STANDARD OPERATING PROCEDURE

Form No.: EHSMSM/446/4013 Form Rev. No.:00 Effective date: 01-04-2009


SOP No. KPO/OP/UTL-CETP/SOP-E/0024.R00 Effective:Date:16/05/2017 RevisionNo.-R00
SOPDESC: Operation of SS RO Section: CETP
Department Utility Page | 1
Step Activity Associated Requirements/ Responsibility Process/ Tools/ PPE’s Remarks/
No. (WHAT) Hazards (WHO) (HOW) Reference

Use hand gloves, safety goggle and safety shoes


SAFETY:- Slip,trip & fall.
throughout the process.
See the level of SS RO Feed tank(T-113) in local level
gauge LG-1903 and LIT-1902 at HMI
SS RO reject tank( T-106) in local level gauge LG- 1520
Checking the level ENVIRONMENT: - N/A
1 Operator & LIT-1519 at HMI
of RO Feed tank And RO Permeat tank(T-105) in local gause LG-1501 &
LIT-1502 at HMI
Level in RO Feed tank(T-113) should not be less than 0.3
meter RO Permeate tank(T-105) level should not be above
QUALITY: -N/A
4.9 meter

Chemical (CIP) inlet valve of 12 arreys RO should be


SAFETY:- Slip,trip & fall.
closed for ROM-102A/B.
Chemical (CIP) outlet valve from permeate side & reject
ENVIRONMENT: - N/A
Opening & closing side of 12 arreys RO should be closed for ROM-102A/B.
of the SS RO
2 Operator Chemical (CIP) inlet valve of 6 arreys RO should be
valves before
starting the pumps closed for ROM-102A/B.
QUALITY: -N/A
Chemical (CIP) outlet valve from permeate side & reject
side of 6 arreys RO should be closed for ROM-102A/B.

Prepared by Approved by
Name and Designation Priya Ranjana Nayak (Sr. Manager) Name and Designation Debabrata Nayak (Head water &Power)
Signature with date Signature with date
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.:00 Effective date: 01-04-2009
SOP No. KPO/OP/UTL-CETP/SOP-E/0024.R00 Effective:Date:16/05/2017 RevisionNo.-R00
SOPDESC: Operation of SS RO Section: CETP
Department Utility Page | 2
Step Activity Associated Requirements/ Responsibility Process/ Tools/ PPE’s Remarks/
No. (WHAT) Hazards (WHO) (HOW) Reference

RO Turbo Charger by pass (V-2036) should be open.

MCF Feed pumps(P-109A/B) should be started as per


SOP No.- KPO/OP/UTL-CETP/SOP-E/0023.R00
SAFETY:- Slip, trip & fall. RO Trains ROM- 102A/B should be in service mode. The
operator should control Turbocharger when required to
increase the pressure of reject inlet to secondary zone (6
Array side).
Starting of the SS Suction valve (V-1914/115) should be open & Discharge
3 ENVIRONMENT: - N/A Operator
RO Feed pumps valve (V-1916/1917) should be closed.
Motor should be ready & not tripped due to any fault.
Emergency push button should not be pressed. Now start
the pumps manually from either LBPS or HMI. The
QUALITY: -N/A
discharge valve open slowly after starting of pumps.
Maintain discharge pressure in up to 30kg/cm2

At high ORP, RO feed pump will trip & dump valve will
SAFETY:- Slip, trip & fall. open automatically. Under certain condition when ORP
Interlock in RO
4 Operator will <300 mv then field operator will communicate to start
feed pump ENVIRONMENT: - N/A the pump from HMI in auto mode. Then pump will start
QUALITY: -N/A as well as dump valve will closed automatically.