* Submitted in fulfilment of item (17) of clause 1.2.1 of Employer Requirement, Appendix -14 Part -2 of Contract Agreement (page 581
Ref: PMC letter no.: L/OCGC/DFCC/CMT/CTP-11/1906/24911
Date 03-06-2019
S.No. Subject Comment (PMC)
Comment (02) of Engineer's letter at ref.(03) above for minor bridge no.12 has not been incorporated. Without submission of construction methodology and protection 1 shceme, general arrangement drawing cannot be forwarded for Emploter/IR approval.
It has to be noted that Alignment Plan is not approved
yet. Hence, any change that may happen shall be 2 General Arrangemnet incorporated in revised general arrangement drawing. Drawing of Minor Bridge 12 Orientation of Detail-A, Detail-B, Detail-C & Detail-D are incorrect. Same shall be corrected accordingly in revised 3 general arrangement drawing.
Box top level mentioned in section 1-1 and section 2-2
mismatched. Same shall be corrected accordingly in 4 revised general arrangement drawing.
Comment (02) of Engineer's letter at ref.(03) above for
minor bridge no.12 has not been incorporated. Without submission of construction methodology and protection 1 shceme, general arrangement drawing cannot be forwarded for Emploter/IR approval.
It has to be noted that Alignment Plan is not approved
yet. Hence, any change that may happen shall be 2 General Arrangemnet incorporated in revised general arrangement drawing. Drawing of Minor Bridge 13 Orientation of Detail-A, Detail-B, Detail-C & Detail-D are incorrect. Same shall be corrected accordingly in revised 3 general arrangement drawing.
Detail-F shall be replaced with Detail-G as Detail-G is
4 marked in plan not Detail-F Existing Ground Level(EGL) shall be corrected in section 2- 5 2 and also mentioned it on U/S side of DFC bridge in section 1-1 -2 of Contract Agreement (page 581