A Preliminaries
A1 Allow lump sum for provide and maintain
performance bond to the value equal to 5%
of contract price from bank acceptable to
the university.
Allow A 7,500.00 7,500.00
A2 Allow lump sum for provide unconditional
on demand Mobilization advance to the
value equal to 20% of contract price from
bank acceptable to the university.
Allow A 10,000.00 10,000.00
Item Description Unit Qty Rate Amount
A3 Provide lump sum for insurance for the
Works (contractor's All risks) for the
duration in accordance with Condition of
Contract.
Allow A 15,000.00 15,000.00
A4
Allow lump sum for removing existing pre-
cast concrete Post and staking them at site.
Allow G 20,000.00 20,000.00
Total Carried to Main Summary 52,500.00
B Site Clearing
B1 Clearing site vegetation, including bushes, Sqr 585.00 600.00 351,000.00
removing shrubs, the width of cleaning
is not exceeding 10 ft
Total Carried to Main Summary 351,000.00
C2 Supply and fixing pre-cast concrete end Nos 60.00 2,565.00 153,900.00
Post of size (5"x5") 5' -9" high for 6 strands
including necessary excavation and
errecting the post and concreting the base
with 1:3:6(1").
F Provisional Sum
F1 Allow for provisional sum of two hundred
Thousand for unforeseen or unexpected
work to be attend for satisfactorily
completion of work.
200,000.00
Total Carried to Main Summary 200,000.00
Improvements of barb wire fence with concertina wire along the boundaries.
Sri Palee Campus, Weawala, Horana.
University Of Colombo.
Summary of Bill of Quantity.
……………………………………… ………………………………………
Prepared By Checked by
L. A. B. Jayathunga P. J. A. Shantha
Works Superintendent Works Engineer(CW)
Sri Palee Campus University of Colombo