SUMMARY OF PROPOSAL

For Official Use ‐ To be filled by the Nodal Agency of PSDF

Project Proposal Number : _______________________ Date of Receipt : __________________


To be filled by the Applicant Organization / Utility
1. Name of the requesting
West Bengal State Electricity Transmission Co. Ltd.
Organization / Utility :

2. Short Summary of Project / Scheme / Activity

a. Name of the Project / Renovation and up‐gradation of Protection System of West


Scheme / Activity Bengal State Electricity Transmission Company Ltd.

Replacement of very old, obsolete design, low rupturing


b. Objective of the Project / capacity to achieve most reliable and economical power
Scheme / Activity : transmission system in the country with the highest system
availability and quality and the least technical losses.

Name : Sri Sujit Nath



E‐mail ID : sujit.nath@wbsetcl.in or cped@cal3.vsnl.net.in

c. Authorized Person For this
Land line No : 033 2359 2652
Project / Scheme / Activity

Mobile No. : 09434910019

Fax No : 033 2359 1955

d. Nature of the Project /
Scheme / Activity: Inter –
Intra‐State incident to Inter‐State system.
State / Intra – State
(Please Specify)
The state of West Bengal in particular and the nation in
e. Identified Beneficiaries
general.
With implementation of the scheme, overall redundancy in
the system will be provided. So any contingency can be
f. Merits of the scheme tackled. Improvement in reliability of power supply can be
achieved and All India Grid will be safe in synchronization
with West Bengal State grid.
No limitation envisaged. Only partial shutdown is required to
g. Limitations, if any
replace the equipment, this can be managed judiciously.

The scheme is scheduled to be completed Schedule within 14
h. Time frame for
months progressively from the date of receipt of sanction of
Implementation
the fund/grant.


i. Estimated Cost of Project /
`136.45 Crore at 4th quarter 2013‐14 Price Level.
Scheme / Activity



PSDF Project Proposal


Format A2
Page 1 of 4



DETAILED PROPOSAL (DP)

1. Details of the Requesting Organization / Entity

1.1 Details of Organization / Entity

Name of Organization / Entity West Bengal State Electricity Transmission Co. Ltd.

Acronym or Abbreviation
WBSETCL
(if applicable)

1.2 Details of Head of the Organization

Name (Mr / Ms / Mrs) Mr. Susanta Kumar Das

Designation Managing Director

E‐mail Address susanta.das@wbsetcl.in

Landline No. 033 2337 0206

Fax No. 033 2337 0206


Vidyut Bhavan (8th floor :: A‐Block), Salt Lake, Sector – III,
Address
Block ‐ DJ
City Kolkata

Postal Code 700 091



1.3 Details of Project In‐charge/Project Manager (Authorized Person) for this project/
scheme/activity (Not below the rank of Dy. Gen. Manager / Superintending Engg.)

Name (Mr. / Ms. / Mrs.) Mr. Sujit Nath

Designation Chief Engineer, Central Planning Department

E‐mail Address sujit.nath@wbsetcl.in or cped@cal3.vsnl.net.in

Landline No. 033 2359 2652

Mobile No. 09434910019

Fax No. 033 2359 1955

Address Vidyut Bhavan (9th floor), Salt Lake, Sector – III, Block ‐ DJ

City Kolkata

Postal Code 700 091


Any Change in above mentioned details may be notified to the Nodal Agency of PSDF immediately.

PSDF Project Proposal
Format A2
Page 2 of 4


2. Justification of the Proposal

2.1 Analysis of the Objective

In many substations equipment namely Circuit Breakers, CTs, PTs, LAs, Isolators, C&R Panel,

Relays, Battery, Battery chargers, PLCC equipment are very old i.e. completed their normal service
Obsolete design, non‐availability of critical spares is also factors leading to necessity for
life.

replacement of old equipment.

Looking
to the present scenario & development of latest technology for protection of equipment
and lines it is pertinent to replace relays having old & obsolete technology by modern technology


numerical relays having distinct feature & reliable operation over a period of time for betterment

of system.
now‐a‐days fault study & analysis has greater significance. For fault analysis fault data is
Also

necessary, which can be possible only with numerical relays, which has in built disturbance

recorder that provides pre fault & post fault data.

Purchase of modern testing equipment for various substations are required to check & know the
healthiness of each equipment and their electrical and mechanical parameters for better
operation and maintenance of the substations and transmission lines, which includes computers
for remote monitoring, safety tools, modern tools and tackles, testing equipment etc.

Installation of additional 33 kV Earthing Transformers has been considered for following


technical reasons:
Nos. of Earthing Transformers of the substation should be selected in such a way that 132/33 kV
power transformers can be run individual or parallel mode to cope up unforeseen system
requirement.

Earthing transformer is used for artificial grounding and its rating is so selected that ZO/Z1 ratio

should be kept within limit so that healthy phase voltage rise should not be beyond safe value.
Earthing transformer rating is designed in our practice to consider of one power transformer.
In individual mode: there is no paralleling with other transformer. One Earthling transformer for
each power transformer is necessary in this option.
Parallel mode: Earthing transformer is not required for each transformer. But collective rating of

Earthing transformers should be such that ZO/Z1 ratio is within limit for safe voltage rise. Therefore

rating/nos. should be increased with increased power transformer capacity/nos.
Considering above, requirement of new Earthing Transformers has been considered at some
substations where nos. of installed 132/33 kV Power Transformers is more than the nos. of
installed Earthing Transformers.
As an example, at Arambag 400/220/132/33 kV substations, at present 3 nos. 50 MVA, 132/33 kV
(YnD1) Transformers is in operation with 2 nos. Earthing Transformers (551.7 A). So, installation

of one no. new Earthing Transformer has been considered for protection purpose.

With implementation of the scheme, overall redundancy in the system will be provided. So any

contingency can be tackled. Improvement in reliability of power supply can be achieved and All

India Grid will be safe in synchronization with West Bengal State grid.


No limitation envisaged. Only partial shutdown is required to replace the equipment, this can be

managed judiciously.








PSDF Project Proposal


Format A2
Page 3 of 4


2.2 Identified Beneficiaries of the Project


The state of West Bengal in particular and the Nation in general.

With implementation of the scheme, the West Bengal State grid, part and person of One Grid, will

run more efficiently and more effectively. So, reliability of the grid can be achieved at desire level.


2.3 Identified Source of Funding

of the total project cost is to be funded through grant from PSDF. Balance amount will be
90%

contributed from internal resources.


2.4 Details of Activities for Project / Scheme / Activity

After getting approval of the project towards funding, the following activities will be under taken
to achieve desire results:

1. Issuance of work order
2. Procurement of equipment through tendering from reputed manufacturer
3. Placement of erection & commissioning order

The Area Manager in the rank of Superintending Engineer will supervise the project work in their
jurisdiction. Further, progresses of work are being reviewed monthly at head quarter by the
Managing Director, WBSETCL with representation from all Area Managers.
Due to urgency, some work has already been taken up & completed.

2.5 Executing Agency

The project will be implemented at different sub‐station located at different location of the State.
As such, it will be implemented by different enlisted reputed vendors. Major equipment will be
procured centrally through tender from reputed manufacturer.

PSDF Project Proposal


Format A2
Page 4 of 4


2.6 Time line for Implementation of Project / Scheme / Activity


Time line for implementing this project/ scheme/ activity is given here under considering date of

receipt of PSDF grant approval as zero date:

1. Issuance of Work Order : 1 month
2. Procurement of Equipment : 6 months
3. Erection & Commissioning : 8 months

Timeline of the Project / Scheme / Activity
Likely Duration of Project
15 months
(in Months)
Start Date Date of receipt of approval of PSDF Funding
Likely Completion Date October, 2015

Timeline of Activities
S. Description Year 2014 – 15 2015‐16
No Month Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4
1. Project Approval
2. Bid Preparation
3. Bidding Period
4. Evaluation, Contract
Award & Mobilization
5. First Disbursement
6. Project Status Report
7. Second Disbursement
8. Project Status Report
9. Third Disbursement
10. Project Status Report
11. Fourth Disbursement
12. Project Status Report






PSDF Project Proposal


COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.1

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT

SUBSTATION : JEERAT 400/220/132 KV (Rs. in Lakh)


Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 2 46.09 92.18 2.77 94.95 5.77 15.11 115.83
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 3 29.87 89.60 2.69 92.29 5.61 14.68 112.58
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 9 7.73 69.57 2.09 71.66 4.36 11.40 87.42
1.1.5 420 KV CVT 1Ph Nos 2 3.75 7.50 0.23 7.73 0.47 1.23 9.43
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 258.85 7.78 266.63 16.21 42.42 325.26
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 5 14.28 71.41 2.14 73.55 4.47 11.70 89.72
1.2.2 220KV Isolator 3‐ph Nos. 14 5.51 77.11 2.31 79.42 4.83 12.64 96.89
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 1 5.71 5.71 0.17 5.88 0.36 0.94 7.18
1.2.4 220KV CVT 1Ph Nos. 4 3.14 12.56 0.38 12.94 0.79 2.06 15.79
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 1 0.51 0.51 0.02 0.53 0.03 0.08 0.64
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 167.29 5.02 172.31 10.48 27.42 210.21
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 5 1.65 8.25 0.25 8.50 0.52 1.35 10.37
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2 2.08 4.16 0.12 4.28 0.26 0.68 5.22
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 12.41 0.37 12.78 0.78 2.03 15.59
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 1 0.12 0.12 0.00 0.12 0.01 0.02 0.15
1.4.5 Surge arrestor Nos. 2 0.06 0.12 0.00 0.12 0.01 0.02 0.15
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.24 0.00 0.24 0.02 0.04 0.30
Sub ‐ Total 1 438.79 13.16 451.95 27.48 71.91 551.34

2.0 Control & Relay Panels


2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides) Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 1 107.00 107.00 3.21 110.21 6.70 17.54 134.45
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 116.32 3.49 119.81 7.28 19.07 146.16
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides) Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 1 91.02 91.02 2.73 93.75 5.70 14.92 114.37
Sub ‐ Total 2.2 91.02 2.73 93.75 5.70 14.92 114.37
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides) Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 18 5.06 91.08 2.73 93.81 5.70 14.93 114.44
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1.96 0.00 0.00 0.00 0.00 0.00 0.00
2.4.4 LBB nos 28 1.50 42.00 1.26 43.26 2.63 6.88 52.77
Sub ‐ Total 2.4 133.08 3.99 137.07 8.33 21.81 167.21

Jeerat: Page 1 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.1

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT

SUBSTATION : JEERAT 400/220/132 KV (Rs. in Lakh)


Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 420.06 12.60 432.66 26.30 68.85 527.81
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 10 4.76 47.60 1.43 49.03 2.98 7.80 59.81
3.1.2 Ph. To Ph. Coupling Device Nos 5 1.43 7.15 0.21 7.36 0.45 1.17 8.98
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 8 6.22 49.76 1.49 51.25 3.12 8.16 62.53
3.1.5 Protn. Coupler Nos 12 4.36 52.32 1.57 53.89 3.28 8.58 65.75
Sub ‐ Total 3 156.83 4.70 161.53 9.83 25.71 197.07
SWITCHYARD ERECTION
4.0 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.0 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.0 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.0 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.0 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.2 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.0 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.2 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.3 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 0.00 0.00 0.00 0.00 0.00 0.00
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.2 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 1103.32 33.10 1136.42 69.09 180.84 1386.35

Jeerat: Page 2 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.2

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :Arambag 400/220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3 3.75 11.25 0.34 11.59 0.70 1.84 14.13
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 11.25 0.34 11.59 0.70 1.84 14.13
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 24 5.51 132.19 3.97 136.16 8.28 21.67 166.11
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 4 3.14 12.56 0.38 12.94 0.79 2.06 15.79
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 144.75 4.34 149.09 9.06 23.72 181.87
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 1 6.62 6.62 0.20 6.82 0.41 1.08 8.31
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2 2.08 4.16 0.12 4.28 0.26 0.68 5.22
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 10.78 0.32 11.10 0.67 1.77 13.54
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 1 2.81 2.81 0.08 2.89 0.18 0.46 3.53
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 2.81 0.08 2.89 0.18 0.46 3.53
Sub ‐ Total 1 169.59 5.09 174.68 10.62 27.79 213.09
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV side Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV side Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV side Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection ,
Transformer differential protection relays
with IRGB port for Refurbishment &
augmentation of protection system . Nos 13 5.06 65.78 1.97 67.75 4.12 10.78 82.65
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00

Arambag: Page 3 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.2

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :Arambag 400/220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.3 Synchronising Trolley Nos 1.96 0.00 0.00 0.00 0.00 0.00 0.00
2.4.4 LBB nos 13 1.50 19.50 0.59 20.09 1.22 3.20 24.51
Sub ‐ Total 2.4 85.28 2.56 87.84 5.34 13.98 107.16
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 174.24 5.23 179.47 10.91 28.56 218.94
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 10 4.76 47.60 1.43 49.03 2.98 7.80 59.81
3.1.2 Ph. To Ph. Coupling Device Nos 6 1.43 8.58 0.26 8.84 0.54 1.41 10.79
3.1.3 H.F. Cable KM 1 1.40 1.40 0.04 1.44 0.09 0.23 1.76
3.1.4 Carrier Equipment Nos 10 6.22 62.20 1.87 64.07 3.90 10.20 78.17
3.1.5 Protn. Coupler Nos 12 4.36 52.32 1.57 53.89 3.28 8.58 65.75
Sub ‐ Total 3 172.10 5.17 177.27 10.79 28.22 216.28
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 1 14.27 14.27 0.43 14.70 0.89 2.34 17.93
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 1 31.46 31.46 0.94 32.40 1.97 5.16 39.53
15.4 SF6 gas handling plant Nos 1 33.71 33.71 1.01 34.72 2.11 5.52 42.35
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 1 15.39 15.39 0.46 15.85 0.96 2.52 19.33
Sub ‐ Total 15.0 122.31 3.67 125.98 7.65 20.05 153.68
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 724.48 21.75 746.23 45.37 118.76 910.36

Arambag: Page 4 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.3

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :Durgapur 400/220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 1 9.04 9.04 0.27 9.31 0.57 1.48 11.36
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 9.04 0.27 9.31 0.57 1.48 11.36
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 28 5.51 154.22 4.63 158.85 9.66 25.28 193.79
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 1 5.71 5.71 0.17 5.88 0.36 0.94 7.18
1.2.4 220KV CVT 1Ph Nos. 4 3.14 12.56 0.38 12.94 0.79 2.06 15.79
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 8 0.51 4.08 0.12 4.20 0.26 0.67 5.13
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 176.57 5.30 181.87 11.06 28.94 221.87
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 1 6.62 6.62 0.20 6.82 0.41 1.08 8.31
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2 2.08 4.16 0.12 4.28 0.26 0.68 5.22
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 10.78 0.32 11.10 0.67 1.77 13.54
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 196.38 5.89 202.27 12.30 32.19 246.76

2.0 Control & Relay Panels


2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 2 9.32 18.64 0.56 19.20 1.17 3.06 23.43
Sub ‐ Total 2.1 18.64 0.56 19.20 1.17 3.06 23.43
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 1 9.13 9.13 0.27 9.40 0.57 1.50 11.47
2.2.2 CB Relay panel with A/R Nos 8 13.10 104.80 3.14 107.94 6.56 17.18 131.68
2.2.3 Transformer protection panel (HV & MV sides Nos 2 13.51 27.02 0.81 27.83 1.69 4.43 33.95
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 1 91.02 91.02 2.73 93.75 5.70 14.92 114.37
Sub ‐ Total 2.2 231.97 6.95 238.92 14.52 38.03 291.47
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 3 5.06 15.18 0.46 15.64 0.95 2.49 19.08
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00

DURGAPUR: Page 5 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.3

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :Durgapur 400/220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 14 1.50 21.00 0.63 21.63 1.32 3.44 26.39
Sub ‐ Total 2.4 38.14 1.15 39.29 2.39 6.25 47.93
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 368.39 11.05 379.44 23.07 60.39 462.90
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 8 4.76 38.08 1.14 39.22 2.38 6.24 47.84
3.1.2 Ph. To Ph. Coupling Device Nos 1 1.43 1.43 0.04 1.47 0.09 0.23 1.79
3.1.3 H.F. Cable KM 1 1.40 1.40 0.04 1.44 0.09 0.23 1.76
3.1.4 Carrier Equipment Nos 6 6.22 37.32 1.12 38.44 2.34 6.12 46.90
3.1.5 Protn. Coupler Nos 14 4.36 61.04 1.83 62.87 3.82 10.00 76.69
Sub ‐ Total 3 139.27 4.17 143.44 8.72 22.82 174.98
SWITCHYARD ERECTION
4.0 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.0 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.0 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.0 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.0 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.2 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.0 Power & Control Cables KM 12 1.50 18.00 0.54 18.54 1.13 2.95 22.62
Sub ‐ Total 9 to 14 59.66 1.79 61.45 3.74 9.78 74.97
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 27.48 0.83 28.31 1.72 4.51 34.54
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.2 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.3 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 0.00 0.00 0.00 0.00 0.00 0.00
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.2 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 2 20.00 40.00 1.20 41.20 2.50 6.56 50.26
Sub ‐ Total 18.0 40.00 1.20 41.20 2.50 6.56 50.26
Grand Total 839.68 25.19 864.87 52.58 137.64 1055.09

DURGAPUR: Page 6 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.4

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :KLC Bantala 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.20 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 0.00 0.00 0.00 0.00 0.00 0.00
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 16 0.50 8.00 0.24 8.24 0.50 1.31 10.05
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 9 0.08 0.72 0.02 0.74 0.04 0.12 0.90
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 8.72 0.26 8.98 0.54 1.43 10.95
Sub ‐ Total 1 8.72 0.26 8.98 0.55 1.43 10.96

2.0 Control & Relay Panels


2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.20 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 1 91.02 91.02 2.73 93.75 5.70 14.92 114.37
Sub ‐ Total 2.2 91.02 2.73 93.75 5.70 14.92 114.37
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07

KLC, BANTALA: Page 7 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.4

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :KLC Bantala 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 6 5.06 30.36 0.91 31.27 1.90 4.98 38.15
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 8 1.50 12.00 0.36 12.36 0.75 1.97 15.08
Sub ‐ Total 2.3 44.32 1.33 45.65 2.77 7.27 55.69
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 224.30 6.73 231.03 14.04 36.77 281.84
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 4 4.36 17.44 0.52 17.96 1.09 2.86 21.91
Sub ‐ Total 3 17.44 0.52 17.96 1.09 2.86 21.91
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 1 14.27 14.27 0.43 14.70 0.89 2.34 17.93
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 1 31.46 31.46 0.94 32.40 1.97 5.16 39.53
15.4 SF6 gas handling plant Nos 1 33.71 33.71 1.01 34.72 2.11 5.52 42.35
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 1 15.39 15.39 0.46 15.85 0.96 2.52 19.33
Sub ‐ Total 15.0 122.31 3.67 125.98 7.65 20.05 153.68
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.2 LT Transformer 33KV/0.433KV, 315 KVA Nos 2 7.26 14.52 0.44 14.96 0.91 2.38 18.25
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 30.60 0.92 31.52 1.92 5.02 38.46
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.10 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 473.53 14.21 487.74 29.64 77.63 595.01

KLC, BANTALA: Page 8 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.5

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :Kasba 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 1 14.28 14.28 0.43 14.71 0.89 2.34 17.94
1.2.2 220KV Isolator 3‐ph Nos. 19 5.51 104.65 3.14 107.79 6.55 17.15 131.49
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 6 5.71 34.25 1.03 35.28 2.15 5.61 43.04
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 42 0.20 8.40 0.25 8.65 0.53 1.38 10.56
Sub ‐ Total 1.2 161.58 4.85 166.43 10.12 26.48 203.03
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 9 1.65 14.85 0.45 15.30 0.93 2.43 18.66
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 28 3.86 108.04 3.24 111.28 6.77 17.71 135.76
1.3.6 CVT Nos. 2 2.08 4.16 0.12 4.28 0.26 0.68 5.22
1.3.7 132 KV Post Insulator Nos. 121 0.15 18.15 0.54 18.69 1.14 2.97 22.80
Sub ‐ Total 1.3 145.20 4.36 149.56 9.09 23.80 182.45
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00

Sub ‐ Total 1 306.78 9.20 315.98 19.21 50.28 385.47

2.0 Control & Relay Panels


2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 1 9.13 9.13 0.27 9.40 0.57 1.50 11.47
2.2.2 CB Relay panel with A/R Nos 4 13.10 52.40 1.57 53.97 3.28 8.59 65.84
2.2.3 Transformer protection panel (HV & MV sides Nos 2 13.51 27.02 0.81 27.83 1.69 4.43 33.95
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 1 91.02 91.02 2.73 93.75 5.70 14.92 114.37
Sub ‐ Total 2.2 179.57 5.38 184.95 11.24 29.44 225.63
2.30 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 79.64 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.3 0.00 0.00 0.00 0.00 0.00 0.00

KASBA: Page 9 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.5

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION :Kasba 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 6 5.06 30.36 0.91 31.27 1.90 4.98 38.15
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.3 32.32 0.97 33.29 2.02 5.30 40.61
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 221.21 6.63 227.84 13.84 36.27 277.95
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 2 4.76 9.52 0.29 9.81 0.60 1.56 11.97
3.1.2 Ph. To Ph. Coupling Device Nos 4 1.43 5.72 0.17 5.89 0.36 0.94 7.19
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 2 6.22 12.44 0.37 12.81 0.78 2.04 15.63
3.1.5 Protn. Coupler Nos 6 4.36 26.16 0.78 26.94 1.64 4.29 32.87
Sub ‐ Total 3 53.84 1.61 55.45 3.38 8.83 67.66
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.10 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 0.00 0.00 0.00 0.00 0.00 0.00
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 2 3.50 7.00 0.21 7.21 0.44 1.15 8.80
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 15.50 0.47 15.97 0.97 2.54 19.48
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 676.47 20.29 696.76 42.35 110.90 850.01

KASBA: Page 10 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.6

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Howrah 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 1 14.28 14.28 0.43 14.71 0.89 2.34 17.94
1.2.2 220KV Isolator 3‐ph Nos. 18 5.51 99.14 2.97 102.11 6.21 16.25 124.57
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 13 5.71 74.21 2.23 76.44 4.65 12.16 93.25
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 12 0.51 6.12 0.18 6.30 0.38 1.00 7.68
1.2.6 220KV PT Nos. 6 3.26 19.56 0.59 20.15 1.23 3.21 24.59
1.2.7 220 KV Post Insulator Nos. 33 0.20 6.60 0.20 6.80 0.41 1.08 8.29
Sub ‐ Total 1.2 219.91 6.60 226.51 13.77 36.04 276.32
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 1 6.62 6.62 0.20 6.82 0.41 1.08 8.31
1.3.2 CT Nos. 40 1.65 66.00 1.98 67.98 4.13 10.82 82.93
1.3.3 PT Nos. 6 1.51 9.06 0.27 9.33 0.57 1.49 11.39
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 12 0.35 4.20 0.13 4.33 0.26 0.69 5.28
1.3.5 Isolators Nos. 7 3.86 27.01 0.81 27.82 1.69 4.43 33.94
1.3.6 CVT Nos. 2 2.08 4.16 0.12 4.28 0.26 0.68 5.22
1.3.7 132 KV Post Insulator Nos. 55 0.15 8.25 0.25 8.50 0.52 1.35 10.37
Sub ‐ Total 1.3 125.30 3.76 129.06 7.85 20.54 157.45
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 1 2.81 2.81 0.08 2.89 0.18 0.46 3.53
1.4.2 CT Nos. 3 0.50 1.50 0.05 1.55 0.09 0.25 1.89
1.4.3 PT Nos. 3 0.47 1.41 0.04 1.45 0.09 0.23 1.77
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 3 0.06 0.18 0.01 0.19 0.01 0.03 0.23
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 3 0.91 2.73 0.08 2.81 0.17 0.45 3.43
Sub ‐ Total 1.4 8.63 0.26 8.89 0.54 1.42 10.85
Sub ‐ Total 1 353.84 10.62 364.46 22.16 57.99 444.61

2.0 Control & Relay Panels


2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV
0.00 0.00 0.00 0.00 0.00 0.00
sides) Nos
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 1 9.13 9.13 0.27 9.40 0.57 1.50 11.47
2.2.2 CB Relay panel with A/R Nos 4 13.10 52.40 1.57 53.97 3.28 8.59 65.84
2.2.3 Transformer protection panel (HV & MV sides Nos 3 13.51 40.53 1.22 41.75 2.54 6.64 50.93
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 102.06 3.06 105.12 6.39 16.73 128.24
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV
0.00 0.00 0.00 0.00 0.00 0.00
sides) Nos 7.74
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07

HOWRAH: Page 11 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.6

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Howrah 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 4 5.06 20.24 0.61 20.85 1.27 3.32 25.44
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.3 22.20 0.67 22.87 1.39 3.64 27.90
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 213.22 6.40 219.62 13.35 34.95 267.92
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 10 4.76 47.60 1.43 49.03 2.98 7.80 59.81
3.1.2 Ph. To Ph. Coupling Device Nos 8 1.43 11.44 0.34 11.78 0.72 1.88 14.38
3.1.3 H.F. Cable KM 1 1.40 1.40 0.04 1.44 0.09 0.23 1.76
3.1.4 Carrier Equipment Nos 4 6.22 24.88 0.75 25.63 1.56 4.08 31.27
3.1.5 Protn. Coupler Nos 4 4.36 17.44 0.52 17.96 1.09 2.86 21.91
Sub ‐ Total 3 102.76 3.08 105.84 6.44 16.85 129.13
SWITCHYARD ERECTION
4.0 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.0 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.0 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.0 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.0 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.2 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.0 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.2 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.3 LT Transformer 33KV/0.433KV, 630 KVA Nos 2 14.70 29.40 0.88 30.28 1.84 4.82 36.94
Sub ‐ Total 16.0 29.40 0.88 30.28 1.84 4.82 36.94
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.2 ACDB Set 1 12.34 12.34 0.37 12.71 0.77 2.02 15.50
17.3 DCDB Set 2 8.50 17.00 0.51 17.51 1.06 2.79 21.36
Sub ‐ Total 17.0 29.34 0.88 30.22 1.83 4.81 36.86
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 807.70 24.24 831.94 50.57 132.40 1014.91

HOWRAH: Page 12 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.7

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Domjur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 5 6.62 33.09 0.99 34.08 2.07 5.42 41.57
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 33.09 0.99 34.08 2.07 5.42 41.57
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 4 2.81 11.24 0.34 11.58 0.70 1.84 14.12
1.4.2 CT Nos. 2 0.50 1.00 0.03 1.03 0.06 0.16 1.25
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 12.24 0.37 12.61 0.76 2.00 15.37
Sub ‐ Total 1 45.33 1.36 46.69 2.84 7.43 56.96
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 8 5.06 40.48 1.21 41.69 2.53 6.63 50.85

DOMJUR: Page 13 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.7

PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Domjur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 13 1.50 19.50 0.59 20.09 1.22 3.20 24.51
Sub ‐ Total 2.3 61.94 1.86 63.80 3.87 10.15 77.82
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 150.90 4.53 155.43 9.44 24.73 189.60
3.0 Communication Equipment
3.10 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 2 4.36 8.72 0.26 8.98 0.55 1.43 10.96
Sub ‐ Total 3 8.72 0.26 8.98 0.55 1.43 10.96
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
46.00 1.38 47.38 2.88 7.54 57.80
existing system. LS 1 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 87.66 2.63 90.29 5.49 14.37 110.15
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 1 14.27 14.27 0.43 14.70 0.89 2.34 17.93
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 1 31.46 31.46 0.94 32.40 1.97 5.16 39.53
15.4 SF6 gas handling plant Nos 1 33.71 33.71 1.01 34.72 2.11 5.52 42.35
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 1 15.39 15.39 0.46 15.85 0.96 2.52 19.33
Sub ‐ Total 15.0 122.31 3.67 125.98 7.65 20.05 153.68
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 459.50 13.79 473.29 28.76 75.32 577.37

DOMJUR: Page 14 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.8
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Gokarno 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 3 5.71 17.13 0.51 17.64 1.07 2.81 21.52
1.2.4 220KV CVT 1Ph Nos. 4 3.14 12.56 0.38 12.94 0.79 2.06 15.79
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 29.69 0.89 30.58 1.86 4.87 37.31
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 3 6.62 19.86 0.60 20.46 1.24 3.25 24.95
1.3.2 CT Nos. 4 1.65 6.60 0.20 6.80 0.41 1.08 8.29
1.3.3 PT Nos. 3 1.51 4.53 0.14 4.67 0.28 0.74 5.69
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 1 0.35 0.35 0.01 0.36 0.02 0.06 0.44
1.3.5 Isolators Nos. 8 3.86 30.87 0.93 31.80 1.93 5.06 38.79
1.3.6 CVT Nos. 2 2.08 4.16 0.12 4.28 0.26 0.68 5.22
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 66.36 1.99 68.35 4.16 10.88 83.39
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 1 2.81 2.81 0.08 2.89 0.18 0.46 3.53
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 2.81 0.08 2.89 0.18 0.46 3.53
Sub ‐ Total 1 98.86 2.97 101.83 6.19 16.20 124.22

2.0 Control & Relay Panels


2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07

GOKARNO: Page 15 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.8
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Gokarno 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 13 5.06 65.78 1.97 67.75 4.12 10.78 82.65
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 14 1.50 21.00 0.63 21.63 1.32 3.44 26.39
Sub ‐ Total 2.3 88.74 2.66 91.40 5.56 14.54 111.50
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 177.70 5.33 183.03 11.13 29.12 223.28
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 8 4.76 38.08 1.14 39.22 2.38 6.24 47.84
3.1.2 Ph. To Ph. Coupling Device Nos 5 1.43 7.15 0.21 7.36 0.45 1.17 8.98
3.1.3 H.F. Cable KM 1 1.40 1.40 0.04 1.44 0.09 0.23 1.76
3.1.4 Carrier Equipment Nos 4 6.22 24.88 0.75 25.63 1.56 4.08 31.27
3.1.5 Protn. Coupler Nos 6 4.36 26.16 0.78 26.94 1.64 4.29 32.87
Sub ‐ Total 3 97.67 2.92 100.59 6.12 16.01 122.72
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
46.00 1.38 47.38 2.88 7.54 57.80
existing system. LS 1 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 2 20.09 40.18 1.21 41.39 2.52 6.59 50.50
13.2 Battery and Battery charger,200AH,48V Set 1 5.39 5.39 0.16 5.55 0.34 0.88 6.77
14.0 Power & Control Cables KM 5 1.50 7.50 0.23 7.73 0.47 1.23 9.43
Sub ‐ Total 9 to 14 120.64 3.63 124.27 7.56 19.78 151.61
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 1 14.27 14.27 0.43 14.70 0.89 2.34 17.93
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 1 31.46 31.46 0.94 32.40 1.97 5.16 39.53
15.4 SF6 gas handling plant Nos 1 33.71 33.71 1.01 34.72 2.11 5.52 42.35
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 1 15.39 15.39 0.46 15.85 0.96 2.52 19.33
Sub ‐ Total 15.0 122.31 3.67 125.98 7.65 20.05 153.68
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 661.76 19.86 681.62 41.44 108.47 831.53

GOKARNO: Page 16 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.9
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Satgachia 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 4 3.14 12.56 0.38 12.94 0.79 2.06 15.79
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 2 0.51 1.02 0.03 1.05 0.06 0.17 1.28
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 13.58 0.41 13.99 0.85 2.23 17.07
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6 6.62 39.71 1.19 40.90 2.49 6.51 49.90
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2 2.08 4.16 0.12 4.28 0.26 0.68 5.22
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 43.87 1.32 45.19 2.75 7.19 55.13
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 6 2.81 16.86 0.51 17.37 1.06 2.76 21.19
1.4.2 CT Nos. 8 0.50 4.00 0.12 4.12 0.25 0.66 5.03
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 20.86 0.63 21.49 1.31 3.42 26.22

Sub ‐ Total 1 78.31 2.35 80.66 4.90 12.83 98.39

2.0 Control & Relay Panels


2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07

SATGACHIA: Page 17 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.9
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Satgachia 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 10 5.06 50.60 1.52 52.12 3.17 8.29 63.58
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 15 1.50 22.50 0.68 23.18 1.41 3.69 28.28
Sub ‐ Total 2.3 75.06 2.26 77.32 4.70 12.30 94.32
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 164.02 4.93 168.95 10.27 26.88 206.10
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 8 4.76 38.08 1.14 39.22 2.38 6.24 47.84
3.1.2 Ph. To Ph. Coupling Device Nos 5 1.43 7.15 0.21 7.36 0.45 1.17 8.98
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 4 6.22 24.88 0.75 25.63 1.56 4.08 31.27
3.1.5 Protn. Coupler Nos 6 4.36 26.16 0.78 26.94 1.64 4.29 32.87
Sub ‐ Total 3 96.27 2.88 99.15 6.03 15.78 120.96
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 2 20.09 40.18 1.21 41.39 2.52 6.59 50.50
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 61.75 1.86 63.61 3.87 10.13 77.61
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 27.48 0.83 28.31 1.72 4.51 34.54
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 472.41 14.19 486.60 29.58 77.44 593.62

SATGACHIA: Page 18 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.10
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Laxmikantapur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 3 0.51 1.53 0.05 1.58 0.10 0.25 1.93
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 1.53 0.05 1.58 0.10 0.25 1.93
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6 6.62 39.71 1.19 40.90 2.49 6.51 49.90
1.3.2 CT Nos. 5 1.65 8.25 0.25 8.50 0.52 1.35 10.37
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 8 0.35 2.80 0.08 2.88 0.18 0.46 3.52
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 50.76 1.52 52.28 3.18 8.32 63.78
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 4 2.81 11.24 0.34 11.58 0.70 1.84 14.12
1.4.2 CT Nos. 6 0.50 3.00 0.09 3.09 0.19 0.49 3.77
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 4 0.08 0.32 0.01 0.33 0.02 0.05 0.40
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 14.56 0.44 15.00 0.91 2.38 18.29
Sub ‐ Total 1 66.85 2.01 68.86 4.19 10.96 84.01

2.0 Control & Relay Panels


2.10 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 1 91.02 91.02 2.73 93.75 5.70 14.92 114.37
Sub ‐ Total 2.2 91.02 2.73 93.75 5.70 14.92 114.37
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 1 5.62 5.62 0.17 5.79 0.35 0.92 7.06
2.3.2 Transformer protection panel (HV & MV sides Nos 2 7.74 15.48 0.46 15.94 0.97 2.54 19.45
2.3.3 Line protection panel Nos 1 12.70 12.70 0.38 13.08 0.80 2.08 15.96
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 113.44 3.40 116.84 7.11 18.59 142.54

LAXMIKANTAPUR: Page 19 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.10
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Laxmikantapur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 7 5.06 35.42 1.06 36.48 2.22 5.81 44.51
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 14 1.50 21.00 0.63 21.63 1.32 3.44 26.39
Sub ‐ Total 2.3 58.38 1.75 60.13 3.66 9.57 73.36
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 272.16 8.16 280.32 17.05 44.61 341.98
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 8 4.76 38.08 1.14 39.22 2.38 6.24 47.84
3.1.2 Ph. To Ph. Coupling Device Nos 4 1.43 5.72 0.17 5.89 0.36 0.94 7.19
3.1.3 H.F. Cable KM 1 1.40 1.40 0.04 1.44 0.09 0.23 1.76
3.1.4 Carrier Equipment Nos 4 6.22 24.88 0.75 25.63 1.56 4.08 31.27
3.1.5 Protn. Coupler Nos 4 4.36 17.44 0.52 17.96 1.09 2.86 21.91
Sub ‐ Total 3 87.52 2.62 90.14 5.48 14.35 109.97
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 530.25 15.91 546.16 33.21 86.93 666.30

LAXMIKANTAPUR: Page 20 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.11
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : NJP 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 12 6.62 79.42 2.38 81.80 4.97 13.02 99.79
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 79.42 2.38 81.80 4.97 13.02 99.79
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 79.42 2.38 81.80 4.97 13.02 99.79
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 4 5.06 20.24 0.61 20.85 1.27 3.32 25.44

NEW JALPAIGURI: Page 21 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.11
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : NJP 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1.96 0.00 0.00 0.00 0.00 0.00 0.00
2.4.4 LBB nos 13 1.50 19.50 0.59 20.09 1.22 3.20 24.51
Sub ‐ Total 2.3 39.74 1.20 40.94 2.49 6.52 49.95
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 128.70 3.87 132.57 8.06 21.10 161.73
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 2 4.36 8.72 0.26 8.98 0.55 1.43 10.96
Sub ‐ Total 3 8.72 0.26 8.98 0.55 1.43 10.96
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
46.00 1.38 47.38 2.88 7.54 57.80
existing system. LS 1 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 2 20.09 40.18 1.21 41.39 2.52 6.59 50.50
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 107.75 3.24 110.99 6.75 17.67 135.41
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 1 14.27 14.27 0.43 14.70 0.89 2.34 17.93
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 1 31.46 31.46 0.94 32.40 1.97 5.16 39.53
15.4 SF6 gas handling plant Nos 1 33.71 33.71 1.01 34.72 2.11 5.52 42.35
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 1 15.39 15.39 0.46 15.85 0.96 2.52 19.33
Sub ‐ Total 15.0 122.31 3.67 125.98 7.65 20.05 153.68
16.0 Transformers
16.10 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 0.00 0.00 0.00 0.00 0.00 0.00
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 7 3.50 24.50 0.74 25.24 1.53 4.02 30.79
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 33.00 1.00 34.00 2.06 5.41 41.47
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 499.90 15.02 514.92 31.29 81.96 628.17

NEW JALPAIGURI: Page 22 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.12
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : New Haldia 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 10 5.51 55.08 1.65 56.73 3.45 9.03 69.21
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 55.08 1.65 56.73 3.45 9.03 69.21
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 1 6.62 6.62 0.20 6.82 0.41 1.08 8.31
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 6.62 0.20 6.82 0.41 1.08 8.31
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 61.70 1.85 63.55 3.86 10.11 77.52
2.0 Control & Relay Panels
2.10 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 6 5.06 30.36 0.91 31.27 1.90 4.98 38.15
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
NEW HALDIA: Page 23 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.12
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : New Haldia 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.4 LBB nos 9 1.50 13.50 0.41 13.91 0.85 2.21 16.97
Sub ‐ Total 2.3 45.82 1.38 47.20 2.87 7.51 57.58
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 134.78 4.05 138.83 8.44 22.09 169.36
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 2 4.36 8.72 0.26 8.98 0.55 1.43 10.96
Sub ‐ Total 3 8.72 0.26 8.98 0.55 1.43 10.96
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
46.00 1.38 47.38 2.88 7.54 57.80
existing system. LS 1 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 87.66 2.63 90.29 5.49 14.37 110.15
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 27.48 0.83 28.31 1.72 4.51 34.54
16.0 Transformers
16.10 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 0.00 0.00 0.00 0.00 0.00 0.00
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 348.84 10.48 359.32 21.84 57.18 438.34

NEW HALDIA: Page 24 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.13
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Dalkhola 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 2 6.62 13.24 0.40 13.64 0.83 2.17 16.64
1.3.2 CT Nos. 10 1.65 16.50 0.50 17.00 1.03 2.70 20.73
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 16 0.35 5.60 0.17 5.77 0.35 0.92 7.04
1.3.5 Isolators Nos. 8 3.86 30.87 0.93 31.80 1.93 5.06 38.79
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 4 0.15 0.60 0.02 0.62 0.04 0.10 0.76
Sub ‐ Total 1.3 66.81 2.00 68.81 4.18 10.95 83.94
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 13 0.50 6.50 0.20 6.70 0.41 1.07 8.18
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 6 0.06 0.36 0.01 0.37 0.02 0.06 0.45
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 6.86 0.21 7.07 0.43 1.13 8.63
Sub ‐ Total 1 73.67 2.21 75.88 4.61 12.07 92.56
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07

DALKHOLA: Page 25 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.13
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Dalkhola 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 4 5.06 20.24 0.61 20.85 1.27 3.32 25.44
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 10 1.50 15.00 0.45 15.45 0.94 2.46 18.85
Sub ‐ Total 2.3 37.20 1.12 38.32 2.33 6.10 46.75
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 126.16 3.79 129.95 7.90 20.68 158.53
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 2 4.36 8.72 0.26 8.98 0.55 1.43 10.96
Sub ‐ Total 3 8.72 0.26 8.98 0.55 1.43 10.96
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.0 Power & Control Cables KM 5 1.50 7.50 0.23 7.73 0.47 1.23 9.43
Sub ‐ Total 9 to 14 49.16 1.48 50.64 3.08 8.06 61.78
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 319.77 9.61 329.38 20.02 52.42 401.82

DALKHOLA: Page 26 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.14
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Midnapur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 3 5.51 16.52 0.50 17.02 1.04 2.71 20.77
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 16.52 0.50 17.02 1.04 2.71 20.77
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 4 6.62 26.47 0.79 27.26 1.66 4.34 33.26
1.3.2 CT Nos. 5 1.65 8.25 0.25 8.50 0.52 1.35 10.37
1.3.3 PT Nos. 3 1.51 4.53 0.14 4.67 0.28 0.74 5.69
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 2 0.35 0.70 0.02 0.72 0.04 0.11 0.87
1.3.5 Isolators Nos. 2 3.86 7.72 0.23 7.95 0.48 1.26 9.69
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 47.67 1.43 49.10 2.99 7.81 59.90
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 2 0.50 1.00 0.03 1.03 0.06 0.16 1.25
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 12 0.91 10.92 0.33 11.25 0.68 1.79 13.72
Sub ‐ Total 1.4 11.92 0.36 12.28 0.74 1.95 14.97
Sub ‐ Total 1 76.11 2.28 78.39 4.77 12.47 95.63
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 15 5.06 75.90 2.28 78.18 4.75 12.44 95.37

MIDNAPUR: Page 27 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.14
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Midnapur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 16 1.50 24.00 0.72 24.72 1.50 3.93 30.15
Sub ‐ Total 2.3 101.86 3.06 104.92 6.37 16.69 127.98
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 190.82 5.73 196.55 11.94 31.27 239.76
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 2 4.36 8.72 0.26 8.98 0.55 1.43 10.96
Sub ‐ Total 3 8.72 0.26 8.98 0.55 1.43 10.96
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
46.00 1.38 47.38 2.88 7.54 57.80
existing system. LS 1 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 2 20.09 40.18 1.21 41.39 2.52 6.59 50.50
13.2 Battery and Battery charger,200AH,48V Set 1 5.39 5.39 0.16 5.55 0.34 0.88 6.77
14.0 Power & Control Cables KM 6 1.50 9.00 0.27 9.27 0.56 1.47 11.30
Sub ‐ Total 9 to 14 122.14 3.67 125.81 7.65 20.02 153.48
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.10 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 0.00 0.00 0.00 0.00 0.00 0.00
17.00 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 443.77 13.33 457.10 27.78 72.73 557.61

MIDNAPUR: Page 28 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.15
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : New Bishnupur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 1 5.71 5.71 0.17 5.88 0.36 0.94 7.18
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 5.71 0.17 5.88 0.36 0.94 7.18
1.30 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 1 0.35 0.35 0.01 0.36 0.02 0.06 0.44
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 0.35 0.01 0.36 0.02 0.06 0.44
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 2 0.50 1.00 0.03 1.03 0.06 0.16 1.25
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 1.00 0.03 1.03 0.06 0.16 1.25
Sub ‐ Total 1 7.06 0.21 7.27 0.44 1.16 8.87
2.0 Control & Relay Panels
2.10 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 4 5.06 20.24 0.61 20.85 1.27 3.32 25.44

NEW BISHNUPUR: Page 29 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.15
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : New Bishnupur 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 11 1.50 16.50 0.50 17.00 1.03 2.70 20.73
Sub ‐ Total 2.3 38.70 1.17 39.87 2.42 6.34 48.63
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 127.66 3.84 131.50 7.99 20.92 160.41
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 8 4.36 34.88 1.05 35.93 2.18 5.72 43.83
Sub ‐ Total 3 34.88 1.05 35.93 2.18 5.72 43.83
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 27.48 0.83 28.31 1.72 4.51 34.54
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 283.32 8.52 291.84 17.73 46.45 356.02

NEW BISHNUPUR: Page 30 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.16
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Rishra 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 2 1.65 3.30 0.10 3.40 0.21 0.54 4.15
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 1 3.86 3.86 0.12 3.98 0.24 0.63 4.85
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 7.16 0.21 7.37 0.45 1.17 8.99
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 7.16 0.21 7.37 0.45 1.17 8.99
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 4 5.06 20.24 0.61 20.85 1.27 3.32 25.44
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00

RISHRA: Page 31 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.16
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Rishra 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 17 1.50 25.50 0.77 26.27 1.60 4.18 32.05
Sub ‐ Total 2.3 47.70 1.44 49.14 2.99 7.82 59.95
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 136.66 4.11 140.77 8.56 22.40 171.73
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 4.36 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 3 0.00 0.00 0.00 0.00 0.00 0.00
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 2 20.09 40.18 1.21 41.39 2.52 6.59 50.50
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 61.75 1.86 63.61 3.87 10.13 77.61
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 267.63 8.05 275.68 16.76 43.88 336.32

RISHRA: Page 32 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.17
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Krishnanagar 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 0.00 0.00 0.00 0.00 0.00 0.00
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 0.00 0.00 0.00 0.00 0.00 0.00
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 6 5.06 30.36 0.91 31.27 1.90 4.98 38.15
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00

KRISHNANAGAR: Page 33 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.17
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Krishnanagar 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 11 1.50 16.50 0.50 17.00 1.03 2.70 20.73
Sub ‐ Total 2.3 48.82 1.47 50.29 3.05 8.00 61.34
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 137.78 4.14 141.92 8.62 22.58 173.12
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 4.36 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 3 0.00 0.00 0.00 0.00 0.00 0.00
SWITCHYARD ERECTION
4.0 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.0 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.0 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.0 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.0 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.2 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.0 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.2 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.3 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.2 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 241.50 7.26 248.76 15.11 39.59 303.46

KRISHNANAGAR: Page 34 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.18
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Asansole 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 0.00 0.00 0.00 0.00 0.00 0.00
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 1 2.81 2.81 0.08 2.89 0.18 0.46 3.53
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 2.81 0.08 2.89 0.18 0.46 3.53
Sub ‐ Total 1 2.81 0.08 2.89 0.18 0.46 3.53
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 2 5.06 10.12 0.30 10.42 0.63 1.66 12.71
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00

ASANSOLE: Page 35 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.18
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Asansole 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 9 1.50 13.50 0.41 13.91 0.85 2.21 16.97
Sub ‐ Total 2.3 25.58 0.77 26.35 1.60 4.19 32.14
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 114.54 3.44 117.98 7.17 18.77 143.92
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 2 4.36 8.72 0.26 8.98 0.55 1.43 10.96
Sub ‐ Total 3 8.72 0.26 8.98 0.55 1.43 10.96
SWITCHYARD ERECTION
4.0 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.0 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.0 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.0 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.0 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.2 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.0 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.2 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.3 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.2 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 229.79 6.90 236.69 14.39 37.67 288.75

ASANSOLE: Page 36 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.19
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Subhasgram 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.20 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 0.00 0.00 0.00 0.00 0.00 0.00
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 0.00 0.00 0.00 0.00 0.00 0.00
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 4 5.06 20.24 0.61 20.85 1.27 3.32 25.44
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00

SUBASHGRAM: Page 37 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.19
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Subhasgram 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.3 Synchronising Trolley Nos 1.96 0.00 0.00 0.00 0.00 0.00 0.00
2.4.4 LBB nos 14 1.50 21.00 0.63 21.63 1.32 3.44 26.39
Sub ‐ Total 2.3 41.24 1.24 42.48 2.59 6.76 51.83
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 130.20 3.91 134.11 8.16 21.34 163.61
3.0 Communication Equipment
3.10 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 4.36 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 3 0.00 0.00 0.00 0.00 0.00 0.00
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.1 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.2 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 233.92 7.03 240.95 14.65 38.35 293.95

SUBASHGRAM: Page 38 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.20
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : New town AA‐III 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 0.00 0.00 0.00 0.00 0.00 0.00
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 0.00 0.00 0.00 0.00 0.00 0.00
2.0 Control & Relay Panels
2.10 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 2 5.06 10.12 0.30 10.42 0.63 1.66 12.71

NEW TOWN AA‐III: Page 39 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.20
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : New town AA‐III 220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 9 1.50 13.50 0.41 13.91 0.85 2.21 16.97
Sub ‐ Total 2.3 25.58 0.77 26.35 1.60 4.19 32.14
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 114.54 3.44 117.98 7.17 18.77 143.92
3.0 Communication Equipment
3.1 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 4.36 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 3 0.00 0.00 0.00 0.00 0.00 0.00
SWITCHYARD ERECTION
4.0 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.0 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.0 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.0 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.0 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 10.00 0.00 0.00 0.00 0.00 0.00 0.00
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 17.48 0.53 18.01 1.09 2.87 21.97
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 1 16.08 16.08 0.48 16.56 1.01 2.64 20.21
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 16.08 0.48 16.56 1.01 2.64 20.21
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.2 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 218.26 6.56 224.82 13.66 35.78 274.26

NEW TOWN AA‐III: Page 40 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.21
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Kharagpur 400/220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
1.1 420 KV Equipment
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 46.09 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 29.87 0.00 0.00 0.00 0.00 0.00 0.00
1.1.3 420 KV Isolator 3‐ph Nos 9.04 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 7.73 0.00 0.00 0.00 0.00 0.00 0.00
1.1.5 420 KV CVT 1Ph Nos 3.75 0.00 0.00 0.00 0.00 0.00 0.00
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 1.37 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1.1 0.00 0.00 0.00 0.00 0.00 0.00
1.2 220KV Equipment
1.2.1 220 KV Circuit Breaker 3Ph Nos. 14.28 0.00 0.00 0.00 0.00 0.00 0.00
1.2.2 220KV Isolator 3‐ph Nos. 5.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 5.71 0.00 0.00 0.00 0.00 0.00 0.00
1.2.4 220KV CVT 1Ph Nos. 3.14 0.00 0.00 0.00 0.00 0.00 0.00
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 0.51 0.00 0.00 0.00 0.00 0.00 0.00
1.2.6 220KV PT Nos. 3.26 0.00 0.00 0.00 0.00 0.00 0.00
1.2.7 220 KV Post Insulator Nos. 0.20 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.2 0.00 0.00 0.00 0.00 0.00 0.00
1.3 132 KV Equipment
1.3.1 Circuit Breakers Nos. 6.62 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 CT Nos. 1.65 0.00 0.00 0.00 0.00 0.00 0.00
1.3.3 PT Nos. 1.51 0.00 0.00 0.00 0.00 0.00 0.00
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0.35 0.00 0.00 0.00 0.00 0.00 0.00
1.3.5 Isolators Nos. 3.86 0.00 0.00 0.00 0.00 0.00 0.00
1.3.6 CVT Nos. 2.08 0.00 0.00 0.00 0.00 0.00 0.00
1.3.7 132 KV Post Insulator Nos. 0.15 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.3 0.00 0.00 0.00 0.00 0.00 0.00
1.4 33 KV Equipment
1.4.1 Circuit Breakers Nos. 2.81 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 CT Nos. 0.50 0.00 0.00 0.00 0.00 0.00 0.00
1.4.3 PT Nos. 0.47 0.00 0.00 0.00 0.00 0.00 0.00
1.4.4 Surge Capacitor Nos. 0.12 0.00 0.00 0.00 0.00 0.00 0.00
1.4.5 Surge arrestor Nos. 0.06 0.00 0.00 0.00 0.00 0.00 0.00
1.4.6 33 KV Post Insulator Nos. 0.08 0.00 0.00 0.00 0.00 0.00 0.00
1.4.7 Isolators Nos. 0.91 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1.4 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 1 0.00 0.00 0.00 0.00 0.00 0.00
2.0 Control & Relay Panels
2.1 Control & Relay Panels (400 KV)
2.1.1 CB Relay panel without A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.2 CB Relay panel with A/R Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.3 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.4 Transformer protection panel (HV & MV sides Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.5 Reactor protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.1.6 Bus bar protection panel (duplicate) Nos 168.89 0.00 0.00 0.00 0.00 0.00 0.00
2.1.7 Bus bar protection panel (Augmentation ) Nos 107.00 0.00 0.00 0.00 0.00 0.00 0.00
2.1.8 Time synchronisation equipment(GPS) Nos 1 9.32 9.32 0.28 9.60 0.58 1.53 11.71
Sub ‐ Total 2.1 9.32 0.28 9.60 0.58 1.53 11.71
2.2 Control & Relay Panels (220 KV)
2.2.1 CB Relay panel without A/R Nos 9.13 0.00 0.00 0.00 0.00 0.00 0.00
2.2.2 CB Relay panel with A/R Nos 13.10 0.00 0.00 0.00 0.00 0.00 0.00
2.2.3 Transformer protection panel (HV & MV sides Nos 13.51 0.00 0.00 0.00 0.00 0.00 0.00
2.2.4 Line protection panel Nos 0.00 0.00 0.00 0.00 0.00 0.00
2.2.5 Bus bar protection panel Nos 91.02 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.2 0.00 0.00 0.00 0.00 0.00 0.00
2.3 Control & Relay Panels (132 KV)
2.3.1 Bus coupler panel Nos 5.62 0.00 0.00 0.00 0.00 0.00 0.00
2.3.2 Transformer protection panel (HV & MV sides Nos 7.74 0.00 0.00 0.00 0.00 0.00 0.00
2.3.3 Line protection panel Nos 12.70 0.00 0.00 0.00 0.00 0.00 0.00
2.3.4 Bus bar protection panel Nos 1 79.64 79.64 2.39 82.03 4.99 13.05 100.07
Sub ‐ Total 2.3 79.64 2.39 82.03 4.99 13.05 100.07

KHARAGPUR: Page 41 of 42
COST BREAK UP OF SUB STATION ‐EQUIPMENT ANNEXURE.‐ 1.3.21
PROJ UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION : Kharagpur 400/220/132 KV (Rs. in Lakh)
Sr. Rate Total F&I @4% Erection/
No. Description Unit Qty. incl. Total Spares Exw. & & CST Civil Total
ED Spares 2% Works
1 2 3 4 5 6=4x5 7 8=6+7 9 10 11=8+9+10
2.4 Other protection & control system
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
for Refurbishment & augmentation of
protection system . Nos 6 5.06 30.36 0.91 31.27 1.90 4.98 38.15
2.4.2 Bus Bar High‐impedance 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2.4.3 Synchronising Trolley Nos 1 1.96 1.96 0.06 2.02 0.12 0.32 2.46
2.4.4 LBB nos 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2.3 32.32 0.97 33.29 2.02 5.30 40.61
2.5 SUBSTATION AUTOMATION SYSTEM
Sub ‐ Total 2.5 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 2 121.28 3.64 124.92 7.59 19.88 152.39
3.0 Communication Equipment
3.10 PLCC Equipment
3.1.1 Line Traps Nos 4.76 0.00 0.00 0.00 0.00 0.00 0.00
3.1.2 Ph. To Ph. Coupling Device Nos 1.43 0.00 0.00 0.00 0.00 0.00 0.00
3.1.3 H.F. Cable KM 1.40 0.00 0.00 0.00 0.00 0.00 0.00
3.1.4 Carrier Equipment Nos 6.22 0.00 0.00 0.00 0.00 0.00 0.00
3.1.5 Protn. Coupler Nos 4.36 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 3 0.00 0.00 0.00 0.00 0.00 0.00
SWITCHYARD ERECTION
4.00 Equipment Structure 0.00 0.00 0.00 0.00 0.00 0.00
5.00 Other Equipment (Bus Bar materials) 0.00 0.00 0.00 0.00 0.00 0.00
6.00 Equipment Civil works 0.00 0.00 0.00 0.00 0.00 0.00
7.00 Erection 0.00 0.00 0.00 0.00 0.00 0.00
8.00 Any other 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 4 to 8 0.00 0.00 0.00 0.00 0.00 0.00
SUBSTATION AUXILIARIES
9.0 Fire Fighting System for augmentation of
0.00 0.00 0.00 0.00 0.00 0.00
existing system. LS 46.00
10.0 Air Conditioning System 0.00 0.00 0.00 0.00 0.00 0.00
11.0 Lighting system 0.00 0.00 0.00 0.00 0.00 0.00
12.0 D.G. Set (250 KVA) Nos 1 21.57 21.57 0.65 22.22 1.35 3.54 27.11
13.1 Battery and Battery charger,300AH,220V Set 1 20.09 20.09 0.60 20.69 1.26 3.29 25.24
13.20 Battery and Battery charger,200AH,48V Set 5.39 0.00 0.00 0.00 0.00 0.00 0.00
14.00 Power & Control Cables KM 1.50 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 9 to 14 41.66 1.25 42.91 2.61 6.83 52.35
15.0 Misc. Testing and maintenance Equipment
15.1 DCRM for Circuit Breaker Nos 14.27 0.00 0.00 0.00 0.00 0.00 0.00
15.2 DC e/f locator Nos 1 11.24 11.24 0.34 11.58 0.70 1.84 14.12
15.3 Oil filter machine Nos 31.46 0.00 0.00 0.00 0.00 0.00 0.00
15.4 SF6 gas handling plant Nos 33.71 0.00 0.00 0.00 0.00 0.00 0.00
15.5 SF6 gas monitoring device Nos 1 0.96 0.96 0.03 0.99 0.06 0.16 1.21
15.6 SF6 gas leakage detecter Nos 1 0.67 0.67 0.02 0.69 0.04 0.11 0.84
15.7 Digital insilation tester(5‐10KV) Nos 1 4.61 4.61 0.14 4.75 0.29 0.76 5.80
15.8 Thermovision Camera Nos 1 10.00 10.00 0.30 10.30 0.63 1.64 12.57
15.9 TAN‐DELTA TEST SET Nos 15.39 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 15.0 27.48 0.83 28.31 1.72 4.51 34.54
16.0 Transformers
16.1 33kV Earthing Transformer, 550A, 30s Nos 16.08 0.00 0.00 0.00 0.00 0.00 0.00
16.20 LT Transformer 33KV/0.433KV, 315 KVA Nos 7.26 0.00 0.00 0.00 0.00 0.00 0.00
16.30 LT Transformer 33KV/0.433KV, 630 KVA Nos 14.70 0.00 0.00 0.00 0.00 0.00 0.00
Sub ‐ Total 16.0 0.00 0.00 0.00 0.00 0.00 0.00
17.0 LT Switch gear
17.10 11KV Sw gear (VCB) Panel Nos 3.50 0.00 0.00 0.00 0.00 0.00 0.00
17.20 ACDB Set 12.34 0.00 0.00 0.00 0.00 0.00 0.00
17.3 DCDB Set 1 8.50 8.50 0.26 8.76 0.53 1.39 10.68
Sub ‐ Total 17.0 8.50 0.26 8.76 0.53 1.39 10.68
18.0 Other works
18.1 Dismantling,shifting,of old equipments
18.20 Any other 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Event Logger Nos 1 20.00 20.00 0.60 20.60 1.25 3.28 25.13
Sub ‐ Total 18.0 20.00 0.60 20.60 1.25 3.28 25.13
Grand Total 218.92 6.58 225.50 13.70 35.89 275.09

KHARAGPUR: Page 42 of 42
ABSTRACT COST ESTIMATE ANNEXURE.‐ 1.3.18
PROJECT : UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT (Rs. in Lakh)

Laxmik N.
Sl. No. Description Aramb Durgap KLC Gokarn Satga New Dalkho Midna Krisna Asanso Subhas NT AA‐
Jeerat Kasba Howrah Domjur antapu NJP Bishnup Rishra Kgp Total
ag ur Bantala a chia Haldia la pur nagar le gram III
r ur
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
1.1 420 KV Equipment 0.0
1.1.1 420 KV Circuit Breaker 3Ph with PIR 115.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 115.8
1.1.2 420 KV Circuit Breaker 3Ph without PIR 112.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 112.6
1.1.3 420 KV Isolator 3‐ph 0.0 0.0 11.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.4
1.1.4 420 KV Current Transformer 1Ph(SF6) 87.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 87.4
1.1.5 420 KV CVT 1Ph 9.4 14.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 23.6
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Sub Total 1.1 325.3 14.1 11.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 350.7
1.2 220KV Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.2.1 220 KV Circuit Breaker 3Ph 89.7 0.0 0.0 0.0 17.9 17.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 125.6
1.2.2 220KV Isolator 3‐ph 96.9 166.1 193.8 0.0 131.5 124.6 0.0 0.0 0.0 0.0 0.0 69.2 0.0 20.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 802.8
1.2.3 220KV Current Transformer 1PH(SF6) 7.2 0.0 7.2 0.0 43.0 93.2 0.0 21.5 0.0 0.0 0.0 0.0 0.0 0.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 179.3
1.2.4 220KV CVT 1Ph 15.8 15.8 15.8 0.0 0.0 0.0 0.0 15.8 15.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 79.0
1.2.5 216 KV Surge Arrestor 1Ph(polymer) 0.6 0.0 5.1 0.0 0.0 7.7 0.0 0.0 1.3 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16.7
1.2.6 220KV PT 0.0 0.0 0.0 0.0 0.0 24.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 24.6
1.2.7 220 KV Post Insulator 0.0 0.0 0.0 0.0 10.6 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.9
Sub ‐ Total 1.2 210.2 181.9 221.9 0.0 203.0 276.3 0.0 37.3 17.1 1.9 0.0 69.2 0.0 20.8 7.2 0.0 0.0 0.0 0.0 0.0 0.0 1246.8
1.3 132 KV Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.3.1 Circuit Breakers 0.0 8.3 8.3 0.0 0.0 8.3 41.6 24.9 49.9 49.9 99.8 8.3 16.6 33.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 349.2
1.3.2 CT 10.4 0.0 0.0 0.0 18.7 82.9 0.0 8.3 0.0 10.4 0.0 0.0 20.7 10.4 0.0 4.2 0.0 0.0 0.0 0.0 0.0 165.9
1.3.3 PT 0.0 0.0 0.0 0.0 0.0 11.4 0.0 5.7 0.0 0.0 0.0 0.0 0.0 5.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 22.8
1.3.4 120KV Surge Arrestor 1Ph (Polymer) 0.0 0.0 0.0 0.0 0.0 5.3 0.0 0.4 0.0 3.5 0.0 0.0 7.0 0.9 0.4 0.0 0.0 0.0 0.0 0.0 0.0 17.6
1.3.5 Isolators 0.0 0.0 0.0 0.0 135.8 33.9 0.0 38.8 0.0 0.0 0.0 0.0 38.8 9.7 0.0 4.8 0.0 0.0 0.0 0.0 0.0 261.8
1.3.6 CVT 5.2 5.2 5.2 0.0 5.2 5.2 0.0 5.2 5.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 36.5
1.3.7 132 KV Post Insulator 0.0 0.0 0.0 0.0 22.8 10.4 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 33.9
Sub ‐ Total 1.3 15.6 13.5 13.5 0.0 182.5 157.4 41.6 83.4 55.1 63.8 99.8 8.3 83.9 59.9 0.4 9.0 0.0 0.0 0.0 0.0 0.0 887.8
1.4 33 KV Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.4.1 Circuit Breakers 0.0 3.5 0.0 0.0 0.0 3.5 14.1 3.5 21.2 14.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5 0.0 0.0 0.0 63.6
1.4.2 CT 0.0 0.0 0.0 10.1 0.0 1.9 1.3 0.0 5.0 3.8 0.0 0.0 8.2 1.3 1.3 0.0 0.0 0.0 0.0 0.0 0.0 32.7
1.4.3 PT 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8
1.4.4 Surge Capacitor 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2
1.4.5 Surge arrestor 0.2 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8
1.4.6 33 KV Post Insulator 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3
1.4.7 Isolators 0.0 0.0 0.0 0.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 17.2
Sub ‐ Total 1.4 0.3 3.5 0.0 11.0 0.0 10.9 15.4 3.5 26.2 18.3 0.0 0.0 8.6 15.0 1.3 0.0 0.0 3.5 0.0 0.0 0.0 117.4
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Sub ‐ Total 1 551.3 213.1 246.8 11.0 385.5 444.6 57.0 124.2 98.4 84.0 99.8 77.5 92.6 95.6 8.9 9.0 0.0 3.5 0.0 0.0 0.0 2602.7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

ABSTRUCT COST ESTIMATE: Page 1 of 3
ABSTRACT COST ESTIMATE ANNEXURE.‐ 1.3.18
PROJECT : UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT (Rs. in Lakh)

Laxmik N.
Sl. No. Description Aramb Durgap KLC Gokarn Satga New Dalkho Midna Krisna Asanso Subhas NT AA‐
Jeerat Kasba Howrah Domjur antapu NJP Bishnup Rishra Kgp Total
ag ur Bantala a chia Haldia la pur nagar le gram III
r ur
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
2.0 Control & Relay Panels 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1 Control & Relay Panels (400 KV) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1.1 CB Relay panel without A/R 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1.2 CB Relay panel with A/R 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1.3 Line protection panel 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1.4 Transformer protection panel (HV & MV sides 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1.5 Reactor protection panel 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1.6 Bus bar protection panel (duplicate) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.1.7 Bus bar protection panel (Augmentation ) 134.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 134.5
2.1.8 Time synchronisation equipment(GPS) 11.7 11.7 23.4 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 257.6
Sub ‐ Total 2.1 146.2 11.7 23.4 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 392.1
2.2 Control & Relay Panels (220 KV) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.2.1 CB Relay panel without A/R 0.0 0.0 11.5 0.0 11.5 11.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 34.4
2.2.2 CB Relay panel with A/R 0.0 0.0 131.7 0.0 65.8 65.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 263.4
2.2.3 Transformer protection panel (HV & MV sides 0.0 0.0 34.0 0.0 34.0 50.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 118.8
2.2.4 Line protection panel 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.2.5 Bus bar protection panel 114.4 0.0 114.4 114.4 114.4 0.0 0.0 0.0 0.0 114.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 571.9
Sub ‐ Total 2.2 114.4 0.0 291.5 114.4 225.6 128.2 0.0 0.0 0.0 114.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 988.5
2.3 Control & Relay Panels (132 KV) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.3.1 Bus coupler panel 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.1
2.3.2 Transformer protection panel (HV & MV sides 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 19.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 19.5
2.3.3 Line protection panel 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 16.0
2.3.4 Bus bar protection panel 100.1 100.1 100.1 100.1 0.0 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 2001.4
Sub ‐ Total 2.3 100.1 100.1 100.1 100.1 0.0 100.1 100.1 100.1 100.1 142.5 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 100.1 2043.9
2.4 Other protection & control system 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.4.1 Numerical Distance protection , Transformer
differential protection relays with IRGB port
114.4 82.7 19.1 38.2 38.2 25.4 50.9 82.7 63.6 44.5 25.4 38.2 25.4 95.4 25.4 25.4 38.2 12.7 25.4 12.7 38.2 921.9
for Refurbishment & augmentation of
protection system .
2.4.2 Bus Bar High‐impedance 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2.4.3 Synchronising Trolley 0.0 0.0 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 0.0 2.5 2.5 2.5 2.5 2.5 2.5 2.5 0.0 2.5 2.5 41.8
2.4.4 LBB 52.8 24.5 26.4 15.1 0.0 0.0 24.5 26.4 28.3 26.4 24.5 17.0 18.9 30.2 20.7 32.1 20.7 17.0 26.4 17.0 0.0 448.6
Sub ‐ Total 2.4 167.2 107.2 47.9 55.7 40.6 27.9 77.8 111.5 94.3 73.4 50.0 57.6 46.8 128.0 48.6 60.0 61.3 32.1 51.8 32.1 40.6 1412.4
2.5 SUBSTATION AUTOMATION SYSTEM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Sub ‐ Total 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Sub ‐ Total 2 527.8 218.9 462.9 281.8 278.0 267.9 189.6 223.3 206.1 342.0 161.7 169.4 158.5 239.8 160.4 171.7 173.1 143.9 163.6 143.9 152.4 4836.8
3.0 Communication Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.0 PLCC Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3.1.1 Line Traps 59.8 59.8 47.8 0.0 12.0 59.8 0.0 47.8 47.8 47.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 382.8
3.1.2 Ph. To Ph. Coupling Device 9.0 10.8 1.8 0.0 7.2 14.4 0.0 9.0 9.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 68.3
3.1.3 H.F. Cable 0.0 1.8 1.8 0.0 0.0 1.8 0.0 1.8 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.8
3.1.4 Carrier Equipment 62.5 78.2 46.9 0.0 15.6 31.3 0.0 31.3 31.3 31.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 328.3
3.1.5 Protn. Coupler 65.8 65.8 76.7 21.9 32.9 21.9 11.0 32.9 32.9 21.9 11.0 11.0 11.0 11.0 43.8 0.0 0.0 11.0 0.0 0.0 0.0 482.1
Sub ‐ Total 3 197.1 216.3 175.0 21.9 67.7 129.1 11.0 122.7 121.0 110.0 11.0 11.0 11.0 11.0 43.8 0.0 0.0 11.0 0.0 0.0 0.0 1270.3

ABSTRUCT COST ESTIMATE: Page 2 of 3
ABSTRACT COST ESTIMATE ANNEXURE.‐ 1.3.18
PROJECT : UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT (Rs. in Lakh)

Laxmik N.
Sl. No. Description Aramb Durgap KLC Gokarn Satga New Dalkho Midna Krisna Asanso Subhas NT AA‐
Jeerat Kasba Howrah Domjur antapu NJP Bishnup Rishra Kgp Total
ag ur Bantala a chia Haldia la pur nagar le gram III
r ur
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
SWITCHYARD ERECTION 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4.0 Equipment Structure 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5.0 Other Equipment (Bus Bar materials) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6.0 Equipment Civil works 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7.0 Erection 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8.0 Any other 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Sub ‐ Total 4 to 8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SUBSTATION AUXILIARIES 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9.0 Fire Fighting System for augmentation of
existing system. 0.0 0.0 0.0 0.0 0.0 0.0 57.8 57.8 0.0 0.0 57.8 57.8 0.0 57.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 289.0
10.0 Air Conditioning System 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11.0 Lighting system 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
12.0 D.G. Set (250 KVA) 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 27.1 569.3
13.1 Battery and Battery charger,300AH,220V 25.2 25.2 25.2 25.2 25.2 25.2 25.2 50.5 50.5 25.2 50.5 25.2 25.2 50.5 25.2 50.5 25.2 25.2 25.2 25.2 25.2 656.3
13.2 Battery and Battery charger,200AH,48V 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0 0.0 0.0 0.0 6.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13.5
14.0 Power & Control Cables 0.0 0.0 22.6 0.0 0.0 0.0 0.0 9.4 0.0 0.0 0.0 0.0 9.4 11.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 52.8
Sub ‐ Total 9 to 14 52.4 52.4 75.0 52.4 52.4 52.4 110.2 151.6 77.6 52.4 135.4 110.2 61.8 153.5 52.4 77.6 52.4 52.4 52.4 52.4 52.4 1581.0
15.0 Misc. Testing and maintenance Equipment 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
15.1 DCRM for Circuit Breaker 0.0 17.9 0.0 17.9 0.0 0.0 17.9 17.9 0.0 0.0 17.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 89.7
15.2 DC e/f locator 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 14.1 296.5
15.3 Oil filter machine 0.0 39.5 0.0 39.5 0.0 0.0 39.5 39.5 0.0 0.0 39.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 197.7
15.4 SF6 gas handling plant 0.0 42.4 0.0 42.4 0.0 0.0 42.4 42.4 0.0 0.0 42.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 211.8
15.5 SF6 gas monitoring device 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 25.4
15.6 SF6 gas leakage detecter 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 17.6
15.7 Digital insilation tester(5‐10KV) 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 5.8 121.8
15.8 Thermovision camera 0.0 12.6 12.6 12.6 0.0 0.0 12.6 12.6 12.6 0.0 12.6 12.6 0.0 0.0 12.6 0.0 0.0 0.0 0.0 0.0 12.6 125.7
15.9 TAN‐DELTA TEST SET 0.0 19.3 0.0 19.3 0.0 0.0 19.3 19.3 0.0 0.0 19.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 96.7
Sub ‐ Total 15.0 22.0 153.7 34.5 153.7 22.0 22.0 153.7 153.7 34.5 22.0 153.7 34.5 22.0 22.0 34.5 22.0 22.0 22.0 22.0 22.0 34.5 1182.8
16.0 Transformers 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
16.1 33kV Earthing Transformer, 550A, 30s 0.0 20.2 0.0 20.2 0.0 0.0 20.2 20.2 20.2 20.2 0.0 0.0 20.2 0.0 20.2 20.2 20.2 20.2 20.2 20.2 0.0 262.7
16.2 LT Transformer 33KV/0.433KV, 315 KVA 0.0 0.0 0.0 18.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.3
16.3 LT Transformer 33KV/0.433KV, 630 KVA 0.0 0.0 0.0 0.0 0.0 36.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 36.9
Sub ‐ Total 16.0 0.0 20.2 0.0 38.5 0.0 36.9 20.2 20.2 20.2 20.2 0.0 0.0 20.2 0.0 20.2 20.2 20.2 20.2 20.2 20.2 0.0 317.9
17.0 LT Switch gear 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
17.1 11KV Sw gear (VCB) Panel 0.0 0.0 0.0 0.0 8.8 0.0 0.0 0.0 0.0 0.0 30.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 39.6
17.2 ACDB 0.0 0.0 0.0 0.0 0.0 15.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.5
17.3 DCDB 10.7 10.7 10.7 10.7 10.7 21.4 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 235.0
Sub ‐ Total 17.0 10.7 10.7 10.7 10.7 19.5 36.9 10.7 10.7 10.7 10.7 41.5 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 10.7 290.1
18.0 Other works 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
18.1 Dismantling,shifting,of old equipments 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
18.2 Any other 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
18.3 Event Logger 25.1 25.1 50.3 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 552.9
Sub ‐ Total 18.0 25.1 25.1 50.3 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 552.9
Grand Total 1386.4 910.4 1055.1 595.0 850.0 1014.9 577.4 831.5 593.6 666.3 628.2 438.3 401.8 557.6 356.0 336.3 303.5 288.8 294.0 274.3 275.1 12634.3

ABSTRUCT COST ESTIMATE: Page 3 of 3
ANNEXURE ‐ 1.0
ABSTRACT COST ESTIMATE
(BASE COST)

UPGRADATION OF CONTROL & PROTECTION SYSTEM AND


REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
(Cost updated to the price level of 2013‐14 period )
Sr. DESCRIPTION AMOUNT
No. (Rs. in Lakh)

A Assesment of healthof existing equipments

B Civil Works
i) Infrastructure for substations
ii) Non Residential Buildings if any

C Equipment (Supply & Erection) Cost
i) Sub‐Stations 12634.30
ii) Voice & Data Connection
D Sub Total A to C 12634.30


E
Incidental Expenses during construction @ 5% of [D] 631.72
F Contingencies @ 3% of D 379.03
L
Sub Total (A to F) 13645.05

G Interest During Construction(IDC) 0.00

GRAND TOTAL (Rounded) 13645.00


Details of Existing Equipment Proposed to be Replaced
Name of Substation : JEERAT 400 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of Reason for
Sl. No. Name of Feeder Equipment Name Manufacturin Make Voltage available insulation/ Replacement
Commission Replacement
g for CT & PT Operation (Y/N)
1 Bus Transfer 420 KV Circuit Breaker 3Ph 1984‐85 HBB 1‐Feb‐87 400 NA Y* Age old trouble prone.
with PIR
2 KTPP 420 KV Circuit Breaker 3Ph 1984‐85 HBB 4‐Jul‐91 400 NA Y* Age old trouble prone.
with PIR
3 315MVA Tr‐1 420 KV Circuit Breaker 3Ph 1984‐85 HBB 1‐Dec‐87 400 NA Y* Age old trouble prone.
without PIR
4 315MVA Tr‐2 420 KV Circuit Breaker 3Ph 1984‐85 HBB 27‐Feb‐87 400 NA Y* Age old trouble prone.
without PIR
5 Bus Coupler 420 KV Circuit Breaker 3Ph 1984‐85 HBB 1‐Dec‐87 400 NA Y Age old trouble prone.
without PIR
6 160MVA Tr‐2 220 KV Circuit Breaker 3Ph 1984‐85 HBB 220 NA Y* Age old trouble prone.
7 Bus Coupler 220 KV Circuit Breaker 3Ph 1984‐85 HBB 31‐Oct‐90 220 NA Y* Age old trouble prone.
8 Satgachia‐1 220 KV Circuit Breaker 3Ph 1984‐85 HBB 2‐Feb‐87 220 NA Y* Age old trouble prone.
9 Satgachia‐2 220 KV Circuit Breaker 3Ph 1984‐85 HBB 3‐Feb‐87 220 NA Y* Age old trouble prone.
10 160 MVA Tr‐3 220 KV Circuit Breaker 3Ph 1994 TELK 21‐Dec‐94 220 NA Y* Age old trouble prone.
11 Newtown‐2 220 KV Isolator 3‐ph(Line) 2013 HBB 21‐Apr‐98 220 NA Y* Age old trouble prone.
12 315MVA Tr‐2 220 KV Isolator 3‐ph(Line) 1984‐85 HBB 1‐Feb‐87 220 NA Y* Age old trouble prone.
13 315MVA Tr‐3 220 KV Isolator 3‐ph(Line) 1984‐85 Hivlem 4‐Sep‐98 220 NA Y* Age old trouble prone.
14 Rishra‐1 220 KV Isolator 3‐ph(Line) 2002‐03 ALLIANCE 6‐Jan‐04 220 NA Y* Age old trouble prone.
15 Rishra‐2 220 KV Isolator 3‐ph(Line) 2002‐03 ALLIANCE 6‐Jan‐04 220 NA Y* Age old trouble prone.
16 Newtown‐2 220 KV Isolator 3‐ph (MB‐ 1984‐85 HBB 21‐Apr‐98 220 NA Y* Age old trouble prone.
1)
17 315MVA Tr‐1 220 KV Isolator 3‐ph(MB‐1) 1984‐85 HBB 1‐Dec‐87 220 NA Y* Age old trouble prone.

18 315MVA Tr‐2 220 KV Isolator 3‐ph (MB‐ 1984‐85 HBB 1‐Feb‐87 220 NA Y* Age old trouble prone.
1)
19 160MVA Tr‐1 220 KV Isolator 3‐ph (MB‐ 1984‐85 HBB 16‐May‐90 220 NA Y* Age old trouble prone.
1)
20 160 MVA Tr‐2 220 KV Isolator 3‐ph (MB‐ 1984‐85 HBB 8‐Oct‐88 220 NA Y* Age old trouble prone.
1)
21 161 MVA Tr‐2 220 KV Isolator 3‐ph (Line) 1984‐85 HBB 8‐Oct‐88 220 NA Y* Age old trouble prone.

22 Rishra‐1 220 KV Isolator 3‐ph (MB‐ 2002‐03 ALLIANCE 6‐Jan‐04 220 NA Y* Age old trouble prone.
1)
23 160 MVA Tr‐1 220 KV Isolator 3‐ph (Line) 1984‐85 HBB 16‐May‐90 220 NA Y* Age old trouble prone.

Page ‐ 1/33
Name of Substation : JEERAT 400 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of Reason for
Sl. No. Name of Feeder Equipment Name Manufacturin Make Voltage available insulation/ Replacement
Commission Replacement
g for CT & PT Operation (Y/N)
24 Newtown‐1 220 KV Isolator 3‐ph (Line) 1984‐85 HBB 28‐Jan‐00 220 NA Y* Age old trouble prone.

25 315MVA Tr‐2 420 KV Current 2006 Bhel 11‐Sep‐11 400 5 core Y* Defective and oil
Transformer 1Ph R Ph. leakage.
26 315MVA Tr‐2 420 KV Current 2011 Areva 11‐Sep‐11 400 5 core Y* Defective and oil
Transformer 1Ph Y Ph. leakage.
27 315MVA Tr‐2 420 KV Current 2011 Areva 11‐Sep‐11 400 5 core Y* Defective and oil
Transformer 1Ph B Ph. leakage.
28 Buscoupler 420 KV Current 2002 Bhel 2006 400 5 core Y* Defective and oil
Transformer 1Ph (Oil) M2 leakage.
29 Buscoupler 420 KV Current 2002 Bhel 1‐Jun‐06 400 5 core Y* Defective and oil
Transformer 1Ph (Oil) M2 leakage.
30 315 MVA Tr‐1 420 KV Current 2008 Bhel 1‐Feb‐09 400 5 core Y* Defective and oil
Transformer 1Ph R Ph. leakage.
31 315 MVA Tr‐1 420 KV Current 2008 Bhel 1‐Feb‐09 400 5 core Y* Defective and oil
Transformer 1Ph Y Ph. leakage.
32 315 MVA Tr‐1 420 KV Current 2008 Bhel 1‐Feb‐09 400 5 core Y* Defective and oil
Transformer 1Ph B Ph. leakage.
33 BKTPP 420 KV Current 1997 CGL 1‐Sep‐98 400 5 core Y* Replacement age old
Transformer 1Ph (Oil) Y equipment
Ph.
34 160MVA Tr‐1 220 KV Current 1990 WSI 16‐May‐90 220 5 core Y* Replacement age old
Transformer 1PH (Oil) R equipment
Ph.
35 315MVA Tr‐3 198kV Surge Arrestor 1998 CGL 4‐Sep‐98 220 NA Y* Replacement age old
equipment
36 Ashokenagar‐1 132 KV CT R & B Ph. 1987 HBB 1988 132 5 core Y* Replacement
(2 Nos.) defective equipment
37 Ashokenagar‐2 132 KV CT Y Ph. 1984‐85 Choudhary 1988 132 5 core Y* Replacement
defective equipment
38 Ashokenagar‐2 132 KV CT B Ph. 1984‐85 HBB 1988 132 5 core Y* Replacement
defective equipment
39 160MVA Tr‐1 132 KV CT Y Ph. 2005 Choudhary 132 5 core Y* Defective and oil
leakage.
40 315MVA Tr‐3 33 KV Surge Capacitor B Ph. 1998 Madhab 4‐Sep‐98 33 Y* Replacement age old
Capacitor equipment
41 315MVA Tr‐3 33kV Surge Arrestor Y & B CGL 4‐Sep‐98 33 Y* Replacement age old
Ph. (2 Nos.) equipment
* Already replaced due to exigency
Page ‐ 2/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : ARAMBAG 400 KV SUBSTATION
Type of
No. of Cores Tagged for
Year of Date of insulation Reason for
Sl No. Name of Feeder Equipment Name Make Voltage available for Replacement
Manufacturing Commission / Replacement
CT & PT (Y/N)
Operation
1 50 MVA Tr‐II 132 KV Circuit Breakers 1995 BHEL 06‐03‐95 132 NA Y Age Old & Obsolete
2 KAMARPUKUR‐I 33 KV Circuit Breakers 1994 CGL 16‐03‐95 33 Y Age Old & Obsolete
220 KV Isolator 3‐ph
3 BISHNUPUR‐I ALLIANCE 06‐03‐95 220 Y Age old.
(4 Nos.)
220 KV Isolator 3‐ph
4 BISHNUPUR‐II ALLIANCE 06‐03‐95 220 Y Age old.
(4 Nos.)
220 KV Isolator 3‐ph
5 160 MVA TR‐I ALLIANCE 06‐03‐95 220 Y Age old.
(4 Nos.)
220 KV Isolator 3‐ph
6 160 MVA TR‐II ALLIANCE 1998 220 Y Age old.
(4 Nos.)
220 KV Isolator 3‐ph
7 BUS TRANSFER ALLIANCE 06‐03‐95 220 Y Age old.
(3 Nos.)
220 KV Isolator 3‐ph
8 315 MVA TR‐I ALLIANCE 08‐03‐00 220 Y Age old.
(4 Nos.)
220 KV Isolator 3‐ph
9 220 KV MB‐I PT ALLIANCE 06‐03‐95 220 Y Age old.
(1 No.)
10 RISHRA 220 KV CVT 1Ph CGL 30.09.2003 220 2 Core Y* Age old & Oil leakage.
33 KV Earthing
Improving reliability of
11 Arambag SS Transformer Fresh Requirement 33 Y protection system.
(1 No.)
* Already replaced due to exigency

Page 3 of 33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Durgapur 400 KV Substation.
Date of No. of Cores Type of Tagged for
Sl Year of Reason for
Name of Feeder Equipment Name Make Commissio Voltage available for insulation/ Replacement
No. Manufacturing Replacement
n CT & PT Operation (Y/N)
1 ARAMBAG 420 KV Isolator 3‐ph 2000 ELPRO 03‐12‐10 400 NA Pantograph Y Trouble prone.
2 Bakreswar‐I 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
3 Bakreswar‐I 220 KV Isolator 3‐ph 29D 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
4 Bakreswar‐II 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
5 Bakreswar‐II 220 KV Isolator 3‐ph 29D 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
6 160 MVA TR1 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
7 161 MVA TR1 220 KV Isolator 3‐ph 29D 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
8 160 MVA TR2 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
9 161 MVA TR2 220 KV Isolator 3‐ph 29B 1976 TMG May‐76 220 NA HCB type Y* Age old trouble
prone.
10 162 MVA TR2 220 KV Isolator 3‐ph 29D 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
11 Asansol 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
12 Asansol 220 KV Isolator 3‐ph 29D 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
13 STPS 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
14 STPS 220 KV Isolator 3‐ph 29D 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
15 WARIA ‐ I 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
16 WARIA ‐ I 220 KV Isolator 3‐ph 29B 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
17 WARIA ‐ I 220 KV Isolator 3‐ph 29D 1976 TMG May‐76 220 NA HCB type Y Age old trouble
prone.
18 WARIA ‐ II 220 KV Isolator 3‐ph 29A 2003 Alliance 2003 220 NA Straggered Y Trouble prone.

Page ‐ 4/33
Name of Substation : Durgapur 400 KV Substation.
Date of No. of Cores Type of Tagged for
Sl Year of Reason for
Name of Feeder Equipment Name Make Commissio Voltage available for insulation/ Replacement
No. Manufacturing Replacement
n CT & PT Operation (Y/N)
19 WARIA ‐ II 220 KV Isolator 3‐ph 29B 1997 Alliance 1997 220 NA Straggered Y Age old trouble
prone.
20 WARIA ‐ II 220 KV Isolator 3‐ph 29D 2000 G. Nandy 2000 220 NA HCB type Y Age old trouble
prone.
21 DPL ‐ II 220 KV Isolator 3‐ph 29A 1999 Alliance 1999 220 NA Straggered Y Age old trouble
prone.
22 DPL ‐ II 220 KV Isolator 3‐ph 29B 1999 Alliance 1999 220 NA Straggered Y Age old trouble
prone.
23 DPL ‐ II 220 KV Isolator 3‐ph 29D 2004 Alliance 2004 220 NA HCB type Y Trouble prone.
24 DPL ‐ I 220 KV Isolator 3‐ph 29A 1976 TMG May‐76 220 NA HCB type Y* Age old trouble
prone.
25 DPL ‐ I 220 KV Isolator 3‐ph 29D 1996 Alliance 1996 220 NA HCB type Y Age old trouble
prone.
26 315 MVA T1 220KV Isolator 3‐ph 29A 2003 Alliance 2007 220 NA Straggered Y Trouble prone.
27 316 MVA T1 220 KV Isolator 3‐ph 29B 2003 Alliance 2007 220 NA Straggered Y Trouble prone.
28 315 MVA T2 220 KV Isolator 3‐ph 29A 2003 Alliance 2007 220 NA Straggered Y Trouble prone.
29 316 MVA T2 220 KV Isolator 3‐ph 29B 2003 Alliance 2007 220 NA Straggered Y Trouble prone.
30 WARIA ‐ I 220 KV CT Y‐Ph 1976 HBB May‐76 220 Y Age old trouble
prone.
31 Bakreswar ‐ I 198 KV LA B‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.
32 Bakreswar ‐ II 198 KV LA R‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.
33 Bakreswar ‐ II 198 KV LA B‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.
34 STPS 198 KV LA R‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.
35 STPS 198 KV LA B‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.
36 160 MVA TR2 198 KV LA R‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.
37 160 MVA TR 2 198 KV LA Y‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.
38 160 MVA TR2 198 KV LA B‐Ph 1976 WS May‐76 220 NA Y Age old trouble
prone.

Page ‐ 5/33
Name of Substation : Durgapur 400 KV Substation.
Date of No. of Cores Type of Tagged for
Sl Year of Reason for
Name of Feeder Equipment Name Make Commissio Voltage available for insulation/ Replacement
No. Manufacturing Replacement
n CT & PT Operation (Y/N)
39 220 Bus Transfer CB Relay panel without A/R 1976 WS May‐76 220 NA Y# Upgradion of
Protection System
40 Bakreswar ‐ I CB Relay panel with A/R 1976 EE May‐76 220 NA Y# Upgradion of
Protection System
41 Bakreswar ‐ II CB Relay panel with A/R 1976 EE May‐76 220 NA Y# Upgradion of
Protection System
42 ASANSOL CB Relay panel with A/R 1976 EE May‐76 220 NA Y# Upgradion of
Protection System
43 STPS CB Relay panel with A/R 1976 EE May‐76 220 NA Y# Upgradion of
Protection System
44 WARIA ‐ I CB Relay panel with A/R 1982 EE 1982 220 NA Y# Upgradion of
Protection System
45 WARIA ‐ II CB Relay panel with A/R 1982 ASEA 1982 220 NA Y# Upgradion of
Protection System
46 DPL ‐ I CB Relay panel with A/R 1982 ER 1982 220 NA Y# Upgradion of
Protection System
47 DPL ‐ II CB Relay panel with A/R 1982 ASEA 1982 220 NA Y# Upgradion of
Protection System
48 160 MVA TR1 220 KV Transformer 1976 EE May‐76 220 NA Y# Upgradion of
protection panel (HV & MV Protection System
sides)
49 160 MVA TR2 220 KV Transformer 1976 EE May‐76 220 NA Y# Upgradion of
protection panel (HV & MV Protection System
sides)
50 132 KV Mankar ‐ II 132 KV Circuit Breaker, 1998 ABB 1999 132 NA Y* Age old trouble
SF6 prone.

* Already replaced due to exigency # Replacement work in progress

Page ‐ 6/33
Details of Existing Equipment Proposed to be Replaced

Name of Substation : Asansol 220 KV Substation


No. of
Type of Tagged for
Sl Name of Year of Date of Cores Reason for
Equipment Name Make Voltage insulation/ Replacement
No. Feeder Manufacturing Commission available Replacement
Operation (Y/N)
for CT & PT
1 Kuilapur Circuit Breaker 2011 CGL 2011 33 NA Y* Defective
33 KV Earthing Improving reliability
2 Asansole SS Transformer Fresh Requirement 33 Y of protection
(1 No.) system.
* Already replaced due to exigency

Page 7/33
Details of Existing Equipment Proposed to be Replaced
Name of Sub‐Station: NJP 220/132/33/11 KV Sub‐Station
No. of
Year of Type of Tagged for
Sl Date of Cores Reason for
Name of Feeder Equipment Name manufacturin Make Voltage insulation/ Replacement
No. Commission available Replacement
g Operation (Y/N)
for CT & PT
1 132 kV Siliguri‐I Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
2 132 kV Siliguri‐II Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
3 31.5 MVA 132/33 Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
Transformer prone
4 160 MVA Tr‐I Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
5 132 kV Bus Transfer Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
6 50 MVA 132/33 Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
Transformer prone
7 160 MVA Tr‐II Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
8 TCF PS‐I Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
9 NBU Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
10 Siliguri PGCIL Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
11 Chalsa Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
12 Moynaguri Circuit Breaker 2001‐02 BHEL Sept,2003 132 NA Hydraulic Y Obsolete & trouble
prone
13 Sahudangi LT Switchgear (11 kV ) Not Found CGL Sept,2003 11 NA Oil CB Y Obsolete & trouble
prone
14 Bhutki LT Switchgear (11 kV ) Not Found CGL Sept,2003 11 NA Oil CB Y Obsolete & trouble
prone

Page ‐ 8/33
Name of Sub‐Station: NJP 220/132/33/11 KV Sub‐Station
No. of
Year of Type of Tagged for
Sl Date of Cores Reason for
Name of Feeder Equipment Name manufacturin Make Voltage insulation/ Replacement
No. Commission available Replacement
g Operation (Y/N)
for CT & PT
15 Dabur LT Switchgear (11 kV ) Not Found CGL Sept,2003 11 NA Oil CB Y Obsolete & trouble
prone
16 Fulbari LT Switchgear (11 kV ) Not Found CGL Sept,2003 11 NA Oil CB Y Obsolete & trouble
prone
17 6.3 MVA Tr‐I (Incomer‐ LT Switchgear (11 kV ) Not Found CGL Sept,2003 11 NA Oil CB Y Obsolete & trouble
I) prone
18 6.3 MVA Tr‐II (Incomer‐ LT Switchgear (11 kV ) Not Found CGL Sept,2003 11 NA Oil CB Y Obsolete & trouble
II) prone
19 11 kV Bus‐coupler LT Switchgear (11 kV ) Not Found CGL Sept,2003 11 NA Oil CB Y Obsolete & trouble
prone
20 NJP SS Augmentation of Defective
existing Fire Fighting
System with Fire Alarm

Page ‐ 9/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Lakshmikantapur 220 KV SUBSTATION
No. of Cores Type of Tagged for
Sl. Year of Date of Reason for
Name of Feeder Equipment Name Make Voltage available insulation/ Replacement
No. Manufacturing Commission Replacement
for CT & PT Operation (Y/N)
1 FALTA CKT‐1 132 KV Circuit Breakers 2001 BHEL 28/05/2002 132 NA SF6 ckt Y TROUBLE PRONE
breaker.
2 FALTA CKT‐2 132 KV Circuit Breakers 2001 BHEL 28/05/2002 132 NA Y TROUBLE PRONE
Hydraulic
3 160 MVA 220/132 KV TR‐1 132 KV Circuit Breakers 2001 BHEL 05/01/2005 132 NA operating Y TROUBLE PRONE
4 160 MVA 220/132 KV TR‐2 132 KV Circuit Breakers 2001 BHEL 08/12/2003 132 NA mechanism Y TROUBLE PRONE
5 31.5 MVA 132/33 KV TR‐1 132 KV Circuit Breakers 1992 BHEL NA 132 NA MOCB Y Obsolate, Age old
6 132 KV BUS TRANSFER 132 KV Circuit Breakers 1992 BHEL NA 132 NA MOCB Y Obsolate, Age old
7 BALIACHANDI 33 KV Circuit Breakers 2001 ABB 19/05/2003 33 NA SF6 Y TROUBLE PRONE
8 50 MVA 132/33 KV TR‐3 33 KV Circuit Breakers 1999 ABB NA 33 NA SF6 Y TROUBLE PRONE
9 33 KV Maintenance Bay 33 KV Circuit Breakers 2004 ABB 20/01/2006 33 NA SF6 Y TROUBLE PRONE
10 Jaynagar‐1 33 KV Circuit Breakers 1999 ABB NA 33 NA SF6 Y TROUBLE PRONE
11 Subhasgram Ckt. ‐ II 216 KV Surge Arrestor R Ph 2000 CGL 2003 220 NA Y * HIGH PD
12 160 MVA 220/132 KV TR‐1 216 KV Surge Arrestor B Ph 2000 CGL 2004 220 Y OBSEVERVED WITH
13 160 MVA 220/132 KV TR‐2 216 KV Surge Arrestor B Ph 2000 CGL 2004 220 Y LOCALIZE HEATING
LOW TAN‐DELTA
14 160 MVA 220/132 KV TR‐3 132 KV CT B Ph. 2012 Vijoy Elect. 2012 132 5 CORE Y * VALUE
LOW TAN‐DELTA
15 160 MVA 220/132 KV TR‐3 132 KV CT Y Ph. 2012 Vijoy Elect. 2012 132 5 CORE Y
VALUE
132 KV CT R , Y & B Ph. CHOUDHAR AUGMENTATION OF
16 132 KV BUS TRANSFER 1998 NA 132 3 CORE Y
(3 nos) Y CAPACITY
120 KV Surge Arrestor
17 160 MVA 220/132 KV TR‐2
Y & B Ph (2 Nos.)
CGL NA 132 NA Y *
HIGH PD
18 160 MVA 220/132 KV TR‐1 120 KV Surge Arrestor R Ph CGL NA 132 NA Y * OBSEVERVED WITH
19 FALTA CKT‐1 120 KV Surge Arrestor Y Ph CGL NA 132 NA Y * LOCALIZE HEATING
20 JOKA 120 KV Surge Arrestor B Ph CGL NA 132 Y
120 KV Surge Arrestor Replacement of
21 31.5 MVA 132/33 KV TR‐1 CGL 132 Y
R, Y &B Ph (3 nos) ground mounted LA.s.
22 33 KV Maintenance Bay 33 KV CT R , Y & B Ph. 2002 SG ELECT 20/01/2006 33 3 CORE Y * Defective, Oil leakage
Transformer Group Control
23 33 KV CT R Ph. 33 3 CORE Y * Defective, Oil leakage
Bay
24 31.5 MVA 132/33 KV TR‐2 33 KV CT Y Ph. 33 3 CORE Y * Defective, Oil leakage
DUE TO INTERNAL
25 31.5 MVA 132/33 KV TR‐2 33 KV CT B Ph. 33 3 CORE Y
OVERHEATING OF CT
Damaged partially
26 33 KV MAINBUS 33 KV Post Insulator (4 Nos.) 33 Y
broken
33 KV Earthing Improving reliability
27 Lakshmikantapur SS Fresh Requirement 33 Y
Transformer (1 No.) of protection system.
* Already replaced due to exigency

Page ‐ 10/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Kasba 220 KV SUBSTATION
Type of
No. of Cores Tagged for
Year of Date of insulation Reason for
Sl. No. Name of Feeder Equipment Name Make Voltage available for Replacemen
Manufacturing Commission / Replacement
CT & PT t (Y/N)
Operation
160 MVA, 220/132/33 KV
1 220 KV Isolator 3‐Ph (MBI) 2009 G.NANDY 26‐09‐11 220 NA Y* Defective trouble prone.
TR‐IV
160 MVA, 220/132/33 KV
2 220 KV Isolator 3‐Ph (MBI) NF ALLIANCE NF 220 NA Y* Age old trouble prone.
TR‐III
3 CESC 220 KV Isolator 3‐Ph (MBI) 2009 G.NANDY 10‐12‐12 220 NA Y* Defective trouble prone.
Subhasgram‐KLC‐Newtown
4 220 KV Isolator 3‐Ph (MBI) NF ALLIANCE NF 220 NA Y* Age old trouble prone.
(Diamond)
5 Subhasgram 220 KV Isolator 3‐Ph (MBI) NF ALLIANCE NF 220 NA Y* Age old trouble prone.
Subhasgram‐KLC‐Newtown 220 KV Isolator 3‐Ph (Line
6 NF ALLIANCE NF 220 NA Y Age old trouble prone.
(Diamond) Side)
Subhasgram‐KLC‐Newtown
7 220 KV Isolator 3‐Ph (TBI) NF ALLIANCE NF 220 NA Y Age old trouble prone.
(Diamond)
220 KV Isolator 3‐Ph (Line
8 Subhasgram NF ALLIANCE NF 220 NA Y Age old trouble prone.
Side)
9 Subhasgram 220 KV Isolator 3‐Ph (TBI) NF ALLIANCE NF 220 NA Y Age old trouble prone.
160 MVA, 220/132/33 KV 220 KV Isolator 3‐Ph (Line
10 NF ALLIANCE NF 220 NA Y Age old trouble prone.
TR‐III Side)
160 MVA, 220/132/33 KV
11 220 KV Isolator 3‐Ph (TBI) NF ALLIANCE NF 220 NA Y Age old trouble prone.
TR‐III
220 KV Isolator 3‐Ph (Line
12 Jeerat Ckt‐I NF G.Nandy NF 220 NA Y Defective trouble prone.
Side)
220 KV Isolator 3‐Ph (Line
13 Jeerat Ckt‐II NF ‐Do‐ NF 220 NA Y Defective trouble prone.
Side)
14 220 KV Bus‐Coupler 220 KV Isolator 3‐Ph (TBI) NF G.Nandy NF 220 NA Y Defective trouble prone.
15 Jeerat Ckt‐I 220 KV Isolator 3‐Ph (TBI) NF ‐Do‐ NF 220 NA Y Defective trouble prone.
16 Jeerat Ckt‐II 220 KV Isolator 3‐Ph (TBI) NF ‐Do‐ NF 220 NA Y Defective trouble prone.
220 KV Isolator 3‐Ph (Line
17 150 MVA, 220/132/33 KV TR‐I NF ‐Do‐ NF 220 NA Y Defective trouble prone.
Side)
220 KV Isolator 3‐Ph (Line
18 150 MVA, 220/132/33 KV TR‐II NF ‐Do‐ NF 220 NA Y Defective trouble prone.
Side)
160 MVA, 220/132/33 KV TR‐ 220 KV Isolator 3‐Ph (Line
19 NF ‐Do‐ NF 220 NA Y Defective trouble prone.
IV Side)

Page ‐ 11/33
Name of Substation : Kasba 220 KV SUBSTATION
Type of
No. of Cores Tagged for
Year of Date of insulation Reason for
Sl. No. Name of Feeder Equipment Name Make Voltage available for Replacemen
Manufacturing Commission / Replacement
CT & PT t (Y/N)
Operation
Chowdhury
20 CESC Ckt‐I 132 KV CT R Ph. (Main) NF NF 132 Y Age old,oil leakage.
Industries
Chowdhury
21 CESC Ckt‐I 132 KV CT Y Ph. (Main) NF NF 132 Y Age old,oil leakage.
Industries
Chowdhury
22 CESC Ckt‐I 132 KV CT B Ph. (Main) NF NF 132 Y Age old,oil leakage.
Industries
Chowdhury
23 CESC Ckt‐II 132 KV CT R Ph. (Main) NF NF 132 Y Age old,oil leakage.
Industries
Chowdhury
24 CESC Ckt‐II 132 KV CT Y Ph. (Main) NF NF 132 Y Age old,oil leakage.
Industries
25 CESC Ckt‐II 132 KV CT B Ph. (Main) NF BHEL NF 132 Y Age old,oil leakage.
Chowdhury
26 CESC Ckt‐III 132 KV CT R Ph. (Main) NF NF 132 Y Age old,oil leakage.
Industries
27 CESC Ckt‐III 132 KV CT Y Ph. (Main) NF BHEL NF 132 Y Age old,oil leakage.
28 CESC Ckt‐III 132 KV CT B Ph. (Main) NF BHEL NF 132 Y Age old,oil leakage.
29 CESC Ckt‐I 132 KV Isolators (MBI) NF NF NF 132 NA Y* Age old trouble prone.
30 CESC Ckt‐II 132 KV Isolators (MBI) NF NF NF 132 NA Y* Age old trouble prone.
31 CESC Ckt‐III 132 KV Isolators (MBI) NF NF NF 132 NA Y* Age old trouble prone.
150 MVA, 220/132/33 KV
32 132 KV Isolators (MBI) NF NF NF 132 NA Y* Age old trouble prone.
TR‐I
150 MVA, 220/132/33 KV
33 132 KV Isolators (MBI) NF NF NF 132 NA Y* Age old trouble prone.
TR‐II
160 MVA, 220/132/33 KV
34 132 KV Isolators (MBI) NF NF NF 132 NA Y* Age old trouble prone.
TR‐III
35 CESC Ckt‐I 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
36 CESC Ckt‐II 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
37 CESC Ckt‐III 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
38 Sonarpur 132 KV Isolators (MBI) NF NF NF 132 NA Y Age old trouble prone.
39 Sonarpur 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
40 Behala 132 KV Isolators (MBI) NF NF NF 132 NA Y Age old trouble prone.
41 Behala 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
42 Bus‐Coupler 132 KV Isolators (MBI) NF NF NF 132 NA Y Age old trouble prone.
160 MVA, 220/132/33 KV TR‐
51 132 KV Isolators (MBI) NF NF NF 132 NA Y Age old trouble prone.
IV
52 132 KV P.T‐I 132 KV Isolators (MBI) NF NF NF 132 NA Y Age old trouble prone.

Page ‐ 12/33
Name of Substation : Kasba 220 KV SUBSTATION
Type of
No. of Cores Tagged for
Year of Date of insulation Reason for
Sl. No. Name of Feeder Equipment Name Make Voltage available for Replacemen
Manufacturing Commission / Replacement
CT & PT t (Y/N)
Operation
53 132 KV P.T‐II 132 KV Isolators (MBI) NF NF NF 132 NA Y Age old trouble prone.
54 Sonarpur 132 KV Isolators (TBI) NF NF NF 132 NA Y Age old trouble prone.
55 Behala 132 KV Isolators (TBI) NF NF NF 132 NA Y Age old trouble prone.
56 CESC Ckt‐I 132 KV Isolators (TBI) NF NF NF 132 NA Y Age old trouble prone.
57 CESC Ckt‐II 132 KV Isolators (TBI) NF NF NF 132 NA Y Age old trouble prone.
58 CESC Ckt‐III 132 KV Isolators (TBI) NF NF NF 132 NA Y Age old trouble prone.
59 Saltlake 132 KV Isolators (TBI) NF NF NF 132 NA Y Age old trouble prone.
60 132 kV Bus‐Coupler 132 KV Isolators (TBI) NF NF NF 132 NA Y Age old trouble prone.
61 150 MVA, 220/132/33 KV TR‐I 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
62 150 MVA, 220/132/33 KV TR‐II 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
160 MVA, 220/132/33 KV TR‐
63 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
III
160 MVA, 220/132/33 KV TR‐
64 132 KV Isolators (Line Side) NF NF NF 132 NA Y Age old trouble prone.
IV
43 Jeerat Ckt‐I 220 KV CT R Ph. NF BALTEAU NF 220 Y Age old,oil leakage.
44 Jeerat Ckt‐I 220 KV CTY Ph. NF BALTEAU NF 220 Y Age old,oil leakage.
45 Jeerat Ckt‐I 220 KV CT B Ph. NF BALTEAU NF 220 Y Age old,oil leakage.
46 Jeerat Ckt‐II 220 KV CT R Ph. NF BALTEAU NF 220 Y Age old,oil leakage.
47 Jeerat Ckt‐II 220 KV CT Y Ph. NF BALTEAU NF 220 Y Age old,oil leakage.
48 Jeerat Ckt‐II 220 KV CT B Ph. NF BALTEAU NF 220 Y Age old,oil leakage.
132 KV Post Insulator
49 Kasba SS NF NF NF 132 NA Y Old, partially broken.
(121 Nos.)
220 KV Post Insulator
50 Kasba SS NF NF NF 220 NA Y Old, partially broken.
(42 Nos.)
Age old, with gas
160 MVA, 220/132/33 KV TR‐
65 220 KV Circuit Breaker‐3 Ph 1994 TELK NF 220 NA Y leakage. No spares are
III
available.
Old & obsolete series
6.6/0.4 KV, 250 KVA Station 6.6kV Switch gear ‐ VCB
66 NF ECE NF 6.6 OCB's Y type OCBs. No spares
Aux. Transformer bay (2 Nos)
are available.

Page ‐ 13/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : KLC Bantala 220 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of
Sl. No. Name of Feeder Equipment Name Manufacturin Make Voltage available insulation/ Replacement Reason for Replacement
Commission
g for CT & PT Operation (Y/N)
Lakshmi
1 Mondalganthi 33 KV CT R Ph. 2005 29.04.2008 33 3 Oil Y* Heavy Oil leakage from stud
Electricals
Lakshmi
2 Minakhan 33 KV CT Y Ph. 2004
Electricals
07.04.2006 33 2 Oil Y P.D Value beyond limit

Lakshmi
3 Minakhan 33 KV CT B Ph. 2004 07.04.2006 33 2 Oil Y P.D Value beyond limit.
Electricals
TARIT
4 6.3 MVA TR‐I 33 KV CT R Ph. 1999 APPLIANCES
12.12.2000 33 2 Oil Y* Heavy Oil leakage from stud

Lakshmi
5 Gangajoara 33 KV CT R Ph. 2004 03.08.2005 33 2 Oil Y P.D Value beyond limit,
Electricals
Lakshmi
6 Gangajoara 33 KV CT B Ph. 2004
Electricals
03.08.2005 33 2 Oil Y P.D Value beyond limit

33 KV CT R, Y & B Ph. Lakshmi Metal body corroded


7 Salt Lake 2005 33 3 Oil Y
(3 nos) Electricals severely
33 KV CT R, Y & B Ph. Oil leakage & metal body
8 33 KV Bhangar
(3 nos)
N.A. CHOWDHURY 29.07.2000 33 3 Oil Y
corroded severely
Lakshmi
9 Gangajoara 33 KV CT Y Ph. 2004 03.08.2005 33 3 Oil Y P.D Value beyond limit
Electricals
33 KV CT R, Y & B Ph. TARIT Metal body corroded
10 6.3 MVA TR‐II (3 nos)
1999 APPLIANCES
04.05.2001 33 3 Oil Y
severely causing oil leakage
33 KV Post Insulator
11 33 KV Bhangar N.A N.A. 29.07.2000 33 Y Partially damaged.
(09 Nos.)
LT Transformer
33KV/0.433KV, 315 Abhay trans.
12 KVA
1996
& switch Gear
33 Oil Y Corrosion and oil leakage.
(2 nos)
33 KV Earthing Improving reliability of
13 KLC SS Fresh Requirement 33 Y
Transformer (1 No.) protection system.

* Replacement of these equipments are already done due to exigency.

Page ‐ 14/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Howrah 220 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of Reason for
Sl. No. Name of Feeder Equipment Name Manufac Make Voltage available for insulation/ Replacement
Commission Replacement
turing CT & PT Operation (Y/N)
1 220kV Bus coupler bay 245kV Circuir breaker Fresh requirement Yes for 220kV Bus zone
245 KV Isolator 3‐ph differential protection
2 220kV Bus coupler bay, Fresh requirement Yes scheme
(2 nos)
Main Bus Section Isolator HCB, Very old , obsolete
3 220 KV Isolator 3‐ph 1970's TMG 1974‐73 220kV NA Yes
towards KTPP side Manual and trouble prone.
Main Bus Section Isolator HCB, Very old , obsolete
4 220 KV Isolator 3‐ph 1970's TMG 1974‐74 220kV NA Yes * *
towards Foundry Park side Manual and trouble prone.
5 Foundry Park Ckt. 2 220 KV Isolator 3‐ph (MBI) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes
6 Foundry Park Ckt. 2 220 KV Isolator 3‐ph (TBI) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes
7 160MVA Tr.1 220 KV Isolator 3‐ph (MBI) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes
8 160MVA Tr.1 220 KV Isolator 3‐ph (TBI) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes
9 Bus Transfer 220 KV Isolator 3‐ph (MBI) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes
10 160MVA Tr.2 220 KV Isolator 3‐ph (LBI) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes
11 160MVA Tr.2 220 KV Isolator 3‐ph (TBI) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes Very old , obsolete
12 220KV PT set A 220 KV Isolator 3‐ph (Set A) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes and trouble prone.
13 220KV PT set B 220 KV Isolator 3‐ph (Set A) 1970's TMG 1974‐75 220kV NA HCB, Manual Yes
14 KTPP‐1 220 KV Isolator 3‐ph (TBI) 1980's HBB 1984 220kV NA HCB, Manual Yes
15 KTPP‐2 228 KV Isolator 3‐ph (TBI) 1980's HBB 1984 220kV NA HCB, Manual Yes
16 150MVA Tr.3 bay 220 KV Isolator 3‐ph (MBI) 1980's HBB 1984 220kV NA HCB, Manual Yes
17 150MVA Tr.3 bay 220 KV Isolator 3‐ph (LBI) 1980's HBB 1984 220kV NA HCB, Manual Yes
18 150MVA Tr.3 bay 220 KV Isolator 3‐ph (TBI) 1980's HBB 1984 220kV NA HCB, Manual Yes
19 160MVA Tr.1 220 KV CT (B Ph.) 1970's Balteau 1974‐76 220kV 5core Oil Yes * *
20 160MVA Tr.2 220 KV CT (R Ph.) 1970's Balteau 1974‐77 220kV 5core Oil Yes * * Age old CTs
21 150MVA Tr.3 220 KV CT (R Ph.) 1980's W.S.Engg 1984 220kV 5core Oil Yes * *
22 150MVA Tr.3 220 KV CT (B Ph.) 1980's W.S.Engg 1984 220kV 5core Oil Yes * *
23 220KV B/C 220 KV CT (R Ph.) 1970's Balteau 1970's 220kV 5core Oil Yes
24 220KV B/C 220 KV CT (Y Ph.) 1990's Telk 1991's 220kV 5core Oil Yes Age old CTs
25 Foundry Park‐I 220 KV CT (Y Ph.) 1990's Telk 1991's 220kV 5core Oil Yes
Required to
26 Bus Coupler bay 220 KV CT (6 Nos.) Fresh requirement 220kV Yes implement Bus zone
differential scheme
220 KV PT R, Y & B ph
27 220kV PT Set A 1975 Rade Koncar Around 1975 220kV 3 Core Oil Yes
(3 Nos)
Age old
220 KV PT R, Y & B ph
28 220kV PT Set B 1975 Rade Koncar Around 1975 220kV 4 Core Oil Yes
(3 Nos)

Page ‐ 15/33
Name of Substation : Howrah 220 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of Reason for
Sl. No. Name of Feeder Equipment Name Manufac Make Voltage available for insulation/ Replacement
Commission Replacement
turing CT & PT Operation (Y/N)
160MVA Tr.2, KTPP‐1&2, 
solid core
29 150MVA Tr‐3,  Bus Coupler  220 KV Post Insulator (30 Nos.) 1970's TMG 1970's 245 Single Stack,  Yes Trouble prone
BPIs
to implement Bus
30 Bus Coupler bay (3 nos) 220 KV Post Insulator Fresh requirement 245 Yes zone differential
scheme
220 KV KTPP ‐ 1 198 KV Surge Arrester (R, Y, B Ground 
31 1981's W.S Engg. 220  4stack Yes
Ph.) (3 Nos.) mounted
198 KV Surge Arrester (R, B Ground 
32 220KV KTPP ‐ 2 1981's W.S Engg. 220  4stack Yes
Ph.) (2 Nos.) mounted
Replacement of age
198 KV Surge Arrester (R, Y, B Ground 
33 220KV F. Park ‐ 1 1980's W.S Engg. 220  4stack Yes old ground mounted
Ph.) (3 Nos.) mounted
Lightning arrestors
198 KV Surge Arrester (R, B Ground 
34 220KV F. Park ‐ 2 1989's W.S Engg. 220  4stack Yes
Ph.) (2 Nos.) mounted
198 KV Surge Arrester (Y, B Ground 
35 220KV TRANSFORMER ‐ 3  1989's W.S Engg. 220  4stack Yes
Ph.) (2 Nos.) mounted
132KV Current Transformer Age old and oil
36 Bus Transfer 1963's SIEMENS 1970's 145 2 core OIL Yes* *
(R, Y, B Ph.) 3 Nos. leakage.
132KV Current Transformer
37 132 KV LILUAH‐II 1963's SIEMENS 1970's 145 2 core OIL Yes
(R, Y, B Ph.) 3 Nos.
132KV Current Transformer
38 132 KV LILUAH‐I 1963's SIEMENS 1970's 145 2/ 3 core OIL Yes
(R, Y, B Ph.) 3 Nos.
132KV Current Transformer
39 132 KV CESC‐I 1963's SIEMENS 1970's 145 2 core OIL Yes
(R, Y, B Ph.) 3 Nos.
132KV Current Transformer
40 132 KV CESC‐II 1963's SIEMENS 1970's 145 2 core OIL Yes
(R, Y, B Ph.) 3 Nos.
132KV Current Transformer
41 132 KV Liluah‐III 1963's SIEMENS 1970's 145 2 core OIL Yes
(R, Y Ph.) 2 Nos. For implementation
132KV Current Transformer
42 132 KV LILUAH‐III, B ph ‐‐‐‐ HEAVY ELECT. 1984'S 145 2core OIL Yes of Bus zone
(B Ph.) 1 No.
differential protection
132KV Current Transformer
43 133 KV LILUAH‐IV ‐‐‐‐ BHEL 1989'S 145 2core OIL Yes scheme, 5 core CT is
( R Ph.) 1 No.
132KV Current Transformer needed
44 133 KV LILUAH‐IV ‐‐‐‐ MARSONS 2002'S 145 3core OIL Yes
( Y Ph.) 1 No.
132KV Current Transformer
45 133 KV LILUAH‐IV ‐‐‐‐ ASEA 1974'S 145 2core OIL Yes
( B Ph.) 1 No.
132KV Current Transformer
46 135 KV CESC‐III 1963's SIEMENS 1970's 145 2 core OIL Yes
(R, Y, B Ph.) 3 Nos.
132KV Current Transformer
47 132 KV TRACTION‐I ‐‐‐‐ ASEA ‐‐‐‐ 145 3core OIL Yes
( R Ph.) 1 No.
Page ‐ 16/33
Name of Substation : Howrah 220 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of Reason for
Sl. No. Name of Feeder Equipment Name Manufac Make Voltage available for insulation/ Replacement
Commission Replacement
turing CT & PT Operation (Y/N)
132KV Current Transformer
48 132 KV TRACTION‐I ‐‐‐‐ MARSONS ‐‐‐‐ 145 3core OIL Yes
(B Ph.) 1 No.
132KV Current Transformer
49 132 KV TRACTION‐II ‐‐‐‐ BHEL ‐‐‐‐ 145 2core OIL Yes
(R, B Ph.) 2 Nos. For implementation
132KV Current Transformer
50 150 MVA TR‐III ‐‐‐‐ BHEL 1984'S 145 3core OIL Yes of Bus zone
(R, Y, B Ph.) 3 Nos.
differential protection
132KV Current Transformer
51 150 MVA TR‐IV 2013's Vijoy 2013's 145 3core OIL Yes scheme, 5 core CT is
(R, Y, B Ph.) 3 Nos.
132KV Current Transformer needed
52 132 kV Bus Coupler bay Fresh requirement 145 Yes
(6 Nos.)
53 132 kV Bus coupler bay 145kV Circuir breaker Fresh requirement 145 Yes for 132kV Bus zone
differential protection
54 132 kV Bus coupler bay 145 KV Isolator 3‐ph (2 Nos.) Fresh requirement 145 Yes scheme
for 132kV Bus zone
55 Bus Transfer bay MB‐ 1 & 2 132 KV Isolator 3‐ph (2 Nos.) 1965's AEI's 1970's 145 HCB Manual Yes
differential scheme
Bus Section isolator for 3rd Convertion of 3rd bus
56 132 KV Isolator 3‐ph Fresh requirement 145 Yes
bus to 2nd main bus
57 132kV PT A Isolator 132 KV Isolator 3‐ph 1965's AEI's 1970's 145 HCB Manual Yes
PT shifting as a part of
58 132kV PT A Isolator 132 KV Isolator 3‐ph 1965's AEI's 1970's 145 HCB Manual Yes
132kV Bus zone
differential protection
59 145kV PT Set A 145kV PT R, Y, B Ph. (3 Nos.) 2013's Vijai 2013's 145 2 core Oil Yes
scheme
60 145kV PT Set B 145kV PT R, Y, B Ph. (3 Nos.) 1964's ASIA 1970's 145 2 core Oil Yes
120 KV Surge Arrester R & B
61 132KV Traction ‐ 1 1989's W.S Engg. 1989's 145 3stack Low structure Yes
Ph. (2 Nos.)
120 KV Surge Arrester R & B
62 132KV Traction ‐ 2 1980's W.S Engg. 1980's 145 3stack Low structure Yes
Ph. (2 Nos.)
120 KV Surge Arrester R & Y Ground 
63 132KV Liluah ‐ 1 1980's W.S Engg. 1980's 145 3stack Yes Replacement of age
Ph. (2 Nos.) mounted
old ground mounted
120 KV Surge Arrester R & B Ground 
64 132KV Liluah ‐ 2 1980's W.S Engg. 1980's 145 3stack Yes Lightning arrestors
Ph. (2 Nos.) mounted
120 KV Surge Arrester Y & B 1980 & Ground 
65 132KV Liluah ‐ 3 W.S Engg. 1980 & 1989 145 3stack Yes
Ph. (2 Nos.) 1989 mounted

Page ‐ 17/33
Name of Substation : Howrah 220 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of Reason for
Sl. No. Name of Feeder Equipment Name Manufac Make Voltage available for insulation/ Replacement
Commission Replacement
turing CT & PT Operation (Y/N)
120 KV Surge Arrester R & Y Elpro & Ground 
66 132KV Liluah ‐ 4 1991's 1991's 145 3stack Yes
Ph. (2 Nos.) Oblem mounted
Liluah I to IV, Traction I & II, for 132kV Bus zone
145 KV Post Insulator
67 B/C & B/T Byas Fresh requirement 145 NA Yes differential protection
(Approximately 55 nos)
scheme
220V
68 Howrah SS DCDB 1970's SIEMENS 1970's NA Yes Age old trouble prone
DC
69 Howrah SS Aux. Supply 33kV Circuit breaker Fresh requirement 33 NA Yes
70 Howrah SS Aux. Supply 33kV Isolator (3 Nos.) Fresh requirement 33 NA Yes
71 Howrah SS Aux. Supply 33 kV PT (3 Nos.)
for Auxiliary power
72 Howrah SS Aux. Supply 33 kV Surge Arrester (3 Nos.)
supply system
73 Howrah SS Aux. Supply 33kV CTs (3 nos) Fresh requirement 33 NA Yes renovation
33/0.4kV Transformer
74 Howrah SS Aux. Supply Fresh requirement 33 NA Yes
630KVA (2nos)
75 Howrah SS Aux. Supply ACDB Fresh requirement 415V NA Yes

** Replacement of these equipments are already done due to exigency.

Page ‐ 18/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Domjur 220 KV SUBSTATION
Year of No. of Cores Type of Tagged for
Date of Reason for
Sl. No. Name of Feeder Equipment Name Manufacturin Make Voltage available insulation/ Replacement
Commission Replacement
g for CT & PT Operation (Y/N)
1 Domjur‐Uluberia ckt.‐1 132 KV Circuit Breakers 2001 BHEL 24.08.2004 132 ‐ Hydraulic Y Obsolete
2 50 mva 132/33 KV, Tr.‐1 132 KV Circuit Breakers 2001 BHEL 13.04.2004 132 ‐ Hydraulic Y Obsolete
160MVA, 220/132/33KV,
3 132 KV Circuit Breakers 2001 BHEL 19.07.2004 132 ‐ Hydraulic Y Obsolete
Tr.‐1
132KV Transfer Bus
4 132 KV Circuit Breakers 2002‐03 BHEL 28.09.2003 132 ‐ Hydraulic Y Obsolete
Coupler
5 Jangipara ckt.‐1. 132 KV Circuit Breakers 2002‐03 BHEL 28.09.2003 132 ‐ Hydraulic Y Obsolete
6 33 KV Munshirhat 33 KV Circuit Breakers 2001 BHEL 16.01.2004 33 ‐ VCB Y Trouble prone
7 50MVA, 132/33KV, Tr.‐1 33 KV Circuit Breakers 2001 BHEL 13.04.2004 33 ‐ VCB Y Trouble prone
8 6.3MVA, 33/11KV, Tr.‐1 33 KV Circuit Breakers 2001 BHEL 13.01.2004 33 ‐ VCB Y Trouble prone
9 6.3MVA, 33/11KV, Tr.‐2. 33 KV Circuit Breakers 2001 BHEL 09.12.2003 33 ‐ VCB Y Trouble prone
Tarit
10 Munshirhat 33 KV CT (Y‐phase) 2001 16.01.2004 33 2 ‐ Y ** Age Old, Oil leakage
appliances
Tarit
11 Munshirhat 33 KV CT (B‐phase) 2001 16.01.2004 33 2 ‐ Y Age Old, Oil leakage
appliances
Augmentation of existing
12 Domjur SS 2003 Minimax 2003.00 Renovation required
Fire Fighting System
33 KV Earthing Improving
13 Domjur SS Transformer Fresh Requirement 33 Y reliability of
(1 No.) protection system.

** Replacement of these equipments are already done due to exigency.

Page ‐ 19/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Gokarno 220 KV SUBSTATION
No. of
Type of
Year of Cores Tagged for
Date of insulation
Sl. No. Name of Feeder Equipment Name Manufacturin Make Voltage available Replacement Reason for Replacement
Commission /
g for CT & (Y/N)
Operation
PT
Age old trouble prone &
1 50MVA Tr‐2 132 KV Circuit Breakers N.A. BHEL N.A. 132 NA MOCB Y
Obsolete.
Age old trouble prone &
2 Katwa ckt ‐ 1 132 KV Circuit Breakers N.A. BHEL N.A. 132 NA MOCB Y
Obsolete.
Age old trouble prone &
3 Katwa ckt ‐ 2 133 KV Circuit Breakers N.A. BHEL N.A. 132 NA MOCB Y
Obsolete.
4 Nabagram 33KV 33 KV Circuit Breakers N.A. CGL N.A. 33 NA SF6 GCB Y Mechanical problem.
Proposed ‐ TBC & 220 KV Current Replaced for commissioning of
5 5 Core Y*
160MVA Tr‐3 Transformer R PH Bus Bar differential protection.
Proposed ‐ TBC & 220 KV Current Replaced for commissioning of
6 5 Core Y*
160MVA Tr‐3 Transformer Y PH Bus Bar differential protection.
Proposed ‐ TBC & 220 KV Current Replaced for commissioning of
7 5 Core Y*
160MVA Tr‐3 Transformer B PH Bus Bar differential protection.
8 50MVA Tr.3 132 KV CT R Ph. N.A. Choudhury N.A. 132 3 Y Age old and oil leakage.
9 50MVA Tr.3 132 KV CT Y Ph. N.A. Choudhury N.A. 132 3 Y Age old and oil leakage.
10 50MVA Tr.3 132 KV CT B Ph. N.A. Choudhury N.A. 132 3 Y Age old and oil leakage.
11 Lalgola Ckt.‐1 132 KV CT R Ph. 2003 Choudhury N.A. 132 3 Y* Defective.
Against replacement of existing
12 132 KV PT R Ph. 132 KV PT R Ph. 132 1 core Y
single core P.T.
Against replacement of existing
13 132 KV PT Y Ph. 132 KV PT Y Ph. 132 1 core Y
single core P.T.
Against replacement of existing
14 132 KV PT B Ph. 132 KV PT B Ph. 132 1 core Y
single core P.T.
15 50MVA Tr ‐2 120 KV Surge Arrestor Y Ph. N.A. Lamco N.A. 132 Y* Low IR value.
16 Berhampore Ckt. 2 132 KV Isolators N.A. Alliance N.A. 132 ‐‐ N.A. Y Age old and malfunction
132 KV Bus‐Section
17 132 KV Isolators N.A. Alliance N.A. 132 Y Age old & Low rating.
Isolator
132 KV Bus‐Section
18 132 KV Isolators N.A. Alliance N.A. 132 Y Age old & Low rating.
Isolator

Page ‐ 20/33
Name of Substation : Gokarno 220 KV SUBSTATION
No. of
Type of
Year of Cores Tagged for
Date of insulation
Sl. No. Name of Feeder Equipment Name Manufacturin Make Voltage available Replacement Reason for Replacement
Commission /
g for CT & (Y/N)
Operation
PT
19 Berhampore ckt‐1 132 KV Isolators (MBI) 132 Y Age old trouble prone.
20 Rampurhat 132 KV Isolators (MBI) 132 Y Age old trouble prone.
21 Berhampore ckt‐1 132 KV Isolators (Line Side) 132 Y Age old trouble prone.
22 Berhampore ckt‐2 132 KV Isolators (Line Side) 132 Y Age old trouble prone.
23 Rampurhat 132 KV Isolators (Line Side) 132 Y Age old trouble prone.
Fire fighting system to be
Augmentation of existing
24 Gokarna SS extended from proposed 400 kV
Fire Fighting System
to existing switchyard.
2.5 sqmmControl
25 Power & Control Cables Age old damaged cable.
Cable
26 Gokarna SS DCDB Age old and trouble prone.
33 KV Earthing Improving reliability of
27 Gaokarna SS Fresh Requirement 33 Y
Transformer protection system.

* Already replaced due to exigency

Page ‐ 21/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : SATGACHIA 220 KV SUBSTATION
Year of Date of No. of Cores Type of Tagged for
Sl. No. Name of Feeder Equipment Name Manufacturin Make Commissio Voltage available insulation/ Replacement Reason for Replacement
g n for CT & PT Operation (Y/N)
132 KV Circuit Age old trouble prone &
1 Mahachanda Ckt#II 1991 BHEL 1991 132 NA Y
Breakers Obsolete.
132 KV Circuit Age old trouble prone &
2 Katwa Ckt#I 1997 BHEL 2001 132 NA Y
Breakers Obsolete.
132 KV Circuit Age old trouble prone &
3 Katwa Ckt#II 1997 BHEL 2001 132 NA Y
Breakers Obsolete.
132 KV Circuit Age old trouble prone &
4 Dhatrigram 1991 BHEL 1997 132 NA Y
Breakers Obsolete.
132 KV Circuit Age old trouble prone &
5 Bandel 1997 BHEL 1999 132 NA Y
Breakers Obsolete.
132 KV Circuit Age old trouble prone &
6 Khanyan 1997 BHEL 1999 132 NA Y
Breakers Obsolete.
ALIND DELLE Low Breaking Capacity and oil
7 Kusumgram‐II 33 KV Circuit Breakers 1990 2008 33 Y
ALSTHOM leakage.
ALIND DELLE Low Breaking Capacity and oil
8 Nadanghat 33 KV Circuit Breakers 1995 2008 33 Y
ALSTHOM leakage.
ALIND DELLE Low Breaking Capacity and oil
9 6.3MVA 33/11KV Tr‐I 33 KV Circuit Breakers 1991 2008 33 Y
ALSTHOM leakage.
ALIND DELLE Low Breaking Capacity and oil
10 33KV Madhupur 33 KV Circuit Breakers 1989 2008 33 Y
ALSTHOM leakage.
ALIND DELLE Low Breaking Capacity and oil
11 33KV Baidyapur 33 KV Circuit Breakers 1991 2008 33 Y
ALSTHOM leakage.
ALIND DELLE Low Breaking Capacity and oil
12 6.3MVA 33/11KV Tr‐II 33 KV Circuit Breakers 1991 2008 33 Y
ALSTHOM leakage.
198KV Surge Arrester
13 Krishnanagar Ckt#II 2001 Jayashree 2006 220 Y Low IR Value
R Ph.
198KV Surge Arrester
14 Jeerat Ckt#I 1997 CGL 1999 220 Y Low IR Value
R Ph.
50MVA 132/33KV Tr‐II
15
LV side.
33 KV CT Y Ph. 2003 Marson 2005 33 2 Y Excessive oil leakage
50MVA 132/33KV Tr‐II
16
LV side.
33 KV CT B Ph. 2003 Marson 2005 33 2 Y Excessive oil leakage

Page ‐ 22/33
Name of Substation : SATGACHIA 220 KV SUBSTATION
Year of Date of No. of Cores Type of Tagged for
Sl. No. Name of Feeder Equipment Name Manufacturin Make Commissio Voltage available insulation/ Replacement Reason for Replacement
g n for CT & PT Operation (Y/N)
17 6.3MVA 33/11KV Tr‐I 33 KV CT B Ph. 33 2 Y Low IR Value
18 6.3MVA 33/11KV Tr‐I 33 KV CT R Ph. 33 2 Y Low IR Value
19 6.3MVA 33/11KV Tr‐I 33 KV CT Y Ph. 33 2 Y Low IR Value
Marson
20 Memari‐I 33 KV CT B Ph. 2001 2 Y Oil leakage problem
Limited
Marson
21 Memari‐I 33 KV CT R Ph. 2001 2 Y Oil leakage problem
Limited
Marson
22 Memari‐I 33 KV CT Y Ph. 2001 2 Y Oil leakage problem
Limited
Battery and Battery
23 Battery charger 1998 Amara Raja 1999 Y* Defective &trouble prone.
charger,300AH,220V
33 KV Earthing Improving reliability of
24 Satgachia SS Fresh Requirement 33 Y
Transformer (1 No.) protection system.

* Already replaced due to exigency

Page ‐ 23/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : New Haldia 220 KV SUBSTATION
Year of Date of No. of Cores Type of Tagged for
Reason for
Sl. No. Name of Feeder Equipment Name Manufacturin Make Commissio Voltage available insulation/ Replacement
Replacement
g n for CT & PT Operation (Y/N)
132KV B/C, 31.5
1 MVA TR‐II HV 132 KV Circuit Breakers 2001 BHEL 2004 132 NA SF6 , SP‐SP Y Trouble Prone
SIDE
MOTOR
MECHANICAL
2 KTPS‐I 220 KV Isolator 3‐ph(MB‐I) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
3 KTPS‐I 220 KV Isolator 3‐ph(MB‐II) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
4 KTPS‐II 220 KV Isolator 3‐ph (MB‐I) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
5 KTPS‐II 220 KV Isolator 3‐ph (MB‐II) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
6 160 MVA TR‐I 220 KV Isolator 3‐ph (MB‐I) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
7 160 MVA TR‐I 220 KV Isolator 3‐ph (MB‐II) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
8 160 MVA TR‐II 220 KV Isolator 3‐ph(MB‐I) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
9 160 MVA TR‐II 220 KV Isolator 3‐ph(MB‐II) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
10 BUS TRANSFER 220 KV Isolator 3‐ph(MB‐I) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
MOTOR
MECHANICAL
11 BUS TRANSFER 220 KV Isolator 3‐ph(MB‐II) 2002 ALLIANCE 2004 220 NA OPERATED, Y
PROBLEM
HCB
Augmentation of existing 2002 2004 N.A Damaged, trouble
12 New Haldia SS
Fire Fighting System prone.

Page ‐ 24/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Midnapore 220 KV Sub‐Station
Year of Type of No. of Cores Tagged for
Sl. Name of Date of Reason for
Equipment Name Manufacturin Make Voltage insulation/ available Replacement
No. Feeder Commission Replacement
g Operation for CT & PT (Y/N)
132 KV Circuit Defective
1 160 MVA TR‐1 2001 BHEL 2002 132 SF6 NA Y
Breakers Trouble Prone.
132 KV Circuit Defective
2 160 MVA TR‐2 2001 BHEL 2003 132 SF6 NA Y
Breakers Trouble Prone.
132 KV Circuit Age Old &
3 50 MVA TR‐1 1996‐97 BHEL 1997 132 SF6 NA Y
Breakers Malfunction
132 KV Circuit Age Old &
4 50 MVA TR‐2 1996‐97 BHEL 1997 132 SF6 NA Y
Breakers Malfunction
220 KV Isolator (Main,
Defective
5 160 MVA TR‐3 Transfer, Line) Alliance 2007 132 Motorised NA Y
Trouble Prone.
(3 Nos.)
120 KV Surge Arrestor
6 50 MVA TR‐1 CGL 132 Y Low IR Value
R‐Ph
120 KV Surge Arrestor
7 50 MVA TR‐1 LAMCO 132 Y Low IR Value
B‐Ph
132 KV CT Poor TAN‐
8 Jhargram‐1 Tarit 132 Y
(R‐Ph) DELTA value
132 KV CT Poor TAN‐
9 Jhargram‐2 Chowdhury 132 Y
(B‐Ph) DELTA value
132 KV CT Poor TAN‐
10 Pingla Marson 132 Y
(R‐Ph) DELTA value
132 KV CT Poor TAN‐
11 Bishnupur Tarit 132 Y
(Y‐Ph) DELTA value
132 KV CT Poor TAN‐
12 C.K. Road Chowdhury 132 Y
(Y‐Ph) DELTA value
132 KV PT R, Y, B Ph.
13 Bus‐Coupler CGL 132 Y Low IR Value
(3 Nos.)
132 kV Main 132 KV Isolators (H/L) Age old and
14 Alliance 132 Manual Y
Bus (2 Nos.) trouble prone.
33 KV Isolators (Main,
Age old and
15 33 kV Joyashree Line & Transfer) Alliance 33 Manual Y
trouble prone.
(3 Nos.)
Page ‐ 25/33
Name of Substation : Midnapore 220 KV Sub‐Station
Year of Type of No. of Cores Tagged for
Sl. Name of Date of Reason for
Equipment Name Manufacturin Make Voltage insulation/ available Replacement
No. Feeder Commission Replacement
g Operation for CT & PT (Y/N)
33 KV Isolators (Main,
33 kV Age old and
16 Line & Transfer) Alliance 33 Manual Y
Rangamati trouble prone.
(3 Nos.)
33 KV Isolators (Main,
33 kV Keshpur Age old and
17 Line & Transfer) G. Nandy 33 Manual Y
Ckt.2 trouble prone.
(3 Nos.)
33 KV Isolators (Main,
Age old and
18 33 kV NNP Line & Transfer) G. Nandy 33 Manual Y
trouble prone.
(3 Nos.)
33 kV Keshpur
19 33 KV CT (Y‐Ph.) TARIT 33 Y Low IR Value
Ckt. 2

20 33 kV Nimpura 33 KV CT (Y‐Ph.) TARIT 33 Y Low IR Value


Augmentation of
33 kV Side to be
21 Midnapur SS existing Fire Fighting Y
included
System
Battery & Battery
22 Midnapur SS Charger, 220 V, 300 AH 2001 EXIDE Y Age Old
(1 set)
Battery & Battery
23 Midnapur SS Charger, 48 V, 200 AH 2001 EXIDE Y Age Old
(1Set)
Power & Control Cables
Damagaed and
(4 Core, 8 Core, 12
24 Midnapur SS needs to be
Core, 16 Core, 25 Sq.
replaced.
mm.)

Page ‐ 26/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Dalkhola 220 KV
No. of Cores Type of Tagged for
Sl. Year of Date of Reason for
Name of Feeder Equipment Name Make Voltage available insulation/ Replacement
No. Manufacturing Commission Replacement
for CT & PT Operation (Y/N)
1 TCF III Ckt. # 2 132 KV Circuit NF BHEL 16.02.1990 132 NF Y Age old trouble prone.
2 Purnea 132 KV Circuit 1982 BHEL 1985 132 NF Y Age old trouble prone.
3 Raiganj Ckt. # 1 132 KV CT R‐Ph. NF BHEL 132 2 core Y* Defective
4 20 MVA 132/33 kv Tr#1 132 KV CT R‐Ph. 1983 ASEA 1985 132 3 core Y* Age old defective.
132 KV CT
5 20 MVA 132/33 kv Tr#1 NF ASEA 1985 132 3 core Y Age old & low IR.
(3 Nos.)
132 KV CT
6 20 MVA 132/33 kv Tr#2 NF ASEA 1985 132 3 core Y Age old & low IR.
(3 Nos.)
132 KV CT
7 Bus transfer bay NF BHEL 1985 132 2 core Y Age old & low IR.
(2 Nos.)
120 KV Surge Arrestor
8 TCF‐III fdr#1 1983 NF 1985 132 Y* Age old & low IR.
R Ph
120 KV Surge Arrestor
9 20 MVA 132/33 KV Tr‐I NF NF 1985 132 Y Age old Low insulation
(3 Nos.)
20 MVA 132/33 KV Tr‐II 120 KV Surge Arrestor
10 NF NF 1985 132 Y Age old Low insulation
HV side (3 Nos.)
120 KV Surge Arrestor
11 Raiganj fdr#1 NF BHEL 1985 132 Y Age old Low insulation
(3 Nos.)
120 KV Surge Arrestor
12 Raiganj fdr#2 NF BHEL 1985 132 Y Age old Low insulation
(3 Nos.)
120 KV Surge Arrestor
13 Purnea NF BHEL 1985 132 Y Age old Low insulation
(3 Nos.)
132 kV Isolators
14 Raiganj fdr#1 (Main, Transfer, Line) NF NF 1985 132 Y Age old trouble prone.
3 Nos.
132 kV Isolators
15 Raiganj fdr#2 (Main, Transfer, Line) NF NF 1985 132 Y Age old trouble prone.
3 Nos.
132 kV Isolators
16 Bus transfer (Main, Transfer) NF NF 1985 132 Y Age old trouble prone.
2 Nos.
S G
17 20 MVA 132/33 kv Tr#2 33 KV CT B Ph. 2004 2004 33 2 core Y* Defective
Electrials
33 kV CT R phase
18 33 kV Kahata 1992 Rainsmake 1994 33 2 core Age old & oil leakage

Page ‐ 27/33
Name of Substation : Dalkhola 220 KV
No. of Cores Type of Tagged for
Sl. Year of Date of Reason for
Name of Feeder Equipment Name Make Voltage available insulation/ Replacement
No. Manufacturing Commission Replacement
for CT & PT Operation (Y/N)
33 kV CT Y phase
19 33 kV Kahata 1992 Rainsmake 1994 33 2 core Age old & oil leakage
33 kV CT B phase
20 33 kV Kahata NF Chowdhury 1994 33 2 core Age old & oil leakage
33 KV CT R Y B Ph.
21 20 MVA 132/33 kv Tr#1 1982 NF 1985 33 3 core Y Age old & low IR.
(3 Nos.)
33 KV CT R Y B Ph.
22 20 MVA 132/33 kv Tr#2 1982 NF 1985 33 3 core Y Age old & low IR.
(3 Nos.)
33 KV CT R Y B Ph.
23 6.3 MVA 33/11 kv Tr‐II NF NF 1988 33 3 core Y Age old & low IR.
(3 Nos.)
33 KV Surge Arrestor
24 20 MVA 132/33 KV Tr‐I NF NF 1985 33 NA Y Age old & low IR.
(3 Nos.)
33 KV Surge Arrestor
25 20 MVA 132/33 KV Tr‐II NF NF 1985 33 NA Y Age old & low IR.
(3 Nos.)
132 KV Post Insulator
26 Dalkhola SS 132 NA Y Old and partially broken
(4 Nos.)
Power & Control Cables
27 Dalkhola SS NA Y Damaged to be replaced.
33 KV Earthing Improving reliability of
28 Dalkhola SS Fresh Requirement 33 Y
Transformer (1 No.) protection system.

* Already replaced due to exigency

Page ‐ 28/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : NEW BISHNUPUR 220 KV
Date of No. of Cores Type of Tagged for
Sl. Year of Reason for
Name of Feeder Equipment Name Make Commissio Voltage available for insulation/ Replacement
No. Manufacturing Replacement
n CT & PT Operation (Y/N)
220 KV Bus 220 KV Current
1 2007 ABB 2008 220 3 Y* Oil leakage
Coupler Transformer B Ph.
120 KV Surge
2 Bankura Ckt‐1   2011 CGL 2012 132 NA Y* Low IR value.
Arrestor Y Ph
Laxmi 
3 Rohit Bulk 33 KV CT Y Phase 2007 2011 33 2 Y* Oil leakage.
Engg
Laxmi 
4 50 MVA Tr‐I 33 KV CT Y Phase 2007 2008 33 3 Y* Oil leakage.
engg
Improving
33 KV Earthing
5 New Bishnupur SS Fresh Requirement 33 Y reliability of
Transformer (1 No.)
protection system.
* Already replaced due to exigency

Page ‐ 29/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Krishnagar 220 kV Substation
No. of Cores Type of Tagged for
Year of Date of Reason for
Sl. No. Name of Feeder Equipment Name Make Voltage availablefor insulation/ Replacement
Manufacturing Commission CT & PT Replacement
Operation (Y/N)
Improving
33 KV Earthing
1 Krishnagar SS Fresh Requirement 33 NA Y reliability of
Transformer (1 No.)
protection system.

Page ‐ 30/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : RISHRA 220 KV
Date of No. of Cores Type of Tagged for
Sl. Year of Reason for
Name of Feeder Equipment Name Make Commissio Voltage available for insulation/ Replacement
No. Manufacturing Replacement
n CT & PT Operation (Y/N)

132 KV Bus‐ 132 KV CT Y & B Ph. High TAN‐Delta


1 2004 Marson NA 132 3 Y
Coupler (2 Nos.) Value.

Main Bus Section Age old trouble


2 132 KV Isolators NA Bharat NA 132 NA Y
Isolator prone.

Battery and Battery Age old trouble


3 Rishra SS 2001 Exide NA NA Y
charger,300AH,220V prone.

Improving
33 KV Earthing
4 Rishra SS Fresh Requirement 33 Y reliability of
Transformer (1 No.)
protection system.

Page ‐ 31/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : New Town AA III 220 KV
No. of Cores Type of Tagged for
Sl. Year of Date of Reason for
Name of Feeder Equipment Name Make Voltage available for insulation/ Replacement
No. Manufacturing Commission Replacement
CT & PT Operation (Y/N)
Improving
New Town AA III 33 KV Earthing
1 Fresh Requirement 33 Y reliability of
SS Transformer (1 No.)
protection system.

Page ‐ 32/33
Details of Existing Equipment Proposed to be Replaced
Name of Substation : Subhasgram 220 KV
Date of No. of Cores Type of Tagged for
Sl. Year of Reason for
Name of Feeder Equipment Name Make Commissio Voltage available for insulation/ Replacement
No. Manufacturing Replacement
n CT & PT Operation (Y/N)
Improving
33 KV Earthing
1 Subhasgram SS Fresh Requirement 33 Y reliability of
Transformer (1 No.)
protection system.

Page ‐ 33/33
ANNEXURE.‐ 1.3.0.1
ABSTRUCT QUANTITY OF SUB STATION ‐EQUIPMENT
PROJECT:UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION SUMMARY
Ara KLC Laxmi New Kris Kha
Durga Kas How Dom Gokar Sat ga N.Hal Dal Mid Rish Asan Subhas NT
SL. No. Description Unit Jee rat m Ban kanta NJP Bishnu na rag Total
pur ba rah jur na chia dia khola napur ra sole gram AA‐III
bag tala pur pur nagar pur
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
1.1 420 KV Equipment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
1.1.1 420 KV Circuit Breaker 3Ph with PIR Nos 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
1.1.2 420 KV Circuit Breaker 3Ph without PIR Nos. 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
1.1.3 420 KV Isolator 3‐ph Nos 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1.1.4 420 KV Current Transformer 1Ph(SF6) Nos. 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9
1.1.5 420 KV CVT 1Ph Nos 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
1.1.6 390 KV Surge Arrestor 1Ph(Polymer) Nos. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
Sub Total 1.1 16 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20
1.2 220KV Equipment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
1.2.1 220 KV Circuit Breaker 3Ph Nos. 5 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
1.2.2 220KV Isolator 3‐ph Nos. 14 24 28 0 19 18 0 0 0 0 0 10 0 3 0 0 0 0 0 0 0 116
1.2.3 220KV Current Transformer 1PH(SF6) Nos. 1 0 1 0 6 13 0 3 0 0 0 0 0 0 1 0 0 0 0 0 0 25
1.2.4 220KV CVT 1Ph Nos. 4 4 4 0 0 0 0 4 4 0 0 0 0 0 0 0 0 0 0 0 0 20
1.2.5 216 KV Surge Arrestor 1Ph(polymer) Nos. 1 0 8 0 0 12 0 0 2 3 0 0 0 0 0 0 0 0 0 0 0 26
1.2.6 220KV PT Nos. 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
1.2.7 220 KV Post Insulator Nos. 0 0 0 0 42 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75
Sub ‐ Total 1.2 25 28 41 0 68 83 0 7 6 3 0 10 0 3 1 0 0 0 0 0 0 275
1.3 132 KV Equipment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
1.3.1 Circuit Breakers Nos. 0 1 1 0 0 1 5 3 6 6 12 1 2 4 0 0 0 0 0 0 0 42
1.3.2 CT Nos. 5 0 0 0 9 40 0 4 0 5 0 0 10 5 0 2 0 0 0 0 0 80
1.3.3 PT Nos. 0 0 0 0 0 6 0 3 0 0 0 0 0 3 0 0 0 0 0 0 0 12
1.3.4 120KV Surge Arrestor 1Ph (Polymer) Nos. 0 0 0 0 0 12 0 1 0 8 0 0 16 2 1 0 0 0 0 0 0 40
1.3.5 Isolators Nos. 0 0 0 0 28 7 0 8 0 0 0 0 8 2 0 1 0 0 0 0 0 54
1.3.6 CVT Nos. 2 2 2 0 2 2 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 14
1.3.7 132 KV Post Insulator Nos. 0 0 0 0 121 55 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 180
Sub ‐ Total 1.3 7 3 3 0 160 123 5 21 8 19 12 1 40 16 1 3 0 0 0 0 0 422
1.4 33 KV Equipment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
1.4.1 Circuit Breakers Nos. 0 1 0 0 0 1 4 1 6 4 0 0 0 0 0 0 0 1 0 0 0 18
1.4.2 CT Nos. 0 0 0 16 0 3 2 0 8 6 0 0 13 2 2 0 0 0 0 0 0 52
1.4.3 PT Nos. 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
1.4.4 Surge Capacitor Nos. 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1.4.5 Surge arrestor Nos. 2 0 0 0 0 3 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 11
1.4.6 33 KV Post Insulator Nos. 0 0 0 9 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 13
1.4.7 Isolators Nos. 0 0 0 0 0 3 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 15
Sub ‐ Total 1.4 3 1 0 25 0 13 6 1 14 14 0 0 19 14 2 0 0 1 0 0 0 113

Sub ‐ Total 1 51 35 45 25 228 219 11 29 28 36 12 11 59 33 4 3 0 1 0 0 0 830

ABSTRUCT QUANTITY: Page 1 of 4
ANNEXURE.‐ 1.3.0.1
ABSTRUCT QUANTITY OF SUB STATION ‐EQUIPMENT
PROJECT:UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION SUMMARY
Ara KLC Laxmi New Kris Kha
Durga Kas How Dom Gokar Sat ga N.Hal Dal Mid Rish Asan Subhas NT
SL. No. Description Unit Jee rat m Ban kanta NJP Bishnu na rag Total
pur ba rah jur na chia dia khola napur ra sole gram AA‐III
bag tala pur pur nagar pur
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.0 Control & Relay Panels 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1 Control & Relay Panels (400 KV) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1.1 CB Relay panel without A/R Nos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1.2 CB Relay panel with A/R Nos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1.3 Line protection panel Nos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1.4 Transformer protection panel (HV & MV sid Nos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1.5 Reactor protection panel Nos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1.6 Bus bar protection panel (duplicate) Nos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.1.7 Bus bar protection panel (Augmentation ) Nos 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2.1.8 Time synchronisation equipment(GPS) Nos 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22
Sub ‐ Total 2.1 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 23
2.2 Control & Relay Panels (220 KV) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.2.1 CB Relay panel without A/R Nos 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
2.2.2 CB Relay panel with A/R Nos 0 0 8 0 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
2.2.3 Transformer protection panel (HV & MV sid Nos 0 0 2 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
2.2.4 Line protection panel Nos 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.2.5 Bus bar protection panel Nos 1 1 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 5
Sub ‐ Total 2.2 1 12 1 8 8 1 31
2.3 Control & Relay Panels (132 KV) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.3.1 Bus coupler panel Nos 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2.3.2 Transformer protection panel (HV & MV sid Nos 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 2
2.3.3 Line protection panel Nos 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
2.3.4 Bus bar protection panel Nos 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 20
Sub ‐ Total 2.3 1 1 1 1 1 1 1 1 5 1 1 1 1 1 1 1 1 1 1 1 24
2.4 Other protection & control system 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.4.1 Numerical Distance protection ,
Transformer differential protection relays
with IRGB port for Refurbishment & Nos 18 13 3 6 6 4 8 13 10 7 4 6 4 15 4 4 6 2 4 2 6 145
augmentation of protection system .
2.4.2 Bus Bar High‐impedance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
2.4.3 Synchronising Trolley Nos 0 0 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 17
2.4.4 LBB nos 28 13 14 8 0 0 13 14 15 14 13 9 10 16 11 17 11 9 14 9 0 238
Sub ‐ Total 2.4 46 26 18 15 7 5 22 28 26 22 17 16 15 32 16 22 18 12 18 12 7 400
2.5 SUBSTATION AUTOMATION SYSTEM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
Sub ‐ Total 2.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sub ‐ Total 2 50 28 33 18 16 15 24 30 28 29 19 18 17 34 18 24 20 14 20 14 9 478

ABSTRUCT QUANTITY: Page 2 of 4
ANNEXURE.‐ 1.3.0.1
ABSTRUCT QUANTITY OF SUB STATION ‐EQUIPMENT
PROJECT:UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION SUMMARY
Ara KLC Laxmi New Kris Kha
Durga Kas How Dom Gokar Sat ga N.Hal Dal Mid Rish Asan Subhas NT
SL. No. Description Unit Jee rat m Ban kanta NJP Bishnu na rag Total
pur ba rah jur na chia dia khola napur ra sole gram AA‐III
bag tala pur pur nagar pur
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
3.0 Communication Equipment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
3.1 PLCC Equipment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
3.1.1 Line Traps Nos 10 10 8 0 2 10 0 8 8 8 0 0 0 0 0 0 0 0 0 0 0 64
3.1.2 Ph. To Ph. Coupling Device Nos 5 6 1 0 4 8 0 5 5 4 0 0 0 0 0 0 0 0 0 0 0 38
3.1.3 H.F. Cable KM 0 1 1 0 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 5
3.1.4 Carrier Equipment Nos 8 10 6 0 2 4 0 4 4 4 0 0 0 0 0 0 0 0 0 0 0 42
3.1.5 Protn. Coupler Nos 12 12 14 4 6 4 2 6 6 4 2 2 2 2 8 0 0 2 0 0 0 88
Sub ‐ Total 3 35 39 30 4 14 27 2 24 23 21 2 2 2 2 8 0 0 2 0 0 0 237
SWITCHYARD ERECTION 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
4.0 Equipment Structure 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
5.0 Other Equipment (Bus Bar materials) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
6.0 Equipment Civil works 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
7.0 Erection 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
8.0 Any other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
Sub ‐ Total 4 to 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SUBSTATION AUXILIARIES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
9.0 Fire Fighting System for augmentation of
LS 0 0 0 0 0 0 1 1 0 0 1 1 0 1 0 0 0 0 0 0 0 5
existing system.
10.0 Air Conditioning System 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
11.0 Lighting system 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
12.0 D.G. Set (250 KVA) Nos 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
13.1 Battery and Battery charger,300AH,220V Set 1 1 1 1 1 1 1 2 2 1 2 1 1 2 1 2 1 1 1 1 1 26
13.2 Battery and Battery charger,200AH,48V Set 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 2
14.0 Power & Control Cables KM 0 0 12 0 0 0 0 5 0 0 0 0 5 6 0 0 0 0 0 0 0 28
Sub ‐ Total 9 to 14 2 2 14 2 2 2 3 10 3 2 4 3 7 11 2 3 2 2 2 2 2 82
15.0 Misc. Testing and maintenance Equipment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
15.1 DCRM for Circuit Breaker Nos 0 1 0 1 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 5
15.2 DC e/f locator Nos 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
15.3 Oil filter machine Nos 0 1 0 1 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 5
15.4 SF6 gas handling plant Nos 0 1 0 1 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 5
15.5 SF6 gas monitoring device Nos 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
15.6 SF6 gas leakage detecter Nos 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
15.7 Digital insilation tester(5‐10KV) Nos 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
15.8 Thermovision camera Nos 0 1 1 1 0 0 1 1 1 0 1 1 0 0 1 0 0 0 0 0 1 10
15.9 TAN‐DELTA TEST SET Nos 0 1 0 1 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 5
0 0 0 0

ABSTRUCT QUANTITY: Page 3 of 4
ANNEXURE.‐ 1.3.0.1
ABSTRUCT QUANTITY OF SUB STATION ‐EQUIPMENT
PROJECT:UPGRADATION OF CONTROL & PROTECTION SYSTEM AND REPLACEMENT OF DIFFERENT SUBSTATION EQUIPMENT
SUBSTATION SUMMARY
Ara KLC Laxmi New Kris Kha
Durga Kas How Dom Gokar Sat ga N.Hal Dal Mid Rish Asan Subhas NT
SL. No. Description Unit Jee rat m Ban kanta NJP Bishnu na rag Total
pur ba rah jur na chia dia khola napur ra sole gram AA‐III
bag tala pur pur nagar pur
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
16.0 Transformers 0 0 0  
16.1 33kV Earthing Transformer, 550A, 30s Nos 0 1 0 1 0 0 1 1 1 1 0 0 1 0 1 1 1 1 1 1 0 13
16.2 LT Transformer 33KV/0.433KV, 315 KVA Nos 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
16.3 LT Transformer 33KV/0.433KV, 630 KVA Nos 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
17.0 LT Switch gear 0 0 0  
17.1 11KV Sw gear (VCB) Panel Nos 0 0 0 0 2 0 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 9
17.2 ACDB Set 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
17.3 DCDB Set 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22
18.0 Other works 0 0 0  
18.1 Dismantling,shifting,of old equipments 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
18.2 Any other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0  
18.3 Event Logger Nos 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22
Grand Total 144 116 130 63 268 273 52 105 90 95 55 41 92 86 40 37 29 26 29 23 18 1812

ABSTRUCT QUANTITY: Page 4 of 4
Implementation Schedule / Milestones
Target for Physical Milestones
Quarter‐4 Quarter‐1 Quarter‐2 Quarter‐3
Particular Total
of 14‐15 of 15‐16 of 15‐16 of 15‐16
420 KV Equipment
420 KV Circuit Breaker 3Ph with PIR 2 2
420 KV Circuit Breaker 3Ph without PIR 3 2 1
420 KV Isolator 3‐ph 1 1
420 KV Current Transformer 1Ph(SF6) 9 9
420 KV CVT 1Ph 5 1 2 2
220KV Equipment
220 KV Circuit Breaker 3Ph 7 5 2
220KV Isolator 3‐ph 116 24 20 36 36
220KV Current Transformer 1Ph(SF6) 25 6 9 5 5
220KV CVT 1Ph 20 10 10
216 KV Surge Arrestor 1Ph(polymer) 26 14 12
220KV PT 6 6
220 KV Post Insulator 75 25 25 25
132 KV Equipment
Circuit Breakers 42 30 12
CT 80 45 35
PT 12 6 6
120KV Surge Arrestor 1Ph (Polymer) 40 20 20
Isolators 54 15 25 14
CVT 14 14
132 KV Post Insulator 180 50 50 80
33 KV Equipment
Circuit Breakers 18 6 12
CT 52 40 12
PT 3 3
Surge Capacitor 1 1
Surge Arrestor 11 11
33 KV Post Insulator 13 13
Isolators 15 5 10
Control & Relay Panels (400 KV)
Bus bar protection panel (Augmentation ) 1 1
Time synchronisation equipment(GPS) 22 22
Control & Relay Panels (220 KV)
CB Relay panel without A/R 3 1 2
CB Relay panel with A/R 16 6 10
Transformer protection panel (HV & MV sides) 7 2 5
Bus bar protection panel 5 5
Control & Relay Panels (132 KV)
Bus coupler panel 1 1
Transformer protection panel (HV & MV sides) 2 2
Line protection panel 1 1
Bus bar protection panel 20 1 6 8 5
Other protection & control system

Page 1 of 2
Implementation Schedule / Milestones
Target for Physical Milestones
Quarter‐4 Quarter‐1 Quarter‐2 Quarter‐3
Particular Total
of 14‐15 of 15‐16 of 15‐16 of 15‐16
Numerical Distance protection , Transformer
differential protection relays with IRGB port for
145 50 50 45
Refurbishment & augmentation of protection
system .
Synchronising Trolley 17 17
LBB 238 60 100 78
SUBSTATION AUTOMATION SYSTEM
Communication Equipment
PLCC Equipment
Line Traps 64 64
Ph. To Ph. Coupling Device 38 38
H.F. Cable 5 5
Carrier Equipment 42 42
Protn. Coupler 88 88
SUBSTATION AUXILIARIES
Fire Fighting System for augmentation of existing
5 2
system. 3
D.G. Set (250 KVA) 21 15 6
Battery and Battery charger, 300AH, 220V 26 3 6 17
Battery and Battery charger, 200AH, 48V 2 2
Power & Control Cables 28 28
Misc. Testing and maintenance Equipment
DCRM for Circuit Breaker 5 5
DC e/f locator 21 21
Oil filter machine 5 5
SF6 gas handling plant 5 5
SF6 gas monitoring device 21 21
SF6 gas leakage detecter 21 21
Digital insilation tester(5‐10KV) 21 21
Thermovision camera 10 10
TAN‐DELTA TEST SET 5 5
Transformers
33kV Earthing Transformer, 550A, 30s 13 13
LT Transformer 33KV/0.433KV, 315 KVA 2 2
LT Transformer 33KV/0.433KV, 630 KVA 2 2
LT Switch gear
11KV Sw gear (VCB) Panel 9 9
ACDB 1 1
DCDB 22 6 10 6
Other works
Event Logger 22   22
Grand Total 1812 333 421 837 221

Page 2 of 2
Target for Financial Milestones
(Rs.in Lakh)

Quarter 4 Quarter 1 Quarter 2 Quarter 3


Descritption Total Amount
of 2014‐15 of 2015‐16 of 2015‐16 of 2015‐16

PSDF Grant 12281 2457 3684 4912 1228

Internal Resource 1364 273 409 546 136

Total 13645 2730 4093 5458 1364


Format A4
Page 1 of 1

Financial Implication of the Scheme



1. Summary

Sl.
Item Amount in Rs.
No.
1. Total Cost Estimate 136,45,00,000.00
2. Funding Proposed from PSDF 122,81,00,000.00
3. Contribution from Internal Sources 13,64,00,000.00
4. External Borrowings NIL

2. Details

2.1 Cost Estimate

The unit rates for all equipment for sub‐stations at have been obtained from latest LOAs placed by
WBSETCL on February, 2014 and budgetary offer obtained from reputed vendor verbally. Copy of
relevant portion of LOA is furnished.

The detailed cost estimate for implementing the project/ scheme/ activity has been approval by the
Managing Director, WBSETCL. Copy enclosed.

3. Funding

3.1 Funding Proposed from PSDF

90% of the estimated cost is proposed to be funded from PSDF.


3.2 Contribution from Internal Sources

Balance amount will be contributed from internal resources.


3.3 External Borrowings

No external borrowings will be necessary.