Initial Rectification IR
Fixing New
33 B guard/Guide/Boundary pillar as No 10 10
per Morth specifcation
ting ( to be reported by
thin 3rd day of end of
onth):
08/03/2019
.................months
Remarks
PKG NO- 25/B/CHAPRA
Painting of Tree upto 1.2mt
DRM to NH19 (0.48Km)
upto Upto
300mm 600mm Upto 1m Quantity
Sl.No Chainage No L B D/H Dia (sqm)
Dia Dia
1 100 2 1.2 0.942 0.5 1.1304
2 200 2 1.2 3.14 0.1 0.3768
3 300 2 1.2 0.942 0.5 1.1304
4 400 3 1.2 1.884 0.4 2.71296
5 480 2 1.2 0.942 0.5 1.1304
No. of Tree 11 3.3912 2.71296 0.3768 6.48096
Total Quantity in sqm 19.44288
PKG NO- 25/B/CHAPRA
Painting of pole upto 1.2mt
DRM to NH 19 (0.48Km)
Quantity
Sl.No. Chainage No L B D/H (sqm)
1 100 4 1.2 0.65 3.12
2 200 6 1.2 0.65 4.68
3 300 6 1.2 0.65 4.68
4 400 4 1.2 0.65 3.12
5 480 4 1.2 0.65 3.12
Total No.of E.Pole- 24 Total Quantity in sqm= 18.72
High Low
Shoulder Shoulder
Sl.no Chainage No L B D/H (Cutting) (filling)
(sqm) (sqm)
1 1 4 1.5 6
0
10
2 200 2 10 1.5
3 300 1 20 1.5 30
4 400 2 21 1.5
5 480 2 10 1.5 30
30 36