Vous êtes sur la page 1sur 2

Sheet1

WRX CONSULTANTS
DESIGN CALCULATION Page No :

Project : PROJECT TNB.415 Structure : 3-PILE GROUP


Computed By : HSLIM Date : ### Checked By : Date :

S = 900 3-PILE-GROUP B

C = 600 PILE SIZE ( dia. ) = 300 mm.sq.


AS3 C/2
Y PILE SPACING ( S) = 900 mm

AS2 a= 300 mm
E=
814 b= 400 mm
e a
fcu = 30 N/mm2
X b X
fy = 460 N/mm2
f AS3 AS3
F= B= AS1 use 20 mm dia. bar
557 550
AS2 use 20 mm dia. bar
Y
A/2 AS1 AS3 use 20 mm dia. bar
A = 1500
e = 522 PILE WORKING lOAD ( WL ) = 900 KN
f = 261
( D ) Minimum 700 mm
Soffit of beam or slab D use 950 mm

AS1 & AS3


d D use
950
COL

100
AS2 150

T13 - 250 Binders 50 Lean Concrete

3-PILE-GROUP
400 d= 800 mm

MINIMUM DEPTH OF PILE CAP ( D )

IF dia. < = 550 mm than D = 2.dia + 100 = 700 mm


IF dia. > 550 mm than D = 1/3 ( 8.dia. - 600 ) = NA mm

A = ( S / dia. + 1 )dia. + 300 = 1500 mm

B = dia. + 250 = 550 mm

C = dia. + 300 = 600 mm

E = (( S/dia x 6/7 + 1 ) x dia. + 300 ) - F = 814 mm

F = ( S/dia. x 2/7 + 1/2 ) x dia + 150 = 557 mm

FILE : 3PILEGM
Sheet2

WRX CONSULTANTS
DESIGN CALCULATION Page No :

Project : PROJECT TNB.415 Structure : 3-PILE GROUP


Computed By : HSLIM Date : ### Checked By : Date :

MOMENT METHOD
3-PILE-GROUP B
ULTIMATE LOAD ( N ) = 3 x 1.5WL = 4050 KN

PARALLEL TO X - X AXIS
Moment ( M )= 1.5WL( e - b/2 ) = 435 KN.M
M/C.d2 = 1.13
K = M/C.d2.fcu 0.04
Lever arm factor ( la ) = 0.5 + 0.25 - k / 0.9 = 0.95
AS1 minimum = 0.15%B.D = 784 mm2
AS1 required = M / 0.87.fy.la.d = 1429 mm2
OK - more than AS1 minimum
Required 4.55 NOS. T 20

AS1 use 5 T 20

PARALLEL TO Y-Y AXIS


Moment ( M )= 1.5WL( S/2 - a/2 ) = 405 KN.M
M/B.d2 = 1.15
K = M/B.d2.fcu 0.04
Lever arm factor ( la ) = 0.5 + 0.25 - K / 0.9 = 0.95
AS2 minimum = 0.15%C.D = 855 mm2
AS2 required = T / 0.87.fy = 1332 mm2
OK - more than AS1 minimum
Required 4.24 NOS. T 20

AS2 use 5 T 20

Minimum AS3 = 0.15% x 1000 x D = 1425 mm2


T 20 at 220 mm

AS3 use T 20 at 200

Punching shear stress = N / ( 2(a+b)).d = 3.62 N/mm2


OK - Less than 4.38 N/mm2

X -X AXIS

Shear v = 1.5WL / C.d = 2.81 N/mm2


av = e - b/2 - dia/2 + dia/5 = 232 mm
100AS2/C.d = 0.33
vc = 0.46 N/mm2
Enchanced shear stress = vc.2d / av = 3.19 N/mm2
shear check Ok

Shear v = 2 x 1.5WL / C.d = 5.63 N/mm2


av = f - b/2 - dia/2 + dia/5 = -29 mm
100AS2/C.d = 0.33
vc = 0.46 N/mm2
Enchanced shear stress = vc.2d / av = -25.53 N/mm2
av negative value, shear OK

Y -Y AXIS

Shear v = 1.5WL / B.d = 3.07 N/mm2


av = S/2 - a/2 - dia/2 + dia/5 = 210 mm
100AS1/B.d = 0.36
vc = 0.48 N/mm2
Enchanced shear stress = vc.2d / av = 3.63 N/mm2
shear check Ok