Académique Documents
Professionnel Documents
Culture Documents
WBS PROJECT
CUSTOMER STANDARD AUDIT REPORT
LAST U PDATED
DOCUMENT REF
V ERSION 1.0
WBS Project – Customer Standard Audit Report Detail Design - Reports
Table of Contents
Report Overview..............................................................................................3
Purpose......................................................................................................3
Assumptions................................................................................................3
Requirements..............................................................................................3
Follow-up Items...........................................................................................3
Report Availability...........................................................................................4
Frequency /Schedule.....................................................................................4
Access/Distribution Method............................................................................4
Security......................................................................................................4
Report Life.................................................................................................4
Report Definition.............................................................................................5
Report Layout..............................................................................................5
Header/Footer.............................................................................................6
Data Definitions & Mapping.............................................................................6
Joins/Criteria..............................................................................................7
Parameters/Inputs........................................................................................8
Outputs......................................................................................................9
Group By/Sort By..........................................................................................9
Document Management..................................................................................9
Document Approvals......................................................................................9
WBS Project – Customer Standard Audit Report Detail Design - Reports
REPORT OVERVIEW
PURPOSE
I N SUPPORT OF THE SECURITIZATION REQUIREMENTS , AR IS LOOKING FOR A REPORT SIMILAR TO
THE ‘ARG AP A UDIT R EPORT P ROGRAM ’ THAT CAN BE FOUND IN THE WEN AP SUPERVISOR
RESPONSIBILITY TO TRACK AND MONITOR CHANGES TO C USTOMER R ECORDS . T HIS REPORT
SHOULD DISPLAY CHANGES RECORDED IN THE APPROPRIATE AUDIT TABLES COMPARING NEW
VALUE TO OLD VALUE & INCLUDE USER ID OF PERSON MAKING THE CHANGE.
ASSUMPTIONS
REQUIREMENTS
1. CHANGES REPORTED ON SHOULD INCLUDE ALL ELEMENTS OF THE PAYMENT DETAILS TAB
ON B ILL T OS AND DFF V ALUES ON B USINESS P URPOSES .
2. IF HZ_CUST_SITE_USES_ALL.S ITE_USE_CODE = ‘SHIP_TO’,
ONLY NEED TO TRACK CHANGES TO:
GEN_AR_DRAFT_BILL_TO
LOCATION
BILL TO
3. IF HZ_CUST_SITE_USES_ALL.S ITE_USE_CODE = ‘BILL_TO’, CHANGES TO THE
FOLLOWING FIELDS NEED TO BE REPORTED ON :
LOCATION
RECEIPT M ETHOD
RECEIPT M ETHOD START DATE & END DATE
BANK ACCOUNT NUMBER
WBS Project – Customer Standard Audit Report Detail Design - Reports
BANK NAME
BANK START DATE & END DATE
FOLLOW-UP ITEMS
REPORT AVAILABILITY
FREQUENCY /SCHEDULE
On Demand
ACCESS/DISTRIBUTION METHOD
SECURITY
Group Responsibility Access
WBS Project – Customer Standard Audit Report Detail Design - Reports
REPORT DEFINITION
REPORT LAYOUT
Example of AP Audit Report:
HEADER/FOOTER
The following information shall appear on the page(s) and in the location indicated.
Field Title
Field Name Field Value Page Location
(displays on report)
n/a AR Customer Audit <set of books> based 1 Row 1 - Center
Report - <set of on responsibility
books> report is generated
from
Start Date <input parm 1> 1 Row 2 - Center
End Date <input parm 2> 1 Row 3 - Center
Run Date Sysdate 1 Row 4 - Center
WBS Project – Customer Standard Audit Report Detail Design - Reports
QUERY/JOINS/CRITERIA
WBS Project – Customer Standard Audit Report Detail Design - Reports
PARAMETERS/INPUTS
Sequence Field Name Field Title Type Values/Defaults/Constraints
1 Start Date Start Date Date
2 End Date End Date Date
3 Email Recipient 1 Email Recipient 1 Varchar
2
4 Email Recipient 2 Email Recipient 2 Varchar
2
5 Email Recipient 3 Email Recipient 3 Varchar
2
OUTPUTS
Sequence Field Name Field Title Type Values/Defaults/Constraints
1
2
3
4
5
6
7
8
9
GROUP BY/SORT BY
Direction
Sequence Sort By (Field Name) Group (Field Name)
(Asc/Desc)
1 Customer Name Asc
DOCUMENT MANAGEMENT
Date Author Version Change Description
1.0 Origination
WBS Project – Customer Standard Audit Report Detail Design - Reports
SAMPLE
Parameters:
1. Delivery Date
SAMPLE
WBS Project – Customer Standard Audit Report Detail Design - Reports
2. Customer Type
SAMPLE
3. Sales Type
WBS Project – Customer Standard Audit Report Detail Design - Reports
SAMPLE
SAMPLE
SAMPLE
WBS Project – Customer Standard Audit Report Detail Design - Reports
SAMPLE