Vous êtes sur la page 1sur 4

GENCON(R)II PRO

Automatic sequencing of multiple generator-sets


Wexler
c CSD Ltd.
Email: info@wexler.co.il
May 15, 2003

1 General The sequencing logic skips calling up generator-sets


with pending shutdown faults and generator-sets that
GENCON(R) controllers, in a multiple generator-set plant are not in auto mode – those with active In#3 SLEEP
with equal size engines, can automatically start and stop and In#16 AUTOSTART DISABLE 1 commands. Note
their generator-sets according to the plant active (kW) that having an active In#16 command does not prevent
load. The sequence in which the generator-sets start and the generator-set from being started through In#1 RUN
stop can be changed by the operator from any controller WITH LOAD and In#2 TEST W/O LOAD. Figure 1
panel. shows a typical mode switch wiring.
The sequencing logic is designed for plants with a
slowly varying load level. Hotels, hospitals and large res-
idential and office blocks fall into this category. The ob- 2.2 Definitions
jective of the sequencing logic is to keep the number of
N : Denotes the number of generator-sets that currently
parallel running generator-sets to the minimum.
run in parallel.
In this application all the controllers are in configura-
tion #3 and the {System Auto Start} option is 1. U nity : The engine {Xre: Rated kW} parameter in BA-
Note: Sequencing service for gen-sets of arbi- SICS is defined as “one unit of power”. The follow-
trary size and automatic run-time count balancing for ing α, β and λ variables use this unit. For example, if
equal size engines is provided through the manage- Xre is 800kW then a 50% λ level represents a 400kW
ment subsystem of COMM2(phone). Contact Wexler load.
for more details.
λ : Denotes the generator-set load. Note that (1 − λ) is
the spare generator-set power and N ∗ (1 − λ) is the
2 Starting and stopping rules total spare power in the parallel running generator-
sets, i.e., how much extra load the running generator-
2.1 General sets can safely take.
The order in which generator-sets start when the load in- α : Denotes the set-point {+%kW/Xre→ Start}. α is the
creases and the order in which they stop when the load total spare power threshold that requires an increase
decreases is determined by the plant operator through in the number of parallel running generator-sets. α
the SEQUENCE command. With a “→ 2 → 3 → 1” se- can be larger than 100% and its value must be the
quence the generator-set with controller ID no. 2 has the same in all the controllers.
highest running priority. If one generator-set cannot start,
the next one from the sequence automatically starts. 1 In#16 AUTOSTART DISABLE is available from V2.5n

1
β : Denotes the set-point {+%kW/Xre→ Stop}. 1 + β is Before software version 2.5n When the generator-
the total spare power threshold that requires a de- set controllers mode changes from Sleep to
crease in the number of parallel running generator- Auto by simultaneously deactivating their In#3
sets. β can be larger than 100% and its value must command lines, all the generator-sets start and
be the same in all the controllers. Make sure that connect to the bus. The generator-sets run in
α < β or otherwise one generator-set will start and parallel for T0 time and then, according to the
stop incessantly. bus load level (rule 3), some of the generator-
sets stop.
T1 : Denotes the {Parll Start} time delay for the α
threshold. Its value must be the same in all the con- From software version 2.5n When the In#16 com-
trollers. mand lines are simultaneously deactivated all
the generator-sets start and connect to the
T0 : Denotes the {Parll Stop} time delay for the β thresh- bus. The generator-sets run in parallel for T0
old. Its value must be the same in all the controllers. time and then, according to the bus load level
(rule 3), some of the generator-sets stop.

2.3 The rules 6. When the generator set controllers mode changes
1. One generator-set should start and take the load im- from Auto to Manual by simultaneous activation of
mediately when the condition N ∗ (1 − λ) ≤ 0 is their In#1 terminals, all the generator-sets connect to
true. This condition is true when: the bus. When the controllers mode changes back to
Auto by simultaneous deactivation of their In#1 ter-
• N = 0, i.e., the plant must have at least one minals, according to the bus load level (rule 3) some
generator-set powering the load. of the generator-sets stop without delay.

• λ ≥ 1, i.e., the load on the current number of


parallel running generator-sets is too high. 3 Start/stop rules example
2. A generator-set should start and join the parallel A power plant has five generator-sets, each has the fol-
running generator-sets T1 time after the condition lowing set-points: {Xre: Rated kW}=400, α = 25% and
N ∗ (1 − λ) ≤ α becomes true. I.e., when the to- β = 30%. Assume that N generator-sets currently run in
tal spare power in the parallel running generator-sets parallel. As the load increases the following table shows
is α or lower. the load levels when the (N + 1)-th generator-set starts:
N Total bus load Generator-set load
3. A generator-set should stop T0 time after the con-
1 300 300
dition N ∗ (1 − λ) ≥ 1 + β becomes true. I.e., even
2 700 350
after stopping one generator-set the total spare power
3 1100 367
in the remaining generator-sets, N ∗ (1 − λ) − 1, is
4 1500 375
β or higher.
As the load decreases the following table shows the
4. When a generator-set connects to the bus or when a load levels when the N -th generator-set stops:
generator-set disconnects from the bus, rules 1-3 are N Total bus load Genset load
suspended for {LS Settling} seconds. These rules are 2 280 140
suspended to avoid false decisions while the load is 3 680 227
re-distributed among the new number of generator- 4 1080 270
sets. 5 1480 296
This and other examples can be computed by the as-
5. “Black start”: tart.exe program.

2
4 A real application
A, B and C denote the controllers of three equal size
generator-sets that serve for mains failure standby; The
sequence is “→ 1 → 2 → 3”; The Automatic Transfer
Switch (ATS) logic is external.

• Let the signal x = A.In#16 = B.In#16 = C.In#16 (ver-


sion 2.5n onward).
• When the mains is healthy the ATS should hold “x”
active.
• Upon mains failure the ATS releases the signal “x”
2
. All the generator-sets start together according to
rule 5; the generator-set that has stabilized first con-
nects to the (dead) bus without delay and becomes
the “bus master” 3 . The other “slave generator-
sets” connect to the bus after synchronization4 . The
generator-sets run in parallel for T0 ={Parll Stop}
time and then, if the load is low enough, generator-
sets 3 and 2 stop (no. 2 stops {LS Settling} time after
no. 3)

2 The expected plant load is unknown. Probably it will be at its peak

because of the need to recharge the UPS.


3 The generator-set whose governor and AVR determine the bus fre-

quency and voltage.


4 If the master stops, the remaining set with the lowest ID number

becomes the new bus master.

3
G1 G2 G8
OFF OFF OFF
In#3 In#3 In#3
AUTO AUTO AUTO
TEST TEST TEST
In#2 In#2 In#2
MAN MAN MAN
In#1 In#1 In#1

Closed contact inhibits In#16 In#16 In#16

automatic sequencing

Figure 1: Typical mode switch wiring

Vous aimerez peut-être aussi