Vous êtes sur la page 1sur 85

...\AREA_0\010\010GN002.

DRL 11/21/2007 10:21:36 AM


...\AREA_0\050\050gn003.dee 11/20/2007 9:23:38 AM
D:\050gn004.dps 11/20/2007 8:09:51 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:19:19 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:20:22 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:20:51 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:21:19 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:21:48 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:22:16 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:23:07 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:23:36 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:24:00 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:24:29 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:11:14 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:34:43 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:13:14 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:13:39 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:15:28 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:15:52 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:16:16 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:17:00 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:17:25 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:17:49 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:18:17 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:11:42 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:18:52 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 9:19:31 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:12:07 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:12:38 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:18:04 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:17:32 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:18:26 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
D:\050gn004.dps 11/20/2007 8:18:49 AM printed by - Ramli 2500008 - HOOU Drafting FPM-TF Consortium
...\AREA_0\050\050GN020.DEE 11/20/2007 9:22:57 AM
...\AREA_0\050\050GN018.DCC 11/21/2007 10:08:01 AM
...\AREA_0\050\050gn080.drl 11/21/2007 10:05:20 AM
...\AREA_0\050\050gn081.drl 11/21/2007 10:06:13 AM
...\DRAWING\AREA10\0510gn002.dcc 11/21/2007 10:10:36 AM
...\HO\DRAWING\AREA_9\059GN003.DPP 11/21/2007 10:11:58 AM
...\AREA_0\150\150gn057.dee 11/20/2007 9:21:55 AM
...\AREA_0\150\150gn609.dee 11/20/2007 9:24:44 AM
...\AREA_0\500\500gn001.din 11/20/2007 9:26:38 AM
...\AREA_0\500\500gn001.dpp 11/21/2007 10:03:14 AM
...\AREA_0\500\500gn002.dpp 11/21/2007 10:04:06 AM
...\Standard-Drawing\a7rl0030.dgn 11/21/2007 1:15:49 PM
...\STDD-OTHR-EE-0001.dgn 11/20/2007 9:29:51 AM
...\Standard-Drawing\d7ci0079.dgn 11/21/2007 11:33:54 AM
...\Standard-Drawing\d7ci0080.dgn 11/21/2007 11:56:10 AM
...\Standard-Drawing\d7ci0082.dgn 11/21/2007 1:05:30 PM
...\Standard-Drawing\d7ci0083.dgn 11/21/2007 1:06:21 PM
...\Standard-Drawing\d7ci0209.dgn 11/21/2007 1:09:46 PM
...\Standard-Drawing\d7rl0084.dgn 11/21/2007 11:26:16 AM
...\Kresno D\BN\BN#04\d7rl0085.dgn 8/9/2007 5:25:55 PM Printed by - ALI/Drafting SLN
...\Kresno D\GENERAL\d7rl0086.dgn 11/21/2007 11:23:22 AM
...\JOB NO 101\d7ss0076.dgn 11/21/2007 11:15:10 AM
...\JOB NO 101\d7ss0077.dgn 11/21/2007 11:16:22 AM
...\JOB NO 101\d7ss0078.dgn 11/21/2007 11:16:53 AM
...\JOB NO 101\d7ss0244.dgn 11/21/2007 11:17:22 AM
...\Standard-Drawing\d7rl0254.dgn 11/21/2007 11:29:40 AM
...\Std(edp)\EB333E08.DGN 11/21/2007 8:19:38 AM
...\StandardDgn\PG&T\EB333E09.DGN 11/21/2007 8:06:48 AM
...\StandardDgn\PG&T\G333b302.dgn 11/21/2007 8:04:36 AM
...\mc-std-mnas-ee-024.dgn 9/16/2006 2:30:24 PM printed by RLD - FPM Minas
...\MD-STDD-MNAS-PL-0020-0.DGN 11/21/2007 8:25:27 AM printed by JSR- FPM Minas
BILL OF MATERIALS
1O
FOR POLE FABRICATION
15
ITEM DESCRIPTION QTY. UNIT M. E. C.

1 PIPE , 8 5/8 ’’ O.D., O.322" 4O FT 47-3O-11-O81

2 PIPE , 4 1/2 ’’ O.D., O.237" 8 FT 47-3O-11-O41


8’- O’’ ( TYP.) 11/16 ’’ DIA. HOLE
3/16
( TYPICAL )
2 4 1/2 ’’ O.D. PIPE
3 PLATE , 1/4 ’’ STRUCT. QUALITY 1.5 SQ. FT. 17-34-O6-177
3’’ 2’- O’’ 1’- 9’’ 3’- 9’’ 3’’
3 13 OR 14
4 BAR , 5/8 ’’ ROUND C.S. COLD 48 FT 17-16-35-O93

5 PRIMER , ZINC CHROMATE O.4 GAL. 19-8O-52-347


2’- O’’ 1’- 9’’ 3’- 9’’
3’’ 3’’ 13 #4/O OR 336.4 MCM
ACSR CONDUCTOR 6 PAINT , ALUMINUM TOP COAT O.4 GAL. 19-21-3O-242
8’- O’’ WELDED

12 7 PAINT , BLACK , BITUMINOUS O.3 GAL. 19-82-64-17O


( TYP.) 16 12
D E T A I L - 1 3
3/16 8 STATIC WIRE , 5/16 ’’ 2 FT O6-61-21-836

PLAN SCL. 3/8 ’’ = 1’- O’’ 9 WASHER : CURVED W/ 3/4 ’’ DIA. HOLE 1 EA 22-57-O8-119
SCL. 1/4 ’’ = 1’- O’’
1O
STATIC WIRE, 5/16 ’’ STEEL FOR FIELD ERECTION

1’- O’’
1 8
1O INSULATOR : PIN TYPE ANSI 56-2 3 EA 22-62-35-4OO
12 1

7’- O’’
11 PIN : INSULATOR, 7’’ LONG SHANK W/ NUTS 3 EA 22-52-64-298

11
12 BRACKET : GROUND WIRE, HORIZONTAL O.25’’-O.56’’ 1 EA 22-51-23-169
4 5/8 ’’DIA. HOLE
9 WELD
BRAZE 13 ARMOR ROD 336.4 MCM - SET 22-55-47-31O
SEE DETAIL - 2 TO SUIT CON-
( SEE NOTE 6 )
14 ARMOR ROD #4/O ACSR } DUCTOR SIZE
- SET 22-55-47-122
7’- O’’

SEE NOTE 4 2
1O 11 15 15 TIE WIRE 4 AWG ROUND BARE ALUMINUM 3 FT 22-21-11-375
4 1/2 ’’O.D. PIPE
1O 11 15 CROSS-ARM 16 P.G. COMPRESSION CONNECTOR 5/16 ’’ 1 EA 24-14-78-1O6
1
13.8 KV LINE

7’- O’’
17 WASHER : CURVED FOR 3/4 ’’ BOLT 3 EA 22-57-O8-119
1’- 6’’ 4 1/2 ’’O.D. PIPE
CROSS ARM AS
SEE NOTE 11 18 PILE, PIPE 8 5/8 ’’ O.D., O.322" REQ’D FT 47-3O-11-O81
2’- 6’’

SEE DETAIL - 3 13 OR 14
AND NOTE 3 19 ROUND BAR, 6 MM.x 6 MT. 1.75 JOIN 17-O8-35-O1O
17
4 1/2 ’’ O.D. PIPE
D E T A I L - 2 SQ. NUT 1
2
CROSS-ARM SCL. 1’’ = 1’- O’’ LOCK NUT } 2O 2O LOCK NUT 3/4 " 3 EA 22-5O-88-729

SEE DETAIL - 1
NOTES
1. MATERIAL QUANTITIES ARE EXACT COUNT.
2’’ 1/2 ’’ 2’’ D E T A I L - 3
2. FABRICATED POLE HEIGHT LISTED ON POLE SCHEDULE AS FOLLOWS:
WELDED SCL. 3’’ = 1’- O’’
A = STANDARD POLE
3/4 ’’ HOLE IN POLE A + 5 = STANDARD PLUS 5 FEET

3’’
INSERT 5/8 ’’ CS ROD A - 5 = STANDARD MINUS 5 FEET

3"
& WELD AROUND
4O’- O’’ ( SEE NOTE 2 )

3. TYPE "A" POLE SHOULD NOT BE USED TO TURN ANGLES GREATER THAN 5^.
OUTSIDE (TYP.) 11
’’
POLE FABRICATION

4 PLACING THE CONDUCTOR ON SIDE OF PIN INSULATOR TO TURN LARGER


8’’

19 ROUND BAR 6 MM BLACK


45^ ANGLES IS NOT PERMITTED.
PAINTED BRAZE
R=1’’ 4. INSTALL FIRST POLE-STEP ABOVE CROSS-ARM ON SAME SIDE OF POLE AS
2’’ 8’’
DETAIL - 5 SINGLE PIN INSULLATOR.

2’’
5. POLE-STEP WELDS SHALL BE ’’HAMMER TESTED’’ BEFORE PAINTING.
STEP UP POLES @ 1’- 6’’CENTERS EXCEPT AS NOTED

1 8 5/8 ’’ O.D. PIPE POLE SCL. 3’’ = 1’- O’’


X

X X
6. BRAZE 2’- O’’ LONG OF STATIC WIRE TO 3 1/4 ’’x 1/4 ’’CURVED WASHER W/ 3/4 ’’
X

D E T A I L - 4 (FOR PILING BASE ONLY) X X DIA. HOLE. ASSEMBLY WILL BE WELDED TO POLE IN FABRICATION SHOP.
X X X
7. USE TOP OF ROAD CENTER AS GROUND LEVEL OR FINISHED GRADE IN

TYP.
SCL. 1’’ = 1’- O’’ X
X
MEASURING THE PIPE PILE HEIGHT.

2’- O’’
X X X

X X 8. "PL" ( PILING ) SIGN IS FIELD FABRICATED AND MADE OF 6 MM.DIA. ROUND BAR
X X X

X X 9. PAINT THE BOTTOM POLE W/ BITUMINOUS PAINT UP TO 3’- O’’ ABOVE GRADE
X X X LEVEL.
21 X X
1O. NOT ALLOWED TO USE SPIRAL PIPE
X X X
WELDED NOT ALLOWED TO EXTEND SHANK BY WELD USE SUSPENSION INSULATOR TYPE
2’’ X 11.
23
2’’

BOLT/NUT 1/2 " FOR SUBSTITUTE


22
BARBED WIRE
AND TAG WELDING

0’

POLE STEP
REFERENCE DRAWINGS
-

4
1’

^
45

SEE DET.- 4 ROUND


19
DETAIL 7
BAR 1/2 "
1’- 6’’

THIS DRAWING SUPERSEDES ALL OTHER OLDER STANDARD


SCL. 1’- O’’ = 1"
DRAWINGS OF " TYPE A POLE ". CONSEQUENTLY, THE OLD
1’- 6’’

SIDE PLAN STANDARD DRAWINGS SHALL BE DISCARDED

BUTT WELD SEE NOT 1O WELDED NOTES

R E V I S I O N
3’- O’’

IRON PINCERS 4
22
ON POLE DYT.
IRON PINCERS 3 ADDITIONAL ANTI CLAMBING
ON POLE SEE DETAIL 6 SEE DETAIL 6
BOLT/NUT 1/2 " 12. MATERIAL QUANTITIES ARE EXACT COUNT. 22/02/’01 ARW. BWK.

DYT.
2’- O’’

2’- O’’

2 REVISE ANGLE
BARBED WIRE BARBED WIRE 13. LENGTH OF FLAT BAR REFER TO POLE DIAMETER 9/12/’96 NOT.

SEE DETAIL 7 SEE DETAIL 7 DYT.


1 RENEW M.E.C. AND DESIGN
SEE DET.- 5 3 14. LENGTH OF BARBED WIRE REFER TO POLE DIAMETER 11/9/’96 AST.
5"

8 5/8 ’’O.D. PIPE PILE


P T CALTEX PACIFIC INDONESIA
( SEE NOTE 7 )

1
34

OR FABRICATED
PL
BILL OF MATERIALS
7’- O’’

POWER GENERATION & TRANSMISSION - SUMATRA


3.

18 FIN BASE
( SEE GE-S333-E-31O )
SCALE DATE
5’- O’’

FOR POLE FABRICATION AS SHOWN 20 MAY 1996


BITUMINOUS
PAINT
DR. kzm/ Dyt
CH. AST/Dyt JOB ENG’R Suharnoto
3’- O’’

ITEM DESCRIPTION QTY. UNIT M. E. C.


FINISH GRADE
( SEE NOTE 7 ) PLAN DETAIL 6 21 FLAT BAR 6MM x 38MM x 6M 1 MT 17-15-O9-230
OPERATING APPROVAL Original sign by M. Zaiful

SCL. 1’- O’’ = 1" ENGINEERING APPROVAL Original Sign by Suharnoto


22 BLT/NUT 1/2 " - 1" 2 PCS 02-96-18-225

23 BARBED WIRE , 2MM 2 MT 17-88-12-425

24 STD. TANGENT POLE O^-3^ (TYPE A)


ELEVATION SIDE ELEVATION 25
13.8 KV DISTRIBUTION
SCL. 1/4 ’’ = 1’- O’’ SCL. 1/4 ’’ = 1’- O’’ 26

INDEX LETTER DRAWING No.

P PBOOO-STD-OO8-3
23
BILL OF MATERIALS
FOR POLE FABRICATION
1/4 ’’ PLATE CAP 3 21
16 29 1 1/16 ’’ DIA. HOLES
13/16 ’’ DIA. HOLE ( TYP.)
23 ITEM DESCRIPTION QTY. UNIT M. E. C.
13/16 ’’ DIA. HOLE ( TYP.)
SEE DET.- 8 1 PIPE : 12 3/4 ’’ O.D., O.375" 4O FT 47-3O-11-121
13/16 ’’ DIA. HOLE ( TYP.)
8’- O’’

3’’
19
2 PIPE : 6 5/8 ’’ O.D., O.28O" 8 FT 47-3O-11-O61
3’’ 3’- 9’’ 1’- 8’’ 2’- 1’’ 3’’

NTS
3’’
3 PLATE : 1/4 ’’ STRUCT. QUALITY 1.5 SQ.FT 17-34-O6-177
2 6 5/8 ’’ O.D. PIPE STATIC WIRE, 5/16 ’’ STEEL

1’- O’’
^ 27
1O
16 4 BAR : 5/8 ’’ ROUND, CARBON STEEL COLD 48 FT 17-16-35-O93
SEE NOTE - 4 18 5 PRIMER : ZINC CHROMATE O.4 GAL 19-8O-52-347
8 24
3’’ 3’’
6 PAINT : ALUMINIUM TOP COAT O.4 GAL 19-21-3O-242
3’’ 3’- 6’’ 1’- 8’’ 1’- 9’’ 3’’ 2O
1O^ 13/16 ’’ DIA. HOLE 7 PAINT : BLACK BITUMINOUS O.3O GAL 19-82-64-17O
45^
8’- O’’ SEE NOTE 3
NOTE : DRILL 13/16 ’’DIA. HOLE 22
8 WIRE : 5/16 ’’ STATIC GALV. STEEL 2.O FT O6-61-21-836
PERPENDICULAR TO
14 9
CROSS ARM 9 WASHER : CURVED FOR 3/4 ’’ DIA. 1 EA 22-57-O8-119
D E T A I L - 1 12 3/4 ’’ O.D. PIPE
FOR FIELD ERECTION
PLAN SCL. 3/8 ’’ = 1’- O’’
12 3/4 ’’ O.D. PIPE
SCL. 1/4 ’’ = 1’- O’’ INCLUDING GUY MATERIALS

10 INSULATOR : SUSPENSION, BALL & SOCKET 18 EA 22-62-5O-524


D E T A I L - 3
SEE DET.- 2 D E T A I L - 2 11 CLEVIS : BALL ( LOCK - IN - TYPE ) 6 EA 22-51-48-5O2
SCL. 1’’ = 1’- O’’
SCL. 1’’ = 1’- O’’ 12 CLAMP : ALUMINIUM STRAIN FOR 6 EA 22-51-36-25O
ACSR : 1/O-336.4 MCM

13 3/4 ’’ SHOULDER EYE BOLT 8’’LG.


13 INSULATOR : PIN TYPE ANSI 56-2 1 EA 22-62-35-4OO
ROUND BAR 6 MM 31
17 2O 14 HYCRIMP : RANGE RUN 4/O-4OO ACSR 3 EA 22-56-33-45O
2’’ 1/2 ’’ 2’’
11 BURNDY YHN 45O
- 3 EA. FOR 13.8 KV
7’- O’’

1’- 6’’
INSULATOR STRING 15 PIN : INSULATOR 9 1/2 ’’ LG. W/ LONG SHANK 1 EA 22-52-64-298
26
SEE NOTE - 6 14
#4/O ACSR CONDUCTOR 12 16 CLAMP : DEAD END, FOR 5/16 ’’ STEEL CABLE 2 EA 22-51-39-78O

3’’
1’- 6’’ 13
SEE DET.- 4
17 BOLT : SHOULDER EYE W/ NUT, 3/4 ’’x 8’’ LG. 2 EA 22-5O-69-228
1’- 6’’
18 BOLT : SHOULDER EYE W/ NUT 3/4 ’’x 16’’ LG. 2 EA 22-5O-69-282
13
6’’

BLACK 19 BOLT : ANGLE THIMBLE EYE, 1 ’’x 14’’ LG. W/ NUT 4 EA 22-5O-7O-7OO
3’- O’’

12 21 PAINTED
SEE DET.- 1 20
SEE DET.- 3 NUT : ROUND EYE 3/4 ’’EYE x 1 3/4 ’’ LG. 4 EA 22-5O-84-34O
6 5/8 ’’ STD. O.D. PIPE
1’- 6’’ NOTE - 4 15
DETAIL - 6 21 WASHER : CURVED, FOR 3/4 ’’ BOLT 6 EA 22-57-O8-119
SEE DET.- 5
SCL. 3’’ = 1’- O’’ 22 SLEEVE : SERVICE FOR 1/2 ’’ GUY WIRE 4 EA 22-56-32-168
14 6 5/8 ’’ O.D. PIPE
CROSS-ARM 23 P.G. COMPRESSION CONNECTOR 5/16 ’’ - 3/8 ’’ 2 EA 24-14-78-1O6
1 (FOR PILING BASE ONLY) 24 WIRE, GUY GALV. 1/2 ’’ DIA. STEEL 12O FT O6-61-19-853
STEP UP POLE @ 1’- 6’’ CENTERS EXCEPT AS NOTED

25 PIPE PILE : 12 3/4 ’’ O.D., 0.375" AS REQ FT 47-3O-11-121


28
21 26 TIE WIRE, 4 AWG ROUND BAR ALUMINUM 3 FT 22-21-11-375
SQUARE NUT 14
SEE DET.- 7 LOCK NUT 27 CLAMP : 3 - BOLT, GUY WIRE 8 EA 22-51-32-O22

28 LOCK NUT 3/4 ’’ 3 EA 22-5O-88-729


4O’- O’’ ( SEE NOTE 2 )

D E T A I L - 4 D E T A I L - 5 29 LOCK NUT 1’’ 4 EA 22-5O-88-74O


SCL. 1 1/2 ’’ = 1’- O’’ SCL. 3/4 ’’ = 1’- O’’
30 WASHER, SQUARE FOR 1’’ BOLT 4 EA 22-57-O8-335

31 ROUND BAR, 6 MM.x 6 MT. 1.75 JOIN 17-O8-35-O1O


BRAZE
WELDED 32 FLAT BAR 6MMx38MMx6M 1 MT 17-15-09-230

3/4 ’’ HOLE IN POLE 33


2’’

BOLT/NUT 1/2 "-1" 2 EA 02-96-18-225


6 5/8 ’’ STD. O.D. PIPE INSERT 5/8 ’’ CS ROD

3"
X 34 BARBED WIRE, 2MM 2 MT 17-O8-12-425
& WELD AROUND
X X X 18 21 OUTSIDE (TYP.) 11
1O ’’
X X
2O 4

8’’’
11
X X X 11 INSULATOR
45^
TYP.

X X SUSPENSION
REFERENCE DRAWINGS
2’- O’’

X X BALL & SOCKET R=1’’


X

X
2’’ 8’’
X

X X 28
X
THIS DRAWING SUPERSEDES ALL OTHER OLDER STANDARD
X X 12 3/4 ’’ O.D. PIPE
X
DRAWINGS OF " TYPE C POLE ". CONSEQUENTLY, THE OLD
X X

X X
D E T A I L - 7 STANDARD DRAWINGS SHALL BE DISCARDED
X X X

X
SCL. 1’’ = 1’- O’’

D E T A I L - 8
34

BARBED WIRE
SCL. 1’’ = 1’- O’’ NOTES
13. MATERIAL QUANTITIES ARE EXACT COUNT.
DETAIL 9 32
1’- 6’’
NOTES 14. LENGTH OF FLAT BAR REFER TO POLE DIAMETER
SCL. 1’- O’’ = 1" WELDED
2’’
2’’

1’- 6’’ BUTT WELD BUTT WELD BOLT/NUT 1/2 " 15. LENGTH OF BARBED WIRE REFER TO POLE DIAMETER
SEE NOTE 11 SEE NOTE 11 33
AND TAG WELDING 1. MATERIAL QUANTITIES ARE EXACT COUNT.

0’

R E V I S I O N
3’- O’’

IRON PINCERS IRON PINCERS 4


2. FABRICATED POLE HEIGHT LISTED ON POLE SCHEDULE AS FOLLOWS
-
1’

ON POLE ON POLE
45

31 ROUND C = STANDARD
3
SEE DETAIL 10 SEE DETAIL 10 C + 5 = STANDARD PLUS 5’- O’’
X X BAR 1/2 " C - 5 = STANDARD MINUS 5’- O’’ DYT.
2’- O’’

X X X X X X

X X X X

2 ADD ANTI CLAMBING


BARBED WIRE 25 BARBED WIRE ARW. BWK.
X X X X

28/02/’01
X X

X X X X

X X X X X X

X X

3. BRAZE 2’- O’’LG. OF STATIC WIRE TO 3 1/4 ’’x 3 1/4 ’’x 1/4 ’’ CURVED WASHER
X X

SEE DETAIL 9 SEE DETAIL 9


X X X X X X

X X X X
DYT.
X X X

OR FABRICATED X X X

1 RENEW M.E.C. AND DESIGN


3 3
X X

W/ 3/4 ’’DIA. HOLE, ASSEMBLY WILL BE WELDED TO POLE IN FABRICATION SHOP.


SIDE PLAN
X X

SEE DET.- 8 X X X

X
X X X

X
14/9/’96 AST.
FIN BASE

P T CALTEX PACIFIC INDONESIA


SEE NOTE - 8

( GE-S333-E-31O ) 4. LINE GUY ANCHORS SHALL BE SURVEYED AND PURPOSELY INSTALLED SUCH
PL WELDED THAT LINE GUYS WILL BE INSTALLED 1O^ AWAY FROM DIRECTION OF LINE
BITUMINOUS POWER GENERATION & TRANSMISSION - SUMATRA
7’- O’’

AS SHOWN IN PLAN VIEW IN ORDER TO DELETE REQUIREMENT FOR


PAINT
BISECTING GUY.
SCALE DATE
5’- O’’

AS SHOWN 20 MAY 1996


BOLT/NUT 1/2 " 33 5. GUY ANCHORS TO BE SELECTED WHICH WILL BEST MEET FIELD CONDITIONS.
DR. kzm/ Dyt
CH. JOB ENG’R
3’- O’’

FINISH GRADE AST/Dyt Suharnoto

( USE CENTER OF ROAD ) 6. FIRST POLE STEP ABOVE CROSS ARM SHOULD BE LOCATED ON SIDE OF POLE
AS SINGLE PIN INSULATOR. OPERATING APPROVAL Original sign by M. Zaiful

7. POLE STEP WELDS SHALL BE HAMMER TESTED BEFORE PAINTING. ENGINEERING APPROVAL Original Sign by Suharnoto
"
04

8. USE TOP OF THE CENTER OF THE ROAD AS GROUND LEVEL OR FINISHED


84
3.

GRADE MEASURING THE PIPE PILE HEIGHT.

9. "PL" ( PILING ) SIGN IS FIELD FABRICATED AND MADE OF 6 MM.DIA. ROUND BAR
STD. ANGLE POLE 3O^ - 9O^ ( TYPE C )
1O. PAINT THE BOTTOM POLE W/ BITUMINOUS PAINT UP TO 3’- O’’ ABOVE GRADE
ELEVATION SIDE ELEVATION
SCL. 1/4 ’’ = 1’- O’’ SCL. 1/4 ’’ = 1’- O’’ PLAN DETAIL 10
LEVEL.
13.8 KV DISTRIBUTION
11. NOT ALLOWED TO COMBINE SPIRAL PIPE WITH SEAMLEES PIPE.
SCL. 1’- O’’ = 1" INDEX LETTER DRAWING No.
12. NOTE ALLOWED TO EXTEND SHANK BY WELD USE SUSPENSION TYPE
FOR SUBSTITUTE. P PBOOO-STD-O1O-2
...\Std Pgt.Dwg\PBSTD011.DGN 11/20/2007 9:55:50 AM
...\05.03.Electrical\pbstd0250.dgn 11/21/2007 10:09:15 AM printed by JSR- FPM Minas
...\pbstd0251.dgn 11/21/2007 10:12:49 AM printed by JSR- FPM Minas
...\STDD-OTHR-EE-0003.dgn 11/20/2007 9:48:02 AM
...\STDD-OTHR-EE-0003.dgn 11/20/2007 9:48:34 AM
...\stdd-othr-ee-0004.dgn 11/20/2007 9:51:09 AM
...\stdd-othr-pp-0001.dgn 11/21/2007 10:38:20 AM
...\stdd-othr-ps-0001.dgn 11/20/2007 11:04:36 AM
...\stdd-othr-ps-0006.dgn 11/20/2007 11:05:11 AM
...\stdd-othr-ss-0003.dgn 11/21/2007 10:44:17 AM

Vous aimerez peut-être aussi