DAILY ACCOMPLISHMENT REPORT

Project Title: Proposed Pipe Crossing System Date: 4-Apr-19


Client: Metropolitan Waterwork and Sewerage System Location: Meycauyan Bridge
Owner: Luzon Clean Water Development Corporation

A. WEATHER MONITORING
F Fair C Cloudy S Shower R Heavy Rain T Thyphoon
0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400

F F F F F F F F F F F F F F F F
B. MANPOWER
No. DESIGNATION QTY No. DESIGNATION QTY
1 Project Incharge 1 7
2 Driller 1 8
3 Helper 4 9
4 Guard 1 10
5 11
6 12
TOTAL TOTAL
C. EQUIPMENT / TOOLS
No. DESCRIPTION QTY Remarks
1 Welding Genset 2
2 Xy Drill Rig #18 1
3
4
5
6

D. ACTIVITIES FOR TODAY


No. Activity Remarks
1 Additional Micropile 12m depth / 3pcs 2m Steel Casing Installed
2 Washing of Borehole
3 preparing for launching for tommorow
4 Adding of 1pcs Steel Casing
5
6

E. ACTIVITIES FOR TOMORROW


No. Activity Remarks
1
2
3
4
5

F. PROBLEMS ENCOUNTERED / ISSUES / INCIDENT


No. Description Remarks
1 Loose Water
2

Prepared by:

ENGR. NERO JAMES SIA