Corrections to the Bid

s.l. document as per


Page Ref Tender Clause Pre Bid Query
No decision of Pre-bid
meeting
L 4of68 Time of delivery These machines are manufactured 6 months for items 1
- 3 months against customer order and not sold (a) & (b) 3months for
from stock. Manufacturing lead items 2
time is 5-6 months and
transportation to India along with
customs clearance and road
transport to Guwahati will take 2-3
months, Hence, we would request
that delivery period be extended to
at least 8 months from date of
agreement
2 5of58 The As per CVC guidelines on Read 3 years instead
manufacturer/ qualification criteria vide Circular No. 5 years.

dealer should 12-02-I-CTE-6 dated. 17 Dec.2002


have the minimum average annual
minimum turnover requirement should be met
average annual last 3 years. You are requested to
turnover of Rs.3 modify accordingly.
crores in the last

five years
3 47 of 68 Component lS specification is not valid in USA. All Also as per standard
used to the component and design/workmanship specification of the
machine should will be as per manufacture deign and country of
be in conformity specification that can be inspected manufacture.
to lS . prior to dispatch by the
specification departmental representatives.

Copy forwarded to:-


1. Concern Members of the Pre-Bid meetino.
2. M/s Cleantec,C-2O4 Sarvodaya Enclave, New Delhi-1 10017. E-mail:
infr
3r,zsri D. Dutta, JAA, GMDA for uploading to the website.

Bhanqaqarh, Guwahati-781 005.