** ON A/C ALL
TASK 05-21-90-200-003-A
GENERAL VISUAL INSPECTION OF OFFWING ESCAPE SLIDE STOWAGE AREA (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-
33-11.
** ON A/C 101-199
193AT, 194AT
** ON A/C ALL
C. Referenced Information
REFERENCE DESIGNATION
** ON A/C 101-199
(Ref. 53-35-11-000-001-A). Removal of the Wing-to-Fuselage Fairings
(Ref. 53-35-11-400-001-A). Installation of the Wing-to-Fuselage Fairings
** ON A/C ALL
3. Job Set-up
WARNING: MAKE SURE THAT THE LOCK PIN IS CORRECTLY INSTALLED IN THE REGULATOR
VALVE ASSEMBLY OF THE INFLATION RESERVOIR. THIS SAFETIES ALL COMPON-
ENTS OF THE INFLATION SYSTEM IN OPERATION AND PREVENTS ACCIDENTAL:
- DISCHARGE OF THE INFLATION RESERVOIR
- DEPLOYMENT OF THE ESCAPE SLIDE
WHICH CAN CAUSE INJURY AND/OR DAMAGE.
(1) Put an ACCESS PLATFORM 2M (6 FT) in position at the zones 193 and 194.
(2) Remove the offwing escape-slide enclosure (Ref. AMM TASK 25-62-42-000-001) .
** ON A/C 101-199
Subtask 05-21-90-010-052-B
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) in position at the zones 193 and 194.
(2) Remove the access panels 193AT and 194AT (Ref. AMM TASK 53-35-11-000-001) .
** ON A/C ALL
4. Procedure
** ON A/C 101-199
Subtask 05-21-90-210-052-B
A. Inspection
(1) Do a general visual inspection of the compartment behind the panels 193AT and 194AT.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring) are attached correctly.
** ON A/C ALL
5. Close-up
** ON A/C 101-199
Subtask 05-21-90-410-052-B
A. Close Access
(1) Install the access panels 193AT and 194AT (Ref. AMM TASK 53-35-11-400-001) .
(2) Remove the access platform(s).
End of document