Académique Documents
Professionnel Documents
Culture Documents
3. Mr. Quang
Canteen QV renovation work internal inspection
Location : Canteen
Contents :
Location : Canteen
Contents :
1. Update new layout of canteen in
the switch map and install it before
inspection with OVC
2. Take out nilon sheet and cleaning
before inspection with OVC
Location : L-CAN-1
Contents :
Cable terminal have no good
conection, pls repair it.
When repair pls take care and
make sure already no power.
Location : L-CAN-1
Contents :
We should be confirm by marking
after tightening.
Canteen QV renovation work internal inspection
Location : L-CAN-1
Contents :
(only consider for next time design)
Pls check current of Lighting circuit
I think no need use 4sqmm size
only 2.5sqmm is ok, you can reduce
cost.
Location : L-CAN-1
Contents :
Should be use grounding terminal cap
and add cable tag also.
Location : M-CAN-2-2
Contents :
Additional cable tag for main
grounding cable
Location : M-CAN-2-2
Contents :
Additional your confirmed color of
re-tightening marking
Canteen QV renovation work internal inspection
Location : M-CAN-5-1
Contents :
make Current, Leak Current Testing
report of Mechanical Equipment
before inspection with OVC
Location : M-CAN-2-2
Contents :
1. Not yet install grounding cable for
cable rack.
2. Grounding cable conection to panel
you install inside cable rack, this point
very far with Panel, pls next time
consider connection point easy check
easy for explain
Location : M-CAN-5-1
Contents :
1.add grounding cable tag
Location : M-CAN-5-1
Contents :
Have some point dirty in panel
pls cleaning it.