MONTHLY PROGRESS REPORT (ROAD WISE) Modified form-OM-01

Initial Rectification IR

Date of Reporting ( to be reported by


Name of Division Chapra Contractor within 3rd day of end of
aggrement Month):

Package No- 25B/OPRMC-2/Chapra Date of Start:- 08/03/2019


Road Name-
Chainage:-
Report of Cumulative IR work done after the end of …......01/05/2019.........................months
Standard work items Km Total
Items
SI.No- mentioned in Technical Unit updated
No- 0.48
specification ,part -V,D2 quantity
1 2.1 Repairs to Carriage Way:-
Providing Tack Coat with Bitumin
2 A 80/100 grade /Emulsion as per Sqm
Morth specifcation

SDBC/BC with 60/70 grade


3 B Bitumin to carry pavement Cum
repairs MoRT&H Specifcation.

Bituminous Macadam/DBM wth


60/70 Grade Bitumin to carry
4 C Cum
pavement Repairs as per MoRTH
specifcation

Repairs of Minor Digouts and


5 D Failed Section as per Morth Sqm
specifcation

6 E Edge Repairs as per MoRTH specif RM

Light surface sealing size 7mm


bitumen 80/100 grade seal
7 F applied to surface treatment as Sqm
directed by the Engineer in
charge

Slurry seal/seal coat to seal


cracks, fll voids and minor
8 G Sqm
depression for thickness< 5mm
as per MORTH

9 H Any other items


10 2.2 Repairs to Berms & Shoulders
i) High shoulder(cutting) Sqm 30 30
A
11 ii) Low shoulder(flling) Cum 36 36

Non -bituminous Hard Shoulder


12 B i) Paved shoulder /granular . Ii) Sqm
Footpath
13 C Any other items
14 2.3 Jungle Clearence:-
Prunning of trees to get 5.5m
15 A NO.
height above the pavement.

Mowing -slashing of roadside


areas to maintain site distance,
16 B grass/shurb height maximum Sqm
150mm on earthen shoulder and
400mm in rest part

Plantation -New plantation in


medium and islands not
17 C No-
maintained by any other
deparments

18 D Any other items Hect..

Repairs to Cross Drainage Work


19 2.4 and side Drains:

Bricks Masonary work in Cement


20 A Cum
mortar(1:6)
Providing Random Rubble
Masonry work in cement mortar
21 B Cum
(1:6) as per MORTH specifcations
No. 1400&2200

Plastering in CM (1:4) 20mm


22 C thickness per Morth 1300 and Sqm
1200

Pointing with cement Mortar


23 D (1:4) - Morth specifcation 1300 Cum
and 2200

White washing two coats to cross


24 E drainage /Trees/Walls/Structures, Sqm
etc directed by Engineer

Providing Grouted pitching with


25 F rough stone (HBG) MoRTH cum
specifcattion No.2504

26 G Cement Concrete (1:3:6) Cum


27 H Cement Concrete M15 grade Cum
28 I Painting two coats with synthetic Sqm
29 J Revetment with Rough stone
30 K Any other items
Road Safety and Informatory
31 2.5 Items

Fixing new Kilometer (KM) Stones


32 A No 1 1
as per MoRTH specifcation

Fixing New
33 B guard/Guide/Boundary pillar as No 10 10
per Morth specifcation

Fixing New Cautions boards,


informatory like Junctions boards,
34 C No
village name boards etc as per
MoRTH specifcation.

Fixing new object Hazard Maker


at the opening ends of culverts
and bridges or at the any other
35 D points ,delinators,median makers No
and bollards (springs post) as
required as per MoRTH
specifcation

Providing new Rumble


strips/speed breaker or any traffic
36 E No
calming measures on minor
Roads as per MoRTH specifcation

Providing new Refroelectrorised


strips 15cmx15cm on Alluminium
37 F sheet based as tree guard Sqm
,minium 2nos.for each trees as
per MoRTH specifcation

38 G Any other items


Road Marking with hot applied
39 2.6 Thermoplastic and Fixing of
Studs

Thermoplastic Road Marking as


40 A Sqm
per MoRTH

Fixing of studs for urban Road


41 B No
only
42 C Any other items

Repairs and Painting of Road


side assets including Painting of
43 2.7 Treess & poles on formation
width
Repairs of Divider,Road
44 A kerbs,Islands,Parapets and
RCC/Brick Drains

Painting of Tree upto 1.20mt.


45 Height above the Road Sqm 19.44288
surface/Flank
B
Painting of poles upto 1.20mt.
46 Height above the Road Sqm 18.72
surface/Flank

Painting of Road Dividers,Islands,


47 C Parapets,Kerbs etc

Any other items Metal Beam


48 D m
crash Barriers
Modified form-OM-01

ting ( to be reported by
thin 3rd day of end of
onth):

08/03/2019

.................months
Remarks
PKG NO- 25/B/CHAPRA
Painting of Tree upto 1.2mt
DRM to NH19 (0.48Km)
upto Upto
300mm 600mm Upto 1m Quantity
Sl.No Chainage No L B D/H Dia (sqm)
Dia Dia
1 100 2 1.2 0.942 0.5 1.1304
2 200 2 1.2 3.14 0.1 0.3768
3 300 2 1.2 0.942 0.5 1.1304
4 400 3 1.2 1.884 0.4 2.71296
5 480 2 1.2 0.942 0.5 1.1304
No. of Tree 11 3.3912 2.71296 0.3768 6.48096
Total Quantity in sqm 19.44288
PKG NO- 25/B/CHAPRA
Painting of pole upto 1.2mt
DRM to NH 19 (0.48Km)
Quantity
Sl.No. Chainage No L B D/H (sqm)
1 100 4 1.2 0.65 3.12
2 200 6 1.2 0.65 4.68
3 300 6 1.2 0.65 4.68
4 400 4 1.2 0.65 3.12
5 480 4 1.2 0.65 3.12
Total No.of E.Pole- 24 Total Quantity in sqm= 18.72

Total No.of E.Pole- 0 Total Quantity in sqm 0


PKG NO- 25/B/CHAPRA
SHOULDER DETAIL (2.2,A)
Road Name- DRM to NH19( 0.48Km)

High Low
Shoulder Shoulder
Sl.no Chainage No L B D/H (Cutting) (filling)
(sqm) (sqm)

1 1 4 1.5 6
0
10

2 200 2 10 1.5
3 300 1 20 1.5 30
4 400 2 21 1.5
5 480 2 10 1.5 30
30 36