CONCRETE POURING DAILY LOG

Location
Total Volume of Concrete Poured

Item # Structure
Area Type Specific Location C50/20, OPC, 65% C40/20, OPC, 130mm C35/20, OPC, C30/20, SRC, 110mm C25/20, SRC,
GGBS, 7% MS, -210mm 120mm -200mm -190mm 100mm -180mm
150mm -230mm
TOTAL CONCRETE POURED / MIX DESIGN

Prepared by:

______________________________
(Signature over printed name )

30-Dec-99
( Date & Time )
OURING DAILY LOG
Date :

Total Volume of Concrete Poured

Remarks
C20/20, SRC, C20/20, OPC, C20/10, OPC,
120mm -200mm 100mm -180mm 60mm -140mm
TOTAL CONCRETE POURED TODAY
CON

Location

Item # Structure
Area Type Specific Location

1 Foundation Retaining Wall Zone 8 Retaining Wall Zone 8

2 Blinding Concrete GRP

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

12/01/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C75/20, OPC, 55% C30/20 or C20/20


GGBS, 8% MS, SRC
180mm -225mm

192.00

48.00

192.00 48.00 0.00 0.00 0.00 0.00


Date : 1-Dec-2016

Remarks

Witnessed with 4 sets of cubes

2 sets cubes

0.00 0.00 240.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 Bored Piles WADI W1, W3, W5, W7, W9 WADI Bridge A-1

W11, W13 & W15

2 Foundation Ret Wall Zone B Zone 1B Retaining Wall Zone 1B

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

12/03/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C75/20, OPC, 55%


GGBS, 8% MS,
180mm -225mm

68.00

259.00

327.00 0.00 0.00 0.00 0.00 0.00


Date : 3-Dec-2016

Remarks

3 sets cubes

1 MT rejected due to slump (out of range)

5 sets cubes

0.00 0.00 327.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 Retaining Wall Zone 7 Zone 7 Retaining Wall Zone 7

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

12/04/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C75/20, OPC, 55%


GGBS, 8% MS,
180mm -225mm

256.00

256.00 0.00 0.00 0.00 0.00 0.00


Date : 4-Dec-2016

Remarks

with 5 sets cubes

0.00 0.00 256.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 Bored Piles WADI W2,W4,W6, W8 Wadi Bridge A-1

W10 & W17

2 Foundation Retaining Wall Zone 3 Zone 3 Ret Wall Zone 3

3 Blinding Concrete LRT Bridge LRT LRT Bridge Abutment-2

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

12/05/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C75/20, OPC, 55% C30/20 SRC, 120mm


GGBS, 8% MS, -200mm
180mm -225mm

52.00

368.00

50.00

420.00 50.00 0.00 0.00 0.00 0.00


Date : 5-Dec-2016

Remarks

2 sets cubes

6 sets cubes with 17 cubes for durability

2 sets cubes

0.00 0.00 470.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 Bored Piles Wadi W12, W14, W16, Wadi Bridge A-1

W18, W19 & W20

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

12/06/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C75/20, OPC, 55%


GGBS, 8% MS,
180mm -225mm

52.00

52.00 0.00 0.00 0.00 0.00 0.00


Date : 6-Dec-2016

Remarks

2 sets cubes with 17 durability

0.00 0.00 52.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 Retaining Wall Zone Zone Retaining Wall Zone

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

12/07/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C75/20, OPC, 55%


GGBS, 8% MS,
180mm -225mm

0.00 0.00 0.00 0.00 0.00 0.00


Date : 7-Dec-2016

Remarks

0.00 0.00 0.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 Foundation Retaining Wall Zone Zone Retaining Wall Zone

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

12/08/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C75/20, OPC, 55%


GGBS, 8% MS,
180mm -225mm

0.00 0.00 0.00 0.00 0.00 0.00


Date : 8-Dec-2016

Remarks

0.00 0.00 0.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 precast manhole base slab QIS-1 FW1/11,12,13,14 & 22 Logistic Yard

QIS-2 FW1/5/3 & 5 Logistic Yard

QIS-2 FW1/46/1 Logistic Yard

2 protection screed QIS-3 SWST-2

3 manhole blinding QIS-3 SS-4

4 footing QIS-1 SS-2

column-neck QIS-1 SS-1 & SS-4

5 bridge wall RW3 & RW4

6 bridge base slab QIN RW7 & RW8

column-neck QIN SWST-1

7 footing QIS-3 SS-6 & SS-3

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

10/09/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C50/20, OPC, 65% C40/20, OPC, 130mm C35/20, OPC, C30/20, SRC, 110mm C25/20, SRC, C20/20, SRC,
GGBS, 7% MS, -210mm 120mm -200mm -190mm 100mm -180mm 120mm -200mm
150mm -230mm

22.00

14.00

16.00

54.00

189.00

14.00

273.00 22.00 0.00 14.00 0.00 0.00


Date : 9-Oct-2016

Remarks
C20/20, OPC, C20/10, OPC,
100mm -180mm 60mm -140mm

4.00

0.00 4.00 313.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 precast manhole base slab QIS-1 FW1/11,12,13,14 & 22 Logistic Yard

QIS-2 FW1/5/3 & 5 Logistic Yard

QIS-2 FW1/46/1 Logistic Yard

2 protection screed QIS-3 SWST-2

3 manhole blinding QIS-3 SS-4

4 footing QIS-1 SS-2

column-neck QIS-1 SS-1 & SS-4

5 bridge wall QIN RW3 & RW4

6 bridge base slab QIN RW7 & RW8

column-neck QIN SWST-1

7 footing QIS-3 SS-6 & SS-3

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

10/09/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C50/20, OPC, 65% C40/20, OPC, 130mm C35/20, OPC, C30/20, SRC, 110mm C25/20, SRC, C20/20, SRC,
GGBS, 7% MS, -210mm 120mm -200mm -190mm 100mm -180mm 120mm -200mm
150mm -230mm

22.00

14.00

16.00

54.00

189.00

14.00

273.00 22.00 0.00 14.00 0.00 0.00


Date : 9-Oct-2016

Remarks
C20/20, OPC, C20/10, OPC,
100mm -180mm 60mm -140mm

4.00

0.00 4.00 313.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 precast manhole base slab QIS-1 FW1/11,12,13,14 & 22 Logistic Yard

QIS-2 FW1/5/3 & 5 Logistic Yard

QIS-2 FW1/46/1 Logistic Yard

2 protection screed QIS-3 SWST-2

3 manhole blinding QIS-3 SS-4

4 footing QIS-1 SS-2

column-neck QIS-1 SS-1 & SS-4

5 bridge wall QIN RW3 & RW4

6 bridge base slab QIN RW7 & RW8

column-neck QIN SWST-1

7 footing QIS-3 SS-6 & SS-3

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

10/09/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C50/20, OPC, 65% C40/20, OPC, 130mm C35/20, OPC, C30/20, SRC, 110mm C25/20, SRC, C20/20, SRC,
GGBS, 7% MS, -210mm 120mm -200mm -190mm 100mm -180mm 120mm -200mm
150mm -230mm

22.00

14.00

16.00

54.00

189.00

14.00

273.00 22.00 0.00 14.00 0.00 0.00


Date : 9-Oct-2016

Remarks
C20/20, OPC, C20/10, OPC,
100mm -180mm 60mm -140mm

4.00

0.00 4.00 313.00

TOTAL CONCRETE POURED TODAY


CON

Location

Item # Structure
Area Type Specific Location

1 precast manhole base slab QIS-2 FW1/7/5,6 &7 Logistic Yard

QIS-1 FW1/5/17,18 & 19 Logistic Yard

QIS-2 FW1/43/1 Logistic Yard

QIS-2 FW1/5/4 Logistic Yard

TOTAL CONCRETE POURED / MIX DESIGN


Prepared by:

MER ANTHONY D DELA ROSA


(Signature over printed name )

10/10/16
( Date & Time )
CONCRETE POURING DAILY LOG

Total Volume of Concrete Poured (cubic meter)

C50/20, OPC, 65% C40/20, OPC, 130mm C35/20, OPC, C30/20, SRC, 110mm C25/20, SRC, C20/20, SRC,
GGBS, 7% MS, -210mm 120mm -200mm -190mm 100mm -180mm 120mm -200mm
150mm -230mm

20.00

0.00 20.00 0.00 0.00 0.00 0.00


Date : 10-Oct-2016

Remarks
C20/20, OPC, C20/10, OPC,
100mm -180mm 60mm -140mm

0.00 0.00 20.00

TOTAL CONCRETE POURED TODAY