Dimensions A& B are the original pile's spacing. 4 -PILE-GROUP 3/B


Dimensions a1 - a4, & b1 - b4 are the ecc.pile's spacing 250 X 250 RC PILES

b1 b2 PILE WORKING LOAD = 600 KN PER PILE

COLUMN SERVICE AXIAL LOAD ( W ) = 1693 KN


1 2

a1 a2 A= 380 mm
X X

a4 a3 A

4 3
B= 380 mm
C.G of Column
Y PILE 1 ECCENTRICITY
B B + - -4 mm
b4 b3
+ - 13 mm
4-PILE-GROUP 3/B
PILE 2 ECCENTRICITY
a1 = 393 mm - + -4 mm

a2 = 437 mm + - 57 mm

a3 = 339 mm PILE 3 ECCENTRICITY


- + -10 mm
a4 = 385 mm
- + -41 mm
b1 = 376 mm
PILE 4 ECCENTRICITY
b2 = 376 mm + - -44 mm

b3 = 370 mm - + 5 mm

b4 = 336 mm

N.A. ABOUT Y - Y AXIS Y


+ -
ey = b1 + b4 - b2 - b3 = -8.50 mm about y - y axis
4 Y

My-y = W.ey = -14.39 KN.M


Sum dy2
Sum dy2 = ( b1 - ey )^2 + ( b2 + ey )^2 + ( b3 + ey )^2 + ( b4 - ey )^2 = 532,259 mm2

N.A. ABOUt X - X AXIS


+
ex = a1 + a2 - a3 - a4 = 26.50 mm about x - x axis X X
4 -

Mx-x = W.ex = 44.86 KN.M


Sum dx2
Sum dx2 = ( a1 - ex )^2 + ( a2 - ex )^2 + ( a3 + ex )^2 + ( a4 + ex )^2 = 605,755 mm2

FILE : 4PILECC
Sheet2

4-PILE-GROUP 3/B
COMPUTATION OF PILE LOAD 250 X 250 RC PILES

Pile W My-y. dy Mx-x. dx Total


Number No. of pile + Sum dy2 + sum dx2 = Load
in KN

1 423.25 + 10.40 + -27.14 = 406.50 pile - ok

2 423.25 + -9.94 + -30.40 = 382.91 pile - ok

3 423.25 + -9.77 + 27.07 = 440.55 pile - ok

4 423.25 + 9.31 + 30.48 = 463.04 pile - ok

Sum = 1693.00