METRADO
DE CARGAS
PRIMER PISO

 Losa Aligerada 20 cm 300 kg/m2


 Viga Principal (0.20 x 0.40) m2
 Viga Secundaria (0.20 x 0.40) m2
 Columna �𝑟 2= �(0.20)2 0.126m2
 Sobrecarga 200 kg/m2
 Ladrillo 100 kg/m2
 Altura Columna 2.85m
Carga Muerta

 Peso Losa: 𝑷����=AT x 300 kg/m2


AT = (1.91x1.24) + (1.115x1.91) + (1.80x1.115) + (1.8x1.24) AT = 8.737 m2
𝑃����= 8.737x 300 kg/m2 𝑷����= 2621.1 kg

 Peso Viga Principal: Pvp = A x L x 𝜸���


Pvp = (0.2 x 0.40)�2 x (1.91+1.8) m x 2400
Pvp = 712.32 kg

3

 Peso Viga Secundaria: Pvs = A x L x 𝜸� Pvs = 452.16 kg


��
Pvs = (0.2 x 0.40)�2 x (1.24+1.115) m x 2400


3

 Peso Columna: Pc = A x L x
𝜸� �� Pc = 861.84 kg
Pc = (0.126 �2) x (2.85) x 2400


3
 Sobrecarga: SC = AT x S
��
S = [(1.91 + 0.40 + 1.8) x (1.24 + 0.40 + 1.115) ]�2 x 200
�� �
2
S = 11.323 �
2
x 200

S = 2264.4 kg �
2

 Ladrillo: Lad. = AT x 𝑷���


��
Lad. = 11.3233 �2
x 100
Lad. = 1132.3 kg

2

Carga muerta total del Primer Piso:

CM = 8044.32 kg 8.04 ton

Carga Viva
��
𝐶𝑉 = (AT-AC) x 200
1°�
𝑖�� �2
��
2239.4 kg = 2.24 ton

2

𝐶𝑉1°�𝑖��= (11.323 – 0.126) �2 x 200

SEGUNDO PISO

 Losa Aligerada 20 cm 300 kg/m2


 Viga Principal (0.20 x 0.40) m2
 Viga Secundaria (0.20 x 0.40) m2
 Columna �𝑟 2= �(0.20)2 0.126m2
 Sobrecarga 200 kg/m2
 Ladrillo 100 kg/m2
 Altura Columna 2.85m

 Peso Losa: 𝑷����=AT x 300 kg/m2


AT = (1.91x1.24) + (1.115x1.91) + (1.80x1.115) + (1.8x1.24) AT = 8.737 m2
𝑃����= 8.737x 300 kg/m2 𝑷����= 2621.1 kg

 Peso Viga Principal: Pvp = A x L x 𝜸�


2 ��
Pvp = (0.2 x 0.40)� x (1.91+1.8) m x 2400
Pvp = 712.32 kg

3

 Peso Viga Secundaria: Pvs = A x L x 𝜸� Pvs = 452.16 kg


��
Pvs = (0.2 x 0.40)�2 x (1.24+1.115) m x 2400


3

 Peso Columna: Pc = A x L x Pc = 861.84 kg


𝜸� ��
Pc = (0.126 �2) x (2.85) x 2400


3
 Sobrecarga: SC = AT x S
��
S = [(1.91 + 0.40 + 1.8) x (1.24 + 0.40 + 1.115) ]�2 x 200
�� �
2
S = 11.323 �
2
x 200

S = 2264.4 kg �
2

 Ladrillo: Lad. = AT x 𝑷���


��
Lad. = 11.3233 �2
x 100
Lad. = 1132.3 kg

2

Carga muerta total del Segundo Piso:

CM = 8044.32 kg 8.04 ton

Carga Viva
��
𝐶𝑉 = (AT-AC) x 200
2°�
𝑖�� �2
��
2239.4 kg = 2.24 ton

2
𝐶𝑉2°�𝑖��= (11.323 – 0.126) � x 200
2

TERCER PISO

 Losa Aligerada 20 cm 300 kg/m2


 Viga Principal (0.20 x 0.40) m2
 Viga Secundaria (0.20 x 0.40) m2
 Columna �𝑟 2= �(0.20)2 0.126m2
 Sobrecarga 200 kg/m2
 Ladrillo 100 kg/m2
 Altura Columna 2.55m

 Peso Losa: 𝑷����=AT x 300 kg/m2


AT = (1.91x1.24) + (1.115x1.91) + (1.80x1.115) + (1.8x1.24) AT = 8.737 m2
𝑃����= 8.737x 300 kg/m2 𝑷����= 2621.1 kg

 Peso Viga Principal: Pvp = A x L x 𝜸���


Pvp = (0.2 x 0.40)�2 x (1.91+1.8) m x 2400
Pvp = 712.32 kg

3

 Peso Viga Secundaria: Pvs = A x L x 𝜸� Pvs = 452.16 kg


��
Pvs = (0.2 x 0.40)�2 x (1.24+1.115) m x 2400


3
 Peso Columna: Pc = A x L x
𝜸� Pc = 771.12 kg
��
Pc = (0.126 �2) x (2.55) x 2400


3
 Sobrecarga: SC = AT x S
��
S = [(1.91 + 0.40 + 1.8) x (1.24 + 0.40 + 1.115) ]�2 x 200
�� �
2
S = 11.323 �
2
x 200

S = 2264.4 kg �
2

 Ladrillo: Lad. = AT x 𝑷���


��
Lad. = 11.3233 �2
x 100
Lad. = 1132.3 kg

2

Carga muerta total del Tercer Piso:

CM = 7953.6 kg 7.95 ton

Carga Viva
��
𝐶𝑉 = AT x 100
3°�
𝑖�� �2
��
1132.3 kg = 1.13 ton

2
𝐶𝑉3°�𝑖��= 11.323 � x 1002
CARGA MUERTA TOTAL:

𝐶𝑀1°�𝑖��= 8.04 ton

𝐶𝑀2°�𝑖��= 8.04 ton

𝐶𝑀3°�𝑖��= 7.95 ton


CMT = 24.03 ton
CARGA VIVA TOTAL:

𝐶𝑉1°�𝑖��= 2.24 ton

𝐶𝑉2°�𝑖��= 2.24 ton

𝐶𝑉3°�𝑖��= 1.13 ton


CVT = 5.61 ton

CARGA TOTAL: CMT + CVT

CT = 24.03 + 5.61 ton

CT = 29.04 ton
Carga Total

𝐶� = 𝐶��(1.4) + 𝐶��(1.7)

𝐶� = 24.03 (1.4) + 5.61 (1.7) 𝝆 𝐶�= 43.179 ton


𝝆
 Esfuerzo Normal: 𝝈= �=
� 𝝈
43.179 �
�� 43179 ��
A= A = 21590 ��2
2�
� �
/�2
2�
� �
/�2

A=�2 �2 = 21590 ��2 �= 146.94 ��


L = 1.5 m
Zapata 1.5m x 1.5m

Comprobación al vuelco: (M + V x h) Fs < (N + P)


N = 43.179 ton
M = 14.03 ton/m

 V = 6.5 ton P = a x b x c x 𝛾𝐶
���
H = 1.4 m P = (1.5 x 1.5 x 1.4)�3 x 2.4

3

a = 1.50 m P = 7.56 ton


b = 1.50 m
Fs = 1.5
���
𝛾 = 2.4
𝐶 �2
1.4
 [14.03 + (6.5 x 1.4)] 1.5 < (43.179 + 7.56)
2
34.695 < 35.52 “Si cumple”

Comprobación al desplazamiento: (N + P) tg 𝜽 (2/3) > Vfs


(43.179 + 7.56) tg 45° x 2/3 > 6.5 x 1.5
29.29 > 9.75 “Si cumple”
DISEÑO DE
ZAPATA
CENTRICA
Diseño de Zapata Aislada
Df = 1.5 m

𝜸�= 1.65 ton/m3 Columna circular: ∅ 40 cm

�/�= 0.2 ton/m2


12 ton/m2
𝝈�= 1.2 kg/cm2
PM = 24.03 ton
 PV = 5.61 ton

a) Esfuerzo Neto 𝝈�: 𝝈�= 𝝈�– 𝐬/𝐜 – (hf x 𝜸�)



�� ��
� �
��

2 – 0.2 �
𝜎�= 12 � 2–�(1.5
��
x 1.65) �2
𝜎 = 9.33
� 2

𝑷 +𝑷𝑴+𝑷���.
b) Área de la zapata: Az =
𝝈�

𝑷���. = (Pv + Pm) x 5% = (5.61 + 24.03) 0.05

𝑃���. = 1.48
(�
.��
+� � �
.�+�
� �
��.�)��

Az = �.�� Az = 3.34 m2

� 𝑻�+𝑻�
c) Hallando “T”: T = √��+ ( )

�1 = 0.4m

�.�+�.�
�2 = T = √�. ��+ ( ) T = 1.83m


0.4m
𝑻�+𝑻�
d) Hallando “S”: S = √��- ( )

0.4+0.4
S = √3.34 - ( ) S = 1.83m

2
e) Comprobando: Az = S x T
S = 2m + �2 = 2m + 0.40
T = 2m + �1 = 2m + 0.40
Az = S x T

3.34 = (2m + 0.4) (2m + 0.4)

3.34 = 4�2+ 0.8m + 0.8m + 0.16


4�2 + 1.16m – 3.18 =
0 m = 0.72 ≈ 0.75
S = 2(0.75) + 0.4 = 1.90m

T = 2(0.75) + 0.4 = 1.90m

 Dimensionamiento del peralte “d” de la Zapata


1.2 WD + 1.6 WL A.C.I
Vc > Vact
∑�
���
���
���
𝒊� �
𝒊����
Wu =
��
1.2(24.03)+1.6(5.61) ���
Wu = 1.9 �1.9
⇒ Wu = 10.47 �2
�−�
 Vact = Wu x ( )

0.75−�
Vact = 10.47 x ( )

Cortante: ∅ = 0.85
* Vc = ∅ 𝑥 0.53 𝑥 √𝐹′𝐶

0.53 x √210
Vc = 0.85�x��
Vc = 65.3


2

Se sabe: Vc ≥ Vact
Entonces procedemos a igualar:
0.75−�
65.3 = 10.47 x ( )


65.3 d = 7.85 – 10.47 d
75.77 d = 7.85
d = 0.10m
Diseño de cortante por Punzamiento: Escogeremos el menor valor de Vc

a) Vc ≤ ∅ x 0.27 (2 + )√𝑭′�
�� 4
Vc ≤ 0.85 x 0.27 x (2 +
)
𝜶 1 √210 = 19.95 kg/cm2 =199.5 Tn/m2
b) Vc ≤ ∅ x 0.27 x (


+ �)√𝑭′�
c) Vc ≤ ∅ x 1.1 x √𝑭′�

Vc ≤ 0.85 x 1.1 x √210 = 13.55 kg/cm2 = 135.5Tn/m2


Se escogerá: Vc = 13.55 kg/cm2

���

𝑉�𝑡 = = �
� [��(2�
2�� −(�
+�
+� 1)(�
1+�2)+�
2)]
���
𝐴��
��.
Vc = Vact
10.47 [1.9 �1.9−(�+0.4)(�+0.4)]
135.5 ton/m2 =
2�(2�+0.4+0.4)

135.5 (4�2 + 1.6d) = 10.47 [3.61 – (�2 + 0.4d + 0.4d + 0.16)]

542 �2 + 216.8d = 37.80 – 10.47�2 – 8.38d – 1.68

552.47�2 + 225.18d – 36.12 = 0


D = 0.12m

Hay 2 valores de “d”:

d = 0.10m
d = 0.12m

Según el reglamento del ACI nos dice que el máximo a utilizar de peralte en una zapata
es 15cm, de tal forma estamos en lo correcto y procederemos a trabajar con el peralte
obtenido mayor que es 12 cm

Comprobando:

Diseño de Corte por Flexión:


Vc = 65.3 ton/m2
(�
−�)
 Vact = Wu

(�.��−�.��)
Vact = 10.47 x = 54.97 ton/m2

�.��
Vc > Vact 65.3 ton/m2 > 54.97 ton/m2 (SI CUMPLE)

Diseño de Corte por Punzamiento:

bo = 2 x [2(0.12) + 0.40 + 0.40] = 2.08 m2


Ap = bo x d = 2.08 x 0.4 = 0.25 m2

 𝛼�= 40 Zapata Céntrica


Hallamos Vc:
4
a) Vc ≤ 0.85 x 0.27 x (2 +
) √210 = 199.5 ton/m2
1

b) Vc ≤ 0.85 x 1.1 x √210 = 135.4 ton/m2


Tomaremos el menor valor de Vc = 135.4 ton/m2.

Hallamos Vact:

Vact = Wu x [S x T – (d + T1) (d + T2)

Vact = 10.47 [1.9 x 1.9 – (0.12 + 0.4) (0.12 + 0.4)]

Vact = 34.97 ton

Vc > Vact 135.4 ton/m2 > 37.97 ton/m2 (SI CUMPLE)

Por último:


���


������ ��

=

� ��
.� �� �
��


������ �
.���� ⇒ 16.81 �

=
Verificación por Cortante: (d = 0.12)

Vdv = (Wu x S) (m – d) ⇒ (10.47 x 1.90) (0.75 – 0.12)


Vdv = 12.53 ton

��� 12.53
Vn = =
∅ 0.75
Vn = 16.71 ton
Vn = 0.53 √𝑭′�x S x d
0.53√210 x 1.90 x 0.12 x 10 = 17.51 ton

Vc > Vn ⇒ 17.51 > 16.71 (SI CUMPLE)


Chequeo por flexión:

��� 12.53
Vn = =
∅ 0.75
Vn = 16.71 ton

Wu

M
m


Mmax = Wu x m x m/2 = 2

2 𝑥�
10.47 �0.75 2
Mmax =
x 1.90 = 5.60 tn/m 5.60 x 105 kg/cm
2

Interacción Asumimos ==== a=
Cuando d = 0.12
5
��𝑎 a= 𝐴����
As = ∅�
� (�

)
2 0.85 ��′���
5.60 �10 5
* As = 0.90 �4200 (12−2.4) = 13.72 cm2
2
13.72 �4200
*a= = 1.69 cm
0.85 �210 � 190
2da interacción asumiendo a= 1.69

5.60 �10 5
* As = 0.90 �4200 (12−1.69 = 13.28 cm2
)
2
13.28 �4200
*a= = 1.64 cm
0.85 �210 � 190
5.60 �10 5
* As = 0.90 �4200 (12−1.64
)
= 13.25 cm2 OK
2
13.25 �4200
*a= = 1.64 cm
0.85 �210 � 190
Verificación del acero mínimo:

Asmin = �𝑡��𝑝 𝑥 �𝑥 �=0.0018 x 190 x 40 = 4.104 cm2


Trabajaremos con el As mínimo para obtener mayor cantidad de varillas.
Acero Longitudinal

Asumimos: ∅ = 1/2" A∅ = 1.27 ��2


𝐴� 13.25
N= ⇒
𝐴∅ 1.27 ⇒ 10.43 ≈ �
���
� �
𝒊���
Espaciamiento:

�−��− ∅ ���−�(�.�)−�,��
S= ⇒ ⇒ 17.37 cm

−� ��−�

Se usará: 11 ∅ ½” @ 17 cm
Acero Transversal:
1.90
As = 13.25 x = 13.25 cm2
1.90
13.30
N =
1.27 ⇒ 10.50 ≈ � ��
�� �
𝒊���
 S = 17 cm
Se usará: 11 ∅ ½” @ 17 cm
Detalle de zapata en planta:
Detalle de zapata en corte:
Diseño de Zapata Aislada
Df = 1.5 m

𝜸�= 2.10 ton/m3 Columna cuadrada: 30x60c��

��/� = 0.5 ton/m2


𝝈�= 3.5 kg/cm2 35 ton/m2
𝑭 = ���kg/cm2
𝑭 = ����kg/cm2
 WD(CM) = 190 ton
 WL(CV) = 75 ton

1.-Determiando
a) Esfuerzo Netoel𝝈�
Dimensionamiento
: 𝝈� = 𝝈�– 𝐖𝐬/𝐜 en ��)
Planta
– (𝜸x

�� ��
� �
��

2 – 0.5 �
𝜎�= 35 � 2 – (2.10 �
3 x 1.5m)
���
𝜎 = 31.35
� 2

𝑷 +𝑷𝑴+𝑷���.
b) Área de la zapata: Az =
𝝈�

𝑷���. = (Pv + Pm) x 5% = (190 + 75) 0.05

𝑃���. = 13.25

(��+��+��
� ��
.�
� )��

Az = ��.��



Az = 8.88 �
Az = S x T………..(1)

Comprobando: Az = S x T

S
T== 2m
2m +
+ b𝑡 =
= 2(1.27
2(1.27 +
+ 0.60)
0.30) =
= 2.85m
3.15m
Az = S x T

8.88 = (2m + 0.30) (2m + 0.60)

8.88 = 4�2+ 1.20m + 0.60m + 0.18


4�2 + 1.80m – 8.70 = 0
+
- b √�2 − 4��


2a

m = 1.27 OK

m = -1.71

Ecuación(1):

Az = 2.85m x 3.15m


Az = 8.98 �
2. Dimensionamiento del peralte: corte y flexión
1.2 WD + 1.6 WL A.C.I

d
Vact < 𝑉
d
d d
Wu

Wu=Carga
Ultima Mayora
d m-d
m

Carga Ultima Mayorada (Wu):


∑�
���
���
���
𝒊� �
𝒊����
Wu =
��
1.2(190)+1.6(75) ���
Wu = ⇒ Wu = 38.75
�.���� �
2

Cortante Actuante:(Vact)
�−�
 Vact = Wu x ( )


Cortante: ∅ = 0.85
* Vc = ∅ 𝑥 0.53 𝑥 √𝐹′𝐶

Vc = 0.85 x 0.53 x √210


��� ��
Vc = 65.3 = 6.53

2


�2

Se sabe: Vact <

𝑉
Entonces igualando nos queda:
1.27−�
65.3 = 38.75 x ( )


65.3 d = 49.21 – 38.75 d
104.05 d = 49.21
d = 0.47m

3) CHEQUEO DE CORTE POR PUNZONAMIENTO:

Escogeremos el menor valor de Vc



a) Vc ≤ ∅ x 0.27 (2 + )√𝑭′�
�� 4
Vc ≤ 0.85 x 0.27 x (2 +
)
2 √210 = 13.30 kg/cm2
���������
Bc= ≤2

� �����
� � + �)√𝑭′�
0.60
Bc= =2 OK
0.30
𝜶
b) Vc ≤ ∅ x 0.27 x (

c) Vc ≤ ∅ x 1.1 x

√𝑭′�

2 2
Vc ≤ 0.85 x 1.1 x √210 = 13.55 kg/c�=135.5 Tn/�
Se escogerá: Vc = 13.30 kg/cm2

���

𝑉�𝑡 = = �
� [��(2�
2�� −(�
+�
+� 1)(�
1+�2)+�
2)]
���
𝐴��
��.
38.75 [2.85 �3.15−(�+0.60)(�+0.30)]
135.5 ton/m2 =
2�(2�+0.60+0.30)

135.5 (4�2 + 1.8d) = 38.75 [8.98 – (�2 + 0.3d + 0.6d + 0.18)]


542 �2 + 243.9d = 347.97 – 38.75�2 – 34.87d – 6.97
580.75�2 + 278.77d – 341 = 0
+
- b √�2 − 4��


2a

Hay 2 valores de “d”:

 d = 0.60m ok tomamos el mayor


d = 0.47m

Según el reglamento del ACI nos dice que el máximo a utilizar de peralte en una zapata
es 15cm; por tal motivo los datos obtenidos están en lo adecuado, pero procederemos a
utilizar a lo que se utiliza normalmente en Perú de 40 a 50 cm “altura de peralte”.

Comprobando:

Diseño de Corte por Flexión:


Vc = 65.3 ton/m2
(�
−�)
 Vact = Wu

(�.��−�.��)
Vact = 38.75 x = 43.27 ton/m2
�.��

Vact ≤ 𝑉 43.27 ton/m2 < 65.3 ton/m2 (SI CUMPLE)


Diseño de Corte por Punzamiento:

bo = 2 x [2(0.6) + 0.60 + 0.30] = 4.2m


Ap = bo x d = 4.2 x 0.6 = 2.52 m

 𝛼�= 40 Zapata Céntrica


Determinando Vc:
4
d) Vc ≤ 0.85 x 0.27 x (2 +
) √210 x 420 x 60 = 335.23 ton
2
40 �60
e) Vc ≤ 0.85 x 0.27 x ( + 2) √210 x 420 x 60 = 646.53 ton
420

f) Vc ≤ 0.85 x 1.1 x √210 x 420 x 60 = 341.44 ton


Tomaremos el menor valor de Vc = 335.23ton.

Hallamos Vact:

Vact = Wu x [S x T – (d + T1) (d + T2)


Vact = 38.75 [2.85 x 3.15 – (0.6 + 0.6) (0.6 + 0.3)]

Vact = 30.6 ton

Vc > Vact 335.23 ton > 30.06 ton (SI CUMPLE)

Por último:

���


������ ��

=

� ��
.� �� �
��


������ �.���
⇒ 7.15 �

=
4.-Verificación por Cortante: (d = 0.6)

Vdu = (Wu x S) (m – d) ⇒ (38.75 x 2.85) (1.27 – 0.60)


Vdu = 73.99 ton

��� 73.99
Vn = =
∅ 0.75
Vn = 98.66 ton OK

Vc = 0.53 √𝑭′�x S x d

0.53√210 x 2.85 x 0.60 x 10 = 131.3 ton

Vc > Vn ⇒ 131.3 Tn > 98.66 Tn (SI CUMPLE)


5) Chequeo por flexión:

��� 73.99
Vn = =
∅ 0.75
Vn = 98.66 ton

Wu

M
m


Mmax = Wu x m x m/2 = 2

2 𝑥�
38.75 �1.27 2
Mmáx =
2 8.90 x 105 kg/cm
x 2.85 = 89.06 tn/m 


𝑎 a = 𝐴����
As = ∅ �
� (�

)
2 0.85 ��′���
5
89.06 �10
* As = 0.90 �4200 (60−60) = 43.63 cm2
10
43.63 �4200
*a= = 3.6 cm
0.85 �210 � 2.85
Repetimos el cálculo con los nuevos valores obtenidos:

89.06 �10 5
* As = 0.90 �4200 (60−3.6) = 40.48 cm2
2
40.48 �4200
*a= = 3.34 cm
0.85 �210 � 2.85
6.- Verificación del acero mínimo:

Asmin = �𝑡��𝑝 𝑥 �𝑥 �=0.0018 x 285 x 60 = 30.78 cm2


Acero Longitudinal
Usamos As= 40.48 cm2

Asumimos: ∅ = 3/4" A∅ = 2.85 ��2


𝐴� 40.48
N= ⇒
𝐴∅ ⇒ 14.20 ≈ �
2.85 �� �
� �
𝒊���
Calculamos el Espaciamiento:

�−��− ∅ ���−�(�.�)−�.��
S= ⇒ ⇒ 20.62 cm

−� ��−�

Se usará: 14 ∅ 3/4" @ 21 cm
Acero Transversal:
� 3.15
As = As x = 40.48 x = 44.74 cm2
� 2.85

𝐴�= �𝑡��𝑝 𝑥 �𝑥 �= 0.0018 𝑥 3.15 𝑥 60 = 34.02 cm2


Asmin
N= 44.74

𝐴∅ 2.85 = 15.69 ≈ �
���
� �
𝒊���
Calculamos el Espaciamiento:

𝑻−��− ∅ ���−�(�.�)−�.��
S= ⇒ ⇒ 19.87 cm

−� ��−�

Se usará: 16 ∅ 3/4" @ 20 cm
Detalle de zapata en planta:


16 ∅3/4"@�𝐜𝐦

14 ∅ 3/4" @ 21 cm


16 ∅3/4"@�𝐜𝐦

14 ∅ 3/4" @ 21 cm