 Trusses, wood 06 10 00 2
Shingles 07 30 00 1
Quarry tiles 09 30 00 1 Shopfronts 08 41 00 2 Underfloor ducts 26 00 00 4
Shoring 31 41 00 1 Unit masonry 04 20 00 1
Railings, plain metal 05 50 00 2 Shotcreting 31 50 00 2
Railings, decorative metal 05 70 00 2 Shower heads 22 40 00 2 Vapor barriers 07 26 00 1
Railings, wood 06 40 00 2 Shower valves 22 40 00 2 Vents 08 90 00 1
Railings, plastic 06 60 00 2 Shrubs, relocating 32 90 00 2 Vinyl tiles 09 65 00 1
Railings, external 12 93 00 1 Shrubs, planting 32 90 00 2 Vinyl sheet 09 65 00 1
Reinforcement, to concrete 03 20 00 1 Signs, door 10 14 00 1
Removing existing work 02 40 00 3 Signwriting 09 90 00 3 Walkways, plain metal 05 50 00 2
Removing glass 08 80 00 2 Site clearing 31 10 00 1 Walkways, decorative metal 05 70 00 2
Removing trees 31 10 00 1 Sliding partitions 10 22 00 1 Wall Assemblies 09 21 16 1
Render 09 20 00 1 Soil nails 31 50 00 1 Wall Coverings 09 72 00 1
Resilient flooring 09 65 00 1 Specialty Flooring 09 62 00 1 Water Utilities 33 10 00 1
Rock anchors 31 50 00 1 Staircases, wood 06 40 00 2 Wedging under steel column bases 05 10 00 2
Roller shutters, metal 08 11 00 2 Staircases, plain metal 05 50 00 2 Window shutters, metal 08 51 00 2
Roofing, membrane 07 50 00 1 Staircases, decorative metal 05 70 00 2 Window boards, metal 05 50 00 3
Roofing, tiles 07 30 00 1 Structural timber 06 10 00 1 Window shutters, wood 08 52 00 2
Roofing, profiled sheets 07 40 00 1 Structural Metal Framing 05 10 00 1 Window boards, wood 06 20 00 2
Rooflights, plastic 08 60 00 2 Suspended ceiling, wood framework 06 10 00 4 Window boards, plastic 06 60 00 2
Rooflights, metal 08 60 00 2 Suspended ceiling, metal lath 09 22 36 2 Windows, plastic 08 53 00 1
Rooflights, wood 08 60 00 2 Systems, Ceiling 09 50 00 1 Windows, wood 08 52 00 1
Rubbed finish to concrete 03 35 00 1 Windows, metal 08 51 00 1
Temporary construction 01 53 00 1 Wireways 26 00 00 4
Sandblasting 03 35 00 1 Tendons, designed by Engineer 03 23 00 1 Wood strip flooring 09 64 00 1
Screens, entrance 08 41 00 2 Thermal Protection 07 20 00 1 Wood flooring 09 64 00 1
Screens, wood 08 52 00 2 Tile and slab finishes 09 30 00 1 Wood block flooring 09 64 00 1