-n=;=_ -n=;=_
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
SUMMARY OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works
A General Item
B Site Clearance and Earthworks
C Structural Works
D Cross Drainage Works
E Pavement Works
F Drain Works
G Miscellenous Works
Base Cost (A+B+C+D+E+F+G)
VAT @13% of Base Cost
Contingency @ 5% of Base Cost
Total Cost including VAT & Contingency
Price adjustment Contingency @ 10% of Base Cost
Physical Contingency @ 10% of Base cost
Grand Total Cost
Cost Per Km of the road inclusive of VAT and contingency at Base Cost

Prepared by: Checked by: Approved by


2 of 664

Government of ………..
nistry of Physical Infrastructure and Transport
Department of Road
0
0
SUMMARY OF COST

Amount (NRs) Remarks


21,867,400.08 1.05%
545,897,060.82 26.14%
768,534,118.05 36.81%
53,640,636.53 2.57%
392,399,538.00 18.79%
132,148,480.49 6.33%
173,616,829.56 8.31%
2,088,104,063.53 100%(I)
271,453,528.25 II=13% of I
104,405,203.17 III=5% 0f I
2,463,962,794.95 IV=I+II+III
208,810,406.35 V
208,810,406.35 VI
2,881,583,607.65 VII=IV+V+VI
88,631,755.21 VIII=IV/27.8 km

Prepared by: Checked by: Approved by


3 of 664
Government of ……….. -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs)
A General Item
Insurance for the loss of damage to works, plant, material,
A.1 equipment, property and personnel injury or death and third Job 1.00 9,000,000.00
party as per condition of contract.
Establishing engineers site office including three rooms,
A.2 bathroom, toilet and kitchen facilities, furnitures and well month 36.00 20,000.00
furnished as per details provided in bid document.

Relocation of services and repairing for existing


A.3 infrastructure (houses, water supply pipes,kulos,Temple, PS 1.00 2,000,000.00
Foot staircase, Foot trail etc) as instructed by engineer.

Supplying and erecting 1.2m.x 0.75m. size project sign


board in place including 50mm dia. Steel tube, 2mm. thick
A.4 steel plate, cement concrete, painting, writing and No 2.00 9,652.04
supporting steel angle nut and bolit etc. all complete

Carry out maintenance of the existing road/construction


A.5 and traffic diversion to keep the road serviceable:as per 0
specification (SS/SP-100) and instruction of engineer
0 A) During construction Km-mnth 1000.80 8,280.00
B) During Defect liability period Km-mnth 333.60 5,520.00
Sub - Total (A)
B Site Clearance and Earthworks
Clearing of grass, trees, removing roots, breaking sods,
B.1 levelling the surface and safe disposal all complete . Sqm 333600.00 13.08
(SS/SP 200)

Dismantling Bridge, culvert and other structures including


B.2 stockpiling the reusable materials and diposal of usable
materials within 50 m lead all complete.(SS/SP-202)

(a) Plain cement concrete, 1:3:6 or richer mix Cum 10.00 1,353.58
(b) Reinforced cement concrete work Cum 5.00 1,893.72
(c) Random rubble masonry in cement mortar Cum 35.00 1,371.05
(d)Dismantling of RCC pipes (excluding excavation and
rm 50.00 464.03
refilling). upto 600 mm dia.

Roadway excavation in all type of soils including Rock and


B.3 Cum 5823363.00 90.38
safe disposal of materials all complete. (SS/SP - 905)

Formation of embankment including excavation,


B.4 transportation, filling, compaction in layers and watering all Cum 125749.00 120.27
complete. (SS/SP - 900)
Sub - Total (B)
C Structural Works 0 0.00
Excavation for foundation in all types of soil including rock
C.1 in all conditions including dewatering, relevant lift and safe Cum 273146.98 147.65
disposal all complete. (SS/SP-900)

Prepared by: Checked by: Approved by


4 of 664
Government of ……….. -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs)
Assembling machine made Gabion boxes/mattresses,
palcing in position including stretching, forming
compartments; tying with bracing wires and tie wires; tying
C.2 down the lid complete; and providing and filling stone / Cum 91460.00 5,122.31
boulder in gabion boxes / mattresses etc. including
dressing, beding, bonding and all transporation as per
specification..(SP 2400)

Providing , laying and fixing of geotextile (filter fabrics) all


C.3 Sqm 48833.78 186.02
complete. (SS/SP-2400)
Providing and laying Random rubble stone masonry in
cement mortar MM5 including scaffolding, curing, including
C.4 weepholes 100mm dia HDPpipe for weep holes, Cum 22529.14 9,717.35
preparation of mortar ,finishing etc. all complete (SS/SP-
2600)
Providing and Placing machine mixed cement concrete
C.5 M10/40 including compaction, curing, testing all complete. Cum 656.87 9,202.05
(SS/SP-2000)
Carry out backfilling works behind the structures with
approved suitable excavated common material spreading
C.6 Cum 7502.08 648.15
in layers, watering and compaction all complete.(SS/SP-
900.)
Carry out backfilling works behind the structures with
C.7 approved suitable filler material spreading in layers, Cum 11011.18 1,889.25
watering and compaction all complete (SS/SP-900)
Sub - Total (C)
D Cross Drainage Works 0 0.00
Excavation for foundation in all types of soil including rock
D.1 in all conditions including dewatering, relevant lift and safe Cum 6211.43 147.65
disposal all complete. (SS/SP-900)
Providing, laying and levelling of dry stone soling works in
D.2 Cum 9.00 3,034.83
the foundation all complete (SS/SP-2600).
Providing and Placing machine mixed cement concrete
D.3 M15/40 including compaction, curing, testing all complete. Cum 993.55 9,990.50
(SS/SP-2000)
Providing and laying Random rubble stone masonry in
cement mortar [ cement(1) : sand(4)] including scaffolding,
D.5 Cum 2086.88 9,717.35
curing, preparation of mortar,finishing etc.all complete.
(SS/SP-2600)
Providing and laying reinforcement including cutting,
D.6 bending,binding,fixing in position etc.all complete. (SS/SP- Kg 1716.30 122.91
2600)
Providing , Preparing and Installing form work including
necessary supports and removing after completion for
D.7 Sqm 553.90 525.84
foundation and footings (a) using timber ( soft wood) -
Class F1 finish.
Proving and laying RCC pipes with or without collars
jointed with stiff mixture of cement mortar in the proportion
D.8 Rm
of 1 : 2 ( 1 cement : 2 fine sand ) including transportation all
complete.(SS/SP 700)

Prepared by: Checked by: Approved by


5 of 664
Government of ……….. -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs)
a 60 cm Rm 62.50 9,457.15
b 90 cm Rm 962.50 14,956.50
Carry out backfilling works behind the structures with
D.9 common excavated material spreading in layers, watering Cum 2495.05 648.15
and compaction all complete.(SS/SP-900.)
Carry out backfilling works behind the structures with
D.10 approved suitable filler material spreading in layers, Cum 449.55 1,889.25
watering and compaction all complete.(SS/SP-900.)
Assembling machine made Gabion boxes/mattresses,
palcing in position including stretching, forming
compartments; tying with bracing wires and tie wires; tying
D.11 down the lid complete; and providing and filling stone / Cum 885.50 5,122.31
boulder in gabion boxes / mattresses etc. including
dressing, beding, bonding and all transporation as per
specification.(SP 2400)
Sub - Total (D)
E Pavement Works
Preparation of subgrade by grading, watering &
E.1 compaction for upgrading of the road as directed by the Sq.m 249644.00 30.05
engineer all complete. ( SS/SP 1003)
Providing ,laying, spreading , watering, levelling, and
compaction of natural sand gravel subbase work ( grading
E.2 Cum 68114.82 1,647.00
as per table 12.1 of Specs ) as directed by the Engineer all
complete (SS/SP 1201) .
Providing, laying spreading, watering leveling and
compaction of wet mixed crushed stone base course
E.3 material grading as per standard specification including Cum 46788.82 2,865.65
transportation from the source as directed by the
Engineer.-(SS/SP -1202)
Providing and spraying bituminious Prime coat
MC30/MC70 including cleaning the road surface using
E.4 lit 233256.60 187.39
wire,brushes, broom etc. -(Applicationn rate 1ltr/sqm) (SS-
1301,1302).
Supply, Spread and compact 20mm (First coat) and
10mm(Second coat) nominal size chips for double
bituminous surface dressing (DBSD) as per specified
E.5 Ton 8606.46 1,580.36
spreading rates for each layer of surface dressing to meet
all the requirements of special specification all complete.
(SS/SP 1300)
Supply, load and spray Bitumen grade 80/100 binder for
E.6 lit 441909.61 171.18
surface dressing all complete (SS/SP 1301, 1303)
Providing of cutter (Kerosene)for cutting back all complete
E.7 lit 46808.59 104.27
(1301, 1303)
Provide and apply anti striping agent in the road section as
E.8 Kg 2443.59 325.00
instructed by site Engineer.
Sub - Total (E)
F Drain Works
Earthwork in excavation in all type of soil including rock for
F.1 Cum. 25404.76 123.49
drain work and sub-surface drain work

Prepared by: Checked by: Approved by


6 of 664
Government of ……….. -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs)
Providing and placing Plum concrete with 60% M 15/40
F.2 concrete and 40% boulders/stones as per specification all Cum. 11650.20 8,154.67
complete. (SS/SP-2600)
Providing, laying and levelling of dry stone soling works in
F.3 Cum 8445.60 3,034.83
the foundation all complete (SS/SP-2600).
Supplying and place Precast R.C.C. (M20/20) side drain
F.4 cover slab for Drain of size(1.2m*0.5m*0.125m) (SS/SP- Nos. 5000.00 1,675.35
2000)
Sub - Total (F)
G Miscellenous Works

Providing and erecting "W" metal beam crash barrier


comprising of 3 mm thick corrugated sheet metal beam
crash barrier comprising of 3 mm thick corrugated sheet
metal beam rail, 70 cm above road/ground level fixed on
ISMC Series channel vertical post, 150*75*5 mm spaced 2
G.1 m c/c, 1.8 m high, 1.1 m below ground/road level, all sheet rm 7500.00 8,701.48
paetsand fitment to the galvanized by hot dip process, all
fittings to confirm to IS 1367 and IS 1364, metal beam rail
to be fixed on the vertical post with a spacer of channel
section 150*75*5mm, 330 mm long, all complete (IRC-
7.08)

Supplying and applying Thermoplastic Paint for Road


G.2 marking including cleaning,watering,brooming etc. all sqm 18765.00 1,317.74
complete(BS 3262)
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all
G.3 Nos. 23.00 2,537.96
complete as per specification a) Standard
KM post placed at each kilometer. [1503 ]
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all
G.4 Nos. 6.00 5,768.93
complete as per specification b) Bigger kilometer post
(placed at each 5 km.) [1503 ]
G.5 Provision for land acquisition LS 1.00 35,000,000.00
G.6 Provision for IEA / IEE impact mitigation measures LS 1.00 35,000,000.00
Supplying and fixing in place R.C.C. delineator and guard
G.7 post including excavation, back filling, painting and nos. 8340.00 1112.17
erection etc. all complete as per drawing.

Supplying and erecting traffic sign in place including 50mm


dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.8 painting, writing and supporting steel angle nut and bolit Nos. 1000.00 3294.65
etc. completea)60 cm dia circular,60cm.equilateral triangle
and 60cm x 45cm rectangular shaped sign(single post)

Prepared by: Checked by: Approved by


7 of 664
Government of ……….. -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs)

Supplying and erecting traffic sign in place including 50mm


dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.9 painting, writing and supporting steel angle nut and bolit Nos. 100.00 9652.04
etc. complete b) 1.2m.x 0.75m. Size bigger traffic sign with
back support and two or more post.

Sub - Total (G)


Base Cost (A+B+C+D+E+F+G)
VAT @13% of Base Cost
Contingency @ 5% of Base Cost
Total Cost including VAT & Contingency
Price adjustment Contingency @ 10% of Base Cost
Physical Contingency @ 10% of Base cost
Grand Total Cost
Cost Per Km of the road inclusive of VAT and contingency at Base Cost

Prepared by: Checked by: Approved by


8 of 664
Government of ……….. -n=;=_
of Physical Infrastructure and Transport
Department of Road
0
0
BSTRACT OF COST

Amount (NRs) Remarks

9,000,000.00

720,000.00

2,000,000.00

19,304.08

8,286,624.00
1,841,472.00
21,867,400.08

4,363,488.00

13,535.80
9,468.60
47,986.75
23,201.50

526,315,547.94

15,123,832.23

545,897,060.82

40,330,151.59

Prepared by: Checked by: Approved by


9 of 664
Government of ……….. -n=;=_
of Physical Infrastructure and Transport
Department of Road
0
0
BSTRACT OF COST

Amount (NRs) Remarks

468,486,472.60

9,084,059.75

218,923,538.57

6,044,550.58

4,862,473.15

20,802,871.81

768,534,118.05

917,117.63

27,313.47

9,926,061.27

20,278,943.36

210,950.43

291,262.77

Prepared by: Checked by: Approved by


10 of 664
Government of ……….. -n=;=_
of Physical Infrastructure and Transport
Department of Road
0
0
BSTRACT OF COST

Amount (NRs) Remarks


591,071.87
14,395,631.25

1,617,166.65

849,312.33

4,535,805.50

53,640,636.53

7,501,802

112,185,109

134,080,382

43,709,954

13,601,305

75,646,087

4,880,732

794,167
392,399,538.00

3,137,233.81

Prepared by: Checked by: Approved by


11 of 664
Government of ……….. -n=;=_
of Physical Infrastructure and Transport
Department of Road
0
0
BSTRACT OF COST

Amount (NRs) Remarks

95,003,536.43

25,630,960.25

8,376,750.00

132,148,480.49

65,261,100.00

24,727,391.10

58,373.08

34,613.58

35,000,000.00
35,000,000.00

9,275,497.80

3,294,650.00

Prepared by: Checked by: Approved by


12 of 664
Government of ……….. -n=;=_
of Physical Infrastructure and Transport
Department of Road
0
0
BSTRACT OF COST

Amount (NRs) Remarks

965,204.00

173,616,829.56
2,088,104,063.53 I
271,453,528.25 II=13% of I
104,405,203.17 III=5% 0f I
2,463,962,794.95 IV=I+II+III
208,810,406.35 V
208,810,406.35 VI
2,881,583,607.65 VII=IV+V+VI
88,631,755.21 VIII=IV/27.8 km

Prepared by: Checked by: Approved by


13 of 664
Government of ………..
Ministry of Physical Infrastructure and Tran
Department of Road

DETAIL QUANTITY ESTIMA


Name of the road:…………………………….
Chainage:0+000 to ….

S.N. Description of works Unit No.


A General Item
Insurance for the loss of damage to works, plant, material,
A.1 equipment, property and personnel injury or death and third Job 1.00
party as per condition of contract.
Establishing engineers site office including three rooms,
A.2 bathroom, toilet and kitchen facilities, furnitures and well month 36.00
furnished as per details provided in bid document.
Relocation of services and repairing for existing
A.3 infrastructure (houses, water supply pipes,kulos,Temple, PS 1.00
Foot staircase, Foot trail etc) as instructed by engineer.
Supplying and erecting 1.2m.x 0.75m. size project sign board
in place including 50mm dia. Steel tube, 2mm. thick steel
A.4 plate, cement concrete, painting, writing and supporting steel No 2.00
angle nut and bolit etc. all complete

Carry out maintenance of the existing road/construction and


A.5 traffic diversion to keep the road serviceable:as per
specification (SS/SP-100) and instruction of engineer
A) During construction Km-mnth
B) During Defect liability period Km-mnth
B Site Clearance and Earthworks
Clearing of grass, trees, removing roots, breaking sods,
B.1 levelling the surface and safe disposal all complete .(SS/SP Sqm
200)
Dismantling Bridge, culvert and other structures including
B.2 stockpiling the reusable materials and diposal of usable
materials within 50 m lead all complete.(SS/SP-202)
(a) Plain cement concrete, 1:3:6 or richer mix Cum
(b) Reinforced cement concrete work Cum
(c) Random rubble masonry in cement mortar Cum
(d)Dismantling of RCC pipes (excluding excavation and
rm
refilling). upto 600 mm dia.

Roadway excavation in all type of soils including Rock and


B.3 Cum Calculatio
safe disposal of materials all complete. (SS/SP - 905)
Ordinary Soil Cum
Hard Rock Cum
Soft Rock cum

Prepared by: Checked by: Approved by:


14 of 664
Government of ………..
Ministry of Physical Infrastructure and Tran
Department of Road

DETAIL QUANTITY ESTIMA


Name of the road:…………………………….
Chainage:0+000 to ….

S.N. Description of works Unit No.


Formation of embankment including excavation,
B.4 transportation, filling, compaction in layers and watering all Cum
complete. (SS/SP - 900)
C Structural Works
Excavation for foundation in all types of soil including rock in
C.1 all conditions including dewatering, relevant lift and safe Cum
disposal all complete. (SS/SP-900)

Assembling machine made Gabion boxes/mattresses,


palcing in position including stretching, forming
compartments; tying with bracing wires and tie wires; tying
C.2 down the lid complete; and providing and filling stone / Cum
boulder in gabion boxes / mattresses etc. including dressing,
beding, bonding and all transporation as per specification..
(SP 2400)

Providing , laying and fixing of geotextile (filter fabrics) all


C.3 Sqm Calculatio
complete. (SS/SP-2400)

Providing and laying Random rubble stone masonry in


cement mortar MM5 including scaffolding, curing, including
C.4 Cum
weepholes 100mm dia HDPpipe for weep holes, preparation
of mortar ,finishing etc. all complete (SS/SP-2600)

For stone masonry retaining and breast wall Calculatio

Providing and Placing machine mixed cement concrete


C.5 M10/40 including compaction, curing, testing all complete. Cum Calculatio
(SS/SP-2000)

Carry out backfilling works behind the structures with


C.6 approved suitable excavated common material spreading in Cum
layers, watering and compaction all complete.(SS/SP-900.)

Carry out backfilling works behind the structures with


C.7 approved suitable filler material spreading in layers, watering Cum
and compaction all complete (SS/SP-900)
Prepared by: Checked by: Approved by:
15 of 664
Government of ………..
Ministry of Physical Infrastructure and Tran
Department of Road

DETAIL QUANTITY ESTIMA


Name of the road:…………………………….
Chainage:0+000 to ….

S.N. Description of works Unit No.

D Cross Drainage Works


Excavation for foundation in all types of soil including rock in
D.1 all conditions including dewatering, relevant lift and safe Cum
disposal all complete. (SS/SP-900)
Pipe culvert (90 cm) 77
Slab culvert 3m 2

Providing, laying and levelling of dry stone soling works in


D.2 Cum
the foundation all complete (SS/SP-2600).
Slab culvert 3m 2

Providing and Placing machine mixed cement concrete


D.3 M15/40 including compaction, curing, testing all complete. Cum
(SS/SP-2000)
Pipe culvert (90 cm) 77
Slab culvert 3m 2

Providing and laying Random rubble stone masonry in


D.5 cement mortar [ cement(1) : sand(4)] including scaffolding, Cum
curing, preparation of mortar,finishing etc.all complete.
(SS/SP-2600)
Pipe culvert (90 cm) 77
Slab culvert 3m 2

Providing and laying reinforcement including cutting,


D.6 bending,binding,fixing in position etc.all complete. (SS/SP- Kg
2600)
Slab culvert 3m 2

Providing , Preparing and Installing form work including


necessary supports and removing after completion for
D.7 Sqm
foundation and footings (a) using timber ( soft wood) - Class
F1 finish.
Pipe culvert (90 cm) 77
Slab culvert 3m 2

Prepared by: Checked by: Approved by:


16 of 664
Government of ………..
Ministry of Physical Infrastructure and Tran
Department of Road

DETAIL QUANTITY ESTIMA


Name of the road:…………………………….
Chainage:0+000 to ….

S.N. Description of works Unit No.


Proving and laying RCC pipes with or without collars jointed
with stiff mixture of cement mortar in the proportion of 1 : 2
D.8 Rm
( 1 cement : 2 fine sand ) including transportation all
complete.(SS/SP 700)
Pipe culvert (90 cm) 77
Pipe culvert (60 cm) 5

Carry out backfilling works behind the structures with


D.9 common excavated material spreading in layers, watering Cum
and compaction all complete.(SS/SP-900.)
Pipe culvert (90 cm) 77
Slab culvert 3m 2

Carry out backfilling works behind the structures with


D.10 approved suitable filler material spreading in layers, Cum
watering and compaction all complete.(SS/SP-900.)
Pipe culvert (90 cm) 77
Slab culvert 3m 2

Prepared by: Checked by: Approved by:


17 of 664
Government of ………..
Ministry of Physical Infrastructure and Tran
Department of Road

DETAIL QUANTITY ESTIMA


Name of the road:…………………………….
Chainage:0+000 to ….

S.N. Description of works Unit No.


Assembling machine made Gabion boxes/mattresses,
palcing in position including stretching, forming
compartments; tying with bracing wires and tie wires; tying
D.11 down the lid complete; and providing and filling stone / Cum
boulder in gabion boxes / mattresses etc. including dressing,
beding, bonding and all transporation as per specification.
(SP 2400)

Pipe culvert (90 cm) 77

E Pavement Works
Preparation of subgrade by grading, watering & compaction
E.1 for upgrading of the road as directed by the engineer all Sq.m
complete. ( SS/SP 1003)
Providing ,laying, spreading , watering, levelling, and
compaction of natural sand gravel subbase work ( grading as
E.2 Cum Calculation
per table 12.1 of Specs ) as directed by the Engineer all
complete (SS/SP 1201) .
Providing, laying spreading, watering leveling and
compaction of wet mixed crushed stone base course
E.3 material grading as per standard specification including Cum Calculation
transportation from the source as directed by the Engineer.-
(SS/SP -1202)

Providing and spraying bituminious Prime coat MC30/MC70


E.4 including cleaning the road surface using wire,brushes, lit Calculation
broom etc. -(Applicationn rate 1ltr/sqm) (SS-1301,1302).

Supply, Spread and compact 20mm (First coat) and


10mm(Second coat) nominal size chips for double
bituminous surface dressing (DBSD) as per specified
E.5 Ton Calculation
spreading rates for each layer of surface dressing to meet all
the requirements of special specification all complete.(SS/SP
1300)
Supply, load and spray Bitumen grade 80/100 binder for
E.6 lit Calculation
surface dressing all complete (SS/SP 1301, 1303)
Providing of cutter (Kerosene)for cutting back all complete
E.7 lit Calculation
(1301, 1303)
Provide and apply anti striping agent in the road section as
E.8 Kg Calculation
instructed by site Engineer.
F Drain Works
Prepared by: Checked by: Approved by:
18 of 664
Government of ………..
Ministry of Physical Infrastructure and Tran
Department of Road

DETAIL QUANTITY ESTIMA


Name of the road:…………………………….
Chainage:0+000 to ….

S.N. Description of works Unit No.


Earthwork in excavation in all type of soil including rock for
F.1 Cum. Calculation
drain work and sub-surface drain work
Providing and placing Plum concrete with 60% M 15/40
F.2 concrete and 40% boulders/stones as per specification all Cum. Refer to atta
complete. (SS/SP-2600)

Providing, laying and levelling of dry stone soling works in


F.3 Cum Refer to atta
the foundation all complete (SS/SP-2600).
Supplying and place Precast R.C.C. (M20/20) side drain
F.4 cover slab for Drain of size(1.2m*0.5m*0.125m) (SS/SP- Nos.
2000)
G Miscellenous Works

Providing and erecting "W" metal beam crash barrier


comprising of 3 mm thick corrugated sheet metal beam crash
barrier comprising of 3 mm thick corrugated sheet metal
G.1 beam rail, 70 cm above road/ground level fixed on ISMC rm For cu
Series channel vertical post, 150*75*5 mm spaced 2 m c/c,
1.8 m high, 1.1 m below ground/road level, all sheet
paetsand fitment to the galvanized by hot dip process, all
fittings to confirm to IS 1367 and IS 1364, metal beam rail to
be fixed on the vertical post with a spacer of channel section
150*75*5mm, 330 mm long, all complete (IRC- 7.08)
Supplying and applying Thermoplastic Paint for Road
G.2 marking including cleaning,watering,brooming etc. all Sqm
complete(BS 3262)
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all complete
G.3 Nos. 23
as per specification
a) Standard KM post placed at each kilometer. [1503 ]
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all complete
G.4 Nos. 6
as per specification
b) Bigger kilometer post (placed at each 5 km.) [1503 ]
G.5 Provision for land acquisition LS 1
G.6 Provision for IEA / IEE impact mitigation measures LS 1

Prepared by: Checked by: Approved by:


19 of 664
Government of ………..
Ministry of Physical Infrastructure and Tran
Department of Road

DETAIL QUANTITY ESTIMA


Name of the road:…………………………….
Chainage:0+000 to ….

S.N. Description of works Unit No.


Supplying and fixing in place R.C.C. delineator and guard
G.7 post including excavation, back filling, painting and erection Nos. 8340.00
etc. all complete as per drawing.
Supplying and erecting traffic sign in place including 50mm
dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.8 painting, writing and supporting steel angle nut and bolit etc. Nos. 1000.00
complete
a)60 cm dia circular,60cm.equilateral triangle and 60cm x
45cm rectangular shaped sign(single post)
Supplying and erecting traffic sign in place including 50mm
dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.9 painting, writing and supporting steel angle nut and bolit etc. Nos. 100.00
complete
b) 1.2m.x 0.75m. Size bigger traffic sign with back support
and two or more post.

Prepared by: Checked by: Approved by:


20 of 664
Government of ………..
f Physical Infrastructure and Transport
Department of Road

L QUANTITY ESTIMATE

Length Breadth Height


Quantity Remarks
(m) (m) (m)

1.00

36.00

1.00

2.00

36 x 27.8 1000.80
12 x 27.8 333.60

27800.00 12.00 333600.00

10.00
5.00
35.00
50.00

Calculation refer attached sheet 5823363.00

5532194.85
0.00
291168.15

Prepared by: Checked by: Approved by:


21 of 664
Government of ………..
f Physical Infrastructure and Transport
Department of Road

L QUANTITY ESTIMATE

Length Breadth Height


Quantity Remarks
(m) (m) (m)

125749.00

273146.98

Total 273146.98

91460.00

Calculation refer attached sheet 48833.78


Total 48833.78

Calculation refer attached sheet 22529.14


Total 22529.14

Calculation refer attached sheet 656.87

7502.08

Total 7502.08

11011.18

Prepared by: Checked by: Approved by:


22 of 664
Government of ………..
f Physical Infrastructure and Transport
Department of Road

L QUANTITY ESTIMATE

Length Breadth Height


Quantity Remarks
(m) (m) (m)
Total 11011.18

77.27 5949.79
130.82 261.64
Total 6211.43

4.50 9.00
Total 9.00

11.93 918.61
37.47 74.94
Total 993.55

24.28 1869.56
108.66 217.32
Total 2086.88

858.15 1716.30
Total 1716.30

5.06 389.62
82.14 164.28
Total 553.90

Prepared by: Checked by: Approved by:


23 of 664
Government of ………..
f Physical Infrastructure and Transport
Department of Road

L QUANTITY ESTIMATE

Length Breadth Height


Quantity Remarks
(m) (m) (m)

12.50 962.50
12.50 62.50
Total 1025.00

31.49 2424.73
35.16 70.32
Total 2495.05

5.55 427.35
11.10 22.20
Total 449.55

Prepared by: Checked by: Approved by:


24 of 664
Government of ………..
f Physical Infrastructure and Transport
Department of Road

L QUANTITY ESTIMATE

Length Breadth Height


Quantity Remarks
(m) (m) (m)

11.50 885.50
Total 885.50

27800.00 8.98 249644.00

Calculation refer to attached sheet 68114.82

Calculation refer to attached sheet 46788.82

Calculation refer to attached sheet 233256.60

Calculation refer to attached sheet 8606.46

Calculation refer to attached sheet 441909.61

Calculation refer to attached sheet 46808.59

Calculation refer to attached sheet 2443.59

Prepared by: Checked by: Approved by:


25 of 664
Government of ………..
f Physical Infrastructure and Transport
Department of Road

L QUANTITY ESTIMATE

Length Breadth Height


Quantity Remarks
(m) (m) (m)
Calculation refer to attached sheet 25404.76

Refer to attached Calculation Sheet 11650.20

Refer to attached Calculation Sheet 8445.60

5000.00

For curve section of road 7500.00

18765.00

` 23.00

6.00

1.00
1.00

Prepared by: Checked by: Approved by:


26 of 664
Government of ………..
f Physical Infrastructure and Transport
Department of Road

L QUANTITY ESTIMATE

Length Breadth Height


Quantity Remarks
(m) (m) (m)

8340.00

1000.00

100.00

Prepared by: Checked by: Approved by:


Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR ROADWAY


Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
e

Road way Cutting Filling Length Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
0+000 0.00 4.04 - - 0.02 - - - - - - - - 95 - 5
0+020 20.00 21.46 12.75 255.00 0.29 0.16 3.20 - - - - - - 95 242.25 5
0+040 20.00 26.25 23.86 477.20 - 0.15 2.90 - - - - - - 95 453.34 5
0+060 20.00 93.07 59.66 1,193.20 - - - - - - - - - 95 1,133.54 5
0+080 20.00 70.08 81.58 1,631.60 1.29 0.64 12.85 - 10.00 11.47 114.65 4.01 40.10 95 1,550.02 5
0+100 20.00 70.70 70.39 1,407.80 - 0.64 12.85 - 20.00 20.28 405.60 0.66 13.10 95 1,337.41 5
0+120 20.00 87.61 79.16 1,583.20 - - - - 20.00 22.44 448.70 0.66 13.20 95 1,504.04 5
0+140 20.00 138.57 113.09 2,261.80 - - - - 20.00 34.20 683.90 0.68 13.50 95 2,148.71 5
0+160 20.00 145.44 142.01 2,840.20 - - - - 20.00 61.80 1,235.90 1.64 32.80 95 2,698.19 5
0+180 20.00 168.93 157.19 3,143.80 - - - - 20.00 69.42 1,388.40 1.55 31.00 95 2,986.61 5
0+200 20.00 188.70 178.82 3,576.40 - - - - 20.00 96.39 1,927.70 1.55 31.00 95 3,397.58 5
0+220 20.00 136.89 162.80 3,256.00 - - - - 20.00 55.63 1,112.50 1.55 31.00 95 3,093.20 5
0+240 20.00 103.79 120.34 2,406.80 - - - - 20.00 39.98 799.50 1.50 30.00 95 2,286.46 5
0+260 20.00 82.30 93.05 1,861.00 - - - - 20.00 27.95 558.90 0.66 13.20 95 1,767.95 5
0+280 20.00 75.42 78.86 1,577.20 - - - - 20.00 24.87 497.40 0.66 13.20 95 1,498.34 5
0+300 20.00 65.19 70.31 1,406.20 - - - - 20.00 22.49 449.80 0.65 12.90 95 1,335.89 5
0+320 20.00 58.90 62.05 1,241.00 - - - - 20.00 20.64 412.70 0.72 14.40 95 1,178.95 5
0+340 20.00 37.83 48.37 967.40 - - - - 20.00 10.26 205.20 - - 95 919.03 5
0+360 20.00 50.96 44.40 888.00 - - - - 20.00 12.70 253.90 0.92 18.30 95 843.60 5
0+380 20.00 30.62 40.79 815.80 - - - - 20.00 9.65 192.90 - - 95 775.01 5
0+400 20.00 31.78 31.20 624.00 0.34 0.17 3.40 - 20.00 10.45 209.00 0.91 18.10 95 592.80 5
0+420 20.00 39.21 35.50 710.00 - 0.17 3.40 - 20.00 12.91 258.20 0.92 18.30 95 674.50 5
0+440 20.00 32.46 35.84 716.80 1.48 0.74 14.75 - 20.00 12.61 252.20 1.08 21.50 95 680.96 5
0+460 20.00 26.47 29.47 589.40 0.45 0.96 19.25 - 20.00 11.68 233.50 0.41 8.20 95 559.93 5
0+480 20.00 36.41 31.44 628.80 - 0.23 4.50 - 20.00 10.72 214.40 - - 95 597.36 5
0+500 20.00 28.44 32.43 648.60 0.05 0.02 0.45 - 20.00 11.74 234.80 0.56 11.20 95 616.17 5
0+520 20.00 22.02 25.23 504.60 0.40 0.22 4.45 - 20.00 9.61 192.10 0.27 5.40 95 479.37 5
0+540 20.00 20.98 21.50 430.00 0.99 0.69 13.85 - 20.00 11.94 238.80 0.95 19.00 95 408.50 5
27 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
0+560 20.00 13.68 17.33 346.60 9.40 5.19 103.85 - 20.00 4.84 96.70 0.52 10.40 95 329.27 5
0+580 20.00 15.18 14.43 288.60 3.50 6.45 129.00 - 20.00 1.02 20.40 0.01 0.20 95 274.17 5
0+600 20.00 162.12 88.65 1,773.00 - 1.75 35.00 - 20.00 29.30 586.00 0.89 17.80 95 1,684.35 5
0+620 20.00 228.19 195.16 3,903.20 - - - - 20.00 96.75 1,935.00 0.70 14.00 95 3,708.04 5
0+640 20.00 76.68 152.44 3,048.80 - - - - 20.00 32.17 643.40 0.67 13.40 95 2,896.36 5
0+660 20.00 37.44 57.06 1,141.20 0.02 0.01 0.20 - 20.00 16.82 336.40 22.61 452.20 95 1,084.14 5
0+680 20.00 33.65 35.55 711.00 8.81 4.42 88.30 - 20.00 2.50 50.00 0.28 5.60 95 675.45 5
0+700 20.00 34.79 34.22 684.40 2.57 5.69 113.80 - 20.00 5.64 112.80 1.40 27.90 95 650.18 5
0+720 20.00 47.91 41.35 827.00 0.32 1.45 28.90 - 20.00 3.25 64.90 0.61 12.20 95 785.65 5
0+740 20.00 49.90 48.91 978.20 0.42 0.37 7.35 - 20.00 2.77 55.40 0.51 10.20 95 929.29 5
0+760 20.00 40.22 45.06 901.20 1.59 1.00 20.05 - 20.00 1.65 32.90 0.17 3.40 95 856.14 5
0+780 20.00 44.72 42.47 849.40 0.45 1.02 20.40 - 10.00 3.10 31.00 0.53 5.25 95 806.93 5
0+800 20.00 95.30 70.01 1,400.20 - 0.23 4.50 - - - - - - 95 1,330.19 5
0+820 20.00 138.92 117.11 2,342.20 - - - - - - - - - 95 2,225.09 5
0+840 20.00 153.93 146.43 2,928.60 - - - - 10.00 42.59 425.90 0.67 6.70 95 2,782.17 5
0+860 20.00 237.90 195.92 3,918.40 - - - - 20.00 85.93 1,718.50 3.11 62.20 95 3,722.48 5
0+880 20.00 310.62 274.26 5,485.20 - - - - 20.00 122.95 2,459.00 1.64 32.70 95 5,210.94 5
0+900 20.00 293.76 302.19 6,043.80 - - - - 20.00 128.93 2,578.60 1.78 35.60 95 5,741.61 5
0+920 20.00 279.62 286.69 5,733.80 - - - - 20.00 119.61 2,392.20 1.63 32.60 95 5,447.11 5
0+940 20.00 297.02 288.32 5,766.40 0.01 0.00 0.05 - 20.00 150.20 3,004.00 1.38 27.50 95 5,478.08 5
0+960 20.00 276.33 286.68 5,733.60 0.01 0.01 0.10 - 20.00 131.19 2,623.70 1.38 27.60 95 5,446.92 5
0+980 20.00 231.89 254.11 5,082.20 - 0.00 0.05 - 10.00 120.91 1,209.10 1.36 13.60 95 4,828.09 5
1+000 20.00 345.53 288.71 5,774.20 - - - - - - - - - 95 5,485.49 5
1+020 20.00 321.47 333.50 6,670.00 - - - - - - - - - 95 6,336.50 5
1+040 20.00 275.52 298.50 5,970.00 - - - - - - - - - 95 5,671.50 5
1+060 20.00 263.11 269.32 5,386.40 - - - - - - - - - 95 5,117.08 5
1+080 20.00 212.02 237.57 4,751.40 - - - - - - - - - 95 4,513.83 5
1+100 20.00 194.68 203.35 4,067.00 - - - - - - - - - 95 3,863.65 5
1+120 20.00 121.49 158.09 3,161.80 - - - - - - - - - 95 3,003.71 5
1+140 20.00 79.73 100.61 2,012.20 - - - - - - - - - 95 1,911.59 5
1+160 20.00 58.33 69.03 1,380.60 - - - - - - - - - 95 1,311.57 5
1+180 20.00 57.48 57.91 1,158.20 - - - - - - - - - 95 1,100.29 5
1+200 20.00 24.80 41.14 822.80 0.97 0.49 9.70 - 10.00 2.36 23.60 0.33 3.30 95 781.66 5
28 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
1+220 20.00 18.52 21.66 433.20 0.30 0.64 12.70 - 20.00 3.56 71.20 0.67 13.40 95 411.54 5
1+240 20.00 12.46 15.49 309.80 0.61 0.46 9.10 - 20.00 2.60 52.00 0.42 8.30 95 294.31 5
1+260 20.00 13.86 13.16 263.20 3.98 2.30 45.90 - 20.00 3.95 79.00 0.64 12.80 95 250.04 5
1+280 20.00 11.15 12.51 250.20 3.40 3.69 73.75 - 20.00 2.18 43.60 0.48 9.60 95 237.69 5
1+300 20.00 1.04 6.10 122.00 0.49 1.94 38.85 - 10.00 6.37 63.70 1.75 17.50 95 115.90 5
1+320 20.00 23.99 12.52 250.40 0.15 0.32 6.40 - - - - - - 95 237.88 5
1+340 20.00 51.97 37.98 759.60 - 0.08 1.50 - - - - - - 95 721.62 5
1+360 20.00 18.19 35.08 701.60 0.19 0.10 1.90 - - - - - - 95 666.52 5
1+380 20.00 14.38 16.29 325.80 11.81 6.00 119.95 - 10.00 5.24 52.35 0.72 7.20 95 309.51 5
1+400 20.00 2.14 8.26 165.20 10.44 11.12 222.45 57.25 10.00 0.50 5.00 - - 95 156.94 5
1+420 20.00 52.71 27.43 548.60 - 5.22 104.40 - - - - - - 95 521.17 5
1+440 20.00 52.42 52.57 1,051.40 0.02 0.01 0.15 - - - - - - 95 998.83 5
1+460 20.00 0.08 26.25 525.00 5.99 3.00 60.05 - 7.00 1.30 9.10 0.01 0.07 95 498.75 5
1+480 20.00 - 0.04 0.80 5.81 5.90 118.00 117.20 - - - - - 95 0.76 5
1+500 20.00 - - - 6.21 6.01 120.20 120.20 7.00 0.87 6.09 0.11 0.77 95 - 5
1+520 20.00 1.07 0.54 10.80 1.88 4.05 80.90 70.10 - - - - - 95 10.26 5
1+540 20.00 2.89 1.98 39.60 4.65 3.27 65.30 25.70 - - - - - 95 37.62 5
1+560 20.00 0.84 1.87 37.40 3.77 4.21 84.20 46.80 - - - - - 95 35.53 5
1+580 20.00 14.20 7.52 150.40 - 1.89 37.70 - - - - - - 95 142.88 5
1+600 20.00 16.13 15.17 303.40 - - - - - - - - - 95 288.23 5
1+620 20.00 25.34 20.74 414.80 - - - - - - - - - 95 394.06 5
1+640 20.00 35.76 30.55 611.00 - - - - - - - - - 95 580.45 5
1+660 20.00 58.92 47.34 946.80 - - - - - - - - - 95 899.46 5
1+680 20.00 82.18 70.55 1,411.00 - - - - - - - - - 95 1,340.45 5
1+700 20.00 100.98 91.58 1,831.60 - - - - - - - - - 95 1,740.02 5
1+720 20.00 77.10 89.04 1,780.80 - - - - - - - - - 95 1,691.76 5
1+740 20.00 49.35 63.23 1,264.60 - - - - - - - - - 95 1,201.37 5
1+760 20.00 61.09 55.22 1,104.40 0.01 0.00 0.05 - - - - - - 95 1,049.18 5
1+780 20.00 88.78 74.94 1,498.80 - 0.00 0.05 - - - - - - 95 1,423.86 5
1+800 20.00 107.27 98.03 1,960.60 - - - - - - - - - 95 1,862.57 5
1+820 20.00 113.79 110.53 2,210.60 - - - - - - - - - 95 2,100.07 5
1+840 20.00 154.97 134.38 2,687.60 - - - - - - - - - 95 2,553.22 5
1+860 20.00 156.59 155.78 3,115.60 - - - - - - - - - 95 2,959.82 5
29 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
1+880 20.00 110.88 133.74 2,674.80 - - - - - - - - - 95 2,541.06 5
1+900 20.00 67.68 89.28 1,785.60 - - - - - - - - - 95 1,696.32 5
1+920 20.00 100.35 84.02 1,680.40 - - - - - - - - - 95 1,596.38 5
1+940 20.00 123.37 111.86 2,237.20 - - - - - - - - - 95 2,125.34 5
1+960 20.00 159.77 141.57 2,831.40 - - - - - - - - - 95 2,689.83 5
1+980 20.00 175.08 167.43 3,348.60 - - - - - - - - - 95 3,181.17 5
2+000 20.00 144.55 159.82 3,196.40 - - - - - - - - - 95 3,036.58 5
2+020 20.00 144.11 144.33 2,886.60 - - - - - - - - - 95 2,742.27 5
2+040 20.00 129.39 136.75 2,735.00 - - - - - - - - - 95 2,598.25 5
2+060 20.00 105.61 117.50 2,350.00 - - - - - - - - - 95 2,232.50 5
2+080 20.00 103.29 104.45 2,089.00 - - - - - - - - - 95 1,984.55 5
2+100 20.00 95.25 99.27 1,985.40 - - - - - - - - - 95 1,886.13 5
2+120 20.00 109.40 102.33 2,046.60 - - - - - - - - - 95 1,944.27 5
2+140 20.00 89.26 99.33 1,986.60 - - - - - - - - - 95 1,887.27 5
2+160 20.00 72.88 81.07 1,621.40 - - - - - - - - - 95 1,540.33 5
2+180 20.00 185.75 129.32 2,586.40 - - - - - - - - - 95 2,457.08 5
2+200 20.00 163.89 174.82 3,496.40 - - - - 10.00 37.62 376.15 0.67 6.70 95 3,321.58 5
2+220 20.00 100.35 132.12 2,642.40 - - - - 20.00 22.38 447.60 0.66 13.10 95 2,510.28 5
2+240 20.00 79.37 89.86 1,797.20 - - - - 20.00 16.75 335.00 0.74 14.70 95 1,707.34 5
2+260 20.00 81.95 80.66 1,613.20 - - - - 10.00 17.44 174.40 0.86 8.60 95 1,532.54 5
2+280 20.00 102.26 92.11 1,842.20 - - - - - - - - - 95 1,750.09 5
2+300 20.00 97.16 99.71 1,994.20 - - - - - - - - - 95 1,894.49 5
2+320 20.00 74.89 86.03 1,720.60 - - - - - - - - - 95 1,634.57 5
2+340 20.00 47.05 60.97 1,219.40 - - - - - - - - - 95 1,158.43 5
2+360 20.00 53.77 50.41 1,008.20 - - - - - - - - - 95 957.79 5
2+380 20.00 46.84 50.31 1,006.20 - - - - - - - - - 95 955.89 5
2+400 20.00 38.90 42.87 857.40 0.01 0.00 0.05 - - - - - - 95 814.53 5
2+420 20.00 17.92 28.41 568.20 0.02 0.01 0.25 - - - - - - 95 539.79 5
2+440 20.00 4.49 11.21 224.20 1.17 0.60 11.90 - 10.00 1.38 13.80 0.29 2.90 95 212.99 5
2+460 20.00 2.07 3.28 65.60 4.81 2.99 59.80 - 20.00 1.32 26.40 0.21 4.20 95 62.32 5
2+480 20.00 10.85 6.46 129.20 3.31 4.06 81.20 - 10.00 1.53 15.30 0.27 2.70 95 122.74 5
2+500 20.00 151.63 81.24 1,624.80 - 1.66 33.10 - - - - - - 95 1,543.56 5
2+520 20.00 170.48 161.06 3,221.20 - - - - - - - - - 95 3,060.14 5
30 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
2+540 20.00 117.23 143.86 2,877.20 - - - - - - - - - 95 2,733.34 5
2+560 20.00 67.05 92.14 1,842.80 - - - - - - - - - 95 1,750.66 5
2+580 20.00 42.53 54.79 1,095.80 - - - - - - - - - 95 1,041.01 5
2+600 20.00 18.93 30.73 614.60 - - - - - - - - - 95 583.87 5
2+620 20.00 3.51 11.22 224.40 2.66 1.33 26.60 - 10.00 1.72 17.20 0.36 3.60 95 213.18 5
2+640 20.00 0.53 2.02 40.40 6.20 4.43 88.60 48.20 10.00 2.73 27.30 0.58 5.80 95 38.38 5
2+660 20.00 9.09 4.81 96.20 10.16 8.18 163.60 67.40 - - - - - 95 91.39 5
2+680 20.00 30.06 19.58 391.60 - 5.08 101.60 - - - - - - 95 372.02 5
2+700 20.00 37.67 33.87 677.40 - - - - - - - - - 95 643.53 5
2+720 20.00 27.98 32.83 656.60 - - - - - - - - - 95 623.77 5
2+740 20.00 17.21 22.60 452.00 0.27 0.14 2.70 - 10.00 1.54 15.40 0.37 3.70 95 429.40 5
2+760 20.00 9.28 13.25 265.00 2.79 1.53 30.60 - 20.00 2.53 50.60 0.56 11.20 95 251.75 5
2+780 20.00 3.37 6.33 126.60 2.37 2.58 51.60 - 20.00 1.65 33.00 0.43 8.60 95 120.27 5
2+800 20.00 10.54 6.96 139.20 1.10 1.73 34.65 - 20.00 0.99 19.70 0.17 3.40 95 132.24 5
2+820 20.00 7.11 8.83 176.60 6.20 3.65 72.95 - 20.00 5.21 104.10 0.84 16.80 95 167.77 5
2+840 20.00 5.91 6.51 130.20 5.88 6.04 120.80 - 20.00 2.43 48.60 0.24 4.80 95 123.69 5
2+860 20.00 14.03 9.97 199.40 10.45 8.17 163.30 - 10.00 13.23 132.30 3.19 31.90 95 189.43 5
2+880 20.00 36.42 25.23 504.60 1.98 6.22 124.30 - - - - - - 95 479.37 5
2+900 20.00 49.06 42.74 854.80 - 0.99 19.80 - - - - - - 95 812.06 5
2+920 20.00 51.49 50.28 1,005.60 - - - - - - - - - 95 955.32 5
2+940 20.00 28.97 40.23 804.60 4.13 2.07 41.30 - 10.00 5.04 50.40 0.98 9.80 95 764.37 5
2+960 20.00 38.93 33.95 679.00 3.16 3.65 72.90 - 10.00 6.65 66.50 1.40 14.00 95 645.05 5
2+980 20.00 174.52 106.73 2,134.60 - 1.58 31.60 - - - - - - 95 2,027.87 5
3+000 20.00 217.17 195.85 3,917.00 - - - - 10.00 83.38 833.80 0.69 6.90 95 3,721.15 5
3+020 20.00 205.49 211.33 4,226.60 - - - - 20.00 53.42 1,068.40 0.69 13.80 95 4,015.27 5
3+040 20.00 115.05 160.27 3,205.40 - - - - 20.00 29.28 585.50 0.66 13.20 95 3,045.13 5
3+060 20.00 61.81 88.43 1,768.60 - - - - 20.00 26.46 529.20 0.80 16.00 95 1,680.17 5
3+080 20.00 61.54 61.68 1,233.60 - - - - 20.00 26.45 529.00 0.66 13.10 95 1,171.92 5
3+100 20.00 92.79 77.17 1,543.40 - - - - 20.00 25.03 500.60 0.66 13.10 95 1,466.23 5
3+120 20.00 99.40 96.10 1,922.00 - - - - 20.00 27.10 542.00 0.66 13.20 95 1,825.90 5
3+140 20.00 89.59 94.50 1,890.00 0.01 0.00 0.05 - 20.00 27.48 549.60 0.65 13.00 95 1,795.50 5
3+160 20.00 75.86 82.73 1,654.60 - 0.00 0.05 - 10.00 27.96 279.60 0.66 6.55 95 1,571.87 5
3+180 20.00 88.64 82.25 1,645.00 - - - - - - - - - 95 1,562.75 5
31 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
3+200 20.00 64.36 76.50 1,530.00 - - - - - - - - - 95 1,453.50 5
3+220 20.00 60.69 62.53 1,250.60 - - - - - - - - - 95 1,188.07 5
3+240 20.00 39.86 50.28 1,005.60 0.34 0.17 3.40 - - - - - - 95 955.32 5
3+260 20.00 42.04 40.95 819.00 - 0.17 3.40 - - - - - - 95 778.05 5
3+280 20.00 30.90 36.47 729.40 0.34 0.17 3.40 - 10.00 1.26 12.60 0.29 2.90 95 692.93 5
3+300 20.00 16.66 23.78 475.60 1.92 1.13 22.55 - 20.00 2.96 59.10 0.81 16.10 95 451.82 5
3+320 20.00 13.05 14.86 297.20 1.33 1.62 32.45 - 20.00 1.90 38.00 0.48 9.50 95 282.34 5
3+340 20.00 16.63 14.84 296.80 0.12 0.72 14.45 - 20.00 1.69 33.70 0.46 9.20 95 281.96 5
3+360 20.00 18.38 17.51 350.20 1.88 1.00 19.95 - 20.00 3.58 71.60 1.06 21.20 95 332.69 5
3+380 20.00 22.09 20.24 404.80 0.06 0.97 19.35 - 20.00 1.33 26.50 0.34 6.80 95 384.56 5
3+400 20.00 24.67 23.38 467.60 2.85 1.45 29.05 - 10.00 1.74 17.35 0.38 3.75 95 444.22 5
3+420 20.00 52.51 38.59 771.80 - 1.43 28.50 - - - - - - 95 733.21 5
3+440 20.00 36.60 44.56 891.20 1.00 0.50 10.00 - 10.00 1.98 19.80 0.29 2.90 95 846.64 5
3+460 20.00 31.08 33.84 676.80 0.08 0.54 10.80 - 10.00 1.65 16.50 0.48 4.80 95 642.96 5
3+480 20.00 48.47 39.78 795.60 - 0.04 0.80 - - - - - - 95 755.82 5
3+500 20.00 47.47 47.97 959.40 - - - - - - - - - 95 911.43 5
3+520 20.00 60.63 54.05 1,081.00 - - - - - - - - - 95 1,026.95 5
3+540 20.00 48.08 54.36 1,087.20 2.02 1.01 20.20 - - - - - - 95 1,032.84 5
3+560 20.00 56.47 52.28 1,045.60 - 1.01 20.20 - - - - - - 95 993.32 5
3+580 20.00 41.40 48.94 978.80 - - - - - - - - - 95 929.86 5
3+600 20.00 10.59 26.00 520.00 0.70 0.35 6.95 - 7.00 0.62 4.31 0.08 0.56 95 494.00 5
3+620 20.00 56.69 33.64 672.80 - 0.35 6.95 - - - - - - 95 639.16 5
3+640 20.00 250.82 153.76 3,075.20 - - - - - - - - - 95 2,921.44 5
3+660 20.00 258.46 254.64 5,092.80 - - - - - - - - - 95 4,838.16 5
3+680 20.00 142.50 200.48 4,009.60 - - - - 10.00 52.56 525.60 0.69 6.85 95 3,809.12 5
3+700 20.00 184.31 163.41 3,268.20 - - - - 20.00 47.46 949.20 0.76 15.20 95 3,104.79 5
3+720 20.00 118.76 151.54 3,030.80 - - - - 20.00 39.96 799.20 0.67 13.40 95 2,879.26 5
3+740 20.00 156.46 137.61 2,752.20 - - - - 20.00 42.14 842.70 0.67 13.40 95 2,614.59 5
3+760 20.00 128.40 142.43 2,848.60 - - - - 20.00 38.97 779.40 0.67 13.40 95 2,706.17 5
3+780 20.00 111.15 119.78 2,395.60 - - - - 20.00 28.23 564.50 0.65 13.00 95 2,275.82 5
3+800 20.00 107.07 109.11 2,182.20 - - - - 20.00 24.91 498.20 0.80 16.00 95 2,073.09 5
3+820 20.00 74.88 90.98 1,819.60 - - - - 20.00 23.38 467.60 0.80 15.90 95 1,728.62 5
3+840 20.00 94.23 84.56 1,691.20 - - - - 20.00 23.64 472.70 0.66 13.20 95 1,606.64 5
32 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
3+860 20.00 91.92 93.08 1,861.60 - - - - 20.00 22.04 440.80 0.68 13.60 95 1,768.52 5
3+880 20.00 116.26 104.09 2,081.80 - - - - 10.00 22.63 226.30 0.64 6.40 95 1,977.71 5
3+900 20.00 110.29 113.28 2,265.60 - - - - - - - - - 95 2,152.32 5
3+920 20.00 107.17 108.73 2,174.60 - - - - - - - - - 95 2,065.87 5
3+940 20.00 103.29 105.23 2,104.60 - - - - - - - - - 95 1,999.37 5
3+960 20.00 76.06 89.68 1,793.60 0.01 0.00 0.05 - - - - - - 95 1,703.92 5
3+980 20.00 49.29 62.68 1,253.60 - 0.00 0.05 - - - - - - 95 1,190.92 5
4+000 20.00 75.34 62.32 1,246.40 3.70 1.85 36.95 - 10.00 43.38 433.75 1.45 14.50 95 1,184.08 5
4+020 20.00 25.01 50.18 1,003.60 6.45 5.07 101.40 - 20.00 20.19 403.80 2.05 40.90 95 953.42 5
4+040 20.00 19.13 22.07 441.40 1.14 3.79 75.85 - 20.00 4.77 95.40 1.00 19.90 95 419.33 5
4+060 20.00 9.61 14.37 287.40 2.44 1.79 35.80 - 20.00 3.26 65.20 0.52 10.40 95 273.03 5
4+080 20.00 9.28 9.45 189.00 7.89 5.17 103.30 - 10.00 3.58 35.80 0.47 4.70 95 179.55 5
4+100 20.00 8.07 8.68 173.60 9.19 8.54 170.75 - - - - - - 95 164.92 5
4+120 20.00 8.49 8.28 165.60 9.32 9.25 185.05 19.45 10.00 6.46 64.60 1.18 11.80 95 157.32 5
4+140 20.00 33.26 20.88 417.60 1.42 5.37 107.35 - 10.00 4.38 43.80 0.91 9.10 95 396.72 5
4+160 20.00 51.66 42.46 849.20 - 0.71 14.15 - - - - - - 95 806.74 5
4+180 20.00 32.83 42.25 845.00 2.88 1.44 28.75 - 10.00 6.58 65.75 1.46 14.55 95 802.75 5
4+200 20.00 66.73 49.78 995.60 0.34 1.61 32.15 - 10.00 6.04 60.40 1.65 16.50 95 945.82 5
4+220 20.00 89.37 78.05 1,561.00 - 0.17 3.40 - - - - - - 95 1,482.95 5
4+240 20.00 81.76 85.57 1,711.40 - - - - - - - - - 95 1,625.83 5
4+260 20.00 125.55 103.66 2,073.20 - - - - - - - - - 95 1,969.54 5
4+280 20.00 200.55 163.05 3,261.00 - - - - 10.00 53.30 533.00 0.69 6.90 95 3,097.95 5
4+300 20.00 203.66 202.11 4,042.20 - - - - 20.00 52.81 1,056.20 0.83 16.60 95 3,840.09 5
4+320 20.00 206.31 204.99 4,099.80 - - - - 20.00 65.34 1,306.80 0.69 13.70 95 3,894.81 5
4+340 20.00 219.72 213.02 4,260.40 - - - - 20.00 72.04 1,440.80 0.65 13.00 95 4,047.38 5
4+360 20.00 202.62 211.17 4,223.40 - - - - 20.00 115.57 2,311.40 0.69 13.80 95 4,012.23 5
4+380 20.00 200.91 201.77 4,035.40 - - - - 20.00 139.15 2,783.00 1.57 31.40 95 3,833.63 5
4+400 20.00 218.48 209.70 4,194.00 - - - - 20.00 153.98 3,079.60 1.54 30.80 95 3,984.30 5
4+420 20.00 232.37 225.43 4,508.60 - - - - 20.00 172.39 3,447.70 1.56 31.10 95 4,283.17 5
4+440 20.00 306.43 269.40 5,388.00 - - - - 20.00 210.66 4,213.20 1.82 36.30 95 5,118.60 5
4+460 20.00 298.77 302.60 6,052.00 - - - - 20.00 215.08 4,301.60 2.77 55.40 95 5,749.40 5
4+480 20.00 295.45 297.11 5,942.20 - - - - 20.00 281.57 5,631.40 8.25 165.00 95 5,645.09 5
4+500 20.00 260.18 277.82 5,556.40 - - - - 20.00 259.13 5,182.60 5.25 105.00 95 5,278.58 5
33 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
4+520 20.00 258.77 259.48 5,189.60 - - - - 20.00 244.79 4,895.80 4.08 81.60 95 4,930.12 5
4+540 20.00 231.29 245.03 4,900.60 - - - - 20.00 178.69 3,573.70 1.43 28.60 95 4,655.57 5
4+560 20.00 211.65 221.47 4,429.40 - - - - 20.00 154.59 3,091.80 1.58 31.60 95 4,207.93 5
4+580 20.00 244.69 228.17 4,563.40 - - - - 20.00 118.88 2,377.60 1.55 31.00 95 4,335.23 5
4+600 20.00 259.51 252.10 5,042.00 0.01 0.00 0.05 - 20.00 130.27 2,605.40 1.56 31.20 95 4,789.90 5
4+620 20.00 227.96 243.74 4,874.80 - 0.00 0.05 - 20.00 157.72 3,154.30 1.58 31.60 95 4,631.06 5
4+640 20.00 218.73 223.35 4,467.00 - - - - 20.00 185.16 3,703.20 16.28 325.60 95 4,243.65 5
4+660 20.00 281.15 249.94 4,998.80 - - - - 20.00 214.23 4,284.60 33.65 673.00 95 4,748.86 5
4+680 20.00 249.00 265.08 5,301.60 - - - - 20.00 194.84 3,896.80 7.42 148.40 95 5,036.52 5
4+700 20.00 206.26 227.63 4,552.60 - - - - 20.00 148.30 2,966.00 0.65 13.00 95 4,324.97 5
4+720 20.00 186.46 196.36 3,927.20 - - - - 20.00 142.17 2,843.30 2.66 53.20 95 3,730.84 5
4+740 20.00 167.18 176.82 3,536.40 - - - - 20.00 106.52 2,130.30 1.57 31.40 95 3,359.58 5
4+760 20.00 167.75 167.47 3,349.40 - - - - 20.00 70.37 1,407.40 0.65 13.00 95 3,181.93 5
4+780 20.00 179.27 173.51 3,470.20 - - - - 20.00 51.38 1,027.50 0.64 12.80 95 3,296.69 5
4+800 20.00 175.99 177.63 3,552.60 - - - - 20.00 45.61 912.20 0.65 13.00 95 3,374.97 5
4+820 20.00 175.79 175.89 3,517.80 - - - - 20.00 52.33 1,046.60 0.73 14.50 95 3,341.91 5
4+840 20.00 120.58 148.19 2,963.80 - - - - 20.00 37.41 748.10 0.68 13.60 95 2,815.61 5
4+860 20.00 79.92 100.25 2,005.00 - - - - 20.00 20.61 412.10 0.89 17.80 95 1,904.75 5
4+880 20.00 57.07 68.50 1,370.00 - - - - 20.00 14.16 283.20 0.93 18.60 95 1,301.50 5
4+900 20.00 35.56 46.32 926.40 - - - - 20.00 9.59 191.80 0.90 18.00 95 880.08 5
4+920 20.00 35.93 35.75 715.00 - - - - 20.00 10.57 211.40 1.00 19.90 95 679.25 5
4+940 20.00 25.31 30.62 612.40 0.27 0.14 2.70 - 20.00 8.25 165.00 - - 95 581.78 5
4+960 20.00 28.46 26.89 537.80 0.19 0.23 4.55 - 20.00 8.11 162.20 0.91 18.10 95 510.91 5
4+980 20.00 25.88 27.17 543.40 - 0.09 1.85 - 20.00 7.70 154.00 - - 95 516.23 5
5+000 20.00 22.68 24.28 485.60 0.39 0.20 3.90 - 20.00 8.81 176.20 0.27 5.30 95 461.32 5
5+020 20.00 30.63 26.66 533.20 - 0.20 3.90 - 20.00 8.06 161.20 1.04 20.80 95 506.54 5
5+040 20.00 37.61 34.12 682.40 - - - - 20.00 10.64 212.80 1.05 21.00 95 648.28 5
5+060 20.00 33.66 35.64 712.80 - - - - 20.00 8.78 175.60 1.05 20.90 95 677.16 5
5+080 20.00 63.05 48.36 967.20 - - - - 20.00 21.18 423.60 0.76 15.20 95 918.84 5
5+100 20.00 81.17 72.11 1,442.20 - - - - 20.00 25.60 512.00 0.78 15.50 95 1,370.09 5
5+120 20.00 70.93 76.05 1,521.00 - - - - 20.00 28.04 560.70 0.89 17.80 95 1,444.95 5
5+140 20.00 62.91 66.92 1,338.40 - - - - 20.00 18.52 370.40 0.77 15.40 95 1,271.48 5
5+160 20.00 75.18 69.05 1,381.00 0.01 0.01 0.10 - 20.00 26.26 525.20 0.92 18.30 95 1,311.95 5
34 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
5+180 20.00 55.74 65.46 1,309.20 - 0.01 0.10 - 10.00 14.64 146.40 0.86 8.60 95 1,243.74 5
5+200 20.00 34.16 44.95 899.00 - - - - - - - - - 95 854.05 5
5+220 20.00 38.99 36.58 731.60 - - - - - - - - - 95 695.02 5
5+240 20.00 22.46 30.73 614.60 - - - - 10.00 1.11 11.10 0.24 2.35 95 583.87 5
5+260 20.00 15.41 18.94 378.80 1.55 0.78 15.50 - 20.00 1.97 39.30 0.24 4.70 95 359.86 5
5+280 20.00 25.00 20.21 404.20 5.71 3.63 72.60 - 20.00 3.61 72.20 0.50 10.00 95 383.99 5
5+300 20.00 19.68 22.34 446.80 4.98 5.35 106.90 - 20.00 3.61 72.10 0.51 10.20 95 424.46 5
5+320 20.00 11.98 15.83 316.60 7.29 6.13 122.65 - 20.00 4.59 91.80 0.77 15.30 95 300.77 5
5+340 20.00 23.04 17.51 350.20 5.99 6.64 132.75 - 20.00 5.65 113.00 1.07 21.40 95 332.69 5
5+360 20.00 19.21 21.13 422.60 1.83 3.91 78.20 - 10.00 1.27 12.70 0.27 2.70 95 401.47 5
5+380 20.00 24.89 22.05 441.00 2.08 1.96 39.10 - - - - - - 95 418.95 5
5+400 20.00 32.03 28.46 569.20 1.57 1.83 36.50 - 10.00 4.18 41.75 0.85 8.50 95 540.74 5
5+420 20.00 2.55 17.29 345.80 8.60 5.09 101.70 - 20.00 6.14 122.80 1.14 22.80 95 328.51 5
5+440 20.00 36.68 19.62 392.40 - 4.30 86.00 - 20.00 0.75 15.00 0.12 2.40 95 372.78 5
5+460 20.00 31.31 34.00 680.00 0.29 0.15 2.90 - 20.00 2.41 48.20 0.76 15.20 95 646.00 5
5+480 20.00 52.20 41.76 835.20 0.06 0.17 3.45 - 20.00 21.38 427.60 0.89 17.80 95 793.44 5
5+500 20.00 26.53 39.37 787.40 0.09 0.07 1.45 - 20.00 0.49 9.80 0.07 1.30 95 748.03 5
5+520 20.00 10.81 18.67 373.40 7.09 3.59 71.75 - 10.00 6.67 66.70 1.37 13.70 95 354.73 5
5+540 20.00 133.07 71.94 1,438.80 - 3.54 70.85 - - - - - - 95 1,366.86 5
5+560 20.00 73.92 103.50 2,070.00 0.11 0.05 1.05 - 10.00 2.11 21.05 0.67 6.70 95 1,966.50 5
5+580 20.00 15.90 44.91 898.20 2.22 1.16 23.25 - 20.00 6.77 135.30 1.63 32.50 95 853.29 5
5+600 20.00 10.27 13.09 261.80 1.07 1.65 32.90 - 10.00 4.34 43.40 1.00 10.00 95 248.71 5
5+620 20.00 90.61 50.44 1,008.80 - 0.54 10.70 - - - - - - 95 958.36 5
5+640 20.00 29.74 60.18 1,203.60 2.93 1.47 29.30 - 10.00 3.45 34.45 0.50 5.00 95 1,143.42 5
5+660 20.00 35.84 32.79 655.80 6.13 4.53 90.60 - 20.00 6.57 131.40 1.51 30.20 95 623.01 5
5+680 20.00 23.36 29.60 592.00 6.67 6.40 128.00 - 20.00 16.76 335.20 4.90 98.00 95 562.40 5
5+700 20.00 22.99 23.18 463.60 7.26 6.97 139.30 - 20.00 20.00 400.00 6.90 138.00 95 440.42 5
5+720 20.00 - 11.50 230.00 65.54 36.40 727.95 497.95 20.00 8.94 178.70 0.11 2.20 95 218.50 5
5+740 20.00 47.15 23.58 471.60 0.52 33.03 660.55 188.95 20.00 5.71 114.10 1.51 30.20 95 448.02 5
5+760 20.00 20.21 33.68 673.60 6.96 3.74 74.80 - 20.00 15.49 309.80 4.35 86.90 95 639.92 5
5+780 20.00 10.26 15.24 304.80 14.28 10.62 212.40 - 20.00 12.71 254.20 2.80 56.00 95 289.56 5
5+800 20.00 59.20 34.73 694.60 5.22 9.75 195.00 - 20.00 7.31 146.10 1.72 34.40 95 659.87 5
5+820 20.00 94.18 76.69 1,533.80 1.84 3.53 70.60 - 20.00 11.80 236.00 3.65 73.00 95 1,457.11 5
35 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
5+840 20.00 30.61 62.40 1,248.00 6.05 3.95 78.90 - 20.00 12.16 243.20 3.21 64.20 95 1,185.60 5
5+860 20.00 51.01 40.81 816.20 1.66 3.85 77.05 - 20.00 11.62 232.40 3.83 76.60 95 775.39 5
5+880 20.00 65.31 58.16 1,163.20 0.88 1.27 25.35 - 20.00 4.95 99.00 1.15 23.00 95 1,105.04 5
5+900 20.00 20.38 42.85 857.00 7.09 3.99 79.70 - 20.00 4.34 86.80 0.50 10.00 95 814.15 5
5+920 20.00 11.38 15.88 317.60 9.31 8.20 164.00 - 20.00 2.63 52.60 0.20 4.00 95 301.72 5
5+940 20.00 81.74 46.56 931.20 - 4.66 93.10 - 20.00 0.51 10.20 0.04 0.80 95 884.64 5
5+960 20.00 76.61 79.18 1,583.60 0.40 0.20 4.00 - 10.00 2.84 28.40 0.94 9.40 95 1,504.42 5
5+980 20.00 55.77 66.19 1,323.80 - 0.20 4.00 - - - - - - 95 1,257.61 5
6+000 20.00 29.22 42.50 850.00 1.44 0.72 14.40 - 10.00 2.93 29.30 0.84 8.35 95 807.50 5
6+020 20.00 12.19 20.71 414.20 9.44 5.44 108.80 - 20.00 14.89 297.80 3.93 78.60 95 393.49 5
6+040 20.00 17.81 15.00 300.00 4.75 7.10 141.90 - 20.00 6.00 120.00 1.09 21.80 95 285.00 5
6+060 20.00 25.96 21.89 437.80 0.60 2.68 53.50 - 20.00 1.30 25.90 0.28 5.60 95 415.91 5
6+080 20.00 23.45 24.71 494.20 2.24 1.42 28.40 - 20.00 2.33 46.60 0.65 13.00 95 469.49 5
6+100 20.00 58.70 41.08 821.60 - 1.12 22.40 - 20.00 1.18 23.60 0.23 4.60 95 780.52 5
6+120 20.00 47.76 53.23 1,064.60 1.40 0.70 14.00 - 20.00 2.45 49.00 0.66 13.20 95 1,011.37 5
6+140 20.00 53.40 50.58 1,011.60 0.20 0.80 16.00 - 20.00 1.48 29.50 0.39 7.80 95 961.02 5
6+160 20.00 13.84 33.62 672.40 10.80 5.50 110.00 - 20.00 9.20 183.90 2.12 42.40 95 638.78 5
6+180 20.00 3.79 8.82 176.40 24.63 17.71 354.25 177.85 20.00 11.73 234.60 2.13 42.60 95 167.58 5
6+200 20.00 21.70 12.75 255.00 2.91 13.77 275.30 20.30 20.00 5.78 115.50 1.33 26.60 95 242.25 5
6+220 20.00 14.78 18.24 364.80 5.79 4.35 86.95 - 20.00 4.33 86.60 0.66 13.20 95 346.56 5
6+240 20.00 28.08 21.43 428.60 0.06 2.93 58.50 - 20.00 1.30 26.00 0.33 6.60 95 407.17 5
6+260 20.00 11.73 19.91 398.20 5.05 2.56 51.10 - 20.00 2.47 49.40 0.12 2.40 95 378.29 5
6+280 20.00 0.29 6.01 120.20 7.30 6.17 123.45 3.25 20.00 2.29 45.80 0.20 4.00 95 114.19 5
6+300 20.00 - 0.15 3.00 16.81 12.05 241.00 238.00 20.00 4.23 84.60 0.51 10.10 95 2.85 5
6+320 20.00 - - - 40.75 28.78 575.55 575.55 20.00 6.85 137.00 1.10 22.00 95 - 5
6+340 20.00 - - - 57.16 48.96 979.10 979.10 20.00 11.86 237.20 3.05 61.00 95 - 5
6+360 20.00 - - - 61.26 59.21 1,184.15 1,184.15 10.00 7.82 78.20 1.53 15.30 95 - 5
6+380 20.00 - - - 126.07 93.66 1,873.20 1,873.20 - - - - - 95 - 5
6+400 20.00 - - - 168.86 147.46 2,949.25 2,949.25 - - - - - 95 - 5
6+420 20.00 - - - 172.41 170.63 3,412.65 3,412.65 - - - - - 95 - 5
6+440 20.00 - - - 212.31 192.36 3,847.10 3,847.10 - - - - - 95 - 5
6+460 20.00 - - - 180.83 196.57 3,931.35 3,931.35 - - - - - 95 - 5
6+480 20.00 - - - 71.09 125.96 2,519.20 2,519.20 10.00 8.80 87.95 0.75 7.45 95 - 5
36 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
6+500 20.00 32.55 16.28 325.60 5.93 38.51 770.20 444.60 20.00 17.49 349.80 5.42 108.40 95 309.32 5
6+520 20.00 0.28 16.42 328.40 23.75 14.84 296.75 - 20.00 11.69 233.80 2.37 47.40 95 311.98 5
6+540 20.00 4.49 2.39 47.80 18.21 20.98 419.55 371.75 20.00 17.52 350.40 4.45 88.90 95 45.41 5
6+560 20.00 11.62 8.06 161.20 4.47 11.34 226.80 65.60 10.00 4.63 46.30 0.88 8.75 95 153.14 5
6+580 20.00 34.04 22.83 456.60 - 2.24 44.70 - - - - - - 95 433.77 5
6+600 20.00 35.30 34.67 693.40 0.16 0.08 1.60 - - - - - - 95 658.73 5
6+620 20.00 4.04 19.67 393.40 8.96 4.56 91.20 - 10.00 1.46 14.60 0.01 0.10 95 373.73 5
6+640 20.00 - 2.02 40.40 15.93 12.45 248.90 208.50 20.00 5.73 114.50 0.77 15.30 95 38.38 5
6+660 20.00 22.00 11.00 220.00 0.02 7.98 159.50 - 10.00 1.93 19.30 0.57 5.70 95 209.00 5
6+680 20.00 54.44 38.22 764.40 - 0.01 0.20 - - - - - - 95 726.18 5
6+700 20.00 99.87 77.16 1,543.20 - - - - 10.00 107.70 1,077.00 1.58 15.80 95 1,466.04 5
6+720 20.00 42.02 70.95 1,419.00 0.01 0.00 0.05 - 20.00 25.09 501.80 0.90 18.00 95 1,348.05 5
6+740 20.00 14.42 28.22 564.40 0.25 0.13 2.55 - 20.00 17.56 351.20 1.65 33.00 95 536.18 5
6+760 20.00 32.69 23.56 471.20 - 0.13 2.50 - 20.00 29.79 595.80 0.67 13.40 95 447.64 5
6+780 20.00 26.8012 29.75 595.00 0.003 0.00 0.03 - 20.00 26.71 534.20 0.66 13.20 95 565.25 5
6+800 20.00 28.72 27.76 555.20 - 0.00 0.03 - 20.00 29.60 591.90 0.80 16.00 95 527.44 5
6+820 20.00 28.43 28.58 571.60 - - - - 20.00 28.72 574.40 0.70 14.00 95 543.02 5
6+840 20.00 44.06 36.25 725.00 - - - - 20.00 33.50 670.00 0.79 15.80 95 688.75 5
6+860 20.00 37.81 40.94 818.80 - - - - 20.00 31.70 634.00 0.66 13.20 95 777.86 5
6+880 20.00 59.42 48.62 972.40 - - - - 20.00 42.26 845.20 0.68 13.60 95 923.78 5
6+900 20.00 74.80 67.11 1,342.20 - - - - 20.00 50.55 1,011.00 0.69 13.80 95 1,275.09 5
6+920 20.00 72.26 73.53 1,470.60 - - - - 20.00 49.51 990.10 0.69 13.80 95 1,397.07 5
6+940 20.00 58.26 65.26 1,305.20 - - - - 20.00 74.35 1,487.00 0.69 13.80 95 1,239.94 5
6+960 20.00 79.33 68.80 1,376.00 - - - - 20.00 125.16 2,503.20 1.60 32.00 95 1,307.20 5
6+980 20.00 85.36 82.35 1,647.00 - - - - 20.00 146.05 2,921.00 1.60 32.00 95 1,564.65 5
7+000 20.00 91.57 88.47 1,769.40 - - - - 20.00 153.23 3,064.60 1.73 34.60 95 1,680.93 5
7+020 20.00 120.16 105.87 2,117.40 - - - - 20.00 121.84 2,436.70 1.60 31.90 95 2,011.53 5
7+040 20.00 85.82 102.99 2,059.80 - - - - 20.00 93.36 1,867.20 2.83 56.60 95 1,956.81 5
7+060 20.00 101.95 93.89 1,877.80 - - - - 20.00 119.29 2,385.80 1.63 32.60 95 1,783.91 5
7+080 20.00 124.52 105.17 2,103.40 - - - - 20.00 153.99 3,079.80 1.44 28.70 95 1,998.23 5
7+100 20.00 142.30 122.13 2,442.60 - - - - 20.00 185.32 3,706.40 1.55 31.00 95 2,320.47 5
7+120 20.00 125.50 125.01 2,500.20 0.02 0.01 0.20 - 20.00 222.57 4,451.40 1.68 33.60 95 2,375.19 5
7+140 20.00 152.87 147.59 2,951.80 - - - - 20.00 279.81 5,596.20 3.09 61.80 95 2,804.21 5
37 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
7+160 20.00 147.40 136.45 2,729.00 - 0.01 0.20 - 10.00 317.47 3,174.70 6.91 69.10 95 2,592.55 5
7+180 20.00 280.74 216.81 4,336.20 - - - - - - - - - 95 4,119.39 5
7+200 20.00 273.47 210.44 4,208.80 - - - - - - - - - 95 3,998.36 5
7+220 20.00 349.04 314.89 6,297.80 - - - - - - - - - 95 5,982.91 5
7+240 20.00 343.48 308.48 6,169.60 - - - - - - - - - 95 5,861.12 5
7+260 20.00 349.52 349.28 6,985.60 - - - - - - - - - 95 6,636.32 5
7+280 20.00 356.63 350.06 7,001.20 - - - - - - - - - 95 6,651.14 5
7+300 20.00 375.73 362.63 7,252.60 - - - - - - - - - 95 6,889.97 5
7+320 20.00 376.24 366.44 7,328.80 - - - - - - - - - 95 6,962.36 5
7+340 20.00 381.43 378.58 7,571.60 - - - - - - - - - 95 7,193.02 5
7+360 20.00 413.65 394.95 7,899.00 - - - - - - - - - 95 7,504.05 5
7+380 20.00 395.84 388.64 7,772.80 - - - - - - - - - 95 7,384.16 5
7+400 20.00 458.15 435.90 8,718.00 - - - - - - - - - 95 8,282.10 5
7+420 20.00 520.54 458.19 9,163.80 - - - - - - - - - 95 8,705.61 5
7+440 20.00 523.58 490.87 9,817.40 - - - - - - - - - 95 9,326.53 5
7+460 20.00 491.16 505.85 10,117.00 - - - - - - - - - 95 9,611.15 5
7+480 20.00 509.23 516.41 10,328.20 - - - - - - - - - 95 9,811.79 5
7+500 20.00 564.29 527.73 10,554.60 - - - - - - - - - 95 10,026.87 5
7+520 20.00 540.48 524.86 10,497.20 - - - - - - - - - 95 9,972.34 5
7+540 20.00 471.61 517.95 10,359.00 - - - - - - - - - 95 9,841.05 5
7+560 20.00 551.84 546.16 10,923.20 - - - - - - - - - 95 10,377.04 5
7+580 20.00 553.28 512.45 10,249.00 - - - - - - - - - 95 9,736.55 5
7+600 20.00 555.13 553.49 11,069.80 - - - - - - - - - 95 10,516.31 5
7+620 20.00 538.54 545.91 10,918.20 - - - - - - - - - 95 10,372.29 5
7+640 20.00 536.41 545.77 10,915.40 - - - - - - - - - 95 10,369.63 5
7+660 20.00 514.70 526.62 10,532.40 - - - - - - - - - 95 10,005.78 5
7+680 20.00 533.10 534.76 10,695.20 - - - - - - - - - 95 10,160.44 5
7+700 20.00 525.30 520.00 10,400.00 - - - - - - - - - 95 9,880.00 5
7+720 20.00 539.82 536.46 10,729.20 - - - - - - - - - 95 10,192.74 5
7+740 20.00 737.30 631.30 12,626.00 - - - - - - - - - 95 11,994.70 5
7+760 20.00 738.40 639.11 12,782.20 - - - - - - - - - 95 12,143.09 5
7+780 20.00 668.14 702.72 14,054.40 - - - - - - - - - 95 13,351.68 5
7+800 20.00 601.15 669.78 13,395.60 - - - - - - - - - 95 12,725.82 5
38 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
7+820 20.00 602.05 635.10 12,702.00 - - - - - - - - - 95 12,066.90 5
7+840 20.00 618.61 609.88 12,197.60 - - - - - - - - - 95 11,587.72 5
7+860 20.00 615.22 608.64 12,172.80 - - - - - - - - - 95 11,564.16 5
7+880 20.00 634.77 626.69 12,533.80 - - - - - - - - - 95 11,907.11 5
7+900 20.00 662.03 638.63 12,772.60 - - - - - - - - - 95 12,133.97 5
7+920 20.00 746.72 690.75 13,815.00 - - - - - - - - - 95 13,124.25 5
7+940 20.00 679.53 670.78 13,415.60 - - - - - - - - - 95 12,744.82 5
7+960 20.00 683.29 715.01 14,300.20 - - - - - - - - - 95 13,585.19 5
7+980 20.00 728.17 703.85 14,077.00 - - - - - - - - - 95 13,373.15 5
8+000 20.00 740.84 712.07 14,241.40 - - - - - - - - - 95 13,529.33 5
8+020 20.00 789.39 758.78 15,175.60 - - - - - - - - - 95 14,416.82 5
8+040 20.00 810.61 775.73 15,514.60 - - - - - - - - - 95 14,738.87 5
8+060 20.00 817.57 803.48 16,069.60 - - - - - - - - - 95 15,266.12 5
8+080 20.00 837.40 824.01 16,480.20 - - - - - - - - - 95 15,656.19 5
8+100 20.00 812.04 814.81 16,296.20 - - - - - - - - - 95 15,481.39 5
8+120 20.00 793.09 815.25 16,305.00 - - - - - - - - - 95 15,489.75 5
8+140 20.00 755.68 783.86 15,677.20 - - - - - - - - - 95 14,893.34 5
8+160 20.00 738.00 765.55 15,311.00 - - - - - - - - - 95 14,545.45 5
8+180 20.00 825.03 790.36 15,807.20 - - - - - - - - - 95 15,016.84 5
8+200 20.00 820.19 779.10 15,582.00 - - - - - - - - - 95 14,802.90 5
8+220 20.00 884.48 854.76 17,095.20 - - - - - - - - - 95 16,240.44 5
8+240 20.00 799.06 809.63 16,192.60 - - - - - - - - - 95 15,382.97 5
8+260 20.00 787.89 836.19 16,723.80 - - - - - - - - - 95 15,887.61 5
8+280 20.00 761.42 780.24 15,604.80 - - - - - - - - - 95 14,824.56 5
8+300 20.00 821.06 804.48 16,089.60 0.01 0.01 0.20 - - - - - - 95 15,285.12 5
8+320 20.00 803.73 782.58 15,651.60 - - - - - - - - - 95 14,869.02 5
8+340 20.00 693.04 757.05 15,141.00 - 0.01 0.20 - - - - - - 95 14,383.95 5
8+360 20.00 887.73 845.73 16,914.60 - - - - - - - - - 95 16,068.87 5
8+380 20.00 803.32 748.18 14,963.60 - - - - - - - - - 95 14,215.42 5
8+400 20.00 834.76 861.25 17,225.00 - - - - - - - - - 95 16,363.75 5
8+420 20.00 781.40 792.36 15,847.20 - - - - - - - - - 95 15,054.84 5
8+440 20.00 776.86 805.81 16,116.20 - - - - - - - - - 95 15,310.39 5
8+460 20.00 928.10 854.75 17,095.00 - - - - - - - - - 95 16,240.25 5
39 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
8+480 20.00 947.08 861.97 17,239.40 - - - - - - - - - 95 16,377.43 5
8+500 20.00 853.41 890.76 17,815.20 - - - - - - - - - 95 16,924.44 5
8+520 20.00 862.98 905.03 18,100.60 - - - - - - - - - 95 17,195.57 5
8+540 20.00 873.57 863.49 17,269.80 - - - - - - - - - 95 16,406.31 5
8+560 20.00 907.34 885.16 17,703.20 - - - - - - - - - 95 16,818.04 5
8+580 20.00 908.68 891.13 17,822.60 - - - - - - - - - 95 16,931.47 5
8+600 20.00 946.49 926.92 18,538.40 - - - - - - - - - 95 17,611.48 5
8+620 20.00 952.36 930.52 18,610.40 - - - - - - - - - 95 17,679.88 5
8+640 20.00 891.92 919.21 18,384.20 - - - - - - - - - 95 17,464.99 5
8+660 20.00 888.74 920.55 18,411.00 - - - - - - - - - 95 17,490.45 5
8+680 20.00 936.70 914.31 18,286.20 - - - - - - - - - 95 17,371.89 5
8+700 20.00 873.70 881.22 17,624.40 - - - - - - - - - 95 16,743.18 5
8+720 20.00 947.16 941.93 18,838.60 - - - - - - - - - 95 17,896.67 5
8+740 20.00 836.45 855.08 17,101.60 - - - - - - - - - 95 16,246.52 5
8+760 20.00 925.96 936.56 18,731.20 - - - - - - - - - 95 17,794.64 5
8+780 20.00 1,007.90 922.18 18,443.60 - - - - - - - - - 95 17,521.42 5
8+800 20.00 1,016.65 971.31 19,426.20 - - - - - - - - - 95 18,454.89 5
8+820 20.00 940.71 974.31 19,486.20 - - - - - - - - - 95 18,511.89 5
8+840 20.00 971.79 994.22 19,884.40 - - - - - - - - - 95 18,890.18 5
8+860 20.00 1,073.70 1,007.21 20,144.20 - - - - - - - - - 95 19,136.99 5
8+880 20.00 1,062.44 1,017.12 20,342.40 - - - - - - - - - 95 19,325.28 5
8+900 20.00 1,042.50 1,058.10 21,162.00 - - - - - - - - - 95 20,103.90 5
8+920 20.00 975.73 1,019.09 20,381.80 - - - - - - - - - 95 19,362.71 5
8+940 20.00 1,084.79 1,063.65 21,273.00 - - - - - - - - - 95 20,209.35 5
8+960 20.00 1,016.27 996.00 19,920.00 - - - - - - - - - 95 18,924.00 5
8+980 20.00 998.48 1,041.64 20,832.80 - - - - - - - - - 95 19,791.16 5
9+000 20.00 997.94 1,007.11 20,142.20 - - - - - - - - - 95 19,135.09 5
9+020 20.00 1,079.63 1,039.06 20,781.20 0.01 0.01 0.20 - - - - - - 95 19,742.14 5
9+040 20.00 1,096.84 1,047.39 20,947.80 - - - - - - - - - 95 19,900.41 5
9+060 20.00 1,040.30 1,059.97 21,199.40 - 0.01 0.20 - - - - - - 95 20,139.43 5
9+080 20.00 970.52 1,033.68 20,673.60 - - - - - - - - - 95 19,639.92 5
9+100 20.00 973.24 1,006.77 20,135.40 - - - - - - - - - 95 19,128.63 5
9+120 20.00 1,097.02 1,033.77 20,675.40 - - - - - - - - - 95 19,641.63 5
40 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
9+140 20.00 1,085.24 1,029.24 20,584.80 - - - - - - - - - 95 19,555.56 5
9+160 20.00 1,063.88 1,080.45 21,609.00 - - - - - - - - - 95 20,528.55 5
9+180 20.00 993.47 1,039.36 20,787.20 - - - - - - - - - 95 19,747.84 5
9+200 20.00 974.60 1,019.24 20,384.80 - - - - - - - - - 95 19,365.56 5
9+220 20.00 1,029.28 1,011.38 20,227.60 - - - - - - - - - 95 19,216.22 5
9+240 20.00 991.86 983.23 19,664.60 - - - - - - - - - 95 18,681.37 5
9+260 20.00 1,024.32 1,026.80 20,536.00 - - - - - - - - - 95 19,509.20 5
9+280 20.00 962.29 977.08 19,541.60 - - - - - - - - - 95 18,564.52 5
9+300 20.00 1,040.21 1,032.27 20,645.40 - - - - - - - - - 95 19,613.13 5
9+320 20.00 1,091.17 1,026.73 20,534.60 - - - - - - - - - 95 19,507.87 5
9+340 20.00 1,084.88 1,062.55 21,251.00 - - - - - - - - - 95 20,188.45 5
9+360 20.00 1,046.08 1,068.63 21,372.60 - - - - - - - - - 95 20,303.97 5
9+380 20.00 924.40 1,004.64 20,092.80 - - - - - - - - - 95 19,088.16 5
9+400 20.00 1,015.40 1,030.74 20,614.80 - - - - - - - - - 95 19,584.06 5
9+420 20.00 1,178.37 1,051.39 21,027.80 - - - - - - - - - 95 19,976.41 5
9+440 20.00 1,183.85 1,099.63 21,992.60 - - - - - - - - - 95 20,892.97 5
9+460 20.00 1,076.73 1,127.55 22,551.00 - - - - - - - - - 95 21,423.45 5
9+480 20.00 1,134.14 1,159.00 23,180.00 - - - - - - - - - 95 22,021.00 5
9+500 20.00 1,020.61 1,048.67 20,973.40 - - - - - - - - - 95 19,924.73 5
9+520 20.00 1,070.77 1,102.46 22,049.20 - - - - - - - - - 95 20,946.74 5
9+540 20.00 1,069.04 1,044.83 20,896.60 - - - - - - - - - 95 19,851.77 5
9+560 20.00 1,076.99 1,073.88 21,477.60 - - - - - - - - - 95 20,403.72 5
9+580 20.00 1,071.40 1,070.22 21,404.40 - - - - - - - - - 95 20,334.18 5
9+600 20.00 939.50 1,008.25 20,165.00 - - - - - - - - - 95 19,156.75 5
9+620 20.00 669.02 870.21 17,404.20 - - - - - - - - - 95 16,533.99 5
9+640 20.00 1,120.64 1,030.07 20,601.40 - - - - - - - - - 95 19,571.33 5
9+660 20.00 1,083.42 876.22 17,524.40 - - - - - - - - - 95 16,648.18 5
9+680 20.00 1,003.17 1,061.91 21,238.20 - - - - - - - - - 95 20,176.29 5
9+700 20.00 990.32 1,036.87 20,737.40 - - - - - - - - - 95 19,700.53 5
9+720 20.00 1,007.09 1,005.13 20,102.60 - - - - - - - - - 95 19,097.47 5
9+740 20.00 1,019.17 1,004.75 20,095.00 - - - - - - - - - 95 19,090.25 5
9+760 20.00 973.08 990.09 19,801.80 - - - - - - - - - 95 18,811.71 5
9+780 20.00 1,026.77 1,022.97 20,459.40 - - - - - - - - - 95 19,436.43 5
41 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
9+800 20.00 1,030.31 1,001.70 20,034.00 - - - - - - - - - 95 19,032.30 5
9+820 20.00 970.31 998.54 19,970.80 - - - - - - - - - 95 18,972.26 5
9+840 20.00 847.80 939.06 18,781.20 - - - - - - - - - 95 17,842.14 5
9+860 20.00 984.66 977.49 19,549.80 0.07 0.04 0.80 - - - - - - 95 18,572.31 5
9+880 20.00 989.09 918.45 18,369.00 - - - - - - - - - 95 17,450.55 5
9+900 20.00 1,056.48 1,020.57 20,411.40 - 0.04 0.80 - - - - - - 95 19,390.83 5
9+920 20.00 1,034.14 1,011.62 20,232.40 - - - - - - - - - 95 19,220.78 5
9+940 20.00 1,045.98 1,051.23 21,024.60 - - - - - - - - - 95 19,973.37 5
9+960 20.00 937.77 985.96 19,719.20 - - - - - - - - - 95 18,733.24 5
9+980 20.00 931.20 988.59 19,771.80 - - - - - - - - - 95 18,783.21 5
10+000 20.00 1,112.13 1,024.95 20,499.00 - - - - - - - - - 95 19,474.05 5
10+020 20.00 1,110.48 1,020.84 20,416.80 - - - - - - - - - 95 19,395.96 5
10+040 20.00 1,162.36 1,137.25 22,745.00 - - - - - - - - - 95 21,607.75 5
10+060 20.00 996.26 1,053.37 21,067.40 - - - - - - - - - 95 20,014.03 5
10+080 20.00 1,000.47 1,081.42 21,628.40 - - - - - - - - - 95 20,546.98 5
10+100 20.00 1,015.27 1,005.77 20,115.40 - - - - - - - - - 95 19,109.63 5
10+120 20.00 1,122.83 1,061.65 21,233.00 - - - - - - - - - 95 20,171.35 5
10+140 20.00 1,108.96 1,062.12 21,242.40 - - - - - - - - - 95 20,180.28 5
10+160 20.00 1,111.38 1,117.11 22,342.20 - - - - - - - - - 95 21,225.09 5
10+180 20.00 1,125.62 1,117.29 22,345.80 - - - - - - - - - 95 21,228.51 5
10+200 20.00 1,143.73 1,127.56 22,551.20 - - - - - - - - - 95 21,423.64 5
10+220 20.00 1,157.22 1,141.42 22,828.40 - - - - - - - - - 95 21,686.98 5
10+240 20.00 1,152.54 1,148.14 22,962.80 - - - - - - - - - 95 21,814.66 5
10+260 20.00 1,147.54 1,152.38 23,047.60 - - - - - - - - - 95 21,895.22 5
10+280 20.00 1,138.47 1,145.51 22,910.20 - - - - - - - - - 95 21,764.69 5
10+300 20.00 1,119.41 1,133.48 22,669.60 - - - - - - - - - 95 21,536.12 5
10+320 20.00 1,103.78 1,121.13 22,422.60 0.05 0.03 0.60 - - - - - - 95 21,301.47 5
10+340 20.00 1,121.29 1,120.35 22,407.00 - - - - - - - - - 95 21,286.65 5
10+360 20.00 1,102.67 1,103.23 22,064.60 - 0.03 0.60 - - - - - - 95 20,961.37 5
10+380 20.00 1,054.24 1,087.77 21,755.40 - - - - - - - - - 95 20,667.63 5
10+400 20.00 1,050.80 1,076.74 21,534.80 - - - - - - - - - 95 20,458.06 5
10+420 20.00 1,056.63 1,055.44 21,108.80 - - - - - - - - - 95 20,053.36 5
10+440 20.00 986.22 1,018.51 20,370.20 - - - - - - - - - 95 19,351.69 5
42 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
10+460 20.00 1,086.62 1,071.63 21,432.60 - - - - - - - - - 95 20,360.97 5
10+480 20.00 1,130.21 1,058.22 21,164.40 - - - - - - - - - 95 20,106.18 5
10+500 20.00 1,131.99 1,109.31 22,186.20 - - - - - - - - - 95 21,076.89 5
10+520 20.00 1,076.56 1,103.39 22,067.80 0.01 0.01 0.20 - - - - - - 95 20,964.41 5
10+540 20.00 1,080.88 1,106.44 22,128.80 - - - - - - - - - 95 21,022.36 5
10+560 20.00 1,105.88 1,091.22 21,824.40 - 0.01 0.20 - - - - - - 95 20,733.18 5
10+580 20.00 1,021.77 1,051.33 21,026.60 - - - - - - - - - 95 19,975.27 5
10+600 20.00 1,027.68 1,066.78 21,335.60 - - - - - - - - - 95 20,268.82 5
10+620 20.00 1,035.25 1,028.51 20,570.20 - - - - - - - - - 95 19,541.69 5
10+640 20.00 1,042.52 1,035.10 20,702.00 - - - - - - - - - 95 19,666.90 5
10+660 20.00 1,041.63 1,038.44 20,768.80 - - - - - - - - - 95 19,730.36 5
10+680 20.00 901.69 972.11 19,442.20 - - - - - - - - - 95 18,470.09 5
10+700 20.00 845.80 943.72 18,874.40 - - - - - - - - - 95 17,930.68 5
10+720 20.00 1,118.44 1,010.07 20,201.40 - - - - - - - - - 95 19,191.33 5
10+740 20.00 1,080.88 963.34 19,266.80 - - - - - - - - - 95 18,303.46 5
10+760 20.00 1,077.53 1,097.99 21,959.80 - - - - - - - - - 95 20,861.81 5
10+780 20.00 1,078.85 1,079.87 21,597.40 - - - - - - - - - 95 20,517.53 5
10+800 20.00 1,061.57 1,069.55 21,391.00 - - - - - - - - - 95 20,321.45 5
10+820 20.00 1,059.66 1,069.26 21,385.20 - - - - - - - - - 95 20,315.94 5
10+840 20.00 1,101.21 1,081.39 21,627.80 - - - - - - - - - 95 20,546.41 5
10+860 20.00 1,098.29 1,078.98 21,579.60 - - - - - - - - - 95 20,500.62 5
10+880 20.00 1,029.97 1,065.59 21,311.80 0.01 0.01 0.20 - - - - - - 95 20,246.21 5
10+900 20.00 1,005.63 1,051.96 21,039.20 - - - - - - - - - 95 19,987.24 5
10+920 20.00 930.76 980.37 19,607.40 - 0.01 0.20 - - - - - - 95 18,627.03 5
10+940 20.00 971.34 988.49 19,769.80 - - - - - - - - - 95 18,781.31 5
10+960 20.00 997.97 964.37 19,287.40 - - - - - - - - - 95 18,323.03 5
10+980 20.00 961.94 966.64 19,332.80 - - - - - - - - - 95 18,366.16 5
11+000 20.00 901.95 949.96 18,999.20 - - - - - - - - - 95 18,049.24 5
11+020 20.00 906.46 934.20 18,684.00 - - - - - - - - - 95 17,749.80 5
11+040 20.00 875.91 888.93 17,778.60 - - - - - - - - - 95 16,889.67 5
11+060 20.00 849.61 878.04 17,560.80 - - - - - - - - - 95 16,682.76 5
11+080 20.00 871.28 873.60 17,472.00 - - - - - - - - - 95 16,598.40 5
11+100 20.00 844.24 846.93 16,938.60 - - - - - - - - - 95 16,091.67 5
43 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
11+120 20.00 824.53 847.91 16,958.20 - - - - - - - - - 95 16,110.29 5
11+140 20.00 810.55 827.40 16,548.00 - - - - - - - - - 95 15,720.60 5
11+160 20.00 720.43 772.48 15,449.60 - - - - - - - - - 95 14,677.12 5
11+180 20.00 654.89 732.72 14,654.40 - - - - - - - - - 95 13,921.68 5
11+200 20.00 680.85 700.64 14,012.80 - - - - - - - - - 95 13,312.16 5
11+220 20.00 614.46 634.68 12,693.60 - - - - - - - - - 95 12,058.92 5
11+240 20.00 595.04 637.95 12,759.00 - - - - - - - - - 95 12,121.05 5
11+260 20.00 561.94 588.20 11,764.00 - - - - - - - - - 95 11,175.80 5
11+280 20.00 533.79 564.42 11,288.40 - - - - - - - - - 95 10,723.98 5
11+300 20.00 546.28 554.11 11,082.20 - - - - - - - - - 95 10,528.09 5
11+320 20.00 550.45 542.12 10,842.40 - - - - - - - - - 95 10,300.28 5
11+340 20.00 457.02 501.65 10,033.00 - - - - - - - - - 95 9,531.35 5
11+360 20.00 460.17 505.31 10,106.20 - - - - - - - - - 95 9,600.89 5
11+380 20.00 436.79 446.91 8,938.20 - - - - - - - - - 95 8,491.29 5
11+400 20.00 241.60 350.89 7,017.80 - - - - - - - - - 95 6,666.91 5
11+420 20.00 418.27 427.53 8,550.60 0.01 0.01 0.20 - - - - - - 95 8,123.07 5
11+440 20.00 447.33 344.47 6,889.40 - - - - - - - - - 95 6,544.93 5
11+460 20.00 437.53 427.90 8,558.00 - 0.01 0.20 - - - - - - 95 8,130.10 5
11+480 20.00 407.78 427.56 8,551.20 0.01 0.01 0.20 - - - - - - 95 8,123.64 5
11+500 20.00 353.13 395.33 7,906.60 - - - - - - - - - 95 7,511.27 5
11+520 20.00 359.50 383.64 7,672.80 - 0.01 0.20 - - - - - - 95 7,289.16 5
11+540 20.00 295.91 324.52 6,490.40 - - - - - - - - - 95 6,165.88 5
11+560 20.00 359.47 359.49 7,189.80 - - - - - - - - - 95 6,830.31 5
11+580 20.00 291.55 293.73 5,874.60 - - - - - - - - - 95 5,580.87 5
11+600 20.00 275.22 317.35 6,347.00 - - - - - - - - - 95 6,029.65 5
11+620 20.00 242.38 266.97 5,339.40 - - - - - - - - - 95 5,072.43 5
11+640 20.00 213.27 244.25 4,885.00 - - - - - - - - - 95 4,640.75 5
11+660 20.00 225.53 233.96 4,679.20 - - - - - - - - - 95 4,445.24 5
11+680 20.00 268.59 240.93 4,818.60 - - - - - - - - - 95 4,577.67 5
11+700 20.00 266.80 246.17 4,923.40 - - - - - - - - - 95 4,677.23 5
11+720 20.00 235.28 251.94 5,038.80 - - - - - - - - - 95 4,786.86 5
11+740 20.00 264.23 265.52 5,310.40 0.01 0.01 0.20 - - - - - - 95 5,044.88 5
11+760 20.00 212.04 223.66 4,473.20 - - - - - - - - - 95 4,249.54 5
44 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
11+780 20.00 278.08 271.16 5,423.20 - 0.01 0.20 - - - - - - 95 5,152.04 5
11+800 20.00 274.53 243.29 4,865.80 - - - - - - - - - 95 4,622.51 5
11+820 20.00 301.48 289.78 5,795.60 - - - - - - - - - 95 5,505.82 5
11+840 20.00 326.56 300.55 6,011.00 - - - - - - - - - 95 5,710.45 5
11+860 20.00 338.69 320.09 6,401.80 - - - - - - - - - 95 6,081.71 5
11+880 20.00 409.67 368.12 7,362.40 - - - - - - - - - 95 6,994.28 5
11+900 20.00 458.41 398.55 7,971.00 - - - - - - - - - 95 7,572.45 5
11+920 20.00 519.38 464.53 9,290.60 - - - - - - - - - 95 8,826.07 5
11+940 20.00 562.08 510.25 10,205.00 0.02 0.01 0.20 - - - - - - 95 9,694.75 5
11+960 20.00 536.56 527.97 10,559.40 - - - - - - - - - 95 10,031.43 5
11+980 20.00 588.42 575.25 11,505.00 - 0.01 0.20 - - - - - - 95 10,929.75 5
12+000 20.00 547.27 541.92 10,838.40 - - - - - - - - - 95 10,296.48 5
12+020 20.00 458.79 523.61 10,472.20 - - - - - - - - - 95 9,948.59 5
12+040 20.00 520.71 533.99 10,679.80 - - - - - - - - - 95 10,145.81 5
12+060 20.00 586.61 522.70 10,454.00 - - - - - - - - - 95 9,931.30 5
12+080 20.00 589.18 554.95 11,099.00 - - - - - - - - - 95 10,544.05 5
12+100 20.00 556.09 571.35 11,427.00 0.01 0.01 0.20 - - - - - - 95 10,855.65 5
12+120 20.00 522.02 555.60 11,112.00 - - - - - - - - - 95 10,556.40 5
12+140 20.00 511.98 534.04 10,680.80 - 0.01 0.20 - - - - - - 95 10,146.76 5
12+160 20.00 503.27 512.65 10,253.00 - - - - - - - - - 95 9,740.35 5
12+180 20.00 402.82 457.40 9,148.00 0.01 0.01 0.20 - - - - - - 95 8,690.60 5
12+200 20.00 446.15 474.71 9,494.20 - - - - - - - - - 95 9,019.49 5
12+220 20.00 373.55 388.19 7,763.80 - 0.01 0.20 - - - - - - 95 7,375.61 5
12+240 20.00 475.99 461.07 9,221.40 - - - - - - - - - 95 8,760.33 5
12+260 20.00 500.41 436.98 8,739.60 - - - - - - - - - 95 8,302.62 5
12+280 20.00 440.52 458.26 9,165.20 - - - - - - - - - 95 8,706.94 5
12+300 20.00 426.32 463.37 9,267.40 - - - - - - - - - 95 8,804.03 5
12+320 20.00 418.73 429.63 8,592.60 - - - - - - - - - 95 8,162.97 5
12+340 20.00 412.82 419.57 8,391.40 - - - - - - - - - 95 7,971.83 5
12+360 20.00 372.97 395.85 7,917.00 - - - - - - - - - 95 7,521.15 5
12+380 20.00 297.79 355.31 7,106.20 - - - - - - - - - 95 6,750.89 5
12+400 20.00 313.94 343.46 6,869.20 0.01 0.01 0.20 - - - - - - 95 6,525.74 5
12+420 20.00 308.39 303.09 6,061.80 - - - - - - - - - 95 5,758.71 5
45 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
12+440 20.00 257.70 285.82 5,716.40 - 0.01 0.20 - - - - - - 95 5,430.58 5
12+460 20.00 287.53 297.96 5,959.20 - - - - - - - - - 95 5,661.24 5
12+480 20.00 238.60 248.15 4,963.00 - - - - - - - - - 95 4,714.85 5
12+500 20.00 287.96 287.75 5,755.00 - - - - - - - - - 95 5,467.25 5
12+520 20.00 309.94 274.27 5,485.40 - - - - - - - - - 95 5,211.13 5
12+540 20.00 318.25 303.11 6,062.20 0.01 0.01 0.20 - - - - - - 95 5,759.09 5
12+560 20.00 329.43 319.69 6,393.80 - - - - - - - - - 95 6,074.11 5
12+580 20.00 342.33 330.29 6,605.80 - 0.01 0.20 - - - - - - 95 6,275.51 5
12+600 20.00 309.48 319.46 6,389.20 - - - - - - - - - 95 6,069.74 5
12+620 20.00 287.06 314.70 6,294.00 - - - - - - - - - 95 5,979.30 5
12+640 20.00 255.44 282.46 5,649.20 - - - - - - - - - 95 5,366.74 5
12+660 20.00 235.32 261.19 5,223.80 - - - - - - - - - 95 4,962.61 5
12+680 20.00 182.92 219.18 4,383.60 - - - - - - - - - 95 4,164.42 5
12+700 20.00 342.32 288.82 5,776.40 - - - - - - - - - 95 5,487.58 5
12+720 20.00 391.01 286.97 5,739.40 - - - - - - - - - 95 5,452.43 5
12+740 20.00 394.23 368.28 7,365.60 - - - - - - - - - 95 6,997.32 5
12+760 20.00 355.02 373.02 7,460.40 - - - - - - - - - 95 7,087.38 5
12+780 20.00 360.73 377.48 7,549.60 - - - - - - - - - 95 7,172.12 5
12+800 20.00 354.35 354.69 7,093.80 - - - - - - - - - 95 6,739.11 5
12+820 20.00 336.82 348.78 6,975.60 - - - - - - - - - 95 6,626.82 5
12+840 20.00 359.86 357.11 7,142.20 - - - - - - - - - 95 6,785.09 5
12+860 20.00 404.72 370.77 7,415.40 - - - - - - - - - 95 7,044.63 5
12+880 20.00 368.79 364.33 7,286.60 - - - - - - - - - 95 6,922.27 5
12+900 20.00 349.69 377.21 7,544.20 - - - - - - - - - 95 7,166.99 5
12+920 20.00 349.19 358.99 7,179.80 - - - - - - - - - 95 6,820.81 5
12+940 20.00 336.02 342.86 6,857.20 - - - - - - - - - 95 6,514.34 5
12+960 20.00 355.90 352.55 7,051.00 - - - - - - - - - 95 6,698.45 5
12+980 20.00 362.87 349.45 6,989.00 - - - - - - - - - 95 6,639.55 5
13+000 20.00 384.00 369.95 7,399.00 - - - - - - - - - 95 7,029.05 5
13+020 20.00 309.65 336.26 6,725.20 - - - - - - - - - 95 6,388.94 5
13+040 20.00 340.78 362.39 7,247.80 - - - - - - - - - 95 6,885.41 5
13+060 20.00 324.85 317.25 6,345.00 - - - - - - - - - 95 6,027.75 5
13+080 20.00 316.74 328.76 6,575.20 - - - - - - - - - 95 6,246.44 5
46 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
13+100 20.00 285.95 305.40 6,108.00 - - - - - - - - - 95 5,802.60 5
13+120 20.00 196.30 256.52 5,130.40 - - - - - - - - - 95 4,873.88 5
13+140 20.00 155.50 220.73 4,414.60 - - - - - - - - - 95 4,193.87 5
13+160 20.00 156.82 176.56 3,531.20 - - - - - - - - - 95 3,354.64 5
13+180 20.00 208.72 182.11 3,642.20 - - - - - - - - - 95 3,460.09 5
13+200 20.00 199.93 178.38 3,567.60 - - - - - - - - - 95 3,389.22 5
13+220 20.00 170.87 189.80 3,796.00 - - - - - - - - - 95 3,606.20 5
13+240 20.00 163.42 181.68 3,633.60 - - - - - - - - - 95 3,451.92 5
13+260 20.00 225.54 198.21 3,964.20 - - - - - - - - - 95 3,765.99 5
13+280 20.00 201.03 182.23 3,644.60 - - - - - - - - - 95 3,462.37 5
13+300 20.00 192.17 208.86 4,177.20 - - - - - - - - - 95 3,968.34 5
13+320 20.00 220.30 210.67 4,213.40 - - - - - - - - - 95 4,002.73 5
13+340 20.00 198.45 195.31 3,906.20 - - - - - - - - - 95 3,710.89 5
13+360 20.00 223.33 221.82 4,436.40 - - - - - - - - - 95 4,214.58 5
13+380 20.00 193.30 195.88 3,917.60 - - - - - - - - - 95 3,721.72 5
13+400 20.00 185.70 204.52 4,090.40 - - - - - - - - - 95 3,885.88 5
13+420 20.00 159.61 176.46 3,529.20 - - - - - - - - - 95 3,352.74 5
13+440 20.00 171.50 178.60 3,572.00 - - - - - - - - - 95 3,393.40 5
13+460 20.00 66.25 112.93 2,258.60 - - - - - - - - - 95 2,145.67 5
13+480 20.00 70.78 121.14 2,422.80 - - - - - - - - - 95 2,301.66 5
13+500 20.00 215.86 141.06 2,821.20 - - - - - - - - - 95 2,680.14 5
13+520 20.00 186.19 128.49 2,569.80 - - - - - - - - - 95 2,441.31 5
13+540 20.00 175.08 195.47 3,909.40 - - - - - - - - - 95 3,713.93 5
13+560 20.00 187.35 186.77 3,735.40 - - - - - - - - - 95 3,548.63 5
13+580 20.00 151.55 163.32 3,266.40 - - - - - - - - - 95 3,103.08 5
13+600 20.00 189.67 188.51 3,770.20 - - - - - - - - - 95 3,581.69 5
13+620 20.00 217.06 184.31 3,686.20 - - - - - - - - - 95 3,501.89 5
13+640 20.00 156.77 173.22 3,464.40 - - - - - - - - - 95 3,291.18 5
13+660 20.00 162.56 189.81 3,796.20 - - - - - - - - - 95 3,606.39 5
13+680 20.00 116.38 136.58 2,731.60 0.01 0.01 0.20 - - - - - - 95 2,595.02 5
13+700 20.00 99.33 130.95 2,619.00 - - - - - - - - - 95 2,488.05 5
13+720 20.00 92.39 104.39 2,087.80 - 0.01 0.20 - - - - - - 95 1,983.41 5
13+740 20.00 77.41 88.37 1,767.40 - - - - - - - - - 95 1,679.03 5
47 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
13+760 20.00 80.02 86.21 1,724.20 - - - - - - - - - 95 1,637.99 5
13+780 20.00 51.43 64.42 1,288.40 - - - - - - - - - 95 1,223.98 5
13+800 20.00 41.76 60.89 1,217.80 - - - - - - - - - 95 1,156.91 5
13+820 20.00 12.16 31.80 636.00 9.72 4.86 97.20 - - - - - - 95 604.20 5
13+840 20.00 14.72 28.24 564.80 10.13 5.07 101.40 - 10.00 17.67 176.70 5.19 51.85 95 536.56 5
13+860 20.00 13.35 12.76 255.20 8.12 8.92 178.40 - 20.00 14.28 285.50 4.07 81.40 95 242.44 5
13+880 20.00 14.11 14.42 288.40 3.67 6.90 138.00 - 20.00 9.06 181.20 2.35 47.00 95 273.98 5
13+900 20.00 11.98 12.67 253.40 0.90 4.51 90.20 - 10.00 2.72 27.20 0.76 7.55 95 240.73 5
13+920 20.00 38.96 26.54 530.80 - 1.84 36.80 - - - - - - 95 504.26 5
13+940 20.00 - 5.99 119.80 31.44 16.17 323.40 203.60 10.00 4.12 41.15 0.68 6.80 95 113.81 5
13+960 20.00 - 19.48 389.60 16.32 8.16 163.20 - 20.00 12.23 244.60 2.76 55.20 95 370.12 5
13+980 20.00 - - - 14.80 23.12 462.40 462.40 10.00 5.74 57.40 0.85 8.45 95 - 5
14+000 20.00 10.52 5.26 105.20 11.66 13.99 279.80 174.60 - - - - - 95 99.94 5
14+020 20.00 49.13 24.57 491.40 0.34 7.57 151.40 - - - - - - 95 466.83 5
14+040 20.00 54.45 32.49 649.80 0.29 5.98 119.60 - - - - - - 95 617.31 5
14+060 20.00 31.63 40.38 807.60 2.89 1.62 32.40 - - - - - - 95 767.22 5
14+080 20.00 11.46 32.96 659.20 - 0.15 3.00 - - - - - - 95 626.24 5
14+100 20.00 13.94 22.79 455.80 - 1.45 29.00 - 10.00 1.29 12.90 0.26 2.55 95 433.01 5
14+120 20.00 9.55 10.51 210.20 - - - - 20.00 1.20 24.00 0.23 4.60 95 199.69 5
14+140 20.00 7.96 10.95 219.00 3.27 1.64 32.80 - 20.00 2.76 55.20 0.41 8.10 95 208.05 5
14+160 20.00 7.29 8.42 168.40 4.44 2.22 44.40 - 20.00 9.13 182.60 2.24 44.80 95 159.98 5
14+180 20.00 10.97 9.47 189.40 19.43 11.35 227.00 37.60 20.00 16.33 326.60 3.52 70.40 95 179.93 5
14+200 20.00 6.69 6.99 139.80 12.81 8.63 172.60 32.80 20.00 18.84 376.80 6.20 124.00 95 132.81 5
14+220 20.00 3.93 7.45 149.00 23.95 21.69 433.80 284.80 20.00 10.34 206.80 2.25 44.90 95 141.55 5
14+240 20.00 26.55 16.62 332.40 3.82 8.32 166.40 - 10.00 8.46 84.55 2.25 22.50 95 315.78 5
14+260 20.00 7.34 5.64 112.80 84.90 54.43 1,088.60 975.80 - - - - - 95 107.16 5
14+280 20.00 6.50 16.53 330.60 57.32 30.57 611.40 280.80 10.00 4.63 46.30 0.93 9.30 95 314.07 5
14+300 20.00 1.41 4.38 87.60 65.67 75.29 1,505.80 1,418.20 20.00 37.27 745.40 16.67 333.30 95 83.22 5
14+320 20.00 6.47 6.49 129.80 15.54 36.43 728.60 598.80 20.00 21.52 430.40 7.17 143.40 95 123.31 5
14+340 20.00 1.61 1.51 30.20 32.77 49.22 984.40 954.20 20.00 9.81 196.20 3.58 71.60 95 28.69 5
14+360 20.00 12.52 9.50 190.00 11.34 13.44 268.80 78.80 20.00 5.66 113.20 0.80 16.00 95 180.50 5
14+380 20.00 20.59 11.10 222.00 1.88 17.33 346.60 124.60 10.00 2.72 27.20 0.70 7.00 95 210.90 5
14+400 20.00 28.62 20.57 411.40 - 5.67 113.40 - - - - - - 95 390.83 5
48 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
14+420 20.00 14.96 17.78 355.60 - 0.94 18.80 - 10.00 1.67 16.65 0.40 4.00 95 337.82 5
14+440 20.00 9.62 19.12 382.40 4.17 2.09 41.80 - 20.00 9.43 188.60 2.33 46.60 95 363.28 5
14+460 20.00 5.97 10.47 209.40 1.53 0.77 15.40 - 20.00 2.53 50.50 0.64 12.80 95 198.93 5
14+480 20.00 2.05 5.84 116.80 3.49 3.83 76.60 - 10.00 1.07 10.70 0.17 1.70 95 110.96 5
14+500 20.00 1.48 3.73 74.60 4.02 2.78 55.60 - - - - - - 95 70.87 5
14+520 20.00 3.32 2.69 53.80 0.13 1.81 36.20 - - - - - - 95 51.11 5
14+540 20.00 3.90 2.69 53.80 5.00 4.51 90.20 36.40 - - - - - 95 51.11 5
14+560 20.00 10.62 6.97 139.40 1.16 0.65 13.00 - - - - - - 95 132.43 5
14+580 20.00 4.08 3.99 79.80 6.53 5.77 115.40 35.60 - - - - - 95 75.81 5
14+600 20.00 27.56 19.09 381.80 1.92 1.54 30.80 - - - - - - 95 362.71 5
14+620 20.00 20.33 12.21 244.20 3.64 5.09 101.80 - - - - - - 95 231.99 5
14+640 20.00 26.70 27.13 542.60 5.78 3.85 77.00 - 10.00 6.20 62.00 1.33 13.30 95 515.47 5
14+660 20.00 14.59 17.46 349.20 9.51 6.58 131.60 - 20.00 3.91 78.20 0.47 9.40 95 331.74 5
14+680 20.00 9.23 17.97 359.40 12.73 9.26 185.20 - 20.00 4.11 82.20 0.28 5.60 95 341.43 5
14+700 20.00 16.40 15.50 310.00 4.05 6.78 135.60 - 20.00 9.62 192.40 2.37 47.40 95 294.50 5
14+720 20.00 12.75 10.99 219.80 6.40 9.57 191.40 - 20.00 2.66 53.20 0.19 3.80 95 208.81 5
14+740 20.00 26.89 21.65 433.00 1.37 2.71 54.20 - 20.00 4.58 91.50 1.02 20.40 95 411.35 5
14+760 20.00 73.41 43.08 861.60 0.45 3.43 68.60 - 20.00 5.31 106.20 1.52 30.40 95 818.52 5
14+780 20.00 8.16 17.53 350.60 17.13 9.25 185.00 - 20.00 7.78 155.50 1.53 30.60 95 333.07 5
14+800 20.00 30.15 51.78 1,035.60 0.28 0.37 7.40 - 10.00 1.36 13.60 0.33 3.25 95 983.82 5
14+820 20.00 36.39 22.28 445.60 - 8.57 171.40 - - - - - - 95 423.32 5
14+840 20.00 20.40 25.28 505.60 - 0.14 2.80 - 10.00 1.42 14.15 0.28 2.80 95 480.32 5
14+860 20.00 14.17 25.28 505.60 3.99 2.00 40.00 - 20.00 1.74 34.80 0.17 3.40 95 480.32 5
14+880 20.00 0.86 10.63 212.60 13.34 6.67 133.40 - 20.00 5.47 109.30 0.72 14.40 95 201.97 5
14+900 20.00 1.78 7.98 159.60 4.73 4.36 87.20 - 20.00 2.96 59.20 0.36 7.10 95 151.62 5
14+920 20.00 0.59 0.73 14.60 6.01 9.68 193.60 179.00 20.00 0.98 19.50 - - 95 13.87 5
14+940 20.00 0.39 1.09 21.80 8.20 6.47 129.40 107.60 20.00 2.24 44.70 0.18 3.60 95 20.71 5
14+960 20.00 1.49 1.04 20.80 7.49 6.75 135.00 114.20 10.00 2.25 22.50 0.17 1.70 95 19.76 5
14+980 20.00 19.18 9.79 195.80 1.93 5.07 101.40 - - - - - - 95 186.01 5
15+000 20.00 21.28 11.39 227.80 0.09 3.79 75.80 - - - - - - 95 216.41 5
15+020 20.00 11.42 15.30 306.00 2.51 2.22 44.40 - 10.00 2.13 21.30 0.18 1.75 95 290.70 5
15+040 20.00 0.07 10.68 213.60 11.22 5.66 113.20 - 20.00 2.76 55.20 0.18 3.60 95 202.92 5
15+060 20.00 - 5.71 114.20 11.00 6.76 135.20 21.00 20.00 1.64 32.80 0.03 0.60 95 108.49 5
49 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
15+080 20.00 7.62 3.85 77.00 1.37 6.30 126.00 49.00 20.00 2.49 49.80 0.65 13.00 95 73.15 5
15+100 20.00 4.89 2.45 49.00 1.97 6.49 129.80 80.80 20.00 1.04 20.80 0.18 3.60 95 46.55 5
15+120 20.00 - 3.81 76.20 23.80 12.59 251.80 175.60 20.00 3.05 61.00 0.24 4.70 95 72.39 5
15+140 20.00 6.57 5.73 114.60 8.21 5.09 101.80 - 20.00 2.72 54.40 0.24 4.80 95 108.87 5
15+160 20.00 28.10 14.05 281.00 0.24 12.02 240.40 - 10.00 1.56 15.60 0.39 3.85 95 266.95 5
15+180 20.00 30.02 18.30 366.00 - 4.11 82.20 - - - - - - 95 347.70 5
15+200 20.00 12.52 20.31 406.20 1.08 0.66 13.20 - 10.00 1.99 19.90 0.27 2.70 95 385.89 5
15+220 20.00 7.38 18.70 374.00 6.54 3.27 65.40 - 20.00 1.66 33.20 0.05 1.00 95 355.30 5
15+240 20.00 11.26 11.89 237.80 0.78 0.93 18.60 - 20.00 1.46 29.20 0.32 6.40 95 225.91 5
15+260 20.00 17.01 12.20 244.00 4.44 5.49 109.80 - 20.00 2.58 51.60 0.56 11.20 95 231.80 5
15+280 20.00 16.65 13.96 279.20 11.35 6.07 121.40 - 20.00 1.80 35.90 0.04 0.80 95 265.24 5
15+300 20.00 3.12 10.07 201.40 8.41 6.43 128.60 - 20.00 3.00 59.90 0.29 5.80 95 191.33 5
15+320 20.00 10.51 13.58 271.60 3.48 7.42 148.40 - 20.00 1.60 32.00 0.06 1.20 95 258.02 5
15+340 20.00 2.25 2.69 53.80 4.57 6.49 129.80 76.00 20.00 1.10 22.00 0.17 3.40 95 51.11 5
15+360 20.00 - 5.26 105.20 10.90 7.19 143.80 38.60 20.00 2.48 49.60 0.48 9.60 95 99.94 5
15+380 20.00 2.82 2.54 50.80 11.20 7.89 157.80 107.00 20.00 0.22 4.40 - - 95 48.26 5
15+400 20.00 15.93 7.97 159.40 5.54 8.22 164.40 5.00 20.00 2.06 41.20 0.15 3.00 95 151.43 5
15+420 20.00 21.08 11.95 239.00 0.79 6.00 120.00 - 20.00 2.46 49.20 0.37 7.30 95 227.05 5
15+440 20.00 - 7.97 159.40 19.43 12.49 249.80 90.40 20.00 1.78 35.60 0.06 1.10 95 151.43 5
15+460 20.00 2.70 11.89 237.80 10.38 5.59 111.80 - 20.00 4.35 87.00 0.49 9.80 95 225.91 5
15+480 20.00 6.22 3.11 62.20 2.85 11.14 222.80 160.60 20.00 4.26 85.10 0.66 13.20 95 59.09 5
15+500 20.00 9.81 6.26 125.20 5.74 8.06 161.20 36.00 20.00 3.27 65.30 0.37 7.40 95 118.94 5
15+520 20.00 9.68 7.95 159.00 0.94 1.90 38.00 - 20.00 2.17 43.30 0.55 11.00 95 151.05 5
15+540 20.00 15.33 12.57 251.40 2.01 3.88 77.60 - 20.00 2.12 42.40 0.22 4.40 95 238.83 5
15+560 20.00 32.52 21.10 422.00 0.43 0.69 13.80 - 10.00 1.33 13.30 0.29 2.90 95 400.90 5
15+580 20.00 52.41 33.87 677.40 - 1.01 20.20 - - - - - - 95 643.53 5
15+600 20.00 44.88 38.70 774.00 - 0.22 4.40 - - - - - - 95 735.30 5
15+620 20.00 44.17 48.29 965.80 - - - - - - - - - 95 917.51 5
15+640 20.00 7.13 26.01 520.20 3.20 1.60 32.00 - 10.00 2.19 21.85 0.46 4.55 95 494.19 5
15+660 20.00 0.50 22.34 446.80 6.76 3.38 67.60 - 20.00 3.90 78.00 0.48 9.60 95 424.46 5
15+680 20.00 1.63 4.38 87.60 5.96 4.58 91.60 4.00 20.00 1.19 23.80 - - 95 83.22 5
15+700 20.00 3.81 2.16 43.20 6.65 6.71 134.20 91.00 20.00 3.81 76.20 0.45 9.00 95 41.04 5
15+720 20.00 18.95 10.29 205.80 1.64 3.80 76.00 - 20.00 2.45 49.00 0.29 5.80 95 195.51 5
50 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
15+740 20.00 22.53 13.17 263.40 1.14 3.90 78.00 - 20.00 2.15 43.00 0.28 5.60 95 250.23 5
15+760 20.00 5.95 12.45 249.00 6.26 3.95 79.00 - 20.00 3.26 65.20 0.36 7.20 95 236.55 5
15+780 20.00 2.98 12.76 255.20 4.82 2.98 59.60 - 20.00 2.98 59.50 0.35 7.00 95 242.44 5
15+800 20.00 10.08 8.02 160.40 2.76 4.51 90.20 - 20.00 1.94 38.70 0.17 3.40 95 152.38 5
15+820 20.00 26.27 14.63 292.60 1.85 3.34 66.80 - 20.00 1.98 39.60 0.20 4.00 95 277.97 5
15+840 20.00 4.60 7.34 146.80 0.28 1.52 30.40 - 20.00 1.18 23.60 0.25 5.00 95 139.46 5
15+860 20.00 4.82 15.55 311.00 7.75 4.80 96.00 - 20.00 5.44 108.70 0.81 16.20 95 295.45 5
15+880 20.00 12.46 8.53 170.60 3.32 1.80 36.00 - 20.00 1.54 30.80 0.08 1.60 95 162.07 5
15+900 20.00 21.55 13.19 263.80 1.20 4.48 89.60 - 20.00 2.50 50.00 0.34 6.70 95 250.61 5
15+920 20.00 20.54 16.50 330.00 2.80 3.06 61.20 - 20.00 1.40 28.00 0.05 1.00 95 313.50 5
15+940 20.00 9.31 15.43 308.60 5.47 3.34 66.80 - 20.00 4.59 91.80 0.68 13.60 95 293.17 5
15+960 20.00 7.23 13.89 277.80 12.14 7.47 149.40 - 20.00 20.22 404.40 5.65 113.00 95 263.91 5
15+980 20.00 1.35 5.33 106.60 22.12 13.80 276.00 169.40 20.00 12.51 250.20 2.68 53.60 95 101.27 5
16+000 20.00 24.60 15.92 318.40 2.45 7.30 146.00 - 20.00 6.94 138.80 1.60 31.90 95 302.48 5
16+020 20.00 11.42 6.39 127.80 10.39 16.26 325.20 197.40 20.00 6.66 133.20 1.14 22.80 95 121.41 5
16+040 20.00 20.02 22.31 446.20 7.52 4.99 99.80 - 20.00 11.53 230.60 2.76 55.20 95 423.89 5
16+060 20.00 33.07 22.25 445.00 4.13 7.26 145.20 - 20.00 5.91 118.20 1.15 23.00 95 422.75 5
16+080 20.00 28.75 24.39 487.80 4.26 5.89 117.80 - 20.00 6.14 122.80 1.13 22.60 95 463.41 5
16+100 20.00 4.50 18.79 375.80 8.45 6.29 125.80 - 20.00 7.38 147.50 1.29 25.80 95 357.01 5
16+120 20.00 1.17 14.96 299.20 13.99 9.13 182.60 - 20.00 9.11 182.20 1.72 34.40 95 284.24 5
16+140 20.00 0.01 2.26 45.20 67.68 38.07 761.40 716.20 10.00 2.42 24.20 0.30 2.95 95 42.94 5
16+160 20.00 - 0.59 11.80 102.19 58.09 1,161.80 1,150.00 - - - - - 95 11.21 5
16+180 20.00 - 0.01 0.20 103.97 85.83 1,716.60 1,716.40 - - - - - 95 0.19 5
16+200 20.00 21.39 10.70 214.00 0.20 51.20 1,024.00 810.00 7.00 0.79 5.53 0.13 0.91 95 203.30 5
16+220 20.00 87.83 43.92 878.40 - 51.99 1,039.80 161.40 - - - - - 95 834.48 5
16+240 20.00 19.31 20.35 407.00 3.89 2.05 41.00 - 10.00 6.02 60.20 1.19 11.90 95 386.65 5
16+260 20.00 12.94 50.39 1,007.80 4.19 2.10 42.00 - 20.00 6.35 127.00 1.23 24.60 95 957.41 5
16+280 20.00 4.06 11.69 233.80 15.58 9.74 194.80 - 20.00 16.94 338.80 4.20 84.00 95 222.11 5
16+300 20.00 5.56 9.25 185.00 16.77 10.48 209.60 24.60 20.00 14.66 293.20 3.47 69.40 95 175.75 5
16+320 20.00 26.56 15.31 306.20 5.85 10.72 214.40 - 20.00 12.24 244.80 3.24 64.70 95 290.89 5
16+340 20.00 53.83 29.70 594.00 2.14 9.46 189.20 - 20.00 7.28 145.60 1.72 34.40 95 564.30 5
16+360 20.00 58.97 42.77 855.40 2.60 4.23 84.60 - 20.00 21.28 425.60 7.84 156.80 95 812.63 5
16+380 20.00 46.11 49.97 999.40 4.69 3.42 68.40 - 10.00 22.95 229.45 9.11 91.10 95 949.43 5
51 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
16+400 20.00 64.28 61.63 1,232.60 - 1.30 26.00 - - - - - - 95 1,170.97 5
16+420 20.00 161.67 103.89 2,077.80 - 2.35 47.00 - - - - - - 95 1,973.91 5
16+440 20.00 195.83 130.06 2,601.20 - - - - - - - - - 95 2,471.14 5
16+460 20.00 125.50 143.59 2,871.80 - - - - - - - - - 95 2,728.21 5
16+480 20.00 127.70 161.77 3,235.40 - - - - - - - - - 95 3,073.63 5
16+500 20.00 173.26 149.38 2,987.60 - - - - - - - - - 95 2,838.22 5
16+520 20.00 177.27 152.49 3,049.80 - - - - - - - - - 95 2,897.31 5
16+540 20.00 163.86 168.56 3,371.20 - - - - - - - - - 95 3,202.64 5
16+560 20.00 99.00 138.14 2,762.80 - - - - - - - - - 95 2,624.66 5
16+580 20.00 72.83 118.35 2,367.00 - - - - - - - - - 95 2,248.65 5
16+600 20.00 75.12 87.06 1,741.20 - - - - - - - - - 95 1,654.14 5
16+620 20.00 75.07 73.95 1,479.00 - - - - - - - - - 95 1,405.05 5
16+640 20.00 121.16 98.14 1,962.80 - - - - - - - - - 95 1,864.66 5
16+660 20.00 165.01 120.04 2,400.80 - - - - - - - - - 95 2,280.76 5
16+680 20.00 162.01 141.59 2,831.80 - - - - - - - - - 95 2,690.21 5
16+700 20.00 162.30 163.66 3,273.20 0.01 0.01 0.20 - - - - - - 95 3,109.54 5
16+720 20.00 103.65 132.83 2,656.60 - - - - - - - - - 95 2,523.77 5
16+740 20.00 124.10 143.20 2,864.00 - 0.01 0.20 - - - - - - 95 2,720.80 5
16+760 20.00 109.84 106.75 2,135.00 - - - - - - - - - 95 2,028.25 5
16+780 20.00 110.84 117.47 2,349.40 - - - - - - - - - 95 2,231.93 5
16+800 20.00 65.28 87.56 1,751.20 - - - - - - - - - 95 1,663.64 5
16+820 20.00 44.91 77.88 1,557.60 1.46 0.73 14.60 - 10.00 4.76 47.60 0.96 9.60 95 1,479.72 5
16+840 20.00 51.00 58.14 1,162.80 1.45 0.73 14.60 - 10.00 1.83 18.25 0.22 2.20 95 1,104.66 5
16+860 20.00 98.07 71.49 1,429.80 2.11 1.79 35.80 - - - - - - 95 1,358.31 5
16+880 20.00 49.66 50.33 1,006.60 4.97 3.21 64.20 - 10.00 9.63 96.30 3.50 35.00 95 956.27 5
16+900 20.00 32.51 65.29 1,305.80 7.18 4.65 93.00 - 20.00 7.02 140.40 2.38 47.60 95 1,240.51 5
16+920 20.00 28.57 39.12 782.40 20.39 12.68 253.60 - 20.00 0.15 3.00 - - 95 743.28 5
16+940 20.00 33.24 32.88 657.60 9.57 8.38 167.60 - 20.00 12.91 258.20 3.46 69.20 95 624.72 5
16+960 20.00 37.25 32.91 658.20 2.01 11.20 224.00 - 20.00 11.40 228.00 3.48 69.60 95 625.29 5
16+980 20.00 32.92 33.08 661.60 4.64 7.11 142.20 - 20.00 12.93 258.60 3.70 74.00 95 628.52 5
17+000 20.00 42.60 39.93 798.60 8.53 5.27 105.40 - 20.00 3.34 66.70 0.83 16.60 95 758.67 5
17+020 20.00 14.56 23.74 474.80 9.18 6.91 138.20 - 20.00 10.21 204.20 2.24 44.80 95 451.06 5
17+040 20.00 8.44 25.52 510.40 10.01 9.27 185.40 - 20.00 7.17 143.40 1.73 34.60 95 484.88 5
52 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
17+060 20.00 11.18 12.87 257.40 10.86 10.02 200.40 - 20.00 2.83 56.60 0.56 11.20 95 244.53 5
17+080 20.00 8.55 8.50 170.00 12.07 11.04 220.80 50.80 20.00 10.54 210.80 2.75 55.00 95 161.50 5
17+100 20.00 11.57 11.38 227.60 12.75 11.81 236.20 8.60 20.00 14.43 288.50 4.38 87.60 95 216.22 5
17+120 20.00 24.87 16.71 334.20 11.36 11.72 234.40 - 20.00 9.30 185.90 2.80 55.90 95 317.49 5
17+140 20.00 47.00 29.29 585.80 5.78 9.27 185.40 - 20.00 16.52 330.40 5.27 105.30 95 556.51 5
17+160 20.00 12.21 18.54 370.80 2.65 7.01 140.20 - 20.00 3.25 65.00 0.93 18.60 95 352.26 5
17+180 20.00 36.30 41.65 833.00 3.72 4.75 95.00 - 20.00 3.02 60.40 0.42 8.40 95 791.35 5
17+200 20.00 34.70 23.46 469.20 3.53 3.09 61.80 - 10.00 6.17 61.70 1.35 13.50 95 445.74 5
17+220 20.00 108.78 72.54 1,450.80 - 1.86 37.20 - - - - - - 95 1,378.26 5
17+240 20.00 156.20 95.45 1,909.00 - 1.77 35.40 - 10.00 45.23 452.25 0.68 6.80 95 1,813.55 5
17+260 20.00 107.72 108.25 2,165.00 - - - - 20.00 39.28 785.60 1.27 25.40 95 2,056.75 5
17+280 20.00 71.79 114.00 2,280.00 1.08 0.54 10.80 - 20.00 35.83 716.60 2.07 41.40 95 2,166.00 5
17+300 20.00 76.91 92.32 1,846.40 - - - - 10.00 25.30 253.00 0.66 6.60 95 1,754.08 5
17+320 20.00 18.10 44.95 899.00 2.61 1.85 37.00 - - - - - - 95 854.05 5
17+340 20.00 0.69 38.80 776.00 8.53 4.27 85.40 - - - - - - 95 737.20 5
17+360 20.00 - 9.05 181.00 21.09 11.85 237.00 56.00 - - - - - 95 171.95 5
17+380 20.00 22.50 11.60 232.00 9.47 9.00 180.00 - 10.00 2.23 22.30 0.08 0.80 95 220.40 5
17+400 20.00 28.45 14.23 284.60 2.63 11.86 237.20 - 20.00 4.05 81.00 0.62 12.40 95 270.37 5
17+420 20.00 6.85 14.68 293.60 10.61 10.04 200.80 - 10.00 5.80 58.00 0.97 9.70 95 278.92 5
17+440 20.00 41.73 35.09 701.80 0.01 1.32 26.40 - - - - - - 95 666.71 5
17+460 20.00 84.32 45.59 911.80 - 5.31 106.20 - - - - - - 95 866.21 5
17+480 20.00 15.46 28.60 572.00 14.45 7.23 144.60 - 10.00 16.81 168.10 4.16 41.55 95 543.40 5
17+500 20.00 - 42.16 843.20 30.03 15.02 300.40 - 20.00 15.32 306.30 3.43 68.60 95 801.04 5
17+520 20.00 56.52 35.99 719.80 0.10 7.28 145.60 - 10.00 2.93 29.30 0.97 9.65 95 683.81 5
17+540 20.00 96.48 48.24 964.80 - 15.02 300.40 - - - - - - 95 916.56 5
17+560 20.00 94.40 75.46 1,509.20 - 0.05 1.00 - - - - - - 95 1,433.74 5
17+580 20.00 150.64 123.56 2,471.20 - - - - 10.00 48.34 483.40 0.69 6.85 95 2,347.64 5
17+600 20.00 85.05 89.73 1,794.60 0.01 0.01 0.20 - 10.00 19.96 199.60 0.94 9.40 95 1,704.87 5
17+620 20.00 59.16 104.90 2,098.00 - - - - - - - - - 95 1,993.10 5
17+640 20.00 88.11 86.58 1,731.60 - 0.01 0.20 - 7.00 21.23 148.61 1.02 7.14 95 1,645.02 5
17+660 20.00 61.46 60.31 1,206.20 - - - - - - - - - 95 1,145.89 5
17+680 20.00 61.05 74.58 1,491.60 - - - - - - - - - 95 1,417.02 5
17+700 20.00 45.74 53.60 1,072.00 0.88 0.44 8.80 - 10.00 2.88 28.80 0.90 8.95 95 1,018.40 5
53 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
17+720 20.00 50.01 55.53 1,110.60 0.31 0.16 3.20 - 10.00 2.43 24.30 0.74 7.35 95 1,055.07 5
17+740 20.00 97.50 71.62 1,432.40 - 0.44 8.80 - - - - - - 95 1,360.78 5
17+760 20.00 97.41 73.71 1,474.20 - 0.16 3.20 - - - - - - 95 1,400.49 5
17+780 20.00 66.75 82.13 1,642.60 0.15 0.08 1.60 - 10.00 1.56 15.55 0.40 4.00 95 1,560.47 5
17+800 20.00 58.13 77.77 1,555.40 0.47 0.24 4.80 - 10.00 2.77 27.70 0.48 4.80 95 1,477.63 5
17+820 20.00 157.79 112.27 2,245.40 - 0.08 1.60 - - - - - - 95 2,133.13 5
17+840 20.00 33.63 45.88 917.60 5.23 2.85 57.00 - 10.00 7.86 78.55 1.91 19.10 95 871.72 5
17+860 20.00 26.78 92.29 1,845.80 6.96 3.48 69.60 - 20.00 7.39 147.70 1.48 29.60 95 1,753.51 5
17+880 20.00 72.58 53.11 1,062.20 0.03 2.63 52.60 - 10.00 1.93 19.25 0.57 5.70 95 1,009.09 5
17+900 20.00 59.63 43.21 864.20 - 3.48 69.60 - - - - - - 95 820.99 5
17+920 20.00 3.81 38.20 764.00 13.56 6.80 136.00 - 10.00 2.70 27.00 0.22 2.20 95 725.80 5
17+940 20.00 7.53 33.58 671.60 5.78 2.89 57.80 - 20.00 5.73 114.50 0.99 19.80 95 638.02 5
17+960 20.00 15.00 9.41 188.20 2.81 8.19 163.80 - 20.00 4.07 81.40 0.61 12.20 95 178.79 5
17+980 20.00 22.95 15.24 304.80 0.63 3.21 64.20 - 10.00 1.21 12.10 0.25 2.45 95 289.56 5
18+000 20.00 45.93 30.47 609.40 - 1.41 28.20 - - - - - - 95 578.93 5
18+020 20.00 5.52 14.24 284.80 11.54 6.09 121.80 - 10.00 9.72 97.20 1.96 19.60 95 270.56 5
18+040 20.00 - 22.97 459.40 25.60 12.80 256.00 - 20.00 13.17 263.40 2.60 52.00 95 436.43 5
18+060 20.00 15.93 10.73 214.60 2.54 7.04 140.80 - 20.00 1.87 37.30 0.41 8.20 95 203.87 5
18+080 20.00 6.60 3.30 66.00 10.54 18.07 361.40 295.40 20.00 6.47 129.30 1.05 21.00 95 62.70 5
18+100 20.00 16.75 16.34 326.80 4.94 3.74 74.80 - 20.00 4.84 96.70 0.88 17.60 95 310.46 5
18+120 20.00 39.51 23.06 461.20 1.09 5.82 116.40 - 20.00 2.64 52.80 0.74 14.80 95 438.14 5
18+140 20.00 54.11 35.43 708.60 - 2.47 49.40 - 20.00 0.48 9.60 0.05 0.90 95 673.17 5
18+160 20.00 36.16 37.84 756.80 0.49 0.79 15.80 - 20.00 2.03 40.60 0.55 11.00 95 718.96 5
18+180 20.00 12.23 33.17 663.40 8.20 4.10 82.00 - 20.00 5.72 114.40 1.05 20.90 95 630.23 5
18+200 20.00 15.57 25.87 517.40 7.66 4.08 81.60 - 20.00 6.04 120.80 1.15 23.00 95 491.53 5
18+220 20.00 17.87 15.05 301.00 4.14 6.17 123.40 - 20.00 5.71 114.20 1.12 22.30 95 285.95 5
18+240 20.00 7.75 11.66 233.20 10.68 9.17 183.40 - 20.00 5.49 109.80 0.85 17.00 95 221.54 5
18+260 20.00 22.88 20.38 407.60 1.11 2.63 52.60 - 20.00 2.45 49.00 0.65 13.00 95 387.22 5
18+280 20.00 63.30 35.53 710.60 1.68 6.18 123.60 - 20.00 2.99 59.70 0.85 17.00 95 675.07 5
18+300 20.00 155.36 89.12 1,782.40 29.68 15.40 308.00 - 20.00 0.60 12.00 0.10 2.00 95 1,693.28 5
18+320 20.00 29.48 46.39 927.80 32.90 17.29 345.80 - 20.00 1.72 34.40 0.26 5.10 95 881.41 5
18+340 20.00 49.83 102.60 2,052.00 35.07 32.38 647.60 - 20.00 2.22 44.40 0.38 7.60 95 1,949.40 5
18+360 20.00 38.97 34.23 684.60 10.34 21.62 432.40 - 20.00 9.15 183.00 1.57 31.40 95 650.37 5
54 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
18+380 20.00 - 24.92 498.40 46.66 40.87 817.40 319.00 20.00 1.11 22.20 0.26 5.20 95 473.48 5
18+400 20.00 0.98 19.98 399.60 74.64 42.49 849.80 450.20 20.00 8.44 168.80 1.91 38.20 95 379.62 5
18+420 20.00 41.78 20.89 417.80 7.23 26.95 539.00 121.20 20.00 15.40 308.00 4.49 89.80 95 396.91 5
18+440 20.00 229.73 115.36 2,307.20 - 37.32 746.40 - 20.00 1.17 23.30 0.21 4.20 95 2,191.84 5
18+460 20.00 191.66 116.72 2,334.40 4.30 5.77 115.40 - 20.00 33.33 666.60 14.13 282.50 95 2,217.68 5
18+480 20.00 123.02 176.38 3,527.60 6.96 3.48 69.60 - 20.00 15.96 319.10 7.46 149.20 95 3,351.22 5
18+500 20.00 133.59 162.63 3,252.60 - 2.15 43.00 - 20.00 41.79 835.80 0.68 13.50 95 3,089.97 5
18+520 20.00 129.83 126.43 2,528.60 - 3.48 69.60 - 20.00 39.54 790.80 0.75 15.00 95 2,402.17 5
18+540 20.00 53.88 93.74 1,874.80 - - - - 20.00 20.70 414.00 0.73 14.60 95 1,781.06 5
18+560 20.00 31.90 80.87 1,617.40 0.42 0.21 4.20 - 20.00 1.15 23.00 0.25 5.00 95 1,536.53 5
18+580 20.00 44.82 49.35 987.00 - - - - 10.00 1.05 10.50 0.23 2.30 95 937.65 5
18+600 20.00 138.57 85.24 1,704.80 - 0.21 4.20 - - - - - - 95 1,619.56 5
18+620 20.00 98.28 71.55 1,431.00 - - - - - - - - - 95 1,359.45 5
18+640 20.00 26.48 82.53 1,650.60 0.29 0.15 3.00 - - - - - - 95 1,568.07 5
18+660 20.00 3.09 50.69 1,013.80 11.16 5.58 111.60 - 10.00 4.58 45.80 0.53 5.30 95 963.11 5
18+680 20.00 5.58 16.03 320.60 17.70 9.00 180.00 - 20.00 6.16 123.20 0.75 15.00 95 304.57 5
18+700 20.00 22.48 12.79 255.80 3.22 7.19 143.80 - 20.00 6.20 123.90 1.34 26.70 95 243.01 5
18+720 20.00 11.11 8.35 167.00 4.79 11.25 225.00 58.00 20.00 6.06 121.10 1.11 22.20 95 158.65 5
18+740 20.00 13.48 17.98 359.60 7.73 5.48 109.60 - 20.00 7.65 153.00 1.42 28.40 95 341.62 5
18+760 20.00 19.72 15.42 308.40 5.05 4.92 98.40 - 20.00 8.89 177.80 2.04 40.80 95 292.98 5
18+780 20.00 16.57 15.03 300.60 7.01 7.37 147.40 - 20.00 10.97 219.30 2.76 55.20 95 285.57 5
18+800 20.00 21.87 20.80 416.00 6.25 5.65 113.00 - 10.00 7.50 75.00 1.58 15.80 95 395.20 5
18+820 20.00 91.56 54.07 1,081.40 - 3.51 70.20 - - - - - - 95 1,027.33 5
18+840 20.00 68.16 45.02 900.40 - 3.13 62.60 - - - - - - 95 855.38 5
18+860 20.00 67.28 79.42 1,588.40 - - - - - - - - - 95 1,508.98 5
18+880 20.00 51.87 60.02 1,200.40 - - - - 10.00 0.58 5.80 0.06 0.60 95 1,140.38 5
18+900 20.00 29.95 48.62 972.40 2.53 1.27 25.40 - 20.00 3.05 60.90 0.47 9.40 95 923.78 5
18+920 20.00 24.78 38.33 766.60 3.34 1.67 33.40 - 20.00 5.47 109.40 1.15 23.00 95 728.27 5
18+940 20.00 13.56 21.76 435.20 9.23 5.88 117.60 - 20.00 5.83 116.60 1.05 21.00 95 413.44 5
18+960 20.00 8.73 16.76 335.20 10.72 7.03 140.60 - 20.00 5.43 108.50 0.90 17.90 95 318.44 5
18+980 20.00 41.51 27.54 550.80 1.07 5.15 103.00 - 10.00 2.04 20.35 0.28 2.80 95 523.26 5
19+000 20.00 74.30 41.52 830.40 - 5.36 107.20 - - - - - - 95 788.88 5
19+020 20.00 55.56 48.54 970.80 0.54 0.81 16.20 - - - - - - 95 922.26 5
55 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
19+040 20.00 36.75 55.53 1,110.60 0.83 0.42 8.40 - 7.00 2.43 17.01 0.35 2.42 95 1,055.07 5
19+060 20.00 77.62 66.59 1,331.80 - 0.27 5.40 - - - - - - 95 1,265.21 5
19+080 20.00 129.78 83.27 1,665.40 - 0.42 8.40 - - - - - - 95 1,582.13 5
19+100 20.00 166.20 121.91 2,438.20 - - - - - - - - - 95 2,316.29 5
19+120 20.00 101.78 115.78 2,315.60 - - - - - - - - - 95 2,199.82 5
19+140 20.00 36.05 101.13 2,022.60 - - - - - - - - - 95 1,921.47 5
19+160 20.00 5.00 53.39 1,067.80 12.78 6.39 127.80 - 10.00 12.95 129.50 3.00 30.00 95 1,014.41 5
19+180 20.00 - 18.03 360.60 33.91 16.96 339.20 - 20.00 8.88 177.60 1.75 35.00 95 342.57 5
19+200 20.00 11.17 8.09 161.80 8.86 10.82 216.40 54.60 20.00 10.07 201.40 2.31 46.20 95 153.71 5
19+220 20.00 17.66 8.83 176.60 5.34 19.63 392.60 216.00 20.00 9.16 183.20 2.05 41.00 95 167.77 5
19+240 20.00 9.67 10.42 208.40 7.74 8.30 166.00 - 20.00 7.01 140.20 1.36 27.20 95 197.98 5
19+260 20.00 10.08 13.87 277.40 9.31 7.33 146.60 - 20.00 5.46 109.20 0.93 18.60 95 263.53 5
19+280 20.00 23.79 16.73 334.60 3.04 5.39 107.80 - 20.00 10.12 202.30 2.72 54.30 95 317.87 5
19+300 20.00 27.63 18.86 377.20 8.04 8.68 173.60 - 20.00 9.49 189.80 2.30 46.00 95 358.34 5
19+320 20.00 18.79 21.29 425.80 9.82 6.43 128.60 - 20.00 13.52 270.40 3.54 70.70 95 404.51 5
19+340 20.00 15.29 21.46 429.20 10.33 9.19 183.80 - 20.00 8.42 168.40 1.79 35.70 95 407.74 5
19+360 20.00 11.63 15.21 304.20 12.60 11.21 224.20 - 20.00 10.30 205.90 2.39 47.80 95 288.99 5
19+380 20.00 18.25 16.77 335.40 5.24 7.79 155.80 - 20.00 9.07 181.40 2.02 40.40 95 318.63 5
19+400 20.00 11.02 11.33 226.60 6.56 9.58 191.60 - 20.00 4.16 83.20 0.61 12.20 95 215.27 5
19+420 20.00 10.65 14.45 289.00 5.27 5.26 105.20 - 20.00 5.12 102.40 0.91 18.20 95 274.55 5
19+440 20.00 7.88 9.45 189.00 6.29 6.43 128.60 - 20.00 4.47 89.40 0.69 13.80 95 179.55 5
19+460 20.00 4.09 7.37 147.40 12.99 9.13 182.60 35.20 20.00 8.50 170.00 1.53 30.60 95 140.03 5
19+480 20.00 2.26 5.07 101.40 18.10 12.20 244.00 142.60 20.00 10.24 204.80 1.88 37.60 95 96.33 5
19+500 20.00 9.19 6.64 132.80 8.29 10.64 212.80 80.00 20.00 6.63 132.60 1.24 24.80 95 126.16 5
19+520 20.00 11.97 7.12 142.40 5.07 11.59 231.80 89.40 20.00 3.28 65.50 0.40 8.00 95 135.28 5
19+540 20.00 4.29 6.74 134.80 7.70 8.00 160.00 25.20 20.00 2.16 43.20 0.18 3.60 95 128.06 5
19+560 20.00 4.69 8.33 166.60 3.28 4.18 83.60 - 20.00 2.53 50.60 0.58 11.60 95 158.27 5
19+580 20.00 8.96 6.63 132.60 1.23 4.47 89.40 - 10.00 1.02 10.20 0.18 1.75 95 125.97 5
19+600 20.00 15.13 9.91 198.20 1.20 2.24 44.80 - - - - - - 95 188.29 5
19+620 20.00 5.25 7.11 142.20 2.82 2.03 40.60 - 10.00 1.98 19.80 0.17 1.70 95 135.09 5
19+640 20.00 4.92 10.03 200.60 2.94 2.07 41.40 - 20.00 1.92 38.30 0.16 3.10 95 190.57 5
19+660 20.00 5.20 5.23 104.60 2.95 2.89 57.80 - 10.00 2.15 21.50 0.20 1.95 95 99.37 5
19+680 20.00 19.50 12.21 244.20 0.01 1.48 29.60 - - - - - - 95 231.99 5
56 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
19+700 20.00 25.82 15.51 310.20 - 1.48 29.60 - - - - - - 95 294.69 5
19+720 20.00 39.17 29.34 586.80 - 0.01 0.20 - - - - - - 95 557.46 5
19+740 20.00 93.15 59.49 1,189.80 - - - - - - - - - 95 1,130.31 5
19+760 20.00 126.80 82.99 1,659.80 - - - - - - - - - 95 1,576.81 5
19+780 20.00 149.08 121.12 2,422.40 - - - - - - - - - 95 2,301.28 5
19+800 20.00 117.44 122.12 2,442.40 - - - - - - - - - 95 2,320.28 5
19+820 20.00 93.82 121.45 2,429.00 - - - - - - - - - 95 2,307.55 5
19+840 20.00 62.69 90.07 1,801.40 - - - - - - - - - 95 1,711.33 5
19+860 20.00 50.58 72.20 1,444.00 - - - - - - - - - 95 1,371.80 5
19+880 20.00 39.28 50.99 1,019.80 3.24 1.62 32.40 - - - - - - 95 968.81 5
19+900 20.00 27.97 39.28 785.60 1.32 0.66 13.20 - 7.00 2.13 14.91 0.26 1.82 95 746.32 5
19+920 20.00 75.95 57.62 1,152.40 - 1.62 32.40 - - - - - - 95 1,094.78 5
19+940 20.00 34.23 31.10 622.00 1.67 1.50 30.00 - 7.00 1.17 8.16 0.12 0.84 95 590.90 5
19+960 20.00 54.07 65.01 1,300.20 0.05 0.03 0.60 - - - - - - 95 1,235.19 5
19+980 20.00 75.50 54.87 1,097.40 0.01 0.84 16.80 - - - - - - 95 1,042.53 5
20+000 20.00 25.31 39.69 793.80 - 0.03 0.60 - - - - - - 95 754.11 5
20+020 20.00 - 37.75 755.00 28.77 14.39 287.80 - - - - - - 95 717.25 5
20+040 20.00 - 12.66 253.20 98.12 49.06 981.20 728.00 - - - - - 95 240.54 5
20+060 20.00 - - - 23.59 26.18 523.60 523.60 10.00 2.95 29.50 0.17 1.65 95 - 5
20+080 20.00 5.03 2.52 50.40 0.82 49.47 989.40 939.00 20.00 0.72 14.40 0.11 2.20 95 47.88 5
20+100 20.00 1.20 0.60 12.00 4.35 13.97 279.40 267.40 20.00 3.05 61.00 0.75 15.00 95 11.40 5
20+120 20.00 1.78 3.41 68.20 3.16 1.99 39.80 - 10.00 1.48 14.80 0.08 0.80 95 64.79 5
20+140 20.00 2.93 2.07 41.40 1.11 2.73 54.60 13.20 - - - - - 95 39.33 5
20+160 20.00 4.14 2.96 59.20 0.21 1.69 33.80 - - - - - - 95 56.24 5
20+180 20.00 2.93 2.93 58.60 0.48 0.80 16.00 - - - - - - 95 55.67 5
20+200 20.00 3.09 3.62 72.40 4.02 2.12 42.40 - - - - - - 95 68.78 5
20+220 20.00 1.75 2.34 46.80 6.50 3.49 69.80 23.00 10.00 1.91 19.10 0.35 3.50 95 44.46 5
20+240 20.00 2.74 2.92 58.40 3.23 3.63 72.60 14.20 20.00 1.01 20.20 0.16 3.10 95 55.48 5
20+260 20.00 12.52 7.14 142.80 0.44 3.47 69.40 - 10.00 1.46 14.60 0.33 3.30 95 135.66 5
20+280 20.00 23.24 12.99 259.80 - 1.62 32.40 - - - - - - 95 246.81 5
20+300 20.00 14.69 13.61 272.20 0.40 0.42 8.40 - 10.00 1.42 14.20 0.33 3.25 95 258.59 5
20+320 20.00 2.26 12.75 255.00 12.78 6.39 127.80 - 20.00 5.61 112.20 0.75 15.00 95 242.25 5
20+340 20.00 11.51 13.10 262.00 1.94 1.17 23.40 - 20.00 2.14 42.80 0.23 4.50 95 248.90 5
57 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
20+360 20.00 12.10 7.18 143.60 1.33 7.06 141.20 - 10.00 1.92 19.20 0.45 4.45 95 136.42 5
20+380 20.00 6.00 8.76 175.20 1.47 1.71 34.20 - - - - - - 95 166.44 5
20+400 20.00 - 6.05 121.00 11.68 6.51 130.20 9.20 10.00 1.50 14.95 0.19 1.90 95 114.95 5
20+420 20.00 - 3.00 60.00 26.41 13.94 278.80 218.80 10.00 2.31 23.10 0.06 0.60 95 57.00 5
20+440 20.00 4.48 2.24 44.80 6.55 9.12 182.40 137.60 - - - - - 95 42.56 5
20+460 20.00 10.53 5.27 105.40 1.87 14.14 282.80 177.40 - - - - - 95 100.13 5
20+480 20.00 10.15 7.32 146.40 4.15 5.35 107.00 - 10.00 2.39 23.90 0.46 4.60 95 139.08 5
20+500 20.00 14.00 12.27 245.40 4.30 3.09 61.80 - 20.00 5.97 119.30 1.19 23.70 95 233.13 5
20+520 20.00 21.25 15.70 314.00 1.92 3.04 60.80 - 20.00 3.86 77.10 0.72 14.40 95 298.30 5
20+540 20.00 7.87 10.94 218.80 10.38 7.34 146.80 - 20.00 12.84 256.80 3.06 61.10 95 207.86 5
20+560 20.00 12.89 17.07 341.40 5.86 3.89 77.80 - 10.00 8.13 81.30 1.63 16.30 95 324.33 5
20+580 20.00 64.57 36.22 724.40 - 5.19 103.80 - - - - - - 95 688.18 5
20+600 20.00 47.18 30.04 600.80 0.06 2.96 59.20 - - - - - - 95 570.76 5
20+620 20.00 13.26 38.92 778.40 8.15 4.08 81.60 - 10.00 6.26 62.55 1.12 11.20 95 739.48 5
20+640 20.00 20.19 33.69 673.80 6.75 3.41 68.20 - 20.00 3.71 74.20 0.51 10.10 95 640.11 5
20+660 20.00 11.19 12.23 244.60 6.91 7.53 150.60 - 20.00 4.51 90.20 0.64 12.80 95 232.37 5
20+680 20.00 - 10.10 202.00 28.70 17.73 354.60 152.60 20.00 9.30 186.00 1.67 33.40 95 191.90 5
20+700 20.00 2.46 6.83 136.60 21.97 14.44 288.80 152.20 20.00 12.00 240.00 2.44 48.80 95 129.77 5
20+720 20.00 4.79 2.40 48.00 16.00 22.35 447.00 399.00 20.00 5.38 107.60 0.87 17.40 95 45.60 5
20+740 20.00 0.01 1.24 24.80 22.52 22.25 445.00 420.20 20.00 6.33 126.60 1.24 24.80 95 23.56 5
20+760 20.00 - 2.40 48.00 25.12 20.56 411.20 363.20 20.00 8.78 175.60 1.44 28.80 95 45.60 5
20+780 20.00 2.34 1.18 23.60 13.43 17.98 359.60 336.00 20.00 4.33 86.60 0.58 11.60 95 22.42 5
20+800 20.00 4.01 2.01 40.20 14.86 19.99 399.80 359.60 20.00 7.26 145.10 1.28 25.60 95 38.19 5
20+820 20.00 - 1.17 23.40 25.02 19.23 384.60 361.20 20.00 10.14 202.70 2.14 42.80 95 22.23 5
20+840 20.00 - 2.01 40.20 36.07 25.47 509.40 469.20 20.00 9.34 186.80 2.27 45.40 95 38.19 5
20+860 20.00 - - - 50.58 37.80 756.00 756.00 20.00 5.86 117.10 0.93 18.60 95 - 5
20+880 20.00 - - - 73.34 54.71 1,094.20 1,094.20 10.00 0.44 4.35 - - 95 - 5
20+900 20.00 - - - 115.72 83.15 1,663.00 1,663.00 - - - - - 95 - 5
20+920 20.00 - - - 141.72 107.53 2,150.60 2,150.60 - - - - - 95 - 5
20+940 20.00 - - - 45.88 80.80 1,616.00 1,616.00 10.00 6.27 62.70 0.79 7.90 95 - 5
20+960 20.00 - - - 39.38 90.55 1,811.00 1,811.00 20.00 6.47 129.30 1.39 27.70 95 - 5
20+980 20.00 - - - 77.36 61.62 1,232.40 1,232.40 20.00 0.98 19.50 0.01 0.20 95 - 5
21+000 20.00 4.72 2.36 47.20 8.17 23.78 475.60 428.40 20.00 3.56 71.20 0.36 7.20 95 44.84 5
58 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
21+020 20.00 18.63 9.32 186.40 4.19 40.78 815.60 629.20 20.00 5.56 111.10 1.08 21.60 95 177.08 5
21+040 20.00 5.36 5.04 100.80 10.09 9.13 182.60 81.80 20.00 6.84 136.80 1.16 23.10 95 95.76 5
21+060 20.00 11.70 15.17 303.40 6.19 5.19 103.80 - 20.00 4.44 88.80 0.64 12.80 95 288.23 5
21+080 20.00 3.39 4.38 87.60 9.03 9.56 191.20 103.60 10.00 3.95 39.50 0.47 4.65 95 83.22 5
21+100 20.00 3.17 7.44 148.80 13.62 9.91 198.20 49.40 - - - - - 95 141.36 5
21+120 20.00 10.69 7.04 140.80 3.27 6.15 123.00 - 10.00 3.94 39.40 0.56 5.60 95 133.76 5
21+140 20.00 31.27 17.22 344.40 0.39 7.01 140.20 - 20.00 1.31 26.20 0.30 6.00 95 327.18 5
21+160 20.00 17.41 14.05 281.00 4.63 3.95 79.00 - 20.00 6.48 129.50 1.25 25.00 95 266.95 5
21+180 20.00 23.46 27.37 547.40 0.83 0.61 12.20 - 10.00 2.14 21.40 0.55 5.50 95 520.03 5
21+200 20.00 - 8.71 174.20 27.40 16.02 320.40 146.20 - - - - - 95 165.49 5
21+220 20.00 - 11.73 234.60 30.00 15.42 308.40 73.80 - - - - - 95 222.87 5
21+240 20.00 - - - 44.60 36.00 720.00 720.00 - - - - - 95 - 5
21+260 20.00 4.63 2.32 46.40 9.05 19.53 390.60 344.20 7.00 4.62 32.34 0.57 3.99 95 44.08 5
21+280 20.00 121.46 60.73 1,214.60 - 22.30 446.00 - - - - - - 95 1,153.87 5
21+300 20.00 236.47 120.55 2,411.00 - 4.53 90.60 - 10.00 57.59 575.90 0.68 6.80 95 2,290.45 5
21+320 20.00 126.53 124.00 2,480.00 - - - - 20.00 32.41 648.20 0.90 17.90 95 2,356.00 5
21+340 20.00 44.54 140.51 2,810.20 - - - - 20.00 15.74 314.80 0.87 17.40 95 2,669.69 5
21+360 20.00 48.26 87.40 1,748.00 - - - - 20.00 15.39 307.80 0.88 17.60 95 1,660.60 5
21+380 20.00 65.80 55.17 1,103.40 - - - - 20.00 20.27 405.40 0.89 17.70 95 1,048.23 5
21+400 20.00 44.34 46.30 926.00 - - - - 20.00 16.38 327.60 0.89 17.70 95 879.70 5
21+420 20.00 24.55 45.18 903.60 2.79 1.40 28.00 - 20.00 3.03 60.60 0.47 9.30 95 858.42 5
21+440 20.00 3.84 24.09 481.80 13.30 6.65 133.00 - 20.00 13.26 265.10 3.03 60.60 95 457.71 5
21+460 20.00 - 12.28 245.60 21.98 12.39 247.80 2.20 20.00 9.43 188.60 1.68 33.60 95 233.32 5
21+480 20.00 0.13 1.99 39.80 16.75 15.03 300.60 260.80 20.00 6.71 134.20 1.22 24.40 95 37.81 5
21+500 20.00 - - - 23.66 22.82 456.40 456.40 20.00 14.36 287.20 2.99 59.80 95 - 5
21+520 20.00 0.48 0.31 6.20 16.95 16.85 337.00 330.80 20.00 12.42 248.40 2.58 51.60 95 5.89 5
21+540 20.00 9.31 4.66 93.20 6.86 15.26 305.20 212.00 10.00 4.29 42.85 0.62 6.20 95 88.54 5
21+560 20.00 68.11 34.30 686.00 - 8.48 169.60 - - - - - - 95 651.70 5
21+580 20.00 96.71 53.01 1,060.20 - 3.43 68.60 - - - - - - 95 1,007.19 5
21+600 20.00 344.62 206.37 4,127.40 - - - - - - - - - 95 3,921.03 5
21+620 20.00 338.60 217.66 4,353.20 - - - - - - - - - 95 4,135.54 5
21+640 20.00 201.08 272.85 5,457.00 0.01 0.01 0.20 - - - - - - 95 5,184.15 5
21+660 20.00 163.12 250.86 5,017.20 - - - - - - - - - 95 4,766.34 5
59 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
21+680 20.00 156.46 178.77 3,575.40 - 0.01 0.20 - - - - - - 95 3,396.63 5
21+700 20.00 145.33 154.23 3,084.60 0.01 0.01 0.20 - - - - - - 95 2,930.37 5
21+720 20.00 181.97 169.22 3,384.40 - - - - - - - - - 95 3,215.18 5
21+740 20.00 164.15 154.74 3,094.80 - 0.01 0.20 - - - - - - 95 2,940.06 5
21+760 20.00 172.52 177.25 3,545.00 - - - - - - - - - 95 3,367.75 5
21+780 20.00 123.81 143.98 2,879.60 - - - - 10.00 40.57 405.70 0.68 6.75 95 2,735.62 5
21+800 20.00 84.92 128.72 2,574.40 - - - - 20.00 31.84 636.70 0.75 14.90 95 2,445.68 5
21+820 20.00 29.71 76.76 1,535.20 2.99 1.50 30.00 - 20.00 6.13 122.60 1.29 25.80 95 1,458.44 5
21+840 20.00 8.83 46.88 937.60 9.00 4.50 90.00 - 20.00 10.94 218.80 2.45 49.00 95 890.72 5
21+860 20.00 0.78 15.25 305.00 20.75 11.87 237.40 - 20.00 15.23 304.50 3.33 66.50 95 289.75 5
21+880 20.00 - 4.42 88.40 38.91 23.96 479.20 390.80 20.00 14.43 288.60 2.66 53.20 95 83.98 5
21+900 20.00 - 0.39 7.80 32.79 26.77 535.40 527.60 20.00 14.57 291.30 2.89 57.80 95 7.41 5
21+920 20.00 0.84 0.42 8.40 16.34 27.63 552.60 544.20 20.00 7.58 151.60 1.28 25.60 95 7.98 5
21+940 20.00 12.39 6.20 124.00 5.62 19.21 384.20 260.20 10.00 4.95 49.50 0.84 8.40 95 117.80 5
21+960 20.00 50.12 25.48 509.60 0.58 8.46 169.20 - - - - - - 95 484.12 5
21+980 20.00 247.14 129.77 2,595.40 - 2.81 56.20 - - - - - - 95 2,465.63 5
22+000 20.00 260.19 155.16 3,103.20 - 0.29 5.80 - 10.00 101.02 1,010.15 0.66 6.60 95 2,948.04 5
22+020 20.00 225.13 236.14 4,722.80 - - - - 20.00 69.17 1,383.40 0.65 12.90 95 4,486.66 5
22+040 20.00 102.11 181.15 3,623.00 - - - - 20.00 32.60 651.90 0.67 13.40 95 3,441.85 5
22+060 20.00 34.38 129.76 2,595.20 0.50 0.25 5.00 - 20.00 2.17 43.40 0.62 12.40 95 2,465.44 5
22+080 20.00 0.16 51.14 1,022.80 23.04 11.52 230.40 - 20.00 8.42 168.40 1.45 29.00 95 971.66 5
22+100 20.00 - 17.19 343.80 29.79 15.15 303.00 - 20.00 9.48 189.50 1.83 36.60 95 326.61 5
22+120 20.00 - 0.08 1.60 40.35 31.70 634.00 632.40 20.00 3.39 67.80 0.55 11.00 95 1.52 5
22+140 20.00 - - - 46.86 38.33 766.60 766.60 20.00 2.23 44.50 0.32 6.40 95 - 5
22+160 20.00 - - - 23.46 31.91 638.20 638.20 10.00 5.50 55.00 0.71 7.10 95 - 5
22+180 20.00 156.56 78.28 1,565.60 - 23.43 468.60 - - - - - - 95 1,487.32 5
22+200 20.00 138.38 69.19 1,383.80 - 11.73 234.60 - 10.00 40.86 408.60 0.67 6.70 95 1,314.61 5
22+220 20.00 91.59 124.08 2,481.60 - - - - 20.00 31.67 633.40 0.67 13.30 95 2,357.52 5
22+240 20.00 28.81 83.60 1,672.00 1.00 0.50 10.00 - 20.00 2.23 44.60 0.60 12.00 95 1,588.40 5
22+260 20.00 2.04 46.82 936.40 14.84 7.42 148.40 - 20.00 8.00 160.00 1.37 27.40 95 889.58 5
22+280 20.00 3.15 15.98 319.60 15.41 8.21 164.20 - 20.00 7.16 143.10 1.29 25.80 95 303.62 5
22+300 20.00 11.04 6.54 130.80 8.17 11.51 230.20 99.40 20.00 6.34 126.70 1.25 25.00 95 124.26 5
22+320 20.00 6.29 4.72 94.40 11.65 13.53 270.60 176.20 20.00 9.35 187.00 1.84 36.80 95 89.68 5
60 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
22+340 20.00 17.23 14.14 282.80 4.51 6.34 126.80 - 20.00 5.51 110.20 1.03 20.60 95 268.66 5
22+360 20.00 47.50 26.90 538.00 0.84 6.25 125.00 - 10.00 5.45 54.50 1.26 12.60 95 511.10 5
22+380 20.00 221.89 119.56 2,391.20 - 2.26 45.20 - - - - - - 95 2,271.64 5
22+400 20.00 292.64 170.07 3,401.40 - 0.42 8.40 - 10.00 130.50 1,305.00 1.64 16.35 95 3,231.33 5
22+420 20.00 213.61 217.75 4,355.00 - - - - 20.00 81.70 1,634.00 0.69 13.80 95 4,137.25 5
22+440 20.00 181.25 236.95 4,739.00 - - - - 20.00 57.21 1,144.20 0.64 12.70 95 4,502.05 5
22+460 20.00 157.00 185.31 3,706.20 - - - - 20.00 51.61 1,032.20 0.64 12.70 95 3,520.89 5
22+480 20.00 124.20 152.73 3,054.60 - - - - 20.00 33.20 663.90 0.91 18.10 95 2,901.87 5
22+500 20.00 56.45 106.73 2,134.60 - - - - 20.00 18.86 377.10 0.76 15.20 95 2,027.87 5
22+520 20.00 22.99 73.60 1,472.00 3.42 1.71 34.20 - 20.00 6.70 134.00 1.38 27.60 95 1,398.40 5
22+540 20.00 15.16 35.81 716.20 8.53 4.27 85.40 - 20.00 10.98 219.60 2.48 49.60 95 680.39 5
22+560 20.00 0.86 11.93 238.60 23.65 13.54 270.80 32.20 20.00 18.94 378.80 4.39 87.70 95 226.67 5
22+580 20.00 25.02 20.09 401.80 0.33 4.43 88.60 - 20.00 1.42 28.40 0.33 6.50 95 381.71 5
22+600 20.00 238.68 119.77 2,395.40 - 11.83 236.60 - 20.00 60.53 1,210.60 0.70 13.90 95 2,275.63 5
22+620 20.00 161.73 93.38 1,867.60 - 0.17 3.40 - 20.00 70.66 1,413.10 0.69 13.70 95 1,774.22 5
22+640 20.00 195.14 216.91 4,338.20 - - - - 20.00 54.96 1,099.20 0.72 14.40 95 4,121.29 5
22+660 20.00 111.79 136.76 2,735.20 - - - - 10.00 33.82 338.20 0.75 7.45 95 2,598.44 5
22+680 20.00 62.33 128.74 2,574.80 - - - - - - - - - 95 2,446.06 5
22+700 20.00 25.62 68.71 1,374.20 2.45 1.23 24.60 - 10.00 7.09 70.90 1.63 16.25 95 1,305.49 5
22+720 20.00 20.22 41.28 825.60 3.71 1.86 37.20 - 20.00 6.22 124.30 1.24 24.80 95 784.32 5
22+740 20.00 6.92 16.27 325.40 11.98 7.22 144.40 - 20.00 8.67 173.40 1.66 33.20 95 309.13 5
22+760 20.00 - 10.11 202.20 30.29 17.00 340.00 137.80 20.00 14.95 299.00 3.06 61.20 95 192.09 5
22+780 20.00 - 3.46 69.20 32.09 22.04 440.80 371.60 20.00 12.14 242.70 2.59 51.80 95 65.74 5
22+800 20.00 0.23 0.12 2.40 28.05 29.17 583.40 581.00 10.00 15.93 159.30 3.43 34.30 95 2.28 5
22+820 20.00 117.03 58.52 1,170.40 - 16.05 321.00 - - - - - - 95 1,111.88 5
22+840 20.00 193.11 96.67 1,933.40 - 14.03 280.60 - 10.00 67.76 677.60 0.69 6.90 95 1,836.73 5
22+860 20.00 204.41 160.72 3,214.40 - - - - 20.00 56.55 1,131.00 0.68 13.60 95 3,053.68 5
22+880 20.00 176.08 184.60 3,692.00 0.01 0.01 0.20 - 20.00 49.65 993.00 0.68 13.50 95 3,507.40 5
22+900 20.00 199.87 202.14 4,042.80 - - - - 20.00 55.58 1,111.60 0.69 13.80 95 3,840.66 5
22+920 20.00 226.99 201.54 4,030.80 - 0.01 0.20 - 20.00 61.11 1,222.20 0.69 13.80 95 3,829.26 5
22+940 20.00 167.03 183.45 3,669.00 - - - - 20.00 92.79 1,855.80 1.62 32.40 95 3,485.55 5
22+960 20.00 164.32 195.66 3,913.20 - - - - 20.00 92.32 1,846.40 1.61 32.20 95 3,717.54 5
22+980 20.00 220.30 193.67 3,873.40 0.01 0.01 0.20 - 20.00 82.96 1,659.20 1.80 35.90 95 3,679.73 5
61 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
23+000 20.00 200.75 182.54 3,650.80 - - - - 20.00 73.81 1,476.20 1.76 35.20 95 3,468.26 5
23+020 20.00 200.21 210.26 4,205.20 - 0.01 0.20 - 20.00 76.20 1,524.00 1.61 32.20 95 3,994.94 5
23+040 20.00 174.02 187.39 3,747.80 - - - - 20.00 98.59 1,971.80 1.62 32.40 95 3,560.41 5
23+060 20.00 216.63 208.42 4,168.40 - - - - 20.00 92.02 1,840.40 1.63 32.50 95 3,959.98 5
23+080 20.00 225.44 199.73 3,994.60 - - - - 20.00 99.91 1,998.20 1.63 32.60 95 3,794.87 5
23+100 20.00 261.99 239.31 4,786.20 - - - - 10.00 136.80 1,368.00 1.37 13.70 95 4,546.89 5
23+120 20.00 110.45 167.95 3,359.00 - - - - - - - - - 95 3,191.05 5
23+140 20.00 69.09 165.54 3,310.80 - - - - - - - - - 95 3,145.26 5
23+160 20.00 25.69 68.07 1,361.40 0.25 0.13 2.60 - - - - - - 95 1,293.33 5
23+180 20.00 116.93 93.01 1,860.20 0.01 0.01 0.20 - - - - - - 95 1,767.19 5
23+200 20.00 116.80 71.25 1,425.00 - 0.13 2.60 - - - - - - 95 1,353.75 5
23+220 20.00 111.39 114.16 2,283.20 - 0.01 0.20 - - - - - - 95 2,169.04 5
23+240 20.00 98.53 107.67 2,153.40 - - - - - - - - - 95 2,045.73 5
23+260 20.00 121.95 116.67 2,333.40 - - - - - - - - - 95 2,216.73 5
23+280 20.00 91.28 94.91 1,898.20 - - - - - - - - - 95 1,803.29 5
23+300 20.00 35.16 78.56 1,571.20 1.32 0.66 13.20 - 10.00 4.95 49.45 1.04 10.40 95 1,492.64 5
23+320 20.00 5.25 48.27 965.40 9.71 4.86 97.20 - 20.00 6.68 133.60 1.21 24.10 95 917.13 5
23+340 20.00 3.00 19.08 381.60 14.58 7.95 159.00 - 20.00 13.48 269.50 2.99 59.80 95 362.52 5
23+360 20.00 12.80 9.03 180.60 6.36 8.04 160.80 - 20.00 8.37 167.40 1.67 33.40 95 171.57 5
23+380 20.00 12.40 7.70 154.00 7.09 10.84 216.80 62.80 20.00 8.05 161.00 1.57 31.40 95 146.30 5
23+400 20.00 22.46 17.63 352.60 1.18 3.77 75.40 - 20.00 2.16 43.20 0.56 11.20 95 334.97 5
23+420 20.00 46.46 29.43 588.60 0.05 3.57 71.40 - 20.00 1.80 36.00 0.51 10.20 95 559.17 5
23+440 20.00 9.26 15.86 317.20 6.07 3.63 72.60 - 20.00 7.87 157.40 1.66 33.20 95 301.34 5
23+460 20.00 - 23.23 464.60 51.82 25.94 518.80 54.20 10.00 5.43 54.25 0.70 7.00 95 441.37 5
23+480 20.00 - 4.63 92.60 88.50 47.29 945.80 853.20 - - - - - 95 87.97 5
23+500 20.00 11.07 5.54 110.80 0.71 26.27 525.40 414.60 7.00 2.31 16.17 0.62 4.34 95 105.26 5
23+520 20.00 38.19 19.10 382.00 2.43 45.47 909.40 527.40 - - - - - 95 362.90 5
23+540 20.00 47.85 29.46 589.20 - 0.36 7.20 - - - - - - 95 559.74 5
23+560 20.00 77.73 57.96 1,159.20 - 1.22 24.40 - - - - - - 95 1,101.24 5
23+580 20.00 72.85 60.35 1,207.00 - - - - - - - - - 95 1,146.65 5
23+600 20.00 35.45 56.59 1,131.80 0.03 0.02 0.40 - - - - - - 95 1,075.21 5
23+620 20.00 35.82 54.34 1,086.80 - - - - - - - - - 95 1,032.46 5
23+640 20.00 203.09 119.27 2,385.40 0.01 0.02 0.40 - - - - - - 95 2,266.13 5
62 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
23+660 20.00 230.19 133.01 2,660.20 - - - - - - - - - 95 2,527.19 5
23+680 20.00 168.94 186.02 3,720.40 - 0.01 0.20 - - - - - - 95 3,534.38 5
23+700 20.00 1.60 115.90 2,318.00 8.07 4.04 80.80 - 7.00 3.73 26.11 0.45 3.15 95 2,202.10 5
23+720 20.00 - 84.47 1,689.40 - - - - - - - - - 95 1,604.93 5
23+740 20.00 25.78 13.69 273.80 1.08 4.58 91.60 - 10.00 1.63 16.30 0.38 3.80 95 260.11 5
23+760 20.00 32.68 16.34 326.80 0.61 0.31 6.20 - 20.00 2.09 41.80 0.58 11.60 95 310.46 5
23+780 20.00 9.62 17.70 354.00 5.32 3.20 64.00 - 20.00 2.34 46.70 0.48 9.50 95 336.30 5
23+800 20.00 1.59 17.14 342.80 15.42 8.02 160.40 - 20.00 3.81 76.20 0.47 9.30 95 325.66 5
23+820 20.00 5.14 7.38 147.60 11.19 8.26 165.20 17.60 20.00 5.99 119.80 0.96 19.20 95 140.22 5
23+840 20.00 17.87 9.73 194.60 2.83 9.13 182.60 - 20.00 3.47 69.30 0.50 10.00 95 184.87 5
23+860 20.00 25.12 15.13 302.60 1.77 6.48 129.60 - 20.00 4.50 90.00 0.84 16.80 95 287.47 5
23+880 20.00 24.43 21.15 423.00 2.13 2.48 49.60 - 20.00 3.95 78.90 0.67 13.30 95 401.85 5
23+900 20.00 0.18 12.65 253.00 21.24 11.51 230.20 - 20.00 10.24 204.70 1.65 33.00 95 240.35 5
23+920 20.00 - 12.22 244.40 49.98 26.06 521.20 276.80 20.00 3.66 73.20 0.14 2.80 95 232.18 5
23+940 20.00 3.59 1.89 37.80 10.82 16.03 320.60 282.80 10.00 8.97 89.65 1.74 17.40 95 35.91 5
23+960 20.00 49.45 24.73 494.60 - 24.99 499.80 5.20 - - - - - 95 469.87 5
23+980 20.00 32.04 17.82 356.40 0.06 5.44 108.80 - - - - - - 95 338.58 5
24+000 20.00 1.21 25.33 506.60 7.14 3.57 71.40 - - - - - - 95 481.27 5
24+020 20.00 2.75 17.40 348.00 20.80 10.43 208.60 - 7.00 2.50 17.50 0.05 0.35 95 330.60 5
24+040 20.00 93.57 47.39 947.80 - 3.57 71.40 - - - - - - 95 900.41 5
24+060 20.00 137.18 69.97 1,399.40 - 10.40 208.00 - - - - - - 95 1,329.43 5
24+080 20.00 144.07 118.82 2,376.40 - - - - - - - - - 95 2,257.58 5
24+100 20.00 85.96 111.57 2,231.40 - - - - - - - - - 95 2,119.83 5
24+120 20.00 34.65 89.36 1,787.20 0.25 0.13 2.60 - - - - - - 95 1,697.84 5
24+140 20.00 3.81 44.89 897.80 0.82 0.41 8.20 - - - - - - 95 852.91 5
24+160 20.00 0.12 17.39 347.80 1.32 0.79 15.80 - - - - - - 95 330.41 5
24+180 20.00 8.83 6.32 126.40 - 0.41 8.20 - - - - - - 95 120.08 5
24+200 20.00 10.15 5.14 102.80 0.08 0.70 14.00 - - - - - - 95 97.66 5
24+220 20.00 93.12 50.98 1,019.60 - - - - - - - - - 95 968.62 5
24+240 20.00 246.97 128.56 2,571.20 0.01 0.05 1.00 - - - - - - 95 2,442.64 5
24+260 20.00 190.54 141.83 2,836.60 - - - - - - - - - 95 2,694.77 5
24+280 20.00 148.07 197.52 3,950.40 - 0.01 0.20 - - - - - - 95 3,752.88 5
24+300 20.00 122.18 156.36 3,127.20 - - - - - - - - - 95 2,970.84 5
63 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
24+320 20.00 125.03 136.55 2,731.00 - - - - - - - - - 95 2,594.45 5
24+340 20.00 152.65 137.42 2,748.40 0.01 0.01 0.20 - - - - - - 95 2,610.98 5
24+360 20.00 25.28 75.16 1,503.20 0.78 0.39 7.80 - 7.00 3.48 24.36 1.09 7.63 95 1,428.04 5
24+380 20.00 37.01 94.83 1,896.60 0.02 0.02 0.40 - - - - - - 95 1,801.77 5
24+400 20.00 82.24 53.76 1,075.20 - 0.39 7.80 - - - - - - 95 1,021.44 5
24+420 20.00 62.29 49.65 993.00 - 0.01 0.20 - - - - - - 95 943.35 5
24+440 20.00 46.56 64.40 1,288.00 - - - - - - - - - 95 1,223.60 5
24+460 20.00 30.21 46.25 925.00 0.13 0.07 1.40 - 10.00 1.63 16.30 0.44 4.35 95 878.75 5
24+480 20.00 25.33 35.95 719.00 1.12 0.56 11.20 - 20.00 3.03 60.60 0.88 17.60 95 683.05 5
24+500 20.00 22.57 26.39 527.80 0.77 0.45 9.00 - 20.00 2.07 41.30 0.54 10.70 95 501.41 5
24+520 20.00 16.21 20.77 415.40 3.33 2.23 44.60 - 20.00 2.53 50.50 0.63 12.60 95 394.63 5
24+540 20.00 29.27 25.92 518.40 0.83 0.80 16.00 - 10.00 3.30 32.95 1.02 10.20 95 492.48 5
24+560 20.00 45.50 30.86 617.20 1.62 2.48 49.60 - - - - - - 95 586.34 5
24+580 20.00 96.29 62.78 1,255.60 - 0.42 8.40 - - - - - - 95 1,192.82 5
24+600 20.00 138.39 91.95 1,839.00 0.01 0.82 16.40 - - - - - - 95 1,747.05 5
24+620 20.00 59.85 78.07 1,561.40 - - - - 10.00 0.89 8.90 0.14 1.40 95 1,483.33 5
24+640 20.00 12.20 75.30 1,506.00 2.34 1.18 23.60 - 10.00 2.56 25.60 0.62 6.20 95 1,430.70 5
24+660 20.00 24.35 42.10 842.00 0.30 0.15 3.00 - - - - - - 95 799.90 5
24+680 20.00 43.66 27.93 558.60 - 1.17 23.40 - - - - - - 95 530.67 5
24+700 20.00 62.18 43.27 865.40 - 0.15 3.00 - - - - - - 95 822.13 5
24+720 20.00 20.35 32.01 640.20 1.92 0.96 19.20 - 10.00 2.28 22.80 0.56 5.60 95 608.19 5
24+740 20.00 34.18 48.18 963.60 0.18 0.09 1.80 - 20.00 1.65 33.00 0.44 8.80 95 915.42 5
24+760 20.00 19.65 20.00 400.00 0.44 1.18 23.60 - 10.00 1.30 13.00 0.28 2.80 95 380.00 5
24+780 20.00 60.30 47.24 944.80 - 0.09 1.80 - - - - - - 95 897.56 5
24+800 20.00 35.63 27.64 552.80 0.33 0.39 7.80 - 10.00 1.25 12.50 0.29 2.90 95 525.16 5
24+820 20.00 42.32 51.31 1,026.20 0.12 0.06 1.20 - 10.00 1.59 15.90 0.41 4.10 95 974.89 5
24+840 20.00 60.55 48.09 961.80 - 0.17 3.40 - - - - - - 95 913.71 5
24+860 20.00 17.96 30.14 602.80 3.10 1.61 32.20 - 10.00 2.60 26.00 0.68 6.75 95 572.66 5
24+880 20.00 0.04 30.30 606.00 17.27 8.64 172.80 - 20.00 6.11 122.20 0.80 16.00 95 575.70 5
24+900 20.00 - 8.98 179.60 34.09 18.60 372.00 192.40 20.00 10.44 208.80 1.39 27.80 95 170.62 5
24+920 20.00 13.89 6.97 139.40 10.80 14.04 280.80 141.40 10.00 13.98 139.75 3.41 34.05 95 132.43 5
24+940 20.00 73.67 36.84 736.80 - 17.05 341.00 - - - - - - 95 699.96 5
24+960 20.00 40.44 27.17 543.40 0.98 5.89 117.80 - - - - - - 95 516.23 5
64 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
24+980 20.00 80.08 76.88 1,537.60 0.04 0.02 0.40 - 10.00 1.72 17.15 0.50 5.00 95 1,460.72 5
25+000 20.00 77.24 58.84 1,176.80 0.01 0.50 10.00 - 20.00 2.05 41.00 0.56 11.20 95 1,117.96 5
25+020 20.00 77.68 78.88 1,577.60 0.09 0.07 1.40 - 20.00 1.45 29.00 0.41 8.20 95 1,498.72 5
25+040 20.00 50.43 63.84 1,276.80 3.18 1.60 32.00 - 20.00 6.03 120.60 1.29 25.80 95 1,212.96 5
25+060 20.00 9.68 43.68 873.60 9.03 4.56 91.20 - 20.00 6.84 136.80 1.19 23.70 95 829.92 5
25+080 20.00 24.55 37.49 749.80 1.10 2.14 42.80 - 20.00 1.95 39.00 0.28 5.60 95 712.31 5
25+100 20.00 29.36 19.52 390.40 7.27 8.15 163.00 - 20.00 5.35 107.00 1.10 22.00 95 370.88 5
25+120 20.00 14.19 19.37 387.40 1.53 1.32 26.40 - 20.00 3.91 78.20 1.23 24.60 95 368.03 5
25+140 20.00 5.37 17.37 347.40 3.84 5.56 111.20 - 20.00 1.35 26.90 0.23 4.60 95 330.03 5
25+160 20.00 0.31 7.25 145.00 7.14 4.34 86.80 - 20.00 2.87 57.40 0.61 12.10 95 137.75 5
25+180 20.00 3.38 4.38 87.60 3.82 3.83 76.60 - 20.00 1.40 28.00 0.24 4.70 95 83.22 5
25+200 20.00 0.98 0.65 13.00 7.84 7.49 149.80 136.80 20.00 4.22 84.40 0.67 13.40 95 12.35 5
25+220 20.00 26.47 14.93 298.60 0.20 2.01 40.20 - 10.00 1.42 14.15 0.36 3.55 95 283.67 5
25+240 20.00 67.52 34.25 685.00 - 3.92 78.40 - - - - - - 95 650.75 5
25+260 20.00 81.94 54.21 1,084.20 - 0.10 2.00 - - - - - - 95 1,029.99 5
25+280 20.00 69.56 68.54 1,370.80 - - - - - - - - - 95 1,302.26 5
25+300 20.00 77.82 79.88 1,597.60 - - - - - - - - - 95 1,517.72 5
25+320 20.00 101.44 85.50 1,710.00 - - - - - - - - - 95 1,624.50 5
25+340 20.00 111.07 94.45 1,889.00 - - - - - - - - - 95 1,794.55 5
25+360 20.00 83.55 92.50 1,850.00 - - - - - - - - - 95 1,757.50 5
25+380 20.00 62.12 86.60 1,732.00 - - - - - - - - - 95 1,645.40 5
25+400 20.00 50.11 66.83 1,336.60 - - - - - - - - - 95 1,269.77 5
25+420 20.00 38.87 50.50 1,010.00 - - - - - - - - - 95 959.50 5
25+440 20.00 40.69 45.40 908.00 - - - - - - - - - 95 862.60 5
25+460 20.00 42.28 40.58 811.60 - - - - - - - - - 95 771.02 5
25+480 20.00 128.10 84.40 1,688.00 - - - - - - - - - 95 1,603.60 5
25+500 20.00 151.54 96.91 1,938.20 - - - - - - - - - 95 1,841.29 5
25+520 20.00 148.50 138.30 2,766.00 - - - - - - - - - 95 2,627.70 5
25+540 20.00 136.07 143.81 2,876.20 - - - - - - - - - 95 2,732.39 5
25+560 20.00 122.08 135.29 2,705.80 - - - - - - - - - 95 2,570.51 5
25+580 20.00 166.13 151.10 3,022.00 - - - - - - - - - 95 2,870.90 5
25+600 20.00 221.35 171.72 3,434.40 - - - - - - - - - 95 3,262.68 5
25+620 20.00 213.30 189.72 3,794.40 - - - - - - - - - 95 3,604.68 5
65 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
25+640 20.00 196.15 208.75 4,175.00 - - - - - - - - - 95 3,966.25 5
25+660 20.00 212.05 212.68 4,253.60 0.01 0.01 0.20 - - - - - - 95 4,040.92 5
25+680 20.00 218.03 207.09 4,141.80 - - - - - - - - - 95 3,934.71 5
25+700 20.00 272.77 242.41 4,848.20 - 0.01 0.20 - - - - - - 95 4,605.79 5
25+720 20.00 304.52 261.28 5,225.60 - - - - - - - - - 95 4,964.32 5
25+740 20.00 336.92 304.85 6,097.00 - - - - - - - - - 95 5,792.15 5
25+760 20.00 326.80 315.66 6,313.20 - - - - - - - - - 95 5,997.54 5
25+780 20.00 332.77 334.85 6,697.00 - - - - - - - - - 95 6,362.15 5
25+800 20.00 395.93 361.37 7,227.40 - - - - - - - - - 95 6,866.03 5
25+820 20.00 399.29 366.03 7,320.60 - - - - - - - - - 95 6,954.57 5
25+840 20.00 588.57 492.25 9,845.00 - - - - - - - - - 95 9,352.75 5
25+860 20.00 489.84 444.57 8,891.40 - - - - - - - - - 95 8,446.83 5
25+880 20.00 433.44 511.01 10,220.20 - - - - - - - - - 95 9,709.19 5
25+900 20.00 384.09 436.97 8,739.40 - - - - - - - - - 95 8,302.43 5
25+920 20.00 356.70 395.07 7,901.40 - - - - - - - - - 95 7,506.33 5
25+940 20.00 551.79 467.94 9,358.80 - - - - - - - - - 95 8,890.86 5
25+960 20.00 493.40 425.05 8,501.00 - - - - - - - - - 95 8,075.95 5
25+980 20.00 459.98 505.89 10,117.80 - - - - - - - - - 95 9,611.91 5
26+000 20.00 340.54 416.97 8,339.40 - - - - - - - - - 95 7,922.43 5
26+020 20.00 450.64 455.31 9,106.20 - - - - - - - - - 95 8,650.89 5
26+040 20.00 376.94 358.74 7,174.80 - - - - - - - - - 95 6,816.06 5
26+060 20.00 318.31 384.48 7,689.60 - - - - - - - - - 95 7,305.12 5
26+080 20.00 326.30 351.62 7,032.40 0.01 0.01 0.20 - - - - - - 95 6,680.78 5
26+100 20.00 302.65 310.48 6,209.60 - - - - - - - - - 95 5,899.12 5
26+120 20.00 259.39 292.85 5,857.00 - 0.01 0.20 - 10.00 80.61 806.10 0.70 7.00 95 5,564.15 5
26+140 20.00 310.74 306.70 6,134.00 - - - - 20.00 78.17 1,563.40 0.70 13.90 95 5,827.30 5
26+160 20.00 287.67 273.53 5,470.60 - - - - 20.00 66.38 1,327.50 0.69 13.80 95 5,197.07 5
26+180 20.00 210.28 260.51 5,210.20 - - - - 20.00 49.38 987.60 0.68 13.60 95 4,949.69 5
26+200 20.00 168.26 227.97 4,559.40 - - - - 20.00 39.96 799.20 0.67 13.40 95 4,331.43 5
26+220 20.00 140.01 175.15 3,503.00 - - - - 10.00 31.02 310.20 0.67 6.70 95 3,327.85 5
26+240 20.00 157.26 162.76 3,255.20 - - - - - - - - - 95 3,092.44 5
26+260 20.00 110.35 125.18 2,503.60 - - - - - - - - - 95 2,378.42 5
26+280 20.00 47.06 102.16 2,043.20 - - - - - - - - - 95 1,941.04 5
66 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
26+300 20.00 23.06 66.71 1,334.20 - - - - - - - - - 95 1,267.49 5
26+320 20.00 16.06 31.56 631.20 - - - - - - - - - 95 599.64 5
26+340 20.00 26.26 24.66 493.20 - - - - - - - - - 95 468.54 5
26+360 20.00 4.08 10.07 201.40 0.58 0.29 5.80 - - - - - - 95 191.33 5
26+380 20.00 0.61 13.44 268.80 3.98 1.99 39.80 - 7.00 0.89 6.23 0.12 0.84 95 255.36 5
26+400 20.00 6.85 5.47 109.40 0.64 0.61 12.20 - - - - - - 95 103.93 5
26+420 20.00 28.53 14.57 291.40 - 1.99 39.80 - - - - - - 95 276.83 5
26+440 20.00 23.46 15.16 303.20 - 0.32 6.40 - - - - - - 95 288.04 5
26+460 20.00 7.13 17.83 356.60 0.94 0.47 9.40 - - - - - - 95 338.77 5
26+480 20.00 0.02 11.74 234.80 12.25 6.13 122.60 - 7.00 4.41 30.87 0.47 3.26 95 223.06 5
26+500 20.00 26.33 16.73 334.60 - 0.47 9.40 - - - - - - 95 317.87 5
26+520 20.00 40.26 20.14 402.80 - 6.13 122.60 - - - - - - 95 382.66 5
26+540 20.00 41.23 33.78 675.60 - - - - - - - - - 95 641.82 5
26+560 20.00 59.44 49.85 997.00 - - - - - - - - - 95 947.15 5
26+580 20.00 92.72 66.98 1,339.60 - - - - - - - - - 95 1,272.62 5
26+600 20.00 82.69 71.07 1,421.40 - - - - - - - - - 95 1,350.33 5
26+620 20.00 52.26 72.49 1,449.80 - - - - - - - - - 95 1,377.31 5
26+640 20.00 15.61 49.15 983.00 - - - - - - - - - 95 933.85 5
26+660 20.00 5.10 28.68 573.60 4.44 2.22 44.40 - - - - - - 95 544.92 5
26+680 20.00 7.71 11.66 233.20 - - - - - - - - - 95 221.54 5
26+700 20.00 30.72 17.91 358.20 0.01 2.23 44.60 - - - - - - 95 340.29 5
26+720 20.00 24.39 16.05 321.00 - - - - - - - - - 95 304.95 5
26+740 20.00 37.25 33.99 679.80 - 0.01 0.20 - - - - - - 95 645.81 5
26+760 20.00 53.08 38.74 774.80 - - - - - - - - - 95 736.06 5
26+780 20.00 82.02 59.64 1,192.80 - - - - - - - - - 95 1,133.16 5
26+800 20.00 81.64 67.36 1,347.20 - - - - - - - - - 95 1,279.84 5
26+820 20.00 89.69 85.86 1,717.20 - - - - - - - - - 95 1,631.34 5
26+840 20.00 110.62 96.13 1,922.60 - - - - - - - - - 95 1,826.47 5
26+860 20.00 98.45 94.07 1,881.40 - - - - - - - - - 95 1,787.33 5
26+880 20.00 67.19 88.91 1,778.20 - - - - - - - - - 95 1,689.29 5
26+900 20.00 45.06 71.76 1,435.20 - - - - - - - - - 95 1,363.44 5
26+920 20.00 32.29 49.74 994.80 - - - - - - - - - 95 945.06 5
26+940 20.00 44.40 44.73 894.60 - - - - - - - - - 95 849.87 5
67 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
26+960 20.00 14.57 23.43 468.60 3.89 1.95 39.00 - 10.00 2.39 23.90 0.54 5.40 95 445.17 5
26+980 20.00 2.34 23.37 467.40 5.83 2.92 58.40 - 20.00 2.40 47.90 0.56 11.20 95 444.03 5
27+000 20.00 14.42 14.50 290.00 1.24 2.57 51.40 - 20.00 2.74 54.80 0.37 7.40 95 275.50 5
27+020 20.00 12.13 7.24 144.80 2.56 4.20 84.00 - 10.00 2.14 21.40 0.21 2.10 95 137.56 5
27+040 20.00 16.48 15.45 309.00 0.11 0.68 13.60 - - - - - - 95 293.55 5
27+060 20.00 11.71 11.92 238.40 0.26 1.41 28.20 - - - - - - 95 226.48 5
27+080 20.00 1.29 8.89 177.80 5.65 2.88 57.60 - 10.00 1.50 15.00 0.03 0.25 95 168.91 5
27+100 20.00 7.44 9.58 191.60 12.89 6.58 131.60 - 20.00 2.73 54.60 0.18 3.60 95 182.02 5
27+120 20.00 6.02 3.66 73.20 8.12 6.89 137.80 64.60 20.00 4.97 99.40 0.64 12.80 95 69.54 5
27+140 20.00 9.05 8.25 165.00 7.14 10.02 200.40 35.40 10.00 5.13 51.30 0.79 7.90 95 156.75 5
27+160 20.00 31.30 18.66 373.20 0.05 4.09 81.80 - - - - - - 95 354.54 5
27+180 20.00 21.73 15.39 307.80 1.14 4.14 82.80 - 10.00 3.05 30.45 0.86 8.60 95 292.41 5
27+200 20.00 15.53 23.42 468.40 2.45 1.25 25.00 - 20.00 2.02 40.30 0.44 8.70 95 444.98 5
27+220 20.00 14.43 18.08 361.60 0.53 0.84 16.80 - 20.00 1.48 29.60 0.33 6.60 95 343.52 5
27+240 20.00 7.73 11.63 232.60 1.09 1.77 35.40 - 20.00 1.26 25.20 0.25 4.90 95 220.97 5
27+260 20.00 1.61 8.02 160.40 10.00 5.27 105.40 - 20.00 4.83 96.50 0.60 12.00 95 152.38 5
27+280 20.00 26.38 17.06 341.20 2.91 2.00 40.00 - 10.00 1.69 16.85 0.32 3.20 95 324.14 5
27+300 20.00 27.67 14.64 292.80 - 5.00 100.00 - - - - - - 95 278.16 5
27+320 20.00 2.09 14.24 284.80 4.47 3.69 73.80 - 10.00 1.86 18.60 0.12 1.20 95 270.56 5
27+340 20.00 8.92 18.30 366.00 4.70 2.35 47.00 - 20.00 1.13 22.60 - - 95 347.70 5
27+360 20.00 29.81 15.95 319.00 2.65 3.56 71.20 - 20.00 1.00 20.00 - - 95 303.05 5
27+380 20.00 16.15 12.54 250.80 4.68 4.69 93.80 - 20.00 5.52 110.30 1.04 20.80 95 238.26 5
27+400 20.00 6.25 18.03 360.60 1.06 1.86 37.20 - 20.00 1.02 20.40 0.18 3.60 95 342.57 5
27+420 20.00 11.09 13.62 272.40 5.22 4.95 99.00 - 20.00 2.41 48.20 0.46 9.20 95 258.78 5
27+440 20.00 6.20 6.23 124.60 1.90 1.48 29.60 - 20.00 1.41 28.20 0.28 5.60 95 118.37 5
27+460 20.00 3.11 7.10 142.00 6.21 5.72 114.40 - 20.00 2.78 55.50 0.27 5.40 95 134.90 5
27+480 20.00 3.73 4.97 99.40 10.95 6.43 128.60 29.20 20.00 1.84 36.70 0.08 1.50 95 94.43 5
27+500 20.00 0.01 1.56 31.20 14.98 10.60 212.00 180.80 20.00 1.48 29.60 0.37 7.40 95 29.64 5
27+520 20.00 7.80 5.77 115.40 8.10 9.53 190.60 75.20 20.00 8.01 160.20 1.52 30.40 95 109.63 5
27+540 20.00 36.08 18.05 361.00 0.74 7.86 157.20 - 20.00 2.58 51.60 0.40 8.00 95 342.95 5
27+560 20.00 49.36 28.58 571.60 0.74 4.42 88.40 - 20.00 5.53 110.60 1.33 26.60 95 543.02 5
27+580 20.00 58.61 47.35 947.00 0.78 0.76 15.20 - 20.00 9.12 182.40 2.78 55.60 95 899.65 5
27+600 20.00 14.63 32.00 640.00 11.77 6.26 125.20 - 20.00 13.78 275.60 3.21 64.20 95 608.00 5
68 of 664
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cut
Excess filling
Length
e

Road way Cutting Filling Cutting Back filling Ordinary Soil Soft
ag

Length (m)
in

Av area Volume Area Av area Volume Area Area


ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)
(m2) (m3) (m2) (m2) (m3) (m2) (m2)
C

% %
27+620 20.00 13.85 36.23 724.60 3.32 2.05 41.00 - 10.00 4.10 40.95 0.59 5.90 95 688.37 5
27+640 20.00 14.88 14.76 295.20 0.17 5.97 119.40 - - - - - - 95 280.44 5
27+660 20.00 15.33 14.59 291.80 - 1.66 33.20 - - - - - - 95 277.21 5
27+680 20.00 17.33 16.11 322.20 - 0.09 1.80 - - - - - - 95 306.09 5
27+700 20.00 19.95 17.64 352.80 - - - - - - - - - 95 335.16 5
27+720 20.00 6.45 11.89 237.80 0.03 0.02 0.40 - - - - - - 95 225.91 5
27+740 20.00 7.01 13.48 269.60 0.20 0.10 2.00 - - - - - - 95 256.12 5
27+760 20.00 4.96 5.71 114.20 2.43 1.23 24.60 - - - - - - 95 108.49 5
27+780 20.00 7.41 7.21 144.20 2.95 1.58 31.60 - - - - - - 95 136.99 5
27+800 20.00 9.44 7.20 144.00 0.76 1.60 32.00 - 7.00 1.29 9.03 0.26 1.82 95 136.80 5

Total 27800.00 5823363.00 125749.00 66772.60 273146.98 15730.26 5532194.85

69 of 664
ment of ………..
Infrastructure and Transport
ment of Road
0

ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
- 0 - Ordinary Soil
12.75 0 - Ordinary Soil
23.86 0 - Ordinary Soil
59.66 0 - Ordinary Soil
81.58 0 - Ordinary Soil
70.39 0 - Ordinary Soil
79.16 0 - Ordinary Soil
113.09 0 - Ordinary Soil
142.01 0 - Ordinary Soil
157.19 0 - Ordinary Soil
178.82 0 - Ordinary Soil
162.80 0 - Ordinary Soil
120.34 0 - Ordinary Soil
93.05 0 - Ordinary Soil
78.86 0 - Ordinary Soil
70.31 0 - Ordinary Soil
62.05 0 - Ordinary Soil
48.37 0 - Ordinary Soil
44.40 0 - Ordinary Soil
40.79 0 - Ordinary Soil
31.20 0 - Ordinary Soil
35.50 0 - Ordinary Soil
35.84 0 - Ordinary Soil
29.47 0 - Ordinary Soil
31.44 0 - Ordinary Soil
32.43 0 - Ordinary Soil
25.23 0 - Ordinary Soil
21.50 0 - Ordinary Soil

70 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
17.33 0 - Ordinary Soil
14.43 0 - Ordinary Soil
88.65 0 - Ordinary Soil
195.16 0 - Ordinary Soil
152.44 0 - Ordinary Soil
57.06 0 - Ordinary Soil
35.55 0 - Ordinary Soil
34.22 0 - Ordinary Soil
41.35 0 - Ordinary Soil
48.91 0 - Ordinary Soil
45.06 0 - Ordinary Soil
42.47 0 - Ordinary Soil
70.01 0 - Ordinary Soil
117.11 0 - Ordinary Soil
146.43 0 - Ordinary Soil
195.92 0 - Ordinary Soil
274.26 0 - Ordinary Soil
302.19 0 - Ordinary Soil
286.69 0 - Ordinary Soil
288.32 0 - Ordinary Soil
286.68 0 - Ordinary Soil
254.11 0 - Ordinary Soil
288.71 0 - Ordinary Soil
333.50 0 - Ordinary Soil
298.50 0 - Ordinary Soil
269.32 0 - Ordinary Soil
237.57 0 - Ordinary Soil
203.35 0 - Ordinary Soil
158.09 0 - Ordinary Soil
100.61 0 - Ordinary Soil
69.03 0 - Ordinary Soil
57.91 0 - Ordinary Soil
41.14 0 - Ordinary Soil

71 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
21.66 0 - Ordinary Soil
15.49 0 - Ordinary Soil
13.16 0 - Ordinary Soil
12.51 0 - Ordinary Soil
6.10 0 - Ordinary Soil
12.52 0 - Ordinary Soil
37.98 0 - Ordinary Soil
35.08 0 - Ordinary Soil
16.29 0 - Ordinary Soil
8.26 0 - Ordinary Soil
27.43 0 - Ordinary Soil
52.57 0 - Ordinary Soil
26.25 0 - Ordinary Soil
0.04 0 - Ordinary Soil
- 0 - Ordinary Soil
0.54 0 - Ordinary Soil
1.98 0 - Ordinary Soil
1.87 0 - Ordinary Soil
7.52 0 - Ordinary Soil
15.17 0 - Ordinary Soil
20.74 0 - Ordinary Soil
30.55 0 - Ordinary Soil
47.34 0 - Ordinary Soil
70.55 0 - Ordinary Soil
91.58 0 - Ordinary Soil
89.04 0 - Ordinary Soil
63.23 0 - Ordinary Soil
55.22 0 - Ordinary Soil
74.94 0 - Ordinary Soil
98.03 0 - Ordinary Soil
110.53 0 - Ordinary Soil
134.38 0 - Ordinary Soil
155.78 0 - Ordinary Soil

72 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
133.74 0 - Ordinary Soil
89.28 0 - Ordinary Soil
84.02 0 - Ordinary Soil
111.86 0 - Ordinary Soil
141.57 0 - Ordinary Soil
167.43 0 - Ordinary Soil
159.82 0 - Ordinary Soil
144.33 0 - Ordinary Soil
136.75 0 - Ordinary Soil
117.50 0 - Ordinary Soil
104.45 0 - Ordinary Soil
99.27 0 - Ordinary Soil
102.33 0 - Ordinary Soil
99.33 0 - Ordinary Soil
81.07 0 - Ordinary Soil
129.32 0 - Ordinary Soil
174.82 0 - Ordinary Soil
132.12 0 - Ordinary Soil
89.86 0 - Ordinary Soil
80.66 0 - Ordinary Soil
92.11 0 - Ordinary Soil
99.71 0 - Ordinary Soil
86.03 0 - Ordinary Soil
60.97 0 - Ordinary Soil
50.41 0 - Ordinary Soil
50.31 0 - Ordinary Soil
42.87 0 - Ordinary Soil
28.41 0 - Ordinary Soil
11.21 0 - Ordinary Soil
3.28 0 - Ordinary Soil
6.46 0 - Ordinary Soil
81.24 0 - Ordinary Soil
161.06 0 - Ordinary Soil

73 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
143.86 0 - Ordinary Soil
92.14 0 - Ordinary Soil
54.79 0 - Ordinary Soil
30.73 0 - Ordinary Soil
11.22 0 - Ordinary Soil
2.02 0 - Ordinary Soil
4.81 0 - Ordinary Soil
19.58 0 - Ordinary Soil
33.87 0 - Ordinary Soil
32.83 0 - Ordinary Soil
22.60 0 - Ordinary Soil
13.25 0 - Ordinary Soil
6.33 0 - Ordinary Soil
6.96 0 - Ordinary Soil
8.83 0 - Ordinary Soil
6.51 0 - Ordinary Soil
9.97 0 - Ordinary Soil
25.23 0 - Ordinary Soil
42.74 0 - Ordinary Soil
50.28 0 - Ordinary Soil
40.23 0 - Ordinary Soil
33.95 0 - Ordinary Soil
106.73 0 - Ordinary Soil
195.85 0 - Ordinary Soil
211.33 0 - Ordinary Soil
160.27 0 - Ordinary Soil
88.43 0 - Ordinary Soil
61.68 0 - Ordinary Soil
77.17 0 - Ordinary Soil
96.10 0 - Ordinary Soil
94.50 0 - Ordinary Soil
82.73 0 - Ordinary Soil
82.25 0 - Ordinary Soil

74 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
76.50 0 - Ordinary Soil
62.53 0 - Ordinary Soil
50.28 0 - Ordinary Soil
40.95 0 - Ordinary Soil
36.47 0 - Ordinary Soil
23.78 0 - Ordinary Soil
14.86 0 - Ordinary Soil
14.84 0 - Ordinary Soil
17.51 0 - Ordinary Soil
20.24 0 - Ordinary Soil
23.38 0 - Ordinary Soil
38.59 0 - Ordinary Soil
44.56 0 - Ordinary Soil
33.84 0 - Ordinary Soil
39.78 0 - Ordinary Soil
47.97 0 - Ordinary Soil
54.05 0 - Ordinary Soil
54.36 0 - Ordinary Soil
52.28 0 - Ordinary Soil
48.94 0 - Ordinary Soil
26.00 0 - Ordinary Soil
33.64 0 - Ordinary Soil
153.76 0 - Ordinary Soil
254.64 0 - Ordinary Soil
200.48 0 - Ordinary Soil
163.41 0 - Ordinary Soil
151.54 0 - Ordinary Soil
137.61 0 - Ordinary Soil
142.43 0 - Ordinary Soil
119.78 0 - Ordinary Soil
109.11 0 - Ordinary Soil
90.98 0 - Ordinary Soil
84.56 0 - Ordinary Soil

75 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
93.08 0 - Ordinary Soil
104.09 0 - Ordinary Soil
113.28 0 - Ordinary Soil
108.73 0 - Ordinary Soil
105.23 0 - Ordinary Soil
89.68 0 - Ordinary Soil
62.68 0 - Ordinary Soil
62.32 0 - Ordinary Soil
50.18 0 - Ordinary Soil
22.07 0 - Ordinary Soil
14.37 0 - Ordinary Soil
9.45 0 - Ordinary Soil
8.68 0 - Ordinary Soil
8.28 0 - Ordinary Soil
20.88 0 - Ordinary Soil
42.46 0 - Ordinary Soil
42.25 0 - Ordinary Soil
49.78 0 - Ordinary Soil
78.05 0 - Ordinary Soil
85.57 0 - Ordinary Soil
103.66 0 - Ordinary Soil
163.05 0 - Ordinary Soil
202.11 0 - Ordinary Soil
204.99 0 - Ordinary Soil
213.02 0 - Ordinary Soil
211.17 0 - Ordinary Soil
201.77 0 - Ordinary Soil
209.70 0 - Ordinary Soil
225.43 0 - Ordinary Soil
269.40 0 - Ordinary Soil
302.60 0 - Ordinary Soil
297.11 0 - Ordinary Soil
277.82 0 - Ordinary Soil

76 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
259.48 0 - Ordinary Soil
245.03 0 - Ordinary Soil
221.47 0 - Ordinary Soil
228.17 0 - Ordinary Soil
252.10 0 - Ordinary Soil
243.74 0 - Ordinary Soil
223.35 0 - Ordinary Soil
249.94 0 - Ordinary Soil
265.08 0 - Ordinary Soil
227.63 0 - Ordinary Soil
196.36 0 - Ordinary Soil
176.82 0 - Ordinary Soil
167.47 0 - Ordinary Soil
173.51 0 - Ordinary Soil
177.63 0 - Ordinary Soil
175.89 0 - Ordinary Soil
148.19 0 - Ordinary Soil
100.25 0 - Ordinary Soil
68.50 0 - Ordinary Soil
46.32 0 - Ordinary Soil
35.75 0 - Ordinary Soil
30.62 0 - Ordinary Soil
26.89 0 - Ordinary Soil
27.17 0 - Ordinary Soil
24.28 0 - Ordinary Soil
26.66 0 - Ordinary Soil
34.12 0 - Ordinary Soil
35.64 0 - Ordinary Soil
48.36 0 - Ordinary Soil
72.11 0 - Ordinary Soil
76.05 0 - Ordinary Soil
66.92 0 - Ordinary Soil
69.05 0 - Ordinary Soil

77 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
65.46 0 - Ordinary Soil
44.95 0 - Ordinary Soil
36.58 0 - Ordinary Soil
30.73 0 - Ordinary Soil
18.94 0 - Ordinary Soil
20.21 0 - Ordinary Soil
22.34 0 - Ordinary Soil
15.83 0 - Ordinary Soil
17.51 0 - Ordinary Soil
21.13 0 - Ordinary Soil
22.05 0 - Ordinary Soil
28.46 0 - Ordinary Soil
17.29 0 - Ordinary Soil
19.62 0 - Ordinary Soil
34.00 0 - Ordinary Soil
41.76 0 - Ordinary Soil
39.37 0 - Ordinary Soil
18.67 0 - Ordinary Soil
71.94 0 - Ordinary Soil
103.50 0 - Ordinary Soil
44.91 0 - Ordinary Soil
13.09 0 - Ordinary Soil
50.44 0 - Ordinary Soil
60.18 0 - Ordinary Soil
32.79 0 - Ordinary Soil
29.60 0 - Ordinary Soil
23.18 0 - Ordinary Soil
11.50 0 - Ordinary Soil
23.58 0 - Ordinary Soil
33.68 0 - Ordinary Soil
15.24 0 - Ordinary Soil
34.73 0 - Ordinary Soil
76.69 0 - Ordinary Soil

78 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
62.40 0 - Ordinary Soil
40.81 0 - Ordinary Soil
58.16 0 - Ordinary Soil
42.85 0 - Ordinary Soil
15.88 0 - Ordinary Soil
46.56 0 - Ordinary Soil
79.18 0 - Ordinary Soil
66.19 0 - Ordinary Soil
42.50 0 - Ordinary Soil
20.71 0 - Ordinary Soil
15.00 0 - Ordinary Soil
21.89 0 - Ordinary Soil
24.71 0 - Ordinary Soil
41.08 0 - Ordinary Soil
53.23 0 - Ordinary Soil
50.58 0 - Ordinary Soil
33.62 0 - Ordinary Soil
8.82 0 - Ordinary Soil
12.75 0 - Ordinary Soil
18.24 0 - Ordinary Soil
21.43 0 - Ordinary Soil
19.91 0 - Ordinary Soil
6.01 0 - Ordinary Soil
0.15 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil

79 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
16.28 0 - Ordinary Soil
16.42 0 - Ordinary Soil
2.39 0 - Ordinary Soil
8.06 0 - Ordinary Soil
22.83 0 - Ordinary Soil
34.67 0 - Ordinary Soil
19.67 0 - Ordinary Soil
2.02 0 - Ordinary Soil
11.00 0 - Ordinary Soil
38.22 0 - Ordinary Soil
77.16 0 - Ordinary Soil
70.95 0 - Ordinary Soil
28.22 0 - Ordinary Soil
23.56 0 - Ordinary Soil
29.75 0 - Ordinary Soil
27.76 0 - Ordinary Soil
28.58 0 - Ordinary Soil
36.25 0 - Ordinary Soil
40.94 0 - Ordinary Soil
48.62 0 - Ordinary Soil
67.11 0 - Ordinary Soil
73.53 0 - Ordinary Soil
65.26 0 - Ordinary Soil
68.80 0 - Ordinary Soil
82.35 0 - Ordinary Soil
88.47 0 - Ordinary Soil
105.87 0 - Ordinary Soil
102.99 0 - Ordinary Soil
93.89 0 - Ordinary Soil
105.17 0 - Ordinary Soil
122.13 0 - Ordinary Soil
125.01 0 - Ordinary Soil
147.59 0 - Ordinary Soil

80 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
136.45 0 - Ordinary Soil
216.81 0 - Ordinary Soil
210.44 0 - Ordinary Soil
314.89 0 - Ordinary Soil
308.48 0 - Ordinary Soil
349.28 0 - Ordinary Soil
350.06 0 - Ordinary Soil
362.63 0 - Ordinary Soil
366.44 0 - Ordinary Soil
378.58 0 - Ordinary Soil
394.95 0 - Ordinary Soil
388.64 0 - Ordinary Soil
435.90 0 - Ordinary Soil
458.19 0 - Ordinary Soil
490.87 0 - Ordinary Soil
505.85 0 - Ordinary Soil
516.41 0 - Ordinary Soil
527.73 0 - Ordinary Soil
524.86 0 - Ordinary Soil
517.95 0 - Ordinary Soil
546.16 0 - Ordinary Soil
512.45 0 - Ordinary Soil
553.49 0 - Ordinary Soil
545.91 0 - Ordinary Soil
545.77 0 - Ordinary Soil
526.62 0 - Ordinary Soil
534.76 0 - Ordinary Soil
520.00 0 - Ordinary Soil
536.46 0 - Ordinary Soil
631.30 0 - Ordinary Soil
639.11 0 - Ordinary Soil
702.72 0 - Ordinary Soil
669.78 0 - Ordinary Soil

81 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
635.10 0 - Ordinary Soil
609.88 0 - Ordinary Soil
608.64 0 - Ordinary Soil
626.69 0 - Ordinary Soil
638.63 0 - Ordinary Soil
690.75 0 - Ordinary Soil
670.78 0 - Ordinary Soil
715.01 0 - Ordinary Soil
703.85 0 - Ordinary Soil
712.07 0 - Ordinary Soil
758.78 0 - Ordinary Soil
775.73 0 - Ordinary Soil
803.48 0 - Ordinary Soil
824.01 0 - Ordinary Soil
814.81 0 - Ordinary Soil
815.25 0 - Ordinary Soil
783.86 0 - Ordinary Soil
765.55 0 - Ordinary Soil
790.36 0 - Ordinary Soil
779.10 0 - Ordinary Soil
854.76 0 - Ordinary Soil
809.63 0 - Ordinary Soil
836.19 0 - Ordinary Soil
780.24 0 - Ordinary Soil
804.48 0 - Ordinary Soil
782.58 0 - Ordinary Soil
757.05 0 - Ordinary Soil
845.73 0 - Ordinary Soil
748.18 0 - Ordinary Soil
861.25 0 - Ordinary Soil
792.36 0 - Ordinary Soil
805.81 0 - Ordinary Soil
854.75 0 - Ordinary Soil

82 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
861.97 0 - Ordinary Soil
890.76 0 - Ordinary Soil
905.03 0 - Ordinary Soil
863.49 0 - Ordinary Soil
885.16 0 - Ordinary Soil
891.13 0 - Ordinary Soil
926.92 0 - Ordinary Soil
930.52 0 - Ordinary Soil
919.21 0 - Ordinary Soil
920.55 0 - Ordinary Soil
914.31 0 - Ordinary Soil
881.22 0 - Ordinary Soil
941.93 0 - Ordinary Soil
855.08 0 - Ordinary Soil
936.56 0 - Ordinary Soil
922.18 0 - Ordinary Soil
971.31 0 - Ordinary Soil
974.31 0 - Ordinary Soil
994.22 0 - Ordinary Soil
1,007.21 0 - Ordinary Soil
1,017.12 0 - Ordinary Soil
1,058.10 0 - Ordinary Soil
1,019.09 0 - Ordinary Soil
1,063.65 0 - Ordinary Soil
996.00 0 - Ordinary Soil
1,041.64 0 - Ordinary Soil
1,007.11 0 - Ordinary Soil
1,039.06 0 - Ordinary Soil
1,047.39 0 - Ordinary Soil
1,059.97 0 - Ordinary Soil
1,033.68 0 - Ordinary Soil
1,006.77 0 - Ordinary Soil
1,033.77 0 - Ordinary Soil

83 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
1,029.24 0 - Ordinary Soil
1,080.45 0 - Ordinary Soil
1,039.36 0 - Ordinary Soil
1,019.24 0 - Ordinary Soil
1,011.38 0 - Ordinary Soil
983.23 0 - Ordinary Soil
1,026.80 0 - Ordinary Soil
977.08 0 - Ordinary Soil
1,032.27 0 - Ordinary Soil
1,026.73 0 - Ordinary Soil
1,062.55 0 - Ordinary Soil
1,068.63 0 - Ordinary Soil
1,004.64 0 - Ordinary Soil
1,030.74 0 - Ordinary Soil
1,051.39 0 - Ordinary Soil
1,099.63 0 - Ordinary Soil
1,127.55 0 - Ordinary Soil
1,159.00 0 - Ordinary Soil
1,048.67 0 - Ordinary Soil
1,102.46 0 - Ordinary Soil
1,044.83 0 - Ordinary Soil
1,073.88 0 - Ordinary Soil
1,070.22 0 - Ordinary Soil
1,008.25 0 - Ordinary Soil
870.21 0 - Ordinary Soil
1,030.07 0 - Ordinary Soil
876.22 0 - Ordinary Soil
1,061.91 0 - Ordinary Soil
1,036.87 0 - Ordinary Soil
1,005.13 0 - Ordinary Soil
1,004.75 0 - Ordinary Soil
990.09 0 - Ordinary Soil
1,022.97 0 - Ordinary Soil

84 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
1,001.70 0 - Ordinary Soil
998.54 0 - Ordinary Soil
939.06 0 - Ordinary Soil
977.49 0 - Ordinary Soil
918.45 0 - Ordinary Soil
1,020.57 0 - Ordinary Soil
1,011.62 0 - Ordinary Soil
1,051.23 0 - Ordinary Soil
985.96 0 - Ordinary Soil
988.59 0 - Ordinary Soil
1,024.95 0 - Ordinary Soil
1,020.84 0 - Ordinary Soil
1,137.25 0 - Ordinary Soil
1,053.37 0 - Ordinary Soil
1,081.42 0 - Ordinary Soil
1,005.77 0 - Ordinary Soil
1,061.65 0 - Ordinary Soil
1,062.12 0 - Ordinary Soil
1,117.11 0 - Ordinary Soil
1,117.29 0 - Ordinary Soil
1,127.56 0 - Ordinary Soil
1,141.42 0 - Ordinary Soil
1,148.14 0 - Ordinary Soil
1,152.38 0 - Ordinary Soil
1,145.51 0 - Ordinary Soil
1,133.48 0 - Ordinary Soil
1,121.13 0 - Ordinary Soil
1,120.35 0 - Ordinary Soil
1,103.23 0 - Ordinary Soil
1,087.77 0 - Ordinary Soil
1,076.74 0 - Ordinary Soil
1,055.44 0 - Ordinary Soil
1,018.51 0 - Ordinary Soil

85 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
1,071.63 0 - Ordinary Soil
1,058.22 0 - Ordinary Soil
1,109.31 0 - Ordinary Soil
1,103.39 0 - Ordinary Soil
1,106.44 0 - Ordinary Soil
1,091.22 0 - Ordinary Soil
1,051.33 0 - Ordinary Soil
1,066.78 0 - Ordinary Soil
1,028.51 0 - Ordinary Soil
1,035.10 0 - Ordinary Soil
1,038.44 0 - Ordinary Soil
972.11 0 - Ordinary Soil
943.72 0 - Ordinary Soil
1,010.07 0 - Ordinary Soil
963.34 0 - Ordinary Soil
1,097.99 0 - Ordinary Soil
1,079.87 0 - Ordinary Soil
1,069.55 0 - Ordinary Soil
1,069.26 0 - Ordinary Soil
1,081.39 0 - Ordinary Soil
1,078.98 0 - Ordinary Soil
1,065.59 0 - Ordinary Soil
1,051.96 0 - Ordinary Soil
980.37 0 - Ordinary Soil
988.49 0 - Ordinary Soil
964.37 0 - Ordinary Soil
966.64 0 - Ordinary Soil
949.96 0 - Ordinary Soil
934.20 0 - Ordinary Soil
888.93 0 - Ordinary Soil
878.04 0 - Ordinary Soil
873.60 0 - Ordinary Soil
846.93 0 - Ordinary Soil

86 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
847.91 0 - Ordinary Soil
827.40 0 - Ordinary Soil
772.48 0 - Ordinary Soil
732.72 0 - Ordinary Soil
700.64 0 - Ordinary Soil
634.68 0 - Ordinary Soil
637.95 0 - Ordinary Soil
588.20 0 - Ordinary Soil
564.42 0 - Ordinary Soil
554.11 0 - Ordinary Soil
542.12 0 - Ordinary Soil
501.65 0 - Ordinary Soil
505.31 0 - Ordinary Soil
446.91 0 - Ordinary Soil
350.89 0 - Ordinary Soil
427.53 0 - Ordinary Soil
344.47 0 - Ordinary Soil
427.90 0 - Ordinary Soil
427.56 0 - Ordinary Soil
395.33 0 - Ordinary Soil
383.64 0 - Ordinary Soil
324.52 0 - Ordinary Soil
359.49 0 - Ordinary Soil
293.73 0 - Ordinary Soil
317.35 0 - Ordinary Soil
266.97 0 - Ordinary Soil
244.25 0 - Ordinary Soil
233.96 0 - Ordinary Soil
240.93 0 - Ordinary Soil
246.17 0 - Ordinary Soil
251.94 0 - Ordinary Soil
265.52 0 - Ordinary Soil
223.66 0 - Ordinary Soil

87 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
271.16 0 - Ordinary Soil
243.29 0 - Ordinary Soil
289.78 0 - Ordinary Soil
300.55 0 - Ordinary Soil
320.09 0 - Ordinary Soil
368.12 0 - Ordinary Soil
398.55 0 - Ordinary Soil
464.53 0 - Ordinary Soil
510.25 0 - Ordinary Soil
527.97 0 - Ordinary Soil
575.25 0 - Ordinary Soil
541.92 0 - Ordinary Soil
523.61 0 - Ordinary Soil
533.99 0 - Ordinary Soil
522.70 0 - Ordinary Soil
554.95 0 - Ordinary Soil
571.35 0 - Ordinary Soil
555.60 0 - Ordinary Soil
534.04 0 - Ordinary Soil
512.65 0 - Ordinary Soil
457.40 0 - Ordinary Soil
474.71 0 - Ordinary Soil
388.19 0 - Ordinary Soil
461.07 0 - Ordinary Soil
436.98 0 - Ordinary Soil
458.26 0 - Ordinary Soil
463.37 0 - Ordinary Soil
429.63 0 - Ordinary Soil
419.57 0 - Ordinary Soil
395.85 0 - Ordinary Soil
355.31 0 - Ordinary Soil
343.46 0 - Ordinary Soil
303.09 0 - Ordinary Soil

88 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
285.82 0 - Ordinary Soil
297.96 0 - Ordinary Soil
248.15 0 - Ordinary Soil
287.75 0 - Ordinary Soil
274.27 0 - Ordinary Soil
303.11 0 - Ordinary Soil
319.69 0 - Ordinary Soil
330.29 0 - Ordinary Soil
319.46 0 - Ordinary Soil
314.70 0 - Ordinary Soil
282.46 0 - Ordinary Soil
261.19 0 - Ordinary Soil
219.18 0 - Ordinary Soil
288.82 0 - Ordinary Soil
286.97 0 - Ordinary Soil
368.28 0 - Ordinary Soil
373.02 0 - Ordinary Soil
377.48 0 - Ordinary Soil
354.69 0 - Ordinary Soil
348.78 0 - Ordinary Soil
357.11 0 - Ordinary Soil
370.77 0 - Ordinary Soil
364.33 0 - Ordinary Soil
377.21 0 - Ordinary Soil
358.99 0 - Ordinary Soil
342.86 0 - Ordinary Soil
352.55 0 - Ordinary Soil
349.45 0 - Ordinary Soil
369.95 0 - Ordinary Soil
336.26 0 - Ordinary Soil
362.39 0 - Ordinary Soil
317.25 0 - Ordinary Soil
328.76 0 - Ordinary Soil

89 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
305.40 0 - Ordinary Soil
256.52 0 - Ordinary Soil
220.73 0 - Ordinary Soil
176.56 0 - Ordinary Soil
182.11 0 - Ordinary Soil
178.38 0 - Ordinary Soil
189.80 0 - Ordinary Soil
181.68 0 - Ordinary Soil
198.21 0 - Ordinary Soil
182.23 0 - Ordinary Soil
208.86 0 - Ordinary Soil
210.67 0 - Ordinary Soil
195.31 0 - Ordinary Soil
221.82 0 - Ordinary Soil
195.88 0 - Ordinary Soil
204.52 0 - Ordinary Soil
176.46 0 - Ordinary Soil
178.60 0 - Ordinary Soil
112.93 0 - Ordinary Soil
121.14 0 - Ordinary Soil
141.06 0 - Ordinary Soil
128.49 0 - Ordinary Soil
195.47 0 - Ordinary Soil
186.77 0 - Ordinary Soil
163.32 0 - Ordinary Soil
188.51 0 - Ordinary Soil
184.31 0 - Ordinary Soil
173.22 0 - Ordinary Soil
189.81 0 - Ordinary Soil
136.58 0 - Ordinary Soil
130.95 0 - Ordinary Soil
104.39 0 - Ordinary Soil
88.37 0 - Ordinary Soil

90 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
86.21 0 - Ordinary Soil
64.42 0 - Ordinary Soil
60.89 0 - Ordinary Soil
31.80 0 - Ordinary Soil
28.24 0 - Ordinary Soil
12.76 0 - Ordinary Soil
14.42 0 - Ordinary Soil
12.67 0 - Ordinary Soil
26.54 0 - Ordinary Soil
5.99 0 - Ordinary Soil
19.48 0 - Ordinary Soil
- 0 - Ordinary Soil
5.26 0 - Ordinary Soil
24.57 0 - Ordinary Soil
32.49 0 - Ordinary Soil
40.38 0 - Ordinary Soil
32.96 0 - Ordinary Soil
22.79 0 - Ordinary Soil
10.51 0 - Ordinary Soil
10.95 0 - Ordinary Soil
8.42 0 - Ordinary Soil
9.47 0 - Ordinary Soil
6.99 0 - Ordinary Soil
7.45 0 - Ordinary Soil
16.62 0 - Ordinary Soil
5.64 0 - Ordinary Soil
16.53 0 - Ordinary Soil
4.38 0 - Ordinary Soil
6.49 0 - Ordinary Soil
1.51 0 - Ordinary Soil
9.50 0 - Ordinary Soil
11.10 0 - Ordinary Soil
20.57 0 - Ordinary Soil

91 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
17.78 0 - Ordinary Soil
19.12 0 - Ordinary Soil
10.47 0 - Ordinary Soil
5.84 0 - Ordinary Soil
3.73 0 - Ordinary Soil
2.69 0 - Ordinary Soil
2.69 0 - Ordinary Soil
6.97 0 - Ordinary Soil
3.99 0 - Ordinary Soil
19.09 0 - Ordinary Soil
12.21 0 - Ordinary Soil
27.13 0 - Ordinary Soil
17.46 0 - Ordinary Soil
17.97 0 - Ordinary Soil
15.50 0 - Ordinary Soil
10.99 0 - Ordinary Soil
21.65 0 - Ordinary Soil
43.08 0 - Ordinary Soil
17.53 0 - Ordinary Soil
51.78 0 - Ordinary Soil
22.28 0 - Ordinary Soil
25.28 0 - Ordinary Soil
25.28 0 - Ordinary Soil
10.63 0 - Ordinary Soil
7.98 0 - Ordinary Soil
0.73 0 - Ordinary Soil
1.09 0 - Ordinary Soil
1.04 0 - Ordinary Soil
9.79 0 - Ordinary Soil
11.39 0 - Ordinary Soil
15.30 0 - Ordinary Soil
10.68 0 - Ordinary Soil
5.71 0 - Ordinary Soil

92 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
3.85 0 - Ordinary Soil
2.45 0 - Ordinary Soil
3.81 0 - Ordinary Soil
5.73 0 - Ordinary Soil
14.05 0 - Ordinary Soil
18.30 0 - Ordinary Soil
20.31 0 - Ordinary Soil
18.70 0 - Ordinary Soil
11.89 0 - Ordinary Soil
12.20 0 - Ordinary Soil
13.96 0 - Ordinary Soil
10.07 0 - Ordinary Soil
13.58 0 - Ordinary Soil
2.69 0 - Ordinary Soil
5.26 0 - Ordinary Soil
2.54 0 - Ordinary Soil
7.97 0 - Ordinary Soil
11.95 0 - Ordinary Soil
7.97 0 - Ordinary Soil
11.89 0 - Ordinary Soil
3.11 0 - Ordinary Soil
6.26 0 - Ordinary Soil
7.95 0 - Ordinary Soil
12.57 0 - Ordinary Soil
21.10 0 - Ordinary Soil
33.87 0 - Ordinary Soil
38.70 0 - Ordinary Soil
48.29 0 - Ordinary Soil
26.01 0 - Ordinary Soil
22.34 0 - Ordinary Soil
4.38 0 - Ordinary Soil
2.16 0 - Ordinary Soil
10.29 0 - Ordinary Soil

93 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
13.17 0 - Ordinary Soil
12.45 0 - Ordinary Soil
12.76 0 - Ordinary Soil
8.02 0 - Ordinary Soil
14.63 0 - Ordinary Soil
7.34 0 - Ordinary Soil
15.55 0 - Ordinary Soil
8.53 0 - Ordinary Soil
13.19 0 - Ordinary Soil
16.50 0 - Ordinary Soil
15.43 0 - Ordinary Soil
13.89 0 - Ordinary Soil
5.33 0 - Ordinary Soil
15.92 0 - Ordinary Soil
6.39 0 - Ordinary Soil
22.31 0 - Ordinary Soil
22.25 0 - Ordinary Soil
24.39 0 - Ordinary Soil
18.79 0 - Ordinary Soil
14.96 0 - Ordinary Soil
2.26 0 - Ordinary Soil
0.59 0 - Ordinary Soil
0.01 0 - Ordinary Soil
10.70 0 - Ordinary Soil
43.92 0 - Ordinary Soil
20.35 0 - Ordinary Soil
50.39 0 - Ordinary Soil
11.69 0 - Ordinary Soil
9.25 0 - Ordinary Soil
15.31 0 - Ordinary Soil
29.70 0 - Ordinary Soil
42.77 0 - Ordinary Soil
49.97 0 - Ordinary Soil

94 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
61.63 0 - Ordinary Soil
103.89 0 - Ordinary Soil
130.06 0 - Ordinary Soil
143.59 0 - Ordinary Soil
161.77 0 - Ordinary Soil
149.38 0 - Ordinary Soil
152.49 0 - Ordinary Soil
168.56 0 - Ordinary Soil
138.14 0 - Ordinary Soil
118.35 0 - Ordinary Soil
87.06 0 - Ordinary Soil
73.95 0 - Ordinary Soil
98.14 0 - Ordinary Soil
120.04 0 - Ordinary Soil
141.59 0 - Ordinary Soil
163.66 0 - Ordinary Soil
132.83 0 - Ordinary Soil
143.20 0 - Ordinary Soil
106.75 0 - Ordinary Soil
117.47 0 - Ordinary Soil
87.56 0 - Ordinary Soil
77.88 0 - Ordinary Soil
58.14 0 - Ordinary Soil
71.49 0 - Ordinary Soil
50.33 0 - Ordinary Soil
65.29 0 - Ordinary Soil
39.12 0 - Ordinary Soil
32.88 0 - Ordinary Soil
32.91 0 - Ordinary Soil
33.08 0 - Ordinary Soil
39.93 0 - Ordinary Soil
23.74 0 - Ordinary Soil
25.52 0 - Ordinary Soil

95 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
12.87 0 - Ordinary Soil
8.50 0 - Ordinary Soil
11.38 0 - Ordinary Soil
16.71 0 - Ordinary Soil
29.29 0 - Ordinary Soil
18.54 0 - Ordinary Soil
41.65 0 - Ordinary Soil
23.46 0 - Ordinary Soil
72.54 0 - Ordinary Soil
95.45 0 - Ordinary Soil
108.25 0 - Ordinary Soil
114.00 0 - Ordinary Soil
92.32 0 - Ordinary Soil
44.95 0 - Ordinary Soil
38.80 0 - Ordinary Soil
9.05 0 - Ordinary Soil
11.60 0 - Ordinary Soil
14.23 0 - Ordinary Soil
14.68 0 - Ordinary Soil
35.09 0 - Ordinary Soil
45.59 0 - Ordinary Soil
28.60 0 - Ordinary Soil
42.16 0 - Ordinary Soil
35.99 0 - Ordinary Soil
48.24 0 - Ordinary Soil
75.46 0 - Ordinary Soil
123.56 0 - Ordinary Soil
89.73 0 - Ordinary Soil
104.90 0 - Ordinary Soil
86.58 0 - Ordinary Soil
60.31 0 - Ordinary Soil
74.58 0 - Ordinary Soil
53.60 0 - Ordinary Soil

96 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
55.53 0 - Ordinary Soil
71.62 0 - Ordinary Soil
73.71 0 - Ordinary Soil
82.13 0 - Ordinary Soil
77.77 0 - Ordinary Soil
112.27 0 - Ordinary Soil
45.88 0 - Ordinary Soil
92.29 0 - Ordinary Soil
53.11 0 - Ordinary Soil
43.21 0 - Ordinary Soil
38.20 0 - Ordinary Soil
33.58 0 - Ordinary Soil
9.41 0 - Ordinary Soil
15.24 0 - Ordinary Soil
30.47 0 - Ordinary Soil
14.24 0 - Ordinary Soil
22.97 0 - Ordinary Soil
10.73 0 - Ordinary Soil
3.30 0 - Ordinary Soil
16.34 0 - Ordinary Soil
23.06 0 - Ordinary Soil
35.43 0 - Ordinary Soil
37.84 0 - Ordinary Soil
33.17 0 - Ordinary Soil
25.87 0 - Ordinary Soil
15.05 0 - Ordinary Soil
11.66 0 - Ordinary Soil
20.38 0 - Ordinary Soil
35.53 0 - Ordinary Soil
89.12 0 - Ordinary Soil
46.39 0 - Ordinary Soil
102.60 0 - Ordinary Soil
34.23 0 - Ordinary Soil

97 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
24.92 0 - Ordinary Soil
19.98 0 - Ordinary Soil
20.89 0 - Ordinary Soil
115.36 0 - Ordinary Soil
116.72 0 - Ordinary Soil
176.38 0 - Ordinary Soil
162.63 0 - Ordinary Soil
126.43 0 - Ordinary Soil
93.74 0 - Ordinary Soil
80.87 0 - Ordinary Soil
49.35 0 - Ordinary Soil
85.24 0 - Ordinary Soil
71.55 0 - Ordinary Soil
82.53 0 - Ordinary Soil
50.69 0 - Ordinary Soil
16.03 0 - Ordinary Soil
12.79 0 - Ordinary Soil
8.35 0 - Ordinary Soil
17.98 0 - Ordinary Soil
15.42 0 - Ordinary Soil
15.03 0 - Ordinary Soil
20.80 0 - Ordinary Soil
54.07 0 - Ordinary Soil
45.02 0 - Ordinary Soil
79.42 0 - Ordinary Soil
60.02 0 - Ordinary Soil
48.62 0 - Ordinary Soil
38.33 0 - Ordinary Soil
21.76 0 - Ordinary Soil
16.76 0 - Ordinary Soil
27.54 0 - Ordinary Soil
41.52 0 - Ordinary Soil
48.54 0 - Ordinary Soil

98 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
55.53 0 - Ordinary Soil
66.59 0 - Ordinary Soil
83.27 0 - Ordinary Soil
121.91 0 - Ordinary Soil
115.78 0 - Ordinary Soil
101.13 0 - Ordinary Soil
53.39 0 - Ordinary Soil
18.03 0 - Ordinary Soil
8.09 0 - Ordinary Soil
8.83 0 - Ordinary Soil
10.42 0 - Ordinary Soil
13.87 0 - Ordinary Soil
16.73 0 - Ordinary Soil
18.86 0 - Ordinary Soil
21.29 0 - Ordinary Soil
21.46 0 - Ordinary Soil
15.21 0 - Ordinary Soil
16.77 0 - Ordinary Soil
11.33 0 - Ordinary Soil
14.45 0 - Ordinary Soil
9.45 0 - Ordinary Soil
7.37 0 - Ordinary Soil
5.07 0 - Ordinary Soil
6.64 0 - Ordinary Soil
7.12 0 - Ordinary Soil
6.74 0 - Ordinary Soil
8.33 0 - Ordinary Soil
6.63 0 - Ordinary Soil
9.91 0 - Ordinary Soil
7.11 0 - Ordinary Soil
10.03 0 - Ordinary Soil
5.23 0 - Ordinary Soil
12.21 0 - Ordinary Soil

99 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
15.51 0 - Ordinary Soil
29.34 0 - Ordinary Soil
59.49 0 - Ordinary Soil
82.99 0 - Ordinary Soil
121.12 0 - Ordinary Soil
122.12 0 - Ordinary Soil
121.45 0 - Ordinary Soil
90.07 0 - Ordinary Soil
72.20 0 - Ordinary Soil
50.99 0 - Ordinary Soil
39.28 0 - Ordinary Soil
57.62 0 - Ordinary Soil
31.10 0 - Ordinary Soil
65.01 0 - Ordinary Soil
54.87 0 - Ordinary Soil
39.69 0 - Ordinary Soil
37.75 0 - Ordinary Soil
12.66 0 - Ordinary Soil
- 0 - Ordinary Soil
2.52 0 - Ordinary Soil
0.60 0 - Ordinary Soil
3.41 0 - Ordinary Soil
2.07 0 - Ordinary Soil
2.96 0 - Ordinary Soil
2.93 0 - Ordinary Soil
3.62 0 - Ordinary Soil
2.34 0 - Ordinary Soil
2.92 0 - Ordinary Soil
7.14 0 - Ordinary Soil
12.99 0 - Ordinary Soil
13.61 0 - Ordinary Soil
12.75 0 - Ordinary Soil
13.10 0 - Ordinary Soil

100 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
7.18 0 - Ordinary Soil
8.76 0 - Ordinary Soil
6.05 0 - Ordinary Soil
3.00 0 - Ordinary Soil
2.24 0 - Ordinary Soil
5.27 0 - Ordinary Soil
7.32 0 - Ordinary Soil
12.27 0 - Ordinary Soil
15.70 0 - Ordinary Soil
10.94 0 - Ordinary Soil
17.07 0 - Ordinary Soil
36.22 0 - Ordinary Soil
30.04 0 - Ordinary Soil
38.92 0 - Ordinary Soil
33.69 0 - Ordinary Soil
12.23 0 - Ordinary Soil
10.10 0 - Ordinary Soil
6.83 0 - Ordinary Soil
2.40 0 - Ordinary Soil
1.24 0 - Ordinary Soil
2.40 0 - Ordinary Soil
1.18 0 - Ordinary Soil
2.01 0 - Ordinary Soil
1.17 0 - Ordinary Soil
2.01 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
2.36 0 - Ordinary Soil

101 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
9.32 0 - Ordinary Soil
5.04 0 - Ordinary Soil
15.17 0 - Ordinary Soil
4.38 0 - Ordinary Soil
7.44 0 - Ordinary Soil
7.04 0 - Ordinary Soil
17.22 0 - Ordinary Soil
14.05 0 - Ordinary Soil
27.37 0 - Ordinary Soil
8.71 0 - Ordinary Soil
11.73 0 - Ordinary Soil
- 0 - Ordinary Soil
2.32 0 - Ordinary Soil
60.73 0 - Ordinary Soil
120.55 0 - Ordinary Soil
124.00 0 - Ordinary Soil
140.51 0 - Ordinary Soil
87.40 0 - Ordinary Soil
55.17 0 - Ordinary Soil
46.30 0 - Ordinary Soil
45.18 0 - Ordinary Soil
24.09 0 - Ordinary Soil
12.28 0 - Ordinary Soil
1.99 0 - Ordinary Soil
- 0 - Ordinary Soil
0.31 0 - Ordinary Soil
4.66 0 - Ordinary Soil
34.30 0 - Ordinary Soil
53.01 0 - Ordinary Soil
206.37 0 - Ordinary Soil
217.66 0 - Ordinary Soil
272.85 0 - Ordinary Soil
250.86 0 - Ordinary Soil

102 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
178.77 0 - Ordinary Soil
154.23 0 - Ordinary Soil
169.22 0 - Ordinary Soil
154.74 0 - Ordinary Soil
177.25 0 - Ordinary Soil
143.98 0 - Ordinary Soil
128.72 0 - Ordinary Soil
76.76 0 - Ordinary Soil
46.88 0 - Ordinary Soil
15.25 0 - Ordinary Soil
4.42 0 - Ordinary Soil
0.39 0 - Ordinary Soil
0.42 0 - Ordinary Soil
6.20 0 - Ordinary Soil
25.48 0 - Ordinary Soil
129.77 0 - Ordinary Soil
155.16 0 - Ordinary Soil
236.14 0 - Ordinary Soil
181.15 0 - Ordinary Soil
129.76 0 - Ordinary Soil
51.14 0 - Ordinary Soil
17.19 0 - Ordinary Soil
0.08 0 - Ordinary Soil
- 0 - Ordinary Soil
- 0 - Ordinary Soil
78.28 0 - Ordinary Soil
69.19 0 - Ordinary Soil
124.08 0 - Ordinary Soil
83.60 0 - Ordinary Soil
46.82 0 - Ordinary Soil
15.98 0 - Ordinary Soil
6.54 0 - Ordinary Soil
4.72 0 - Ordinary Soil

103 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
14.14 0 - Ordinary Soil
26.90 0 - Ordinary Soil
119.56 0 - Ordinary Soil
170.07 0 - Ordinary Soil
217.75 0 - Ordinary Soil
236.95 0 - Ordinary Soil
185.31 0 - Ordinary Soil
152.73 0 - Ordinary Soil
106.73 0 - Ordinary Soil
73.60 0 - Ordinary Soil
35.81 0 - Ordinary Soil
11.93 0 - Ordinary Soil
20.09 0 - Ordinary Soil
119.77 0 - Ordinary Soil
93.38 0 - Ordinary Soil
216.91 0 - Ordinary Soil
136.76 0 - Ordinary Soil
128.74 0 - Ordinary Soil
68.71 0 - Ordinary Soil
41.28 0 - Ordinary Soil
16.27 0 - Ordinary Soil
10.11 0 - Ordinary Soil
3.46 0 - Ordinary Soil
0.12 0 - Ordinary Soil
58.52 0 - Ordinary Soil
96.67 0 - Ordinary Soil
160.72 0 - Ordinary Soil
184.60 0 - Ordinary Soil
202.14 0 - Ordinary Soil
201.54 0 - Ordinary Soil
183.45 0 - Ordinary Soil
195.66 0 - Ordinary Soil
193.67 0 - Ordinary Soil

104 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
182.54 0 - Ordinary Soil
210.26 0 - Ordinary Soil
187.39 0 - Ordinary Soil
208.42 0 - Ordinary Soil
199.73 0 - Ordinary Soil
239.31 0 - Ordinary Soil
167.95 0 - Ordinary Soil
165.54 0 - Ordinary Soil
68.07 0 - Ordinary Soil
93.01 0 - Ordinary Soil
71.25 0 - Ordinary Soil
114.16 0 - Ordinary Soil
107.67 0 - Ordinary Soil
116.67 0 - Ordinary Soil
94.91 0 - Ordinary Soil
78.56 0 - Ordinary Soil
48.27 0 - Ordinary Soil
19.08 0 - Ordinary Soil
9.03 0 - Ordinary Soil
7.70 0 - Ordinary Soil
17.63 0 - Ordinary Soil
29.43 0 - Ordinary Soil
15.86 0 - Ordinary Soil
23.23 0 - Ordinary Soil
4.63 0 - Ordinary Soil
5.54 0 - Ordinary Soil
19.10 0 - Ordinary Soil
29.46 0 - Ordinary Soil
57.96 0 - Ordinary Soil
60.35 0 - Ordinary Soil
56.59 0 - Ordinary Soil
54.34 0 - Ordinary Soil
119.27 0 - Ordinary Soil

105 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
133.01 0 - Ordinary Soil
186.02 0 - Ordinary Soil
115.90 0 - Ordinary Soil
84.47 0 - Ordinary Soil
13.69 0 - Ordinary Soil
16.34 0 - Ordinary Soil
17.70 0 - Ordinary Soil
17.14 0 - Ordinary Soil
7.38 0 - Ordinary Soil
9.73 0 - Ordinary Soil
15.13 0 - Ordinary Soil
21.15 0 - Ordinary Soil
12.65 0 - Ordinary Soil
12.22 0 - Ordinary Soil
1.89 0 - Ordinary Soil
24.73 0 - Ordinary Soil
17.82 0 - Ordinary Soil
25.33 0 - Ordinary Soil
17.40 0 - Ordinary Soil
47.39 0 - Ordinary Soil
69.97 0 - Ordinary Soil
118.82 0 - Ordinary Soil
111.57 0 - Ordinary Soil
89.36 0 - Ordinary Soil
44.89 0 - Ordinary Soil
17.39 0 - Ordinary Soil
6.32 0 - Ordinary Soil
5.14 0 - Ordinary Soil
50.98 0 - Ordinary Soil
128.56 0 - Ordinary Soil
141.83 0 - Ordinary Soil
197.52 0 - Ordinary Soil
156.36 0 - Ordinary Soil

106 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
136.55 0 - Ordinary Soil
137.42 0 - Ordinary Soil
75.16 0 - Ordinary Soil
94.83 0 - Ordinary Soil
53.76 0 - Ordinary Soil
49.65 0 - Ordinary Soil
64.40 0 - Ordinary Soil
46.25 0 - Ordinary Soil
35.95 0 - Ordinary Soil
26.39 0 - Ordinary Soil
20.77 0 - Ordinary Soil
25.92 0 - Ordinary Soil
30.86 0 - Ordinary Soil
62.78 0 - Ordinary Soil
91.95 0 - Ordinary Soil
78.07 0 - Ordinary Soil
75.30 0 - Ordinary Soil
42.10 0 - Ordinary Soil
27.93 0 - Ordinary Soil
43.27 0 - Ordinary Soil
32.01 0 - Ordinary Soil
48.18 0 - Ordinary Soil
20.00 0 - Ordinary Soil
47.24 0 - Ordinary Soil
27.64 0 - Ordinary Soil
51.31 0 - Ordinary Soil
48.09 0 - Ordinary Soil
30.14 0 - Ordinary Soil
30.30 0 - Ordinary Soil
8.98 0 - Ordinary Soil
6.97 0 - Ordinary Soil
36.84 0 - Ordinary Soil
27.17 0 - Ordinary Soil

107 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
76.88 0 - Ordinary Soil
58.84 0 - Ordinary Soil
78.88 0 - Ordinary Soil
63.84 0 - Ordinary Soil
43.68 0 - Ordinary Soil
37.49 0 - Ordinary Soil
19.52 0 - Ordinary Soil
19.37 0 - Ordinary Soil
17.37 0 - Ordinary Soil
7.25 0 - Ordinary Soil
4.38 0 - Ordinary Soil
0.65 0 - Ordinary Soil
14.93 0 - Ordinary Soil
34.25 0 - Ordinary Soil
54.21 0 - Ordinary Soil
68.54 0 - Ordinary Soil
79.88 0 - Ordinary Soil
85.50 0 - Ordinary Soil
94.45 0 - Ordinary Soil
92.50 0 - Ordinary Soil
86.60 0 - Ordinary Soil
66.83 0 - Ordinary Soil
50.50 0 - Ordinary Soil
45.40 0 - Ordinary Soil
40.58 0 - Ordinary Soil
84.40 0 - Ordinary Soil
96.91 0 - Ordinary Soil
138.30 0 - Ordinary Soil
143.81 0 - Ordinary Soil
135.29 0 - Ordinary Soil
151.10 0 - Ordinary Soil
171.72 0 - Ordinary Soil
189.72 0 - Ordinary Soil

108 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
208.75 0 - Ordinary Soil
212.68 0 - Ordinary Soil
207.09 0 - Ordinary Soil
242.41 0 - Ordinary Soil
261.28 0 - Ordinary Soil
304.85 0 - Ordinary Soil
315.66 0 - Ordinary Soil
334.85 0 - Ordinary Soil
361.37 0 - Ordinary Soil
366.03 0 - Ordinary Soil
492.25 0 - Ordinary Soil
444.57 0 - Ordinary Soil
511.01 0 - Ordinary Soil
436.97 0 - Ordinary Soil
395.07 0 - Ordinary Soil
467.94 0 - Ordinary Soil
425.05 0 - Ordinary Soil
505.89 0 - Ordinary Soil
416.97 0 - Ordinary Soil
455.31 0 - Ordinary Soil
358.74 0 - Ordinary Soil
384.48 0 - Ordinary Soil
351.62 0 - Ordinary Soil
310.48 0 - Ordinary Soil
292.85 0 - Ordinary Soil
306.70 0 - Ordinary Soil
273.53 0 - Ordinary Soil
260.51 0 - Ordinary Soil
227.97 0 - Ordinary Soil
175.15 0 - Ordinary Soil
162.76 0 - Ordinary Soil
125.18 0 - Ordinary Soil
102.16 0 - Ordinary Soil

109 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
66.71 0 - Ordinary Soil
31.56 0 - Ordinary Soil
24.66 0 - Ordinary Soil
10.07 0 - Ordinary Soil
13.44 0 - Ordinary Soil
5.47 0 - Ordinary Soil
14.57 0 - Ordinary Soil
15.16 0 - Ordinary Soil
17.83 0 - Ordinary Soil
11.74 0 - Ordinary Soil
16.73 0 - Ordinary Soil
20.14 0 - Ordinary Soil
33.78 0 - Ordinary Soil
49.85 0 - Ordinary Soil
66.98 0 - Ordinary Soil
71.07 0 - Ordinary Soil
72.49 0 - Ordinary Soil
49.15 0 - Ordinary Soil
28.68 0 - Ordinary Soil
11.66 0 - Ordinary Soil
17.91 0 - Ordinary Soil
16.05 0 - Ordinary Soil
33.99 0 - Ordinary Soil
38.74 0 - Ordinary Soil
59.64 0 - Ordinary Soil
67.36 0 - Ordinary Soil
85.86 0 - Ordinary Soil
96.13 0 - Ordinary Soil
94.07 0 - Ordinary Soil
88.91 0 - Ordinary Soil
71.76 0 - Ordinary Soil
49.74 0 - Ordinary Soil
44.73 0 - Ordinary Soil

110 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
23.43 0 - Ordinary Soil
23.37 0 - Ordinary Soil
14.50 0 - Ordinary Soil
7.24 0 - Ordinary Soil
15.45 0 - Ordinary Soil
11.92 0 - Ordinary Soil
8.89 0 - Ordinary Soil
9.58 0 - Ordinary Soil
3.66 0 - Ordinary Soil
8.25 0 - Ordinary Soil
18.66 0 - Ordinary Soil
15.39 0 - Ordinary Soil
23.42 0 - Ordinary Soil
18.08 0 - Ordinary Soil
11.63 0 - Ordinary Soil
8.02 0 - Ordinary Soil
17.06 0 - Ordinary Soil
14.64 0 - Ordinary Soil
14.24 0 - Ordinary Soil
18.30 0 - Ordinary Soil
15.95 0 - Ordinary Soil
12.54 0 - Ordinary Soil
18.03 0 - Ordinary Soil
13.62 0 - Ordinary Soil
6.23 0 - Ordinary Soil
7.10 0 - Ordinary Soil
4.97 0 - Ordinary Soil
1.56 0 - Ordinary Soil
5.77 0 - Ordinary Soil
18.05 0 - Ordinary Soil
28.58 0 - Ordinary Soil
47.35 0 - Ordinary Soil
32.00 0 - Ordinary Soil

111 of 664
ULATIONS FOR ROADWAY

Road Way Cutting Soil type


Soft Rock Hard Rock

ks
ar
Volume Volume

em
R
(m3) % (m3)
36.23 0 - Ordinary Soil
14.76 0 - Ordinary Soil
14.59 0 - Ordinary Soil
16.11 0 - Ordinary Soil
17.64 0 - Ordinary Soil
11.89 0 - Ordinary Soil
13.48 0 - Ordinary Soil
5.71 0 - Ordinary Soil
7.21 0 - Ordinary Soil
7.20 0 - Ordinary Soil

291168.15 0.00

112 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road
Planning and Design Branch

EARTHWORK HAULAGE QUANTITY CALCULATIONS(Beyond 1Km)

Name of the road:…………………………….


Chainage:0+000 to ….
Haulage beyond-1km
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
1 0+000 4.04 0.02 - 1+200 1.20
2 0+020 21.46 255.00 0.29 3.10 251.90 1+200 1.18
3 0+040 26.25 477.10 - 2.90 474.20 1+200 1.16
4 0+060 93.07 1,193.20 - - 1,193.20 1+200 1.14
5 0+080 81.55 1,746.20 5.30 53.00 1,693.20 1+200 1.12
6 0+100 90.98 1,725.30 0.66 59.60 1,665.70 1+200 1.10
7 0+120 110.05 2,010.30 0.66 13.20 1,997.10 1+200 1.08
8 0+140 172.77 2,828.20 0.68 13.40 2,814.80 1+200 1.06
9 0+160 207.24 3,800.10 1.64 23.20 3,776.90 1+200 1.04
10 0+180 238.35 4,455.90 1.55 31.90 4,424.00 1+200 1.02
11 0+200 285.09 5,234.40 1.55 31.00 5,203.40 1+200 1.00
12 0+220 192.52 4,776.10 1.55 31.00 4,745.10 1+200 0.98
13 0+240 143.77 3,362.90 1.50 30.50 3,332.40 1+200 0.96
14 0+260 110.25 2,540.20 0.66 21.60 2,518.60 1+200 0.94
15 0+280 100.29 2,105.40 0.66 13.20 2,092.20 1+200 0.92
16 0+300 87.68 1,879.70 0.65 13.10 1,866.60 1+200 0.90
17 0+320 79.54 1,672.20 0.72 13.70 1,658.50 1+200 0.88
18 0+340 48.09 1,276.30 - 7.20 1,269.10 1+200 0.86
19 0+360 63.66 1,117.50 0.92 9.20 1,108.30 1+200 0.84
20 0+380 40.27 1,039.30 - 9.20 1,030.10 1+200 0.82
21 0+400 42.23 825.00 1.25 12.50 812.50 1+200 0.80
22 0+420 52.12 943.50 0.92 21.70 921.80 1+200 0.78
23 0+440 45.07 971.90 2.55 34.70 937.20 1+200 0.76
24 0+460 38.15 832.20 0.86 34.10 798.10 1+200 0.74
25 0+480 47.13 852.80 - 8.60 844.20 1+200 0.72
26 0+500 40.18 873.10 0.61 6.10 867.00 1+200 0.70
27 0+520 31.63 718.10 0.67 12.80 705.30 1+200 0.68
28 0+540 32.92 645.50 1.94 26.10 619.40 1+200 0.66
29 0+560 18.52 514.40 9.92 118.60 395.80 1+200 0.64
30 0+580 16.20 347.20 3.51 134.30 212.90 1+200 0.62
31 0+600 191.42 2,076.20 0.89 44.00 2,032.20 1+200 0.60
32 0+620 324.94 5,163.60 0.70 15.90 5,147.70 1+200 0.58
33 0+640 108.85 4,337.90 0.67 13.70 4,324.20 1+200 0.56
34 0+660 54.26 1,631.10 22.63 233.00 1,398.10 1+200 0.54
35 0+680 36.15 904.10 9.09 317.20 586.90 1+200 0.52
36 0+700 40.43 765.80 3.97 130.60 635.20 1+200 0.50
37 0+720 51.16 915.90 0.93 49.00 866.90 1+200 0.48
38 0+740 52.67 1,038.30 0.93 18.60 1,019.70 1+200 0.46
39 0+760 41.87 945.40 1.76 26.90 918.50 1+200 0.44

113 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
40 0+780 47.82 896.90 0.98 27.40 869.50 1+200 0.42
41 0+800 95.30 1,431.20 - 9.80 1,421.40 1+200 0.40
42 0+820 138.92 2,342.20 - - 2,342.20 1+200 0.38
43 0+840 196.52 3,354.40 0.67 6.70 3,347.70 1+200 0.36
44 0+860 323.83 5,203.50 3.11 37.80 5,165.70 1+200 0.34
45 0+880 433.57 7,574.00 1.64 47.50 7,526.50 1+200 0.32
46 0+900 422.69 8,562.60 1.78 34.20 8,528.40 1+200 0.30
47 0+920 399.23 8,219.20 1.63 34.10 8,185.10 1+200 0.28
48 0+940 447.22 8,464.50 1.38 30.10 8,434.40 1+200 0.26
49 0+960 407.52 8,547.40 1.39 27.70 8,519.70 1+200 0.24
50 0+980 352.80 7,603.20 1.36 27.50 7,575.70 1+200 0.22
51 1+000 345.53 6,983.30 - 13.60 6,969.70 1+200 0.20
52 1+020 321.47 6,670.00 - - 6,670.00 1+200 0.18
53 1+040 275.52 5,969.90 - - 5,969.90 1+200 0.16
54 1+060 263.11 5,386.30 - - 5,386.30 1+200 0.14
55 1+080 212.02 4,751.30 - - 4,751.30 1+200 0.12
56 1+100 194.68 4,067.00 - - 4,067.00 1+200 0.10
57 1+120 121.49 3,161.70 - - 3,161.70 1+200 0.08
58 1+140 79.73 2,012.20 - - 2,012.20 1+200 0.06
59 1+160 58.33 1,380.60 - - 1,380.60 1+200 0.04
60 1+180 57.48 1,158.10 - - 1,158.10 1+200 0.02
61 1+200 27.16 846.40 1.30 13.00 833.40 1+200 -
62 1+220 22.08 492.40 0.97 22.70 469.70 1+200 0.02
63 1+240 15.06 371.40 1.03 20.00 351.40 1+200 0.04
64 1+260 17.81 328.70 4.62 56.50 272.20 1+200 0.06
65 1+280 13.33 311.40 3.88 85.00 226.40 1+200 0.08
66 1+300 7.41 207.40 2.24 61.20 146.20 1+200 0.10
67 1+320 23.99 314.00 0.15 23.90 290.10 1+200 0.12
68 1+340 51.97 759.60 - 1.50 758.10 1+200 0.14
69 1+360 18.19 701.60 0.19 1.90 699.70 1+200 0.16
70 1+380 19.62 378.10 12.53 127.20 250.90 1+200 0.18
71 1+400 2.64 222.60 10.44 229.70 (7.10) 1+200 0.20
72 1+420 52.71 553.50 - 104.40 449.10 1+200 0.22
73 1+440 52.42 1,051.30 0.02 0.20 1,051.10 1+200 0.24
74 1+460 1.38 538.00 6.00 60.20 477.80 1+200 0.26
75 1+480 - 13.80 5.81 118.10 (104.30) 1+200 0.28
76 1+500 0.87 8.70 6.32 121.30 (112.60) 1+200 0.30
77 1+520 1.07 19.40 1.88 82.00 (62.60) 1+200 0.32
78 1+540 2.89 39.60 4.65 65.30 (25.70) 1+200 0.34
79 1+560 0.84 37.30 3.77 84.20 (46.90) 1+200 0.36
80 1+580 14.20 150.40 - 37.70 112.70 1+200 0.38
81 1+600 16.13 303.30 - - 303.30 1+200 0.40
82 1+620 25.34 414.70 - - 414.70 1+200 0.42
83 1+640 35.76 611.00 - - 611.00 1+200 0.44
84 1+660 58.92 946.80 - - 946.80 1+200 0.46
85 1+680 82.18 1,411.00 - - 1,411.00 1+200 0.48
86 1+700 100.98 1,831.60 - - 1,831.60 1+200 0.50
87 1+720 77.10 1,780.80 - - 1,780.80 1+200 0.52
88 1+740 49.35 1,264.50 - - 1,264.50 1+200 0.54
89 1+760 61.09 1,104.40 0.01 0.10 1,104.30 1+200 0.56
90 1+780 88.78 1,498.70 - 0.10 1,498.60 1+200 0.58

114 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
91 1+800 107.27 1,960.50 - - 1,960.50 1+200 0.60
92 1+820 113.79 2,210.60 - - 2,210.60 1+200 0.62
93 1+840 154.97 2,687.60 - - 2,687.60 1+200 0.64
94 1+860 156.59 3,115.60 - - 3,115.60 1+200 0.66
95 1+880 110.88 2,674.70 - - 2,674.70 1+200 0.68
96 1+900 67.68 1,785.60 - - 1,785.60 1+200 0.70
97 1+920 100.35 1,680.30 - - 1,680.30 1+200 0.72
98 1+940 123.37 2,237.20 - - 2,237.20 1+200 0.74
99 1+960 159.77 2,831.40 - - 2,831.40 1+200 0.76
100 1+980 175.08 3,348.50 - - 3,348.50 1+200 0.78
101 2+000 144.55 3,196.30 - - 3,196.30 1+200 0.80
102 2+020 144.11 2,886.60 - - 2,886.60 1+200 0.82
103 2+040 129.39 2,735.00 - - 2,735.00 1+200 0.84
104 2+060 105.61 2,350.00 - - 2,350.00 1+200 0.86
105 2+080 103.29 2,089.00 - - 2,089.00 1+200 0.88
106 2+100 95.25 1,985.40 - - 1,985.40 1+200 0.90
107 2+120 109.40 2,046.50 - - 2,046.50 1+200 0.92
108 2+140 89.26 1,986.60 - - 1,986.60 1+200 0.94
109 2+160 72.88 1,621.40 - - 1,621.40 3+160 1.00
110 2+180 185.75 2,586.30 - - 2,586.30 3+160 0.98
111 2+200 201.51 3,872.60 0.67 6.70 3,865.90 3+160 0.96
112 2+220 122.73 3,242.40 0.66 13.30 3,229.10 3+160 0.94
113 2+240 96.12 2,188.50 0.74 14.00 2,174.50 3+160 0.92
114 2+260 99.39 1,955.10 0.86 16.00 1,939.10 3+160 0.90
115 2+280 102.26 2,016.50 - 8.60 2,007.90 3+160 0.88
116 2+300 97.16 1,994.20 - - 1,994.20 3+160 0.86
117 2+320 74.89 1,720.50 - - 1,720.50 3+160 0.84
118 2+340 47.05 1,219.40 - - 1,219.40 3+160 0.82
119 2+360 53.77 1,008.20 - - 1,008.20 3+160 0.80
120 2+380 46.84 1,006.10 - - 1,006.10 3+160 0.78
121 2+400 38.90 857.40 0.01 0.10 857.30 3+160 0.76
122 2+420 17.92 568.20 0.02 0.30 567.90 3+160 0.74
123 2+440 5.87 237.90 1.46 14.80 223.10 3+160 0.72
124 2+460 3.39 92.60 5.02 64.80 27.80 3+160 0.70
125 2+480 12.38 157.70 3.58 86.00 71.70 3+160 0.68
126 2+500 151.63 1,640.10 - 35.80 1,604.30 3+160 0.66
127 2+520 170.48 3,221.10 - - 3,221.10 3+160 0.64
128 2+540 117.23 2,877.10 - - 2,877.10 3+160 0.62
129 2+560 67.05 1,842.80 - - 1,842.80 3+160 0.60
130 2+580 42.53 1,095.80 - - 1,095.80 3+160 0.58
131 2+600 18.93 614.60 - - 614.60 3+160 0.56
132 2+620 5.23 241.60 3.02 30.20 211.40 3+160 0.54
133 2+640 3.26 84.90 6.78 98.00 (13.10) 3+160 0.52
134 2+660 9.09 123.50 10.16 169.40 (45.90) 3+160 0.50
135 2+680 30.06 391.50 - 101.60 289.90 3+160 0.48
136 2+700 37.67 677.30 - - 677.30 3+160 0.46
137 2+720 27.98 656.50 - - 656.50 3+160 0.44
138 2+740 18.75 467.30 0.64 6.40 460.90 3+160 0.42
139 2+760 11.81 305.60 3.35 39.90 265.70 3+160 0.40
140 2+780 5.02 168.30 2.80 61.50 106.80 3+160 0.38
141 2+800 11.53 165.50 1.27 40.70 124.80 3+160 0.36

115 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
142 2+820 12.32 238.50 7.04 83.10 155.40 3+160 0.34
143 2+840 8.34 206.60 6.12 131.60 75.00 3+160 0.32
144 2+860 27.26 356.00 13.64 197.60 158.40 3+160 0.30
145 2+880 36.42 636.80 1.98 156.20 480.60 3+160 0.28
146 2+900 49.06 854.80 - 19.80 835.00 3+160 0.26
147 2+920 51.49 1,005.50 - - 1,005.50 3+160 0.24
148 2+940 34.01 855.00 5.11 51.10 803.90 3+160 0.22
149 2+960 45.58 795.90 4.56 96.70 699.20 3+160 0.20
150 2+980 174.52 2,201.00 - 45.60 2,155.40 3+160 0.18
151 3+000 300.55 4,750.70 0.69 6.90 4,743.80 3+160 0.16
152 3+020 258.91 5,594.60 0.69 13.80 5,580.80 3+160 0.14
153 3+040 144.33 4,032.40 0.66 13.50 4,018.90 3+160 0.12
154 3+060 88.27 2,326.00 0.80 14.60 2,311.40 3+160 0.10
155 3+080 87.99 1,762.60 0.66 14.60 1,748.00 3+160 0.08
156 3+100 117.82 2,058.10 0.66 13.20 2,044.90 3+160 0.06
157 3+120 126.50 2,443.20 0.66 13.20 2,430.00 3+160 0.04
158 3+140 117.07 2,435.70 0.66 13.20 2,422.50 3+160 0.02
159 3+160 103.82 2,208.90 0.66 13.20 2,195.70 3+160 -
160 3+180 88.64 1,924.60 - 6.60 1,918.00 3+160 0.02
161 3+200 64.36 1,530.00 - - 1,530.00 3+160 0.04
162 3+220 60.69 1,250.50 - - 1,250.50 3+160 0.06
163 3+240 39.86 1,005.50 0.34 3.40 1,002.10 3+160 0.08
164 3+260 42.04 819.00 - 3.40 815.60 3+160 0.10
165 3+280 32.16 742.00 0.63 6.30 735.70 3+160 0.12
166 3+300 19.62 517.80 2.72 33.50 484.30 3+160 0.14
167 3+320 14.95 345.70 1.81 45.30 300.40 3+160 0.16
168 3+340 18.32 332.70 0.58 23.90 308.80 3+160 0.18
169 3+360 21.96 402.80 2.94 35.20 367.60 3+160 0.20
170 3+380 23.42 453.80 0.40 33.40 420.40 3+160 0.22
171 3+400 26.41 498.30 3.23 36.30 462.00 3+160 0.24
172 3+420 52.51 789.20 - 32.30 756.90 3+160 0.26
173 3+440 38.58 910.90 1.29 12.90 898.00 3+160 0.28
174 3+460 32.73 713.10 0.56 18.50 694.60 3+160 0.30
175 3+480 48.47 812.00 - 5.60 806.40 3+160 0.32
176 3+500 47.47 959.40 - - 959.40 3+160 0.34
177 3+520 60.63 1,081.00 - - 1,081.00 3+160 0.36
178 3+540 48.08 1,087.10 2.02 20.20 1,066.90 3+160 0.38
179 3+560 56.47 1,045.50 - 20.20 1,025.30 3+160 0.40
180 3+580 41.40 978.70 - - 978.70 3+160 0.42
181 3+600 11.21 526.10 0.78 7.80 518.30 3+160 0.44
182 3+620 56.69 679.00 - 7.80 671.20 3+160 0.46
183 3+640 250.82 3,075.10 - - 3,075.10 3+160 0.48
184 3+660 258.46 5,092.80 - - 5,092.80 3+160 0.50
185 3+680 195.06 4,535.20 0.69 6.90 4,528.30 3+160 0.52
186 3+700 231.77 4,268.30 0.76 14.50 4,253.80 3+160 0.54
187 3+720 158.72 3,904.90 0.67 14.30 3,890.60 3+160 0.56
188 3+740 198.60 3,573.20 0.67 13.40 3,559.80 3+160 0.58
189 3+760 167.37 3,659.70 0.67 13.40 3,646.30 3+160 0.60
190 3+780 139.38 3,067.50 0.65 13.20 3,054.30 3+160 0.62
191 3+800 131.98 2,713.60 0.80 14.50 2,699.10 3+160 0.64
192 3+820 98.26 2,302.40 0.80 16.00 2,286.40 3+160 0.66

116 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
193 3+840 117.87 2,161.30 0.66 14.60 2,146.70 3+160 0.68
194 3+860 113.96 2,318.30 0.68 13.40 2,304.90 3+160 0.70
195 3+880 138.89 2,528.50 0.64 13.20 2,515.30 3+160 0.72
196 3+900 110.29 2,491.80 - 6.40 2,485.40 3+160 0.74
197 3+920 107.17 2,174.60 - - 2,174.60 3+160 0.76
198 3+940 103.29 2,104.60 - - 2,104.60 3+160 0.78
199 3+960 76.06 1,793.50 0.01 0.10 1,793.40 3+160 0.80
200 3+980 49.29 1,253.50 - 0.10 1,253.40 3+160 0.82
201 4+000 118.72 1,680.10 5.15 51.50 1,628.60 3+160 0.84
202 4+020 45.20 1,639.20 8.49 136.40 1,502.80 3+160 0.86
203 4+040 23.90 691.00 2.14 106.30 584.70 3+160 0.88
204 4+060 12.87 367.70 2.96 51.00 316.70 3+160 0.90
205 4+080 12.86 257.30 8.36 113.20 144.10 3+160 0.92
206 4+100 8.07 209.30 9.19 175.50 33.80 3+160 0.94
207 4+120 14.95 230.20 10.50 196.90 33.30 3+160 0.96
208 4+140 37.64 525.90 2.33 128.30 397.60 3+160 0.98
209 4+160 51.66 893.00 - 23.30 869.70 3+160 1.00
210 4+180 39.41 910.70 4.33 43.30 867.40 5+180 1.00
211 4+200 72.77 1,121.80 1.99 63.20 1,058.60 5+180 0.98
212 4+220 89.37 1,621.40 - 19.90 1,601.50 5+180 0.96
213 4+240 81.76 1,711.30 - - 1,711.30 5+180 0.94
214 4+260 125.55 2,073.10 - - 2,073.10 5+180 0.92
215 4+280 253.85 3,794.00 0.69 6.90 3,787.10 5+180 0.90
216 4+300 256.47 5,103.20 0.83 15.20 5,088.00 5+180 0.88
217 4+320 271.65 5,281.20 0.69 15.20 5,266.00 5+180 0.86
218 4+340 291.76 5,634.10 0.65 13.40 5,620.70 5+180 0.84
219 4+360 318.19 6,099.50 0.69 13.40 6,086.10 5+180 0.82
220 4+380 340.06 6,582.50 1.57 22.60 6,559.90 5+180 0.80
221 4+400 372.46 7,125.20 1.54 31.10 7,094.10 5+180 0.78
222 4+420 404.76 7,772.20 1.56 31.00 7,741.20 5+180 0.76
223 4+440 517.09 9,218.50 1.82 33.80 9,184.70 5+180 0.74
224 4+460 513.85 10,309.40 2.77 45.90 10,263.50 5+180 0.72
225 4+480 577.02 10,908.70 8.25 110.20 10,798.50 5+180 0.70
226 4+500 519.31 10,963.30 5.25 135.00 10,828.30 5+180 0.68
227 4+520 503.56 10,228.70 4.08 93.30 10,135.40 5+180 0.66
228 4+540 409.98 9,135.40 1.43 55.10 9,080.30 5+180 0.64
229 4+560 366.24 7,762.20 1.58 30.10 7,732.10 5+180 0.62
230 4+580 363.57 7,298.10 1.55 31.30 7,266.80 5+180 0.60
231 4+600 389.78 7,533.50 1.57 31.20 7,502.30 5+180 0.58
232 4+620 385.68 7,754.60 1.58 31.50 7,723.10 5+180 0.56
233 4+640 403.89 7,895.70 16.28 178.60 7,717.10 5+180 0.54
234 4+660 495.38 8,992.70 33.65 499.30 8,493.40 5+180 0.52
235 4+680 443.84 9,392.20 7.42 410.70 8,981.50 5+180 0.50
236 4+700 354.56 7,984.00 0.65 80.70 7,903.30 5+180 0.48
237 4+720 328.63 6,831.90 2.66 33.10 6,798.80 5+180 0.46
238 4+740 273.70 6,023.30 1.57 42.30 5,981.00 5+180 0.44
239 4+760 238.12 5,118.20 0.65 22.20 5,096.00 5+180 0.42
240 4+780 230.65 4,687.70 0.64 12.90 4,674.80 5+180 0.40
241 4+800 221.60 4,522.50 0.65 12.90 4,509.60 5+180 0.38
242 4+820 228.12 4,497.20 0.73 13.80 4,483.40 5+180 0.36
243 4+840 157.99 3,861.10 0.68 14.10 3,847.00 5+180 0.34

117 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
244 4+860 100.53 2,585.20 0.89 15.70 2,569.50 5+180 0.32
245 4+880 71.23 1,717.60 0.93 18.20 1,699.40 5+180 0.30
246 4+900 45.15 1,163.80 0.90 18.30 1,145.50 5+180 0.28
247 4+920 46.50 916.50 1.00 19.00 897.50 5+180 0.26
248 4+940 33.56 800.60 0.27 12.70 787.90 5+180 0.24
249 4+960 36.57 701.30 1.09 13.60 687.70 5+180 0.22
250 4+980 33.58 701.50 - 10.90 690.60 5+180 0.20
251 5+000 31.49 650.70 0.66 6.60 644.10 5+180 0.18
252 5+020 38.69 701.80 1.04 17.00 684.80 5+180 0.16
253 5+040 48.25 869.40 1.05 20.90 848.50 5+180 0.14
254 5+060 42.44 906.90 1.05 21.00 885.90 5+180 0.12
255 5+080 84.23 1,266.70 0.76 18.10 1,248.60 5+180 0.10
256 5+100 106.77 1,910.00 0.78 15.40 1,894.60 5+180 0.08
257 5+120 98.97 2,057.40 0.89 16.70 2,040.70 5+180 0.06
258 5+140 81.43 1,804.00 0.77 16.60 1,787.40 5+180 0.04
259 5+160 101.44 1,828.70 0.93 17.00 1,811.70 5+180 0.02
260 5+180 70.38 1,718.20 0.86 17.90 1,700.30 5+180 -
261 5+200 34.16 1,045.40 - 8.60 1,036.80 5+180 0.02
262 5+220 38.99 731.50 - - 731.50 5+180 0.04
263 5+240 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.06
264 5+260 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.08
265 5+280 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.10
266 5+300 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.12
267 5+320 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.14
268 5+340 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.16
269 5+360 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.18
270 5+380 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.20
271 5+400 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.22
272 5+420 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.24
273 5+440 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.26
274 5+460 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.28
275 5+480 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.30
276 5+500 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.32
277 5+520 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.34
278 5+540 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.36
279 5+560 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.38
280 5+580 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.40
281 5+600 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.42
282 5+620 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.44
283 5+640 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.46
284 5+660 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.48
285 5+680 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.50
286 5+700 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.52
287 5+720 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.54
288 5+740 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.56
289 5+760 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.58
290 5+780 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.60
291 5+800 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.62
292 5+820 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.64
293 5+840 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.66
294 5+860 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.68

118 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
295 5+880 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.70
296 5+900 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.72
297 5+920 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.74
298 5+940 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.76
299 5+960 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.78
300 5+980 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.80
301 6+000 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.82
302 6+020 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.84
303 6+040 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.86
304 6+060 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.88
305 6+080 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.90
306 6+100 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.92
307 6+120 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.94
308 6+140 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.96
309 6+160 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.98
310 6+180 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.00
311 6+200 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.02
312 6+220 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.04
313 6+240 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.06
314 6+260 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.08
315 6+280 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.10
316 6+300 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.12
317 6+320 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.14
318 6+340 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.16
319 6+360 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.18
320 6+380 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.20
321 6+400 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.22
322 6+420 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.24
323 6+440 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.26
324 6+460 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.24
325 6+480 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.22
326 6+500 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.20
327 6+520 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.18
328 6+540 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.16
329 6+560 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.14
330 6+580 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.12
331 6+600 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.10
332 6+620 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.08
333 6+640 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.06
334 6+660 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.04
335 6+680 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.02
336 6+700 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.00
337 6+720 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.98
338 6+740 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.96
339 6+760 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.94
340 6+780 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.92
341 6+800 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.90
342 6+820 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.88
343 6+840 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.86
344 6+860 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.84
345 6+880 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.82

119 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
346 6+900 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.80
347 6+920 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.78
348 6+940 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.76
349 6+960 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.74
350 6+980 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.72
351 7+000 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.70
352 7+020 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.68
353 7+040 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.66
354 7+060 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.64
355 7+080 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.62
356 7+100 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.60
357 7+120 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.58
358 7+140 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.56
359 7+160 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.54
360 7+180 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.52
361 7+200 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.50
362 7+220 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.48
363 7+240 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.46
364 7+260 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.44
365 7+280 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.42
366 7+300 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.40
367 7+320 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.38
368 7+340 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.36
369 7+360 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.34
370 7+380 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.32
371 7+400 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.30
372 7+420 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.28
373 7+440 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.26
374 7+460 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.24
375 7+480 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.22
376 7+500 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.20
377 7+520 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.18
378 7+540 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.16
379 7+560 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.14
380 7+580 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.12
381 7+600 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.10
382 7+620 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.08
383 7+640 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.06
384 7+660 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.04
385 7+680 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.02
386 7+700 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 -
387 7+720 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.02
388 7+740 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.04
389 7+760 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.06
390 7+780 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.08
391 7+800 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.10
392 7+820 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.12
393 7+840 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.14
394 7+860 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.16
395 7+880 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.18
396 7+900 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.20

120 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
397 7+920 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.22
398 7+940 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.24
399 7+960 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.26
400 7+980 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.28
401 8+000 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.30
402 8+020 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.32
403 8+040 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.34
404 8+060 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.36
405 8+080 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.38
406 8+100 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.40
407 8+120 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.42
408 8+140 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.44
409 8+160 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.46
410 8+180 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.48
411 8+200 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.50
412 8+220 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.52
413 8+240 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.54
414 8+260 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.56
415 8+280 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.58
416 8+300 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.60
417 8+320 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.62
418 8+340 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.64
419 8+360 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.66
420 8+380 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.68
421 8+400 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.70
422 8+420 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.72
423 8+440 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.74
424 8+460 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.76
425 8+480 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.78
426 8+500 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.80
427 8+520 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.82
428 8+540 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.84
429 8+560 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.86
430 8+580 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.88
431 8+600 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.90
432 8+620 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.92
433 8+640 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.94
434 8+660 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.96
435 8+680 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.98
436 8+700 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.00
437 8+720 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.02
438 8+740 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.04
439 8+760 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.06
440 8+780 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.08
441 8+800 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.10
442 8+820 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.12
443 8+840 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.14
444 8+860 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.16
445 8+880 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.18
446 8+900 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.10
447 8+920 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.08

121 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
448 8+940 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.06
449 8+960 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.04
450 8+980 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.02
451 9+000 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.00
452 9+020 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.98
453 9+040 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.96
454 9+060 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.94
455 9+080 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.92
456 9+100 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.90
457 9+120 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.88
458 9+140 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.86
459 9+160 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.84
460 9+180 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.82
461 9+200 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.80
462 9+220 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.78
463 9+240 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.76
464 9+260 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.74
465 9+280 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.72
466 9+300 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.70
467 9+320 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.68
468 9+340 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.66
469 9+360 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.64
470 9+380 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.62
471 9+400 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.60
472 9+420 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.58
473 9+440 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.56
474 9+460 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.54
475 9+480 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.52
476 9+500 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.50
477 9+520 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.48
478 9+540 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.46
479 9+560 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.44
480 9+580 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.42
481 9+600 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.40
482 9+620 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.38
483 9+640 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.36
484 9+660 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.34
485 9+680 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.32
486 9+700 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.30
487 9+720 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.28
488 9+740 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.26
489 9+760 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.24
490 9+780 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.22
491 9+800 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.20
492 9+820 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.18
493 9+840 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.16
494 9+860 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.14
495 9+880 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.12
496 9+900 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.10
497 9+920 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.08
498 9+940 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.06

122 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
499 9+960 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.04
500 9+980 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.02
501 10+000 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 -
502 10+020 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.02
503 10+040 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.04
504 10+060 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.06
505 10+080 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.08
506 10+100 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.10
507 10+120 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.12
508 10+140 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.14
509 10+160 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.16
510 10+180 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.18
511 10+200 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.20
512 10+220 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.22
513 10+240 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.24
514 10+260 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.26
515 10+280 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.28
516 10+300 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.30
517 10+320 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.32
518 10+340 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.34
519 10+360 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.36
520 10+380 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.38
521 10+400 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.40
522 10+420 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.42
523 10+440 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.44
524 10+460 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.46
525 10+480 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.48
526 10+500 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.50
527 10+520 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.52
528 10+540 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.54
529 10+560 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.56
530 10+580 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.58
531 10+600 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.60
532 10+620 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.62
533 10+640 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.64
534 10+660 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.66
535 10+680 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.68
536 10+700 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.70
537 10+720 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.72
538 10+740 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.74
539 10+760 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.76
540 10+780 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.78
541 10+800 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.80
542 10+820 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.82
543 10+840 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.84
544 10+860 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.86
545 10+880 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.88
546 10+900 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.90
547 10+920 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.92
548 10+940 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.94
549 10+960 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.96

123 of 664
Total
Surplus/
Cut Fill Hauled
waste Volume Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM.
(m³)
550 10+980 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.98
551 11+000 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.00
552 11+020 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.98
553 11+040 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.96
554 11+060 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.94
555 11+080 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.92
556 11+100 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.90
557 11+120 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.88
558 11+140 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.86
559 11+160 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.84
560 11+180 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.82
561 11+200 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.80
562 11+220 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.78
563 11+240 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.76
564 11+260 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.74
565 11+280 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.72
566 11+300 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.70
567 11+320 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.68
568 11+340 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.66
569 11+360 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.64
570 11+380 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.62
571 11+400 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.60
572 11+420 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.58
573 11+440 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.56
574 11+460 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.54
575 11+480 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.52
576 11+500 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.50
577 11+520 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.48
578 11+540 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.46
579 11+560 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.44
580 11+580 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.42
581 11+600 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.40
582 11+620 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.38
583 11+640 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.36
584 11+660 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.34
585 11+680 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.32
Total Total Haulage Qty

124 of 664
Transport

TIONS(Beyond 1Km)

Net Hauled Hauled Quntity


Distance Remarks

KM. M3-KM

0.20 -
0.18 45.34
0.16 75.87
0.14 167.05
0.12 203.18
0.10 166.57
0.08 159.77
0.06 168.89
0.04 151.08
0.02 88.48
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

125 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - Disposal site
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

126 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

127 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - Disposal site
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

128 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

129 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - Disposal site
- -
- -
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509

130 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
0.02 Err:509
0.04 Err:509
0.06 Err:509
0.08 Err:509
0.10 Err:509
0.12 Err:509
0.14 Err:509
0.16 Err:509
0.18 Err:509
0.20 Err:509
0.22 Err:509
0.24 Err:509
0.26 Err:509
0.24 Err:509
0.22 Err:509
0.20 Err:509
0.18 Err:509
0.16 Err:509
0.14 Err:509
0.12 Err:509
0.10 Err:509
0.08 Err:509
0.06 Err:509
0.04 Err:509
0.02 Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509

131 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509 Disposal site
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509

132 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
0.02 Err:509
0.04 Err:509
0.06 Err:509
0.08 Err:509
0.10 Err:509
0.12 Err:509
0.14 Err:509
0.16 Err:509
0.18 Err:509
0.10 Err:509
0.08 Err:509

133 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

0.06 Err:509
0.04 Err:509
0.02 Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509

134 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- Err:509
- Err:509
- Err:509 Disposal site
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509

135 of 664
Net Hauled Hauled Quntity
Distance

Remarks
KM. M3-KM

- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
- Err:509
-

136 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

Name of the road:…………………………….


Chainage:0+000 to ….
A) Gabion dismantle works
Quantity for
Total Structure details Total
Left Right dismantle
Ch. Length Sec area Sec area Right quantity
(m) Height Height(m Left (m3) (m3)
(m2) (m2) (m3)
(m) )
3+700 6.50 2.5 3.5 56.875 56.88
3+800 13.50 4.5 6.5 394.875 394.88
6+340 25.00 2.5 3.5 218.75 218.75
16+300 10.00 3 4.5 135 135.00
Total 0.00 0.00 0.00 0.00

137 of 664
ort

Remarks
(type of
structure)
Gabion walls
Gabion walls
Gabion walls
Gabion walls

138 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
0+000 10 0.66 6.60 95 6.27 5 0.33 0
0+020 20 0.66 13.20 95 12.54 5 0.66 0
0+040 20 0.60 12.60 95 11.97 5 0.63 0
0+060 20 0.60 12.00 95 11.40 5 0.60 0
0+080 20 0.66 12.60 95 11.97 5 0.63 0
0+100 20 0.51 11.10 95 10.55 5 0.56 0
0+120 20 1.17 16.80 95 15.96 5 0.84 0
0+140 20 1.17 23.40 95 22.23 5 1.17 0
0+160 20 0.96 21.30 95 20.24 5 1.07 0
0+180 20 0.97 19.30 95 18.34 5 0.97 0
0+200 20 1.02 19.90 95 18.91 5 1.00 0
0+220 20 0.98 20.00 95 19.00 5 1.00 0
0+240 20 0.98 19.60 95 18.62 5 0.98 0
0+260 20 1.07 20.50 95 19.48 5 1.03 0
0+280 20 1.06 21.30 95 20.24 5 1.07 0
0+300 20 1.17 22.30 95 21.19 5 1.12 0
0+320 20 1.16 23.30 95 22.14 5 1.17 0
0+340 20 1.11 22.70 95 21.57 5 1.14 0
0+360 20 1.17 22.80 95 21.66 5 1.14 0
0+380 20 0.51 16.80 95 15.96 5 0.84 0
0+400 20 0.51 10.20 95 9.69 5 0.51 0
0+420 20 0.51 10.20 95 9.69 5 0.51 0
0+440 20 0.50 10.10 95 9.60 5 0.51 0
0+460 20 0.51 10.10 95 9.60 5 0.51 0
0+480 20 0.50 10.10 95 9.60 5 0.51 0
0+500 20 0.52 10.20 95 9.69 5 0.51 0
0+520 20 0.51 10.30 95 9.79 5 0.52 0
0+540 20 0.51 10.20 95 9.69 5 0.51 0
0+560 20 0.66 11.70 95 11.12 5 0.59 0
0+580 20 0.66 13.20 95 12.54 5 0.66 0
0+600 20 1.17 18.30 95 17.39 5 0.92 0
0+620 20 1.17 23.40 95 22.23 5 1.17 0
0+640 20 1.17 23.40 95 22.23 5 1.17 0
0+660 20 0.92 20.90 95 19.86 5 1.05 0
0+680 20 0.66 15.80 95 15.01 5 0.79 0
0+700 20 0.66 13.20 95 12.54 5 0.66 0
0+720 20 0.66 13.20 95 12.54 5 0.66 0
0+740 20 0.66 13.20 95 12.54 5 0.66 0
0+760 20 0.66 13.20 95 12.54 5 0.66 0
0+780 20 0.66 13.20 95 12.54 5 0.66 0
0+800 20 1.32 19.80 95 18.81 5 0.99 0
0+820 20 0.80 21.20 95 20.14 5 1.06 0
0+840 20 0.59 13.90 95 13.21 5 0.70 0
0+860 20 1.02 16.10 95 15.30 5 0.81 0
0+880 20 0.96 19.80 95 18.81 5 0.99 0
0+900 20 1.02 19.80 95 18.81 5 0.99 0
0+920 20 1.02 20.40 95 19.38 5 1.02 0

139 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
0+940 20 1.02 20.40 95 19.38 5 1.02 0
0+960 20 1.02 20.40 95 19.38 5 1.02 0
0+980 20 1.02 20.40 95 19.38 5 1.02 0
1+000 20 1.32 23.40 95 22.23 5 1.17 0
1+020 20 1.26 25.80 95 24.51 5 1.29 0
1+040 20 1.26 25.20 95 23.94 5 1.26 0
1+060 20 1.32 25.80 95 24.51 5 1.29 0
1+080 20 1.26 25.80 95 24.51 5 1.29 0
1+100 20 1.32 25.80 95 24.51 5 1.29 0
1+120 20 1.32 26.40 95 25.08 5 1.32 0
1+140 20 1.32 26.40 95 25.08 5 1.32 0
1+160 20 1.32 26.40 95 25.08 5 1.32 0
1+180 20 1.20 25.20 95 23.94 5 1.26 0
1+200 20 0.66 18.60 95 17.67 5 0.93 0
1+220 20 0.66 13.20 95 12.54 5 0.66 0
1+240 20 0.66 13.20 95 12.54 5 0.66 0
1+260 20 0.66 13.20 95 12.54 5 0.66 0
1+280 20 0.66 13.20 95 12.54 5 0.66 0
1+300 20 0.64 13.00 95 12.35 5 0.65 0
1+320 20 0.66 13.00 95 12.35 5 0.65 0
1+340 20 0.66 13.20 95 12.54 5 0.66 0
1+360 20 0.66 13.20 95 12.54 5 0.66 0
1+380 20 0.66 13.20 95 12.54 5 0.66 0
1+400 20 0.60 12.60 95 11.97 5 0.63 0
1+420 20 1.32 19.20 95 18.24 5 0.96 0
1+440 20 0.66 19.80 95 18.81 5 0.99 0
1+460 20 0.36 10.20 95 9.69 5 0.51 0
1+480 20 - 3.60 95 3.42 5 0.18 0
1+500 20 - - 95 - 5 0.00 0
1+520 20 0.52 5.20 95 4.94 5 0.26 0
1+540 20 0.66 11.80 95 11.21 5 0.59 0
1+560 20 - 6.60 95 6.27 5 0.33 0
1+580 20 1.32 13.20 95 12.54 5 0.66 0
1+600 20 1.32 26.40 95 25.08 5 1.32 0
1+620 20 1.20 25.20 95 23.94 5 1.26 0
1+640 20 1.32 25.20 95 23.94 5 1.26 0
1+660 20 1.32 26.40 95 25.08 5 1.32 0
1+680 20 1.26 25.80 95 24.51 5 1.29 0
1+700 20 1.20 24.60 95 23.37 5 1.23 0
1+720 20 1.32 25.20 95 23.94 5 1.26 0
1+740 20 1.32 26.40 95 25.08 5 1.32 0
1+760 20 1.32 26.40 95 25.08 5 1.32 0
1+780 20 1.32 26.40 95 25.08 5 1.32 0
1+800 20 1.32 26.40 95 25.08 5 1.32 0
1+820 20 1.26 25.80 95 24.51 5 1.29 0
1+840 20 1.26 25.20 95 23.94 5 1.26 0
1+860 20 1.32 25.80 95 24.51 5 1.29 0

140 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
1+880 20 1.32 26.40 95 25.08 5 1.32 0
1+900 20 1.32 26.40 95 25.08 5 1.32 0
1+920 20 1.32 26.40 95 25.08 5 1.32 0
1+940 20 1.26 25.80 95 24.51 5 1.29 0
1+960 20 1.26 25.20 95 23.94 5 1.26 0
1+980 20 1.32 25.80 95 24.51 5 1.29 0
2+000 20 1.32 26.40 95 25.08 5 1.32 0
2+020 20 1.32 26.40 95 25.08 5 1.32 0
2+040 20 1.32 26.40 95 25.08 5 1.32 0
2+060 20 1.26 25.80 95 24.51 5 1.29 0
2+080 20 1.32 25.80 95 24.51 5 1.29 0
2+100 20 1.26 25.80 95 24.51 5 1.29 0
2+120 20 1.32 25.80 95 24.51 5 1.29 0
2+140 20 1.32 26.40 95 25.08 5 1.32 0
2+160 20 1.32 26.40 95 25.08 5 1.32 0
2+180 20 1.26 25.80 95 24.51 5 1.29 0
2+200 20 1.12 23.80 95 22.61 5 1.19 0
2+220 20 1.17 22.90 95 21.76 5 1.15 0
2+240 20 1.16 23.30 95 22.14 5 1.17 0
2+260 20 1.17 23.30 95 22.14 5 1.17 0
2+280 20 1.32 24.90 95 23.66 5 1.25 0
2+300 20 1.32 26.40 95 25.08 5 1.32 0
2+320 20 1.20 25.20 95 23.94 5 1.26 0
2+340 20 1.32 25.20 95 23.94 5 1.26 0
2+360 20 1.26 25.80 95 24.51 5 1.29 0
2+380 20 1.26 25.20 95 23.94 5 1.26 0
2+400 20 1.32 25.80 95 24.51 5 1.29 0
2+420 20 0.66 19.80 95 18.81 5 0.99 0
2+440 20 0.66 13.20 95 12.54 5 0.66 0
2+460 20 0.66 13.20 95 12.54 5 0.66 0
2+480 20 0.66 13.20 95 12.54 5 0.66 0
2+500 20 1.32 19.80 95 18.81 5 0.99 0
2+520 20 1.32 26.40 95 25.08 5 1.32 0
2+540 20 1.32 26.40 95 25.08 5 1.32 0
2+560 20 1.32 26.40 95 25.08 5 1.32 0
2+580 20 1.32 26.40 95 25.08 5 1.32 0
2+600 20 0.66 19.80 95 18.81 5 0.99 0
2+620 20 0.66 13.20 95 12.54 5 0.66 0
2+640 20 0.60 12.60 95 11.97 5 0.63 0
2+660 20 0.66 12.60 95 11.97 5 0.63 0
2+680 20 1.26 19.20 95 18.24 5 0.96 0
2+700 20 1.26 25.20 95 23.94 5 1.26 0
2+720 20 0.60 18.60 95 17.67 5 0.93 0
2+740 20 0.60 12.00 95 11.40 5 0.60 0
2+760 20 0.66 12.60 95 11.97 5 0.63 0
2+780 20 0.36 10.20 95 9.69 5 0.51 0
2+800 20 0.66 10.20 95 9.69 5 0.51 0

141 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
2+820 20 0.66 13.20 95 12.54 5 0.66 0
2+840 20 0.66 13.20 95 12.54 5 0.66 0
2+860 20 0.66 13.20 95 12.54 5 0.66 0
2+880 20 0.66 13.20 95 12.54 5 0.66 0
2+900 20 0.66 13.20 95 12.54 5 0.66 0
2+920 20 0.66 13.20 95 12.54 5 0.66 0
2+940 20 0.66 13.20 95 12.54 5 0.66 0
2+960 20 0.66 13.20 95 12.54 5 0.66 0
2+980 20 1.32 19.80 95 18.81 5 0.99 0
3+000 20 1.17 24.90 95 23.66 5 1.25 0
3+020 20 1.07 22.40 95 21.28 5 1.12 0
3+040 20 1.17 22.40 95 21.28 5 1.12 0
3+060 20 1.18 23.50 95 22.33 5 1.18 0
3+080 20 1.17 23.50 95 22.33 5 1.18 0
3+100 20 1.17 23.40 95 22.23 5 1.17 0
3+120 20 1.17 23.40 95 22.23 5 1.17 0
3+140 20 1.17 23.40 95 22.23 5 1.17 0
3+160 20 1.17 23.40 95 22.23 5 1.17 0
3+180 20 1.32 24.90 95 23.66 5 1.25 0
3+200 20 0.60 19.20 95 18.24 5 0.96 0
3+220 20 0.66 12.60 95 11.97 5 0.63 0
3+240 20 0.66 13.20 95 12.54 5 0.66 0
3+260 20 0.66 13.20 95 12.54 5 0.66 0
3+280 20 0.60 12.60 95 11.97 5 0.63 0
3+300 20 0.60 12.00 95 11.40 5 0.60 0
3+320 20 0.66 12.60 95 11.97 5 0.63 0
3+340 20 0.66 13.20 95 12.54 5 0.66 0
3+360 20 0.66 13.20 95 12.54 5 0.66 0
3+380 20 0.60 12.60 95 11.97 5 0.63 0
3+400 20 0.66 12.60 95 11.97 5 0.63 0
3+420 20 1.32 19.80 95 18.81 5 0.99 0
3+440 20 0.66 19.80 95 18.81 5 0.99 0
3+460 20 0.66 13.20 95 12.54 5 0.66 0
3+480 20 0.66 13.20 95 12.54 5 0.66 0
3+500 20 0.66 13.20 95 12.54 5 0.66 0
3+520 20 0.66 13.20 95 12.54 5 0.66 0
3+540 20 0.66 13.20 95 12.54 5 0.66 0
3+560 20 0.66 13.20 95 12.54 5 0.66 0
3+580 20 0.60 12.60 95 11.97 5 0.63 0
3+600 20 0.66 12.60 95 11.97 5 0.63 0
3+620 20 1.32 19.80 95 18.81 5 0.99 0
3+640 20 1.26 25.80 95 24.51 5 1.29 0
3+660 20 1.32 25.80 95 24.51 5 1.29 0
3+680 20 1.17 24.90 95 23.66 5 1.25 0
3+700 20 1.12 22.90 95 21.76 5 1.15 0
3+720 20 1.17 22.90 95 21.76 5 1.15 0
3+740 20 1.06 22.30 95 21.19 5 1.12 0

142 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
3+760 20 1.06 21.20 95 20.14 5 1.06 0
3+780 20 1.11 21.70 95 20.62 5 1.09 0
3+800 20 1.12 22.30 95 21.19 5 1.12 0
3+820 20 1.18 23.00 95 21.85 5 1.15 0
3+840 20 1.07 22.50 95 21.38 5 1.13 0
3+860 20 1.17 22.40 95 21.28 5 1.12 0
3+880 20 1.11 22.80 95 21.66 5 1.14 0
3+900 20 1.32 24.30 95 23.09 5 1.22 0
3+920 20 1.32 26.40 95 25.08 5 1.32 0
3+940 20 1.32 26.40 95 25.08 5 1.32 0
3+960 20 1.26 25.80 95 24.51 5 1.29 0
3+980 20 0.66 19.20 95 18.24 5 0.96 0
4+000 20 0.47 11.30 95 10.74 5 0.57 0
4+020 20 0.51 9.80 95 9.31 5 0.49 0
4+040 20 0.66 11.70 95 11.12 5 0.59 0
4+060 20 0.66 13.20 95 12.54 5 0.66 0
4+080 20 0.66 13.20 95 12.54 5 0.66 0
4+100 20 0.66 13.20 95 12.54 5 0.66 0
4+120 20 0.66 13.20 95 12.54 5 0.66 0
4+140 20 0.66 13.20 95 12.54 5 0.66 0
4+160 20 0.66 13.20 95 12.54 5 0.66 0
4+180 20 0.60 12.60 95 11.97 5 0.63 0
4+200 20 0.66 12.60 95 11.97 5 0.63 0
4+220 20 0.66 13.20 95 12.54 5 0.66 0
4+240 20 1.20 18.60 95 17.67 5 0.93 0
4+260 20 1.26 24.60 95 23.37 5 1.23 0
4+280 20 1.17 24.30 95 23.09 5 1.22 0
4+300 20 1.12 22.90 95 21.76 5 1.15 0
4+320 20 1.17 22.90 95 21.76 5 1.15 0
4+340 20 1.12 22.90 95 21.76 5 1.15 0
4+360 20 0.97 20.90 95 19.86 5 1.05 0
4+380 20 1.02 19.90 95 18.91 5 1.00 0
4+400 20 1.02 20.40 95 19.38 5 1.02 0
4+420 20 1.03 20.50 95 19.48 5 1.03 0
4+440 20 1.02 20.50 95 19.48 5 1.03 0
4+460 20 0.99 20.10 95 19.10 5 1.01 0
4+480 20 1.02 20.10 95 19.10 5 1.01 0
4+500 20 1.03 20.50 95 19.48 5 1.03 0
4+520 20 1.02 20.50 95 19.48 5 1.03 0
4+540 20 0.92 19.40 95 18.43 5 0.97 0
4+560 20 1.02 19.40 95 18.43 5 0.97 0
4+580 20 0.93 19.50 95 18.53 5 0.98 0
4+600 20 1.02 19.50 95 18.53 5 0.98 0
4+620 20 1.02 20.40 95 19.38 5 1.02 0
4+640 20 1.03 20.50 95 19.48 5 1.03 0
4+660 20 0.98 20.10 95 19.10 5 1.01 0
4+680 20 1.02 20.00 95 19.00 5 1.00 0

143 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
4+700 20 1.02 20.40 95 19.38 5 1.02 0
4+720 20 1.02 20.40 95 19.38 5 1.02 0
4+740 20 1.02 20.40 95 19.38 5 1.02 0
4+760 20 1.17 21.90 95 20.81 5 1.10 0
4+780 20 1.17 23.40 95 22.23 5 1.17 0
4+800 20 1.13 23.00 95 21.85 5 1.15 0
4+820 20 1.12 22.50 95 21.38 5 1.13 0
4+840 20 1.11 22.30 95 21.19 5 1.12 0
4+860 20 1.11 22.20 95 21.09 5 1.11 0
4+880 20 1.17 22.80 95 21.66 5 1.14 0
4+900 20 1.17 23.40 95 22.23 5 1.17 0
4+920 20 0.50 16.70 95 15.87 5 0.84 0
4+940 20 0.51 10.10 95 9.60 5 0.51 0
4+960 20 0.50 10.10 95 9.60 5 0.51 0
4+980 20 0.51 10.10 95 9.60 5 0.51 0
5+000 20 0.51 10.20 95 9.69 5 0.51 0
5+020 20 0.51 10.20 95 9.69 5 0.51 0
5+040 20 0.51 10.20 95 9.69 5 0.51 0
5+060 20 0.51 10.20 95 9.69 5 0.51 0
5+080 20 1.06 15.70 95 14.92 5 0.79 0
5+100 20 1.12 21.80 95 20.71 5 1.09 0
5+120 20 1.11 22.30 95 21.19 5 1.12 0
5+140 20 1.05 21.60 95 20.52 5 1.08 0
5+160 20 0.51 15.60 95 14.82 5 0.78 0
5+180 20 0.51 10.20 95 9.69 5 0.51 0
5+200 20 0.66 11.70 95 11.12 5 0.59 0
5+220 20 0.66 13.20 95 12.54 5 0.66 0
5+240 20 0.66 13.20 95 12.54 5 0.66 0
5+260 20 0.66 13.20 95 12.54 5 0.66 0
5+280 20 0.66 13.20 95 12.54 5 0.66 0
5+300 20 0.66 13.20 95 12.54 5 0.66 0
5+320 20 0.66 13.20 95 12.54 5 0.66 0
5+340 20 0.66 13.20 95 12.54 5 0.66 0
5+360 20 0.66 13.20 95 12.54 5 0.66 0
5+380 20 0.66 13.20 95 12.54 5 0.66 0
5+400 20 0.60 12.60 95 11.97 5 0.63 0
5+420 20 0.66 12.60 95 11.97 5 0.63 0
5+440 20 0.66 13.20 95 12.54 5 0.66 0
5+460 20 0.66 13.20 95 12.54 5 0.66 0
5+480 20 0.51 11.70 95 11.12 5 0.59 0
5+500 20 0.66 11.70 95 11.12 5 0.59 0
5+520 20 0.66 13.20 95 12.54 5 0.66 0
5+540 20 0.60 12.60 95 11.97 5 0.63 0
5+560 20 0.60 12.00 95 11.40 5 0.60 0
5+580 20 0.66 12.60 95 11.97 5 0.63 0
5+600 20 0.66 13.20 95 12.54 5 0.66 0
5+620 20 0.66 13.20 95 12.54 5 0.66 0

144 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
5+640 20 0.60 12.60 95 11.97 5 0.63 0
5+660 20 0.66 12.60 95 11.97 5 0.63 0
5+680 20 0.66 13.20 95 12.54 5 0.66 0
5+700 20 0.66 13.20 95 12.54 5 0.66 0
5+720 20 - 6.60 95 6.27 5 0.33 0
5+740 20 0.66 6.60 95 6.27 5 0.33 0
5+760 20 0.60 12.60 95 11.97 5 0.63 0
5+780 20 0.66 12.60 95 11.97 5 0.63 0
5+800 20 0.66 13.20 95 12.54 5 0.66 0
5+820 20 0.60 12.60 95 11.97 5 0.63 0
5+840 20 0.60 12.00 95 11.40 5 0.60 0
5+860 20 0.66 12.60 95 11.97 5 0.63 0
5+880 20 0.66 13.20 95 12.54 5 0.66 0
5+900 20 0.66 13.20 95 12.54 5 0.66 0
5+920 20 0.66 13.20 95 12.54 5 0.66 0
5+940 20 0.66 13.20 95 12.54 5 0.66 0
5+960 20 0.60 12.60 95 11.97 5 0.63 0
5+980 20 0.66 12.60 95 11.97 5 0.63 0
6+000 20 0.66 13.20 95 12.54 5 0.66 0
6+020 20 0.66 13.20 95 12.54 5 0.66 0
6+040 20 0.66 13.20 95 12.54 5 0.66 0
6+060 20 0.66 13.20 95 12.54 5 0.66 0
6+080 20 0.66 13.20 95 12.54 5 0.66 0
6+100 20 0.66 13.20 95 12.54 5 0.66 0
6+120 20 0.60 12.60 95 11.97 5 0.63 0
6+140 20 0.60 12.00 95 11.40 5 0.60 0
6+160 20 0.66 12.60 95 11.97 5 0.63 0
6+180 20 0.60 12.60 95 11.97 5 0.63 0
6+200 20 0.66 12.60 95 11.97 5 0.63 0
6+220 20 0.60 12.60 95 11.97 5 0.63 0
6+240 20 0.60 12.00 95 11.40 5 0.60 0
6+260 20 0.60 12.00 95 11.40 5 0.60 0
6+280 20 0.65 12.50 95 11.88 5 0.63 0
6+300 20 - 6.50 95 6.18 5 0.33 0
6+320 20 - - 95 - 5 0.00 0
6+340 20 - - 95 - 5 0.00 0
6+360 20 - - 95 - 5 0.00 0
6+380 20 - - 95 - 5 0.00 0
6+400 20 - - 95 - 5 0.00 0
6+420 20 - - 95 - 5 0.00 0
6+440 20 - - 95 - 5 0.00 0
6+460 20 - - 95 - 5 0.00 0
6+480 20 - - 95 - 5 0.00 0
6+500 20 0.66 6.60 95 6.27 5 0.33 0
6+520 20 0.57 12.30 95 11.69 5 0.62 0
6+540 20 0.66 12.30 95 11.69 5 0.62 0
6+560 20 0.66 13.20 95 12.54 5 0.66 0

145 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
6+580 20 0.66 13.20 95 12.54 5 0.66 0
6+600 20 0.66 13.20 95 12.54 5 0.66 0
6+620 20 0.66 13.20 95 12.54 5 0.66 0
6+640 20 0.35 10.10 95 9.60 5 0.51 0
6+660 20 0.66 10.10 95 9.60 5 0.51 0
6+680 20 1.32 19.80 95 18.81 5 0.99 0
6+700 20 0.98 23.00 95 21.85 5 1.15 0
6+720 20 1.12 21.00 95 19.95 5 1.05 0
6+740 20 0.51 16.30 95 15.49 5 0.82 0
6+760 20 0.465 9.75 95 9.26 5 0.49 0
6+780 20 0.51 9.75 95 9.26 5 0.49 0
6+800 20 0.51 10.20 95 9.69 5 0.51 0
6+820 20 0.505 10.15 95 9.64 5 0.51 0
6+840 20 0.52 10.25 95 9.74 5 0.51 0
6+860 20 1.17 16.90 95 16.06 5 0.85 0
6+880 20 1.123 22.93 95 21.78 5 1.15 0
6+900 20 1.17 22.93 95 21.78 5 1.15 0
6+920 20 1.11 22.80 95 21.66 5 1.14 0
6+940 20 1.02 21.30 95 20.24 5 1.07 0
6+960 20 1.02 20.40 95 19.38 5 1.02 0
6+980 20 0.93 19.50 95 18.53 5 0.98 0
7+000 20 1.03 19.60 95 18.62 5 0.98 0
7+020 20 1.02 20.50 95 19.48 5 1.03 0
7+040 20 0.975 19.95 95 18.95 5 1.00 0
7+060 20 1.015 19.90 95 18.91 5 1.00 0
7+080 20 0.968 19.83 95 18.84 5 0.99 0
7+100 20 0.985 19.53 95 18.55 5 0.98 0
7+120 20 1.02 20.05 95 19.05 5 1.00 0
7+140 20 1.02 20.40 95 19.38 5 1.02 0
7+160 20 1.02 20.40 95 19.38 5 1.02 0
7+180 20 1.32 23.40 95 22.23 5 1.17 0
7+200 20 1.26 25.80 95 24.51 5 1.29 0
7+220 20 1.26 25.20 95 23.94 5 1.26 0
7+240 20 1.32 25.80 95 24.51 5 1.29 0
7+260 20 1.32 26.40 95 25.08 5 1.32 0
7+280 20 1.32 26.40 95 25.08 5 1.32 0
7+300 20 1.26 25.80 95 24.51 5 1.29 0
7+320 20 1.32 25.80 95 24.51 5 1.29 0
7+340 20 1.2 25.20 95 23.94 5 1.26 0
7+360 20 1.32 25.20 95 23.94 5 1.26 0
7+380 20 1.32 26.40 95 25.08 5 1.32 0
7+400 20 1.26 25.80 95 24.51 5 1.29 0
7+420 20 1.26 25.20 95 23.94 5 1.26 0
7+440 20 1.32 25.80 95 24.51 5 1.29 0
7+460 20 1.32 26.40 95 25.08 5 1.32 0
7+480 20 1.32 26.40 95 25.08 5 1.32 0
7+500 20 1.32 26.40 95 25.08 5 1.32 0

146 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
7+520 20 1.32 26.40 95 25.08 5 1.32 0
7+540 20 1.32 26.40 95 25.08 5 1.32 0
7+560 20 1.26 25.80 95 24.51 5 1.29 0
7+580 20 1.32 25.80 95 24.51 5 1.29 0
7+600 20 1.26 25.80 95 24.51 5 1.29 0
7+620 20 1.32 25.80 95 24.51 5 1.29 0
7+640 20 1.32 26.40 95 25.08 5 1.32 0
7+660 20 1.32 26.40 95 25.08 5 1.32 0
7+680 20 1.32 26.40 95 25.08 5 1.32 0
7+700 20 1.32 26.40 95 25.08 5 1.32 0
7+720 20 1.32 26.40 95 25.08 5 1.32 0
7+740 20 1.32 26.40 95 25.08 5 1.32 0
7+760 20 1.32 26.40 95 25.08 5 1.32 0
7+780 20 1.26 25.80 95 24.51 5 1.29 0
7+800 20 1.32 25.80 95 24.51 5 1.29 0
7+820 20 1.32 26.40 95 25.08 5 1.32 0
7+840 20 1.32 26.40 95 25.08 5 1.32 0
7+860 20 1.32 26.40 95 25.08 5 1.32 0
7+880 20 1.32 26.40 95 25.08 5 1.32 0
7+900 20 1.32 26.40 95 25.08 5 1.32 0
7+920 20 1.26 25.80 95 24.51 5 1.29 0
7+940 20 1.32 25.80 95 24.51 5 1.29 0
7+960 20 1.32 26.40 95 25.08 5 1.32 0
7+980 20 1.26 25.80 95 24.51 5 1.29 0
8+000 20 1.32 25.80 95 24.51 5 1.29 0
8+020 20 1.32 26.40 95 25.08 5 1.32 0
8+040 20 1.32 26.40 95 25.08 5 1.32 0
8+060 20 1.32 26.40 95 25.08 5 1.32 0
8+080 20 1.32 26.40 95 25.08 5 1.32 0
8+100 20 1.26 25.80 95 24.51 5 1.29 0
8+120 20 1.32 25.80 95 24.51 5 1.29 0
8+140 20 1.32 26.40 95 25.08 5 1.32 0
8+160 20 1.32 26.40 95 25.08 5 1.32 0
8+180 20 1.32 26.40 95 25.08 5 1.32 0
8+200 20 1.32 26.40 95 25.08 5 1.32 0
8+220 20 1.26 25.80 95 24.51 5 1.29 0
8+240 20 1.32 25.80 95 24.51 5 1.29 0
8+260 20 1.32 26.40 95 25.08 5 1.32 0
8+280 20 1.32 26.40 95 25.08 5 1.32 0
8+300 20 1.26 25.80 95 24.51 5 1.29 0
8+320 20 1.32 25.80 95 24.51 5 1.29 0
8+340 20 0.99 23.10 95 21.95 5 1.16 0
8+360 20 1.26 22.50 95 21.38 5 1.13 0
8+380 20 1.32 25.80 95 24.51 5 1.29 0
8+400 20 1.32 26.40 95 25.08 5 1.32 0
8+420 20 1.2 25.20 95 23.94 5 1.26 0
8+440 20 1.32 25.20 95 23.94 5 1.26 0

147 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
8+460 20 1.32 26.40 95 25.08 5 1.32 0
8+480 20 1.26 25.80 95 24.51 5 1.29 0
8+500 20 1.32 25.80 95 24.51 5 1.29 0
8+520 20 1.32 26.40 95 25.08 5 1.32 0
8+540 20 1.2 25.20 95 23.94 5 1.26 0
8+560 20 1.26 24.60 95 23.37 5 1.23 0
8+580 20 1.32 25.80 95 24.51 5 1.29 0
8+600 20 1.26 25.80 95 24.51 5 1.29 0
8+620 20 1.26 25.20 95 23.94 5 1.26 0
8+640 20 1.32 25.80 95 24.51 5 1.29 0
8+660 20 1.26 25.80 95 24.51 5 1.29 0
8+680 20 1.32 25.80 95 24.51 5 1.29 0
8+700 20 1.32 26.40 95 25.08 5 1.32 0
8+720 20 1.26 25.80 95 24.51 5 1.29 0
8+740 20 1.2 24.60 95 23.37 5 1.23 0
8+760 20 1.32 25.20 95 23.94 5 1.26 0
8+780 20 1.32 26.40 95 25.08 5 1.32 0
8+800 20 1.26 25.80 95 24.51 5 1.29 0
8+820 20 1.32 25.80 95 24.51 5 1.29 0
8+840 20 1.32 26.40 95 25.08 5 1.32 0
8+860 20 1.26 25.80 95 24.51 5 1.29 0
8+880 20 1.32 25.80 95 24.51 5 1.29 0
8+900 20 1.26 25.80 95 24.51 5 1.29 0
8+920 20 1.2 24.60 95 23.37 5 1.23 0
8+940 20 1.32 25.20 95 23.94 5 1.26 0
8+960 20 1.26 25.80 95 24.51 5 1.29 0
8+980 20 1.32 25.80 95 24.51 5 1.29 0
9+000 20 1.32 26.40 95 25.08 5 1.32 0
9+020 20 1.26 25.80 95 24.51 5 1.29 0
9+040 20 1.32 25.80 95 24.51 5 1.29 0
9+060 20 1.32 26.40 95 25.08 5 1.32 0
9+080 20 1.32 26.40 95 25.08 5 1.32 0
9+100 20 1.32 26.40 95 25.08 5 1.32 0
9+120 20 1.32 26.40 95 25.08 5 1.32 0
9+140 20 1.26 25.80 95 24.51 5 1.29 0
9+160 20 1.32 25.80 95 24.51 5 1.29 0
9+180 20 1.32 26.40 95 25.08 5 1.32 0
9+200 20 1.32 26.40 95 25.08 5 1.32 0
9+220 20 1.26 25.80 95 24.51 5 1.29 0
9+240 20 1.32 25.80 95 24.51 5 1.29 0
9+260 20 1.32 26.40 95 25.08 5 1.32 0
9+280 20 1.26 25.80 95 24.51 5 1.29 0
9+300 20 1.32 25.80 95 24.51 5 1.29 0
9+320 20 1.32 26.40 95 25.08 5 1.32 0
9+340 20 1.32 26.40 95 25.08 5 1.32 0
9+360 20 1.32 26.40 95 25.08 5 1.32 0
9+380 20 1.32 26.40 95 25.08 5 1.32 0

148 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
9+400 20 1.26 25.80 95 24.51 5 1.29 0
9+420 20 1.26 25.20 95 23.94 5 1.26 0
9+440 20 1.32 25.80 95 24.51 5 1.29 0
9+460 20 1.32 26.40 95 25.08 5 1.32 0
9+480 20 1.32 26.40 95 25.08 5 1.32 0
9+500 20 1.26 25.80 95 24.51 5 1.29 0
9+520 20 1.32 25.80 95 24.51 5 1.29 0
9+540 20 1.32 26.40 95 25.08 5 1.32 0
9+560 20 1.32 26.40 95 25.08 5 1.32 0
9+580 20 1.32 26.40 95 25.08 5 1.32 0
9+600 20 0.765 20.85 95 19.81 5 1.04 0
9+620 20 0.66 14.25 95 13.54 5 0.71 0
9+640 20 1.26 19.20 95 18.24 5 0.96 0
9+660 20 1.32 25.80 95 24.51 5 1.29 0
9+680 20 1.2 25.20 95 23.94 5 1.26 0
9+700 20 1.32 25.20 95 23.94 5 1.26 0
9+720 20 1.32 26.40 95 25.08 5 1.32 0
9+740 20 1.2 25.20 95 23.94 5 1.26 0
9+760 20 1.32 25.20 95 23.94 5 1.26 0
9+780 20 1.26 25.80 95 24.51 5 1.29 0
9+800 20 1.32 25.80 95 24.51 5 1.29 0
9+820 20 1.26 25.80 95 24.51 5 1.29 0
9+840 20 1.178 24.38 95 23.16 5 1.22 0
9+860 20 1.2 23.78 95 22.59 5 1.19 0
9+880 20 1.32 25.20 95 23.94 5 1.26 0
9+900 20 1.32 26.40 95 25.08 5 1.32 0
9+920 20 1.26 25.80 95 24.51 5 1.29 0
9+940 20 1.32 25.80 95 24.51 5 1.29 0
9+960 20 1.32 26.40 95 25.08 5 1.32 0
9+980 20 1.155 24.75 95 23.51 5 1.24 0
10+000 20 1.26 24.15 95 22.94 5 1.21 0
10+020 20 1.32 25.80 95 24.51 5 1.29 0
10+040 20 1.32 26.40 95 25.08 5 1.32 0
10+060 20 1.26 25.80 95 24.51 5 1.29 0
10+080 20 1.32 25.80 95 24.51 5 1.29 0
10+100 20 1.32 26.40 95 25.08 5 1.32 0
10+120 20 1.32 26.40 95 25.08 5 1.32 0
10+140 20 1.32 26.40 95 25.08 5 1.32 0
10+160 20 1.32 26.40 95 25.08 5 1.32 0
10+180 20 1.32 26.40 95 25.08 5 1.32 0
10+200 20 1.32 26.40 95 25.08 5 1.32 0
10+220 20 1.32 26.40 95 25.08 5 1.32 0
10+240 20 1.32 26.40 95 25.08 5 1.32 0
10+260 20 1.32 26.40 95 25.08 5 1.32 0
10+280 20 1.32 26.40 95 25.08 5 1.32 0
10+300 20 1.2 25.20 95 23.94 5 1.26 0
10+320 20 1.32 25.20 95 23.94 5 1.26 0

149 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
10+340 20 1.26 25.80 95 24.51 5 1.29 0
10+360 20 1.26 25.20 95 23.94 5 1.26 0
10+380 20 1.32 25.80 95 24.51 5 1.29 0
10+400 20 1.32 26.40 95 25.08 5 1.32 0
10+420 20 1.32 26.40 95 25.08 5 1.32 0
10+440 20 1.32 26.40 95 25.08 5 1.32 0
10+460 20 1.32 26.40 95 25.08 5 1.32 0
10+480 20 1.32 26.40 95 25.08 5 1.32 0
10+500 20 1.32 26.40 95 25.08 5 1.32 0
10+520 20 1.26 25.80 95 24.51 5 1.29 0
10+540 20 1.32 25.80 95 24.51 5 1.29 0
10+560 20 1.32 26.40 95 25.08 5 1.32 0
10+580 20 1.32 26.40 95 25.08 5 1.32 0
10+600 20 1.32 26.40 95 25.08 5 1.32 0
10+620 20 1.32 26.40 95 25.08 5 1.32 0
10+640 20 1.32 26.40 95 25.08 5 1.32 0
10+660 20 1.32 26.40 95 25.08 5 1.32 0
10+680 20 1.32 26.40 95 25.08 5 1.32 0
10+700 20 1.018 23.38 95 22.21 5 1.17 0
10+720 20 1.32 23.38 95 22.21 5 1.17 0
10+740 20 1.32 26.40 95 25.08 5 1.32 0
10+760 20 1.26 25.80 95 24.51 5 1.29 0
10+780 20 1.26 25.20 95 23.94 5 1.26 0
10+800 20 1.32 25.80 95 24.51 5 1.29 0
10+820 20 1.2 25.20 95 23.94 5 1.26 0
10+840 20 1.32 25.20 95 23.94 5 1.26 0
10+860 20 1.32 26.40 95 25.08 5 1.32 0
10+880 20 1.26 25.80 95 24.51 5 1.29 0
10+900 20 1.2 24.60 95 23.37 5 1.23 0
10+920 20 1.26 24.60 95 23.37 5 1.23 0
10+940 20 1.32 25.80 95 24.51 5 1.29 0
10+960 20 1.32 26.40 95 25.08 5 1.32 0
10+980 20 1.32 26.40 95 25.08 5 1.32 0
11+000 20 1.32 26.40 95 25.08 5 1.32 0
11+020 20 1.32 26.40 95 25.08 5 1.32 0
11+040 20 1.32 26.40 95 25.08 5 1.32 0
11+060 20 1.32 26.40 95 25.08 5 1.32 0
11+080 20 1.26 25.80 95 24.51 5 1.29 0
11+100 20 1.26 25.20 95 23.94 5 1.26 0
11+120 20 1.32 25.80 95 24.51 5 1.29 0
11+140 20 1.32 26.40 95 25.08 5 1.32 0
11+160 20 1.32 26.40 95 25.08 5 1.32 0
11+180 20 1.32 26.40 95 25.08 5 1.32 0
11+200 20 1.32 26.40 95 25.08 5 1.32 0
11+220 20 1.32 26.40 95 25.08 5 1.32 0
11+240 20 1.32 26.40 95 25.08 5 1.32 0
11+260 20 1.32 26.40 95 25.08 5 1.32 0

150 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
11+280 20 1.32 26.40 95 25.08 5 1.32 0
11+300 20 1.32 26.40 95 25.08 5 1.32 0
11+320 20 1.26 25.80 95 24.51 5 1.29 0
11+340 20 1.32 25.80 95 24.51 5 1.29 0
11+360 20 1.32 26.40 95 25.08 5 1.32 0
11+380 20 1.32 26.40 95 25.08 5 1.32 0
11+400 20 0.66 19.80 95 18.81 5 0.99 0
11+420 20 1.2 18.60 95 17.67 5 0.93 0
11+440 20 1.32 25.20 95 23.94 5 1.26 0
11+460 20 1.32 26.40 95 25.08 5 1.32 0
11+480 20 1.32 26.40 95 25.08 5 1.32 0
11+500 20 1.32 26.40 95 25.08 5 1.32 0
11+520 20 1.32 26.40 95 25.08 5 1.32 0
11+540 20 0.835 21.55 95 20.47 5 1.08 0
11+560 20 1.32 21.55 95 20.47 5 1.08 0
11+580 20 1.26 25.80 95 24.51 5 1.29 0
11+600 20 1.32 25.80 95 24.51 5 1.29 0
11+620 20 1.32 26.40 95 25.08 5 1.32 0
11+640 20 0.77 20.90 95 19.86 5 1.05 0
11+660 20 1.32 20.90 95 19.86 5 1.05 0
11+680 20 1.32 26.40 95 25.08 5 1.32 0
11+700 20 1.32 26.40 95 25.08 5 1.32 0
11+720 20 1.32 26.40 95 25.08 5 1.32 0
11+740 20 1.32 26.40 95 25.08 5 1.32 0
11+760 20 1.32 26.40 95 25.08 5 1.32 0
11+780 20 1.32 26.40 95 25.08 5 1.32 0
11+800 20 1.32 26.40 95 25.08 5 1.32 0
11+820 20 1.32 26.40 95 25.08 5 1.32 0
11+840 20 1.32 26.40 95 25.08 5 1.32 0
11+860 20 1.32 26.40 95 25.08 5 1.32 0
11+880 20 1.32 26.40 95 25.08 5 1.32 0
11+900 20 1.32 26.40 95 25.08 5 1.32 0
11+920 20 1.26 25.80 95 24.51 5 1.29 0
11+940 20 1.26 25.20 95 23.94 5 1.26 0
11+960 20 1.26 25.20 95 23.94 5 1.26 0
11+980 20 1.32 25.80 95 24.51 5 1.29 0
12+000 20 1.32 26.40 95 25.08 5 1.32 0
12+020 20 1.32 26.40 95 25.08 5 1.32 0
12+040 20 1.32 26.40 95 25.08 5 1.32 0
12+060 20 1.32 26.40 95 25.08 5 1.32 0
12+080 20 1.32 26.40 95 25.08 5 1.32 0
12+100 20 1.32 26.40 95 25.08 5 1.32 0
12+120 20 1.32 26.40 95 25.08 5 1.32 0
12+140 20 1.32 26.40 95 25.08 5 1.32 0
12+160 20 1.32 26.40 95 25.08 5 1.32 0
12+180 20 0.6 19.20 95 18.24 5 0.96 0
12+200 20 1.26 18.60 95 17.67 5 0.93 0

151 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
12+220 20 0.715 19.75 95 18.76 5 0.99 0
12+240 20 1.32 20.35 95 19.33 5 1.02 0
12+260 20 1.32 26.40 95 25.08 5 1.32 0
12+280 20 1.32 26.40 95 25.08 5 1.32 0
12+300 20 1.32 26.40 95 25.08 5 1.32 0
12+320 20 1.32 26.40 95 25.08 5 1.32 0
12+340 20 1.32 26.40 95 25.08 5 1.32 0
12+360 20 1.32 26.40 95 25.08 5 1.32 0
12+380 20 1.32 26.40 95 25.08 5 1.32 0
12+400 20 1.26 25.80 95 24.51 5 1.29 0
12+420 20 1.32 25.80 95 24.51 5 1.29 0
12+440 20 1.32 26.40 95 25.08 5 1.32 0
12+460 20 1.32 26.40 95 25.08 5 1.32 0
12+480 20 1.32 26.40 95 25.08 5 1.32 0
12+500 20 1.32 26.40 95 25.08 5 1.32 0
12+520 20 1.32 26.40 95 25.08 5 1.32 0
12+540 20 1.26 25.80 95 24.51 5 1.29 0
12+560 20 1.32 25.80 95 24.51 5 1.29 0
12+580 20 1.32 26.40 95 25.08 5 1.32 0
12+600 20 1.32 26.40 95 25.08 5 1.32 0
12+620 20 1.32 26.40 95 25.08 5 1.32 0
12+640 20 1.32 26.40 95 25.08 5 1.32 0
12+660 20 0.6 19.20 95 18.24 5 0.96 0
12+680 20 0.66 12.60 95 11.97 5 0.63 0
12+700 20 1.32 19.80 95 18.81 5 0.99 0
12+720 20 1.32 26.40 95 25.08 5 1.32 0
12+740 20 1.32 26.40 95 25.08 5 1.32 0
12+760 20 1.32 26.40 95 25.08 5 1.32 0
12+780 20 1.2 25.20 95 23.94 5 1.26 0
12+800 20 1.32 25.20 95 23.94 5 1.26 0
12+820 20 1.2 25.20 95 23.94 5 1.26 0
12+840 20 1.26 24.60 95 23.37 5 1.23 0
12+860 20 1.26 25.20 95 23.94 5 1.26 0
12+880 20 1.32 25.80 95 24.51 5 1.29 0
12+900 20 1.32 26.40 95 25.08 5 1.32 0
12+920 20 1.32 26.40 95 25.08 5 1.32 0
12+940 20 1.32 26.40 95 25.08 5 1.32 0
12+960 20 1.32 26.40 95 25.08 5 1.32 0
12+980 20 1.32 26.40 95 25.08 5 1.32 0
13+000 20 1.32 26.40 95 25.08 5 1.32 0
13+020 20 1.32 26.40 95 25.08 5 1.32 0
13+040 20 1.32 26.40 95 25.08 5 1.32 0
13+060 20 1.32 26.40 95 25.08 5 1.32 0
13+080 20 1.32 26.40 95 25.08 5 1.32 0
13+100 20 1.32 26.40 95 25.08 5 1.32 0
13+120 20 1.26 25.80 95 24.51 5 1.29 0
13+140 20 1.32 25.80 95 24.51 5 1.29 0

152 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
13+160 20 1.32 26.40 95 25.08 5 1.32 0
13+180 20 1.32 26.40 95 25.08 5 1.32 0
13+200 20 1.32 26.40 95 25.08 5 1.32 0
13+220 20 1.32 26.40 95 25.08 5 1.32 0
13+240 20 1.32 26.40 95 25.08 5 1.32 0
13+260 20 1.32 26.40 95 25.08 5 1.32 0
13+280 20 1.26 25.80 95 24.51 5 1.29 0
13+300 20 1.32 25.80 95 24.51 5 1.29 0
13+320 20 1.32 26.40 95 25.08 5 1.32 0
13+340 20 1.32 26.40 95 25.08 5 1.32 0
13+360 20 1.32 26.40 95 25.08 5 1.32 0
13+380 20 1.32 26.40 95 25.08 5 1.32 0
13+400 20 1.32 26.40 95 25.08 5 1.32 0
13+420 20 0.935 22.55 95 21.42 5 1.13 0
13+440 20 0.6 15.35 95 14.58 5 0.77 0
13+460 20 0.6 12.00 95 11.40 5 0.60 0
13+480 20 0.66 12.60 95 11.97 5 0.63 0
13+500 20 1.32 19.80 95 18.81 5 0.99 0
13+520 20 1.32 26.40 95 25.08 5 1.32 0
13+540 20 1.32 26.40 95 25.08 5 1.32 0
13+560 20 1.32 26.40 95 25.08 5 1.32 0
13+580 20 1.32 26.40 95 25.08 5 1.32 0
13+600 20 1.26 25.80 95 24.51 5 1.29 0
13+620 20 1.2 24.60 95 23.37 5 1.23 0
13+640 20 1.32 25.20 95 23.94 5 1.26 0
13+660 20 1.32 26.40 95 25.08 5 1.32 0
13+680 20 1.26 25.80 95 24.51 5 1.29 0
13+700 20 1.32 25.80 95 24.51 5 1.29 0
13+720 20 1.32 26.40 95 25.08 5 1.32 0
13+740 20 1.32 26.40 95 25.08 5 1.32 0
13+760 20 1.32 26.40 95 25.08 5 1.32 0
13+780 20 0.66 19.80 95 18.81 5 0.99 0
13+800 20 1.32 19.80 95 18.81 5 0.99 0
13+820 20 0.66 19.80 95 18.81 5 0.99 0
13+840 20 0.66 13.20 95 12.54 5 0.66 0
13+860 20 0.66 13.20 95 12.54 5 0.66 0
13+880 20 0.66 13.20 95 12.54 5 0.66 0
13+900 20 0.66 13.20 95 12.54 5 0.66 0
13+920 20 1.32 19.80 95 18.81 5 0.99 0
13+940 20 0 13.20 95 12.54 5 0.66 0
13+960 20 0 - 95 - 5 0.00 0
13+980 20 0 - 95 - 5 0.00 0
14+000 20 0.6 6.00 95 5.70 5 0.30 0
14+020 20 1.2 18.00 95 17.10 5 0.90 0
14+040 20 1.32 25.20 95 23.94 5 1.26 0
14+060 20 1.32 26.40 95 25.08 5 1.32 0
14+080 20 0.66 19.80 95 18.81 5 0.99 0

153 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
14+100 20 0.66 13.20 95 12.54 5 0.66 0
14+120 20 0.6 12.60 95 11.97 5 0.63 0
14+140 20 0.66 12.60 95 11.97 5 0.63 0
14+160 20 0.66 13.20 95 12.54 5 0.66 0
14+180 20 0.66 13.20 95 12.54 5 0.66 0
14+200 20 0.165 8.25 95 7.84 5 0.41 0
14+220 20 0.1 2.65 95 2.52 5 0.13 0
14+240 20 0.66 7.60 95 7.22 5 0.38 0
14+260 20 0 6.60 95 6.27 5 0.33 0
14+280 20 0 - 95 - 5 0.00 0
14+300 20 0 - 95 - 5 0.00 0
14+320 20 0.238 2.38 95 2.26 5 0.12 0
14+340 20 0 2.38 95 2.26 5 0.12 0
14+360 20 0.66 6.60 95 6.27 5 0.33 0
14+380 20 0.66 13.20 95 12.54 5 0.66 0
14+400 20 0.6 12.60 95 11.97 5 0.63 0
14+420 20 0.66 12.60 95 11.97 5 0.63 0
14+440 20 0.66 13.20 95 12.54 5 0.66 0
14+460 20 0.66 13.20 95 12.54 5 0.66 0
14+480 20 0.66 13.20 95 12.54 5 0.66 0
14+500 20 0.66 13.20 95 12.54 5 0.66 0
14+520 20 0.66 13.20 95 12.54 5 0.66 0
14+540 20 0.66 13.20 95 12.54 5 0.66 0
14+560 20 0.66 13.20 95 12.54 5 0.66 0
14+580 20 0.66 13.20 95 12.54 5 0.66 0
14+600 20 0.6 12.60 95 11.97 5 0.63 0
14+620 20 0.66 12.60 95 11.97 5 0.63 0
14+640 20 0.66 13.20 95 12.54 5 0.66 0
14+660 20 0.6 12.60 95 11.97 5 0.63 0
14+680 20 0.66 12.60 95 11.97 5 0.63 0
14+700 20 0.66 13.20 95 12.54 5 0.66 0
14+720 20 0.6 12.60 95 11.97 5 0.63 0
14+740 20 0.66 12.60 95 11.97 5 0.63 0
14+760 20 0.66 13.20 95 12.54 5 0.66 0
14+780 20 0.66 13.20 95 12.54 5 0.66 0
14+800 20 0.66 13.20 95 12.54 5 0.66 0
14+820 20 0.66 13.20 95 12.54 5 0.66 0
14+840 20 0.66 13.20 95 12.54 5 0.66 0
14+860 20 0.6 12.60 95 11.97 5 0.63 0
14+880 20 0.66 12.60 95 11.97 5 0.63 0
14+900 20 0.66 13.20 95 12.54 5 0.66 0
14+920 20 0.66 13.20 95 12.54 5 0.66 0
14+940 20 0.658 13.18 95 12.52 5 0.66 0
14+960 20 0.66 13.18 95 12.52 5 0.66 0
14+980 20 0.66 13.20 95 12.54 5 0.66 0
15+000 20 0.66 13.20 95 12.54 5 0.66 0
15+020 20 0.66 13.20 95 12.54 5 0.66 0

154 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
15+040 20 0.565 12.25 95 11.64 5 0.61 0
15+060 20 0.11 6.75 95 6.41 5 0.34 0
15+080 20 0.66 7.70 95 7.32 5 0.39 0
15+100 20 0.66 13.20 95 12.54 5 0.66 0
15+120 20 0 6.60 95 6.27 5 0.33 0
15+140 20 0.66 6.60 95 6.27 5 0.33 0
15+160 20 0.66 13.20 95 12.54 5 0.66 0
15+180 20 0.66 13.20 95 12.54 5 0.66 0
15+200 20 0.66 13.20 95 12.54 5 0.66 0
15+220 20 0.6 12.60 95 11.97 5 0.63 0
15+240 20 0.66 12.60 95 11.97 5 0.63 0
15+260 20 0.66 13.20 95 12.54 5 0.66 0
15+280 20 0.66 13.20 95 12.54 5 0.66 0
15+300 20 0.66 13.20 95 12.54 5 0.66 0
15+320 20 0.66 13.20 95 12.54 5 0.66 0
15+340 20 0.66 13.20 95 12.54 5 0.66 0
15+360 20 0.035 6.95 95 6.60 5 0.35 0
15+380 20 0.66 6.95 95 6.60 5 0.35 0
15+400 20 0.66 13.20 95 12.54 5 0.66 0
15+420 20 0.66 13.20 95 12.54 5 0.66 0
15+440 20 0 6.60 95 6.27 5 0.33 0
15+460 20 0.66 6.60 95 6.27 5 0.33 0
15+480 20 0.66 13.20 95 12.54 5 0.66 0
15+500 20 0.6 12.60 95 11.97 5 0.63 0
15+520 20 0.6 12.00 95 11.40 5 0.60 0
15+540 20 0.66 12.60 95 11.97 5 0.63 0
15+560 20 0.66 13.20 95 12.54 5 0.66 0
15+580 20 1.32 19.80 95 18.81 5 0.99 0
15+600 20 1.2 25.20 95 23.94 5 1.26 0
15+620 20 1.32 25.20 95 23.94 5 1.26 0
15+640 20 0.66 19.80 95 18.81 5 0.99 0
15+660 20 0.66 13.20 95 12.54 5 0.66 0
15+680 20 0.66 13.20 95 12.54 5 0.66 0
15+700 20 0.66 13.20 95 12.54 5 0.66 0
15+720 20 0.66 13.20 95 12.54 5 0.66 0
15+740 20 0.66 13.20 95 12.54 5 0.66 0
15+760 20 0.66 13.20 95 12.54 5 0.66 0
15+780 20 0.66 13.20 95 12.54 5 0.66 0
15+800 20 0.6 12.60 95 11.97 5 0.63 0
15+820 20 0.66 12.60 95 11.97 5 0.63 0
15+840 20 0.66 13.20 95 12.54 5 0.66 0
15+860 20 0.66 13.20 95 12.54 5 0.66 0
15+880 20 0.6 12.60 95 11.97 5 0.63 0
15+900 20 0.66 12.60 95 11.97 5 0.63 0
15+920 20 0.66 13.20 95 12.54 5 0.66 0
15+940 20 0.6 12.60 95 11.97 5 0.63 0
15+960 20 0.66 12.60 95 11.97 5 0.63 0

155 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
15+980 20 0.66 13.20 95 12.54 5 0.66 0
16+000 20 0.66 13.20 95 12.54 5 0.66 0
16+020 20 0.66 13.20 95 12.54 5 0.66 0
16+040 20 0.66 13.20 95 12.54 5 0.66 0
16+060 20 0.66 13.20 95 12.54 5 0.66 0
16+080 20 0.66 13.20 95 12.54 5 0.66 0
16+100 20 0.66 13.20 95 12.54 5 0.66 0
16+120 20 0.66 13.20 95 12.54 5 0.66 0
16+140 20 0 6.60 95 6.27 5 0.33 0
16+160 20 0 - 95 - 5 0.00 0
16+180 20 0 - 95 - 5 0.00 0
16+200 20 0.66 6.60 95 6.27 5 0.33 0
16+220 20 0.66 13.20 95 12.54 5 0.66 0
16+240 20 0.66 13.20 95 12.54 5 0.66 0
16+260 20 0.66 13.20 95 12.54 5 0.66 0
16+280 20 0.66 13.20 95 12.54 5 0.66 0
16+300 20 0.6 12.60 95 11.97 5 0.63 0
16+320 20 0.66 12.60 95 11.97 5 0.63 0
16+340 20 0.66 13.20 95 12.54 5 0.66 0
16+360 20 0.66 13.20 95 12.54 5 0.66 0
16+380 20 0.66 13.20 95 12.54 5 0.66 0
16+400 20 1.32 19.80 95 18.81 5 0.99 0
16+420 20 1.32 26.40 95 25.08 5 1.32 0
16+440 20 1.32 26.40 95 25.08 5 1.32 0
16+460 20 0.935 22.55 95 21.42 5 1.13 0
16+480 20 1.32 22.55 95 21.42 5 1.13 0
16+500 20 1.32 26.40 95 25.08 5 1.32 0
16+520 20 1.32 26.40 95 25.08 5 1.32 0
16+540 20 1.32 26.40 95 25.08 5 1.32 0
16+560 20 1.32 26.40 95 25.08 5 1.32 0
16+580 20 1.2 25.20 95 23.94 5 1.26 0
16+600 20 1.32 25.20 95 23.94 5 1.26 0
16+620 20 1.32 26.40 95 25.08 5 1.32 0
16+640 20 1.32 26.40 95 25.08 5 1.32 0
16+660 20 1.32 26.40 95 25.08 5 1.32 0
16+680 20 0.655 19.75 95 18.76 5 0.99 0
16+700 20 1.32 19.75 95 18.76 5 0.99 0
16+720 20 1.32 26.40 95 25.08 5 1.32 0
16+740 20 1.32 26.40 95 25.08 5 1.32 0
16+760 20 1.32 26.40 95 25.08 5 1.32 0
16+780 20 0.66 19.80 95 18.81 5 0.99 0
16+800 20 0.66 13.20 95 12.54 5 0.66 0
16+820 20 0.6 12.60 95 11.97 5 0.63 0
16+840 20 0.66 12.60 95 11.97 5 0.63 0
16+860 20 0.66 13.20 95 12.54 5 0.66 0
16+880 20 0.66 13.20 95 12.54 5 0.66 0
16+900 20 0.66 13.20 95 12.54 5 0.66 0

156 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
16+920 20 0.66 13.20 95 12.54 5 0.66 0
16+940 20 0.66 13.20 95 12.54 5 0.66 0
16+960 20 0.66 13.20 95 12.54 5 0.66 0
16+980 20 0.66 13.20 95 12.54 5 0.66 0
17+000 20 0.66 13.20 95 12.54 5 0.66 0
17+020 20 0.66 13.20 95 12.54 5 0.66 0
17+040 20 0.66 13.20 95 12.54 5 0.66 0
17+060 20 0.66 13.20 95 12.54 5 0.66 0
17+080 20 0.66 13.20 95 12.54 5 0.66 0
17+100 20 0.66 13.20 95 12.54 5 0.66 0
17+120 20 0.66 13.20 95 12.54 5 0.66 0
17+140 20 0.66 13.20 95 12.54 5 0.66 0
17+160 20 0.66 13.20 95 12.54 5 0.66 0
17+180 20 0.66 13.20 95 12.54 5 0.66 0
17+200 20 0.66 13.20 95 12.54 5 0.66 0
17+220 20 1.32 19.80 95 18.81 5 0.99 0
17+240 20 1.17 24.90 95 23.66 5 1.25 0
17+260 20 0.51 16.80 95 15.96 5 0.84 0
17+280 20 0.51 10.20 95 9.69 5 0.51 0
17+300 20 0.465 9.75 95 9.26 5 0.49 0
17+320 20 0.66 11.25 95 10.69 5 0.56 0
17+340 20 0.635 12.95 95 12.30 5 0.65 0
17+360 20 0.178 8.13 95 7.72 5 0.41 0
17+380 20 0.66 8.38 95 7.96 5 0.42 0
17+400 20 0.66 13.20 95 12.54 5 0.66 0
17+420 20 0.66 13.20 95 12.54 5 0.66 0
17+440 20 0.66 13.20 95 12.54 5 0.66 0
17+460 20 0.66 13.20 95 12.54 5 0.66 0
17+480 20 0.66 13.20 95 12.54 5 0.66 0
17+500 20 0.185 8.45 95 8.03 5 0.42 0
17+520 20 0.6 7.85 95 7.46 5 0.39 0
17+540 20 0.66 12.60 95 11.97 5 0.63 0
17+560 20 0.66 13.20 95 12.54 5 0.66 0
17+580 20 0.507 11.67 95 11.09 5 0.58 0
17+600 20 0.51 10.17 95 9.66 5 0.51 0
17+620 20 0.66 11.70 95 11.12 5 0.59 0
17+640 20 0.455 11.15 95 10.59 5 0.56 0
17+660 20 0.66 11.15 95 10.59 5 0.56 0
17+680 20 0.66 13.20 95 12.54 5 0.66 0
17+700 20 0.66 13.20 95 12.54 5 0.66 0
17+720 20 0.66 13.20 95 12.54 5 0.66 0
17+740 20 0.66 13.20 95 12.54 5 0.66 0
17+760 20 0.66 13.20 95 12.54 5 0.66 0
17+780 20 0.66 13.20 95 12.54 5 0.66 0
17+800 20 0.66 13.20 95 12.54 5 0.66 0
17+820 20 1.32 19.80 95 18.81 5 0.99 0
17+840 20 0.66 19.80 95 18.81 5 0.99 0

157 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
17+860 20 0.66 13.20 95 12.54 5 0.66 0
17+880 20 0.66 13.20 95 12.54 5 0.66 0
17+900 20 0.66 13.20 95 12.54 5 0.66 0
17+920 20 0.66 13.20 95 12.54 5 0.66 0
17+940 20 0.66 13.20 95 12.54 5 0.66 0
17+960 20 0.6 12.60 95 11.97 5 0.63 0
17+980 20 0.66 12.60 95 11.97 5 0.63 0
18+000 20 0.66 13.20 95 12.54 5 0.66 0
18+020 20 0.66 13.20 95 12.54 5 0.66 0
18+040 20 0.23 8.90 95 8.46 5 0.45 0
18+060 20 0.66 8.90 95 8.46 5 0.45 0
18+080 20 0.66 13.20 95 12.54 5 0.66 0
18+100 20 0.66 13.20 95 12.54 5 0.66 0
18+120 20 0.66 13.20 95 12.54 5 0.66 0
18+140 20 0.66 13.20 95 12.54 5 0.66 0
18+160 20 0.66 13.20 95 12.54 5 0.66 0
18+180 20 0.66 13.20 95 12.54 5 0.66 0
18+200 20 0.66 13.20 95 12.54 5 0.66 0
18+220 20 0.66 13.20 95 12.54 5 0.66 0
18+240 20 0.66 13.20 95 12.54 5 0.66 0
18+260 20 0.6 12.60 95 11.97 5 0.63 0
18+280 20 0.66 12.60 95 11.97 5 0.63 0
18+300 20 0.66 13.20 95 12.54 5 0.66 0
18+320 20 0.66 13.20 95 12.54 5 0.66 0
18+340 20 0.66 13.20 95 12.54 5 0.66 0
18+360 20 0.66 13.20 95 12.54 5 0.66 0
18+380 20 0 6.60 95 6.27 5 0.33 0
18+400 20 0 - 95 - 5 0.00 0
18+420 20 0.66 6.60 95 6.27 5 0.33 0
18+440 20 0.66 13.20 95 12.54 5 0.66 0
18+460 20 0.6 12.60 95 11.97 5 0.63 0
18+480 20 0.66 12.60 95 11.97 5 0.63 0
18+500 20 1.17 18.30 95 17.39 5 0.92 0
18+520 20 1.158 23.28 95 22.12 5 1.16 0
18+540 20 1.16 23.18 95 22.02 5 1.16 0
18+560 20 0.66 18.20 95 17.29 5 0.91 0
18+580 20 0.66 13.20 95 12.54 5 0.66 0
18+600 20 1.32 19.80 95 18.81 5 0.99 0
18+620 20 1.32 26.40 95 25.08 5 1.32 0
18+640 20 0.66 19.80 95 18.81 5 0.99 0
18+660 20 0.66 13.20 95 12.54 5 0.66 0
18+680 20 0.66 13.20 95 12.54 5 0.66 0
18+700 20 0.66 13.20 95 12.54 5 0.66 0
18+720 20 0.66 13.20 95 12.54 5 0.66 0
18+740 20 0.66 13.20 95 12.54 5 0.66 0
18+760 20 0.66 13.20 95 12.54 5 0.66 0
18+780 20 0.66 13.20 95 12.54 5 0.66 0

158 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
18+800 20 0.66 13.20 95 12.54 5 0.66 0
18+820 20 1.26 19.20 95 18.24 5 0.96 0
18+840 20 1.32 25.80 95 24.51 5 1.29 0
18+860 20 1.26 25.80 95 24.51 5 1.29 0
18+880 20 0.66 19.20 95 18.24 5 0.96 0
18+900 20 0.66 13.20 95 12.54 5 0.66 0
18+920 20 0.66 13.20 95 12.54 5 0.66 0
18+940 20 0.66 13.20 95 12.54 5 0.66 0
18+960 20 0.66 13.20 95 12.54 5 0.66 0
18+980 20 0.66 13.20 95 12.54 5 0.66 0
19+000 20 0.66 13.20 95 12.54 5 0.66 0
19+020 20 0.66 13.20 95 12.54 5 0.66 0
19+040 20 0.66 13.20 95 12.54 5 0.66 0
19+060 20 0.66 13.20 95 12.54 5 0.66 0
19+080 20 1.32 19.80 95 18.81 5 0.99 0
19+100 20 1.32 26.40 95 25.08 5 1.32 0
19+120 20 1.32 26.40 95 25.08 5 1.32 0
19+140 20 0.66 19.80 95 18.81 5 0.99 0
19+160 20 0.66 13.20 95 12.54 5 0.66 0
19+180 20 0.01 6.70 95 6.37 5 0.34 0
19+200 20 0.6 6.10 95 5.80 5 0.31 0
19+220 20 0.66 12.60 95 11.97 5 0.63 0
19+240 20 0.66 13.20 95 12.54 5 0.66 0
19+260 20 0.66 13.20 95 12.54 5 0.66 0
19+280 20 0.66 13.20 95 12.54 5 0.66 0
19+300 20 0.66 13.20 95 12.54 5 0.66 0
19+320 20 0.66 13.20 95 12.54 5 0.66 0
19+340 20 0.6 12.60 95 11.97 5 0.63 0
19+360 20 0.66 12.60 95 11.97 5 0.63 0
19+380 20 0.66 13.20 95 12.54 5 0.66 0
19+400 20 0.66 13.20 95 12.54 5 0.66 0
19+420 20 0.66 13.20 95 12.54 5 0.66 0
19+440 20 0.66 13.20 95 12.54 5 0.66 0
19+460 20 0.66 13.20 95 12.54 5 0.66 0
19+480 20 0.66 13.20 95 12.54 5 0.66 0
19+500 20 0.66 13.20 95 12.54 5 0.66 0
19+520 20 0.66 13.20 95 12.54 5 0.66 0
19+540 20 0.66 13.20 95 12.54 5 0.66 0
19+560 20 0.66 13.20 95 12.54 5 0.66 0
19+580 20 0.66 13.20 95 12.54 5 0.66 0
19+600 20 0.66 13.20 95 12.54 5 0.66 0
19+620 20 0.6 12.60 95 11.97 5 0.63 0
19+640 20 0.66 12.60 95 11.97 5 0.63 0
19+660 20 0.6 12.60 95 11.97 5 0.63 0
19+680 20 0.66 12.60 95 11.97 5 0.63 0
19+700 20 0.66 13.20 95 12.54 5 0.66 0
19+720 20 0.6 12.60 95 11.97 5 0.63 0

159 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
19+740 20 1.32 19.20 95 18.24 5 0.96 0
19+760 20 1.32 26.40 95 25.08 5 1.32 0
19+780 20 1.26 25.80 95 24.51 5 1.29 0
19+800 20 1.32 25.80 95 24.51 5 1.29 0
19+820 20 1.26 25.80 95 24.51 5 1.29 0
19+840 20 0.66 19.20 95 18.24 5 0.96 0
19+860 20 0.66 13.20 95 12.54 5 0.66 0
19+880 20 0.66 13.20 95 12.54 5 0.66 0
19+900 20 0.66 13.20 95 12.54 5 0.66 0
19+920 20 0.6 12.60 95 11.97 5 0.63 0
19+940 20 0.66 12.60 95 11.97 5 0.63 0
19+960 20 0.6 12.60 95 11.97 5 0.63 0
19+980 20 1.26 18.60 95 17.67 5 0.93 0
20+000 20 1.32 25.80 95 24.51 5 1.29 0
20+020 20 0.023 13.43 95 12.76 5 0.67 0
20+040 20 0 0.23 95 0.22 5 0.01 0
20+060 20 0.22 2.20 95 2.09 5 0.11 0
20+080 20 0.66 8.80 95 8.36 5 0.44 0
20+100 20 0.66 13.20 95 12.54 5 0.66 0
20+120 20 0.66 13.20 95 12.54 5 0.66 0
20+140 20 0.66 13.20 95 12.54 5 0.66 0
20+160 20 0.66 13.20 95 12.54 5 0.66 0
20+180 20 0.66 13.20 95 12.54 5 0.66 0
20+200 20 0.66 13.20 95 12.54 5 0.66 0
20+220 20 0.66 13.20 95 12.54 5 0.66 0
20+240 20 0.66 13.20 95 12.54 5 0.66 0
20+260 20 0.66 13.20 95 12.54 5 0.66 0
20+280 20 0.66 13.20 95 12.54 5 0.66 0
20+300 20 0.66 13.20 95 12.54 5 0.66 0
20+320 20 0.66 13.20 95 12.54 5 0.66 0
20+340 20 0.66 13.20 95 12.54 5 0.66 0
20+360 20 0.66 13.20 95 12.54 5 0.66 0
20+380 20 0.66 13.20 95 12.54 5 0.66 0
20+400 20 0.098 7.58 95 7.20 5 0.38 0
20+420 20 0 0.98 95 0.93 5 0.05 0
20+440 20 0.66 6.60 95 6.27 5 0.33 0
20+460 20 0.66 13.20 95 12.54 5 0.66 0
20+480 20 0.66 13.20 95 12.54 5 0.66 0
20+500 20 0.66 13.20 95 12.54 5 0.66 0
20+520 20 0.66 13.20 95 12.54 5 0.66 0
20+540 20 0.66 13.20 95 12.54 5 0.66 0
20+560 20 0.6 12.60 95 11.97 5 0.63 0
20+580 20 1.26 18.60 95 17.67 5 0.93 0
20+600 20 0.66 19.20 95 18.24 5 0.96 0
20+620 20 0.66 13.20 95 12.54 5 0.66 0
20+640 20 0.66 13.20 95 12.54 5 0.66 0
20+660 20 0.66 13.20 95 12.54 5 0.66 0

160 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
20+680 20 0.015 6.75 95 6.41 5 0.34 0
20+700 20 0.66 6.75 95 6.41 5 0.34 0
20+720 20 0.66 13.20 95 12.54 5 0.66 0
20+740 20 0.368 10.28 95 9.77 5 0.51 0
20+760 20 0 3.68 95 3.50 5 0.18 0
20+780 20 0.66 6.60 95 6.27 5 0.33 0
20+800 20 0.66 13.20 95 12.54 5 0.66 0
20+820 20 0.03 6.90 95 6.56 5 0.35 0
20+840 20 0 0.30 95 0.29 5 0.02 0
20+860 20 0 - 95 - 5 0.00 0
20+880 20 0 - 95 - 5 0.00 0
20+900 20 0 - 95 - 5 0.00 0
20+920 20 0 - 95 - 5 0.00 0
20+940 20 0 - 95 - 5 0.00 0
20+960 20 0.008 0.08 95 0.08 5 0.00 0
20+980 20 0 0.08 95 0.08 5 0.00 0
21+000 20 0.66 6.60 95 6.27 5 0.33 0
21+020 20 0.66 13.20 95 12.54 5 0.66 0
21+040 20 0.66 13.20 95 12.54 5 0.66 0
21+060 20 0.66 13.20 95 12.54 5 0.66 0
21+080 20 0.66 13.20 95 12.54 5 0.66 0
21+100 20 0.66 13.20 95 12.54 5 0.66 0
21+120 20 0.66 13.20 95 12.54 5 0.66 0
21+140 20 0.66 13.20 95 12.54 5 0.66 0
21+160 20 0.66 13.20 95 12.54 5 0.66 0
21+180 20 0.66 13.20 95 12.54 5 0.66 0
21+200 20 0 6.60 95 6.27 5 0.33 0
21+220 20 0 - 95 - 5 0.00 0
21+240 20 0 - 95 - 5 0.00 0
21+260 20 0.66 6.60 95 6.27 5 0.33 0
21+280 20 1.26 19.20 95 18.24 5 0.96 0
21+300 20 1.17 24.30 95 23.09 5 1.22 0
21+320 20 1.065 22.35 95 21.23 5 1.12 0
21+340 20 0.51 15.75 95 14.96 5 0.79 0
21+360 20 0.51 10.20 95 9.69 5 0.51 0
21+380 20 0.51 10.20 95 9.69 5 0.51 0
21+400 20 0.51 10.20 95 9.69 5 0.51 0
21+420 20 0.66 11.70 95 11.12 5 0.59 0
21+440 20 0.66 13.20 95 12.54 5 0.66 0
21+460 20 0.265 9.25 95 8.79 5 0.46 0
21+480 20 0.57 8.35 95 7.93 5 0.42 0
21+500 20 0.06 6.30 95 5.99 5 0.32 0
21+520 20 0.65 7.10 95 6.75 5 0.36 0
21+540 20 0.66 13.10 95 12.45 5 0.66 0
21+560 20 0.6 12.60 95 11.97 5 0.63 0
21+580 20 1.32 19.20 95 18.24 5 0.96 0
21+600 20 1.32 26.40 95 25.08 5 1.32 0

161 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
21+620 20 1.32 26.40 95 25.08 5 1.32 0
21+640 20 1.32 26.40 95 25.08 5 1.32 0
21+660 20 1.32 26.40 95 25.08 5 1.32 0
21+680 20 1.32 26.40 95 25.08 5 1.32 0
21+700 20 1.32 26.40 95 25.08 5 1.32 0
21+720 20 1.32 26.40 95 25.08 5 1.32 0
21+740 20 1.26 25.80 95 24.51 5 1.29 0
21+760 20 1.32 25.80 95 24.51 5 1.29 0
21+780 20 1.17 24.90 95 23.66 5 1.25 0
21+800 20 0.5 16.70 95 15.87 5 0.84 0
21+820 20 0.66 11.60 95 11.02 5 0.58 0
21+840 20 0.66 13.20 95 12.54 5 0.66 0
21+860 20 0.658 13.18 95 12.52 5 0.66 0
21+880 20 0 6.58 95 6.25 5 0.33 0
21+900 20 0 - 95 - 5 0.00 0
21+920 20 0.6 6.00 95 5.70 5 0.30 0
21+940 20 0.66 12.60 95 11.97 5 0.63 0
21+960 20 0.66 13.20 95 12.54 5 0.66 0
21+980 20 1.32 19.80 95 18.81 5 0.99 0
22+000 20 1.17 24.90 95 23.66 5 1.25 0
22+020 20 1.17 23.40 95 22.23 5 1.17 0
22+040 20 1.17 23.40 95 22.23 5 1.17 0
22+060 20 0.6 17.70 95 16.82 5 0.89 0
22+080 20 0.53 11.30 95 10.74 5 0.57 0
22+100 20 0.01 5.40 95 5.13 5 0.27 0
22+120 20 0 0.10 95 0.10 5 0.01 0
22+140 20 0 - 95 - 5 0.00 0
22+160 20 0.252 2.52 95 2.39 5 0.13 0
22+180 20 1.32 15.72 95 14.93 5 0.79 0
22+200 20 1.17 24.90 95 23.66 5 1.25 0
22+220 20 1.17 23.40 95 22.23 5 1.17 0
22+240 20 0.66 18.30 95 17.39 5 0.92 0
22+260 20 0.66 13.20 95 12.54 5 0.66 0
22+280 20 0.66 13.20 95 12.54 5 0.66 0
22+300 20 0.66 13.20 95 12.54 5 0.66 0
22+320 20 0.66 13.20 95 12.54 5 0.66 0
22+340 20 0.66 13.20 95 12.54 5 0.66 0
22+360 20 0.66 13.20 95 12.54 5 0.66 0
22+380 20 1.26 19.20 95 18.24 5 0.96 0
22+400 20 1.11 23.70 95 22.52 5 1.19 0
22+420 20 1.17 22.80 95 21.66 5 1.14 0
22+440 20 1.168 23.38 95 22.21 5 1.17 0
22+460 20 1.065 22.33 95 21.21 5 1.12 0
22+480 20 1.17 22.35 95 21.23 5 1.12 0
22+500 20 0.5 16.70 95 15.87 5 0.84 0
22+520 20 0.66 11.60 95 11.02 5 0.58 0
22+540 20 0.6 12.60 95 11.97 5 0.63 0

162 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
22+560 20 0.66 12.60 95 11.97 5 0.63 0
22+580 20 0.66 13.20 95 12.54 5 0.66 0
22+600 20 1.125 17.85 95 16.96 5 0.89 0
22+620 20 1.17 22.95 95 21.80 5 1.15 0
22+640 20 1.105 22.75 95 21.61 5 1.14 0
22+660 20 1.16 22.65 95 21.52 5 1.13 0
22+680 20 0.6 17.60 95 16.72 5 0.88 0
22+700 20 0.66 12.60 95 11.97 5 0.63 0
22+720 20 0.66 13.20 95 12.54 5 0.66 0
22+740 20 0.66 13.20 95 12.54 5 0.66 0
22+760 20 0.03 6.90 95 6.56 5 0.35 0
22+780 20 0 0.30 95 0.29 5 0.02 0
22+800 20 0.555 5.55 95 5.27 5 0.28 0
22+820 20 1.32 18.75 95 17.81 5 0.94 0
22+840 20 1.17 24.90 95 23.66 5 1.25 0
22+860 20 1.17 23.40 95 22.23 5 1.17 0
22+880 20 1.17 23.40 95 22.23 5 1.17 0
22+900 20 1.17 23.40 95 22.23 5 1.17 0
22+920 20 1.168 23.38 95 22.21 5 1.17 0
22+940 20 1.02 21.88 95 20.79 5 1.09 0
22+960 20 1.02 20.40 95 19.38 5 1.02 0
22+980 20 0.998 20.18 95 19.17 5 1.01 0
23+000 20 1 19.98 95 18.98 5 1.00 0
23+020 20 0.975 19.75 95 18.76 5 0.99 0
23+040 20 1.02 19.95 95 18.95 5 1.00 0
23+060 20 1.02 20.40 95 19.38 5 1.02 0
23+080 20 1.02 20.40 95 19.38 5 1.02 0
23+100 20 1.015 20.35 95 19.33 5 1.02 0
23+120 20 1.32 23.35 95 22.18 5 1.17 0
23+140 20 1.32 26.40 95 25.08 5 1.32 0
23+160 20 1.033 23.53 95 22.35 5 1.18 0
23+180 20 1.32 23.53 95 22.35 5 1.18 0
23+200 20 1.2 25.20 95 23.94 5 1.26 0
23+220 20 1.32 25.20 95 23.94 5 1.26 0
23+240 20 1.32 26.40 95 25.08 5 1.32 0
23+260 20 1.32 26.40 95 25.08 5 1.32 0
23+280 20 1.32 26.40 95 25.08 5 1.32 0
23+300 20 0.66 19.80 95 18.81 5 0.99 0
23+320 20 0.66 13.20 95 12.54 5 0.66 0
23+340 20 0.66 13.20 95 12.54 5 0.66 0
23+360 20 0.66 13.20 95 12.54 5 0.66 0
23+380 20 0.66 13.20 95 12.54 5 0.66 0
23+400 20 0.66 13.20 95 12.54 5 0.66 0
23+420 20 0.66 13.20 95 12.54 5 0.66 0
23+440 20 0.6 12.60 95 11.97 5 0.63 0
23+460 20 0 6.00 95 5.70 5 0.30 0
23+480 20 0 - 95 - 5 0.00 0

163 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
23+500 20 0.66 6.60 95 6.27 5 0.33 0
23+520 20 0.66 13.20 95 12.54 5 0.66 0
23+540 20 0.66 13.20 95 12.54 5 0.66 0
23+560 20 0.66 13.20 95 12.54 5 0.66 0
23+580 20 0.6 12.60 95 11.97 5 0.63 0
23+600 20 0.66 12.60 95 11.97 5 0.63 0
23+620 20 0.66 13.20 95 12.54 5 0.66 0
23+640 20 1.32 19.80 95 18.81 5 0.99 0
23+660 20 1.32 26.40 95 25.08 5 1.32 0
23+680 20 1.32 26.40 95 25.08 5 1.32 0
23+700 20 0.66 19.80 95 18.81 5 0.99 0
23+720 20 0 6.60 95 6.27 5 0.33 0
23+740 20 0.66 6.60 95 6.27 5 0.33 0
23+760 20 0.66 13.20 95 12.54 5 0.66 0
23+780 20 0.66 13.20 95 12.54 5 0.66 0
23+800 20 0.66 13.20 95 12.54 5 0.66 0
23+820 20 0.66 13.20 95 12.54 5 0.66 0
23+840 20 0.66 13.20 95 12.54 5 0.66 0
23+860 20 0.66 13.20 95 12.54 5 0.66 0
23+880 20 0.6 12.60 95 11.97 5 0.63 0
23+900 20 0.49 10.90 95 10.36 5 0.55 0
23+920 20 0 4.90 95 4.66 5 0.25 0
23+940 20 0.66 6.60 95 6.27 5 0.33 0
23+960 20 0.66 13.20 95 12.54 5 0.66 0
23+980 20 0.66 13.20 95 12.54 5 0.66 0
24+000 20 0.66 13.20 95 12.54 5 0.66 0
24+020 20 0.66 13.20 95 12.54 5 0.66 0
24+040 20 1.32 19.80 95 18.81 5 0.99 0
24+060 20 1.32 26.40 95 25.08 5 1.32 0
24+080 20 1.32 26.40 95 25.08 5 1.32 0
24+100 20 1.32 26.40 95 25.08 5 1.32 0
24+120 20 0.66 19.80 95 18.81 5 0.99 0
24+140 20 0.66 13.20 95 12.54 5 0.66 0
24+160 20 0.595 12.55 95 11.92 5 0.63 0
24+180 20 0.66 12.55 95 11.92 5 0.63 0
24+200 20 0.66 13.20 95 12.54 5 0.66 0
24+220 20 1.32 19.80 95 18.81 5 0.99 0
24+240 20 1.32 26.40 95 25.08 5 1.32 0
24+260 20 1.32 26.40 95 25.08 5 1.32 0
24+280 20 1.32 26.40 95 25.08 5 1.32 0
24+300 20 1.32 26.40 95 25.08 5 1.32 0
24+320 20 1.32 26.40 95 25.08 5 1.32 0
24+340 20 1.2 25.20 95 23.94 5 1.26 0
24+360 20 0.66 18.60 95 17.67 5 0.93 0
24+380 20 0.66 13.20 95 12.54 5 0.66 0
24+400 20 1.32 19.80 95 18.81 5 0.99 0
24+420 20 0.66 19.80 95 18.81 5 0.99 0

164 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
24+440 20 0.66 13.20 95 12.54 5 0.66 0
24+460 20 0.66 13.20 95 12.54 5 0.66 0
24+480 20 0.66 13.20 95 12.54 5 0.66 0
24+500 20 0.66 13.20 95 12.54 5 0.66 0
24+520 20 0.66 13.20 95 12.54 5 0.66 0
24+540 20 0.66 13.20 95 12.54 5 0.66 0
24+560 20 0.66 13.20 95 12.54 5 0.66 0
24+580 20 1.32 19.80 95 18.81 5 0.99 0
24+600 20 1.32 26.40 95 25.08 5 1.32 0
24+620 20 0.66 19.80 95 18.81 5 0.99 0
24+640 20 0.66 13.20 95 12.54 5 0.66 0
24+660 20 0.66 13.20 95 12.54 5 0.66 0
24+680 20 0.66 13.20 95 12.54 5 0.66 0
24+700 20 0.66 13.20 95 12.54 5 0.66 0
24+720 20 0.6 12.60 95 11.97 5 0.63 0
24+740 20 0.66 12.60 95 11.97 5 0.63 0
24+760 20 0.66 13.20 95 12.54 5 0.66 0
24+780 20 0.66 13.20 95 12.54 5 0.66 0
24+800 20 0.6 12.60 95 11.97 5 0.63 0
24+820 20 0.6 12.00 95 11.40 5 0.60 0
24+840 20 0.66 12.60 95 11.97 5 0.63 0
24+860 20 0.66 13.20 95 12.54 5 0.66 0
24+880 20 0.507 11.67 95 11.09 5 0.58 0
24+900 20 0 5.07 95 4.82 5 0.25 0
24+920 20 0.66 6.60 95 6.27 5 0.33 0
24+940 20 0.66 13.20 95 12.54 5 0.66 0
24+960 20 0.66 13.20 95 12.54 5 0.66 0
24+980 20 0.66 13.20 95 12.54 5 0.66 0
25+000 20 0.66 13.20 95 12.54 5 0.66 0
25+020 20 0.6 12.60 95 11.97 5 0.63 0
25+040 20 0.66 12.60 95 11.97 5 0.63 0
25+060 20 0.66 13.20 95 12.54 5 0.66 0
25+080 20 0.66 13.20 95 12.54 5 0.66 0
25+100 20 0.66 13.20 95 12.54 5 0.66 0
25+120 20 0.6 12.60 95 11.97 5 0.63 0
25+140 20 0.6 12.00 95 11.40 5 0.60 0
25+160 20 0.645 12.45 95 11.83 5 0.62 0
25+180 20 0.66 13.05 95 12.40 5 0.65 0
25+200 20 0.66 13.20 95 12.54 5 0.66 0
25+220 20 0.6 12.60 95 11.97 5 0.63 0
25+240 20 1.32 19.20 95 18.24 5 0.96 0
25+260 20 1.32 26.40 95 25.08 5 1.32 0
25+280 20 1.32 26.40 95 25.08 5 1.32 0
25+300 20 1.32 26.40 95 25.08 5 1.32 0
25+320 20 1.32 26.40 95 25.08 5 1.32 0
25+340 20 1.32 26.40 95 25.08 5 1.32 0
25+360 20 1.32 26.40 95 25.08 5 1.32 0

165 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
25+380 20 1.32 26.40 95 25.08 5 1.32 0
25+400 20 1.32 26.40 95 25.08 5 1.32 0
25+420 20 1.32 26.40 95 25.08 5 1.32 0
25+440 20 1.32 26.40 95 25.08 5 1.32 0
25+460 20 1.32 26.40 95 25.08 5 1.32 0
25+480 20 1.32 26.40 95 25.08 5 1.32 0
25+500 20 1.26 25.80 95 24.51 5 1.29 0
25+520 20 1.32 25.80 95 24.51 5 1.29 0
25+540 20 1.32 26.40 95 25.08 5 1.32 0
25+560 20 1.32 26.40 95 25.08 5 1.32 0
25+580 20 1.32 26.40 95 25.08 5 1.32 0
25+600 20 1.32 26.40 95 25.08 5 1.32 0
25+620 20 1.32 26.40 95 25.08 5 1.32 0
25+640 20 1.32 26.40 95 25.08 5 1.32 0
25+660 20 1.32 26.40 95 25.08 5 1.32 0
25+680 20 1.32 26.40 95 25.08 5 1.32 0
25+700 20 1.32 26.40 95 25.08 5 1.32 0
25+720 20 1.32 26.40 95 25.08 5 1.32 0
25+740 20 1.32 26.40 95 25.08 5 1.32 0
25+760 20 1.32 26.40 95 25.08 5 1.32 0
25+780 20 1.32 26.40 95 25.08 5 1.32 0
25+800 20 1.32 26.40 95 25.08 5 1.32 0
25+820 20 1.32 26.40 95 25.08 5 1.32 0
25+840 20 1.32 26.40 95 25.08 5 1.32 0
25+860 20 1.32 26.40 95 25.08 5 1.32 0
25+880 20 1.32 26.40 95 25.08 5 1.32 0
25+900 20 1.32 26.40 95 25.08 5 1.32 0
25+920 20 0.6 19.20 95 18.24 5 0.96 0
25+940 20 1.32 19.20 95 18.24 5 0.96 0
25+960 20 1.32 26.40 95 25.08 5 1.32 0
25+980 20 1.32 26.40 95 25.08 5 1.32 0
26+000 20 1.2 25.20 95 23.94 5 1.26 0
26+020 20 1.32 25.20 95 23.94 5 1.26 0
26+040 20 1.32 26.40 95 25.08 5 1.32 0
26+060 20 1.32 26.40 95 25.08 5 1.32 0
26+080 20 1.32 26.40 95 25.08 5 1.32 0
26+100 20 1.32 26.40 95 25.08 5 1.32 0
26+120 20 1.17 24.90 95 23.66 5 1.25 0
26+140 20 1.063 22.33 95 21.21 5 1.12 0
26+160 20 1.17 22.33 95 21.21 5 1.12 0
26+180 20 1.17 23.40 95 22.23 5 1.17 0
26+200 20 1.17 23.40 95 22.23 5 1.17 0
26+220 20 1.065 22.35 95 21.23 5 1.12 0
26+240 20 1.32 23.85 95 22.66 5 1.19 0
26+260 20 1.32 26.40 95 25.08 5 1.32 0
26+280 20 1.26 25.80 95 24.51 5 1.29 0
26+300 20 1.32 25.80 95 24.51 5 1.29 0

166 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
26+320 20 1.32 26.40 95 25.08 5 1.32 0
26+340 20 1.26 25.80 95 24.51 5 1.29 0
26+360 20 0.66 19.20 95 18.24 5 0.96 0
26+380 20 0.66 13.20 95 12.54 5 0.66 0
26+400 20 0.66 13.20 95 12.54 5 0.66 0
26+420 20 1.32 19.80 95 18.81 5 0.99 0
26+440 20 1.32 26.40 95 25.08 5 1.32 0
26+460 20 0.66 19.80 95 18.81 5 0.99 0
26+480 20 0.488 11.48 95 10.91 5 0.57 0
26+500 20 1.32 18.08 95 17.18 5 0.90 0
26+520 20 1.32 26.40 95 25.08 5 1.32 0
26+540 20 1.32 26.40 95 25.08 5 1.32 0
26+560 20 1.26 25.80 95 24.51 5 1.29 0
26+580 20 1.32 25.80 95 24.51 5 1.29 0
26+600 20 1.32 26.40 95 25.08 5 1.32 0
26+620 20 1.32 26.40 95 25.08 5 1.32 0
26+640 20 1.26 25.80 95 24.51 5 1.29 0
26+660 20 0.66 19.20 95 18.24 5 0.96 0
26+680 20 1.32 19.80 95 18.81 5 0.99 0
26+700 20 1.32 26.40 95 25.08 5 1.32 0
26+720 20 1.32 26.40 95 25.08 5 1.32 0
26+740 20 1.32 26.40 95 25.08 5 1.32 0
26+760 20 1.32 26.40 95 25.08 5 1.32 0
26+780 20 1.32 26.40 95 25.08 5 1.32 0
26+800 20 1.32 26.40 95 25.08 5 1.32 0
26+820 20 1.32 26.40 95 25.08 5 1.32 0
26+840 20 1.32 26.40 95 25.08 5 1.32 0
26+860 20 1.32 26.40 95 25.08 5 1.32 0
26+880 20 1.32 26.40 95 25.08 5 1.32 0
26+900 20 1.26 25.80 95 24.51 5 1.29 0
26+920 20 0.66 19.20 95 18.24 5 0.96 0
26+940 20 0.66 13.20 95 12.54 5 0.66 0
26+960 20 0.66 13.20 95 12.54 5 0.66 0
26+980 20 0.66 13.20 95 12.54 5 0.66 0
27+000 20 0.66 13.20 95 12.54 5 0.66 0
27+020 20 0.6 12.60 95 11.97 5 0.63 0
27+040 20 0.66 12.60 95 11.97 5 0.63 0
27+060 20 0.66 13.20 95 12.54 5 0.66 0
27+080 20 0.6 12.60 95 11.97 5 0.63 0
27+100 20 0.66 12.60 95 11.97 5 0.63 0
27+120 20 0.66 13.20 95 12.54 5 0.66 0
27+140 20 0.6 12.60 95 11.97 5 0.63 0
27+160 20 0.66 12.60 95 11.97 5 0.63 0
27+180 20 0.66 13.20 95 12.54 5 0.66 0
27+200 20 0.66 13.20 95 12.54 5 0.66 0
27+220 20 0.66 13.20 95 12.54 5 0.66 0
27+240 20 0.66 13.20 95 12.54 5 0.66 0

167 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type
Ordinary Soil Soft Rock Hard Rock
Chainage Length (m) Area (m2) Volume(m3)
Volume
Volume (m3)
% % (m3) %
27+260 20 0.66 13.20 95 12.54 5 0.66 0
27+280 20 0.66 13.20 95 12.54 5 0.66 0
27+300 20 0.66 13.20 95 12.54 5 0.66 0
27+320 20 0.66 13.20 95 12.54 5 0.66 0
27+340 20 0.66 13.20 95 12.54 5 0.66 0
27+360 20 0.66 13.20 95 12.54 5 0.66 0
27+380 20 0.66 13.20 95 12.54 5 0.66 0
27+400 20 0.66 13.20 95 12.54 5 0.66 0
27+420 20 0.66 13.20 95 12.54 5 0.66 0
27+440 20 0.66 13.20 95 12.54 5 0.66 0
27+460 20 0.66 13.20 95 12.54 5 0.66 0
27+480 20 0.66 13.20 95 12.54 5 0.66 0
27+500 20 0 6.60 95 6.27 5 0.33 0
27+520 20 0.66 6.60 95 6.27 5 0.33 0
27+540 20 0.6 12.60 95 11.97 5 0.63 0
27+560 20 0.66 12.60 95 11.97 5 0.63 0
27+580 20 0.66 13.20 95 12.54 5 0.66 0
27+600 20 0.6 12.60 95 11.97 5 0.63 0
27+620 20 0.66 12.60 95 11.97 5 0.63 0
27+640 20 0.66 13.20 95 12.54 5 0.66 0
27+660 20 0.66 13.20 95 12.54 5 0.66 0
27+680 20 1.32 19.80 95 18.81 5 0.99 0
27+700 20 1.32 26.40 95 25.08 5 1.32 0
27+720 20 0.66 19.80 95 18.81 5 0.99 0
27+740 20 0.66 13.20 95 12.54 5 0.66 0
27+760 20 0.66 13.20 95 12.54 5 0.66 0
27+780 20 0.66 13.20 95 12.54 5 0.66 0
27+800 20 0.66 13.20 95 12.54 5 0.66 0

Total 27810 25404.76 24134.92 1270.73

168 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

169 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

170 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

171 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

172 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

173 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

174 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

175 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

176 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

177 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

178 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

179 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

180 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

181 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

182 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

183 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

184 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

185 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

186 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

187 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

188 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

189 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

190 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

191 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

192 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

193 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

194 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

195 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

196 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

197 of 664
rt

AINS

ng Soil type
Hard Rock

ks
ar
Volume
em
R
(m3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

198 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
0+020 20 6 13.5 270 270.00 160.00
0+040 20 4 7 140 140.00 104.00
0+060 20 6 13.5 270 270.00 160.00
0+080 20 6 13.5 270 270.00 160.00
0+100 20 7 17.5 350 350.00 188.00
0+120 20 7 17.5 350 350.00 188.00
0+140 20 7 17.5 350 350.00 188.00
0+160 15 6 13.5 202.5 202.50 120.00
0+360 15 4 7 105 105.00 78.00
0+380 20 7 17.5 350 350.00 188.00
0+400 20 9 27 540 540.00 244.00
0+420 20 6 13.5 270 270.00 160.00
0+440 20 6 13.5 270 270.00 160.00
0+460 20 6 13.5 270 270.00 160.00
0+480 20 5 10 200 200.00 132.00
0+500 20 4 7 140 140.00 104.00
0+520 20 4 7 140 140.00 104.00
0+540 15 3 4.5 67.5 67.50 57.00
1+080 15 9 27 405 405.00 183.00
1+100 20 9 27 540 540.00 244.00
1+120 20 8 22 440 440.00 216.00
1+140 20 7 17.5 350 350.00 188.00
1+160 20 6 13.5 270 270.00 160.00
1+180 20 5 10 200 200.00 132.00
1+200 20 6 13.5 270 270.00 160.00
1+220 20 4 7 140 140.00 104.00
1+240 20 4 7 140 140.00 104.00
1+260 20 3 4.5 90 90.00 76.00
1+280 20 4 7 140 140.00 104.00
1+300 20 4 7 140 140.00 104.00
1+320 20 4 7 140 140.00 104.00
1+340 20 4 7 140 140.00 104.00
1+360 20 6 13.5 270 270.00 160.00
1+380 20 6 13.5 270 270.00 160.00
1+400 20 6 13.5 270 270.00 160.00
1+420 20 7 17.5 350 350.00 188.00
1+440 20 8 22 440 440.00 216.00

199 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
1+460 20 6 13.5 270 270.00 160.00
1+480 20 7 17.5 350 350.00 188.00
1+500 20 6 13.5 270 270.00 160.00
1+520 20 6 13.5 270 270.00 160.00
1+540 20 4 7 140 140.00 104.00
1+560 15 4 7 105 105.00 78.00
1+600 15 6 13.5 202.5 202.50 120.00
1+620 20 5 10 200 200.00 132.00
1+640 20 7 17.5 350 350.00 188.00
1+660 20 7 17.5 350 350.00 188.00
1+680 20 11 38.5 770 770.00 300.00
1+700 20 10 32.5 650 650.00 272.00
1+720 20 10 32.5 650 650.00 272.00
1+740 20 8 22 440 440.00 216.00
1+760 20 6 13.5 270 270.00 160.00
1+780 20 4 7 140 140.00 104.00
1+800 20 4 7 140 140.00 104.00
1+820 15 3 4.5 67.5 67.50 57.00
2+080 15 5 10 150 150.00 99.00
2+100 20 5 10 200 200.00 132.00
2+120 15 4 7 105 105.00 78.00
3+140 15 7 17.5 262.5 262.50 141.00
3+160 20 8 22 440 440.00 216.00
3+180 20 7 17.5 350 350.00 188.00
3+200 20 9 27 540 540.00 244.00
3+220 20 10 32.5 650 650.00 272.00
3+240 20 10 32.5 650 650.00 272.00
3+260 20 8 22 440 440.00 216.00
3+280 20 5 10 200 200.00 132.00
3+300 15 7 17.5 262.5 262.50 141.00
3+740 15 3 4.5 67.5 67.50 57.00
3+760 15 5 10 150 150.00 99.00
5+360 10 3 4.5 45 45.00 38.00
5+400 15 3 4.5 67.5 67.50 57.00
5+420 20 4 7 140 140.00 104.00
5+440 20 4 7 140 140.00 104.00
5+460 20 5 10 200 200.00 132.00

200 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
5+480 20 5 10 200 200.00 132.00
5+500 20 5 10 200 200.00 132.00
5+520 20 6 13.5 270 270.00 160.00
5+540 20 8 22 440 440.00 216.00
5+560 20 7 17.5 350 350.00 188.00
5+580 20 7 17.5 350 350.00 188.00
5+600 20 6 13.5 270 270.00 160.00
5+620 20 11 38.5 770 770.00 300.00
5+640 20 11 38.5 770 770.00 300.00
5+660 20 10 32.5 650 650.00 272.00
5+680 20 9 27 540 540.00 244.00
5+700 20 8 22 440 440.00 216.00
5+720 20 9 27 540 540.00 244.00
5+740 20 6 13.5 270 270.00 160.00
5+760 20 9 27 540 540.00 244.00
5+780 20 6 13.5 270 270.00 160.00
5+800 20 5 10 200 200.00 132.00
5+820 20 5 10 200 200.00 132.00
5+840 20 6 13.5 270 270.00 160.00
5+860 15 5 10 150 150.00 99.00
6+200 15 5 10 150 150.00 99.00
6+220 20 6 13.5 270 270.00 160.00
6+240 20 7 17.5 350 350.00 188.00
6+260 15 4 7 105 105.00 78.00
6+600 10 4 7 70 70.00 52.00
6+960 15 4 7 105 105.00 78.00
6+980 20 8 22 440 440.00 216.00
7+000 15 5 10 150 150.00 99.00
7+720 15 4 7 105 105.00 78.00
7+740 20 5 10 200 200.00 132.00
7+760 20 6 13.5 270 270.00 160.00
7+780 20 4 7 140 140.00 104.00
7+800 20 4 7 140 140.00 104.00
7+820 20 5 10 200 200.00 132.00
7+840 15 6 13.5 202.5 202.50 120.00
11+240 15 3 4.5 67.5 67.50 57.00
11+260 20 6 13.5 270 270.00 160.00

201 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
11+280 20 8 22 440 440.00 216.00
11+300 20 8 22 440 440.00 216.00
11+320 15 9 27 405 405.00 183.00
11+500 10 3 4.5 45 45.00 38.00
15+720 15 4 7 105 105.00 78.00
15+740 20 4 7 140 140.00 104.00
15+760 20 5 10 200 200.00 132.00
15+780 20 5 10 200 200.00 132.00
15+800 20 5 10 200 200.00 132.00
15+820 20 6 13.5 270 270.00 160.00
15+840 20 7 17.5 350 350.00 188.00
15+860 20 6 13.5 270 270.00 160.00
15+880 20 5 10 200 200.00 132.00
15+900 20 4 7 140 140.00 104.00
15+920 20 4 7 140 140.00 104.00
15+940 20 5 10 200 200.00 132.00
15+960 20 5 10 200 200.00 132.00
15+980 20 5 10 200 200.00 132.00
16+000 20 6 13.5 270 270.00 160.00
16+020 20 4 7 140 140.00 104.00
16+040 20 5 10 200 200.00 132.00
16+060 15 5 10 150 150.00 99.00
16+260 15 6 13.5 202.5 202.50 120.00
16+280 20 6 13.5 270 270.00 160.00
16+300 15 6 13.5 202.5 202.50 120.00
16+840 15 7 17.5 262.5 262.50 141.00
16+860 20 5 10 200 200.00 132.00
16+880 20 7 17.5 350 350.00 188.00
16+900 20 8 22 440 440.00 216.00
16+920 20 8 22 440 440.00 216.00
16+940 20 5 10 200 200.00 132.00
16+960 20 6 13.5 270 270.00 160.00
16+980 20 4 7 140 140.00 104.00
17+000 20 5 10 200 200.00 132.00
17+020 20 5 10 200 200.00 132.00
17+040 20 8 22 440 440.00 216.00
17+060 20 9 27 540 540.00 244.00

202 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
17+080 20 7 17.5 350 350.00 188.00
17+100 20 8 22 440 440.00 216.00
17+120 20 7 17.5 350 350.00 188.00
17+140 20 8 22 440 440.00 216.00
17+160 20 8 22 440 440.00 216.00
17+180 15 8 22 330 330.00 162.00
17+220 15 8 22 330 330.00 162.00
17+240 20 8 22 440 440.00 216.00
17+260 20 8 22 440 440.00 216.00
17+280 20 6 13.5 270 270.00 160.00
17+300 20 6 13.5 270 270.00 160.00
17+320 20 9 27 540 540.00 244.00
17+340 20 9 27 540 540.00 244.00
17+360 20 5 10 200 200.00 132.00
17+380 15 7 17.5 262.5 262.50 141.00
17+460 10 3 4.5 45 45.00 38.00
18+020 15 6 13.5 202.5 202.50 120.00
18+040 15 6 13.5 202.5 202.50 120.00
18+080 15 4 7 105 105.00 78.00
18+100 20 8 22 440 440.00 216.00
18+120 15 6 13.5 202.5 202.50 120.00
18+300 15 4 7 105 105.00 78.00
18+320 20 10 32.5 650 650.00 272.00
18+340 20 9 27 540 540.00 244.00
18+360 20 7 17.5 350 350.00 188.00
18+380 15 5 10 150 150.00 99.00
18+440 15 4 7 105 105.00 78.00
18+460 20 6 13.5 270 270.00 160.00
18+480 20 10 32.5 650 650.00 272.00
18+500 15 9 27 405 405.00 183.00
18+560 15 9 27 405 405.00 183.00
18+580 20 9 27 540 540.00 244.00
18+600 20 6 13.5 270 270.00 160.00
18+620 15 4 7 105 105.00 78.00
18+920 15 10 32.5 487.5 487.50 204.00
18+940 20 6 13.5 270 270.00 160.00
18+960 20 5 10 200 200.00 132.00

203 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
18+980 15 4 7 105 105.00 78.00
19+040 15 3 4.5 67.5 67.50 57.00
19+060 20 5 10 200 200.00 132.00
19+080 15 5 10 150 150.00 99.00
19+120 10 4 7 70 70.00 52.00
19+160 10 6 13.5 135 135.00 80.00
19+200 10 5 10 100 100.00 66.00
19+620 15 4 7 105 105.00 78.00
19+640 15 4 7 105 105.00 78.00
19+860 15 4 7 105 105.00 78.00
19+880 15 3 4.5 67.5 67.50 57.00
20+660 10 6 13.5 135 135.00 80.00
21+360 15 9 27 405 405.00 183.00
21+380 20 10 32.5 650 650.00 272.00
21+400 20 9 27 540 540.00 244.00
21+420 20 9 27 540 540.00 244.00
21+440 20 7 17.5 350 350.00 188.00
21+460 20 7 17.5 350 350.00 188.00
21+480 20 8 22 440 440.00 216.00
21+500 15 3 4.5 67.5 67.50 57.00
21+760 15 5 10 150 150.00 99.00
21+780 20 13 52 1040 1040.00 356.00
21+800 20 12 45 900 900.00 328.00
21+820 20 11 38.5 770 770.00 300.00
21+840 20 14 59.5 1190 1190.00 384.00
21+860 20 14 59.5 1190 1190.00 384.00
21+880 20 10 32.5 650 650.00 272.00
21+900 20 10 32.5 650 650.00 272.00
21+920 15 8 22 330 330.00 162.00
21+960 10 4 7 70 70.00 52.00
22+000 15 6 13.5 202.5 202.50 120.00
22+020 20 6 13.5 270 7 17.5 350 620.00 348.00
22+040 20 4 7 140 8 22 440 580.00 320.00
22+060 20 10 32.5 650 650.00 272.00
22+080 20 15 67.5 1350 1350.00 412.00
22+100 20 13 52 1040 1040.00 356.00
22+120 20 12 45 900 900.00 328.00

204 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
22+140 15 11 38.5 577.5 577.50 225.00
22+240 15 10 32.5 487.5 9 27 405 892.50 387.00
22+260 20 13 52 1040 9 27 540 1580.00 600.00
22+280 20 13 52 1040 9 27 540 1580.00 600.00
22+300 20 13 52 1040 1040.00 356.00
22+320 20 13 52 1040 1040.00 356.00
22+340 20 14 59.5 1190 1190.00 384.00
22+360 20 15 67.5 1350 1350.00 412.00
22+380 20 15 67.5 1350 1350.00 412.00
22+400 20 13 52 1040 1040.00 356.00
22+420 20 14 59.5 1190 1190.00 384.00
22+440 20 14 59.5 1190 1190.00 384.00
22+460 15 13 52 780 780.00 267.00
22+560 10 6 13.5 135 135.00 80.00
22+680 15 13 52 780 780.00 267.00
22+700 20 13 52 1040 1040.00 356.00
22+720 20 11 38.5 770 770.00 300.00
22+740 15 10 32.5 487.5 487.50 204.00
22+820 15 5 10 150 150.00 99.00
22+840 20 11 38.5 770 770.00 300.00
22+860 20 15 67.5 1350 1350.00 412.00
22+880 20 15 67.5 1350 1350.00 412.00
22+900 20 13 52 1040 1040.00 356.00
22+920 20 12 45 900 900.00 328.00
22+940 15 10 32.5 487.5 487.50 204.00
26+120 15 3 4.5 67.5 67.50 57.00
26+140 20 3 4.5 90 90.00 76.00
26+160 20 4 7 140 140.00 104.00
26+180 20 7 17.5 350 350.00 188.00
26+200 20 10 32.5 650 650.00 272.00
26+220 20 10 32.5 650 650.00 272.00
26+240 20 11 38.5 770 770.00 300.00
26+260 20 10 32.5 650 650.00 272.00
26+280 15 9 27 405 405.00 183.00
26+640 15 3 4.5 67.5 67.50 57.00
26+660 20 4 7 140 140.00 104.00
26+680 15 9 27 405 405.00 183.00

205 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
26+740 15 9 27 405 405.00 183.00
26+760 15 4 7 105 105.00 78.00
26+860 15 5 10 150 150.00 99.00
26+880 15 6 13.5 202.5 202.50 120.00
26+940 15 4 7 105 105.00 78.00
26+960 20 7 17.5 350 350.00 188.00
26+980 15 8 22 330 330.00 162.00
27+140 15 3 4.5 67.5 67.50 57.00
27+160 20 8 22 440 440.00 216.00
27+180 15 3 4.5 67.5 67.50 57.00
27+340 15 3 4.5 67.5 67.50 57.00
27+360 15 4 7 105 105.00 78.00
28+560 15 3 4.5 67.5 67.50 57.00
28+580 20 4 7 140 140.00 104.00
28+600 20 5 10 200 200.00 132.00
28+620 20 7 17.5 350 350.00 188.00
28+640 20 10 32.5 650 650.00 272.00
28+660 20 10 32.5 650 650.00 272.00
28+680 20 9 27 540 540.00 244.00
28+700 20 10 32.5 650 650.00 272.00
28+720 20 10 32.5 650 650.00 272.00
28+740 20 11 38.5 770 770.00 300.00
28+760 15 10 32.5 487.5 487.50 204.00
29+940 15 5 10 150 150.00 99.00
29+960 20 5 10 200 200.00 132.00
29+980 20 5 10 200 200.00 132.00
30+000 20 8 22 440 440.00 216.00
30+020 15 10 32.5 487.5 487.50 204.00
30+140 15 3 4.5 67.5 67.50 57.00
30+160 20 3 4.5 90 90.00 76.00
30+180 20 3 4.5 90 90.00 76.00
30+200 20 4 7 140 140.00 104.00
30+220 20 8 22 440 440.00 216.00
30+240 20 8 22 440 440.00 216.00
30+260 20 8 22 440 440.00 216.00
30+280 20 5 10 200 200.00 132.00
30+300 20 7 17.5 350 350.00 188.00

206 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
30+320 20 6 13.5 270 270.00 160.00
30+340 20 6 13.5 270 270.00 160.00
30+360 20 9 27 540 540.00 244.00
30+380 20 8 22 440 440.00 216.00
30+400 20 7 17.5 350 350.00 188.00
30+420 20 7 17.5 350 350.00 188.00
30+440 15 6 13.5 202.5 202.50 120.00
30+820 15 6 13.5 202.5 202.50 120.00
30+840 20 3 4.5 90 90.00 76.00
30+860 20 7 17.5 350 350.00 188.00
30+880 15 3 4.5 67.5 67.50 57.00
31+060 15 3 4.5 67.5 67.50 57.00
31+080 15 5 10 150 150.00 99.00
31+140 10 4 7 70 70.00 52.00
31+180 15 7 17.5 262.5 262.50 141.00
31+200 20 6 13.5 270 270.00 160.00
31+220 20 5 10 200 200.00 132.00
31+240 15 3 4.5 67.5 67.50 57.00
31+580 15 5 10 150 150.00 99.00
31+600 20 6 13.5 270 270.00 160.00
31+620 20 8 22 440 440.00 216.00
31+640 20 9 27 540 540.00 244.00
31+660 20 9 27 540 540.00 244.00
31+680 20 6 13.5 270 270.00 160.00
31+700 20 8 22 440 440.00 216.00
31+720 20 9 27 540 540.00 244.00
31+740 20 10 32.5 650 650.00 272.00
31+760 15 11 38.5 577.5 577.50 225.00
31+980 15 0 5 10 150 150.00 99.00
32+000 20 0 8 22 440 440.00 216.00
32+020 20 0 4 7 140 140.00 104.00
32+040 20 0 5 10 200 200.00 132.00
32+060 20 0 6 13.5 270 270.00 160.00
32+080 20 0 10 32.5 650 650.00 272.00
32+100 20 0 12 45 900 900.00 328.00
32+120 15 0 12 45 675 675.00 246.00
32+320 15 5 10 150 150.00 99.00

207 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
32+340 20 6 13.5 270 270.00 160.00
32+360 20 6 13.5 270 270.00 160.00
32+380 20 12 45 900 900.00 328.00
32+400 20 13 52 1040 1040.00 356.00
32+420 20 14 59.5 1190 1190.00 384.00
32+440 20 12 45 900 900.00 328.00
32+460 20 13 52 1040 1040.00 356.00
32+480 20 9 27 540 540.00 244.00
32+500 20 7 17.5 350 350.00 188.00
32+520 20 8 22 440 440.00 216.00
32+540 20 10 32.5 650 650.00 272.00
32+560 20 10 32.5 650 650.00 272.00
32+580 20 12 45 900 900.00 328.00
32+600 20 10 32.5 650 650.00 272.00
32+620 15 6 13.5 202.5 202.50 120.00
34+140 15 3 4.5 67.5 67.50 57.00
34+160 20 4 7 140 140.00 104.00
34+180 20 3 4.5 90 90.00 76.00
34+200 15 3 4.5 67.5 67.50 57.00
36+660 15 5 10 150 150.00 99.00
36+680 20 4 7 140 140.00 104.00
36+700 15 4 7 105 105.00 78.00
36+780 15 4 7 105 105.00 78.00
36+800 20 6 13.5 270 270.00 160.00
36+820 20 6 13.5 270 270.00 160.00
36+840 20 3 4.5 90 90.00 76.00
36+860 15 3 4.5 67.5 67.50 57.00
36+920 15 3 4.5 67.5 67.50 57.00
36+940 20 4 7 140 140.00 104.00
36+960 20 3 4.5 90 90.00 76.00
36+980 20 8 22 440 440.00 216.00
37+000 15 6 13.5 202.5 202.50 120.00
37+580 15 4 7 105 105.00 78.00
37+600 20 5 10 200 200.00 132.00
37+620 20 8 22 440 440.00 216.00
37+640 20 3 4.5 90 90.00 76.00
37+660 20 11 38.5 770 770.00 300.00

208 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
37+680 20 5 10 200 200.00 132.00
37+700 15 6 13.5 202.5 202.50 120.00
37+940 10 8 22 220 220.00 108.00
38+120 15 3 4.5 67.5 67.50 57.00
38+140 20 4 7 140 140.00 104.00
38+160 20 3 4.5 90 90.00 76.00
38+180 15 3 4.5 67.5 67.50 57.00
38+280 10 3 4.5 45 45.00 38.00
38+420 15 7 17.5 262.5 262.50 141.00
38+440 20 10 32.5 650 650.00 272.00
38+460 20 11 38.5 770 770.00 300.00
38+480 20 5 10 200 200.00 132.00
38+500 20 5 10 200 200.00 132.00
38+520 15 3 4.5 67.5 67.50 57.00
38+560 15 3 4.5 67.5 67.50 57.00
38+580 15 5 10 150 150.00 99.00
38+660 10 3 4.5 45 45.00 38.00
38+740 15 5 10 150 150.00 99.00
38+760 20 3 4.5 90 90.00 76.00
38+780 20 3 4.5 90 90.00 76.00
38+800 15 3 4.5 67.5 67.50 57.00
38+960 15 6 13.5 202.5 202.50 120.00
38+980 20 6 13.5 270 270.00 160.00
39+000 20 5 10 200 200.00 132.00
39+020 20 5 10 200 200.00 132.00
39+040 20 7 17.5 350 350.00 188.00
39+060 20 6 13.5 270 270.00 160.00
39+080 20 6 13.5 270 270.00 160.00
39+100 20 4 7 140 140.00 104.00
39+120 15 3 4.5 67.5 67.50 57.00
39+920 15 6 13.5 202.5 202.50 120.00
39+940 20 14 59.5 1190 1190.00 384.00
39+960 20 11 38.5 770 770.00 300.00
39+980 20 7 17.5 350 350.00 188.00
40+000 20 9 27 540 540.00 244.00
40+020 20 7 17.5 350 350.00 188.00
40+040 15 4 7 105 105.00 78.00

209 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
40+200 15 6 13.5 202.5 202.50 120.00
40+220 20 9 27 540 540.00 244.00
40+240 20 9 27 540 540.00 244.00
40+260 20 9 27 540 540.00 244.00
40+280 20 8 22 440 440.00 216.00
40+300 20 7 17.5 350 350.00 188.00
40+320 20 5 10 200 200.00 132.00
40+340 20 6 13.5 270 270.00 160.00
40+360 20 6 13.5 270 270.00 160.00
40+380 20 7 17.5 350 350.00 188.00
40+400 20 6 13.5 270 270.00 160.00
40+420 20 8 22 440 440.00 216.00
40+440 20 7 17.5 350 350.00 188.00
40+460 15 6 13.5 202.5 202.50 120.00
40+580 15 5 10 150 150.00 99.00
40+600 20 7 17.5 350 350.00 188.00
40+620 20 4 7 140 140.00 104.00
40+640 20 3 4.5 90 90.00 76.00
40+660 20 4 7 140 140.00 104.00
40+680 15 4 7 105 105.00 78.00
41+620 15 7 17.5 262.5 262.50 141.00
41+640 20 6 13.5 270 270.00 160.00
41+660 20 7 17.5 350 350.00 188.00
41+680 20 5 10 200 200.00 132.00
41+700 15 3 4.5 67.5 67.50 57.00
42+320 15 7 17.5 262.5 262.50 141.00
42+340 20 7 17.5 350 350.00 188.00
42+360 20 9 27 540 540.00 244.00
42+380 20 8 22 440 440.00 216.00
42+400 20 5 10 200 200.00 132.00
42+420 15 3 4.5 67.5 67.50 57.00
43+000 15 3 4.5 67.5 67.50 57.00
43+020 20 4 7 140 140.00 104.00
43+040 20 3 4.5 90 90.00 76.00
43+060 20 4 7 140 140.00 104.00
43+080 20 10 32.5 650 650.00 272.00
43+100 20 9 27 0.00 244.00

210 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
43+120 20 8 22 440 440.00 216.00
43+140 15 7 17.5 262.5 262.50 141.00
43+180 15 4 7 105 105.00 78.00
43+200 20 4 7 140 140.00 104.00
43+220 15 4 7 105 105.00 78.00
43+520 15 6 13.5 202.5 202.50 120.00
43+540 20 7 17.5 350 350.00 188.00
43+560 20 7 17.5 350 350.00 188.00
43+580 20 7 17.5 350 350.00 188.00
43+600 20 6 13.5 270 270.00 160.00
43+620 20 5 10 200 200.00 132.00
43+640 20 5 10 200 200.00 132.00
43+660 20 4 7 140 140.00 104.00
43+680 20 6 13.5 270 270.00 160.00
43+700 20 4 7 140 140.00 104.00
43+720 20 3 4.5 90 90.00 76.00
43+740 20 4 7 140 140.00 104.00
43+760 20 4 7 140 140.00 104.00
43+780 15 4 7 105 105.00 78.00
43+900 10 6 13.5 135 135.00 80.00
44+640 15 6 13.5 202.5 202.50 120.00
44+660 20 9 27 540 540.00 244.00
44+680 20 9 27 540 540.00 244.00
44+700 20 8 22 440 440.00 216.00
44+720 20 8 22 440 440.00 216.00
44+740 20 8 22 440 440.00 216.00
44+760 20 9 27 540 540.00 244.00
44+780 20 9 27 540 540.00 244.00
44+800 20 8 22 440 440.00 216.00
44+820 20 4 7 140 140.00 104.00
44+840 20 4 7 140 140.00 104.00
44+860 20 4 7 140 140.00 104.00
44+880 20 4 7 140 140.00 104.00
44+900 20 7 17.5 350 350.00 188.00
44+920 20 8 22 440 440.00 216.00
44+940 20 11 38.5 770 770.00 300.00
44+960 20 5 10 200 200.00 132.00

211 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
44+980 20 4 7 140 140.00 104.00
45+000 15 4 7 105 105.00 78.00
45+400 15 4 7 105 105.00 78.00
45+420 20 5 10 200 200.00 132.00
45+440 20 10 32.5 650 650.00 272.00
45+460 20 8 22 440 440.00 216.00
45+480 20 8 22 440 440.00 216.00
45+500 20 9 27 540 540.00 244.00
45+520 20 5 10 200 200.00 132.00
45+540 20 3 4.5 90 90.00 76.00
45+560 20 3 4.5 90 90.00 76.00
45+580 20 4 7 140 140.00 104.00
45+600 20 7 17.5 350 350.00 188.00
45+620 20 9 27 540 540.00 244.00
45+640 20 7 17.5 350 350.00 188.00
45+660 15 5 10 150 150.00 99.00
47+340 15 6 13.5 202.5 202.50 120.00
47+360 20 8 22 440 440.00 216.00
47+380 20 7 17.5 350 350.00 188.00
47+400 20 7 17.5 350 350.00 188.00
47+420 20 3 4.5 90 90.00 76.00
47+440 15 3 4.5 67.5 67.50 57.00
48+540 15 5 10 150 150.00 99.00
48+560 20 5 10 200 200.00 132.00
48+580 15 9 27 405 405.00 183.00
48+620 10 5 10 100 100.00 66.00
48+940 15 3 4.5 67.5 67.50 57.00
48+960 20 6 13.5 270 270.00 160.00
48+980 20 8 22 440 440.00 216.00
49+000 20 9 27 540 540.00 244.00
49+020 20 9 27 540 540.00 244.00
49+040 20 12 45 900 900.00 328.00
49+060 15 7 17.5 262.5 262.50 141.00
50+040 15 4 7 105 105.00 78.00
50+060 20 4 7 140 140.00 104.00
50+080 20 4 7 140 140.00 104.00
50+100 20 4 7 140 140.00 104.00

212 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
50+120 20 9 27 540 540.00 244.00
50+140 20 10 32.5 650 650.00 272.00
50+160 20 10 32.5 650 650.00 272.00
50+180 20 8 22 440 440.00 216.00
50+200 15 8 22 330 330.00 162.00
50+260 15 8 22 330 330.00 162.00
50+280 20 11 38.5 770 770.00 300.00
50+300 20 8 22 440 440.00 216.00
50+320 20 5 10 200 200.00 132.00
50+340 20 6 13.5 270 270.00 160.00
50+360 20 8 22 440 440.00 216.00
50+380 15 11 38.5 577.5 577.50 225.00
50+740 15 4 7 105 105.00 78.00
50+760 20 3 4.5 90 90.00 76.00
50+780 20 3 4.5 90 90.00 76.00
50+800 20 4 7 140 140.00 104.00
50+820 20 5 10 200 200.00 132.00
50+840 20 6 13.5 270 270.00 160.00
50+860 20 9 27 540 540.00 244.00
50+880 20 8 22 440 440.00 216.00
50+900 20 5 10 200 200.00 132.00
50+920 20 5 10 200 200.00 132.00
50+940 15 4 7 105 105.00 78.00
56+560 15 3 4.5 67.5 67.50 57.00
56+580 15 5 10 150 150.00 99.00
59+160 15 4 7 105 105.00 78.00
59+180 20 4 7 140 140.00 104.00
59+200 20 4 7 140 140.00 104.00
59+220 20 4 7 140 140.00 104.00
59+240 20 3 4.5 90 90.00 76.00
59+260 20 3 4.5 90 90.00 76.00
59+280 20 7 17.5 350 350.00 188.00
59+300 20 6 13.5 270 270.00 160.00
59+320 20 3 4.5 90 90.00 76.00
59+340 20 6 13.5 270 270.00 160.00
59+360 20 6 13.5 270 270.00 160.00
59+380 20 6 13.5 270 270.00 160.00

213 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage
(m) (m3) m2)
Left side Right side

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
59+400 15 8 22 330 330.00 162.00
Total 0 0 0 0 0

214 of 664
NING WALL

Remarks

215 of 664
NING WALL

Remarks

216 of 664
NING WALL

Remarks

217 of 664
NING WALL

Remarks

218 of 664
NING WALL

Remarks

219 of 664
NING WALL

Remarks

220 of 664
NING WALL

Remarks

221 of 664
NING WALL

Remarks

222 of 664
NING WALL

Remarks

223 of 664
NING WALL

Remarks

224 of 664
NING WALL

Remarks

225 of 664
NING WALL

Remarks

226 of 664
NING WALL

Remarks

227 of 664
NING WALL

Remarks

228 of 664
NING WALL

Remarks

229 of 664
NING WALL

Remarks

230 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road
Planning Monitoring and Evaluation Unit

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)

0+080 7.00 - 6.00 13.50 94.50 94.50


0+560 10.00 - 5.00 10.00 100.00 100.00
0+580 10.00 - 3.00 4.50 45.00 45.00
0+680 10.00 6.00 13.50 135.00 - 135.00
0+700 20.00 5.00 10.00 200.00 - 200.00
0+720 20.00 3.00 4.50 90.00 - 90.00
0+740 20.00 3.00 4.50 90.00 - 90.00
0+760 20.00 3.00 4.50 90.00 - 90.00
0+780 10.00 3.00 4.50 45.00 - 45.00
1+200 10.00 - 3.00 4.50 45.00 45.00
1+220 20.00 - 3.00 4.50 90.00 90.00
1+240 20.00 - 3.00 4.50 90.00 90.00
1+260 20.00 - 5.00 10.00 200.00 200.00
1+280 20.00 - 3.00 4.50 90.00 90.00
1+300 10.00 - 4.00 7.00 70.00 70.00
1+380 10.00 - 6.00 13.50 135.00 135.00
1+400 10.00 - 3.00 4.50 45.00 45.00
1+460 7.00 3.00 4.50 31.50 - 31.50
2+820 10.00 - 5.00 10.00 100.00 100.00
2+840 20.00 - 4.00 7.00 140.00 140.00
2+860 10.00 - 8.00 22.00 220.00 220.00
2+940 10.00 - 5.00 10.00 100.00 100.00
2+960 10.00 - 5.00 10.00 100.00 100.00
3+440 7.00 3.00 4.50 31.50 - 31.50
4+000 10.00 - 4.00 7.00 70.00 70.00
4+020 20.00 - 5.00 10.00 200.00 200.00
4+040 20.00 - 4.00 7.00 140.00 140.00
4+060 20.00 - 4.00 7.00 140.00 140.00
4+080 20.00 - 5.00 10.00 200.00 200.00
4+100 20.00 - 5.00 10.00 200.00 200.00
4+120 20.00 - 6.00 13.50 270.00 270.00
4+140 10.00 - 4.00 7.00 70.00 70.00
4+180 10.00 - 5.00 10.00 100.00 100.00
4+200 10.00 - 4.00 7.00 70.00 70.00
5+260 10.00 - 3.00 4.50 45.00 45.00
5+280 20.00 - 4.00 7.00 140.00 140.00
5+300 20.00 - 4.00 7.00 140.00 140.00
5+320 20.00 - 5.00 10.00 200.00 200.00
5+340 10.00 - 5.00 10.00 100.00 100.00
5+400 10.00 - 4.00 7.00 70.00 70.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
5+420 10.00 - 6.00 13.50 135.00 135.00
5+520 7.00 - 6.00 13.50 94.50 94.50
5+580 10.00 - 5.00 10.00 100.00 100.00
5+600 10.00 - 4.00 7.00 70.00 70.00
5+640 10.00 - 4.00 7.00 70.00 70.00
5+660 20.00 - 6.00 13.50 270.00 270.00
5+680 20.00 - 8.00 22.00 440.00 440.00
5+700 20.00 - 9.00 27.00 540.00 540.00
5+720 20.00 - 10.00 32.50 650.00 650.00
5+740 20.00 - 4.00 7.00 140.00 140.00
5+760 20.00 - 8.00 22.00 440.00 440.00
5+780 20.00 - 8.00 22.00 440.00 440.00
5+800 20.00 - 6.00 13.50 270.00 270.00
5+820 20.00 - 6.00 13.50 270.00 270.00
5+840 20.00 - 7.00 17.50 350.00 350.00
5+860 20.00 - 6.00 13.50 270.00 270.00
5+880 20.00 - 4.00 7.00 140.00 140.00
5+900 20.00 - 5.00 10.00 200.00 200.00
5+920 10.00 - 4.00 7.00 70.00 70.00
6+020 10.00 - 8.00 22.00 220.00 220.00
6+040 10.00 - 5.00 10.00 100.00 100.00
6+160 10.00 - 7.00 17.50 175.00 175.00
6+180 20.00 - 9.00 27.00 540.00 540.00
6+200 20.00 - 5.00 10.00 200.00 200.00
6+220 10.00 - 5.00 10.00 100.00 100.00
6+260 10.00 - 4.00 7.00 70.00 70.00
6+280 20.00 - 4.00 7.00 140.00 140.00
6+300 20.00 - 4.00 7.00 140.00 140.00
6+320 20.00 - 6.00 13.50 270.00 270.00
6+340 20.00 - 10.00 32.50 650.00 650.00
6+360 20.00 - 10.00 32.50 650.00 650.00
6+380 20.00 - 10.00 32.50 650.00 650.00
6+400 20.00 - 10.00 32.50 650.00 650.00
6+420 20.00 - 10.00 32.50 650.00 650.00
6+440 20.00 - 10.00 32.50 650.00 650.00
6+460 20.00 - 10.00 32.50 650.00 650.00
6+480 20.00 10.00 32.50 650.00 9.00 27.00 540.00 1,190.00
6+500 20.00 8.00 22.00 440.00 - 440.00
6+520 20.00 9.00 27.00 540.00 - 540.00
6+540 20.00 10.00 32.50 650.00 - 650.00
6+560 10.00 5.00 10.00 100.00 - 100.00
6+620 10.00 4.00 7.00 70.00 - 70.00
6+640 10.00 6.00 13.50 135.00 - 135.00
13+820 10.00 - 7.00 17.50 175.00 175.00
13+840 20.00 - 9.00 27.00 540.00 540.00
13+860 20.00 - 8.00 22.00 440.00 440.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
13+880 10.00 - 6.00 13.50 135.00 135.00
13+940 10.00 - 8.00 22.00 220.00 220.00
13+960 20.00 - 8.00 22.00 440.00 440.00
13+980 10.00 - 6.00 13.50 135.00 135.00
14+140 10.00 - 4.00 7.00 70.00 70.00
14+160 20.00 - 6.00 13.50 270.00 270.00
14+180 20.00 - 10.00 32.50 650.00 650.00
14+200 20.00 - 8.00 22.00 440.00 440.00
14+220 20.00 - 7.00 17.50 350.00 350.00
14+240 20.00 - 6.00 13.50 270.00 270.00
14+260 20.00 - 8.00 22.00 440.00 440.00
14+280 20.00 - 4.00 7.00 140.00 140.00
14+300 20.00 - 10.00 32.50 650.00 650.00
14+320 20.00 - 10.00 32.50 650.00 650.00
14+340 20.00 - 7.00 17.50 350.00 350.00
14+360 10.00 - 6.00 13.50 135.00 135.00
14+440 7.00 - 6.00 13.50 94.50 94.50
14+640 10.00 - 6.00 13.50 135.00 135.00
14+660 20.00 - 6.00 13.50 270.00 270.00
14+680 20.00 - 6.00 13.50 270.00 270.00
14+700 20.00 - 6.00 13.50 270.00 270.00
14+720 20.00 - 4.00 7.00 140.00 140.00
14+740 20.00 - 4.00 7.00 140.00 140.00
14+760 20.00 - 4.00 7.00 140.00 140.00
14+780 10.00 - 7.00 17.50 175.00 175.00
14+860 10.00 - 4.00 7.00 70.00 70.00
14+880 20.00 - 6.00 13.50 270.00 270.00
14+900 20.00 - 4.00 7.00 140.00 140.00
14+920 20.00 - 3.00 4.50 90.00 90.00
14+940 20.00 - 4.00 7.00 140.00 140.00
14+960 10.00 - 4.00 7.00 70.00 70.00
15+020 10.00 - 3.00 4.50 45.00 45.00
15+040 20.00 - 4.00 7.00 140.00 140.00
15+060 10.00 - 3.00 4.50 45.00 45.00
15+120 10.00 - 4.00 7.00 70.00 70.00
15+140 10.00 - 4.00 7.00 70.00 70.00
15+200 10.00 - 3.00 4.50 45.00 45.00
15+220 10.00 - 3.00 4.50 45.00 45.00
15+280 10.00 - 4.00 7.00 70.00 70.00
15+300 20.00 - 4.00 7.00 140.00 140.00
15+320 10.00 - 3.00 4.50 45.00 45.00
15+380 10.00 - 3.00 4.50 45.00 45.00
15+400 20.00 - 4.00 7.00 140.00 140.00
15+420 20.00 - 3.00 4.50 90.00 90.00
15+440 20.00 - 4.00 7.00 140.00 140.00
15+460 20.00 - 5.00 10.00 200.00 200.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
15+480 20.00 - 4.00 7.00 140.00 140.00
15+500 10.00 - 4.00 7.00 70.00 70.00
15+540 7.00 - 3.00 4.50 31.50 31.50
15+660 10.00 - 4.00 7.00 70.00 70.00
15+680 20.00 - 3.00 4.50 90.00 90.00
15+700 20.00 - 4.00 7.00 140.00 140.00
15+720 20.00 - 3.00 4.50 90.00 90.00
15+740 20.00 - 3.00 4.50 90.00 90.00
15+760 20.00 - 4.00 7.00 140.00 140.00
15+780 20.00 - 4.00 7.00 140.00 140.00
15+800 20.00 - 3.00 4.50 90.00 90.00
15+820 10.00 - 3.00 4.50 45.00 45.00
15+860 10.00 - 5.00 10.00 100.00 100.00
15+880 20.00 - 3.00 4.50 90.00 90.00
15+900 20.00 - 3.00 4.50 90.00 90.00
15+920 20.00 - 3.00 4.50 90.00 90.00
15+940 20.00 - 5.00 10.00 200.00 200.00
15+960 20.00 - 9.00 27.00 540.00 540.00
15+980 20.00 - 9.00 27.00 540.00 540.00
16+000 20.00 - 5.00 10.00 200.00 200.00
16+020 20.00 - 6.00 13.50 270.00 270.00
16+040 20.00 - 7.00 17.50 350.00 350.00
16+060 20.00 - 5.00 10.00 200.00 200.00
16+080 20.00 - 5.00 10.00 200.00 200.00
16+100 20.00 - 6.00 13.50 270.00 270.00
16+120 20.00 - 7.00 17.50 350.00 350.00
16+140 20.00 - 10.00 32.50 650.00 650.00
16+160 20.00 - 10.00 32.50 650.00 650.00
16+180 10.00 - 10.00 32.50 325.00 325.00
16+240 10.00 5.00 10.00 100.00 - 100.00
16+260 20.00 5.00 10.00 200.00 - 200.00
16+280 20.00 9.00 27.00 540.00 - 540.00
16+300 20.00 9.00 27.00 540.00 - 540.00
16+320 20.00 7.00 17.50 350.00 - 350.00
16+340 20.00 5.00 10.00 200.00 - 200.00
16+360 20.00 8.00 22.00 440.00 - 440.00
16+380 10.00 9.00 27.00 270.00 - 270.00
16+820 10.00 - 4.00 7.00 70.00 70.00
16+840 10.00 - 3.00 4.50 45.00 45.00
16+880 10.00 - 7.00 17.50 175.00 175.00
16+900 20.00 - 7.00 17.50 350.00 350.00
16+920 20.00 - 6.00 13.50 270.00 270.00
16+940 20.00 - 8.00 22.00 440.00 440.00
16+960 20.00 - 6.00 13.50 270.00 270.00
16+980 20.00 - 7.00 17.50 350.00 350.00
17+000 20.00 - 6.00 13.50 270.00 270.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
17+020 20.00 - 7.00 17.50 350.00 350.00
17+040 20.00 - 7.00 17.50 350.00 350.00
17+060 20.00 - 6.00 13.50 270.00 270.00
17+080 20.00 - 8.00 22.00 440.00 440.00
17+100 20.00 - 9.00 27.00 540.00 540.00
17+120 20.00 - 8.00 22.00 440.00 440.00
17+140 10.00 - 8.00 22.00 220.00 220.00
17+180 10.00 - 4.00 7.00 70.00 70.00
17+200 10.00 - 5.00 10.00 100.00 100.00
17+380 10.00 - 5.00 10.00 100.00 100.00
17+400 20.00 - 4.00 7.00 140.00 140.00
17+420 10.00 - 6.00 13.50 135.00 135.00
17+480 10.00 - 9.00 27.00 270.00 270.00
17+500 10.00 - 10.00 32.50 325.00 325.00
17+800 7.00 - 3.00 4.50 31.50 31.50
17+840 10.00 - 6.00 13.50 135.00 135.00
17+860 10.00 - 6.00 13.50 135.00 135.00
17+920 10.00 - 5.00 10.00 100.00 100.00
17+940 20.00 - 5.00 10.00 200.00 200.00
17+960 10.00 - 4.00 7.00 70.00 70.00
18+020 10.00 - 7.00 17.50 175.00 175.00
18+040 10.00 - 9.00 27.00 270.00 270.00
18+080 10.00 - 6.00 13.50 135.00 135.00
18+100 10.00 - 5.00 10.00 100.00 100.00
18+180 10.00 - 6.00 13.50 135.00 135.00
18+200 20.00 - 6.00 13.50 270.00 270.00
18+220 20.00 - 5.00 10.00 200.00 200.00
18+240 10.00 - 6.00 13.50 135.00 135.00
18+300 10.00 - 8.00 22.00 220.00 220.00
18+320 20.00 - 9.00 27.00 540.00 540.00
18+340 20.00 - 9.00 27.00 540.00 540.00
18+360 20.00 - 7.00 17.50 350.00 350.00
18+380 20.00 - 6.00 13.50 270.00 270.00
18+400 20.00 - 7.00 17.50 350.00 350.00
18+420 10.00 - 8.00 22.00 220.00 220.00
18+460 10.00 - 10.00 32.50 325.00 325.00
18+480 10.00 - 9.00 27.00 270.00 270.00
18+660 10.00 - 5.00 10.00 100.00 100.00
18+680 20.00 - 6.00 13.50 270.00 270.00
18+700 20.00 - 5.00 10.00 200.00 200.00
18+720 20.00 - 5.00 10.00 200.00 200.00
18+740 20.00 - 6.00 13.50 270.00 270.00
18+760 20.00 - 6.00 13.50 270.00 270.00
18+780 20.00 - 7.00 17.50 350.00 350.00
18+800 10.00 - 6.00 13.50 135.00 135.00
18+900 10.00 - 4.00 7.00 70.00 70.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
18+920 20.00 - 5.00 10.00 200.00 200.00
18+940 20.00 - 6.00 13.50 270.00 270.00
18+960 20.00 - 6.00 13.50 270.00 270.00
18+980 10.00 - 3.00 4.50 45.00 45.00
19+040 7.00 - 3.00 4.50 31.50 31.50
19+160 10.00 - 8.00 22.00 220.00 220.00
19+180 20.00 - 10.00 32.50 650.00 650.00
19+200 20.00 - 7.00 17.50 350.00 350.00
19+220 20.00 - 6.00 13.50 270.00 270.00
19+240 20.00 - 6.00 13.50 270.00 270.00
19+260 20.00 - 6.00 13.50 270.00 270.00
19+280 20.00 - 6.00 13.50 270.00 270.00
19+300 20.00 - 7.00 17.50 350.00 350.00
19+320 20.00 - 8.00 22.00 440.00 440.00
19+340 20.00 - 7.00 17.50 350.00 350.00
19+360 20.00 - 8.00 22.00 440.00 440.00
19+380 20.00 - 6.00 13.50 270.00 270.00
19+400 20.00 - 5.00 10.00 200.00 200.00
19+420 20.00 - 5.00 10.00 200.00 200.00
19+440 20.00 - 5.00 10.00 200.00 200.00
19+460 20.00 - 7.00 17.50 350.00 350.00
19+480 20.00 - 8.00 22.00 440.00 440.00
19+500 20.00 - 6.00 13.50 270.00 270.00
19+520 20.00 - 4.00 7.00 140.00 140.00
19+540 10.00 - 4.00 7.00 70.00 70.00
19+620 10.00 - 3.00 4.50 45.00 45.00
19+640 20.00 - 3.00 4.50 90.00 90.00
19+660 10.00 - 3.00 4.50 45.00 45.00
19+900 7.00 - 3.00 4.50 31.50 31.50
19+940 7.00 - 3.00 4.50 31.50 31.50
20+060 7.00 - 6.00 13.50 94.50 94.50
20+120 7.00 - 3.00 4.50 31.50 31.50
20+320 10.00 - 6.00 13.50 135.00 135.00
20+340 10.00 - 3.00 4.50 45.00 45.00
20+420 7.00 - 5.00 10.00 70.00 70.00
20+500 10.00 - 5.00 10.00 100.00 100.00
20+520 20.00 - 4.00 7.00 140.00 140.00
20+540 20.00 - 8.00 22.00 440.00 440.00
20+560 10.00 - 6.00 13.50 135.00 135.00
20+620 10.00 - 6.00 13.50 135.00 135.00
20+640 20.00 - 5.00 10.00 200.00 200.00
20+660 20.00 - 5.00 10.00 200.00 200.00
20+680 20.00 - 9.00 27.00 540.00 540.00
20+700 20.00 - 9.00 27.00 540.00 540.00
20+720 20.00 - 7.00 17.50 350.00 350.00
20+740 20.00 - 8.00 22.00 440.00 440.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
20+760 20.00 - 8.00 22.00 440.00 440.00
20+780 20.00 - 6.00 13.50 270.00 270.00
20+800 20.00 - 7.00 17.50 350.00 350.00
20+820 20.00 - 9.00 27.00 540.00 540.00
20+840 20.00 - 10.00 32.50 650.00 650.00
20+860 20.00 - 10.00 32.50 650.00 650.00
20+880 20.00 - 10.00 32.50 650.00 650.00
20+900 20.00 - 10.00 32.50 650.00 650.00
20+920 20.00 - 10.00 32.50 650.00 650.00
20+940 20.00 - 10.00 32.50 650.00 650.00
20+960 20.00 - 10.00 32.50 650.00 650.00
20+980 20.00 - 10.00 32.50 650.00 650.00
21+000 20.00 - 4.00 7.00 140.00 140.00
21+020 20.00 - 5.00 10.00 200.00 200.00
21+040 20.00 - 6.00 13.50 270.00 270.00
21+060 20.00 - 5.00 10.00 200.00 200.00
21+080 20.00 - 5.00 10.00 200.00 200.00
21+100 20.00 - 7.00 17.50 350.00 350.00
21+120 10.00 - 4.00 7.00 70.00 70.00
21+160 7.00 - 5.00 10.00 70.00 70.00
21+200 10.00 - 7.00 17.50 175.00 175.00
21+220 20.00 - 7.00 17.50 350.00 350.00
21+240 20.00 - 9.00 27.00 540.00 540.00
21+260 10.00 - 5.00 10.00 100.00 100.00
21+420 10.00 4.00 7.00 70.00 - 70.00
21+440 20.00 8.00 22.00 440.00 - 440.00
21+460 20.00 8.00 22.00 440.00 - 440.00
21+480 20.00 7.00 17.50 350.00 - 350.00
21+500 20.00 9.00 27.00 540.00 - 540.00
21+520 20.00 8.00 22.00 440.00 - 440.00
21+540 10.00 5.00 10.00 100.00 - 100.00
21+820 10.00 - 5.00 10.00 100.00 100.00
21+840 20.00 - 7.00 17.50 350.00 350.00
21+860 20.00 - 9.00 27.00 540.00 540.00
21+880 20.00 - 10.00 32.50 650.00 650.00
21+900 20.00 - 10.00 32.50 650.00 650.00
21+920 20.00 - 7.00 17.50 350.00 350.00
21+940 10.00 - 5.00 10.00 100.00 100.00
22+080 10.00 8.00 22.00 220.00 - 220.00
22+100 20.00 9.00 27.00 540.00 - 540.00
22+120 20.00 9.00 27.00 540.00 - 540.00
22+140 20.00 9.00 27.00 540.00 - 540.00
22+160 10.00 7.00 17.50 175.00 - 175.00
22+260 10.00 - 7.00 17.50 175.00 175.00
22+280 20.00 - 7.00 17.50 350.00 350.00
22+300 20.00 - 6.00 13.50 270.00 270.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
22+320 20.00 - 7.00 17.50 350.00 350.00
22+340 20.00 - 5.00 10.00 200.00 200.00
22+360 10.00 - 4.00 7.00 70.00 70.00
22+520 10.00 5.00 10.00 100.00 - 100.00
22+540 20.00 7.00 17.50 350.00 - 350.00
22+560 10.00 10.00 32.50 325.00 - 325.00
22+700 10.00 - 5.00 10.00 100.00 100.00
22+720 20.00 - 5.00 10.00 200.00 200.00
22+740 20.00 - 7.00 17.50 350.00 350.00
22+760 20.00 - 10.00 32.50 650.00 650.00
22+780 20.00 - 10.00 32.50 650.00 650.00
22+800 10.00 - 10.00 32.50 325.00 325.00
23+300 10.00 - 4.00 7.00 70.00 70.00
23+320 20.00 - 6.00 13.50 270.00 270.00
23+340 20.00 - 8.00 22.00 440.00 440.00
23+360 20.00 - 6.00 13.50 270.00 270.00
23+380 10.00 - 6.00 13.50 135.00 135.00
23+440 10.00 - 6.00 13.50 135.00 135.00
23+460 20.00 - 10.00 32.50 650.00 650.00
23+480 10.00 - 10.00 32.50 325.00 325.00
23+700 10.00 - 4.00 7.00 70.00 70.00
23+720 10.00 - 4.00 7.00 70.00 70.00
23+800 10.00 - 6.00 13.50 135.00 135.00
23+820 20.00 - 6.00 13.50 270.00 270.00
23+840 20.00 - 4.00 7.00 140.00 140.00
23+860 20.00 - 4.00 7.00 140.00 140.00
23+880 20.00 - 4.00 7.00 140.00 140.00
23+900 20.00 - 8.00 22.00 440.00 440.00
23+920 20.00 - 9.00 27.00 540.00 540.00
23+940 10.00 - 7.00 17.50 175.00 175.00
24+000 10.00 - 6.00 13.50 135.00 135.00
24+020 10.00 - 6.00 13.50 135.00 135.00
24+140 10.00 - 3.00 4.50 45.00 45.00
24+160 10.00 - 3.00 4.50 45.00 45.00
24+880 10.00 - 6.00 13.50 135.00 135.00
24+900 20.00 - 9.00 27.00 540.00 540.00
24+920 10.00 - 8.00 22.00 220.00 220.00
25+040 10.00 - 5.00 10.00 100.00 100.00
25+060 20.00 - 6.00 13.50 270.00 270.00
25+080 20.00 - 3.00 4.50 90.00 90.00
25+100 10.00 - 6.00 13.50 135.00 135.00
25+200 7.00 - 5.00 10.00 70.00 70.00
26+480 7.00 5.00 10.00 70.00 - 70.00
27+000 10.00 3.00 4.50 45.00 - 45.00
27+020 10.00 3.00 4.50 45.00 - 45.00
27+080 10.00 3.00 4.50 45.00 - 45.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right
Ch. Length (m) Total Vol (m3)
Height Area Height Area
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
27+100 20.00 5.00 10.00 200.00 - 200.00
27+120 20.00 5.00 10.00 200.00 - 200.00
27+140 10.00 5.00 10.00 100.00 - 100.00
27+260 7.00 5.00 10.00 70.00 - 70.00
27+320 10.00 3.00 4.50 45.00 - 45.00
27+340 20.00 3.00 4.50 90.00 - 90.00
27+360 20.00 3.00 4.50 90.00 - 90.00
27+380 10.00 5.00 10.00 100.00 - 100.00
27+460 10.00 4.00 7.00 70.00 - 70.00
27+480 10.00 4.00 7.00 70.00 - 70.00
27+520 10.00 6.00 13.50 135.00 - 135.00
27+540 20.00 3.00 4.50 90.00 - 90.00
27+560 20.00 4.00 7.00 140.00 - 140.00
27+580 20.00 5.00 10.00 200.00 - 200.00
27+600 10.00 8.00 22.00 220.00 - 220.00
27+620 10.00 4.00 7.00 70.00 - 70.00

Total 5,969.00 13,203.00 78,257.00 91,460.00


Geotextile
Remarks
m2

53.20
62.00
34.00
76.00
124.00
68.00
68.00
68.00
34.00
34.00
68.00
68.00
124.00
68.00
48.00
76.00
34.00
23.80
62.00
96.00
104.00
62.00
62.00
23.80
48.00
124.00
96.00
96.00
124.00
124.00
152.00
48.00
62.00
48.00
34.00
96.00
96.00
124.00
62.00
48.00
Geotextile
Remarks
m2

76.00
53.20
62.00
48.00
48.00
152.00
208.00
236.00
264.00
96.00
208.00
208.00
152.00
152.00
180.00
152.00
96.00
124.00
48.00
104.00
62.00
90.00
236.00
124.00
62.00
48.00
96.00
96.00
152.00
264.00
264.00
264.00
264.00
264.00
264.00
264.00
516.00
208.00
236.00
264.00
62.00
48.00
76.00
90.00
236.00
208.00
Geotextile
Remarks
m2

76.00
104.00
208.00
76.00
48.00
152.00
264.00
208.00
180.00
152.00
208.00
96.00
264.00
264.00
180.00
76.00
53.20
76.00
152.00
152.00
152.00
96.00
96.00
96.00
90.00
48.00
152.00
96.00
68.00
96.00
48.00
34.00
96.00
34.00
48.00
48.00
34.00
34.00
48.00
96.00
34.00
34.00
96.00
68.00
96.00
124.00
Geotextile
Remarks
m2

96.00
48.00
23.80
48.00
68.00
96.00
68.00
68.00
96.00
96.00
68.00
34.00
62.00
68.00
68.00
68.00
124.00
236.00
236.00
124.00
152.00
180.00
124.00
124.00
152.00
180.00
264.00
264.00
132.00
62.00
124.00
236.00
236.00
180.00
124.00
208.00
118.00
48.00
34.00
90.00
180.00
152.00
208.00
152.00
180.00
152.00
Geotextile
Remarks
m2

180.00
180.00
152.00
208.00
236.00
208.00
104.00
48.00
62.00
62.00
96.00
76.00
118.00
132.00
23.80
76.00
76.00
62.00
124.00
48.00
90.00
118.00
76.00
62.00
76.00
152.00
124.00
76.00
104.00
236.00
236.00
180.00
152.00
180.00
104.00
132.00
118.00
62.00
152.00
124.00
124.00
152.00
152.00
180.00
76.00
48.00
Geotextile
Remarks
m2

124.00
152.00
152.00
34.00
23.80
104.00
264.00
180.00
152.00
152.00
152.00
152.00
180.00
208.00
180.00
208.00
152.00
124.00
124.00
124.00
180.00
208.00
152.00
96.00
48.00
34.00
68.00
34.00
23.80
23.80
53.20
23.80
76.00
34.00
43.40
62.00
96.00
208.00
76.00
76.00
124.00
124.00
236.00
236.00
180.00
208.00
Geotextile
Remarks
m2

208.00
152.00
180.00
236.00
264.00
264.00
264.00
264.00
264.00
264.00
264.00
264.00
96.00
124.00
152.00
124.00
124.00
180.00
48.00
43.40
90.00
180.00
236.00
62.00
48.00
208.00
208.00
180.00
236.00
208.00
62.00
62.00
180.00
236.00
264.00
264.00
180.00
62.00
104.00
236.00
236.00
236.00
90.00
90.00
180.00
152.00
Geotextile
Remarks
m2

180.00
124.00
48.00
62.00
180.00
132.00
62.00
124.00
180.00
264.00
264.00
132.00
48.00
152.00
208.00
152.00
76.00
76.00
264.00
132.00
48.00
48.00
76.00
152.00
96.00
96.00
96.00
208.00
236.00
90.00
76.00
76.00
34.00
34.00
76.00
236.00
104.00
62.00
152.00
68.00
76.00
43.40
43.40
34.00
34.00
34.00
Geotextile
Remarks
m2

124.00
124.00
62.00
43.40
34.00
68.00
68.00
62.00
48.00
48.00
76.00
68.00
96.00
124.00
104.00
48.00

46,830.20
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

Masonry Retaining Structure Quantity Calculation


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

0.25m thk.

Remarks
Left side Right side Volume of
Total Granular Geotextile
Length (m) PCC for
Volume (m3) Filter material (m2)
the base
Height Volume (m3) Height Area(m2) Volume (m3) (m3)
Area(m2)

0+440 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87


0+460 10.00 - - 2.25 2.144 21.44 21.44 1.35 5.93 2.13
0+500 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
0+520 20.00 - - 2.00 1.751 35.02 35.02 2.40 10.40 3.74
0+540 10.00 - - 3.00 3.554 35.54 35.54 1.80 8.10 2.92
1+500 7.00 2.50 2.575 18.03 - - 18.03 1.05 4.66 1.68
2+440 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
2+460 20.00 2.50 2.575 51.50 - - 51.50 3.00 13.30 4.79
2+480 10.00 2.50 2.575 25.75 - - 25.75 1.50 6.65 2.39
2+620 10.00 - - 2.50 2.575 25.75 25.75 1.50 6.65 2.39
2+640 10.00 - - 3.50 4.687 46.87 46.87 2.10 9.58 3.45
2+740 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
2+760 20.00 - - 3.00 3.554 71.07 71.07 3.60 16.20 5.83
2+780 20.00 - - 2.00 1.751 35.02 35.02 2.40 10.40 3.74
2+800 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
3+280 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
3+300 20.00 3.25 4.101 82.01 - - 82.01 3.90 17.70 6.37
3+320 20.00 2.75 3.045 60.90 - - 60.90 3.30 14.75 5.31
3+340 20.00 2.00 1.751 35.02 - - 35.02 2.40 10.40 3.74
3+360 20.00 3.50 4.687 93.73 - - 93.73 4.20 19.15 6.89
3+380 20.00 1.75 1.397 27.94 - - 27.94 2.10 9.00 3.24

249 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

0.25m thk.

Remarks
Left side Right side Volume of
Total Granular Geotextile
Length (m) PCC for
Volume (m3) Filter material (m2)
the base
Height Volume (m3) Height Area(m2) Volume (m3) (m3)
Area(m2)

3+400 10.00 3.00 3.554 35.54 - - 35.54 1.80 8.10 2.92


3+460 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
3+600 7.00 1.50 1.082 7.57 - - 7.57 0.63 2.66 0.96
5+000 7.00 - - 2.00 1.751 12.26 12.26 0.84 3.64 1.31
5+240 7.00 - - 1.50 1.082 7.57 7.57 0.63 2.66 0.96
5+360 7.00 - - 2.00 1.751 12.26 12.26 0.84 3.64 1.31
5+440 10.00 - - 1.25 0.805 8.05 8.05 0.75 3.13 1.13
5+460 10.00 - - 2.50 2.575 25.75 25.75 1.50 6.65 2.39
5+500 7.00 - - 1.25 0.805 5.63 5.63 0.53 2.19 0.79
5+560 7.00 - - 2.25 2.144 15.01 15.01 0.95 4.15 1.49
5+940 10.00 - - 1.00 0.567 5.67 5.67 0.60 2.50 0.90
5+960 10.00 - - 2.75 3.045 30.45 30.45 1.65 7.38 2.66
6+000 7.00 - - 3.20 3.988 27.92 27.92 1.34 6.09 2.19
6+060 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
6+080 20.00 - - 3.00 3.554 71.07 71.07 3.60 16.20 5.83
6+100 20.00 - - 1.50 1.082 21.63 21.63 1.80 7.60 2.74
6+120 20.00 - - 3.00 3.554 71.07 71.07 3.60 16.20 5.83
6+140 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
6+240 7.00 - - 1.75 1.397 9.78 9.78 0.74 3.15 1.13
6+660 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
6+740 7.00 - - 2.50 2.575 18.03 18.03 1.05 4.66 1.68
6+800 7.00 - - 1.25 0.805 5.63 5.63 0.53 2.19 0.79
13+900 7.00 - - 2.75 3.045 21.31 21.31 1.16 5.16 1.86
14+100 10.00 - - 1.50 1.082 10.82 10.82 0.90 3.80 1.37
14+120 10.00 - - 1.5 1.082 10.82 10.82 0.90 3.80 1.37
14+380 7.00 - - 3.0 3.554 24.87 24.87 1.26 5.67 2.04
14+420 7.00 - - 1.8 1.397 9.78 9.78 0.76 3.26 1.17
14+460 10.00 - - 2.8 3.045 30.45 30.45 1.68 7.53 2.71

250 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

0.25m thk.

Remarks
Left side Right side Volume of
Total Granular Geotextile
Length (m) PCC for
Volume (m3) Filter material (m2)
the base
Height Volume (m3) Height Area(m2) Volume (m3) (m3)
Area(m2)

14+480 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87


14+800 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
14+840 7.00 - - 1.5 1.082 7.57 7.57 0.63 2.66 0.96
15+080 10.00 - - 2.8 3.045 30.45 30.45 1.68 7.53 2.71
15+100 10.00 - - 1.8 1.397 13.97 13.97 1.08 4.65 1.67
15+160 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
15+240 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
15+260 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
15+340 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
15+360 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
15+520 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
15+560 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
15+640 7.00 - - 3.0 3.554 24.87 24.87 1.26 5.67 2.04
15+840 7.00 - - 1.8 1.397 9.78 9.78 0.76 3.26 1.17
16+200 7.00 1.50 1.082 7.57 - - 7.57 0.63 2.66 0.96
17+160 7.00 - - 3.3 4.101 28.70 28.70 1.39 6.30 2.27
17+260 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
17+280 10.00 - - 3.5 4.687 46.87 46.87 2.10 9.58 3.45
17+520 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
17+700 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
17+720 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39
17+780 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
17+880 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
17+980 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
18+060 7.00 - - 3.0 3.554 24.87 24.87 1.26 5.67 2.04
18+120 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
18+140 20.00 - - 1.0 0.567 11.33 11.33 1.20 5.00 1.80
18+160 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39

251 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

0.25m thk.

Remarks
Left side Right side Volume of
Total Granular Geotextile
Length (m) PCC for
Volume (m3) Filter material (m2)
the base
Height Volume (m3) Height Area(m2) Volume (m3) (m3)
Area(m2)

18+260 10.00 - - 2.8 3.045 30.45 30.45 1.68 7.53 2.71


18+280 10.00 - - 3.3 4.101 41.01 41.01 1.98 9.00 3.24
18+440 7.00 - - 1.5 1.082 7.57 7.57 0.63 2.66 0.96
18+560 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
18+580 10.00 - - 1.5 1.082 10.82 10.82 0.90 3.80 1.37
18+880 7.00 - - 1.0 0.567 3.97 3.97 0.42 1.75 0.63
19+560 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
19+580 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
20+080 10.00 - - 1.5 1.082 10.82 10.82 0.90 3.80 1.37
20+100 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
20+220 10.00 - - 2.8 3.045 30.45 30.45 1.68 7.53 2.71
20+240 20.00 - - 2.0 1.751 35.02 35.02 2.40 10.40 3.74
20+260 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
20+300 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
20+360 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
20+400 7.00 - - 3.0 3.554 24.87 24.87 1.26 5.67 2.04
20+480 7.00 - - 3.0 3.554 24.87 24.87 1.26 5.67 2.04
21+140 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
21+180 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
22+060 7.00 2.50 2.575 18.03 - - 18.03 1.05 4.66 1.68
22+240 7.00 - - 2.8 3.045 21.31 21.31 1.18 5.27 1.90
22+580 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
23+400 10.00 - - 2.8 3.045 30.45 30.45 1.68 7.53 2.71
23+420 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
23+500 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
23+740 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39
23+760 20.00 - - 2.5 2.575 51.50 51.50 3.00 13.30 4.79
23+780 10.00 - - 3.5 4.687 46.87 46.87 2.10 9.58 3.45

252 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

0.25m thk.

Remarks
Left side Right side Volume of
Total Granular Geotextile
Length (m) PCC for
Volume (m3) Filter material (m2)
the base
Height Volume (m3) Height Area(m2) Volume (m3) (m3)
Area(m2)

23+980 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31


24+360 7.00 3.00 3.554 24.87 - - 24.87 1.26 5.67 2.04
24+460 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
24+480 20.00 3.00 3.554 71.07 - - 71.07 3.60 16.20 5.83
24+500 20.00 2.50 2.575 51.50 - - 51.50 3.00 13.30 4.79
24+520 20.00 3.50 4.687 93.73 - - 93.73 4.20 19.15 6.89
24+540 10.00 3.00 3.554 35.54 - - 35.54 1.80 8.10 2.92
24+620 10.00 - - 1.3 0.805 8.05 8.05 0.78 3.28 1.18
24+640 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
24+720 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
24+740 20.00 - - 2.0 1.751 35.02 35.02 2.40 10.40 3.74
24+760 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
24+800 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
24+820 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
24+860 7.00 - - 3.5 4.687 32.81 32.81 1.47 6.70 2.41
24+980 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
25+000 20.00 - - 2.0 1.751 35.02 35.02 2.40 10.40 3.74
25+020 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
25+120 10.00 - - 3.5 4.687 46.87 46.87 2.10 9.58 3.45
25+140 20.00 - - 2.8 3.045 60.90 60.90 3.36 15.05 5.42
25+160 20.00 - - 3.5 4.687 93.73 93.73 4.20 19.15 6.89
25+180 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39
25+220 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
26+380 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
26+960 10.00 3.50 4.687 46.87 - - 46.87 2.10 9.58 3.45
26+980 10.00 3.50 4.687 46.87 - - 46.87 2.10 9.58 3.45
27+180 10.00 3.00 3.554 35.54 - - 35.54 1.80 8.10 2.92
27+200 20.00 3.00 3.554 71.07 - - 71.07 3.60 16.20 5.83

253 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

0.25m thk.

Remarks
Left side Right side Volume of
Total Granular Geotextile
Length (m) PCC for
Volume (m3) Filter material (m2)
the base
Height Volume (m3) Height Area(m2) Volume (m3) (m3)
Area(m2)

27+220 20.00 2.00 1.751 35.02 - - 35.02 2.40 10.40 3.74


27+240 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
27+280 7.00 2.50 2.575 18.03 - - 18.03 1.05 4.66 1.68
27+400 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
27+420 20.00 3.50 4.687 93.73 - - 93.73 4.20 19.15 6.89
27+440 10.00 2.25 2.144 21.44 - - 21.44 1.35 5.93 2.13
27+500 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
27+800 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31

Total 1510.00 1270.05 2539.94 3809.86 217.81 964.19 347.11

254 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

Masonry Retaining Structure Quantity Calculation


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Volume (m3) Height Area(m2) Volume (m3)
Area(m2)

0+100 10 5 4.957 0 - 1.26 13.18 4.74


0+120 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+140 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+160 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
0+180 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
0+200 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
0+220 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
0+240 20 5 4.957 99.14 3 2.141 42.82 141.96 4.02 42.15 15.17
0+260 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+280 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+300 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+320 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+340 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+360 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+380 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+400 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+420 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+440 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+460 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+480 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+500 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+520 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+540 10 3 2.141 21.41 0 21.41 0.75 7.90 2.84
0+600 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79

255 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Volume (m3) Height Area(m2) Volume (m3)
Area(m2)
0+620 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
0+640 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
0+660 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
0+840 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
0+860 20 2.5 1.611 32.22 5 4.957 99.14 131.36 3.77 39.50 14.22
0+880 20 2.5 1.611 32.22 5 4.957 99.14 131.36 3.77 39.50 14.22
0+900 20 2.5 1.611 32.22 5 4.957 99.14 131.36 3.77 39.50 14.22
0+920 20 3 2.141 42.82 5 4.957 99.14 141.96 4.02 42.15 15.17
0+940 20 5 4.957 99.14 5 4.957 99.14 198.28 5.03 52.70 18.97
0+960 20 5 4.957 99.14 5 4.957 99.14 198.28 5.03 52.70 18.97
0+980 10 5 4.957 49.57 5 4.957 49.57 99.14 2.51 26.35 9.49
2+200 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
2+220 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
2+240 20 0 4 3.410 68.2 68.20 2.01 21.05 7.58
2+260 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
3+000 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
3+020 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+040 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+060 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+080 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+100 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+120 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+140 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+160 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
3+680 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
3+700 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+720 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+740 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+760 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+780 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+800 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49

256 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Volume (m3) Height Area(m2) Volume (m3)
Area(m2)
3+820 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+840 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+860 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+880 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
4+000 10 6 6.782 67.82 0 67.82 1.51 15.80 5.69
4+020 10 4 3.410 34.1 0 34.10 1.01 10.53 3.79
4+280 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
4+300 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
4+320 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
4+340 20 6 6.782 135.64 5 4.957 99.14 234.78 5.53 57.95 20.86
4+360 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+380 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+400 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+420 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+440 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+460 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+480 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+500 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+520 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+540 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+560 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+580 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+600 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+620 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+640 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+660 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+680 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+700 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+720 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+740 20 6 6.782 135.64 3 2.141 42.82 178.46 4.52 47.40 17.06
4+760 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38

257 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Volume (m3) Height Area(m2) Volume (m3)
Area(m2)
4+780 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38
4+800 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38
4+820 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38
4+840 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
4+860 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
4+880 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
4+900 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
4+920 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
4+940 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
4+960 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
4+980 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+000 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+020 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+040 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+060 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+080 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+100 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+120 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+140 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+160 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+180 10 4 3.410 34.1 0 34.10 1.01 10.53 3.79
5+480 7 4 3.410 23.87 0 23.87 0.70 7.37 2.65
6+700 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
6+720 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
6+740 10 4 3.410 34.1 0 34.10 1.01 10.53 3.79
6+760 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+780 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+800 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+820 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+840 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+860 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49

258 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Volume (m3) Height Area(m2) Volume (m3)
Area(m2)
6+880 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+900 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+920 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+940 20 5 4.957 99.14 2.5 1.611 32.22 131.36 3.77 39.50 14.22
6+960 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
6+980 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
7+000 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
7+020 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
7+040 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
7+060 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+080 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+100 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+120 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+140 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+160 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
17+240 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+260 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+280 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+300 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+580 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+600 10 3 2.141 21.41 0 21.41 0.75 7.90 2.84
17+640 7 3 2.141 14.987 0 14.99 0.53 5.53 1.99
18+500 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
18+520 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
18+540 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
21+300 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
21+320 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+340 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+360 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+380 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+400 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79

259 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Volume (m3) Height Area(m2) Volume (m3)
Area(m2)
21+780 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
21+800 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+000 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69
22+020 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69
22+040 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+200 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+220 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+400 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+420 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+440 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69
22+460 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69
22+480 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
22+500 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
22+600 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+620 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+640 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+660 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+840 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+860 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+880 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+900 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+920 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+940 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
22+960 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
22+980 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+000 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+020 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+040 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+060 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+080 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+100 10 5 4.957 49.57 5 4.957 49.57 99.14 2.51 26.35 9.49

260 of 664
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Volume (m3) Height Area(m2) Volume (m3)
Area(m2)
26+120 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+140 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+160 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+180 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+200 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+220 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74

Total 2914.00 10613.82 6085.02 16698.84 439.44 4603.30 1657.19

261 of 664
Remarks

262 of 664
Remarks

263 of 664
Remarks

264 of 664
Remarks

265 of 664
Remarks

266 of 664
Remarks

267 of 664
Remarks

268 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS


Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)

0+000 10.00 Side Drain D2 0.28 2.80 0.16 1.60 - -


0+020 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - -
0+040 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - -
0+060 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - -
0+080 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - -
0+100 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - -
0+120 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+140 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+160 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+180 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+200 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+220 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+360 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
0+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
0+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+680 20.00 - - - - Side Drain D 0.10 2.00
0+700 20.00 - - - - Side Drain D 0.10 2.00
0+720 20.00 - - - - Side Drain D 0.10 2.00
0+740 20.00 - - - - Side Drain D 0.10 2.00
0+760 20.00 - - - - Side Drain D 0.10 2.00
0+780 20.00 - - - - Side Drain D 0.10 2.00
0+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00

269 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
0+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
0+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
1+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+440 20.00 - - - - Side Drain D 0.10 2.00
1+460 20.00 - - - - Side Drain D 0.10 2.00
1+480 20.00 - - - - Side Drain D 0.10 2.00
1+500 20.00 - - - - Side Drain D 0.10 2.00
1+520 20.00 - - - - Side Drain D 0.10 2.00
1+540 20.00 - - - - Side Drain D 0.10 2.00
1+560 20.00 - - - - Side Drain D 0.10 2.00
1+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
270 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
1+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
1+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+420 20.00 - - - - Side Drain D 0.10 2.00
2+440 20.00 - - - - Side Drain D 0.10 2.00
2+460 20.00 - - - - Side Drain D 0.10 2.00
2+480 20.00 - - - - Side Drain D 0.10 2.00
2+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
2+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
271 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
2+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
2+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
3+200 20.00 - - - - Side Drain D3 0.26 5.20
3+220 20.00 - - - - Side Drain D3 0.26 5.20
3+240 20.00 - - - - Side Drain D3 0.26 5.20
3+260 20.00 - - - - Side Drain D3 0.26 5.20
3+280 20.00 - - - - Side Drain D3 0.26 5.20
3+300 20.00 - - - - Side Drain D3 0.26 5.20
3+320 20.00 - - - - Side Drain D3 0.26 5.20
3+340 20.00 - - - - Side Drain D3 0.26 5.20
3+360 20.00 - - - - Side Drain D3 0.26 5.20
3+380 20.00 - - - - Side Drain D3 0.26 5.20
3+400 20.00 - - - - Side Drain D3 0.26 5.20
3+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+440 20.00 - - - - Side Drain D 0.10 2.00
3+460 20.00 - - - - Side Drain D 0.10 2.00
3+480 20.00 - - - - Side Drain D 0.10 2.00
3+500 20.00 - - - - Side Drain D 0.10 2.00
3+520 20.00 - - - - Side Drain D 0.10 2.00
3+540 20.00 - - - - Side Drain D 0.10 2.00
3+560 20.00 - - - - Side Drain D 0.10 2.00
3+580 20.00 - - - - Side Drain D 0.10 2.00
3+600 20.00 - - - - Side Drain D 0.10 2.00
3+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
272 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
3+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
3+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
273 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
4+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
4+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
4+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
5+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
5+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
5+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
5+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
274 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
5+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
5+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+500 40.00 - - - - Side Drain D 0.10 4.00
6+520 20.00 - - - - Side Drain D 0.10 2.00
6+540 20.00 - - - - Side Drain D 0.10 2.00
6+560 20.00 - - - - Side Drain D 0.10 2.00
6+580 20.00 - - - - Side Drain D 0.10 2.00
6+600 20.00 - - - - Side Drain D 0.10 2.00
6+620 20.00 - - - - Side Drain D 0.10 2.00
6+640 20.00 - - - - Side Drain D 0.10 2.00
6+660 20.00 - - - - Side Drain D 0.10 2.00
6+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
6+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
6+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
6+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
6+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
275 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
6+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
6+900 120.00 Side Drain D 0.10 12.00 0.13 15.60 Side Drain D 0.10 12.00
6+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
6+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
6+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
6+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
276 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
7+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
7+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
277 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
8+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
8+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
9+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
278 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
9+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
9+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+200 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+220 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+240 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+260 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+280 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+300 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+320 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+340 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+360 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+380 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+400 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+420 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+440 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+460 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+480 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+500 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+520 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+540 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+560 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
279 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
10+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
10+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+200 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+220 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+240 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+260 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+280 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+300 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+320 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+340 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+360 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+380 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+400 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+420 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+440 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+460 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+480 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+500 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+520 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+540 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+560 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
280 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
11+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
11+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+200 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+220 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+240 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+260 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+280 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+300 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+320 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+340 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+360 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+380 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+400 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+420 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+440 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+460 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+480 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+500 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+520 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+540 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+560 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
12+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
281 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
12+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
12+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
13+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
13+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
13+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
282 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
13+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
13+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
13+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
13+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
13+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
13+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
14+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
14+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
14+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
14+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
283 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
14+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
14+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
15+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
15+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
15+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
284 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
15+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
15+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+200 20.00 - - - - Side Drain D 0.10 2.00
16+220 20.00 - - - - Side Drain D 0.10 2.00
16+240 20.00 - - - - Side Drain D 0.10 2.00
16+260 20.00 - - - - Side Drain D 0.10 2.00
16+280 20.00 - - - - Side Drain D 0.10 2.00
16+300 20.00 - - - - Side Drain D 0.10 2.00
16+320 20.00 - - - - Side Drain D 0.10 2.00
16+340 20.00 - - - - Side Drain D 0.10 2.00
16+360 20.00 - - - - Side Drain D 0.10 2.00
16+380 20.00 - - - - Side Drain D 0.10 2.00
16+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
16+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
285 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
16+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
16+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
17+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
17+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
17+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
286 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
17+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
17+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
18+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
18+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
18+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
18+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
18+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
18+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
18+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
287 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
18+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
18+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
19+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
288 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
19+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
19+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
20+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
20+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
20+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
20+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
289 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
20+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
20+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
21+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
21+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
21+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
21+340 20.00 - - - - Side Drain D 0.10 2.00
21+360 20.00 - - - - Side Drain D 0.10 2.00
21+380 20.00 - - - - Side Drain D 0.10 2.00
21+400 20.00 - - - - Side Drain D 0.10 2.00
21+420 20.00 - - - - Side Drain D 0.10 2.00
21+440 20.00 - - - - Side Drain D 0.10 2.00
21+460 20.00 - - - - Side Drain D 0.10 2.00
21+480 20.00 - - - - Side Drain D 0.10 2.00
21+500 20.00 - - - - Side Drain D 0.10 2.00
21+520 20.00 - - - - Side Drain D 0.10 2.00
21+540 20.00 - - - - Side Drain D 0.10 2.00
21+560 20.00 - - - - Side Drain D 0.10 2.00
21+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
21+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
290 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
21+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - -
21+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
22+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
22+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
22+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20
22+060 20.00 - - - - Side Drain D 0.10 2.00
22+080 20.00 - - - - Side Drain D 0.10 2.00
22+100 20.00 - - - - Side Drain D 0.10 2.00
22+120 20.00 - - - - Side Drain D 0.10 2.00
22+140 20.00 - - - - Side Drain D 0.10 2.00
22+160 20.00 - - - - Side Drain D 0.10 2.00
22+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+500 20.00 - - - - Side Drain D 0.10 2.00
22+520 20.00 - - - - Side Drain D 0.10 2.00
22+540 20.00 - - - - Side Drain D 0.10 2.00
22+560 20.00 - - - - Side Drain D 0.10 2.00
22+580 20.00 - - - - Side Drain D 0.10 2.00
22+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
22+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
291 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
22+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
22+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
23+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
292 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
23+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
23+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
24+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
24+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
24+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
24+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+220 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+360 20.00 - - - - Side Drain D2 0.28 5.60
24+380 20.00 - - - - Side Drain D2 0.28 5.60
24+400 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+420 20.00 - - - - Side Drain D2 0.28 5.60
24+440 20.00 - - - - Side Drain D2 0.28 5.60
24+460 20.00 - - - - Side Drain D2 0.28 5.60
24+480 20.00 - - - - Side Drain D2 0.28 5.60
24+500 20.00 - - - - Side Drain D2 0.28 5.60
24+520 20.00 - - - - Side Drain D2 0.28 5.60
24+540 20.00 - - - - Side Drain D2 0.28 5.60
24+560 20.00 - - - - Side Drain D2 0.28 5.60
24+580 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+600 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
24+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
293 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
24+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
24+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - -
25+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+360 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+380 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+400 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+420 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+440 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+460 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+480 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+500 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+520 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+540 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+560 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+580 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+600 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+620 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+640 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+660 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+680 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+700 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+720 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+740 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+760 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+780 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+800 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+820 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+840 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+860 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
294 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
25+880 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+900 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+920 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+940 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+960 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
25+980 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+000 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+020 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+040 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+060 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+080 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+100 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+120 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+140 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+160 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+180 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+200 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+220 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60
26+360 20.00 - - - - Side Drain D 0.10 2.00
26+380 20.00 - - - - Side Drain D 0.10 2.00
26+400 20.00 - - - - Side Drain D 0.10 2.00
26+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+460 20.00 - - - - Side Drain D 0.10 2.00
26+480 20.00 - - - - Side Drain D 0.10 2.00
26+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
295 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
26+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
26+920 20.00 - - - - Side Drain D 0.10 2.00
26+940 20.00 - - - - Side Drain D 0.10 2.00
26+960 20.00 - - - - Side Drain D 0.10 2.00
26+980 20.00 - - - - Side Drain D 0.10 2.00
27+000 20.00 - - - - Side Drain D 0.10 2.00
27+020 20.00 - - - - Side Drain D 0.10 2.00
27+040 20.00 - - - - Side Drain D 0.10 2.00
27+060 20.00 - - - - Side Drain D 0.10 2.00
27+080 20.00 - - - - Side Drain D 0.10 2.00
27+100 20.00 - - - - Side Drain D 0.10 2.00
27+120 20.00 - - - - Side Drain D 0.10 2.00
27+140 20.00 - - - - Side Drain D 0.10 2.00
27+160 20.00 - - - - Side Drain D 0.10 2.00
27+180 20.00 - - - - Side Drain D 0.10 2.00
27+200 20.00 - - - - Side Drain D 0.10 2.00
27+220 20.00 - - - - Side Drain D 0.10 2.00
27+240 20.00 - - - - Side Drain D 0.10 2.00
27+260 20.00 - - - - Side Drain D 0.10 2.00
27+280 20.00 - - - - Side Drain D 0.10 2.00
27+300 20.00 - - - - Side Drain D 0.10 2.00
27+320 20.00 - - - - Side Drain D 0.10 2.00
27+340 20.00 - - - - Side Drain D 0.10 2.00
27+360 20.00 - - - - Side Drain D 0.10 2.00
27+380 20.00 - - - - Side Drain D 0.10 2.00
27+400 20.00 - - - - Side Drain D 0.10 2.00
27+420 20.00 - - - - Side Drain D 0.10 2.00
27+440 20.00 - - - - Side Drain D 0.10 2.00
27+460 20.00 - - - - Side Drain D 0.10 2.00
27+480 20.00 - - - - Side Drain D 0.10 2.00
27+500 20.00 - - - - Side Drain D 0.10 2.00
27+520 20.00 - - - - Side Drain D 0.10 2.00
27+540 20.00 - - - - Side Drain D 0.10 2.00
27+560 20.00 - - - - Side Drain D 0.10 2.00
27+580 20.00 - - - - Side Drain D 0.10 2.00
27+600 20.00 - - - - Side Drain D 0.10 2.00
27+620 20.00 - - - - Side Drain D 0.10 2.00
27+640 20.00 - - - - Side Drain D 0.10 2.00
27+660 20.00 - - - - Side Drain D 0.10 2.00
27+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
27+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00
27+720 20.00 - - - - Side Drain D 0.10 2.00
27+740 20.00 - - - - Side Drain D 0.10 2.00
27+760 20.00 - - - - Side Drain D 0.10 2.00
27+780 20.00 - - - - Side Drain D 0.10 2.00
27+800 20.00 - - - - Side Drain D 0.10 2.00

Total 27910.00 3427.20 3320.20 2636.80


`
296 of 664
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Base Dr. Type Wall
Wall Area Volume Volume
Volume (m³) Area Area
(m²) (m³) (m³)
(m²) (m²)
Total drain Length= 42,170.00 m
Plum concrete qty= 11650.20 cum
Total qty of stone soling work under drain bed = 8445.60 cum
Slab Cover for Buid up areas= 5,000.00 Nos

297 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)

- -
- -
- -
- -
- -
- -
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60

298 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
299 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
300 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
301 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
302 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
303 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 5.20
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
0.13 2.60
304 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 15.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
305 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
306 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
307 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
308 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
309 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
310 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
0.13 2.60
- -
- -
- -
311 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
0.13 2.60
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
312 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
313 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
314 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
- -
- -
315 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
316 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
317 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
318 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
319 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
320 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
- -
- -
- -
- -
321 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
- -
- -
- -
- -
- -
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
322 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
323 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.16 3.20
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
324 of 664
KS

Right

Plum Concrete Remarks


Base Volume
Area (m²) (m³)
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60
0.13 2.60

2266.00

325 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATION FOR TRAPEZOIDAL (Side Drain A) COVER FOR SIDE DRAIN (PER 20 Rm.)
Name of the road:…………………………….
Chainage:0+000 to ….
Item
Description of works No. Length (m) Breadth (m) Height (m)
No.
For Cover Works(1.2m x 0.5m x 0.125m) 1 no.
1 PCC work for RCC in M20/20 in cover 1 0.5 1.200 0.125
Wt(Kg) per
2 Reinforcement Work meter
12 mm dia Bottom Main bars @ 15 cm c/c (Top & Bottom) 4 1.150 0.887
10 mm dia Distribution bars @ 20 cm c/c (Top & Bottom) 6.75 0.450 0.62
Total
3 Formwork
For cover 1 0.5 1.200 0.125

326 of 664
20 Rm.)

Quantity Per no

0.075
Wt(Kg) per Rm
span
4.0802
1.88325
5.963

0.425

327 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATION FOR SIDE DRAIN (PER 20 Rm.)


Name of the road:…………………………….
Chainage:0+000 to ….
Item Quantity Per
Description of works No. Length (m) Breadth (m) Height (m) Sec area
No. m

1 PCC work for bed in M20/20 1 1.0 1.200 0.100 0.120 0.120
PCC work for slope in M20/20 1 1.0 0.263 0.050 0.013 0.013
total M20/20= 0.133
2 MM5 Stone mesonry side wall 1 1.0 0.263 0.263 0.263
A=(0.25*0.45)+(0.5*(0.275+0.475)*0.4)

328 of 664
Unit

cum
cum

329 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

MATRICES OF CROSS DRAINAGE WORKS


Name of the road:…………………………….
Chainage:0+000 to ….
Existing Proposed Proposed
NP3 RCC Slab
Chainage Length Hume culvert
(Km) (m) pipe 0.6 0.9 0.6 (span
culvert dia dia dia 0.9 dia m) 2 3 4 5 6

0+578 12.5 0.9 - - - 1 - - - - -


0+939 10 0.9 - - - 1 - - - - -
1+399 10 0.9 - - - 1 - - - - -
1+898 10 0.9 - - - 1 - - - - -
1+995 10 0.9 - - - 1 - - - - -
2+343 10 0.9 - - - 1 - - - - -
2+478 10 0.9 - - - 1 - - - - -
2+662 10 0.9 - - - 1 - - - - -
2+957 10 0.9 - - - 1 - - - - -
3+343 10 0.9 - - - 1 - - - - -
3+446 10 0.9 - - - 1 - - - - -
3+605 12.5 0.9 - - - 1 - - - - -
3+829 10 0.9 - - - 1 - - - - -
4+124 10 0.9 - - - 1 - - - - -
4+591 10 0.9 - - - 1 - - - - -
5+258 10 0.9 - - - 1 - - - - -
5+424 10 0.9 - - - 1 - - - - -
5+518 10 0.9 - - - 1 - - - - -
5+719 10 0.9 - - - 1 - - - - -
5+919 10 0.9 - - - 1 - - - - -
6+018 10 0.9 - - - 1 - - - - -
6+386 10 0.9 - - - 1 - - - - -
6+633 10 0.9 - - - 1 - - - - -
6+747 10 0.9 - - - 1 - - - - -
7+047 10 0.9 - - - 1 - - - - -
7+539 10 0.9 - - - 1 - - - - -
8+112 10 0.9 - - - 1 - - - - -
8+580 10 0.9 - - - 1 - - - - -
9+015 12.5 0.9 - - - 1 - - - - -
9+463 12.5 0.9 - - - 1 - - - - -
9+891 12.5 0.9 - - - 1 - - - - -
10+147 12.5 0.9 - - - 1 - - - - -
10+578 12.5 0.9 - - - 1 - - - - -
10+908 12.5 0.9 - - - 1 - - - - -
11+282 10 0.9 - - - 1 - - - - -
11+730 10 0.9 - - - 1 - - - - -
12+160 10 0.9 - - - 1 - - - - -
MATRICES OF CROSS DRAINAGE WORKS
Name of the road:…………………………….
Chainage:0+000 to ….
Existing Proposed Proposed
NP3 RCC Slab
Chainage Length Hume culvert
(Km) (m) pipe 0.6 0.9 0.6 (span
culvert dia dia dia 0.9 dia m) 2 3 4 5 6

12+687 12.5 0.9 - - - 1 - - - - -


13+187 12.5 0.9 - - - 1 - - - - -
13+517 12.5 0.9 - - - 1 - - - - -
13+824 12.5 0.9 - - - 1 - - - - -
14+257 12.5 0.9 - - - 1 - - - - -
14+565 12.5 0.9 - - - 1 - - - - -
14+791 10 0.9 - - - 1 - - - - -
14+998 10 0.9 - - - 1 - - - - -
15+371 12.5 0.9 - - - 1 - - - - -
15+678 12.5 0.9 - - - 1 - - - - -
15+982 12.5 0.9 - - - 1 - - - - -
16+307 12.5 0.9 - - - 1 - - - - -
16+722 12.5 0.9 - - - 1 - - - - -
17+087 12.5 0.9 - - - 1 - - - - -
17+343 12.5 0.9 - - - 1 - - - - -
18+038 12.5 0.9 - - - 1 - - - - -
18+237 12.5 0.9 - - - 1 - - - - -
18+690 12.5 0.9 - - - 1 - - - - -
19+147 12.5 0.9 - - - 1 - - - - -
19+658 12.5 0.9 - - - 1 - - - - -
20+042 - - - - 3 - 1 - - -
20+229 12.5 0.9 - - - 1 - - - - -
20+556 12.5 0.9 - - - 1 - - - - -
21+018 12.5 0.9 - - - 1 - - - - -
21+265 12.5 0.9 - - - 1 - - - - -
21+548 12.5 0.9 - - - 1 - - - - -
21+947 12.5 0.9 - - - 1 - - - - -
22+168 12.5 0.9 - - - 1 - - - - -
22+358 12.5 0.9 - - - 1 - - - - -
22+581 12.5 0.9 - - - 1 - - - - -
22+811 12.5 0.9 - - - 1 - - - - -
23+309 12.5 0.9 - - - 1 - - - - -
23+719 - - - - 3 - 1 - - -
24+134 12.5 0.9 - - - 1 - - - - -
24+522 12.5 0.9 - - - 1 - - - - -
24+926 12.5 0.9 - - - 1 - - - - -
25+201 12.5 0.9 - - - 1 - - - - -
25+680 12.5 0.9 - - - 1 - - - - -
26+058 12.5 0.9 - - - 1 - - - - -
26+484 12.5 0.9 - - - 1 - - - - -
26+671 12.5 0.9 - - - 1 - - - - -
MATRICES OF CROSS DRAINAGE WORKS
Name of the road:…………………………….
Chainage:0+000 to ….
Existing Proposed Proposed
NP3 RCC Slab
Chainage Length Hume culvert
(Km) (m) pipe 0.6 0.9 0.6 (span
culvert dia dia dia 0.9 dia m) 2 3 4 5 6

27+246 12.5 0.9 - - - 1 - - - - -

Total - - - 77 - 2 - - -
Total no of Hume Pipe 900mm Proposed = 77
Total no of 3m Slab culvert Proposed = 2
ransport

WORKS

Remarks

Propose PC dia 0.9m


Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
WORKS

Remarks

Propose PC dia 0.9m


Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Proposed Slab Culvert
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Proposed Slab Culvert
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
WORKS

Remarks

Propose PC dia 0.9m


Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

MATRICES OF CROSS DRAINAGE WORKS


Name of the road:…………………………….

Chainage:0+000 to ….
NP3 RCC NP3 RCC
Chainage
Hume pipe Hume pipe Bridge Length Remarks
(Km)
Culvert Culvert
60cm dia 90cm dia
0+050 1 10m PROPOSED PC 0.6M
0+860 1 10m PROPOSED PC 0.6M
1+263 1 10m EXISTING PC
1+690 1 9m PROPOSED PC 0.6M
1+844 1 10m EXISTING BRIDGE SPAN 14M
2+660 1 9m PROPOSED PC 0.6M
2+809 1 9m EXISTING PC
3+126 1 10m EXISTING PC
3+419 1 10m EXISTING PC
3+590 1 10m PROPOSED PC 0.6M
3+714 1 10m EXISTING PC
3+877 1 10m EXISTING PC
4+099 1 9m EXISTING PC
4+137 1 9m EXISTING PC
4+469 1 9m PROPOSED PC 0.6M
4+650 1 10m PROPOSED PC 0.6M
5+590 1 10m PROPOSED PC 0.6M
6+272 1 9m EXISTING PC
6+336 1 10m EXISTING PC
6+710 1 9m PROPOSED PC 0.6M
6+824 1 10m EXISTING PC
7+038 1 9m EXISTING PC
7+230 1 10m PROPOSED PC 0.6M
7+357 1 9m EXISTING PC
7+890 1 10m PROPOSED PC 0.6M
8+272 1 10m EXISTING PC
8+306 1 10m EXISTING PC
8+660 1 9m PROPOSED PC 0.6M
8+870 1 9m PROPOSED PC 0.6M
9+370 1 9m PROPOSED PC 0.6M
9+610 1 9m PROPOSED PC 0.6M
9+970 1 9m PROPOSED PC 0.6M
10+147 1 10m EXISTING BRIDGE SPAN 10M
10+195 1 9m EXISTING PC
10+818 1 10m EXISTING PC
11+129 1 10m EXISTING PC
11+423 1 10m EXISTING PC
11+590 1 10m PROPOSED PC 0.6M
Existing 19 2
Total 17 0 0

336 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Pipe Culvert (60 dia)

Name of the road:…………………………….


Chainage:0+000 to ….

Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earth Excavation

i) D/S Head Wall 1 3.00 1.50 1.25 5.63 m³


ii) U/S Head wall with Catchpit 1 4.32 3.61 1.92 29.94 m³
iii) Pipe portion 1 10.67 0.95 2.44 24.73 m³
v) PCC lining
a) At U/S Head wall with Catchpit 1 4.32 3.61 0.10 1.56 m³
b) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
c) Below pipe portion 1 10.67 0.95 0.10 1.01 m³
63.32 m³

2. Stone Masonry Works (M5)


i) D/S Head Wall 1 3.00 1.00 2.65 7.95 m³
deduction for pipe -1 0.96 0.44 - 0.42 m³
ii) U/S Head wall 1 3.00 0.75 2.38 5.36 m³
deduction for pipe -1 0.87 0.44 - 0.38 m³
iii) U/S Head wall of Catchpit 1 4.12 0.51 1.45 3.05 m³
iv) Side walls 2 1.50 0.75 2.38 5.36 m³
v)catchpit base 1 2.10 2.10 0.30 1.32 m³
vi) Parapet 2 3.00 0.30 0.40 0.72 m³

337 of 664
Quantity Estimate of Pipe Culvert (60 dia)

Name of the road:…………………………….


Chainage:0+000 to ….

Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m
22.96 m³

338 of 664
Quantity Estimate of Pipe Culvert (60 dia)

Name of the road:…………………………….


Chainage:0+000 to ….

Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m
3. Concrete Works (M15/40)
i) At U/S Head wall with Catchpit 1 4.32 3.42 0.10 1.48 m³
ii) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
iii) Below hume pipe 1 12.50 0.80 0.10 10.00 m³
11.93 m³

4. Back Fill
i) Carriage way 1 10.67 0.95 2.44 24.73 m³
deduction for pipe -1 10.67 0.95 - 10.14 m³
ii) U/S Head wall with Catchpit 1 4.32 0.36 1.45 2.26 m³
iii) Side walls 2 1.50 0.60 2.38 4.28 m³
21.13 m³

5. 60cm internal dia RCC Hume Pipe (NP3) 1 12.50 12.50 rm

6. Gabion Works
i) U/S Protection works 1 4.00 1.00 1.00 4.00 m³
ii)D/S Protection 1 3.00 3.00 0.50 4.50 m³
2 3.00 1.00 0.50 3.00 m³
11.50 m³
7. Formwork
i) Below D/S Head Wall 1 9.40 0.10 0.94 m²
ii) U/S Head wall with Catchpit 1 15.88 0.10 1.59 m²
iii) for Bedding Concrete 2 12.50 0.10 2.50
5.03 m²

8. Filter(Pervious) Material behind wall structures


i) D/S Head Wall 1 3.00 0.20 2.65 1.59 m³

339 of 664
Quantity Estimate of Pipe Culvert (60 dia)

Name of the road:…………………………….


Chainage:0+000 to ….

Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m
deduction for pipe -1 0.44 0.20 - 0.09 m³
ii) U/S Head wall 1 3.00 0.20 2.38 1.43 m³
deduction for pipe -1 0.44 0.20 - 0.09 m³
iii) U/S Head wall of Catchpit 1 4.12 0.20 1.45 1.19 m³
iv) Side walls 2 1.50 0.20 2.38 1.43 m³
5.46 m³

340 of 664
Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
diameter of pipe with its wall thickness= 0.75 m
length of catchpit= 1.5 m
width of catchpit= 1.5 m

Assuming that the D/S headwall excavation


height is half of the total height

Assuming that the U/S excavation height


including head wall and catchpit is taken as
average height of U/S headwall & Catchpit

341 of 664
Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
diameter of pipe with its wall thickness= 0.75 m
length of catchpit= 1.5 m
width of catchpit= 1.5 m

342 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Pipe Culvert (60 dia) Extension

Name of the road:…………………………….


Chainage:0+000 to ….

Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.00 m
Pavement Thickness = 0.35 m Pipe length = 5.00 m
height of sidewall= 2.00 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earth Excavation

i) D/S Head Wall 1 3.00 1.50 1.25 5.63 m³


ii) U/S Head wall with Catchpit 1 3.90 3.40 1.73 22.94 m³
iii) Pipe portion 1 3.38 0.95 2.25 7.22 m³
v) PCC lining
a) At U/S Head wall with Catchpit 1 3.90 3.40 0.10 1.33 m³
b) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
c) Below pipe portion 1 3.38 0.95 0.10 0.32 m³
37.89 m³

2. Stone Masonry Works (M5)


i) D/S Head Wall 1 3.00 1.00 2.65 7.95 m³
deduction for pipe -1 0.96 0.44 - 0.42 m³
ii) U/S Head wall 1 3.00 0.65 2.00 3.90 m³
deduction for pipe -1 0.66 0.44 - 0.29 m³
iii) U/S Head wall of Catchpit 1 3.70 0.51 1.45 2.74 m³
iv) Side walls 2 1.50 0.65 2.00 3.90 m³
v)catchpit base 1 2.10 2.10 0.30 1.32 m³
vi) Parapet 2 3.00 0.30 0.40 0.72 m³
Quantity Estimate of Pipe Culvert (60 dia) Extension

Name of the road:…………………………….


Chainage:0+000 to ….

Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.00 m
Pavement Thickness = 0.35 m Pipe length = 5.00 m
height of sidewall= 2.00 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
19.82 m³

3. Concrete Works (M15/40)


i) At U/S Head wall with Catchpit 1 3.90 3.23 0.10 1.26 m³
ii) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
iii) Below hume pipe 1 5.00 0.80 0.10 4.00 m³
5.71 m³

4. Back Fill
i) Carriage way 1 3.38 0.95 2.25 7.22 m³
deduction for pipe -1 3.38 0.95 - 3.21 m³
ii) U/S Head wall with Catchpit 1 3.90 0.36 1.45 2.04 m³
iii) Side walls 2 1.50 0.50 2.00 3.00 m³
9.05 m³

5. 60cm internal dia RCC Hume Pipe (NP3) 1 5.00 5.00 rm

6. Gabion Works
i) U/S Protection works 1 4.00 1.00 1.00 4.00 m³
ii)D/S Protection 1 3.00 3.00 0.50 4.50 m³
2 3.00 1.00 0.50 3.00 m³
11.50 m³
7. Formwork
i) Below D/S Head Wall 1 9.40 0.10 0.94 m²
ii) U/S Head wall with Catchpit 1 14.66 0.10 1.47 m²
Quantity Estimate of Pipe Culvert (60 dia) Extension

Name of the road:…………………………….


Chainage:0+000 to ….

Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.00 m
Pavement Thickness = 0.35 m Pipe length = 5.00 m
height of sidewall= 2.00 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
iii) for Bedding Concrete 2 5.00 0.10 1.00
3.41 m²

8. Filter(Pervious) Material behind wall structures


i) D/S Head Wall 1 3.00 0.20 2.65 1.59 m³
deduction for pipe -1 0.44 0.20 - 0.09 m³
ii) U/S Head wall 1 3.00 0.20 2.00 1.20 m³
deduction for pipe -1 0.44 0.20 - 0.09 m³
iii) U/S Head wall of Catchpit 1 3.70 0.20 1.45 1.07 m³
iv) Side walls 2 1.50 0.20 2.00 1.20 m³
4.88 m³
Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
diameter of pipe with its wall thickness= 0.75 m
length of catchpit= 1.5 m
width of catchpit= 1.5 m

Assuming that the D/S headwall excavation


height is half of the total height

Assuming that the U/S excavation height


including head wall and catchpit is taken as
average height of U/S headwall & Catchpit
Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
diameter of pipe with its wall thickness= 0.75 m
length of catchpit= 1.5 m
width of catchpit= 1.5 m
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Pipe Culvert (90 dia)

Name of the road:…………………………….


Chainage:0+000 to ….
Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.80 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earth Excavation

i) D/S Head Wall 1 3.00 1.50 1.25 5.63 m³


ii) U/S Head wall with Catchpit 1 4.32 3.80 2.09 34.31 m³
iii) Pipe portion 1 10.67 1.30 2.44 33.85 m³
v) PCC lining
a) At U/S Head wall with Catchpit 1 4.32 3.80 0.10 1.64 m³
b) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
c) Below pipe portion 1 10.67 1.30 0.10 1.39 m³
77.27 m³

2. Stone Masonry Works (M5)


i) D/S Head Wall 1 3.00 1.00 2.65 7.95 m³
deduction for pipe -1 0.96 0.95 - 0.91 m³
ii) U/S Head wall 1 3.00 0.80 2.38 5.71 m³
deduction for pipe -1 0.87 0.95 - 0.83 m³
iii) U/S Head wall of Catchpit 1 4.12 0.65 1.80 4.82 m³
iv) Side walls 2 1.50 0.80 2.38 5.71 m³
v)catchpit base 1 1.70 1.70 0.30 0.87 m³
vi) Parapet 2 3.00 0.40 0.40 0.96 m³
24.28 m³

348 of 664
Quantity Estimate of Pipe Culvert (90 dia)

Name of the road:…………………………….


Chainage:0+000 to ….
Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.80 m
Length of head wall(U/S & D/S)= 3.00 m

3. Concrete Works (M15/40)


i) At U/S Head wall with Catchpit 1 4.32 3.59 0.10 1.55 m³
ii) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
iii) Below hume pipe 1 12.50 1.20 0.10 15.00 m³
17.00 m³

4. Back Fill
i) Carriage way 1 10.67 1.30 2.44 33.85 m³
deduction for pipe -1 10.67 0.95 - 10.14 m³
ii) U/S Head wall with Catchpit 1 4.32 0.45 1.80 3.50 m³
iii) Side walls 2 1.50 0.60 2.38 4.28 m³
31.49 m³

5. 90cm internal dia RCC Hume Pipe (NP3) 1 12.50 12.50 rm

6. Gabion Works
i) U/S Protection works 1 4.00 1.00 1.00 4.00 m³
ii)D/S Protection 1 3.00 3.00 0.50 4.50 m³
2 3.00 1.00 0.50 3.00 m³
11.50 m³
7. Formwork
i) Below D/S Head Wall 1 9.40 0.10 0.94 m²
ii) U/S Head wall with Catchpit 1 16.22 0.10 1.62 m²
iii) for Bedding Concrete 2 12.50 0.10 2.50
5.06 m²

8. Filter(Pervious) Material behind wall structures


i) D/S Head Wall 1 3.00 0.20 2.65 1.59 m³

349 of 664
Quantity Estimate of Pipe Culvert (90 dia)

Name of the road:…………………………….


Chainage:0+000 to ….
Assumptions:
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.80 m
Length of head wall(U/S & D/S)= 3.00 m
deduction for pipe -1 0.95 0.20 - 0.19 m³
ii) U/S Head wall 1 3.00 0.20 2.38 1.43 m³
deduction for pipe -1 0.95 0.20 - 0.19 m³
iii) U/S Head wall of Catchpit 1 4.12 0.20 1.80 1.48 m³
iv) Side walls 2 1.50 0.20 2.38 1.43 m³
5.55 m³

350 of 664
Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
diameter of pipe with its wall thickness= 1.10 m
length of catchpit= 1.5 m
width of catchpit= 1.5 m

Assuming that the D/S headwall excavation


height is half of the total height

Assuming that the U/S excavation height


including head wall and catchpit is taken as
average height of U/S headwall & Catchpit

351 of 664
Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
diameter of pipe with its wall thickness= 1.10 m
length of catchpit= 1.5 m
width of catchpit= 1.5 m

352 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY ESTIMATE OF 3m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 3 Total Width of road =
D= 1.05
D1= 2.5 L= 4.54 T=
Lw= 5 Bw1 1.5 T1=
B= 1.5625 Bw2 0.96 T2=
F1= 4.3 A 0.77
Name of the road:…………………………….
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no

Earthwork in Foundation
1
Excavation in Hard soil
Cum
a Main Abutment Cum 2 7.8 1.9625 1.45 45.48
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 7.902 0.3 1 4.74
c Bed
under slab Cum 1 7.8 2.4 0.5 9.36
U/s and d/s under slab Cum 2 6.451 4.3 0.5 27.74
Total 130.82 2

2 15mm Stone soling


a Main Abutment Cum 2 7.8 1.9625 0.15 4.59
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 9.09 2
3 PCC M15/40
a Main Abutment Cum 2 7.8 1.16625 0.45 8.19
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 7.8 3 0.2 4.68
U/s and d/s under slab Cum 2 6.451 4.3 0.2 11.10
Total 37.47 2
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 7.8 1.16625 2.5 45.48
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 7.902 0.3 0.6 2.84
c Bed (Boulder pitching)
under slab Cum 1 7.8 3 0.3 7.02
U/s and d/s under slab Cum 2 6.451 4.3 0.3 16.64
Total 108.66 2

5 M25/20 grade RCC


a abutment cap Cum 2 7.8 0.1755 2.74
b Slab Cum 1 7.8 4.54 0.3 10.62
d Kerb part Cum 2 7.8 Cs area= 0.1225 1.91
Total 15.27 2
TOTAL QUANTITY ESTIMATE OF 3m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 3 Total Width of road =
D= 1.05
D1= 2.5 L= 4.54 T=
Lw= 5 Bw1 1.5 T1=
B= 1.5625 Bw2 0.96 T2=
F1= 4.3 A 0.77
Name of the road:…………………………….
Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no
6 Reinforcement Steel Fe500 Length kg/m

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 7.80 99.11 773.058 773.06

b Parapet and kerb(including


a6,a7 types) kg 85.09 85.09
Total 858.15 2
7 2mm thick Tartfelt Sheet Sqm 2 7.80 0.57 8.89
Total 8.89 2
Granular Filter Material
8
Filling
Abutment Cum 2 7.80 0.25 1.5 5.85
Wing wall Cum 4 5 0.25 1.05 5.25
Total 11.10 2

9 Form Work Sqm


Slab Sqm 1 7.80 Perim= 7.8 60.84
Side of Slab transverse to road Sqm 2 7.80 0.3 4.68
Side of Slab along the road Sqm 2 4.54 0.8 7.26
Abutment Cap Sqm 2 7.80 0.6 9.36
Total 82.14 2
10 Back filling
a Main Abutment Cum 2 7.8 1.9625 1.45 17.7567
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 35.16 2

11 110mm Dia. HDPE Pipe at


weep holes 12.50 2
T

7.8

0.3
0.2
0.15

Total
Quantity

261.640

18.180

74.940

217.320

30.540
T

7.8

0.3
0.2
0.15

Total
Quantity

1716.300

17.780

22.200

164.280

70.320

25.000
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Earthquake emergency Assistance Project
Kupondole,Lalitpur

TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 11.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 11.8 1.775 1.45 55.68
b Wing Walls Cum 4 4.4 1.32 1.45 33.69
c Cutoff Wall Cum 2 8.31376 0.3 1 4.99
c Bed
under slab Cum 1 11.8 3.4 0.5 20.06
U/s and d/s under slab Cum 2 6.35688 3.784 0.5 24.05
Total 138.47 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 11.8 1.775 0.15 6.28
b Wing Walls Cum 4 4.4 1.32 0.15 3.48
Total 9.76 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 11.8 1.0725 0.45 11.39
b Wing Walls Cum 4 4.4 1.32 0.45 10.45
c Bed
under slab Cum 1 11.8 4 0.2 9.44
U/s and d/s under slab Cum 2 6.35688 3.784 0.2 9.62
Total 40.90 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 11.8 1.0725 2.2 55.68
b Wing Walls Cum 4 4.4 Area(avg)= 1.585 27.90
c Cutoff Wall Cum 2 8.31376 0.3 0.6 2.99
c Bed (Boulder pitching)
under slab Cum 1 11.8 4 0.3 14.16
U/s and d/s under slab Cum 2 6.35688 3.784 0.3 14.43
Total 115.16 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 11.8 0.1915 4.52
b Slab Cum 1 11.8 5.54 0.38 24.84
d Kerb part Cum 2 11.8 Cs area= 0.1225 2.89
Total 32.25 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 11.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 11.80 179.99 2123.882 2123.88
b Parapet and kerb(including
a6,a7 types) kg 101.04 101.04
Total 2224.92 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 11.80 0.57 13.45
Total 13.45 0 0.000
Granular Filter Material
8
Filling
Abutment Cum 2 11.80 0.25 1.5 8.85
Wing wall Cum 4 4.4 0.25 1.05 4.62
Total 13.47 0 0.000

9 Form Work Sqm


Slab Sqm 1 11.80 Perim= 11.8 139.24
Side of Slab transverse to road Sqm 2 11.80 0.38 8.97
Side of Slab along the road Sqm 2 5.54 0.88 9.75
Abutment Cap Sqm 2 11.80 0.76 17.94
Total 175.90 0 0.000
10 Back filling
a Main Abutment Cum 2 11.8 1.775 1.45 24.2962
b Wing Walls Cum 4 4.4 1.32 1.45 13.47456
Total 37.77 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 15.54 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT EXTENSION


Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 4.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 4.8 1.775 1.45 22.65
b Wing Walls Cum 4 4.4 1.32 1.45 33.69
c Cutoff Wall Cum 2 8.31376 0.3 1 4.99
c Bed
under slab Cum 1 4.8 3.4 0.5 8.16
U/s and d/s under slab Cum 2 6.35688 3.784 0.5 24.05
Total 93.54 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 4.8 1.775 0.15 2.56
b Wing Walls Cum 4 4.4 1.32 0.15 3.48
Total 6.04 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 4.8 1.0725 0.45 4.63
b Wing Walls Cum 4 4.4 1.32 0.45 10.45
c Bed
under slab Cum 1 4.8 4 0.2 3.84
U/s and d/s under slab Cum 2 6.35688 3.784 0.2 9.62
Total 28.54 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 4.8 1.0725 2.2 22.65
b Wing Walls Cum 4 4.4 Area(avg)= 1.585 27.90
c Cutoff Wall Cum 2 8.31376 0.3 0.6 2.99
c Bed (Boulder pitching)
under slab Cum 1 4.8 4 0.3 5.76
U/s and d/s under slab Cum 2 6.35688 3.784 0.3 14.43
Total 73.73 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 4.8 0.1915 1.84
b Slab Cum 1 4.8 5.54 0.38 10.10
d Kerb part Cum 2 4.8 Cs area= 0.1225 1.18
Total 13.12 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT EXTENSION
Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 4.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 4.80 179.99 863.952 863.95
b Parapet and kerb(including
a6,a7 types) kg 101.04 101.04
Total 964.99 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 4.80 0.57 5.47
Total 5.47 0 0.000
Granular Filter Material
8
Filling
Abutment Cum 2 4.80 0.25 1.5 3.60
Wing wall Cum 4 4.4 0.25 1.05 4.62
Total 8.22 0 0.000

9 Form Work Sqm


Slab Sqm 1 4.80 Perim= 4.8 23.04
Side of Slab transverse to road Sqm 2 4.80 0.38 3.65
Side of Slab along the road Sqm 2 5.54 0.88 9.75
Abutment Cap Sqm 2 4.80 0.76 7.30
Total 43.74 0 0.000
10 Back filling
a Main Abutment Cum 2 4.8 1.775 1.45 9.8832
b Wing Walls Cum 4 4.4 1.32 1.45 13.47456
Total 23.36 0 0.000

110mm Dia. HDPE Pipe at


11
weep holes 9.10 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of New Pipe Culvert


Dia of Pipe= 60 cm
Height of Head wall= 3.5 m
Name of the road:…………………………….
Chainage:0+000 to ….
Total no
Sn Description of Works unit No Length (m) Width (m) Height (m) Quantity
of PC
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Head Wall Cum 1 2.5 1.55 1 3.875
b Catch Pit Cum 1 2.5 2.5 1.6 10
c Pipe Line Cum 1 10 0.8 1.1 8.8
Total 0 17
2 PCC M15 Cum
a Head Wall Cum 1 2.5 1.95 0.2 0.975
b Catch Pit Cum 1 2.5 2.5 0.1 0.63
c Pipe Line Cum 1 8.5 0.75 0.1 0.64
Total 0 17
3 RRM in 1:4 cement mortar Cum
a Head Wall Cum 1 2.5 1.025 3.5 8.97
b Catch Pit Cum 1 2.3 2.3 1.5 7.94
Additional masonry works for
site condition Cum 8.0 0.5 1.5 0.00
Total 16.91
Deduction
a Pipe portion Head wall Cum 1 0.43 (0.95*PI()*(D2)/4) 0.43
b Pipe portion Catch Pit Cum 1 0.20 (0.95*PI()*(D2)/4) 0.20
c Catch Pit Cum 1 1.00 1.2 1.2 1.44
d Inlet Drain Cum 2 0.5 0.45 0.4 0.18
Total Deduction 2.25
Total after deduction 0.00 17.00
Transportation and Laying of
4
Hume Pipe Rm 1 10 0.00 17.00
Back filling work including Pipe Line Excavation Volume-
5
compaction Cum 1 (7.45*PI()*(D2)/4) 0.00 17.00

361 of 664
Remarks

362 of 664
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Earthquake emergency Assistance Project
Kupondole,Lalitpur

TOTAL QUANTITY ESTIMATE OF 5m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 5 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 7 T= 0.42
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 11.8 1.9625 1.45 68.81
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 9.902 0.3 1 5.94
c Bed
under slab Cum 1 11.8 4.4 0.5 25.96
U/s and d/s under slab Cum 2 7.451 4.3 0.5 32.04
Total 176.25 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 11.8 1.9625 0.15 6.95
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 11.45 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 11.8 1.16625 0.45 12.39
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 11.8 5 0.2 11.80
U/s and d/s under slab Cum 2 7.451 4.3 0.2 12.82
Total 50.51 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 11.8 1.16625 2.5 68.81
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 9.902 0.3 0.6 3.56
c Bed (Boulder pitching)
under slab Cum 1 11.8 5 0.3 17.70
U/s and d/s under slab Cum 2 7.451 4.3 0.3 19.22
Total 145.97 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 11.8 0.238 5.62
b Slab Cum 1 11.8 6.54 0.42 32.41
d Kerb part Cum 2 11.8 Cs area= 0.1225 2.89
Total 40.92 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 5m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 5 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 7 T= 0.42
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 11.80 211.12 2491.216 2491.22
b Parapet and kerb(including
a6,a7 types) kg 127.04 127.04
Total 2618.26 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 11.80 0.57 13.45
Total 13.45 0 0.000
Granular Filter Material
8
Filling
Abutment Cum 2 11.80 0.25 1.5 8.85
Wing wall Cum 4 5 0.25 1.05 5.25
Total 14.10 0 0.000

9 Form Work Sqm


Slab Sqm 1 11.80 Perim= 11.8 139.24
Side of Slab transverse to road Sqm 2 11.80 0.42 9.91
Side of Slab along the road Sqm 2 6.54 0.92 12.03
Abutment Cap Sqm 2 11.80 0.84 19.82
Total 181.00 0 0.000
10 Back filling
a Main Abutment Cum 2 11.8 1.9625 1.45 26.8627
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 44.26 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 16.18 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT EXTENSION


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 4.8
D= 1.05
D1= 2.5 L= 5.54 T= 0.38
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.15
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 4.8 1.9625 1.45 27.99
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 10.902 0.3 1 6.54
c Bed
under slab Cum 1 4.8 5.4 0.5 12.96
U/s and d/s under slab Cum 2 7.951 4.3 0.5 34.19
Total 125.18 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 4.8 1.9625 0.15 2.83
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 7.33 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 4.8 1.16625 0.45 5.04
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 4.8 6 0.2 5.76
U/s and d/s under slab Cum 2 7.951 4.3 0.2 13.68
Total 37.98 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 4.8 1.16625 2.5 27.99
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 10.902 0.3 0.6 3.92
c Bed (Boulder pitching)
under slab Cum 1 4.8 6 0.3 8.64
U/s and d/s under slab Cum 2 7.951 4.3 0.3 20.51
Total 97.74 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 4.8 0.1915 1.84
b Slab Cum 1 4.8 7.54 0.38 13.75
d Kerb part Cum 2 4.8 Cs area= 0.1225 1.18
Total 16.77 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT EXTENSION
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 4.8
D= 1.05
D1= 2.5 L= 5.54 T= 0.38
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.15
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 4.80 312.67 1500.816 1500.82
b Parapet and kerb(including
a6,a7 types) kg 144.06 144.06
Total 1644.88 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 4.80 0.57 5.47
Total 5.47 0 0.000
Granular Filter Material
8
Filling
Abutment Cum 2 4.80 0.25 1.5 3.60
Wing wall Cum 4 5 0.25 1.05 5.25
Total 8.85 0 0.000

9 Form Work Sqm


Slab Sqm 1 4.80 Perim= 4.8 23.04
Side of Slab transverse to road Sqm 2 4.80 0.38 3.65
Side of Slab along the road Sqm 2 7.54 0.88 13.27
Abutment Cap Sqm 2 4.80 0.76 7.30
Total 47.26 0 0.000
10 Back filling
a Main Abutment Cum 2 4.8 1.9625 1.45 10.9272
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 28.33 0 0.000

110mm Dia. HDPE Pipe at


11
weep holes 9.74 0 0.000
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Earthquake emergency Assistance Project
Kupondole,Lalitpur

TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 8.4 T= 0.46
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 11.8 1.9625 1.45 68.81
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 10.902 0.3 1 6.54
c Bed
under slab Cum 1 11.8 5.4 0.5 31.86
U/s and d/s under slab Cum 2 7.951 4.3 0.5 34.19
Total 184.90 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 11.8 1.9625 0.15 6.95
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 11.45 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 11.8 1.16625 0.45 12.39
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 11.8 6 0.2 14.16
U/s and d/s under slab Cum 2 7.951 4.3 0.2 13.68
Total 53.73 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 11.8 1.16625 2.5 68.81
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 10.902 0.3 0.6 3.92
c Bed (Boulder pitching)
under slab Cum 1 11.8 6 0.3 21.24
U/s and d/s under slab Cum 2 7.951 4.3 0.3 20.51
Total 151.16 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 11.8 0.246 5.81
b Slab Cum 1 11.8 7.54 0.46 40.93
d Kerb part Cum 2 11.8 Cs area= 0.1225 2.89
Total 49.63 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 8.4 T= 0.46
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 11.80 312.67 3689.506 3689.51
b Parapet and kerb(including
a6,a7 types) kg 144.06 144.06
Total 3833.57 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 11.80 0.57 13.45
Total 13.45 0 0.000
Granular Filter Material
8
Filling
Abutment Cum 2 11.80 0.25 1.5 8.85
Wing wall Cum 4 5 0.25 1.05 5.25
Total 14.10 0 0.000

9 Form Work Sqm


Slab Sqm 1 11.80 Perim= 11.8 139.24
Side of Slab transverse to road Sqm 2 11.80 0.46 10.86
Side of Slab along the road Sqm 2 7.54 0.96 14.48
Abutment Cap Sqm 2 11.80 0.92 21.71
Total 186.29 0 0.000
10 Back filling
a Main Abutment Cum 2 11.8 1.9625 1.45 26.8627
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 44.26 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 16.18 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of New Pipe Culvert


Dia of Pipe= 90 cm
Height of Head wall= 3.5 m

Name of the road:…………………………….

Chainage:0+000 to ….
Total no
Sn Description of Works unit No Length (m) Width (m) Height (m) Quantity Remarks
of PC
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Head Wall Cum 1 3.6 1.55 1 5.58
b Catch Pit Cum 1 2.6 2.6 1.9 12.844
c Pipe Line Cum 1 10 1.15 1.4 16.1
Total 0 0 0
2 PCC M15 Cum
a Head Wall Cum 1 3.6 1.95 0.2 1.404
b Catch Pit Cum 1 2.6 2.6 0.1 0.68
c Pipe Line Cum 1 8.5 1 0.1 0.85
Total 0 0 0
3 RRM in 1:4 cement mortar Cum
a Head Wall Cum 1 3.6 1.025 3.5 12.92
b Catch Pit Cum 1 2.4 2.4 1.8 10.37
Additional masonry works for
site condition Cum 8.0 0.5 1.5 0.00
Total 23.29
Deduction
a Pipe portion Head wall Cum 1 0.90 (0.95*PI()*(D2)/4) 0.90
b Pipe portion Catch Pit Cum 1 0.43 (0.95*PI()*(D2)/4) 0.43
c Catch Pit Cum 1 1.00 1.2 1.5 1.8
d Inlet Drain Cum 2 0.5 0.45 0.4 0.18
Total Deduction 3.31
Total after deduction 0.00 0.00 0
Transportation and Laying of
4
Hume Pipe Rm 1 10 0.00 0.00 0
Back filling work including Pipe Line Excavation Volume-
5
compaction Cum 1 (7.45*PI()*(D2)/4) 0.00 0.00 0
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY CALCULATION OF 10m SPANNED CAUSEWAY


Name of the road:…………………………….
Chainage:0+000 to ….
Item Quantity per
Description of works No. Length (m) Breadth (m) Height (m) Total nos Total Quantity
No. Unit
Earthwork in excavation
1 in foundation 1 10 9 0.45 - 0 -

2 Stone soling on bed 1 10 7 0.2 - 0 -

P.C.C. work in M20


4 in RCC slab 1 10 7 0.15 - 0 -

5 Reinforcement steel work 10 mm bar@ 200mm c/c(parallel to road length) 0.00


10 mm bar @ 200mm c/c (transverse to road) 0.00
Total 0.00 0 -
6 Formwork 3 34 0.2 0 0 -
0
Supply of machine made gabion boxes for
7 u/s and d/s protections 6 10 1 1.00 0.00 0 -
Unit

cu.m.

cu.m.

cu.m.

Kg
Sqm

cu.m.
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Causeway 10 m span


Assumptions:
Span = 10.00 m
Slab Width = 11.00 m
Slab thickness = 0.20 m
Bed PCC thickness 0.075 m
Bed Stone Soling 0.15 m
Total Depth = 0.43 m
Main Bars = 12 dia @ 300 c/c
Distribution Bar 12 dia @ 300 c/c
Side Slope = 7.00% Transverse Beam Thickness
Longitudinal dowel bars = 12 dia @ 300 c/c Height of D/S headwall =
Transverse dowel bars = 12 dia @ 300 c/c U/S Longitudinal Beam Height
Stirrups 8 dia @ 300 c/c Longitudinal Beam Thickness
Name of the road:…………………………….
Chainage:0+000 to ….
Length Breadth Height
Description of Works Nos.
(m) (m) (m)
1. Earthwork in Excavation
Middle portion 1 3.33 11.00 0.430
Approaching portion 2 3.34 11.00 0.430
D/S head wall (CRRM) 1 10.00 1.80 2.250
U/S Gabion Protection 1 6.67 3.00 0.500
D/S Gabion Protection 1 6.67 3.00 0.500

2. 15cm thick stone soling


Causeway slab 1 10.02 11.00 0.15
D/S head wall (CRRM) 1 10.00 1.80 0.15

3. Bed PCC (M15/40)


Causeway slab 1 10.02 11.00 0.075
D/S head wall (CRRM) 1 10.00 1.80 0.075

4. Concrete Work (M20/20)


Causeway slab 1 10.02 11.00 0.20
Cut off Beam Longitudinal U/S 1 10.02 0.30 1.00
Cut off Beam Longitudinal D/S 1 10.02 0.70 0.50
Cutt off Beam Transverse 2 11.00 0.30 0.20

5. Reinforcement
a) Main bar T1(12mm Ф) (6 Panal) 72.67 5.70 @ 0.89kg/m
b) Distribution bar T2(12mm Ф) (6 Panal) 116 3.53 @ 0.89kg/m
c) U/S Longitudinal Beam Main Bar 6 9.92 @ 0.89kg/m
d) D/S Longitudinal Beam Main Bar 6 9.92 @ 0.89kg/m
e) U/SLongitudinal Beam Stirrup 36 2.48 @ 0.39kg/m
f) D/S Longitudinal Beam Stirrup 36 2.28 @ 0.39kg/m
g) Main Bar Transverse Beam(inner) 8 10.90 @ 0.89kg/m
h) Main Bar Transverse Beam(inner) 8 11.40 @ 0.89kg/m
i) Transverse Beam Stirrup 77 1.34 @ 0.39kg/m

373 of 664
j) Longitudinal joint (12mm Ф) 34.33 0.75 @ 0.89kg/m
k) Transverse joint(12mm Ф) 74 0.75 @ 0.89kg/m
Total Reinforcement Qty =

6. Formwork (2*L/3+2*B/2)*6 1 106.00 0.20

7. Coursed random rubble masonry in M5 cement


sand mortar
D/S head wall (CRRM) 1 10.00 1.15 3.00

8. Gabion apron
U/S Protection Works 1 6.67 3.00 0.50
2 3.00 1.00 0.50
D/S Protection Works 1 6.67 3.00 0.50
2 3.00 1.00 0.50

9. Filter Material behind wall structure 1 10.00 0.25 1.80

374 of 664
rt

pan

sverse Beam Thickness 0.4 m


Height of D/S headwall = 3 m
ongitudinal Beam Height 1 m
tudinal Beam Thickness 0.3 m

Quantity Total
No Units
per no Quantity

15.75 m³
31.60 m³
40.50 m³
10.01 m³
10.01 m³
107.87 - - m³

16.53 m³
2.70 m³
19.23 - - m³

8.27 m³
1.35 m³
9.62 - - m³

22.04 m³
3.01 m³
3.51 m³
1.32 m³
29.88 - - m³

368.65 kg.
364.44 kg.
52.97 kg.
52.97 kg.
34.82 kg.
32.01 kg.
77.61 kg.
81.17
40.24 kg.

375 of 664
22.92 kg.
49.40 kg.
1,177.20 - - kg.

21.20 - - m²

34.50 m³
34.50 - - m³

10.01 m³
3.00 m³
10.01 m³
13.01 m³
36.03 - - m³

4.50 - - m³

376 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY CALCULATION OF 12m SPANNED CAUSEWAY


Name of the road:…………………………….
Chainage:0+000 to ….
Item Quantity per
Description of works No. Length (m) Breadth (m) Height (m) Total nos Total Quantity
No. Unit
Earthwork in excavation
1 in foundation 1 12 9 0.45 - 0 -
-
2 Stone soling on bed 1 12 7 0.2 - 0 -
-
P.C.C. work in M20
4 in RCC slab 1 12 7 0.15 - 0 -
-
5 Reinforcement steel work 10 mm bar@ 200mm c/c(parallel to road length) 0.00
10 mm bar @ 200mm c/c (transverse to road) 0.00
Total 0.00 0 -
6 Formwork 3 38 0.2 0 0 -
0
Supply of machine made gabion boxes for
7 u/s and d/s protections 6 12 1 1.00 0.00 0 -
Unit

cu.m.

cu.m.

cu.m.

Kg
Sqm

cu.m.
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Causeway 12 m span


Assumptions:
Span = 12.00 m
Slab Width = 8.00 m
Slab thickness = 0.20 m
Bed PCC thickness 0.075 m
Bed Stone Soling 0.15 m
Total Depth = 0.43 m
Main Bars = 12 dia @ 300 c/c
Distribution Bar 12 dia @ 300 c/c
Side Slope = 7.00% Transverse Beam Thickness
Longitudinal dowel bars = 12 dia @ 300 c/c Height of D/S headwall =
Transverse dowel bars = 12 dia @ 300 c/c U/S Longitudinal Beam Height
Stirrups 8 dia @ 300 c/c Longitudinal Beam Thickness
Name of the road:…………………………….
Chainage:0+000 to ….
Length Breadth Height
Description of Works Nos.
(m) (m) (m)
1. Earthwork in Excavation
Middle portion 1 4.00 8.00 0.430
Approaching portion 2 4.01 8.00 0.430
D/S head wall (CRRM) 1 12.00 1.80 2.250
U/S Gabion Protection 1 8.00 3.00 0.500
D/S Gabion Protection 1 8.00 3.00 0.500

2. 15cm thick stone soling


Causeway slab 1 12.02 8.00 0.15
D/S head wall (CRRM) 1 12.00 1.80 0.15

3. Bed PCC (M15/40)


Causeway slab 1 12.02 8.00 0.075
D/S head wall (CRRM) 1 12.00 1.80 0.075

4. Concrete Work (M20/20)


Causeway slab 1 12.02 8.00 0.20
Cut off Beam Longitudinal U/S 1 12.02 0.30 1.00
Cut off Beam Longitudinal D/S 1 12.02 0.70 0.50
Cutt off Beam Transverse 2 8.00 0.30 0.20

5. Reinforcement
a) Main bar T1(12mm Ф) (6 Panal) 86 4.20 @ 0.89kg/m
b) Distribution bar T2(12mm Ф) (6 Panal) 86 4.20 @ 0.89kg/m
c) U/S Longitudinal Beam Main Bar 6 11.92 @ 0.89kg/m
d) D/S Longitudinal Beam Main Bar 6 11.92 @ 0.89kg/m
e) U/SLongitudinal Beam Stirrup 42 2.48 @ 0.39kg/m
f) D/S Longitudinal Beam Stirrup 42 2.28 @ 0.39kg/m
g) Main Bar Transverse Beam(inner) 8 7.90 @ 0.89kg/m
h) Main Bar Transverse Beam(inner) 8 8.40 @ 0.89kg/m
i) Transverse Beam Stirrup 57 1.34 @ 0.39kg/m

379 of 664
j) Longitudinal joint (12mm Ф) 41 0.75 @ 0.89kg/m
k) Transverse joint(12mm Ф) 54 0.75 @ 0.89kg/m
Total Reinforcement Qty =

6. Formwork (2*L/3+2*B/2)*6 1 96.00 0.20

7. Coursed random rubble masonry in M5 cement


sand mortar
D/S head wall (CRRM) 1 12.00 1.15 3.00

8. Gabion apron
U/S Protection Works 1 8.00 3.00 0.50
2 3.00 1.00 0.50
D/S Protection Works 1 8.00 3.00 0.50
2 3.00 1.00 0.50

9. Filter Material behind wall structure 1 12.00 0.25 1.80

380 of 664
rt

span

sverse Beam Thickness 0.4 m


Height of D/S headwall = 3 m
ongitudinal Beam Height 1 m
tudinal Beam Thickness 0.3 m

Quantity Total
No Units
per no Quantity

13.76 m³
27.59 m³
48.60 m³
12.00 m³
12.00 m³
113.95 - - m³

14.42 m³
3.24 m³
17.66 - - m³

7.21 m³
1.62 m³
8.83 - - m³

19.23 m³
3.61 m³
4.21 m³
0.96 m³
28.01 - - m³

321.47 kg.
321.47 kg.
63.65 kg.
63.65 kg.
40.62 kg.
37.35 kg.
56.25 kg.
59.81
29.79 kg.

381 of 664
27.37 kg.
36.05 kg.
1,057.48 - - kg.

19.20 - - m²

41.40 m³
41.40 - - m³

12.00 m³
3.00 m³
12.00 m³
15.00 m³
42.00 - - m³

5.40 - - m³

382 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR PAVEMENT


Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

0+000 0 7.00 1.75 0.88 - 1.40 0.70 - - 0.53 - - - -


0+020 20 7.92 1.98 1.87 37.30 1.58 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
0+040 20 7.00 1.75 1.87 37.30 1.40 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
0+060 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
0+080 20 8.02 2.01 2.08 41.60 1.60 1.66 33.24 3.00 0.53 10.60 181.20 212.00 23.56
0+100 20 7.62 1.91 1.96 39.20 1.52 1.56 31.28 3.00 0.53 10.60 171.40 200.54 22.28
0+120 20 7.00 1.75 1.83 36.60 1.40 1.46 29.24 3.00 0.53 10.60 161.20 188.60 20.96
0+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+160 20 8.18 2.05 1.90 38.00 1.64 1.52 30.36 3.00 0.53 10.60 166.80 195.16 21.68
0+180 20 7.90 1.98 2.02 40.30 1.58 1.61 32.16 3.00 0.53 10.60 175.80 205.69 22.85
0+200 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
0+220 20 7.50 1.88 1.82 36.30 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80
0+240 20 7.00 1.75 1.82 36.30 1.40 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80
0+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+320 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
0+340 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
0+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

383 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

0+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+440 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
0+460 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
0+480 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
0+500 20 7.42 1.86 1.88 37.50 1.48 1.50 29.96 3.00 0.53 10.60 164.80 192.82 21.42
0+520 20 7.00 1.75 1.81 36.10 1.40 1.44 28.84 3.00 0.53 10.60 159.20 186.26 20.70
0+540 20 7.18 1.80 1.78 35.50 1.44 1.42 28.36 3.00 0.53 10.60 156.80 183.46 20.38
0+560 20 7.26 1.82 1.81 36.20 1.45 1.44 28.88 3.00 0.53 10.60 159.40 186.50 20.72
0+580 20 8.70 2.18 2.00 40.00 1.74 1.60 31.92 3.00 0.53 10.60 174.60 204.28 22.70
0+600 20 8.90 2.23 2.21 44.10 1.78 1.76 35.20 3.00 0.53 10.60 191.00 223.47 24.83
0+620 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
0+640 20 7.37 1.84 2.04 40.70 1.47 1.63 32.54 3.00 0.53 10.60 177.70 207.91 23.10
0+660 20 7.60 1.90 1.87 37.40 1.52 1.50 29.94 3.00 0.53 10.60 164.70 192.70 21.41
0+680 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
0+700 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
0+720 20 7.53 1.88 1.82 36.30 1.51 1.45 29.06 3.00 0.53 10.60 160.30 187.55 20.84
0+740 20 7.00 1.75 1.82 36.30 1.40 1.45 29.06 3.00 0.53 10.60 160.30 187.55 20.84
0+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+780 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
0+800 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
0+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
0+880 20 8.03 2.01 1.88 37.60 1.61 1.50 30.06 3.00 0.53 10.60 165.30 193.40 21.49
0+900 20 7.00 1.75 1.88 37.60 1.40 1.50 30.06 3.00 0.53 10.60 165.30 193.40 21.49

384 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

0+920 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
0+940 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
0+960 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
0+980 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
1+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+060 20 7.76 1.94 1.85 36.90 1.55 1.48 29.52 3.00 0.53 10.60 162.60 190.24 21.14
1+080 20 7.00 1.75 1.85 36.90 1.40 1.48 29.52 3.00 0.53 10.60 162.60 190.24 21.14
1+100 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
1+120 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
1+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+160 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
1+180 20 7.22 1.81 1.85 37.00 1.44 1.48 29.56 3.00 0.53 10.60 162.80 190.48 21.16
1+200 20 7.73 1.93 1.87 37.40 1.55 1.50 29.90 3.00 0.53 10.60 164.50 192.47 21.39
1+220 20 7.00 1.75 1.84 36.80 1.40 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
1+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+280 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
1+300 20 7.59 1.90 2.03 40.50 1.52 1.62 32.38 3.00 0.53 10.60 176.90 206.97 23.00
1+320 20 8.60 2.15 2.03 40.50 1.72 1.62 32.38 3.00 0.53 10.60 176.90 206.97 23.00
1+340 20 8.46 2.12 2.14 42.70 1.69 1.71 34.12 3.00 0.53 10.60 185.60 217.15 24.13
1+360 20 8.60 2.15 2.14 42.70 1.72 1.71 34.12 3.00 0.53 10.60 185.60 217.15 24.13
1+380 20 8.79 2.20 2.18 43.50 1.76 1.74 34.78 3.00 0.53 10.60 188.90 221.01 24.56
1+400 20 8.90 2.23 2.22 44.30 1.78 1.77 35.38 3.00 0.53 10.60 191.90 224.52 24.95
1+420 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09

385 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

1+440 20 7.85 1.96 2.10 41.90 1.57 1.68 33.50 3.00 0.53 10.60 182.50 213.53 23.73
1+460 20 7.56 1.89 1.93 38.50 1.51 1.54 30.82 3.00 0.53 10.60 169.10 197.85 21.98
1+480 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
1+500 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
1+520 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
1+540 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
1+560 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
1+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+660 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
1+680 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
1+700 20 8.53 2.13 2.09 41.80 1.71 1.67 33.46 3.00 0.53 10.60 182.30 213.29 23.70
1+720 20 7.48 1.87 2.00 40.00 1.50 1.60 32.02 3.00 0.53 10.60 175.10 204.87 22.76
1+740 20 8.60 2.15 2.01 40.20 1.72 1.61 32.16 3.00 0.53 10.60 175.80 205.69 22.85
1+760 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
1+780 20 7.09 1.77 1.96 39.20 1.42 1.57 31.38 3.00 0.53 10.60 171.90 201.12 22.35
1+800 20 7.00 1.75 1.76 35.20 1.40 1.41 28.18 3.00 0.53 10.60 155.90 182.40 20.27
1+820 20 8.22 2.06 1.91 38.10 1.64 1.52 30.44 3.00 0.53 10.60 167.20 195.62 21.74
1+840 20 8.90 2.23 2.15 42.90 1.78 1.71 34.24 3.00 0.53 10.60 186.20 217.85 24.21
1+860 20 8.17 2.04 2.14 42.70 1.63 1.71 34.14 3.00 0.53 10.60 185.70 217.27 24.14
1+880 20 7.00 1.75 1.90 37.90 1.40 1.52 30.34 3.00 0.53 10.60 166.70 195.04 21.67
1+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
1+920 20 7.50 1.88 1.82 36.30 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80
1+940 20 8.60 2.15 2.02 40.30 1.72 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88

386 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

1+960 20 8.57 2.14 2.15 42.90 1.71 1.72 34.34 3.00 0.53 10.60 186.70 218.44 24.27
1+980 20 7.13 1.78 1.96 39.20 1.43 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36
2+000 20 7.00 1.75 1.77 35.30 1.40 1.41 28.26 3.00 0.53 10.60 156.30 182.87 20.32
2+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+040 20 7.21 1.80 1.78 35.50 1.44 1.42 28.42 3.00 0.53 10.60 157.10 183.81 20.42
2+060 20 7.00 1.75 1.78 35.50 1.40 1.42 28.42 3.00 0.53 10.60 157.10 183.81 20.42
2+080 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
2+100 20 7.52 1.88 1.93 38.60 1.50 1.54 30.84 3.00 0.53 10.60 169.20 197.96 22.00
2+120 20 7.90 1.98 1.93 38.60 1.58 1.54 30.84 3.00 0.53 10.60 169.20 197.96 22.00
2+140 20 7.31 1.83 1.91 38.10 1.46 1.52 30.42 3.00 0.53 10.60 167.10 195.51 21.72
2+160 20 8.90 2.23 2.03 40.60 1.78 1.62 32.42 3.00 0.53 10.60 177.10 207.21 23.02
2+180 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
2+200 20 8.25 2.06 2.15 42.90 1.65 1.72 34.30 3.00 0.53 10.60 186.50 218.21 24.25
2+220 20 7.20 1.80 1.93 38.60 1.44 1.55 30.90 3.00 0.53 10.60 169.50 198.32 22.04
2+240 20 7.56 1.89 1.85 36.90 1.51 1.48 29.52 3.00 0.53 10.60 162.60 190.24 21.14
2+260 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
2+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+360 20 8.13 2.03 1.89 37.80 1.63 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
2+380 20 7.00 1.75 1.89 37.80 1.40 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
2+400 20 7.61 1.90 1.83 36.50 1.52 1.46 29.22 3.00 0.53 10.60 161.10 188.49 20.94
2+420 20 7.90 1.98 1.94 38.80 1.58 1.55 31.02 3.00 0.53 10.60 170.10 199.02 22.11
2+440 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
2+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

387 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

2+480 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
2+500 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
2+520 20 7.85 1.96 2.06 41.10 1.57 1.65 32.90 3.00 0.53 10.60 179.50 210.02 23.34
2+540 20 7.00 1.75 1.86 37.10 1.40 1.49 29.70 3.00 0.53 10.60 163.50 191.30 21.26
2+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+580 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
2+600 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
2+620 20 7.70 1.93 1.92 38.30 1.54 1.53 30.60 3.00 0.53 10.60 168.00 196.56 21.84
2+640 20 8.54 2.14 2.04 40.70 1.71 1.62 32.48 3.00 0.53 10.60 177.40 207.56 23.06
2+660 20 8.20 2.05 2.10 41.90 1.64 1.67 33.48 3.00 0.53 10.60 182.40 213.41 23.71
2+680 20 7.36 1.84 1.95 38.90 1.47 1.56 31.12 3.00 0.53 10.60 170.60 199.60 22.18
2+700 20 7.59 1.90 1.87 37.40 1.52 1.50 29.90 3.00 0.53 10.60 164.50 192.47 21.39
2+720 20 7.39 1.85 1.88 37.50 1.48 1.50 29.96 3.00 0.53 10.60 164.80 192.82 21.42
2+740 20 7.00 1.75 1.80 36.00 1.40 1.44 28.78 3.00 0.53 10.60 158.90 185.91 20.66
2+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+880 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
2+900 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
2+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
2+960 20 8.81 2.20 1.98 39.50 1.76 1.58 31.62 3.00 0.53 10.60 173.10 202.53 22.50
2+980 20 8.90 2.23 2.22 44.30 1.78 1.77 35.42 3.00 0.53 10.60 192.10 224.76 24.97

388 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

3+000 20 8.87 2.22 2.23 44.50 1.77 1.78 35.54 3.00 0.53 10.60 192.70 225.46 25.05
3+020 20 7.00 1.75 1.99 39.70 1.40 1.59 31.74 3.00 0.53 10.60 173.70 203.23 22.58
3+040 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
3+060 20 7.16 1.79 1.87 37.40 1.43 1.50 29.92 3.00 0.53 10.60 164.60 192.58 21.40
3+080 20 7.00 1.75 1.77 35.40 1.40 1.42 28.32 3.00 0.53 10.60 156.60 183.22 20.36
3+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+240 20 7.13 1.78 1.77 35.30 1.43 1.41 28.26 3.00 0.53 10.60 156.30 182.87 20.32
3+260 20 7.80 1.95 1.87 37.30 1.56 1.49 29.86 3.00 0.53 10.60 164.30 192.23 21.36
3+280 20 7.55 1.89 1.92 38.40 1.51 1.54 30.70 3.00 0.53 10.60 168.50 197.15 21.91
3+300 20 7.46 1.87 1.88 37.60 1.49 1.50 30.02 3.00 0.53 10.60 165.10 193.17 21.46
3+320 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
3+340 20 7.64 1.91 1.89 37.80 1.53 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58
3+360 20 8.03 2.01 1.96 39.20 1.61 1.57 31.34 3.00 0.53 10.60 171.70 200.89 22.32
3+380 20 7.75 1.94 1.98 39.50 1.55 1.58 31.56 3.00 0.53 10.60 172.80 202.18 22.46
3+400 20 8.45 2.11 2.03 40.50 1.69 1.62 32.40 3.00 0.53 10.60 177.00 207.09 23.01
3+420 20 7.38 1.85 1.98 39.60 1.48 1.58 31.66 3.00 0.53 10.60 173.30 202.76 22.53
3+440 20 7.56 1.89 1.87 37.40 1.51 1.49 29.88 3.00 0.53 10.60 164.40 192.35 21.37
3+460 20 7.54 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58
3+480 20 7.17 1.79 1.84 36.80 1.43 1.47 29.42 3.00 0.53 10.60 162.10 189.66 21.07
3+500 20 7.00 1.75 1.77 35.40 1.40 1.42 28.34 3.00 0.53 10.60 156.70 183.34 20.37

389 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

3+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
3+540 20 7.73 1.93 1.84 36.80 1.55 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
3+560 20 7.38 1.85 1.89 37.80 1.48 1.51 30.22 3.00 0.53 10.60 166.10 194.34 21.59
3+580 20 7.91 1.98 1.92 38.30 1.58 1.53 30.58 3.00 0.53 10.60 167.90 196.44 21.83
3+600 20 7.50 1.88 1.93 38.60 1.50 1.54 30.82 3.00 0.53 10.60 169.10 197.85 21.98
3+620 20 8.60 2.15 2.02 40.30 1.72 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88
3+640 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
3+660 20 7.73 1.93 2.04 40.80 1.55 1.63 32.66 3.00 0.53 10.60 178.30 208.61 23.18
3+680 20 7.00 1.75 1.84 36.80 1.40 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
3+700 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
3+720 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
3+740 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
3+760 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
3+780 20 7.41 1.85 1.80 36.00 1.48 1.44 28.82 3.00 0.53 10.60 159.10 186.15 20.68
3+800 20 7.56 1.89 1.87 37.40 1.51 1.50 29.94 3.00 0.53 10.60 164.70 192.70 21.41
3+820 20 7.34 1.84 1.87 37.30 1.47 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
3+840 20 7.43 1.86 1.85 37.00 1.49 1.48 29.54 3.00 0.53 10.60 162.70 190.36 21.15
3+860 20 7.48 1.87 1.87 37.30 1.50 1.49 29.82 3.00 0.53 10.60 164.10 192.00 21.33
3+880 20 7.60 1.90 1.89 37.70 1.52 1.51 30.16 3.00 0.53 10.60 165.80 193.99 21.55
3+900 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
3+920 20 7.44 1.86 1.88 37.60 1.49 1.50 30.08 3.00 0.53 10.60 165.40 193.52 21.50
3+940 20 8.01 2.00 1.93 38.60 1.60 1.55 30.90 3.00 0.53 10.60 169.50 198.32 22.04
3+960 20 8.44 2.11 2.06 41.10 1.69 1.65 32.90 3.00 0.53 10.60 179.50 210.02 23.34
3+980 20 8.02 2.01 2.06 41.20 1.60 1.65 32.92 3.00 0.53 10.60 179.60 210.13 23.35
4+000 20 7.80 1.95 1.98 39.60 1.56 1.58 31.64 3.00 0.53 10.60 173.20 202.64 22.52
4+020 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19

390 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

4+040 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
4+060 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
4+080 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
4+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
4+120 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
4+140 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
4+160 20 7.11 1.78 1.84 36.80 1.42 1.47 29.42 3.00 0.53 10.60 162.10 189.66 21.07
4+180 20 7.42 1.86 1.82 36.40 1.48 1.45 29.06 3.00 0.53 10.60 160.30 187.55 20.84
4+200 20 7.00 1.75 1.81 36.10 1.40 1.44 28.84 3.00 0.53 10.60 159.20 186.26 20.70
4+220 20 8.12 2.03 1.89 37.80 1.62 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
4+240 20 7.00 1.75 1.89 37.80 1.40 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
4+260 20 7.77 1.94 1.85 36.90 1.55 1.48 29.54 3.00 0.53 10.60 162.70 190.36 21.15
4+280 20 7.00 1.75 1.85 36.90 1.40 1.48 29.54 3.00 0.53 10.60 162.70 190.36 21.15
4+300 20 8.26 2.07 1.91 38.20 1.65 1.53 30.52 3.00 0.53 10.60 167.60 196.09 21.79
4+320 20 7.05 1.76 1.92 38.30 1.41 1.53 30.62 3.00 0.53 10.60 168.10 196.68 21.85
4+340 20 7.00 1.75 1.76 35.10 1.40 1.41 28.10 3.00 0.53 10.60 155.50 181.94 20.22
4+360 20 8.04 2.01 1.88 37.60 1.61 1.50 30.08 3.00 0.53 10.60 165.40 193.52 21.50
4+380 20 7.35 1.84 1.93 38.50 1.47 1.54 30.78 3.00 0.53 10.60 168.90 197.61 21.96
4+400 20 7.00 1.75 1.80 35.90 1.40 1.44 28.70 3.00 0.53 10.60 158.50 185.45 20.61
4+420 20 7.06 1.77 1.76 35.20 1.41 1.41 28.12 3.00 0.53 10.60 155.60 182.05 20.23
4+440 20 8.60 2.15 1.96 39.20 1.72 1.57 31.32 3.00 0.53 10.60 171.60 200.77 22.31
4+460 20 8.22 2.06 2.11 42.10 1.64 1.68 33.64 3.00 0.53 10.60 183.20 214.34 23.82
4+480 20 8.50 2.13 2.10 41.90 1.70 1.67 33.44 3.00 0.53 10.60 182.20 213.17 23.69
4+500 20 7.07 1.77 1.95 39.00 1.41 1.56 31.14 3.00 0.53 10.60 170.70 199.72 22.19
4+520 20 7.00 1.75 1.76 35.20 1.40 1.41 28.14 3.00 0.53 10.60 155.70 182.17 20.24
4+540 20 7.29 1.82 1.79 35.70 1.46 1.43 28.58 3.00 0.53 10.60 157.90 184.74 20.53

391 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

4+560 20 7.00 1.75 1.79 35.70 1.40 1.43 28.58 3.00 0.53 10.60 157.90 184.74 20.53
4+580 20 7.10 1.78 1.77 35.30 1.42 1.41 28.20 3.00 0.53 10.60 156.00 182.52 20.28
4+600 20 7.00 1.75 1.77 35.30 1.40 1.41 28.20 3.00 0.53 10.60 156.00 182.52 20.28
4+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
4+640 20 7.06 1.77 1.76 35.20 1.41 1.41 28.12 3.00 0.53 10.60 155.60 182.05 20.23
4+660 20 8.60 2.15 1.96 39.20 1.72 1.57 31.32 3.00 0.53 10.60 171.60 200.77 22.31
4+680 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
4+700 20 7.45 1.86 2.01 40.10 1.49 1.61 32.10 3.00 0.53 10.60 175.50 205.34 22.82
4+720 20 7.00 1.75 1.81 36.10 1.40 1.45 28.90 3.00 0.53 10.60 159.50 186.62 20.74
4+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
4+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
4+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
4+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
4+820 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
4+840 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
4+860 20 7.30 1.83 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54
4+880 20 7.30 1.83 1.83 36.60 1.46 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
4+900 20 7.00 1.75 1.79 35.80 1.40 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54
4+920 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
4+940 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
4+960 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
4+980 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
5+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
5+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
5+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
5+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

392 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

5+080 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
5+100 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
5+120 20 7.95 1.99 1.93 38.60 1.59 1.54 30.82 3.00 0.53 10.60 169.10 197.85 21.98
5+140 20 7.73 1.93 1.96 39.20 1.55 1.57 31.36 3.00 0.53 10.60 171.80 201.01 22.33
5+160 20 7.00 1.75 1.84 36.80 1.40 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
5+180 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
5+200 20 7.47 1.87 1.96 39.20 1.49 1.57 31.34 3.00 0.53 10.60 171.70 200.89 22.32
5+220 20 8.60 2.15 2.01 40.20 1.72 1.61 32.14 3.00 0.53 10.60 175.70 205.57 22.84
5+240 20 8.20 2.05 2.10 42.00 1.64 1.68 33.60 3.00 0.53 10.60 183.00 214.11 23.79
5+260 20 7.62 1.91 1.98 39.60 1.52 1.58 31.64 3.00 0.53 10.60 173.20 202.64 22.52
5+280 20 7.90 1.98 1.95 38.90 1.58 1.55 31.04 3.00 0.53 10.60 170.20 199.13 22.13
5+300 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
5+320 20 8.30 2.08 1.92 38.30 1.66 1.53 30.60 3.00 0.53 10.60 168.00 196.56 21.84
5+340 20 8.02 2.01 2.05 40.90 1.60 1.63 32.64 3.00 0.53 10.60 178.20 208.49 23.17
5+360 20 7.04 1.76 1.89 37.70 1.41 1.51 30.12 3.00 0.53 10.60 165.60 193.75 21.53
5+380 20 7.75 1.94 1.85 37.00 1.55 1.48 29.58 3.00 0.53 10.60 162.90 190.59 21.18
5+400 20 7.65 1.91 1.93 38.50 1.53 1.54 30.80 3.00 0.53 10.60 169.00 197.73 21.97
5+420 20 8.20 2.05 1.98 39.60 1.64 1.59 31.70 3.00 0.53 10.60 173.50 203.00 22.56
5+440 20 7.58 1.90 1.98 39.50 1.52 1.58 31.56 3.00 0.53 10.60 172.80 202.18 22.46
5+460 20 7.00 1.75 1.83 36.50 1.40 1.46 29.16 3.00 0.53 10.60 160.80 188.14 20.90
5+480 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
5+500 20 7.70 1.93 2.04 40.80 1.54 1.63 32.60 3.00 0.53 10.60 178.00 208.26 23.14
5+520 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06
5+540 20 7.94 1.99 1.87 37.40 1.59 1.49 29.88 3.00 0.53 10.60 164.40 192.35 21.37
5+560 20 7.71 1.93 1.96 39.20 1.54 1.57 31.30 3.00 0.53 10.60 171.50 200.66 22.30
5+580 20 7.84 1.96 1.95 38.90 1.57 1.56 31.10 3.00 0.53 10.60 170.50 199.49 22.17

393 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

5+600 20 7.97 1.99 1.98 39.50 1.59 1.58 31.62 3.00 0.53 10.60 173.10 202.53 22.50
5+620 20 8.60 2.15 2.07 41.40 1.72 1.66 33.14 3.00 0.53 10.60 180.70 211.42 23.49
5+640 20 7.00 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
5+660 20 7.19 1.80 1.78 35.50 1.44 1.42 28.38 3.00 0.53 10.60 156.90 183.57 20.40
5+680 20 7.24 1.81 1.81 36.10 1.45 1.44 28.86 3.00 0.53 10.60 159.30 186.38 20.71
5+700 20 7.00 1.75 1.78 35.60 1.40 1.42 28.48 3.00 0.53 10.60 157.40 184.16 20.46
5+720 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
5+740 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
5+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
5+780 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
5+800 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
5+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
5+840 20 7.49 1.87 1.81 36.20 1.50 1.45 28.98 3.00 0.53 10.60 159.90 187.08 20.79
5+860 20 7.00 1.75 1.81 36.20 1.40 1.45 28.98 3.00 0.53 10.60 159.90 187.08 20.79
5+880 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
5+900 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
5+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
5+940 20 8.15 2.04 1.90 37.90 1.63 1.52 30.30 3.00 0.53 10.60 166.50 194.81 21.65
5+960 20 7.00 1.75 1.90 37.90 1.40 1.52 30.30 3.00 0.53 10.60 166.50 194.81 21.65
5+980 20 7.74 1.94 1.85 36.90 1.55 1.47 29.48 3.00 0.53 10.60 162.40 190.01 21.11
6+000 20 8.60 2.15 2.05 40.90 1.72 1.63 32.68 3.00 0.53 10.60 178.40 208.73 23.19
6+020 20 7.72 1.93 2.04 40.80 1.54 1.63 32.64 3.00 0.53 10.60 178.20 208.49 23.17
6+040 20 7.00 1.75 1.84 36.80 1.40 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
6+060 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
6+080 20 8.03 2.01 2.03 40.60 1.61 1.62 32.46 3.00 0.53 10.60 177.30 207.44 23.05
6+100 20 8.20 2.05 2.03 40.60 1.64 1.62 32.46 3.00 0.53 10.60 177.30 207.44 23.05

394 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

6+120 20 7.60 1.90 1.98 39.50 1.52 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
6+140 20 7.47 1.87 1.89 37.70 1.49 1.51 30.14 3.00 0.53 10.60 165.70 193.87 21.54
6+160 20 7.90 1.98 1.93 38.50 1.58 1.54 30.74 3.00 0.53 10.60 168.70 197.38 21.93
6+180 20 7.42 1.86 1.92 38.40 1.48 1.53 30.64 3.00 0.53 10.60 168.20 196.79 21.87
6+200 20 8.20 2.05 1.96 39.10 1.64 1.56 31.24 3.00 0.53 10.60 171.20 200.30 22.26
6+220 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
6+240 20 7.21 1.80 1.93 38.50 1.44 1.54 30.82 3.00 0.53 10.60 169.10 197.85 21.98
6+260 20 7.36 1.84 1.82 36.40 1.47 1.46 29.14 3.00 0.53 10.60 160.70 188.02 20.89
6+280 20 7.00 1.75 1.80 35.90 1.40 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
6+300 20 7.36 1.84 1.80 35.90 1.47 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
6+320 20 7.36 1.84 1.84 36.80 1.47 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
6+340 20 7.00 1.75 1.80 35.90 1.40 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
6+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
6+380 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
6+400 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
6+420 20 7.56 1.89 1.97 39.40 1.51 1.58 31.52 3.00 0.53 10.60 172.60 201.94 22.44
6+440 20 7.82 1.96 1.93 38.50 1.56 1.54 30.76 3.00 0.53 10.60 168.80 197.50 21.94
6+460 20 8.90 2.23 2.10 41.90 1.78 1.67 33.44 3.00 0.53 10.60 182.20 213.17 23.69
6+480 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
6+500 20 7.73 1.93 2.08 41.60 1.55 1.66 33.26 3.00 0.53 10.60 181.30 212.12 23.57
6+520 20 7.00 1.75 1.84 36.80 1.40 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
6+540 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
6+560 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
6+580 20 7.48 1.87 1.81 36.20 1.50 1.45 28.96 3.00 0.53 10.60 159.80 186.97 20.77
6+600 20 8.20 2.05 1.96 39.20 1.64 1.57 31.36 3.00 0.53 10.60 171.80 201.01 22.33
6+620 20 7.25 1.81 1.93 38.60 1.45 1.55 30.90 3.00 0.53 10.60 169.50 198.32 22.04

395 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

6+640 20 8.20 2.05 1.93 38.60 1.64 1.55 30.90 3.00 0.53 10.60 169.50 198.32 22.04
6+660 20 8.39 2.10 2.08 41.50 1.68 1.66 33.18 3.00 0.53 10.60 180.90 211.65 23.52
6+680 20 8.60 2.15 2.13 42.50 1.72 1.70 33.98 3.00 0.53 10.60 184.90 216.33 24.04
6+700 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
6+720 20 8.01 2.00 2.08 41.50 1.60 1.66 33.22 3.00 0.53 10.60 181.10 211.89 23.54
6+740 20 7.80 1.95 1.98 39.50 1.56 1.58 31.62 3.00 0.53 10.60 173.10 202.53 22.50
6+760 20 7.73 1.93 1.94 38.80 1.55 1.55 31.06 3.00 0.53 10.60 170.30 199.25 22.14
6+780 20 7.00 1.75 1.84 36.80 1.40 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
6+800 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
6+820 20 7.34 1.84 1.91 38.20 1.47 1.52 30.48 3.00 0.53 10.60 167.40 195.86 21.76
6+840 20 7.57 1.89 1.87 37.30 1.51 1.49 29.82 3.00 0.53 10.60 164.10 192.00 21.33
6+860 20 7.00 1.75 1.82 36.40 1.40 1.46 29.14 3.00 0.53 10.60 160.70 188.02 20.89
6+880 20 7.29 1.82 1.79 35.70 1.46 1.43 28.58 3.00 0.53 10.60 157.90 184.74 20.53
6+900 20 7.00 1.75 1.79 35.70 1.40 1.43 28.58 3.00 0.53 10.60 157.90 184.74 20.53
6+920 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
6+940 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
6+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
6+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+000 20 7.17 1.79 1.77 35.40 1.43 1.42 28.34 3.00 0.53 10.60 156.70 183.34 20.37
7+020 20 8.90 2.23 2.01 40.20 1.78 1.61 32.14 3.00 0.53 10.60 175.70 205.57 22.84
7+040 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
7+060 20 7.54 1.89 2.06 41.20 1.51 1.64 32.88 3.00 0.53 10.60 179.40 209.90 23.32
7+080 20 7.04 1.76 1.83 36.50 1.41 1.46 29.16 3.00 0.53 10.60 160.80 188.14 20.90
7+100 20 7.02 1.76 1.76 35.20 1.40 1.41 28.12 3.00 0.53 10.60 155.60 182.05 20.23
7+120 20 7.00 1.75 1.76 35.10 1.40 1.40 28.04 3.00 0.53 10.60 155.20 181.58 20.18
7+140 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19

396 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

7+160 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
7+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+200 20 7.63 1.91 1.83 36.60 1.53 1.46 29.26 3.00 0.53 10.60 161.30 188.72 20.97
7+220 20 8.20 2.05 1.98 39.60 1.64 1.58 31.66 3.00 0.53 10.60 173.30 202.76 22.53
7+240 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
7+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+360 20 7.33 1.83 1.79 35.80 1.47 1.43 28.66 3.00 0.53 10.60 158.30 185.21 20.58
7+380 20 7.00 1.75 1.79 35.80 1.40 1.43 28.66 3.00 0.53 10.60 158.30 185.21 20.58
7+400 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
7+420 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
7+440 20 7.85 1.96 2.06 41.10 1.57 1.65 32.90 3.00 0.53 10.60 179.50 210.02 23.34
7+460 20 7.00 1.75 1.86 37.10 1.40 1.49 29.70 3.00 0.53 10.60 163.50 191.30 21.26
7+480 20 7.86 1.97 1.86 37.20 1.57 1.49 29.72 3.00 0.53 10.60 163.60 191.41 21.27
7+500 20 8.60 2.15 2.06 41.20 1.72 1.65 32.92 3.00 0.53 10.60 179.60 210.13 23.35
7+520 20 7.98 2.00 2.08 41.50 1.60 1.66 33.16 3.00 0.53 10.60 180.80 211.54 23.50
7+540 20 7.00 1.75 1.88 37.50 1.40 1.50 29.96 3.00 0.53 10.60 164.80 192.82 21.42
7+560 20 8.17 2.04 1.90 37.90 1.63 1.52 30.34 3.00 0.53 10.60 166.70 195.04 21.67
7+580 20 7.86 1.97 2.01 40.10 1.57 1.60 32.06 3.00 0.53 10.60 175.30 205.10 22.79
7+600 20 8.20 2.05 2.01 40.20 1.64 1.61 32.12 3.00 0.53 10.60 175.60 205.45 22.83
7+620 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
7+640 20 7.64 1.91 1.83 36.60 1.53 1.46 29.28 3.00 0.53 10.60 161.40 188.84 20.98
7+660 20 7.81 1.95 1.93 38.60 1.56 1.55 30.90 3.00 0.53 10.60 169.50 198.32 22.04

397 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

7+680 20 7.00 1.75 1.85 37.00 1.40 1.48 29.62 3.00 0.53 10.60 163.10 190.83 21.20
7+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+740 20 8.90 2.23 1.99 39.80 1.78 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62
7+760 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
7+780 20 8.28 2.07 2.15 43.00 1.66 1.72 34.36 3.00 0.53 10.60 186.80 218.56 24.28
7+800 20 7.00 1.75 1.91 38.20 1.40 1.53 30.56 3.00 0.53 10.60 167.80 196.33 21.81
7+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+840 20 7.50 1.88 1.82 36.30 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80
7+860 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
7+880 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
7+900 20 7.28 1.82 1.85 37.00 1.46 1.48 29.56 3.00 0.53 10.60 162.80 190.48 21.16
7+920 20 8.15 2.04 1.93 38.60 1.63 1.54 30.86 3.00 0.53 10.60 169.30 198.08 22.01
7+940 20 7.00 1.75 1.90 37.90 1.40 1.52 30.30 3.00 0.53 10.60 166.50 194.81 21.65
7+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
7+980 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
8+000 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
8+020 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
8+040 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
8+060 20 7.37 1.84 1.80 35.90 1.47 1.44 28.74 3.00 0.53 10.60 158.70 185.68 20.63
8+080 20 8.60 2.15 2.00 39.90 1.72 1.60 31.94 3.00 0.53 10.60 174.70 204.40 22.71
8+100 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
8+120 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
8+140 20 7.71 1.93 2.04 40.80 1.54 1.63 32.62 3.00 0.53 10.60 178.10 208.38 23.15
8+160 20 7.00 1.75 1.84 36.80 1.40 1.47 29.42 3.00 0.53 10.60 162.10 189.66 21.07
8+180 20 7.78 1.95 1.85 37.00 1.56 1.48 29.56 3.00 0.53 10.60 162.80 190.48 21.16

398 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

8+200 20 8.60 2.15 2.05 41.00 1.72 1.64 32.76 3.00 0.53 10.60 178.80 209.20 23.24
8+220 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
8+240 20 7.36 1.84 2.00 39.90 1.47 1.60 31.92 3.00 0.53 10.60 174.60 204.28 22.70
8+260 20 7.63 1.91 1.88 37.50 1.53 1.50 29.98 3.00 0.53 10.60 164.90 192.93 21.44
8+280 20 7.00 1.75 1.83 36.60 1.40 1.46 29.26 3.00 0.53 10.60 161.30 188.72 20.97
8+300 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
8+320 20 7.38 1.85 1.92 38.30 1.48 1.53 30.56 3.00 0.53 10.60 167.80 196.33 21.81
8+340 20 8.20 2.05 1.95 39.00 1.64 1.56 31.16 3.00 0.53 10.60 170.80 199.84 22.20
8+360 20 8.15 2.04 2.05 40.90 1.63 1.64 32.70 3.00 0.53 10.60 178.50 208.85 23.21
8+380 20 7.00 1.75 1.90 37.90 1.40 1.52 30.30 3.00 0.53 10.60 166.50 194.81 21.65
8+400 20 7.83 1.96 1.86 37.10 1.57 1.48 29.66 3.00 0.53 10.60 163.30 191.06 21.23
8+420 20 7.00 1.75 1.86 37.10 1.40 1.48 29.66 3.00 0.53 10.60 163.30 191.06 21.23
8+440 20 8.46 2.12 1.94 38.70 1.69 1.55 30.92 3.00 0.53 10.60 169.60 198.43 22.05
8+460 20 8.90 2.23 2.18 43.50 1.78 1.74 34.72 3.00 0.53 10.60 188.60 220.66 24.52
8+480 20 8.80 2.20 2.22 44.30 1.76 1.77 35.40 3.00 0.53 10.60 192.00 224.64 24.96
8+500 20 7.00 1.75 1.98 39.50 1.40 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
8+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
8+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
8+560 20 7.66 1.92 1.84 36.70 1.53 1.47 29.32 3.00 0.53 10.60 161.60 189.07 21.01
8+580 20 8.20 2.05 1.99 39.70 1.64 1.59 31.72 3.00 0.53 10.60 173.60 203.11 22.57
8+600 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
8+620 20 8.04 2.01 2.03 40.60 1.61 1.62 32.48 3.00 0.53 10.60 177.40 207.56 23.06
8+640 20 7.00 1.75 1.88 37.60 1.40 1.50 30.08 3.00 0.53 10.60 165.40 193.52 21.50
8+660 20 7.06 1.77 1.76 35.20 1.41 1.41 28.12 3.00 0.53 10.60 155.60 182.05 20.23
8+680 20 7.88 1.97 1.87 37.40 1.58 1.49 29.88 3.00 0.53 10.60 164.40 192.35 21.37
8+700 20 7.00 1.75 1.86 37.20 1.40 1.49 29.76 3.00 0.53 10.60 163.80 191.65 21.29

399 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

8+720 20 8.13 2.03 1.89 37.80 1.63 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
8+740 20 7.00 1.75 1.89 37.80 1.40 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
8+760 20 8.25 2.06 1.91 38.10 1.65 1.53 30.50 3.00 0.53 10.60 167.50 195.98 21.78
8+780 20 8.90 2.23 2.15 42.90 1.78 1.72 34.30 3.00 0.53 10.60 186.50 218.21 24.25
8+800 20 8.77 2.19 2.21 44.20 1.75 1.77 35.34 3.00 0.53 10.60 191.70 224.29 24.92
8+820 20 7.00 1.75 1.97 39.40 1.40 1.58 31.54 3.00 0.53 10.60 172.70 202.06 22.45
8+840 20 7.16 1.79 1.77 35.40 1.43 1.42 28.32 3.00 0.53 10.60 156.60 183.22 20.36
8+860 20 8.20 2.05 1.92 38.40 1.64 1.54 30.72 3.00 0.53 10.60 168.60 197.26 21.92
8+880 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
8+900 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
8+920 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
8+940 20 8.41 2.10 1.93 38.50 1.68 1.54 30.82 3.00 0.53 10.60 169.10 197.85 21.98
8+960 20 7.27 1.82 1.96 39.20 1.45 1.57 31.36 3.00 0.53 10.60 171.80 201.01 22.33
8+980 20 7.00 1.75 1.79 35.70 1.40 1.43 28.54 3.00 0.53 10.60 157.70 184.51 20.50
9+000 20 7.22 1.81 1.78 35.60 1.44 1.42 28.44 3.00 0.53 10.60 157.20 183.92 20.44
9+020 20 8.60 2.15 1.98 39.60 1.72 1.58 31.64 3.00 0.53 10.60 173.20 202.64 22.52
9+040 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
9+060 20 7.88 1.97 2.06 41.20 1.58 1.65 32.96 3.00 0.53 10.60 179.80 210.37 23.37
9+080 20 7.00 1.75 1.86 37.20 1.40 1.49 29.76 3.00 0.53 10.60 163.80 191.65 21.29
9+100 20 7.16 1.79 1.77 35.40 1.43 1.42 28.32 3.00 0.53 10.60 156.60 183.22 20.36
9+120 20 8.90 2.23 2.01 40.20 1.78 1.61 32.12 3.00 0.53 10.60 175.60 205.45 22.83
9+140 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
9+160 20 8.36 2.09 2.16 43.20 1.67 1.73 34.52 3.00 0.53 10.60 187.60 219.49 24.39
9+180 20 7.00 1.75 1.92 38.40 1.40 1.54 30.72 3.00 0.53 10.60 168.60 197.26 21.92
9+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
9+220 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93

400 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

9+240 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
9+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
9+280 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
9+300 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
9+320 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
9+340 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
9+360 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
9+380 20 7.03 1.76 1.76 35.10 1.41 1.40 28.06 3.00 0.53 10.60 155.30 181.70 20.19
9+400 20 8.08 2.02 1.89 37.80 1.62 1.51 30.22 3.00 0.53 10.60 166.10 194.34 21.59
9+420 20 8.60 2.15 2.09 41.70 1.72 1.67 33.36 3.00 0.53 10.60 181.80 212.71 23.63
9+440 20 8.20 2.05 2.10 42.00 1.64 1.68 33.60 3.00 0.53 10.60 183.00 214.11 23.79
9+460 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
9+480 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
9+500 20 8.11 2.03 1.99 39.80 1.62 1.59 31.82 3.00 0.53 10.60 174.10 203.70 22.63
9+520 20 7.00 1.75 1.89 37.80 1.40 1.51 30.22 3.00 0.53 10.60 166.10 194.34 21.59
9+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
9+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
9+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
9+600 20 8.07 2.02 1.89 37.70 1.61 1.51 30.14 3.00 0.53 10.60 165.70 193.87 21.54
9+620 20 8.60 2.15 2.09 41.70 1.72 1.67 33.34 3.00 0.53 10.60 181.70 212.59 23.62
9+640 20 7.80 1.95 2.05 41.00 1.56 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
9+660 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
9+680 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
9+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
9+720 20 7.38 1.85 1.80 36.00 1.48 1.44 28.76 3.00 0.53 10.60 158.80 185.80 20.64
9+740 20 7.56 1.89 1.87 37.40 1.51 1.49 29.88 3.00 0.53 10.60 164.40 192.35 21.37

401 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

9+760 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
9+780 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
9+800 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
9+820 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
9+840 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
9+860 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
9+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
9+900 20 7.87 1.97 1.86 37.20 1.57 1.49 29.74 3.00 0.53 10.60 163.70 191.53 21.28
9+920 20 7.08 1.77 1.87 37.40 1.42 1.50 29.90 3.00 0.53 10.60 164.50 192.47 21.39
9+940 20 7.00 1.75 1.76 35.20 1.40 1.41 28.16 3.00 0.53 10.60 155.80 182.29 20.25
9+960 20 7.12 1.78 1.77 35.30 1.42 1.41 28.24 3.00 0.53 10.60 156.20 182.75 20.31
9+980 20 7.90 1.98 1.88 37.60 1.58 1.50 30.04 3.00 0.53 10.60 165.20 193.28 21.48
10+000 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
10+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+040 20 7.50 1.88 1.82 36.30 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80
10+060 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
10+080 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
10+100 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
10+120 20 7.00 1.75 1.82 36.30 1.40 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80
10+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

402 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

10+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+340 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
10+360 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
10+380 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
10+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+440 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
10+460 20 7.23 1.81 1.90 37.90 1.45 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
10+480 20 7.90 1.98 1.90 37.90 1.58 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
10+500 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
10+520 20 7.12 1.78 1.88 37.60 1.42 1.50 30.04 3.00 0.53 10.60 165.20 193.28 21.48
10+540 20 7.21 1.80 1.79 35.80 1.44 1.43 28.66 3.00 0.53 10.60 158.30 185.21 20.58
10+560 20 8.03 2.01 1.91 38.10 1.61 1.52 30.48 3.00 0.53 10.60 167.40 195.86 21.76
10+580 20 7.00 1.75 1.88 37.60 1.40 1.50 30.06 3.00 0.53 10.60 165.30 193.40 21.49
10+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+660 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
10+700 20 7.72 1.93 1.84 36.80 1.54 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
10+720 20 8.33 2.08 2.01 40.10 1.67 1.61 32.10 3.00 0.53 10.60 175.50 205.34 22.82
10+740 20 7.60 1.90 1.99 39.80 1.52 1.59 31.86 3.00 0.53 10.60 174.30 203.93 22.66
10+760 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
10+780 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71

403 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

10+800 20 7.52 1.88 1.89 37.80 1.50 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
10+820 20 7.55 1.89 1.89 37.70 1.51 1.51 30.14 3.00 0.53 10.60 165.70 193.87 21.54
10+840 20 7.90 1.98 1.94 38.70 1.58 1.55 30.90 3.00 0.53 10.60 169.50 198.32 22.04
10+860 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
10+880 20 7.45 1.86 1.92 38.40 1.49 1.54 30.70 3.00 0.53 10.60 168.50 197.15 21.91
10+900 20 7.37 1.84 1.85 37.00 1.47 1.48 29.64 3.00 0.53 10.60 163.20 190.94 21.22
10+920 20 8.20 2.05 1.95 38.90 1.64 1.56 31.14 3.00 0.53 10.60 170.70 199.72 22.19
10+940 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
10+960 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
10+980 20 7.76 1.94 1.96 39.20 1.55 1.57 31.32 3.00 0.53 10.60 171.60 200.77 22.31
11+000 20 7.00 1.75 1.85 36.90 1.40 1.48 29.52 3.00 0.53 10.60 162.60 190.24 21.14
11+020 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
11+040 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
11+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
11+080 20 7.73 1.93 1.84 36.80 1.55 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
11+100 20 7.80 1.95 1.94 38.80 1.56 1.55 31.06 3.00 0.53 10.60 170.30 199.25 22.14
11+120 20 8.16 2.04 2.00 39.90 1.63 1.60 31.92 3.00 0.53 10.60 174.60 204.28 22.70
11+140 20 8.60 2.15 2.10 41.90 1.72 1.68 33.52 3.00 0.53 10.60 182.60 213.64 23.74
11+160 20 7.59 1.90 2.03 40.50 1.52 1.62 32.38 3.00 0.53 10.60 176.90 206.97 23.00
11+180 20 7.00 1.75 1.83 36.50 1.40 1.46 29.18 3.00 0.53 10.60 160.90 188.25 20.92
11+200 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
11+220 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
11+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
11+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
11+280 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
11+300 20 8.09 2.02 2.00 40.00 1.62 1.60 31.98 3.00 0.53 10.60 174.90 204.63 22.74

404 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

11+320 20 8.54 2.14 2.08 41.60 1.71 1.66 33.26 3.00 0.53 10.60 181.30 212.12 23.57
11+340 20 7.00 1.75 1.95 38.90 1.40 1.55 31.08 3.00 0.53 10.60 170.40 199.37 22.15
11+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
11+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
11+400 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
11+420 20 7.10 1.78 1.87 37.30 1.42 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
11+440 20 8.14 2.04 1.91 38.20 1.63 1.52 30.48 3.00 0.53 10.60 167.40 195.86 21.76
11+460 20 8.20 2.05 2.05 40.90 1.64 1.63 32.68 3.00 0.53 10.60 178.40 208.73 23.19
11+480 20 7.89 1.97 2.01 40.20 1.58 1.61 32.18 3.00 0.53 10.60 175.90 205.80 22.87
11+500 20 7.90 1.98 1.98 39.50 1.58 1.58 31.58 3.00 0.53 10.60 172.90 202.29 22.48
11+520 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
11+540 20 7.70 1.93 1.84 36.80 1.54 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06
11+560 20 8.20 2.05 1.99 39.80 1.64 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62
11+580 20 7.90 1.98 2.02 40.30 1.58 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88
11+600 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
11+620 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
11+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
11+660 20 7.09 1.77 1.76 35.20 1.42 1.41 28.18 3.00 0.53 10.60 155.90 182.40 20.27
11+680 20 8.20 2.05 1.91 38.20 1.64 1.53 30.58 3.00 0.53 10.60 167.90 196.44 21.83
11+700 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
11+720 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
11+740 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
11+760 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
11+780 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
11+800 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
11+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

405 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

11+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
11+860 20 7.17 1.79 1.77 35.40 1.43 1.42 28.34 3.00 0.53 10.60 156.70 183.34 20.37
11+880 20 8.20 2.05 1.92 38.40 1.64 1.54 30.74 3.00 0.53 10.60 168.70 197.38 21.93
11+900 20 7.74 1.94 2.00 39.90 1.55 1.59 31.88 3.00 0.53 10.60 174.40 204.05 22.67
11+920 20 8.20 2.05 2.00 39.90 1.64 1.59 31.88 3.00 0.53 10.60 174.40 204.05 22.67
11+940 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
11+960 20 7.11 1.78 1.92 38.30 1.42 1.53 30.62 3.00 0.53 10.60 168.10 196.68 21.85
11+980 20 8.60 2.15 1.97 39.30 1.72 1.57 31.42 3.00 0.53 10.60 172.10 201.36 22.37
12+000 20 7.27 1.82 1.99 39.70 1.45 1.59 31.74 3.00 0.53 10.60 173.70 203.23 22.58
12+020 20 7.06 1.77 1.80 35.90 1.41 1.43 28.66 3.00 0.53 10.60 158.30 185.21 20.58
12+040 20 7.37 1.84 1.81 36.10 1.47 1.44 28.86 3.00 0.53 10.60 159.30 186.38 20.71
12+060 20 8.60 2.15 2.00 39.90 1.72 1.60 31.94 3.00 0.53 10.60 174.70 204.40 22.71
12+080 20 8.67 2.17 2.16 43.20 1.73 1.73 34.54 3.00 0.53 10.60 187.70 219.61 24.40
12+100 20 7.76 1.94 2.06 41.10 1.55 1.64 32.86 3.00 0.53 10.60 179.30 209.78 23.31
12+120 20 7.00 1.75 1.85 36.90 1.40 1.48 29.52 3.00 0.53 10.60 162.60 190.24 21.14
12+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
12+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
12+180 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
12+200 20 7.33 1.83 1.91 38.10 1.47 1.52 30.46 3.00 0.53 10.60 167.30 195.74 21.75
12+220 20 7.00 1.75 1.79 35.80 1.40 1.43 28.66 3.00 0.53 10.60 158.30 185.21 20.58
12+240 20 7.34 1.84 1.80 35.90 1.47 1.43 28.68 3.00 0.53 10.60 158.40 185.33 20.59
12+260 20 7.80 1.95 1.90 37.90 1.56 1.51 30.28 3.00 0.53 10.60 166.40 194.69 21.63
12+280 20 7.45 1.86 1.91 38.10 1.49 1.53 30.50 3.00 0.53 10.60 167.50 195.98 21.78
12+300 20 7.66 1.92 1.89 37.80 1.53 1.51 30.22 3.00 0.53 10.60 166.10 194.34 21.59
12+320 20 7.90 1.98 1.95 39.00 1.58 1.56 31.12 3.00 0.53 10.60 170.60 199.60 22.18
12+340 20 7.88 1.97 1.98 39.50 1.58 1.58 31.56 3.00 0.53 10.60 172.80 202.18 22.46

406 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

12+360 20 7.00 1.75 1.86 37.20 1.40 1.49 29.76 3.00 0.53 10.60 163.80 191.65 21.29
12+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
12+400 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
12+420 20 7.03 1.76 1.91 38.10 1.41 1.52 30.46 3.00 0.53 10.60 167.30 195.74 21.75
12+440 20 7.60 1.90 1.83 36.60 1.52 1.46 29.26 3.00 0.53 10.60 161.30 188.72 20.97
12+460 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
12+480 20 7.90 1.98 1.94 38.80 1.58 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10
12+500 20 7.64 1.91 1.95 38.90 1.53 1.55 31.08 3.00 0.53 10.60 170.40 199.37 22.15
12+520 20 7.55 1.89 1.90 38.00 1.51 1.52 30.38 3.00 0.53 10.60 166.90 195.27 21.70
12+540 20 7.90 1.98 1.94 38.70 1.58 1.55 30.90 3.00 0.53 10.60 169.50 198.32 22.04
12+560 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
12+580 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
12+600 20 7.59 1.90 1.94 38.80 1.52 1.55 30.98 3.00 0.53 10.60 169.90 198.78 22.09
12+620 20 7.00 1.75 1.83 36.50 1.40 1.46 29.18 3.00 0.53 10.60 160.90 188.25 20.92
12+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
12+660 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
12+680 20 7.90 1.98 1.94 38.70 1.58 1.55 30.92 3.00 0.53 10.60 169.60 198.43 22.05
12+700 20 7.01 1.75 1.87 37.30 1.40 1.49 29.82 3.00 0.53 10.60 164.10 192.00 21.33
12+720 20 7.90 1.98 1.87 37.30 1.58 1.49 29.82 3.00 0.53 10.60 164.10 192.00 21.33
12+740 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
12+760 20 7.86 1.97 1.98 39.50 1.57 1.58 31.52 3.00 0.53 10.60 172.60 201.94 22.44
12+780 20 7.56 1.89 1.93 38.60 1.51 1.54 30.84 3.00 0.53 10.60 169.20 197.96 22.00
12+800 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
12+820 20 7.08 1.77 1.83 36.60 1.42 1.46 29.28 3.00 0.53 10.60 161.40 188.84 20.98
12+840 20 7.87 1.97 1.87 37.40 1.57 1.50 29.90 3.00 0.53 10.60 164.50 192.47 21.39
12+860 20 8.60 2.15 2.06 41.20 1.72 1.65 32.94 3.00 0.53 10.60 179.70 210.25 23.36

407 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

12+880 20 7.94 1.99 2.07 41.40 1.59 1.65 33.08 3.00 0.53 10.60 180.40 211.07 23.45
12+900 20 7.90 1.98 1.99 39.70 1.58 1.58 31.68 3.00 0.53 10.60 173.40 202.88 22.54
12+920 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
12+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
12+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
12+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+000 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
13+020 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
13+040 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
13+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+080 20 7.47 1.87 1.81 36.20 1.49 1.45 28.94 3.00 0.53 10.60 159.70 186.85 20.76
13+100 20 7.80 1.95 1.91 38.20 1.56 1.53 30.54 3.00 0.53 10.60 167.70 196.21 21.80
13+120 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
13+140 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
13+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+260 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
13+280 20 7.20 1.80 1.89 37.80 1.44 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58
13+300 20 7.00 1.75 1.78 35.50 1.40 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41
13+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+380 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88

408 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

13+400 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
13+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+440 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
13+460 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
13+480 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
13+500 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
13+520 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
13+540 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
13+560 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
13+580 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
13+600 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
13+620 20 7.40 1.85 1.88 37.50 1.48 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
13+640 20 7.01 1.75 1.80 36.00 1.40 1.44 28.82 3.00 0.53 10.60 159.10 186.15 20.68
13+660 20 8.20 2.05 1.90 38.00 1.64 1.52 30.42 3.00 0.53 10.60 167.10 195.51 21.72
13+680 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
13+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+740 20 7.72 1.93 1.84 36.80 1.54 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
13+760 20 8.20 2.05 1.99 39.80 1.64 1.59 31.84 3.00 0.53 10.60 174.20 203.81 22.65
13+780 20 7.90 1.98 2.02 40.30 1.58 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88
13+800 20 7.40 1.85 1.92 38.30 1.48 1.53 30.60 3.00 0.53 10.60 168.00 196.56 21.84
13+820 20 8.20 2.05 1.95 39.00 1.64 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
13+840 20 8.19 2.05 2.05 41.00 1.64 1.64 32.78 3.00 0.53 10.60 178.90 209.31 23.26
13+860 20 7.00 1.75 1.90 38.00 1.40 1.52 30.38 3.00 0.53 10.60 166.90 195.27 21.70
13+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
13+900 20 7.50 1.88 1.82 36.30 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80

409 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

13+920 20 7.90 1.98 1.93 38.60 1.58 1.54 30.80 3.00 0.53 10.60 169.00 197.73 21.97
13+940 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
13+960 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
13+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+000 20 7.74 1.94 1.85 36.90 1.55 1.47 29.48 3.00 0.53 10.60 162.40 190.01 21.11
14+020 20 7.03 1.76 1.85 37.00 1.41 1.48 29.54 3.00 0.53 10.60 162.70 190.36 21.15
14+040 20 7.00 1.75 1.76 35.10 1.40 1.40 28.06 3.00 0.53 10.60 155.30 181.70 20.19
14+060 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
14+080 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
14+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+160 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
14+180 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
14+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+280 20 7.58 1.90 1.83 36.50 1.52 1.46 29.16 3.00 0.53 10.60 160.80 188.14 20.90
14+300 20 7.84 1.96 1.93 38.60 1.57 1.54 30.84 3.00 0.53 10.60 169.20 197.96 22.00
14+320 20 7.90 1.98 1.97 39.40 1.58 1.57 31.48 3.00 0.53 10.60 172.40 201.71 22.41
14+340 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
14+360 20 7.42 1.86 1.92 38.40 1.48 1.53 30.64 3.00 0.53 10.60 168.20 196.79 21.87
14+380 20 7.80 1.95 1.91 38.10 1.56 1.52 30.44 3.00 0.53 10.60 167.20 195.62 21.74
14+400 20 7.90 1.98 1.97 39.30 1.58 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36
14+420 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32

410 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

14+440 20 7.53 1.88 1.82 36.30 1.51 1.45 29.06 3.00 0.53 10.60 160.30 187.55 20.84
14+460 20 7.56 1.89 1.89 37.70 1.51 1.51 30.18 3.00 0.53 10.60 165.90 194.10 21.57
14+480 20 8.13 2.03 1.96 39.20 1.63 1.57 31.38 3.00 0.53 10.60 171.90 201.12 22.35
14+500 20 7.00 1.75 1.89 37.80 1.40 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
14+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+560 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
14+580 20 7.87 1.97 1.98 39.50 1.57 1.58 31.54 3.00 0.53 10.60 172.70 202.06 22.45
14+600 20 7.21 1.80 1.89 37.70 1.44 1.51 30.16 3.00 0.53 10.60 165.80 193.99 21.55
14+620 20 8.60 2.15 1.98 39.50 1.72 1.58 31.62 3.00 0.53 10.60 173.10 202.53 22.50
14+640 20 8.02 2.01 2.08 41.60 1.60 1.66 33.24 3.00 0.53 10.60 181.20 212.00 23.56
14+660 20 7.00 1.75 1.88 37.60 1.40 1.50 30.04 3.00 0.53 10.60 165.20 193.28 21.48
14+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+760 20 7.68 1.92 1.84 36.70 1.54 1.47 29.36 3.00 0.53 10.60 161.80 189.31 21.03
14+780 20 8.20 2.05 1.99 39.70 1.64 1.59 31.76 3.00 0.53 10.60 173.80 203.35 22.59
14+800 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
14+820 20 8.11 2.03 2.04 40.80 1.62 1.63 32.62 3.00 0.53 10.60 178.10 208.38 23.15
14+840 20 7.00 1.75 1.89 37.80 1.40 1.51 30.22 3.00 0.53 10.60 166.10 194.34 21.59
14+860 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
14+880 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
14+900 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
14+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

411 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

14+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
14+980 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
15+000 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
15+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
15+040 20 7.43 1.86 1.81 36.10 1.49 1.44 28.86 3.00 0.53 10.60 159.30 186.38 20.71
15+060 20 8.60 2.15 2.01 40.10 1.72 1.60 32.06 3.00 0.53 10.60 175.30 205.10 22.79
15+080 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
15+100 20 7.01 1.75 1.95 39.00 1.40 1.56 31.22 3.00 0.53 10.60 171.10 200.19 22.24
15+120 20 8.20 2.05 1.90 38.00 1.64 1.52 30.42 3.00 0.53 10.60 167.10 195.51 21.72
15+140 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
15+160 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
15+180 20 8.35 2.09 1.92 38.40 1.67 1.54 30.70 3.00 0.53 10.60 168.50 197.15 21.91
15+200 20 8.60 2.15 2.12 42.40 1.72 1.70 33.90 3.00 0.53 10.60 184.50 215.87 23.99
15+220 20 8.14 2.04 2.10 41.90 1.63 1.67 33.48 3.00 0.53 10.60 182.40 213.41 23.71
15+240 20 7.94 1.99 2.02 40.30 1.59 1.61 32.16 3.00 0.53 10.60 175.80 205.69 22.85
15+260 20 8.60 2.15 2.07 41.40 1.72 1.65 33.08 3.00 0.53 10.60 180.40 211.07 23.45
15+280 20 8.38 2.10 2.13 42.50 1.68 1.70 33.96 3.00 0.53 10.60 184.80 216.22 24.02
15+300 20 8.20 2.05 2.08 41.50 1.64 1.66 33.16 3.00 0.53 10.60 180.80 211.54 23.50
15+320 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
15+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
15+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
15+380 20 8.28 2.07 1.91 38.20 1.66 1.53 30.56 3.00 0.53 10.60 167.80 196.33 21.81
15+400 20 8.60 2.15 2.11 42.20 1.72 1.69 33.76 3.00 0.53 10.60 183.80 215.05 23.89
15+420 20 8.24 2.06 2.11 42.10 1.65 1.68 33.68 3.00 0.53 10.60 183.40 214.58 23.84
15+440 20 8.20 2.05 2.06 41.10 1.64 1.64 32.88 3.00 0.53 10.60 179.40 209.90 23.32
15+460 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27

412 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

15+480 20 8.02 2.01 2.03 40.60 1.60 1.62 32.44 3.00 0.53 10.60 177.20 207.32 23.04
15+500 20 7.90 1.98 2.00 39.90 1.58 1.59 31.84 3.00 0.53 10.60 174.20 203.81 22.65
15+520 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
15+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
15+560 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
15+580 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
15+600 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
15+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
15+640 20 7.65 1.91 1.83 36.60 1.53 1.47 29.30 3.00 0.53 10.60 161.50 188.96 21.00
15+660 20 7.00 1.75 1.83 36.60 1.40 1.47 29.30 3.00 0.53 10.60 161.50 188.96 21.00
15+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
15+700 20 7.13 1.78 1.77 35.30 1.43 1.41 28.26 3.00 0.53 10.60 156.30 182.87 20.32
15+720 20 7.80 1.95 1.87 37.30 1.56 1.49 29.86 3.00 0.53 10.60 164.30 192.23 21.36
15+740 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
15+760 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
15+780 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
15+800 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
15+820 20 8.01 2.00 1.99 39.80 1.60 1.59 31.82 3.00 0.53 10.60 174.10 203.70 22.63
15+840 20 7.84 1.96 1.98 39.60 1.57 1.59 31.70 3.00 0.53 10.60 173.50 203.00 22.56
15+860 20 7.66 1.92 1.94 38.80 1.53 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10
15+880 20 7.48 1.87 1.90 37.90 1.50 1.51 30.28 3.00 0.53 10.60 166.40 194.69 21.63
15+900 20 7.31 1.83 1.85 37.00 1.46 1.48 29.58 3.00 0.53 10.60 162.90 190.59 21.18
15+920 20 7.90 1.98 1.91 38.10 1.58 1.52 30.42 3.00 0.53 10.60 167.10 195.51 21.72
15+940 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
15+960 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
15+980 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49

413 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

16+000 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
16+020 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
16+040 20 7.66 1.92 1.99 39.70 1.53 1.59 31.72 3.00 0.53 10.60 173.60 203.11 22.57
16+060 20 7.56 1.89 1.91 38.10 1.51 1.52 30.44 3.00 0.53 10.60 167.20 195.62 21.74
16+080 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
16+100 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
16+120 20 7.10 1.78 1.77 35.30 1.42 1.41 28.20 3.00 0.53 10.60 156.00 182.52 20.28
16+140 20 7.50 1.88 1.83 36.60 1.50 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
16+160 20 7.28 1.82 1.85 37.00 1.46 1.48 29.56 3.00 0.53 10.60 162.80 190.48 21.16
16+180 20 8.90 2.23 2.03 40.50 1.78 1.62 32.36 3.00 0.53 10.60 176.80 206.86 22.98
16+200 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
16+220 20 8.02 2.01 2.12 42.40 1.60 1.69 33.84 3.00 0.53 10.60 184.20 215.51 23.95
16+240 20 7.00 1.75 1.88 37.60 1.40 1.50 30.04 3.00 0.53 10.60 165.20 193.28 21.48
16+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+360 20 7.04 1.76 1.76 35.10 1.41 1.40 28.08 3.00 0.53 10.60 155.40 181.82 20.20
16+380 20 7.00 1.75 1.76 35.10 1.40 1.40 28.08 3.00 0.53 10.60 155.40 181.82 20.20
16+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+420 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
16+440 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
16+460 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
16+480 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

414 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

16+520 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
16+540 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
16+560 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
16+580 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
16+600 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
16+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+640 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
16+660 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
16+680 20 8.60 2.15 2.07 41.30 1.72 1.65 33.00 3.00 0.53 10.60 180.00 210.60 23.40
16+700 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
16+720 20 8.38 2.10 2.13 42.50 1.68 1.70 33.96 3.00 0.53 10.60 184.80 216.22 24.02
16+740 20 7.46 1.87 1.99 39.70 1.49 1.58 31.68 3.00 0.53 10.60 173.40 202.88 22.54
16+760 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
16+780 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
16+800 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
16+820 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
16+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+860 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
16+880 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
16+900 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
16+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
16+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+000 20 7.92 1.98 1.87 37.30 1.58 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
17+020 20 7.00 1.75 1.87 37.30 1.40 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35

415 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

17+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+080 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+100 20 7.78 1.95 1.85 37.00 1.56 1.48 29.56 3.00 0.53 10.60 162.80 190.48 21.16
17+120 20 8.06 2.02 1.99 39.70 1.61 1.58 31.68 3.00 0.53 10.60 173.40 202.88 22.54
17+140 20 8.20 2.05 2.04 40.70 1.64 1.63 32.52 3.00 0.53 10.60 177.60 207.79 23.09
17+160 20 7.66 1.92 1.99 39.70 1.53 1.59 31.72 3.00 0.53 10.60 173.60 203.11 22.57
17+180 20 7.90 1.98 1.95 39.00 1.58 1.56 31.12 3.00 0.53 10.60 170.60 199.60 22.18
17+200 20 7.22 1.81 1.90 37.90 1.44 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
17+220 20 7.81 1.95 1.88 37.60 1.56 1.50 30.06 3.00 0.53 10.60 165.30 193.40 21.49
17+240 20 7.90 1.98 1.97 39.30 1.58 1.57 31.42 3.00 0.53 10.60 172.10 201.36 22.37
17+260 20 7.21 1.80 1.89 37.80 1.44 1.51 30.22 3.00 0.53 10.60 166.10 194.34 21.59
17+280 20 8.20 2.05 1.93 38.50 1.64 1.54 30.82 3.00 0.53 10.60 169.10 197.85 21.98
17+300 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
17+320 20 8.40 2.10 2.08 41.50 1.68 1.66 33.20 3.00 0.53 10.60 181.00 211.77 23.53
17+340 20 7.90 1.98 2.04 40.80 1.58 1.63 32.60 3.00 0.53 10.60 178.00 208.26 23.14
17+360 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
17+380 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
17+400 20 7.59 1.90 1.94 38.80 1.52 1.55 30.98 3.00 0.53 10.60 169.90 198.78 22.09
17+420 20 7.00 1.75 1.83 36.50 1.40 1.46 29.18 3.00 0.53 10.60 160.90 188.25 20.92
17+440 20 7.74 1.94 1.85 36.90 1.55 1.47 29.48 3.00 0.53 10.60 162.40 190.01 21.11
17+460 20 7.90 1.98 1.96 39.20 1.58 1.56 31.28 3.00 0.53 10.60 171.40 200.54 22.28
17+480 20 7.08 1.77 1.88 37.50 1.42 1.50 29.96 3.00 0.53 10.60 164.80 192.82 21.42
17+500 20 7.90 1.98 1.88 37.50 1.58 1.50 29.96 3.00 0.53 10.60 164.80 192.82 21.42
17+520 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
17+540 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93

416 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

17+560 20 7.17 1.79 1.85 36.90 1.43 1.48 29.54 3.00 0.53 10.60 162.70 190.36 21.15
17+580 20 7.00 1.75 1.77 35.40 1.40 1.42 28.34 3.00 0.53 10.60 156.70 183.34 20.37
17+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+640 20 7.63 1.91 1.83 36.60 1.53 1.46 29.26 3.00 0.53 10.60 161.30 188.72 20.97
17+660 20 8.20 2.05 1.98 39.60 1.64 1.58 31.66 3.00 0.53 10.60 173.30 202.76 22.53
17+680 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
17+700 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
17+720 20 7.68 1.92 1.99 39.70 1.54 1.59 31.76 3.00 0.53 10.60 173.80 203.35 22.59
17+740 20 7.00 1.75 1.84 36.70 1.40 1.47 29.36 3.00 0.53 10.60 161.80 189.31 21.03
17+760 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
17+780 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
17+800 20 8.03 2.01 2.00 39.90 1.61 1.59 31.86 3.00 0.53 10.60 174.30 203.93 22.66
17+820 20 8.20 2.05 2.03 40.60 1.64 1.62 32.46 3.00 0.53 10.60 177.30 207.44 23.05
17+840 20 7.84 1.96 2.01 40.10 1.57 1.60 32.08 3.00 0.53 10.60 175.40 205.22 22.80
17+860 20 8.17 2.04 2.00 40.00 1.63 1.60 32.02 3.00 0.53 10.60 175.10 204.87 22.76
17+880 20 8.60 2.15 2.10 41.90 1.72 1.68 33.54 3.00 0.53 10.60 182.70 213.76 23.75
17+900 20 7.00 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
17+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
17+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+020 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
18+040 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
18+060 20 7.36 1.84 1.90 37.90 1.47 1.52 30.32 3.00 0.53 10.60 166.60 194.92 21.66

417 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

18+080 20 7.06 1.77 1.81 36.10 1.41 1.44 28.84 3.00 0.53 10.60 159.20 186.26 20.70
18+100 20 7.00 1.75 1.76 35.20 1.40 1.41 28.12 3.00 0.53 10.60 155.60 182.05 20.23
18+120 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
18+140 20 7.66 1.92 1.94 38.70 1.53 1.55 30.92 3.00 0.53 10.60 169.60 198.43 22.05
18+160 20 7.00 1.75 1.84 36.70 1.40 1.47 29.32 3.00 0.53 10.60 161.60 189.07 21.01
18+180 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
18+200 20 7.60 1.90 1.94 38.80 1.52 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10
18+220 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
18+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+340 20 7.11 1.78 1.77 35.30 1.42 1.41 28.22 3.00 0.53 10.60 156.10 182.64 20.29
18+360 20 7.90 1.98 1.88 37.60 1.58 1.50 30.02 3.00 0.53 10.60 165.10 193.17 21.46
18+380 20 7.52 1.88 1.93 38.60 1.50 1.54 30.84 3.00 0.53 10.60 169.20 197.96 22.00
18+400 20 7.80 1.95 1.92 38.30 1.56 1.53 30.64 3.00 0.53 10.60 168.20 196.79 21.87
18+420 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
18+440 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
18+460 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
18+480 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
18+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+520 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
18+540 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
18+560 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
18+580 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75

418 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

18+600 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
18+620 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
18+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+660 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
18+680 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
18+700 20 7.66 1.92 1.95 39.00 1.53 1.56 31.12 3.00 0.53 10.60 170.60 199.60 22.18
18+720 20 7.00 1.75 1.84 36.70 1.40 1.47 29.32 3.00 0.53 10.60 161.60 189.07 21.01
18+740 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
18+760 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
18+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+820 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
18+840 20 8.09 2.02 2.04 40.70 1.62 1.63 32.58 3.00 0.53 10.60 177.90 208.14 23.13
18+860 20 7.90 1.98 2.00 40.00 1.58 1.60 31.98 3.00 0.53 10.60 174.90 204.63 22.74
18+880 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
18+900 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
18+920 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
18+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
18+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+000 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
19+020 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
19+040 20 7.20 1.80 1.93 38.50 1.44 1.54 30.80 3.00 0.53 10.60 169.00 197.73 21.97
19+060 20 7.36 1.84 1.82 36.40 1.47 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
19+080 20 7.36 1.84 1.84 36.80 1.47 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
19+100 20 7.36 1.84 1.84 36.80 1.47 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09

419 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

19+120 20 7.36 1.84 1.84 36.80 1.47 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
19+140 20 7.36 1.84 1.84 36.80 1.47 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
19+160 20 7.00 1.75 1.80 35.90 1.40 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
19+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+260 20 7.38 1.85 1.80 36.00 1.48 1.44 28.76 3.00 0.53 10.60 158.80 185.80 20.64
19+280 20 7.46 1.87 1.86 37.20 1.49 1.48 29.68 3.00 0.53 10.60 163.40 191.18 21.24
19+300 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
19+320 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
19+340 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
19+360 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
19+380 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
19+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+460 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
19+480 20 7.78 1.95 1.97 39.30 1.56 1.57 31.36 3.00 0.53 10.60 171.80 201.01 22.33
19+500 20 7.00 1.75 1.85 37.00 1.40 1.48 29.56 3.00 0.53 10.60 162.80 190.48 21.16
19+520 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
19+540 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
19+560 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
19+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

420 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

19+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+660 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+700 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
19+720 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
19+740 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
19+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+800 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
19+820 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
19+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
19+920 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
19+940 20 7.13 1.78 1.92 38.30 1.43 1.53 30.66 3.00 0.53 10.60 168.30 196.91 21.88
19+960 20 7.80 1.95 1.87 37.30 1.56 1.49 29.86 3.00 0.53 10.60 164.30 192.23 21.36
19+980 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
20+000 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
20+020 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
20+040 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
20+060 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
20+080 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
20+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+140 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88

421 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

20+160 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
20+180 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
20+200 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
20+220 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
20+240 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
20+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+300 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
20+320 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
20+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+400 20 7.20 1.80 1.78 35.50 1.44 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41
20+420 20 7.00 1.75 1.78 35.50 1.40 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41
20+440 20 7.38 1.85 1.80 36.00 1.48 1.44 28.76 3.00 0.53 10.60 158.80 185.80 20.64
20+460 20 7.21 1.80 1.83 36.50 1.44 1.46 29.18 3.00 0.53 10.60 160.90 188.25 20.92
20+480 20 7.00 1.75 1.78 35.50 1.40 1.42 28.42 3.00 0.53 10.60 157.10 183.81 20.42
20+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+540 20 8.04 2.01 1.88 37.60 1.61 1.50 30.08 3.00 0.53 10.60 165.40 193.52 21.50
20+560 20 8.20 2.05 2.03 40.60 1.64 1.62 32.48 3.00 0.53 10.60 177.40 207.56 23.06
20+580 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
20+600 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
20+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+640 20 7.48 1.87 1.81 36.20 1.50 1.45 28.96 3.00 0.53 10.60 159.80 186.97 20.77
20+660 20 7.70 1.93 1.90 38.00 1.54 1.52 30.36 3.00 0.53 10.60 166.80 195.16 21.68

422 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

20+680 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06
20+700 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
20+720 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
20+740 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
20+760 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
20+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
20+840 20 7.26 1.82 1.79 35.70 1.45 1.43 28.52 3.00 0.53 10.60 157.60 184.39 20.49
20+860 20 7.71 1.93 1.88 37.50 1.54 1.50 29.94 3.00 0.53 10.60 164.70 192.70 21.41
20+880 20 8.60 2.15 2.04 40.80 1.72 1.63 32.62 3.00 0.53 10.60 178.10 208.38 23.15
20+900 20 8.47 2.12 2.14 42.70 1.69 1.71 34.14 3.00 0.53 10.60 185.70 217.27 24.14
20+920 20 7.39 1.85 1.99 39.70 1.48 1.59 31.72 3.00 0.53 10.60 173.60 203.11 22.57
20+940 20 7.00 1.75 1.80 36.00 1.40 1.44 28.78 3.00 0.53 10.60 158.90 185.91 20.66
20+960 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
20+980 20 7.46 1.87 1.86 37.20 1.49 1.49 29.72 3.00 0.53 10.60 163.60 191.41 21.27
21+000 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
21+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+060 20 7.47 1.87 1.81 36.20 1.49 1.45 28.94 3.00 0.53 10.60 159.70 186.85 20.76
21+080 20 7.00 1.75 1.81 36.20 1.40 1.45 28.94 3.00 0.53 10.60 159.70 186.85 20.76
21+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+140 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
21+160 20 7.58 1.90 1.90 38.00 1.52 1.52 30.36 3.00 0.53 10.60 166.80 195.16 21.68
21+180 20 7.00 1.75 1.83 36.50 1.40 1.46 29.16 3.00 0.53 10.60 160.80 188.14 20.90

423 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

21+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+260 20 8.01 2.00 1.88 37.50 1.60 1.50 30.02 3.00 0.53 10.60 165.10 193.17 21.46
21+280 20 8.90 2.23 2.12 42.30 1.78 1.69 33.82 3.00 0.53 10.60 184.10 215.40 23.93
21+300 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
21+320 20 7.40 1.85 2.04 40.80 1.48 1.63 32.60 3.00 0.53 10.60 178.00 208.26 23.14
21+340 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
21+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+460 20 7.36 1.84 1.80 35.90 1.47 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
21+480 20 7.00 1.75 1.80 35.90 1.40 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
21+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+560 20 7.67 1.92 1.84 36.70 1.53 1.47 29.34 3.00 0.53 10.60 161.70 189.19 21.02
21+580 20 8.60 2.15 2.04 40.70 1.72 1.63 32.54 3.00 0.53 10.60 177.70 207.91 23.10
21+600 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
21+620 20 7.19 1.80 1.98 39.50 1.44 1.58 31.58 3.00 0.53 10.60 172.90 202.29 22.48
21+640 20 7.00 1.75 1.78 35.50 1.40 1.42 28.38 3.00 0.53 10.60 156.90 183.57 20.40
21+660 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

424 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

21+720 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
21+740 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
21+760 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
21+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+800 20 7.88 1.97 1.86 37.20 1.58 1.49 29.76 3.00 0.53 10.60 163.80 191.65 21.29
21+820 20 7.25 1.81 1.89 37.80 1.45 1.51 30.26 3.00 0.53 10.60 166.30 194.57 21.62
21+840 20 7.00 1.75 1.78 35.60 1.40 1.43 28.50 3.00 0.53 10.60 157.50 184.28 20.48
21+860 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
21+880 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
21+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
21+960 20 8.83 2.21 1.98 39.60 1.77 1.58 31.66 3.00 0.53 10.60 173.30 202.76 22.53
21+980 20 8.90 2.23 2.22 44.40 1.78 1.77 35.46 3.00 0.53 10.60 192.30 224.99 25.00
22+000 20 8.50 2.13 2.18 43.60 1.70 1.74 34.80 3.00 0.53 10.60 189.00 221.13 24.57
22+020 20 7.00 1.75 1.94 38.80 1.40 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10
22+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+080 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
22+100 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
22+120 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
22+140 20 7.42 1.86 1.81 36.10 1.48 1.44 28.84 3.00 0.53 10.60 159.20 186.26 20.70
22+160 20 8.60 2.15 2.01 40.10 1.72 1.60 32.04 3.00 0.53 10.60 175.20 204.98 22.78
22+180 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
22+200 20 7.43 1.86 2.01 40.10 1.49 1.60 32.06 3.00 0.53 10.60 175.30 205.10 22.79
22+220 20 7.00 1.75 1.81 36.10 1.40 1.44 28.86 3.00 0.53 10.60 159.30 186.38 20.71

425 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

22+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+260 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
22+280 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
22+300 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
22+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+360 20 8.19 2.05 1.90 38.00 1.64 1.52 30.38 3.00 0.53 10.60 166.90 195.27 21.70
22+380 20 8.90 2.23 2.14 42.80 1.78 1.71 34.18 3.00 0.53 10.60 185.90 217.50 24.17
22+400 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
22+420 20 7.00 1.75 1.99 39.80 1.40 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62
22+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+480 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+500 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
22+520 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
22+540 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
22+560 20 7.63 1.91 1.90 38.00 1.53 1.52 30.38 3.00 0.53 10.60 166.90 195.27 21.70
22+580 20 8.60 2.15 2.03 40.60 1.72 1.62 32.46 3.00 0.53 10.60 177.30 207.44 23.05
22+600 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
22+620 20 7.28 1.82 1.99 39.70 1.46 1.59 31.76 3.00 0.53 10.60 173.80 203.35 22.59
22+640 20 7.48 1.87 1.85 36.90 1.50 1.48 29.52 3.00 0.53 10.60 162.60 190.24 21.14
22+660 20 7.56 1.89 1.88 37.60 1.51 1.50 30.08 3.00 0.53 10.60 165.40 193.52 21.50
22+680 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
22+700 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
22+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

426 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

22+760 20 7.36 1.84 1.80 35.90 1.47 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
22+780 20 7.00 1.75 1.80 35.90 1.40 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
22+800 20 8.07 2.02 1.89 37.70 1.61 1.51 30.14 3.00 0.53 10.60 165.70 193.87 21.54
22+820 20 8.90 2.23 2.13 42.50 1.78 1.70 33.94 3.00 0.53 10.60 184.70 216.10 24.01
22+840 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09
22+860 20 7.16 1.79 2.01 40.20 1.43 1.61 32.12 3.00 0.53 10.60 175.60 205.45 22.83
22+880 20 7.00 1.75 1.77 35.40 1.40 1.42 28.32 3.00 0.53 10.60 156.60 183.22 20.36
22+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
22+980 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
23+000 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
23+020 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
23+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+080 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+140 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
23+160 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
23+180 20 7.26 1.82 1.89 37.70 1.45 1.51 30.12 3.00 0.53 10.60 165.60 193.75 21.53
23+200 20 7.00 1.75 1.79 35.70 1.40 1.43 28.52 3.00 0.53 10.60 157.60 184.39 20.49
23+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+240 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
23+260 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35

427 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

23+280 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
23+300 20 7.40 1.85 1.86 37.20 1.48 1.49 29.72 3.00 0.53 10.60 163.60 191.41 21.27
23+320 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
23+340 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
23+360 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
23+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+480 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+520 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
23+540 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
23+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+660 20 7.60 1.90 1.83 36.50 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
23+680 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
23+700 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
23+720 20 0.00 - 0.95 19.00 - 0.76 15.20 3.00 0.53 10.60 91.00 106.47 11.83
23+740 20 7.36 1.84 0.92 18.40 1.47 0.74 14.72 3.00 0.53 10.60 88.60 103.66 11.52
23+760 20 7.36 1.84 1.84 36.80 1.47 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09
23+780 20 7.36 1.84 1.84 36.80 1.47 1.47 29.44 3.00 0.53 10.60 162.20 189.77 21.09

428 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

23+800 20 7.00 1.75 1.80 35.90 1.40 1.44 28.72 3.00 0.53 10.60 158.60 185.56 20.62
23+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
23+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+000 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
24+020 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
24+040 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
24+060 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
24+080 20 7.80 1.95 2.05 41.00 1.56 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27
24+100 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
24+120 20 7.20 1.80 1.88 37.50 1.44 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
24+140 20 7.00 1.75 1.78 35.50 1.40 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41
24+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+180 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
24+200 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
24+220 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
24+240 20 8.26 2.07 2.11 42.20 1.65 1.69 33.72 3.00 0.53 10.60 183.60 214.81 23.87
24+260 20 7.00 1.75 1.91 38.20 1.40 1.53 30.52 3.00 0.53 10.60 167.60 196.09 21.79
24+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+300 20 8.12 2.03 1.89 37.80 1.62 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61

429 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

24+320 20 8.20 2.05 2.04 40.80 1.64 1.63 32.64 3.00 0.53 10.60 178.20 208.49 23.17
24+340 20 7.50 1.88 1.97 39.30 1.50 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36
24+360 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
24+380 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45
24+400 20 7.00 1.75 1.82 36.30 1.40 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80
24+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+480 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
24+500 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
24+520 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
24+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+560 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
24+580 20 7.80 1.95 1.97 39.30 1.56 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36
24+600 20 8.20 2.05 2.00 40.00 1.64 1.60 32.00 3.00 0.53 10.60 175.00 204.75 22.75
24+620 20 7.90 1.98 2.02 40.30 1.58 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88
24+640 20 7.78 1.95 1.97 39.30 1.56 1.57 31.36 3.00 0.53 10.60 171.80 201.01 22.33
24+660 20 7.00 1.75 1.85 37.00 1.40 1.48 29.56 3.00 0.53 10.60 162.80 190.48 21.16
24+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+700 20 7.48 1.87 1.81 36.20 1.50 1.45 28.96 3.00 0.53 10.60 159.80 186.97 20.77
24+720 20 7.25 1.81 1.84 36.80 1.45 1.47 29.46 3.00 0.53 10.60 162.30 189.89 21.10
24+740 20 7.57 1.89 1.85 37.00 1.51 1.48 29.64 3.00 0.53 10.60 163.20 190.94 21.22
24+760 20 7.60 1.90 1.90 37.90 1.52 1.52 30.34 3.00 0.53 10.60 166.70 195.04 21.67
24+780 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
24+800 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
24+820 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32

430 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

24+840 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
24+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
24+880 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
24+900 20 7.18 1.80 1.89 37.80 1.44 1.51 30.16 3.00 0.53 10.60 165.80 193.99 21.55
24+920 20 8.20 2.05 1.93 38.50 1.64 1.54 30.76 3.00 0.53 10.60 168.80 197.50 21.94
24+940 20 7.68 1.92 1.99 39.70 1.54 1.59 31.76 3.00 0.53 10.60 173.80 203.35 22.59
24+960 20 7.90 1.98 1.95 39.00 1.58 1.56 31.16 3.00 0.53 10.60 170.80 199.84 22.20
24+980 20 7.14 1.79 1.89 37.70 1.43 1.50 30.08 3.00 0.53 10.60 165.40 193.52 21.50
25+000 20 7.11 1.78 1.79 35.70 1.42 1.43 28.50 3.00 0.53 10.60 157.50 184.28 20.48
25+020 20 7.80 1.95 1.87 37.30 1.56 1.49 29.82 3.00 0.53 10.60 164.10 192.00 21.33
25+040 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
25+060 20 7.30 1.83 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54
25+080 20 7.40 1.85 1.84 36.80 1.48 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06
25+100 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
25+120 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
25+140 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
25+160 20 7.22 1.81 1.83 36.60 1.44 1.46 29.24 3.00 0.53 10.60 161.20 188.60 20.96
25+180 20 8.20 2.05 1.93 38.60 1.64 1.54 30.84 3.00 0.53 10.60 169.20 197.96 22.00
25+200 20 8.14 2.04 2.05 40.90 1.63 1.63 32.68 3.00 0.53 10.60 178.40 208.73 23.19
25+220 20 7.08 1.77 1.91 38.10 1.42 1.52 30.44 3.00 0.53 10.60 167.20 195.62 21.74
25+240 20 7.46 1.87 1.82 36.40 1.49 1.45 29.08 3.00 0.53 10.60 160.40 187.67 20.85
25+260 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
25+280 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
25+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
25+320 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
25+340 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23

431 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

25+360 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
25+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
25+400 20 7.02 1.76 1.76 35.10 1.40 1.40 28.04 3.00 0.53 10.60 155.20 181.58 20.18
25+420 20 7.46 1.87 1.82 36.30 1.49 1.45 28.96 3.00 0.53 10.60 159.80 186.97 20.77
25+440 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
25+460 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
25+480 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
25+500 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
25+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
25+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
25+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
25+580 20 7.46 1.87 1.81 36.20 1.49 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
25+600 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
25+620 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
25+640 20 7.46 1.87 1.87 37.40 1.49 1.49 29.84 3.00 0.53 10.60 164.20 192.11 21.35
25+660 20 7.00 1.75 1.81 36.20 1.40 1.45 28.92 3.00 0.53 10.60 159.60 186.73 20.75
25+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
25+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
25+720 20 7.20 1.80 1.78 35.50 1.44 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41
25+740 20 7.90 1.98 1.89 37.80 1.58 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58
25+760 20 7.44 1.86 1.92 38.40 1.49 1.53 30.68 3.00 0.53 10.60 168.40 197.03 21.89
25+780 20 7.42 1.86 1.86 37.20 1.48 1.49 29.72 3.00 0.53 10.60 163.60 191.41 21.27
25+800 20 7.90 1.98 1.92 38.40 1.58 1.53 30.64 3.00 0.53 10.60 168.20 196.79 21.87
25+820 20 7.81 1.95 1.97 39.30 1.56 1.57 31.42 3.00 0.53 10.60 172.10 201.36 22.37
25+840 20 7.00 1.75 1.85 37.00 1.40 1.48 29.62 3.00 0.53 10.60 163.10 190.83 21.20
25+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

432 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

25+880 20 7.30 1.83 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54
25+900 20 8.60 2.15 1.99 39.80 1.72 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62
25+920 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
25+940 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
25+960 20 7.00 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
25+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+060 20 7.26 1.82 1.79 35.70 1.45 1.43 28.52 3.00 0.53 10.60 157.60 184.39 20.49
26+080 20 7.00 1.75 1.79 35.70 1.40 1.43 28.52 3.00 0.53 10.60 157.60 184.39 20.49
26+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+240 20 7.58 1.90 1.83 36.50 1.52 1.46 29.16 3.00 0.53 10.60 160.80 188.14 20.90
26+260 20 7.80 1.95 1.93 38.50 1.56 1.54 30.76 3.00 0.53 10.60 168.80 197.50 21.94
26+280 20 7.41 1.85 1.90 38.00 1.48 1.52 30.42 3.00 0.53 10.60 167.10 195.51 21.72
26+300 20 7.00 1.75 1.80 36.00 1.40 1.44 28.82 3.00 0.53 10.60 159.10 186.15 20.68
26+320 20 7.20 1.80 1.78 35.50 1.44 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41
26+340 20 7.40 1.85 1.83 36.50 1.48 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
26+360 20 8.20 2.05 1.95 39.00 1.64 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
26+380 20 7.60 1.90 1.98 39.50 1.52 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49

433 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

26+400 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
26+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+460 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
26+480 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
26+500 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
26+520 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
26+540 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
26+560 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19
26+580 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67
26+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+620 20 7.56 1.89 1.82 36.40 1.51 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
26+640 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
26+660 20 7.56 1.89 1.89 37.80 1.51 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
26+680 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
26+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+840 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23
26+860 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
26+880 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31
26+900 20 7.11 1.78 1.97 39.30 1.42 1.57 31.42 3.00 0.53 10.60 172.10 201.36 22.37

434 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

26+920 20 7.90 1.98 1.88 37.60 1.58 1.50 30.02 3.00 0.53 10.60 165.10 193.17 21.46
26+940 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
26+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
26+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+020 20 7.48 1.87 1.81 36.20 1.50 1.45 28.96 3.00 0.53 10.60 159.80 186.97 20.77
27+040 20 7.56 1.89 1.88 37.60 1.51 1.50 30.08 3.00 0.53 10.60 165.40 193.52 21.50
27+060 20 7.00 1.75 1.82 36.40 1.40 1.46 29.12 3.00 0.53 10.60 160.60 187.90 20.88
27+080 20 7.48 1.87 1.81 36.20 1.50 1.45 28.96 3.00 0.53 10.60 159.80 186.97 20.77
27+100 20 8.20 2.05 1.96 39.20 1.64 1.57 31.36 3.00 0.53 10.60 171.80 201.01 22.33
27+120 20 7.60 1.90 1.98 39.50 1.52 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
27+140 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71
27+160 20 7.00 1.75 1.83 36.50 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93
27+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+280 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
27+300 20 7.49 1.87 1.93 38.50 1.50 1.54 30.78 3.00 0.53 10.60 168.90 197.61 21.96
27+320 20 7.17 1.79 1.83 36.60 1.43 1.47 29.32 3.00 0.53 10.60 161.60 189.07 21.01
27+340 20 8.60 2.15 1.97 39.40 1.72 1.58 31.54 3.00 0.53 10.60 172.70 202.06 22.45
27+360 20 7.38 1.85 2.00 40.00 1.48 1.60 31.96 3.00 0.53 10.60 174.80 204.52 22.72
27+380 20 7.90 1.98 1.92 38.30 1.58 1.53 30.56 3.00 0.53 10.60 167.80 196.33 21.81
27+400 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
27+420 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49

435 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

27+440 20 7.00 1.75 1.87 37.30 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
27+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+480 20 8.44 2.11 1.93 38.60 1.69 1.54 30.88 3.00 0.53 10.60 169.40 198.20 22.02
27+500 20 8.60 2.15 2.13 42.60 1.72 1.70 34.08 3.00 0.53 10.60 185.40 216.92 24.10
27+520 20 7.52 1.88 2.02 40.30 1.50 1.61 32.24 3.00 0.53 10.60 176.20 206.15 22.91
27+540 20 7.00 1.75 1.82 36.30 1.40 1.45 29.04 3.00 0.53 10.60 160.20 187.43 20.83
27+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+600 20 7.90 1.98 1.87 37.30 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32
27+620 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
27+640 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49
27+660 20 7.22 1.81 1.90 37.90 1.44 1.51 30.24 3.00 0.53 10.60 166.20 194.45 21.61
27+680 20 7.07 1.77 1.79 35.80 1.41 1.43 28.58 3.00 0.53 10.60 157.90 184.74 20.53
27+700 20 8.20 2.05 1.91 38.20 1.64 1.53 30.54 3.00 0.53 10.60 167.70 196.21 21.80
27+720 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71

436 of 664
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….
Base for
Subbase for
Subbase Course 250mm Base Course 200mm one side Quantity e
Total shoulder Shoulder
Length Pavement
Width Mean Mean Prime coat 1st Layer ( 20mm Nominal Chips ) App
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 rate of 1.3 ltr/Sqm(90% bitumen(1.17lt
Area Area ltr/sqm) and 10%kerosene(0.13ltr/Sqm))

Bitumen 80/100 Kerosene as


m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) Cutter (Lit)

27+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15
27+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15

Average Width 7.48 m 1.50


Nos. Qty Qty Qty Qty Qty Qty
Quantity to be deducted
Slab culvert 3m 3.00 2 (8.98) (8.98) (0.90) (3.60)

Length Nos. Qty Qty Qty Qty Qty Qty


Quantity to be added
Average pavement width For branch roads (m) 6
Branch Road 15.00 50 900.00 900.00 112.50 450.00 4500.00 5265.00 585.00

Final Total 27794.00 52934.42 42507.22 4281.60 15180.40 233256.60 272910.22 30323.36

Total subbase including shoulder = 68114.82 cum


Total base = 46788.82 cum
Total chips for surface dressing = 8606.46 ton

437 of 664
ment of ………..
Infrastructure and Transport
tment of Road
0

LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

- - - - DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.42 124.74 12.21 2.94 DBST
3.62 134.84 13.33 3.16 DBST
3.43 125.14 12.25 2.95 DBST
3.22 115.04 11.13 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.58 11.75 2.84 DBST
3.52 129.49 12.74 3.04 DBST
3.28 117.81 11.44 2.78 DBST
3.20 113.85 11.00 2.70 DBST
3.20 113.85 11.00 2.70 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

438 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.30 118.60 11.53 2.80 DBST
3.18 113.06 10.91 2.68 DBST
3.14 110.68 10.65 2.62 DBST
3.19 113.26 10.93 2.68 DBST
3.49 128.30 12.61 3.02 DBST
3.82 144.54 14.41 3.38 DBST
3.86 146.52 14.63 3.42 DBST
3.55 131.37 12.95 3.08 DBST
3.29 118.50 11.52 2.80 DBST
3.34 120.78 11.77 2.85 DBST
3.22 114.84 11.11 2.72 DBST
3.21 114.15 11.03 2.70 DBST
3.21 114.15 11.03 2.70 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.31 119.10 11.58 2.81 DBST
3.31 119.10 11.58 2.81 DBST

439 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.34 120.78 11.77 2.85 DBST


3.58 132.66 13.09 3.11 DBST
3.58 132.66 13.09 3.11 DBST
3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.25 116.42 11.29 2.75 DBST
3.25 116.42 11.29 2.75 DBST
3.22 114.84 11.11 2.72 DBST
3.22 114.84 11.11 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.26 116.62 11.31 2.76 DBST
3.29 118.31 11.50 2.79 DBST
3.25 116.13 11.25 2.75 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.42 124.74 12.21 2.94 DBST
3.54 130.58 12.86 3.07 DBST
3.54 130.58 12.86 3.07 DBST
3.71 139.19 13.82 3.26 DBST
3.71 139.19 13.82 3.26 DBST
3.78 142.46 14.18 3.33 DBST
3.84 145.43 14.51 3.40 DBST
3.86 146.52 14.63 3.42 DBST

440 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.65 136.13 13.48 3.19 DBST


3.38 122.86 12.00 2.90 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.32 119.99 11.68 2.83 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.58 132.66 13.09 3.11 DBST
3.65 135.93 13.45 3.19 DBST
3.50 128.80 12.66 3.03 DBST
3.52 129.49 12.74 3.04 DBST
3.74 140.58 13.97 3.29 DBST
3.44 125.63 12.31 2.96 DBST
3.12 109.79 10.55 2.60 DBST
3.34 120.98 11.79 2.85 DBST
3.72 139.79 13.88 3.27 DBST
3.71 139.29 13.83 3.26 DBST
3.33 120.48 11.74 2.84 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.85 11.00 2.70 DBST
3.52 129.69 12.76 3.05 DBST

441 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.73 140.28 13.94 3.28 DBST


3.44 125.73 12.32 2.96 DBST
3.13 110.19 10.59 2.61 DBST
3.10 108.90 10.45 2.59 DBST
3.14 110.98 10.68 2.63 DBST
3.14 110.98 10.68 2.63 DBST
3.28 117.81 11.44 2.78 DBST
3.38 122.96 12.01 2.90 DBST
3.38 122.96 12.01 2.90 DBST
3.34 120.88 11.78 2.85 DBST
3.54 130.78 12.88 3.07 DBST
3.86 146.52 14.63 3.42 DBST
3.73 140.09 13.92 3.28 DBST
3.39 123.26 12.05 2.90 DBST
3.25 116.42 11.29 2.75 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.33 120.09 11.69 2.83 DBST
3.33 120.09 11.69 2.83 DBST
3.22 114.94 11.12 2.72 DBST
3.40 123.85 12.11 2.92 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST

442 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.42 124.74 12.21 2.94 DBST


3.74 140.58 13.97 3.29 DBST
3.59 133.16 13.15 3.12 DBST
3.27 117.32 11.39 2.77 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.84 11.11 2.72 DBST
3.34 120.78 11.77 2.85 DBST
3.36 121.77 11.88 2.87 DBST
3.55 131.08 12.91 3.08 DBST
3.65 136.03 13.46 3.19 DBST
3.41 124.34 12.17 2.93 DBST
3.29 118.31 11.50 2.79 DBST
3.30 118.60 11.53 2.80 DBST
3.18 112.76 10.88 2.67 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.46 126.82 12.44 2.98 DBST
3.84 145.63 14.53 3.40 DBST

443 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.85 146.22 14.60 3.41 DBST


3.47 127.41 12.51 3.00 DBST
3.26 116.82 11.33 2.76 DBST
3.29 118.40 11.51 2.80 DBST
3.13 110.48 10.63 2.62 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.13 110.19 10.59 2.61 DBST
3.29 118.11 11.47 2.79 DBST
3.37 122.27 11.94 2.88 DBST
3.30 118.90 11.56 2.81 DBST
3.28 118.01 11.46 2.79 DBST
3.32 119.79 11.66 2.83 DBST
3.43 125.43 12.29 2.95 DBST
3.46 126.52 12.41 2.98 DBST
3.54 130.68 12.87 3.07 DBST
3.47 127.02 12.46 2.99 DBST
3.29 118.21 11.48 2.79 DBST
3.32 119.79 11.66 2.83 DBST
3.24 115.93 11.23 2.74 DBST
3.13 110.58 10.64 2.62 DBST

444 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.25 116.13 11.25 2.75 DBST
3.32 119.89 11.67 2.83 DBST
3.36 121.67 11.87 2.87 DBST
3.38 122.86 12.00 2.90 DBST
3.52 129.69 12.76 3.05 DBST
3.74 140.58 13.97 3.29 DBST
3.57 131.97 13.01 3.10 DBST
3.25 116.13 11.25 2.75 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.18 112.96 10.90 2.68 DBST
3.29 118.50 11.52 2.80 DBST
3.28 117.81 11.44 2.78 DBST
3.25 116.52 11.30 2.75 DBST
3.28 117.91 11.45 2.79 DBST
3.32 119.59 11.64 2.82 DBST
3.34 120.78 11.77 2.85 DBST
3.31 119.20 11.59 2.81 DBST
3.39 123.26 12.05 2.90 DBST
3.59 133.16 13.15 3.12 DBST
3.59 133.25 13.16 3.13 DBST
3.46 126.92 12.45 2.99 DBST
3.26 116.82 11.33 2.76 DBST

445 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.34 120.78 11.77 2.85 DBST


3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.84 11.11 2.72 DBST
3.34 120.78 11.77 2.85 DBST
3.24 115.93 11.23 2.74 DBST
3.21 114.15 11.03 2.70 DBST
3.18 113.06 10.91 2.68 DBST
3.32 119.99 11.68 2.83 DBST
3.32 119.99 11.68 2.83 DBST
3.25 116.52 11.30 2.75 DBST
3.25 116.52 11.30 2.75 DBST
3.35 121.37 11.84 2.86 DBST
3.36 121.87 11.89 2.87 DBST
3.11 109.40 10.51 2.60 DBST
3.31 119.20 11.59 2.81 DBST
3.38 122.66 11.98 2.89 DBST
3.17 112.37 10.84 2.66 DBST
3.11 109.49 10.52 2.60 DBST
3.43 125.33 12.28 2.95 DBST
3.66 136.82 13.55 3.21 DBST
3.64 135.83 13.44 3.18 DBST
3.41 124.44 12.18 2.93 DBST
3.11 109.59 10.53 2.60 DBST
3.16 111.77 10.77 2.65 DBST

446 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.16 111.77 10.77 2.65 DBST


3.12 109.89 10.56 2.61 DBST
3.12 109.89 10.56 2.61 DBST
3.10 108.90 10.45 2.59 DBST
3.11 109.49 10.52 2.60 DBST
3.43 125.33 12.28 2.95 DBST
3.74 140.58 13.97 3.29 DBST
3.51 129.20 12.71 3.04 DBST
3.19 113.36 10.95 2.68 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.16 111.87 10.78 2.65 DBST
3.22 114.84 11.11 2.72 DBST
3.16 111.87 10.78 2.65 DBST
3.19 113.45 10.96 2.69 DBST
3.19 113.45 10.96 2.69 DBST
3.19 113.45 10.96 2.69 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

447 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.19 113.45 10.96 2.69 DBST


3.28 118.01 11.46 2.79 DBST
3.38 122.86 12.00 2.90 DBST
3.44 125.53 12.30 2.95 DBST
3.25 116.13 11.25 2.75 DBST
3.34 120.78 11.77 2.85 DBST
3.43 125.43 12.29 2.95 DBST
3.51 129.39 12.73 3.04 DBST
3.66 136.62 13.53 3.20 DBST
3.46 126.92 12.45 2.99 DBST
3.40 123.95 12.12 2.92 DBST
3.28 117.81 11.44 2.78 DBST
3.36 121.77 11.88 2.87 DBST
3.56 131.87 13.00 3.10 DBST
3.31 119.39 11.62 2.82 DBST
3.26 116.72 11.32 2.76 DBST
3.38 122.76 11.99 2.89 DBST
3.47 127.22 12.49 2.99 DBST
3.46 126.52 12.41 2.98 DBST
3.22 114.64 11.09 2.71 DBST
3.42 124.74 12.21 2.94 DBST
3.56 131.67 12.98 3.09 DBST
3.24 115.83 11.22 2.74 DBST
3.29 118.21 11.48 2.79 DBST
3.43 125.24 12.27 2.95 DBST
3.41 124.25 12.16 2.93 DBST

448 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.46 126.82 12.44 2.98 DBST


3.61 134.34 13.28 3.15 DBST
3.42 124.74 12.21 2.94 DBST
3.14 110.78 10.66 2.63 DBST
3.19 113.16 10.92 2.68 DBST
3.15 111.28 10.71 2.64 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.75 10.99 2.69 DBST
3.20 113.75 10.99 2.69 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.33 120.29 11.72 2.84 DBST
3.33 120.29 11.72 2.84 DBST
3.25 116.23 11.26 2.75 DBST
3.57 132.07 13.02 3.10 DBST
3.56 131.87 13.00 3.10 DBST
3.24 116.03 11.24 2.74 DBST
3.34 120.78 11.77 2.85 DBST
3.55 130.98 12.90 3.08 DBST
3.55 130.98 12.90 3.08 DBST

449 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.46 126.72 12.43 2.98 DBST


3.31 119.49 11.63 2.82 DBST
3.37 122.46 11.96 2.89 DBST
3.36 121.97 11.90 2.88 DBST
3.42 124.94 12.23 2.94 DBST
3.58 132.66 13.09 3.11 DBST
3.38 122.86 12.00 2.90 DBST
3.21 114.54 11.08 2.71 DBST
3.17 112.46 10.85 2.66 DBST
3.17 112.46 10.85 2.66 DBST
3.24 116.03 11.24 2.74 DBST
3.17 112.46 10.85 2.66 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.58 132.66 13.09 3.11 DBST
3.45 126.32 12.39 2.97 DBST
3.38 122.56 11.97 2.89 DBST
3.64 135.83 13.44 3.18 DBST
3.86 146.52 14.63 3.42 DBST
3.63 134.94 13.34 3.16 DBST
3.25 116.13 11.25 2.75 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.20 113.65 10.98 2.69 DBST
3.44 125.53 12.30 2.95 DBST
3.39 123.26 12.05 2.90 DBST

450 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.39 123.26 12.05 2.90 DBST


3.62 134.54 13.30 3.15 DBST
3.70 138.50 13.74 3.24 DBST
3.74 140.58 13.97 3.29 DBST
3.62 134.74 13.32 3.16 DBST
3.46 126.82 12.44 2.98 DBST
3.41 124.05 12.13 2.92 DBST
3.25 116.13 11.25 2.75 DBST
3.28 117.81 11.44 2.78 DBST
3.35 121.18 11.81 2.86 DBST
3.28 117.91 11.45 2.79 DBST
3.21 114.54 11.08 2.71 DBST
3.16 111.77 10.77 2.65 DBST
3.16 111.77 10.77 2.65 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.13 110.58 10.64 2.62 DBST
3.51 129.39 12.73 3.04 DBST
3.86 146.52 14.63 3.42 DBST
3.59 133.06 13.13 3.12 DBST
3.22 114.64 11.09 2.71 DBST
3.11 109.49 10.52 2.60 DBST
3.10 109.10 10.47 2.59 DBST
3.26 116.82 11.33 2.76 DBST

451 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.26 116.82 11.33 2.76 DBST


3.10 108.90 10.45 2.59 DBST
3.23 115.14 11.14 2.72 DBST
3.47 127.02 12.46 2.99 DBST
3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.17 112.17 10.81 2.66 DBST
3.17 112.17 10.81 2.66 DBST
3.42 124.74 12.21 2.94 DBST
3.74 140.58 13.97 3.29 DBST
3.59 133.16 13.15 3.12 DBST
3.27 117.32 11.39 2.77 DBST
3.27 117.41 11.40 2.77 DBST
3.59 133.25 13.16 3.13 DBST
3.62 134.44 13.29 3.15 DBST
3.30 118.60 11.53 2.80 DBST
3.33 120.48 11.74 2.84 DBST
3.51 129.00 12.68 3.03 DBST
3.51 129.29 12.72 3.04 DBST
3.34 120.78 11.77 2.85 DBST
3.23 115.24 11.15 2.73 DBST
3.39 123.26 12.05 2.90 DBST

452 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.26 116.92 11.34 2.76 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.48 127.71 12.54 3.00 DBST
3.86 146.52 14.63 3.42 DBST
3.74 140.38 13.95 3.28 DBST
3.36 121.57 11.86 2.87 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.85 11.00 2.70 DBST
3.30 118.80 11.55 2.81 DBST
3.30 118.80 11.55 2.81 DBST
3.26 116.62 11.31 2.76 DBST
3.39 123.06 12.02 2.90 DBST
3.33 120.29 11.72 2.84 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.58 132.66 13.09 3.11 DBST
3.58 132.66 13.09 3.11 DBST
3.34 120.78 11.77 2.85 DBST
3.17 112.56 10.86 2.67 DBST
3.49 128.40 12.62 3.02 DBST
3.74 140.58 13.97 3.29 DBST
3.74 140.58 13.97 3.29 DBST
3.56 131.77 12.99 3.09 DBST
3.24 115.93 11.23 2.74 DBST
3.26 116.62 11.31 2.76 DBST

453 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.58 132.46 13.07 3.11 DBST


3.74 140.58 13.97 3.29 DBST
3.49 128.30 12.61 3.02 DBST
3.30 118.70 11.54 2.80 DBST
3.23 115.14 11.14 2.72 DBST
3.28 117.81 11.44 2.78 DBST
3.36 121.57 11.86 2.87 DBST
3.42 124.54 12.19 2.93 DBST
3.57 132.17 13.04 3.10 DBST
3.33 120.29 11.72 2.84 DBST
3.27 117.12 11.36 2.77 DBST
3.27 117.12 11.36 2.77 DBST
3.39 123.35 12.06 2.91 DBST
3.77 142.16 14.15 3.32 DBST
3.84 145.53 14.52 3.40 DBST
3.46 126.72 12.43 2.98 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.23 115.43 11.18 2.73 DBST
3.47 127.31 12.50 2.99 DBST
3.58 132.66 13.09 3.11 DBST
3.55 131.08 12.91 3.08 DBST
3.31 119.20 11.59 2.81 DBST
3.11 109.49 10.52 2.60 DBST
3.29 118.21 11.48 2.79 DBST
3.28 117.61 11.42 2.78 DBST

454 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.33 120.09 11.69 2.83 DBST


3.33 120.09 11.69 2.83 DBST
3.35 121.28 11.83 2.86 DBST
3.73 140.09 13.92 3.28 DBST
3.83 145.23 14.49 3.39 DBST
3.45 126.42 12.40 2.97 DBST
3.13 110.48 10.63 2.62 DBST
3.37 122.36 11.95 2.88 DBST
3.58 132.66 13.09 3.11 DBST
3.58 132.66 13.09 3.11 DBST
3.34 120.78 11.77 2.85 DBST
3.38 122.86 12.00 2.90 DBST
3.44 125.53 12.30 2.95 DBST
3.15 111.57 10.75 2.64 DBST
3.14 111.08 10.69 2.63 DBST
3.46 126.92 12.45 2.99 DBST
3.74 140.58 13.97 3.29 DBST
3.60 133.45 13.18 3.13 DBST
3.28 117.61 11.42 2.78 DBST
3.13 110.48 10.63 2.62 DBST
3.51 129.29 12.72 3.04 DBST
3.86 146.52 14.63 3.42 DBST
3.75 141.17 14.04 3.30 DBST
3.37 122.36 11.95 2.88 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.84 11.11 2.72 DBST

455 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.22 114.84 11.11 2.72 DBST


3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.19 113.45 10.96 2.69 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.11 109.20 10.48 2.59 DBST
3.32 119.89 11.67 2.83 DBST
3.64 135.43 13.40 3.17 DBST
3.66 136.62 13.53 3.20 DBST
3.34 120.78 11.77 2.85 DBST
3.26 116.82 11.33 2.76 DBST
3.48 127.81 12.55 3.01 DBST
3.32 119.89 11.67 2.83 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.31 119.49 11.63 2.82 DBST
3.63 135.33 13.39 3.17 DBST
3.58 132.66 13.09 3.11 DBST
3.42 124.74 12.21 2.94 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.18 112.66 10.87 2.67 DBST
3.29 118.21 11.48 2.79 DBST

456 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.21 114.44 11.07 2.71 DBST


3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST
3.28 117.81 11.44 2.78 DBST
3.34 120.78 11.77 2.85 DBST
3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.27 117.51 11.41 2.78 DBST
3.29 118.31 11.50 2.79 DBST
3.12 109.69 10.54 2.60 DBST
3.12 110.09 10.58 2.61 DBST
3.30 119.00 11.57 2.81 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.85 11.00 2.70 DBST
3.30 118.80 11.55 2.81 DBST
3.30 118.80 11.55 2.81 DBST
3.30 118.80 11.55 2.81 DBST
3.20 113.85 11.00 2.70 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

457 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.33 120.09 11.69 2.83 DBST
3.33 120.09 11.69 2.83 DBST
3.46 126.72 12.43 2.98 DBST
3.30 119.00 11.57 2.81 DBST
3.17 112.17 10.81 2.66 DBST
3.35 121.18 11.81 2.86 DBST
3.31 119.10 11.58 2.81 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.24 116.03 11.24 2.74 DBST
3.51 129.20 12.71 3.04 DBST
3.49 128.01 12.57 3.01 DBST
3.34 120.78 11.77 2.85 DBST
3.34 120.78 11.77 2.85 DBST

458 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.32 119.99 11.68 2.83 DBST


3.31 119.49 11.63 2.82 DBST
3.39 123.26 12.05 2.90 DBST
3.46 126.72 12.43 2.98 DBST
3.37 122.27 11.94 2.88 DBST
3.26 117.02 11.35 2.77 DBST
3.41 124.44 12.18 2.93 DBST
3.34 120.78 11.77 2.85 DBST
3.28 117.81 11.44 2.78 DBST
3.43 125.33 12.28 2.95 DBST
3.25 116.42 11.29 2.75 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.25 116.13 11.25 2.75 DBST
3.41 124.05 12.13 2.92 DBST
3.49 128.30 12.61 3.02 DBST
3.65 136.22 13.49 3.19 DBST
3.54 130.58 12.86 3.07 DBST
3.22 114.74 11.10 2.71 DBST
3.22 114.84 11.11 2.72 DBST
3.22 114.84 11.11 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.50 128.60 12.64 3.02 DBST

459 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.63 134.94 13.34 3.16 DBST


3.41 124.15 12.14 2.92 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.28 117.81 11.44 2.78 DBST
3.35 121.18 11.81 2.86 DBST
3.57 132.07 13.02 3.10 DBST
3.52 129.59 12.75 3.04 DBST
3.46 126.62 12.42 2.98 DBST
3.28 117.81 11.44 2.78 DBST
3.24 115.83 11.22 2.74 DBST
3.48 127.71 12.54 3.00 DBST
3.52 129.69 12.76 3.05 DBST
3.46 126.72 12.43 2.98 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.12 109.79 10.55 2.60 DBST
3.36 121.67 11.87 2.87 DBST
3.58 132.66 13.09 3.11 DBST
3.34 120.78 11.77 2.85 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST

460 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.13 110.58 10.64 2.62 DBST
3.37 122.46 11.96 2.89 DBST
3.49 128.11 12.58 3.01 DBST
3.49 128.11 12.58 3.01 DBST
3.58 132.66 13.09 3.11 DBST
3.36 121.87 11.89 2.87 DBST
3.44 125.83 12.33 2.96 DBST
3.47 127.41 12.51 3.00 DBST
3.17 112.17 10.81 2.66 DBST
3.19 113.16 10.92 2.68 DBST
3.49 128.40 12.62 3.02 DBST
3.75 141.27 14.05 3.30 DBST
3.59 132.96 13.12 3.12 DBST
3.25 116.42 11.29 2.75 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.35 121.08 11.80 2.86 DBST
3.17 112.17 10.81 2.66 DBST
3.17 112.27 10.82 2.66 DBST
3.33 120.19 11.70 2.84 DBST
3.35 121.28 11.83 2.86 DBST
3.32 119.89 11.67 2.83 DBST
3.41 124.34 12.17 2.93 DBST
3.46 126.52 12.41 2.98 DBST

461 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.28 117.61 11.42 2.78 DBST


3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.35 121.08 11.80 2.86 DBST
3.23 115.14 11.14 2.72 DBST
3.34 120.78 11.77 2.85 DBST
3.40 123.75 12.10 2.92 DBST
3.41 124.15 12.14 2.92 DBST
3.34 120.68 11.76 2.85 DBST
3.39 123.26 12.05 2.90 DBST
3.46 126.72 12.43 2.98 DBST
3.46 126.72 12.43 2.98 DBST
3.40 123.65 12.09 2.91 DBST
3.22 114.74 11.10 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.39 123.35 12.06 2.91 DBST
3.28 117.91 11.45 2.79 DBST
3.28 117.91 11.45 2.79 DBST
3.46 126.72 12.43 2.98 DBST
3.45 126.32 12.39 2.97 DBST
3.38 122.96 12.01 2.90 DBST
3.32 119.99 11.68 2.83 DBST
3.23 115.24 11.15 2.73 DBST
3.29 118.31 11.50 2.79 DBST
3.59 133.35 13.17 3.13 DBST

462 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.61 134.05 13.24 3.14 DBST


3.47 127.12 12.47 2.99 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.19 113.55 10.97 2.69 DBST
3.35 121.47 11.85 2.86 DBST
3.42 124.74 12.21 2.94 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.32 119.79 11.66 2.83 DBST
3.14 110.88 10.67 2.63 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST

463 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.21 114.44 11.07 2.71 DBST


3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.42 124.74 12.21 2.94 DBST
3.42 124.74 12.21 2.94 DBST
3.26 116.82 11.33 2.76 DBST
3.22 114.84 11.11 2.72 DBST
3.34 120.78 11.77 2.85 DBST
3.34 120.78 11.77 2.85 DBST
3.22 114.84 11.11 2.72 DBST
3.22 114.84 11.11 2.72 DBST
3.30 118.80 11.55 2.81 DBST
3.18 112.96 10.90 2.68 DBST
3.34 120.88 11.78 2.85 DBST
3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.24 116.03 11.24 2.74 DBST
3.48 127.91 12.56 3.01 DBST
3.52 129.69 12.76 3.05 DBST
3.36 121.77 11.88 2.87 DBST
3.42 124.74 12.21 2.94 DBST
3.58 132.56 13.08 3.11 DBST
3.34 120.68 11.76 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.85 11.00 2.70 DBST

464 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.38 122.76 11.99 2.89 DBST


3.46 126.72 12.43 2.98 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.25 116.23 11.26 2.75 DBST
3.25 116.52 11.30 2.75 DBST
3.11 109.20 10.48 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.18 112.86 10.89 2.67 DBST
3.18 112.86 10.89 2.67 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.64 11.09 2.71 DBST
3.38 122.96 12.01 2.90 DBST
3.45 126.13 12.36 2.97 DBST
3.46 126.72 12.43 2.98 DBST
3.36 121.97 11.90 2.88 DBST
3.34 120.98 11.79 2.85 DBST
3.44 125.73 12.32 2.96 DBST
3.28 117.81 11.44 2.78 DBST

465 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.21 114.15 11.03 2.70 DBST


3.32 119.69 11.65 2.82 DBST
3.44 125.63 12.31 2.96 DBST
3.33 120.09 11.69 2.83 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.45 126.42 12.40 2.97 DBST
3.32 119.59 11.64 2.82 DBST
3.46 126.82 12.44 2.98 DBST
3.62 134.84 13.33 3.16 DBST
3.30 119.00 11.57 2.81 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.24 115.63 11.20 2.73 DBST
3.48 127.51 12.52 3.00 DBST
3.58 132.66 13.09 3.11 DBST
3.56 131.77 12.99 3.09 DBST
3.32 119.89 11.67 2.83 DBST
3.19 113.45 10.96 2.69 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

466 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.19 113.16 10.92 2.68 DBST
3.51 129.00 12.68 3.03 DBST
3.74 140.58 13.97 3.29 DBST
3.42 124.84 12.22 2.94 DBST
3.34 120.88 11.78 2.85 DBST
3.58 132.66 13.09 3.11 DBST
3.34 120.78 11.77 2.85 DBST
3.37 122.27 11.94 2.88 DBST
3.69 138.11 13.70 3.23 DBST
3.65 136.03 13.46 3.19 DBST
3.52 129.49 12.74 3.04 DBST
3.61 134.05 13.24 3.14 DBST
3.70 138.40 13.73 3.24 DBST
3.62 134.44 13.29 3.15 DBST
3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.36 121.57 11.86 2.87 DBST
3.68 137.41 13.62 3.22 DBST
3.67 137.02 13.57 3.21 DBST
3.59 133.06 13.13 3.12 DBST
3.58 132.66 13.09 3.11 DBST

467 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.54 130.88 12.89 3.07 DBST


3.48 127.91 12.56 3.01 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.58 132.66 13.09 3.11 DBST
3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.23 115.34 11.17 2.73 DBST
3.23 115.34 11.17 2.73 DBST
3.10 108.90 10.45 2.59 DBST
3.13 110.19 10.59 2.61 DBST
3.29 118.11 11.47 2.79 DBST
3.26 116.82 11.33 2.76 DBST
3.34 120.78 11.77 2.85 DBST
3.34 120.78 11.77 2.85 DBST
3.28 117.81 11.44 2.78 DBST
3.48 127.81 12.55 3.01 DBST
3.47 127.22 12.49 2.99 DBST
3.40 123.75 12.10 2.92 DBST
3.33 120.19 11.70 2.84 DBST
3.26 116.72 11.32 2.76 DBST
3.34 120.88 11.78 2.85 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST

468 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.28 117.81 11.44 2.78 DBST


3.34 120.78 11.77 2.85 DBST
3.47 127.31 12.50 2.99 DBST
3.34 120.98 11.79 2.85 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.12 109.89 10.56 2.61 DBST
3.22 114.84 11.11 2.72 DBST
3.26 116.62 11.31 2.76 DBST
3.54 130.48 12.85 3.06 DBST
3.86 146.52 14.63 3.42 DBST
3.68 137.81 13.66 3.23 DBST
3.30 119.00 11.57 2.81 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.11 109.30 10.49 2.59 DBST
3.11 109.30 10.49 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.84 11.11 2.72 DBST
3.34 120.78 11.77 2.85 DBST
3.22 114.84 11.11 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

469 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.19 113.45 10.96 2.69 DBST


3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST
3.60 133.65 13.20 3.14 DBST
3.74 140.58 13.97 3.29 DBST
3.70 138.40 13.73 3.24 DBST
3.47 127.12 12.47 2.99 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.18 112.86 10.89 2.67 DBST
3.26 116.82 11.33 2.76 DBST
3.18 112.86 10.89 2.67 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST

470 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.62 11.31 2.76 DBST
3.47 127.12 12.47 2.99 DBST
3.55 131.27 12.94 3.08 DBST
3.47 127.31 12.50 2.99 DBST
3.41 124.34 12.17 2.93 DBST
3.32 119.99 11.68 2.83 DBST
3.31 119.10 11.58 2.81 DBST
3.44 125.83 12.33 2.96 DBST
3.32 119.89 11.67 2.83 DBST
3.38 122.86 12.00 2.90 DBST
3.58 132.66 13.09 3.11 DBST
3.62 134.64 13.31 3.16 DBST
3.56 131.67 12.98 3.09 DBST
3.46 126.72 12.43 2.98 DBST
3.46 126.72 12.43 2.98 DBST
3.40 123.65 12.09 2.91 DBST
3.22 114.74 11.10 2.71 DBST
3.25 116.23 11.26 2.75 DBST
3.43 125.14 12.25 2.95 DBST
3.30 118.60 11.53 2.80 DBST
3.30 118.60 11.53 2.80 DBST
3.28 117.81 11.44 2.78 DBST
3.22 114.84 11.11 2.72 DBST

471 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.25 116.52 11.30 2.75 DBST


3.13 110.58 10.64 2.62 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.23 115.14 11.14 2.72 DBST
3.47 127.02 12.46 2.99 DBST
3.58 132.66 13.09 3.11 DBST
3.58 132.66 13.09 3.11 DBST
3.48 127.51 12.52 3.00 DBST
3.24 115.63 11.20 2.73 DBST
3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST
3.49 128.01 12.57 3.01 DBST
3.55 130.98 12.90 3.08 DBST
3.51 129.10 12.69 3.03 DBST
3.50 128.80 12.66 3.03 DBST
3.65 136.32 13.50 3.19 DBST
3.42 124.74 12.21 2.94 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.42 124.74 12.21 2.94 DBST
3.33 120.38 11.73 2.84 DBST

472 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.18 113.06 10.91 2.68 DBST


3.11 109.49 10.52 2.60 DBST
3.26 116.82 11.33 2.76 DBST
3.39 123.35 12.06 2.91 DBST
3.23 115.43 11.18 2.73 DBST
3.28 117.81 11.44 2.78 DBST
3.40 123.75 12.10 2.92 DBST
3.22 114.84 11.11 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.12 109.99 10.57 2.61 DBST
3.30 118.90 11.56 2.81 DBST
3.38 122.96 12.01 2.90 DBST
3.36 121.97 11.90 2.88 DBST
3.42 124.74 12.21 2.94 DBST
3.26 116.82 11.33 2.76 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.19 113.45 10.96 2.69 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.19 113.45 10.96 2.69 DBST

473 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.28 118.01 11.46 2.79 DBST


3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST
3.41 124.34 12.17 2.93 DBST
3.23 115.43 11.18 2.73 DBST
3.19 113.45 10.96 2.69 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.56 131.57 12.97 3.09 DBST
3.50 128.60 12.64 3.02 DBST
3.28 117.81 11.44 2.78 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.58 132.66 13.09 3.11 DBST
3.38 122.76 11.99 2.89 DBST
3.21 114.44 11.07 2.71 DBST
3.24 116.03 11.24 2.74 DBST
3.24 116.03 11.24 2.74 DBST

474 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.24 116.03 11.24 2.74 DBST


3.24 116.03 11.24 2.74 DBST
3.17 112.46 10.85 2.66 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.18 112.66 10.87 2.67 DBST
3.27 117.22 11.37 2.77 DBST
3.19 113.45 10.96 2.69 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.44 125.53 12.30 2.95 DBST
3.26 116.62 11.31 2.76 DBST
3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

475 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.42 124.74 12.21 2.94 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.19 113.45 10.96 2.69 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.78 11.77 2.85 DBST
3.37 122.07 11.91 2.88 DBST
3.29 118.11 11.47 2.79 DBST
3.42 124.74 12.21 2.94 DBST
3.42 124.74 12.21 2.94 DBST
3.42 124.74 12.21 2.94 DBST
3.26 116.82 11.33 2.76 DBST
3.28 117.81 11.44 2.78 DBST
3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST

476 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.32 119.99 11.68 2.83 DBST


3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.14 110.88 10.67 2.63 DBST
3.14 110.88 10.67 2.63 DBST
3.18 112.66 10.87 2.67 DBST
3.22 114.74 11.10 2.71 DBST
3.14 110.98 10.68 2.63 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.31 119.20 11.59 2.81 DBST
3.55 131.08 12.91 3.08 DBST
3.58 132.66 13.09 3.11 DBST
3.34 120.78 11.77 2.85 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.65 10.98 2.69 DBST
3.34 120.58 11.75 2.84 DBST

477 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.24 115.83 11.22 2.74 DBST


3.22 114.84 11.11 2.72 DBST
3.34 120.78 11.77 2.85 DBST
3.34 120.78 11.77 2.85 DBST
3.22 114.84 11.11 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.15 111.47 10.74 2.64 DBST
3.29 118.50 11.52 2.80 DBST
3.56 131.77 12.99 3.09 DBST
3.71 139.29 13.83 3.26 DBST
3.47 127.31 12.50 2.99 DBST
3.18 112.76 10.88 2.67 DBST
3.18 112.86 10.89 2.67 DBST
3.27 117.41 11.40 2.77 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.19 113.55 10.97 2.69 DBST
3.19 113.55 10.97 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.84 11.11 2.72 DBST
3.34 120.58 11.75 2.84 DBST
3.22 114.64 11.09 2.71 DBST

478 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.30 118.90 11.56 2.81 DBST
3.68 137.71 13.65 3.23 DBST
3.86 146.52 14.63 3.42 DBST
3.56 131.67 12.98 3.09 DBST
3.18 112.86 10.89 2.67 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.17 112.46 10.85 2.66 DBST
3.17 112.46 10.85 2.66 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.23 115.53 11.19 2.73 DBST
3.55 131.37 12.95 3.08 DBST
3.74 140.58 13.97 3.29 DBST
3.46 126.62 12.42 2.98 DBST
3.14 110.78 10.66 2.63 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

479 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.22 114.84 11.11 2.72 DBST


3.34 120.78 11.77 2.85 DBST
3.22 114.84 11.11 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.61 11.42 2.78 DBST
3.33 120.09 11.69 2.83 DBST
3.15 111.38 10.73 2.64 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.47 127.02 12.46 2.99 DBST
3.85 145.83 14.55 3.41 DBST
3.78 142.56 14.19 3.33 DBST
3.40 123.75 12.10 2.92 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.18 113.06 10.91 2.68 DBST
3.50 128.90 12.67 3.03 DBST
3.74 140.58 13.97 3.29 DBST
3.51 129.00 12.68 3.03 DBST
3.19 113.16 10.92 2.68 DBST

480 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.19 113.45 10.96 2.69 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.34 120.68 11.76 2.85 DBST
3.72 139.49 13.85 3.26 DBST
3.86 146.52 14.63 3.42 DBST
3.48 127.71 12.54 3.00 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.32 119.99 11.68 2.83 DBST
3.32 119.99 11.68 2.83 DBST
3.34 120.68 11.76 2.85 DBST
3.55 130.98 12.90 3.08 DBST
3.74 140.58 13.97 3.29 DBST
3.48 127.51 12.52 3.00 DBST
3.25 116.42 11.29 2.75 DBST
3.31 119.20 11.59 2.81 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

481 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.17 112.46 10.85 2.66 DBST


3.17 112.46 10.85 2.66 DBST
3.31 119.49 11.63 2.82 DBST
3.69 138.30 13.72 3.24 DBST
3.86 146.52 14.63 3.42 DBST
3.51 129.29 12.72 3.04 DBST
3.13 110.48 10.63 2.62 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.42 124.74 12.21 2.94 DBST
3.31 119.39 11.62 2.82 DBST
3.15 111.47 10.74 2.64 DBST
3.10 108.90 10.45 2.59 DBST
3.19 113.45 10.96 2.69 DBST
3.28 118.01 11.46 2.79 DBST

482 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.28 118.01 11.46 2.79 DBST


3.27 117.41 11.40 2.77 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.18 112.86 10.89 2.67 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.84 11.11 2.72 DBST
3.34 120.78 11.77 2.85 DBST
3.34 120.78 11.77 2.85 DBST
1.82 45.54 3.41 1.18 DBST
1.77 43.16 3.15 1.12 DBST
3.24 116.03 11.24 2.74 DBST
3.24 116.03 11.24 2.74 DBST

483 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.17 112.46 10.85 2.66 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.42 124.74 12.21 2.94 DBST
3.74 140.58 13.97 3.29 DBST
3.74 140.58 13.97 3.29 DBST
3.74 140.58 13.97 3.29 DBST
3.58 132.66 13.09 3.11 DBST
3.42 124.74 12.21 2.94 DBST
3.30 118.80 11.55 2.81 DBST
3.14 110.88 10.67 2.63 DBST
3.10 108.90 10.45 2.59 DBST
3.42 124.74 12.21 2.94 DBST
3.74 140.58 13.97 3.29 DBST
3.74 140.58 13.97 3.29 DBST
3.67 137.21 13.60 3.21 DBST
3.35 121.37 11.84 2.86 DBST
3.10 108.90 10.45 2.59 DBST
3.32 119.99 11.68 2.83 DBST

484 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.56 131.87 13.00 3.10 DBST


3.44 125.73 12.32 2.96 DBST
3.30 118.80 11.55 2.81 DBST
3.30 118.80 11.55 2.81 DBST
3.20 113.85 11.00 2.70 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.44 125.73 12.32 2.96 DBST
3.50 128.70 12.65 3.03 DBST
3.52 129.69 12.76 3.05 DBST
3.44 125.53 12.30 2.95 DBST
3.26 116.62 11.31 2.76 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.65 10.98 2.69 DBST
3.25 116.13 11.25 2.75 DBST
3.26 117.02 11.35 2.77 DBST
3.33 120.48 11.74 2.84 DBST
3.34 120.78 11.77 2.85 DBST
3.22 114.84 11.11 2.72 DBST
3.28 117.81 11.44 2.78 DBST

485 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.28 117.81 11.44 2.78 DBST


3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.32 119.59 11.64 2.82 DBST
3.38 122.56 11.97 2.89 DBST
3.48 127.51 12.52 3.00 DBST
3.42 124.54 12.19 2.93 DBST
3.31 119.20 11.59 2.81 DBST
3.15 111.38 10.73 2.64 DBST
3.28 117.91 11.45 2.79 DBST
3.26 116.82 11.33 2.76 DBST
3.16 111.87 10.78 2.65 DBST
3.24 115.83 11.22 2.74 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.22 115.04 11.13 2.72 DBST
3.38 122.96 12.01 2.90 DBST
3.57 132.07 13.02 3.10 DBST
3.34 120.98 11.79 2.85 DBST
3.21 114.25 11.04 2.70 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.26 116.82 11.33 2.76 DBST
3.42 124.74 12.21 2.94 DBST

486 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.26 116.82 11.33 2.76 DBST


3.10 108.90 10.45 2.59 DBST
3.10 109.10 10.47 2.59 DBST
3.20 113.65 10.98 2.69 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.19 113.45 10.96 2.69 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.28 118.01 11.46 2.79 DBST
3.19 113.45 10.96 2.69 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.14 110.88 10.67 2.63 DBST
3.32 119.79 11.66 2.83 DBST
3.37 122.17 11.92 2.88 DBST
3.27 117.41 11.40 2.77 DBST
3.36 121.97 11.90 2.88 DBST
3.44 125.83 12.33 2.96 DBST
3.26 116.92 11.34 2.76 DBST
3.10 108.90 10.45 2.59 DBST

487 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.16 111.87 10.78 2.65 DBST


3.48 127.71 12.54 3.00 DBST
3.74 140.58 13.97 3.29 DBST
3.74 140.58 13.97 3.29 DBST
3.42 124.74 12.21 2.94 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.15 111.47 10.74 2.64 DBST
3.15 111.47 10.74 2.64 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.22 114.64 11.09 2.71 DBST
3.38 122.56 11.97 2.89 DBST
3.34 120.88 11.78 2.85 DBST
3.18 112.96 10.90 2.68 DBST
3.14 110.88 10.67 2.63 DBST
3.22 114.84 11.11 2.72 DBST
3.42 124.74 12.21 2.94 DBST
3.46 126.72 12.43 2.98 DBST

488 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.22 114.84 11.11 2.72 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.18 112.86 10.89 2.67 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.26 116.82 11.33 2.76 DBST
3.18 112.86 10.89 2.67 DBST
3.10 108.90 10.45 2.59 DBST
3.21 114.44 11.07 2.71 DBST
3.32 119.99 11.68 2.83 DBST
3.32 119.99 11.68 2.83 DBST
3.21 114.44 11.07 2.71 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.42 124.74 12.21 2.94 DBST
3.74 140.58 13.97 3.29 DBST
3.74 140.58 13.97 3.29 DBST
3.44 125.83 12.33 2.96 DBST

489 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.30 118.90 11.56 2.81 DBST


3.28 117.81 11.44 2.78 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.20 113.65 10.98 2.69 DBST
3.31 119.20 11.59 2.81 DBST
3.21 114.44 11.07 2.71 DBST
3.20 113.65 10.98 2.69 DBST
3.44 125.53 12.30 2.95 DBST
3.46 126.72 12.43 2.98 DBST
3.34 120.78 11.77 2.85 DBST
3.22 114.84 11.11 2.72 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.38 122.66 11.98 2.89 DBST
3.23 115.43 11.18 2.73 DBST
3.45 126.42 12.40 2.97 DBST
3.50 128.50 12.63 3.02 DBST
3.36 121.57 11.86 2.87 DBST
3.46 126.72 12.43 2.98 DBST
3.46 126.72 12.43 2.98 DBST

490 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.28 117.81 11.44 2.78 DBST


3.10 108.90 10.45 2.59 DBST
3.39 123.16 12.03 2.90 DBST
3.71 139.00 13.79 3.25 DBST
3.52 129.89 12.78 3.05 DBST
3.20 114.05 11.02 2.70 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.28 117.81 11.44 2.78 DBST
3.46 126.72 12.43 2.98 DBST
3.46 126.72 12.43 2.98 DBST
3.32 119.99 11.68 2.83 DBST
3.16 111.77 10.77 2.65 DBST
3.35 121.47 11.85 2.86 DBST
3.34 120.78 11.77 2.85 DBST

491 of 664
LATIONS FOR PAVEMENT

Quantity estimate for DBST surface

1st Layer ( 20mm Nominal Chips ) Application 2nd Layer ( 10mm Nominal Chips ) Application

Remarks
rate of 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) rate of 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm)
and 10%kerosene(0.13ltr/Sqm)) and 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as
Chips(20- Chips(10-
as Binder (Lit) Cutter (Lit)
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3.10 108.90 10.45 2.59 DBST


3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST
3.10 108.90 10.45 2.59 DBST

Qty Qty Qty Qty

Qty Qty Qty Qty

94.50 4455.00 495.00 49.50

4669.63 168999.53 16484.23 3935.40

492 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
Err:509

DETAILED QUANTITY ESTIMATE FOR DBST

Name of the road:…………………………….

Work Details Chainage No Length,m Breadth, m Height/Depth, m

1st Layer ( 20mm Nominal Chips ) 0+000 to 19+000 1 0.00 7.00


Total

Items Application Rate Rate SBSD Area Total Qnty.

Bitumen 80/100 1.17 1.30 Lit/sqm 0.00 0.00

Kerosene as Cutter 0.13 10 % cutter 0.00 0.00


20mm Nominal Chips 20.00 Kg/Sqm 0.00 0.00

Work Details Chainage No Length,m Breadth, m Height/Depth, m

2nd Layer ( 10mm Nominal Chips ) 0+000 to 19+000 1 0.00 7.00


Total

493 of 664
DETAILED QUANTITY ESTIMATE FOR DBST

Items Application Rate Rate SBSD Area Total Qnty.

Bitumen 80/100 0.99 1.10 Lit/sqm 0.00 0.00


Kerosene as Cutter 0.11 10 % cutter 0.00 0.00
10 mm Nominal Chips 10.00 Kg/Sqm 0.00 0.00

Summary
Items Total Qnty. Unit
Bitumen 80/100 0.00 Lit.
Kerosene as cutter 0.00 Lit.
20 mm Nominal chips 0.00 Ton
10 mm Nominal chips 0.00 Ton

494 of 664
Qnty., Sqm Remarks

0
0

Unit Remarks

Lit.

Lit.
Ton

Qnty., Sqm Remarks

0
0

495 of 664
Unit Remarks

Lit.
Lit.
Ton

496 of 664
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
Err:509

QUANTITY CALCULATION FOR STONE MASONRY BREAST WALL


Name of the road:…………………………….
Structure quantity

Retaining wall Retaining Wall


Chainage Total Volume Volume of PCC for Remarks
Length (m)
(m3) the baseand top
Left side Right side

Height Area(m2) Volume (m )


3
Height Area(m2) Volume (m3)
12+080 0 0.00 5 3.046 0.00 0.00 0.00
12+160 0 0.00 5 3.046 0.00 0.00 0.00
12+180 0 0.00 5 3.046 0.00 0.00 0.00
12+200 0 0.00 5 3.046 0.00 0.00 0.00
12+220 0 0.00 5 3.046 0.00 0.00 0.00
16+340 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+360 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+380 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+400 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+420 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+440 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+460 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
17+440 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+460 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+480 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+500 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+520 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+540 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+560 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+580 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+600 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+620 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+640 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
Structure quantity

Retaining wall Retaining Wall


Chainage Total Volume Volume of PCC for Remarks
Length (m)
(m3) the baseand top
Left side Right side

Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)


17+660 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+680 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+700 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+720 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+740 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+760 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+780 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+800 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+820 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+840 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+860 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+880 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+900 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+920 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+940 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+960 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+980 0 0.00 9 4.999 0.00 0.00 0.00
18+980 0 4 2.487 0.00 4 2.487 0.00 0.00 0.00
19+000 0 4 2.487 0.00 4 2.487 0.00 0.00 0.00
Total 0 0 0 0.00 0
#REF!
#REF!
#REF!
#REF!

DETAILED QUANTITY ESTIMATE BOX CULVERT(4m SPAN)

#REF!

Item Total
Description of works No. Length Breadth Height Quantity Unit
No. Quantity
(m) (m) (m)

1 Earthwork in excavation in foundation


Box part of culvert 1 8.00 4.00 0.45 14.40 cu.m.
Wing Walls(height varying part) 4 1.50 2.30 1.80 24.84 cu.m.
Wing Walls(height constant part) 4 6.70 2.00 1.80 96.48
Inlet apron 1 7.50 0.45 3.38
Outlet apron 1 7.50 0.45 3.38 cu.m.
u/s Cut off Wall 1 6.00 0.30 2.50 4.50
d/s Cut off Wall 1 6.00 0.30 2.00 3.60 cu.m.
Total = 150.58 cu.m. 150.58

3 P.C.C work in 1:2:4 in foundation bed & floors :


Box part of culvert 1 8.00 4.00 0.15 4.80 cu.m.
Wing Walls(height varying part) 4 1.50 2.30 0.15 2.07 cu.m.
Wing Walls(height constant part) 4 6.70 2.00 0.15 8.04
Inlet apron 1 7.50 0.15 1.13
Outlet apron 1 7.50 0.15 1.13 cu.m.
u/s Cut off Wall 1 6.00 0.30 0.15 0.27
d/s Cut off Wall 1 6.00 0.30 0.15 0.27 cu.m.
Total = 17.71 cu.m. 17.71

5 P.C.C. work in in M25 RCC


Approach slab 2 8.00 3.50 0.30 16.80
top slab 1 8.00 4.00 0.43 13.76
bottom slab 1 8.00 9.80 0.42 32.93

back walls 2 8.00 0.14 2.24


side walls 2 8.00 0.50 3.00 24.00
fillets 4 8.00 0.01 0.32
mid walls 0 8.00 0.30 3.00 0.00
Wing walls(foundation)
a)near culvert part 4 6.70 2.30 0.50 30.82
b)towards end part 4 1.50 2.00 0.50 6.00
Wing walls(stem)
a)near culvert part 4 6.70 0.17 1.70 7.75
b)towards end part 4 1.50 0.30 1.70 3.06
Total = 137.68 cu.m. 137.68
Steel work for the reinforcement of
RCC slab including bending, centring
6 & binding in position
kg per
Culvert part with parapet 1 8.00 meter x 6336.70 50693.60 kg.
Total reinf. In 1
Wing walls 4 wing wall 812.24 3248.96
Total = 53942.56 53942.56
7 Back filling work in abutment back 33 % of e/w 49.69 Cum 49.69
Summary of rates .

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road Design and planning Branch
Planning Monitoring and Evaluation unit
Final sum rates
Specification
S.N. Norms No
Clause No.

1 2.02 201

2 7.01.a 701

3 7.02.iii 701

4 9.01.a 905

5 9.01.b 905

6 9.01.c 905

7 9.02.a 905

8 9.02.b 905

9 9.02.c 905

10 9.10.a 908

11 9.10.a 908

12 10.05.a 1003

13 12.01 1201

14 15.01.b 1501

15 18.01 1804, 1805

16 20.01.a.02 2000

17 20.01.a.03 2000

18 20.01.a.04 2000

19 20.01.a.05 2000

20 20.07.01 2000

21 20.07.02 2000
Summary of rates .

Specification
S.N. Norms No
Clause No.

22 20.07.03 2000

23 24.09 3110
26.01, 6.05
24 old
2602, 2603

25 26.04.b 2607
Summary of rates .

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road Design and planning Branch
Planning Monitoring and Evaluation unit
Final sum rates
Rate
BOQ Description Language Unit
( NRs.)
Clearing of grass, removing roots breaking sods, levelling the surface and disposal all complete [201 ] m2 13.08

Providing, jointing and laying HDP pipes (110 mm/125mm outer diameter) with or without collar etc.
m 351.10
complete in place as per specification. [701 ]
Proving and laying RCC pipes of diameter 900 mm (internal) with or without collars jointed with stiff
m 14,956.50
mixture of cement mortar in the proportion of 1 : 2 ( 1 cement : 2 fine sand ). [701 ]
Road way excavation in soft soil including disposal all complete. [905 ] m3 426.42
Road way excavation in Hard soil / Gravel / Boulder mixed soil including disposal upto 10 m and lift upto
m3 568.56
1.5 m etc. all complete as per specification. [905 ]
Road way excavation in Soft rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per
m3 1,563.54
specification. [905 ]
Earthwork excavation in soft soil for drain and trenches including shoring, struting, bracing, sheeting and
m3 511.70
disposal all complete. [905 ]
Earthwork excavation in Hard soil/Gravels/Boulder mixed soil for drain and trenches including shoring,
struting, bracing, sheeting and disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification m3 852.84
[905 ]

Earthwork excavation in soft rock for drain and trenches including shoring, struting, bracing, sheeting and
m3 1,705.68
disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification [905 ]

Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and
m3 1,889.25
watering etc completefor depth of foundation upto 1.5m . [908 ]
Backfilling in layers in foundation pits,trenches with common excavated material etc including compaction
m3 648.15
and watering etc complete for depth of foundation upto 1.5m . [908 ]
Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in
m2 30.05
common soil. [1003 ]
Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading
m3 1,647.00
as per table 12.1 of standard specification. [1201 ]
Supplying and erecting traffic sign in place including 50mm dia. 2 steel tube, 2mm. thick steel plate,
cement concrete, painting, writing and supporting steel angle nut and bolt etc. complete for size 1.2m.x no 9,652.04
0.75m with back support. [1501 ]
Providing , Preparing and Installing form work including necessary supports and removing after
m2 525.84
completion for foundation and footings . [1804, 1805 ]

Providing and placing machine mixed M15/40 cement concrete for the foundation and footing etc.
m3 9,990.50
including compaction, curing, testing etc. all complete as per specification and drawing. [2000 ]

Providing and placing machine mixed M20/40 cement concrete for the foundation and footing etc.
including compaction, curing, testing and lead 30m. etc. all complete as per specification and drawing. m3 11,239.76
[2000 ]

Providing and placing machine mixed M20/20 cement concrete for the foundation and footing etc.
m3 11,451.41
including compaction, curing, testing etc. all complete as per specification and drawing. [2000 ]

Providing and placing machine mixed M25/20 cement concrete for the foundation and footing etc.
including compaction, curing, testing and lead 30m. etc. all complete as per specification and drawing. m3 13,199.30
[2000 ]
Providing and laying Reinforcement ( diameter upto 8 mm) including cutting, bending, binding, fixing in
mt 127,436.46
position etc. all complete as per specification and drawing. [2000 ]

Providing and laying Reinforcement ( diameter above 8 mm and upto 16 mm) including cutting, bending,
mt 122,872.27
binding, fixing in position etc. all complete as per specification and drawing. [2000 ]
Summary of rates .

Rate
BOQ Description Language Unit
( NRs.)
Providing and laying Reinforcement ( diameter above 16 mm) including cutting, bending, binding, fixing
mt 118,425.30
in position etc. all complete as per specification and drawing. [2000 ]
Providing, laying, fixing in positions of Geo-textile (filter fabrics). [3110 ] m2 186.02

Providing, laying and levelling of dry stone soling works in the foundation all complete. [2602, 2603 ] m3 3,034.83

Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including
scaffolding, curing, preparation of mortar etc. complete, masoned height 0-5m, lead 30m (manual m3 10,138.33
mixing), mortar 35% [2607 ]
505 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No
Clause No.
B
1 107
2 107
A
3 2.02 201
1.b 201
9.01.b 905
9.01.c 905
9.01.d 905
900.02 900
900.03 900
900.04 900

4 905, 900
5 909
2.18 202
6 8.04.03 800
905

Prepared By: Checked By: Approved By:


506 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No
Clause No.

9.07.01.a 907
907
7 907

9 2400 Spec. cl. No: Norms


2041(1st
ammendment 2050)

2400 Spec. cl. No: Norms


2041(1st
ammendment 2050)
10 24.09 2404, 3110
11 26.03.b 2602 2603 2607

12 20.01.a.1 2000
14 908
15 9.10.a 908

Prepared By: Checked By: Approved By:


507 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No
Clause No.
C

9.07.01.a 907
907
16 907

Norms 2041(1st
17 24.02.04
ammendment 2050)

18 20.01.a.2 2000

19 20.03.a.i 2000

20 26.04.b 2607

20.07.01 2000

20.07.02 2000

20.07.03 2000

21 2000

22 18.01 1804, 1805

23 7.02.1 701

Prepared By: Checked By: Approved By:


508 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No
Clause No.

24 7.02.03 701

25 Norms No. 908


26 908

28 2400 Spec. cl. No: Norms


2041(1st
ammendment 2050)
D
29 10.05.b 1003

30 12.01 1201
31 12.07 1202
32 13.03 1301 1302

33 13.05.05 1301 1303

34 13.05.01 1301 1303

35 13.05.03 1301 1303


13.06.01 1301 1304
E
36 905

Prepared By: Checked By: Approved By:


509 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No
Clause No.

13 7.01 701
F

39 15.03.a 1503

40 15.03.b 1503

41 irc 7.08

42 15.02 a 1502
43 15.04 1504

44 15.01.b 1501

45 15.01.b 1501

Prepared By: Checked By: Approved By:


510 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


…….

BOQ Description Language

Maintainance works
Carrying out the routine maintenance of the existing road during the construction Period
Carrying out the routine maintenance of the existing road during Defect Liability Period.
Site Clearance and Earthwork rates
Clearing of grass, removing roots breaking sods, levelling the surface and disposal 10 m.
Scarifying existing granular/bituminous road surface for carrying out the required operations necessary to
complete the work. This includes handling, salvaging, stacking and disposing of scarified material up to a lead of 100 m along the lead route.
Road way excavation in Hard soil / Gravel / Boulder mixed soil including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification. [905 ]
Road way excavation in Soft rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification. [905 ]
Road way excavation in hard rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification. [905 ]
Earthwork excavation in hard soil by bulldozer
Earthwork excavation in soft rock by bulldozer
Earthwork excavation in hard rock by bulldozer
Earthwork excavation in Hard Soil (10% Manual and 90% Equipment)
Earthwork excavation in Soft Rock (10% Manual and 90% Equipment)
Earthwork excavation in hard Rock (10% Manual and 90% Equipment)
Roadway excavation in all type of soils including Rock and safe disposal of materials all complete. (SS/SP - 900) (Weighted rate)
Formation of embankment including compaction in layers not exceeding 150 mm compacted depth, watering and haulage 10 m etc. all complete as per
specification (ii)using equipments.
Dismantling gabion works including stockpiling the reusable materials and disposal of reusable materials within 50m lead.
Haulage of excessive cut materials using Machinary beyond 1 km length
Excavation and disposal of slides including haulage distance upto 50m (by machine)

Structural works rates

Prepared By: Checked By: Approved By:


511 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


…….

BOQ Description Language

Excavation for foundation through all types of soil including relevant lift and disposal upto 20m.
(a) Depth upto 1.5 m
Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete usng Equipment (average rate)
Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete (10% Manual and 90% Equipment)

Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying
down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per
specification.

Providing and filling stones into Gabion crates all complete as per specification along with reuse of stones/rubbles from existing ones.as per Engineers direction
(SS/SP-2400).

Providing, laying and fixing of Geo-textile (filter fabrics), lead 30m


Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. complete,
masoned height 0-5m, lead 30m (machine mixing), mortar 35%
Providing and placing machine mixed M10/40 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all
complete as per specification and drawing.
Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and watering etc complete,lead 10 m
Backfilling in layers in foundation pits,trenches etc including compaction and watering etc complete,lead 10 m
a) Depth of foundation upto 1.5m

Prepared By: Checked By: Approved By:


512 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


…….

BOQ Description Language

Cross Drainage works rates


Excavation for foundation through all types of soil including relevant lift and disposal upto 20m.
(a) Depth upto 1.5 m
Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete usng Equipment (average rate)
Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete (10% Manual and 90% Equipment)

Providing, laying and levelling of dry stone soling works in the foundation all complete.

Providing and placing machine mixed M15/40 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all compl
Providing and placing machine mixed M20/20 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all
complete as per specification and drawing.
Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. complete,
masoned height 0-5m, lead 30m (manual mixing), mortar 35%
Providing and laying Reinforcement ( diameter upto 8 mm) including cutting, bending, binding, fixing in position etc. all complete as per specification and drawing.
[2000 ]
Providing and laying Reinforcement ( diameter above 8 mm and upto 16 mm) including cutting, bending, binding, fixing in position etc. all complete as per
specification and drawing. [2000 ]
Providing and laying Reinforcement ( diameter above 16 mm) including cutting, bending, binding, fixing in position etc. all complete as per specification and
drawing. [2000 ]

Providing and laying Reinforcement of all size including cutting, bending, binding, fixing in position etc. all complete as per specification and drawing. [2000 ]

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and footings . [1804, 1805 ]
Proving and laying RCC pipes of diameter 600 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 cement :
2 fine sand ) , lead upto 100m.

Prepared By: Checked By: Approved By:


513 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


…….

BOQ Description Language

Proving and laying RCC pipes of diameter 900 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 cement :
2 fine sand ) , lead upto 100m.
Backfilling in layers in foundation pits,trenches etc including compaction and watering etc complete,lead 10 m
a) Depth of foundation upto 1.5m
Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and watering etc complete,lead 10 m

Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying
down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per
specification.

Pavement work rates


Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in gravel & boulder mixed soil.

Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading as per table 12.1 of standard specification lead upto 10m.
Providing, laying, spreading, watering, levelling and compaction of crusher run materials for base course with lead up to 10 m (1202)
Providing and spraying bituminous prime coat MC30/MC70 including cleaning the road surface using wire, brushes, broom etc. before applying prime coat

Supply, Spread and compact 20mm (First coat) and 10mm(Second coat) nominal size chips for double bituminous surface dressing (DBSD) as per specified
spreading rates for each layer of surface dressing to meet all the requirements of special specification all complete.(SS/SP 1300)
Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or broken stone chips including compaction, Bitumen
binder for surface dressing
Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or broken stone chips including compaction, Cutter for
bitumen grade 80/100
Providing and applying semi-grouting with compaction 50mm thick (bitumin spray rate=3.5ltr/m2) (SS/SP-1301,1304)
Side drain works rates
Excavation for drain in all type of soils including Rock and safe disposal of materials all complete (10% Manual and 90% Equipment)

Prepared By: Checked By: Approved By:


514 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


…….

BOQ Description Language

Supplying and place Precast R.C.C. (M20/20) side drain cover slab for Drain of size(1.2m*0.5m*0.125m)
Providing HDP pipes (110 mm/125mm outer diameter) for weepholes complete in place as per specification.
Miscellaneous Items
Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all complete as per specification
a) Standard KM post placed at each kilometer.
Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all complete as per specification
b) Bigger kilometer post (placed at each 5 km.)
Provide and erecting "W" metal beam crashbarrier comprising of 3.43mm thick corrugated sheet metal beam rail, 70cm above road/ground level,fixed on ISMC
serises channel vertical post, 150*75*5 mm spaced 2m c/c,1.8m high,1.1m below ground/road level,all steel paetsand fitment to be galvanized by hot dip
process,all fittings to confirm to IS 1367 and IS 1364,metal beam rail to be fixed on the vertical post with a spacer of chaneel section 150*75*5mm 330mm long, all
complete
Supplying and applying Thermoplastic Paint for Road marking including cleaning,watering,brooming etc. all complete
Supplying and fixing in place R.C.C. delineator and guard post including excavation, back filling, painting and erection etc. all complete as per drawing.
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel angle nut
and bolit etc. complete
a)60 cm dia circular,60cm.equilateral triangle and 60cm x 45cm rectangular shaped sign(single post)
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel angle nut
and bolit etc. complete
b) 1.2m.x 0.75m. Size bigger traffic sign with back support and two or more post.

Prepared By: Checked By: Approved By:


515 of 664

Unit Rate ( NRs.)

Km-mnth 8280.00
Km-mnth 5520.00

Sq.m 13.08
Sq.m 8.17
RM 568.56
RM 1,563.54
RM 6,822.72
RM 28.20
RM 39.23
RM 45.70
RM 85.05
RM 191.66
RM 723.41
Cu.m 90.38
Cu.m 120.27
Cu.m 660.35
Cu.m 57.00
Cu.m 184.47

Prepared By: Checked By: Approved By:


516 of 664

Unit Rate ( NRs.)

Cu.m 1,137.12
Cu.m 37.71
Cu.m 147.65

Cu.m 5,122.31

Cu.m 1,596.02

Sq.m 186.02
Cu.m 9,717.35

Cu.m 9,202.05
Cu.m 1,889.25
Cu.m 648.15

Prepared By: Checked By: Approved By:


517 of 664

Unit Rate ( NRs.)

Cu.m 1,137.12
Cu.m 37.71
Cu.m 147.65

Cu.m 3,034.83

Cu.m 9,990.50

Cu.m 11451.41

Cu.m 9,717.35

mt 127,436.46

mt 122,872.27

mt 118,425.30

mt 122,911.34

sqm 525.84

RM 9,457.15

Prepared By: Checked By: Approved By:


518 of 664

Unit Rate ( NRs.)

RM 14,956.50

Cu.m 648.15
1,889.25

Cu.m 5,122.31

Sq.m 30.05

Cu.m 1,647.00
Cu.m 2,865.65
lit 187.39

ton 1,580.36

lit 171.18

lit 104.27
sqm 643.61

Cu.m 123.49

Prepared By: Checked By: Approved By:


519 of 664

Unit Rate ( NRs.)

Nos 1675.35
rm 351.10

no 2,537.96

no 5,768.93

rm 8,701.48

sqm 1,317.74
no 1,112.17

no 3,294.65

no 9,652.04

Prepared By: Checked By: Approved By:


1 of 664
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

RATE ANALYSIS
Description of works: Clearing of grass, removing roots breaking sods, levelling the surface and disposal 10 m.

Spec. cl. No: 201


Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.02 Unskilled md 0.0230 480.00 11.04

Sub total of A = 11.04 Sub total of B = 0.00

Sub total of A +B + C = 11.37 Contractor's overhead expenses 15% =

Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of
(a) Plain cement concrete, 1:4:8 or leaner mix
Spec. cl. No: 202

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.01 Skilled md 0.050 775.00 38.75

Unskilled md 1.4 480.00 672.00

Sub total of A = 710.75 Sub total of B = 0.00

Prepared By Checked By Approved By


2 of 664

RATE ANALYSIS
Sub total of A +B + C = 732.07 Contractor's overhead expenses 15% =

Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of
(b) Plain cement concrete, 1:3:6 or richer mix
Spec. cl. No: 202

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.02 Skilled md 0.050 775.00 38.75

Unskilled md 2.3 480.00 1104.00

Sub total of A = 1142.75 Sub total of B = 0.00

Sub total of A +B + C = 1177.03 Contractor's overhead expenses 15% =

Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of
(c) Reinforced cement concrete work
Spec. cl. No: 202

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.03 Skilled md 0.050 775.00 38.75

Unskilled md 3.25 480.00 1560.00

Sub total of A = 1598.75 Sub total of B = 0.00

Sub total of A +B + C = 1646.71 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


3 of 664

RATE ANALYSIS
Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of
(e) Random rubble masonry in cement mortar
Spec. cl. No: 202

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.05 Skilled md 0.100 775.00 77.50

Unskilled md 2.25 480.00 1080.00

Sub total of A = 1157.50 Sub total of B = 0.00

Sub total of A +B + C = 1192.22 Contractor's overhead expenses 15% =

Description of works: Dismantling of RCC pipes (excluding excavation and refilling).


i) upto 600 mm dia.
Spec. cl. No: 202

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.17.i Skilled md 0.01 775.00 7.75

Unskilled md 0.40 480.00 192.00

Sub total of A = 199.75 Sub total of B = 0.00

Sub total of A +B + C = 205.74 Contractor's overhead expenses 15% =

Description of works: Dismantling of RCC pipes (excluding excavation and refilling).


ii) above 600 mm dia.
Spec. cl. No: 202

Prepared By Checked By Approved By


4 of 664

RATE ANALYSIS
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.17.ii Skilled md 0.01 775.00 7.75

Unskilled md 0.80 480.00 384.00

Sub total of A = 391.75 Sub total of B = 0.00

Sub total of A +B + C = 403.50 Contractor's overhead expenses 15% =


Description of works: Scarifying existing granular/bituminous road surface for carrying out the required operations necessary to co
Spec. cl. No: 201

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

1.b Skilled md 0.00 775.00 0.00 Diesel ltr 0.04 89.38 3.58

Unskilled md 0.00 480.00 0.00

Sub total of A = 0.00 Sub total of B = 3.58

Sub total of A +B + C = 7.10 Contractor's overhead expenses 15% =

Description of works: Dismantling gabion works including stockpiling the reusable materials and disposal of reusable materials wi
Spec. cl. No: 202

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


5 of 664

RATE ANALYSIS
2.18 Skilled md 0.10 775.00 77.50

Unskilled md 1.00 480.00 480.00

Sub total of A = 557.50 Sub total of B = 0.00

Sub total of A +B + C = 574.22 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


6 of 664

RATE ANALYSIS
Description of works: Providing HDP pipes (110 mm/125mm outer diameter) for weepholes complete in place as per specification
Spec. cl. No: 701
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

7.01 Skilled md 3.0 775.00 2325.00 HDP pipe m 50.00 230.00 11500.00

Unskilled md 3.0 480.00 1440.00 Petrol lit 5.00 0.00

Sub total of A = 3765.00 Sub total of B = 11500.00

Sub total of A +B + C = 15265.00 Contractor's overhead expenses 15% =

Description of works: Proving and laying RCC pipes of diameter 600 mm (internal) with or without collars jointed with stiff mixture
1 : 2 ( 1 cement : 2 fine sand ) , lead upto 100m.
Spec. cl. No: 701
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

7.02.1 Skilled md 0.281 775.00 217.77 RCC Pipe m 1.0 7100.83 7100.83

Unskilled md 1.094 480.00 525.12 Cement kg 6.813 16.33 111.25

Sand m3 0.009 802.58 7.22

Jute kg 0.219 100.00 21.90

Sub total of A = 742.89 Sub total of B = 7241.20

Sub total of A +B + C = 8223.61 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


7 of 664

RATE ANALYSIS
Description of works: Proving and laying RCC pipes of diameter 900 mm (internal) with or without collars jointed with stiff mixture
cement : 2 fine sand ) , lead upto 100m.

Spec. cl. No: 701

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

7.02.03 Skilled md 0.344 775.00 266.60 RCC Pipe m 1.0 11414.58 11414.58

Unskilled md 1.562 480.00 749.76 Cement kg 9.062 16.33 147.98

Sand m3 0.013 802.58 10.43

Jute kg 0.375 100.00 37.50

Sub total of A = 1016.36 Sub total of B = 11610.49

Sub total of A +B + C = 13005.65 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


8 of 664

RATE ANALYSIS
Description of works: Road way excavation in Hard soil / Gravel / Boulder mixed soil including disposal upto 10 m and lift upto 1.5

Spec. cl. No: 905

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.01.b Unskilled md 1.000 480.00 480.00

Sub total of A = 480.00 Sub total of B = 0.00

Sub total of A +B + C = 494.40 Contractor's overhead expenses 15% =

Description of works: Road way excavation in Soft rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per s

Spec. cl. No: 905

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.01.c Unskilled md 2.750 480.00 1320.00

Sub total of A = 1320.00 Sub total of B = 0.00

Sub total of A +B + C = 1359.60 Contractor's overhead expenses 15% =

Description of works: Road way excavation in hard rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per s

Prepared By Checked By Approved By


Road way excavation in hard rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as9 ofper
664s

RATE ANALYSIS
Spec. cl. No: 905

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.01.d Unskilled md 12.000 480.00 5760.00

Sub total of A = 5760.00 Sub total of B = 0.00

Sub total of A +B + C = 5932.80 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


10 of 664

RATE ANALYSIS
Description of works: Earthwork excavation in hard soil by bulldozer
Spec. cl. No: 900
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

900.02. Unskilled md 0.010 480.00 4.80 Diesel Lit 0.132 89.38 11.79816

Sub total of A = 4.80 Sub total of B = 11.80

Sub total of A +B + C = 24.52 Contractor's overhead expenses 15% =

Description of works: Earthwork excavation in soft rock by bulldozer


Spec. cl. No: 900
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

900.03 Unskilled md 0.010 480.00 4.80 Diesel Lit 0.195 89.38 17.4291

Sub total of A = 4.80 Sub total of B = 17.43

Sub total of A +B + C = 34.11 Contractor's overhead expenses 15% =

Description of works: Earthwork excavation in hard rock by bulldozer

Spec. cl. No: 900

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

900.04 Unskilled md 0.010 480.00 4.80 Diesel Lit 0.258 89.38 23.06004

Prepared By Checked By Approved By


11 of 664

RATE ANALYSIS
Sub total of A = 4.80 Sub total of B = 23.06

Sub total of A +B + C = 39.74 Contractor's overhead expenses 15% =

Description of works: Earthwork excavation in B.M.S / Hard Soil (10% Manual and 90% Equipment)

Manual (A) Equipment (B)

% Rate Amount % Rate Amount

10 494.40 49.44 90 24.52 24.52

Sub total of A = 49.44 Sub total of B = 24.52


Sub total of A +B 73.96 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


12 of 664

RATE ANALYSIS
Description of works: Earthwork excavation in Soft Rock (10% Manual and 90% Equipment)

Manual (A) Equipment (B)


Norms No.
% Rate Amount % Rate Amount

10 1359.60 135.96 90 34.11 30.699

Sub total of A = 135.96 Sub total of B = 30.70

Sub total of A +B 166.66 Contractor's overhead expenses 15% =

Description of works: Earthwork excavation in hard Rock (10% Manual and 90% Equipment)

Manual (A) Equipment (B)


Norms No.
% Rate Amount % Rate Amount

10 5932.80 593.28 90 39.74 35.766

Sub total of A = 593.28 Sub total of B = 35.77

Sub total of A +B 629.05 Contractor's overhead expenses 15% =

Roadway excavation in all type of soils including Rock and safe disposal of materials all complete. (SS/SP

Description of works: Quantity

Prepared By Checked By Approved By


13 of 664

RATE ANALYSIS
Earthwork excavation in hard Rock (10% Manual and 90% Equipment) 0.00

Earthwork excavation in Soft Rock (10% Manual and 90% Equipment) 291168.15

Earthwork excavation in B.M.S / Hard Soil (10% Manual and 90% Equipment) 5532194.85

Description of works: Formation of embankment including compaction in layers not exceeding 150 mm compacted depth, watering
specification (ii)using equipments.

Spec. cl. No: 909

Manual (A) Equipment (B)


Norms No.
% Rate Amount % Rate Amount

10 846.05 84.61 90 39.62 35.658

Prepared By Checked By Approved By


14 of 664

RATE ANALYSIS
Description of works: Excavation for foundation through all types of soil including relevant lift and disposal upto 20m.
(a) Depth upto 1.5 m
Spec. cl. No: 907

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.07.01.a Unskilled md 2.000 480.00 960.00

Sub total of A = 960.00 Sub total of B = 0.00

Sub total of A +B + C = 988.80 Contractor's overhead expenses 15% =

Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete usng E
Description of works: Rate
Earthwork Excavation in Hard soil 28.20

Earthwork exavation in soft rock 39.23

Earthwork exavation in Hard rock 45.70

Description of works: Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete (10
Spec. cl. No: 907
Manual (A) Equipment (B)
Norms No.
% Rate Amount % Rate Amount

10 1137.12 113.71 90 37.71 33.939

Prepared By Checked By Approved By


15 of 664

RATE ANALYSIS

Description of works: Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and w
a) Depth of foundation upto 1.5m
Spec. cl. No: 908

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.10.a Unskilled md 1.140 480.00 547.20 Filler Material m3 1.1 981.11 1079.22
Sub total of A = 547.20 Sub total of B = 1079.22
Sub total of A +B + C = 1642.83 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


16 of 664

RATE ANALYSIS
Description of works: Backfilling in layers in foundation pits,trenches etc including compaction and watering etc complete,lead 10
a) Depth of foundation upto 1.5m
Spec. cl. No: 908
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.10.a Unskilled md 1.140 480.00 547.20

Sub total of A = 547.20 Sub total of B = 0.00

Sub total of A +B + C = 563.61 Contractor's overhead expenses 15% =

Description of works: Excavation and disposal of slides including haulage distance upto 50m (by machine)

Spec. cl. No: 905

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.11.a Unskilled md 0.00315 480.00 1.51 Diesel Ltr 0.1512 89.38 13.514256

Sub total of A = 1.51 Sub total of B = 13.51

Sub total of A +B + C = 160.41 Contractor's overhead expenses 15% =

Transportation Cost As per clause 8.04.03 1(a) as shown in transporatation rate chart for up to 1 km 290.75
Basic Haulage Rate included in slide removal is assumed to be half of the transportation rate 145.38

NB: Refrence taken from RIP C

Prepared By Checked By Approved By


17 of 664

RATE ANALYSIS
Description of works: Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in c
Spec. cl. No: 1003
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

10.05.a Unskilled md 0.10 480.00 48.00 Diesel lit 0.122 89.38 10.90
skilled md 0.01 775.00 7.75

Sub total of A = 55.75 Sub total of B = 10.90

Sub total of A +B + C = 130.65 Contractor's overhead expenses 15% =

Note: Considering subgrade of 20 cm thickness

Prepared By Checked By Approved By


18 of 664

RATE ANALYSIS
Description of works: Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in g
Spec. cl. No: 1003
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

10.05.b Unskilled md 0.30 480.00 144.00

Sub total of A = 144.00 Sub total of B = 0.00

Sub total of A +B + C = 148.32 Contractor's overhead expenses 15% =

Description of works: Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading as
Spec. cl. No: 1201
10m.

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
12.01
Skilled md 0.0050 775.00 3.87 Subbase agg. cu.m. 1.2800 981.11 1255.82

Unskilled md 0.0400 480.00 19.20 Diesel lit 0.7920 89.38 70.78

Sub total of A = 23.07 Sub total of B = 1326.60

Sub total of A +B + C = 1432.17 Contractor's overhead expenses 15% =


Description of works: Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading as
Description of works: 10m (for manual works).
Providing and spraying bituminous prime coat MC30/MC70 including cleaning the road surface using wire, b
Spec. cl. No: 1301,1302

Prepared By Checked By Approved By


19 of 664

RATE ANALYSIS
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

13.03 Skilled md 0.0030 775.00 2.32 Bitumen MC30/MC70 lit. 1.0500 98.29 103.20

Unskilled md 0.0460 480.00 22.08 kerosene lit 0.1000 89.38 8.93

Diesel lit 0.2750 89.38 24.57

Sub total of A = 24.40 Sub total of B = 136.70

Sub total of A +B + C = 162.95 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


20 of 664

RATE ANALYSIS
Description of works: Providing, laying, spreading, watering, levelling and compaction of crusher run materials for base course wi
Spec. cl. No: 1202
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
12.06
Skilled md 0.0050 775.00 3.87 Base agg. cu.m. 1.2000 1895.67 2274.80

Unskilled md 0.0200 480.00 9.60 Diesel lit 0.9900 89.38 88.48

Sub total of A = 13.47 Sub total of B = 2363.28

Sub total of A +B + C = 2491.87 Contractor's overhead expenses 15% =

Description of works: Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or
Spec. cl. No: 1301 Bitumen binder for surface dressing

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
13.05.01
Skilled md 0.0020 775.00 1.55 Bitumen 80/100 lit 1.0500 98.29 103.20

Unskilled md 0.0140 480.00 6.72 Kerosene lit 0.1000 89.38 8.93

Diesel lit 0.2700 89.38 24.13

Prepared By Checked By Approved By


21 of 664

RATE ANALYSIS
Sub total of A = 8.27 Sub total of B = 136.26

Sub total of A +B + C = 148.85 Contractor's overhead expenses 15% =

Description of works: Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or
Spec. cl. No: 1301 Cutter for bitumen grade 80/100
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
13.05.03
Skilled md 0.0010 775.00 0.77

Unskilled md 0.0010 480.00 0.48

Kerosene or Diesel lit 1.0000 89.38 89.38

Sub total of A = 1.25 Sub total of B = 89.38

Sub total of A +B + C = 90.67 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


22 of 664

RATE ANALYSIS
Description of works: Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or
Spec. cl. No: 1301 1303 Chipping for surface dressing for 1st coat size, 20 mm dia

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
13.05.04
Skilled md 0.0010 775.00 0.77 Chips t 1.0500 648.48
Unskilled md 0.2100 480.00 100.80 Diesel lit 3.6000 89.38
680.90

321.76

Sub total of A = 101.57 Sub total of B = 1002.66

Sub total of A +B + C = 1374.23 Contractor's overhead expenses 15% =

Note: Unit weight of stone chips = 1.65 gm/cc, 1 ton chips = 1m3/1.65

Description of works:
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement c
angle nut and bolit etc. complete
Spec. cl. No: 1501 a)60 cm dia circular,60cm.equilateral triangle and 60cm x 45cm rectangular shaped sign(single post)
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.01.b Skilled md 0.033 775.00 25.57 Enamel paint lit 0.100 550.00 55.00

Unskilled md 0.088 480.00 42.24 M10/40 PCC m3 0.030 9202.05 276.06

Steel plate m2 0.25 3885.75 971.43

Prepared By Checked By Approved By


23 of 664

RATE ANALYSIS
Formwork (F1) m2 0.36 457.25 164.61

Steel tube m 2.50 532.00 1330.00

Sub total of A = 67.81 Sub total of B = 2797.10

Sub total of A +B + C = 2864.91 Contractor's overhead expenses 15% =

Note: considering form work can be used for 10 repeated times

Prepared By Checked By Approved By


24 of 664

RATE ANALYSIS
Description of works:
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement c
angle nut and bolit etc. complete
Spec. cl. No: 1501 b) 1.2m.x 0.75m. Size bigger traffic sign with back support and two or more post.
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.01.b Skilled md 0.085 775.00 65.87 Enamel paint lit 0.400 550.00 220.00

Unskilled md 0.300 480.00 144.00 M10/40 PCC m3 0.120 8001.78 960.21

Steel plate m2 1.00 3885.75 3885.75

Formwork (F1) m2 1.00 457.25 457.25

Steel tube m 5.00 532.00 2660.00

Sub total of A = 209.87 Sub total of B = 8183.21

Sub total of A +B + C = 8393.08 Contractor's overhead expenses 15% =

Description of works:
Supplying and applying paint for Road marking including cleaning, watering, brooming etc. all complete (10
Description of works:
a) Two coats
Supplying andover old R.C.C.
placing painted kilometer
surface post including excavation, back filling, painting and writing etc. all
a) Standard KM post placed at each kilometer.
Spec. cl. No: 1503
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.03.a Skilled md 0.030 775.00 23.25 M15/40 RCC m3 0.060 8687.39 521.24

Unskilled md 0.116 480.00 55.68 M10/40 PCC m3 0.090 8001.78 720.16

Formwork (F2) m2 0.500 457.25 228.62

Prepared By Checked By Approved By


25 of 664

RATE ANALYSIS
Enamel paint lit 0.120 550.00 66.00
Reinforcement bar
kg 7.500 78.93 591.97

Sub total of A = 78.93 Sub total of B = 2127.99

Sub total of A +B + C = 2206.92 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


26 of 664

RATE ANALYSIS
Description of works: Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all
b) Bigger kilometer post (placed at each 5 km.)
Spec. cl. No: 1503
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.03.b Skilled md 0.080 775.00 62.00 M15/40 RCC m3 0.170 8687.39 1476.85

Unskilled md 0.300 480.00 144.00 M10/40 PCC m3 0.230 8001.78 1840.40

Formwork (F2) m2 1.300 457.25 594.42

Enamel paint lit 0.400 550.00 220.00


Reinforcement bar
kg 8.600 78.93 678.79

Sub total of A = 206.00 Sub total of B = 4810.46

Sub total of A +B + C = 5016.46 Contractor's overhead expenses 15% =

Description of works: Supplying and fixing in place R.C.C. delineator and guard post including excavation, back filling, painting a
Spec. cl. No: 1504
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.04 Skilled md 0.021 775.00 16.27 M20/20 PCC m3 0.030 9957.75 298.73

Unskilled md 0.055 480.00 26.40 Formwork (F2) m2 0.540 563.19 304.12

Enamel paint lit 0.180 550.00 99.00


Reinforcement bar
kg 2.82 78.93 222.58

Sub total of A = 42.67 Sub total of B = 924.43

Prepared By Checked By Approved By


27 of 664

RATE ANALYSIS
Sub total of A +B + C = 967.10 Contractor's overhead expenses 15% =

Description of works: Providing , Preparing and Installing form work including necessary supports and removing after completion
(a) using timber ( soft wood) - Class F1 finish.
Spec. cl. No: 1804,1805

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

18.01 Skilled md 1.50 775.00 1162.50 Planks 38mm thick. m3 0.42 4333.33 1819.99

Unskilled md 2.00 480.00 960.00 struts, ballies, etc. m3 0.18 2888.89 520.00

Nails,spikes,etc. kg 1.00 110.00 110.00

Sub total of A = 2122.50 Sub total of B = 2449.99

Sub total of A +B + C = 4572.49 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


28 of 664

RATE ANALYSIS
Description of works: Providing and placing machine mixed M10/40 cement concrete for the foundation and footing etc. including compactio
specification and drawing.
Spec. cl. No: 2000
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.01.a.1 Skilled md 0.50 775.00 387.50 cement mt 0.220 16331.09 3592.83

Unskilled md 3.50 480.00 1680.00 aggregate 20-40mm m3 0.650 1009.58 656.22

aggregate 10 -20mm m3 0.250 1070.00 267.50

coarse sand m3 0.480 802.58 385.23

petrol lit 0.100 100.88 10.08

diesel lit 3.000 89.38 268.14

water lit 132.000 1.91 252.12

Sub total of A = 2067.50 Sub total of B = 5432.12

Sub total of A +B + C = 8001.78 Contractor's overhead expenses 15% =

Description of works: Providing and placing machine mixed M15/40 cement concrete for the foundation and footing etc. including
all complete as per specification and drawing.
Spec. cl. No: 2000
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.01.a.2 Skilled md 0.50 775.00 387.50 cement mt 0.260 16331.09 4246.08

Unskilled md 3.50 480.00 1680.00 aggregate 20-40mm m3 0.530 1009.58 535.07

aggregate 10-20mm m3 0.240 1070.00 256.80

Prepared By Checked By Approved By


29 of 664

RATE ANALYSIS
aggregate 10mm & down m3 0.110 117.70
1070.00
coarse sand m3 0.460 802.58 369.18

petrol lit 0.100 100.88 10.08

diesel lit 3.000 89.38 268.14

water lit 156.000 1.91 297.96

Sub total of A = 2067.50 Sub total of B = 6101.01

Sub total of A +B + C = 8687.39 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


30 of 664

RATE ANALYSIS
Description of works: Providing and placing machine mixed M20/20 cement concrete for the foundation and footing etc. including compactio
specification and drawing.
Spec. cl. No: 2000
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.01.a.4 Skilled md 0.50 775.00 387.50 cement mt 0.330 16331.09 5389.25

Unskilled md 3.50 480.00 1680.00 aggregate 10-20mm m3 0.580 1070.00 620.60

aggregate 10mm & down m3 0.300 1070.00 321.00

coarse sand m3 0.440 802.58 353.13

petrol lit 0.100 100.88 10.08

diesel lit 3.000 89.38 268.14

water lit 198.000 1.91 378.18

Sub total of A = 2067.50 Sub total of B = 7340.38

Sub total of A +B + C = 9957.75 Contractor's overhead expenses 15% =

Description of works: Providing and placing machine mixed M25/20 cement concrete for the foundation and footing etc. including compactio
specification and drawing.
Description of works: Providing and laying Reinforcement ( diameter upto 8 mm) including cutting, bending, binding, fixing in po
specification and drawing.
Spec. cl. No: 2000

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.07.1 Skilled md 15.00 775.00 11625.00 Reinforcement t 1.150 78927.09 90766.15

Prepared By Checked By Approved By


31 of 664

RATE ANALYSIS
Unskilled md 15.00 480.00 7200.00 Binding wire kg 12.000 101.93 1223.16

Sub total of A = 18825.00 Sub total of B = 91989.31

Sub total of A +B + C = 110814.31 Contractor's overhead expenses 15% =

Description of works: Providing and laying Reinforcement ( diameter above 8 mm and upto 16 mm) including cutting, bending, bi
complete as per specification and drawing.
Spec. cl. No: 2000

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.07.2 Skilled md 12.00 775.00 9300.00 Reinforcement t 1.150 78927.09 90766.15

Unskilled md 12.00 480.00 5760.00 Binding wire kg 10.000 101.93 1019.30

Sub total of A = 15060.00 Sub total of B = 91785.45

Sub total of A +B + C = 106845.45 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


32 of 664

RATE ANALYSIS
Description of works: Providing and laying Reinforcement ( diameter above 16 mm) including cutting, bending, binding, fixing in
specification and drawing.
Spec. cl. No: 2000

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.07.3 Skilled md 9.00 775.00 6975.00 Reinforcement t 1.150 78927.09 90766.15

Unskilled md 9.00 480.00 4320.00 Binding wire kg 9.000 101.93 917.37


Sub total of A = 11295.00 Sub total of B = 91683.52

Sub total of A +B + C = 102978.52 Contractor's overhead expenses 15% =

Providing and laying Reinforcement including cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per specif

Description of works: Quantity


diameter upto 8mm

diameter above 8 mm and upto 16 mm

diameter above 16 mm

Description of works: assembling


Assembling Gabion
machineboxesmademattresses, palcing in position
Gabion boxes/mattresses, including
palcing stretching,
in position forming
including compartments;
stretching, forming tying
comp
lid
tying down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. inclub
complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing,
specification.
transporation as[ 3per
x 1 specification.
x 1 : (16 sq. m)]
[ 3 x 1 x 1 : (16 sq. m)]
Spec. cl. No: 2401
Labour (A) Material (B)
Norms No.

Prepared By Checked By Approved By


33 of 664

Norms No.
RATE ANALYSIS
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Filling of stones : Activity no : 24.02.04

Skilled md 0.75 775.00 581.25 Block stone m3 3.00 1895.67 5687.01

Unskilled md 2.25 480.00 1080.00 Bond stone m3 0.30 1895.67 568.70


Machine made gabion crates

Machine made gabion crates m2 16.00 283.00 4528.00

Tying and bracing wires: Activity no : 24.02.01

Unskilled md 1.04 480.00 499.20 Binding wire(12 SWG) Kg 1.81 101.93 184.49

Sub total of A = 2160.45 Sub total of B = 10968.20

Sub total of A +B + C = 13128.65 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


34 of 664

RATE ANALYSIS
Description of works: Assembling machine made Gabion boxes/mattresses palcing in position including stretching, forming comp
tying down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. inclu
transporation as per specification. [ 2 x 1 x 1 : (11sq. m)]

Spec. cl. No: 2401


Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Filling of stones : Activity no : 24.02.04

Skilled md 0.50 775.00 387.50 Block stone m3 2.00 1895.67 3791.34

Unskilled md 1.50 480.00 720.00 Bond stone m3 0.20 1895.67 379.13


Machine made gabion crates

Machine made gabion crates m2 11.00 283.00 3113.00

Tying and bracing wires: Activity no : 24.02.01

Unskilled md 0.75 480.00 360.00 Binding wire(12 SWG) Kg 1.30 91.93 119.50

Sub total of A = 1467.50 Sub total of B = 7402.97

Sub total of A +B + C = 8870.47 Contractor's overhead expenses 15% =

Description of works: Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming comp
tying down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. inclu
transporation as per specification. [ 1.5 x 1 x 1 : (9 sq. m)]

Spec. cl. No: 2401


Labour (A) Material (B)
Norms No.

Prepared By Checked By Approved By


35 of 664

Norms No.
RATE ANALYSIS
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Filling of stones : Activity no : 24.02.04

Skilled md 0.38 775.00 294.50 Block stone m3 1.50 1895.67 2843.50

Unskilled md 1.13 480.00 542.40 Bond stone m3 0.15 1895.67 284.35


Machine made gabion crates

Machine made gabion crates m2 9.00 283.00 2547.00

Tying and bracing wires: Activity no : 24.02.01

Unskilled md 0.68 480.00 326.40 Binding wire(12 SWG) kg 1.25 91.93 114.91

Sub total of A = 1163.30 Sub total of B = 5789.76

Sub total of A +B + C = 6953.06 Contractor's overhead expenses 15% =

Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming compartments;
Spec. cl. No: 2401 down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, b
specification. [average]
Box size Unit Qty. Amount
1.5 x 1 x1 Box m 3
1.5 7996.02
2 x 1 x 1 Box m3 2 10201.04
3 x 1 x 1 Box m 3
3 15097.95
Total : 33295.01

Average (1m3) 5122.31

Prepared By Checked By Approved By


36 of 664

RATE ANALYSIS
Providing and filling stones into Gabion crates all complete as per specification along with reuse of stones/
Description of works: direction (SS/SP-2400).

Spec. cl. No: Norms 2041(1st


ammendment 2050)

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.02.04 skilled md 0.25 775.00 193.75 stone m3 0.44 1895.67 834.09

Unskilled md 0.75 480.00 360.00

Sub total of A = 553.75 Sub total of B = 834.09

Sub total of A +B + C = 1387.84 Contractor's overhead expenses 15% =

Note = 60 % of the boulder/stone can be used from dismantled quantity

Description of works: Providing, laying and fixing of Geo-textile (filter fabrics), lead 30m
Spec. cl. No: 2404,3110
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.09 Unskilled md 0.017 480.00 8.16 Geotextile m2 1.20 128.00 153.60

Sub total of A = 8.16 Sub total of B = 153.60

Sub total of A +B + C = 161.76 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


37 of 664

RATE ANALYSIS
Description of works: Providing and placing concrete with 60% M 15/40 concrete and 40% boulders/stones as per specification L
vibrator.

Spec.cl.No: 2406: 2, 4

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.14.01.a Skilled md 0.30 775.00 232.50 cement t 0.169 16331.09 2759.95

Unskilled md 3.00 480.00 1440.00 Aggregates 20-40(mm) m3 0.345 1852.20 639.00


Aggregates 10-20 (mm) m3 0.156 1852.20 288.94
Aggregates 5-10(mm) m3 0.072 1852.20 133.35
sand m3 0.299 802.58 239.97
petrol lit 0.100 100.88 10.08
diesel lit 3.000 89.38 268.14
Boulder/Stone m3 0.440 1895.67 834.09

Sub total of A = 1672.50 Sub total of B = 5173.52

Sub total of A +B + C = 7091.02 Contractor's overhead expenses 15% =

Description of works: Providing and placing concrete with 60% M 15/40 concrete and 40% boulders/stones as per specification L
mixer and vibrator.
Spec.cl.No: 2406: 2, 4
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


38 of 664

RATE ANALYSIS
24.14.01.b Skilled md 0.30 775.00 232.50 cement t 0.185 16331.09 3021.25

Unskilled md 4.00 480.00 1920.00 Aggregates 20-40(mm) m3 0.345 1009.58 348.30


Aggregates 10-20 (mm)
m3 0.156 1070.00 166.92

Aggregates 5-10(mm) m3 0.072 1070.00 77.04


sand m3 0.299 802.58 239.97
Boulder/Stone m3 0.440 1895.67 834.09

Sub total of A = 2152.50 Sub total of B = 4687.57

Sub total of A +B + C = 6840.07 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


39 of 664

RATE ANALYSIS
Description of works: Providing and placing plum-concrete with 70% M 15/40 concrete and 30% boulders/stones as per specifica
and vibrator.

Spec.cl.No: 2406: 2, 4

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.14.02.a Skilled md 0.30 775.00 232.50 cement t 0.195 16331.09 3184.56


Aggregates 20-40(mm)
Unskilled md 3.00 480.00 1440.00 m3 0.398 1009.58 401.81

Aggregates 10-20 (mm)


m3 0.180 1009.58 181.72

Aggregates 5-10(mm)
m3 0.082 1009.58 82.78
sand m3 0.345 802.58 276.89
petrol lit 0.100 100.88 10.08
diesel lit 3.000 89.38 268.14
Boulder/Stone m3 0.330 1895.67 625.57

Sub total of A = 1672.50 Sub total of B = 5031.55

Sub total of A +B + C = 6949.05 Contractor's overhead expenses 15% =

Description of works: Providing and placing concrete with 70% M 15/40 concrete and 30% boulders/stones as per specification L
mixer and vibrator.

Spec.cl.No: 2406: 2, 4

Prepared By Checked By Approved By


40 of 664

RATE ANALYSIS
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.14.02.b Skilled md 0.30 775.00 232.50 cement t 0.214 16331.09 3494.85

Unskilled md 4.00 480.00 1920.00 Aggregates 20-40(mm) m3 0.398 1852.20 737.17


Aggregates 10-20 (mm) m3 0.180 1852.20 333.39
Aggregates 5-10(mm) m3 0.082 1852.20 151.88
sand m3 0.345 802.58 276.89
Boulder/Stone m3 0.330 1895.67 625.57

Sub total of A = 2152.50 Sub total of B = 5619.75

Sub total of A +B + C = 7772.25 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


41 of 664

RATE ANALYSIS
Description of works: Providing, laying and levelling of dry stone soling works in the foundation all complete.

Spec. cl. No: Norms 2041(1st


ammendment 2050)

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.02.04 Unskilled md 0.75 480.00 360.00 Blockstone m3 1.00 1895.67 1895.67

Skilled md 0.25 775.00 193.75 Bond stone m3 0.10 1895.67 189.56

Sub total of A = 553.75 Sub total of B = 2085.23

Sub total of A +B + C = 2638.98 Contractor's overhead expenses 15% =

Description of works: Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including scaffo
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 35%
Spec. cl. No: 2602,2603,2607

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

26.03.b Skilled md 1.50 775.00 1162.50 Cement t 0.155 16331.09 2531.31

Unskilled md 3.50 480.00 1680.00 Sand m3 0.450 802.58 361.16

Stone m3 1.150 1895.67 2180.02

weepholes m3 0.800 230.00 184.00

Diesel lit 1.000 89.38 89.38

Prepared By Checked By Approved By


42 of 664

RATE ANALYSIS
water lit 100.00 1.91 191.00

Sub total of A = 2842.50 Sub total of B = 5536.87

Sub total of A +B + C = 8449.87 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


43 of 664

RATE ANALYSIS
Description of works: Providing and laying semi-grouting with compaction 50mm thickness.

Spec. cl. No: 1301,1304

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

13.06.01 Skilled md 0.2100 775.00 162.75 Bitumen lit 35.0000 98.29 3440.15

Unskilled md 1.8000 480.00 864.00 Kerosene lit 0.1700 89.38 15.19

Diesel lit 2.5200 89.38 225.23

Coarse agg. m3 0.6000 1070.00 642.00

Key agg. m3 0.1500 1070.00 160.50

Sub total of A = 1026.75 Sub total of B = 4483.07

Sub total of A +B + C = 5596.62 Contractor's overhead expenses 15% =

Description of works: Provide and erecting "W" metal beam crashbarrier comprising of 3.43mm thick corrugated sheet metal beam
ISMC serises channel vertical post, 150*75*5 mm spaced 2m c/c,1.8m high,1.1m below ground/road level,a
dip process,all fittings to confirm to IS 1367 and IS 1364,metal beam rail to be fixed on the vertical post with
IRC 7.08 330mm long, all complete
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


44 of 664

RATE ANALYSIS
Skilled md 0.393 775.00 304.57 Corrugated sheet, 3.43 mm
thick, "W" beam section
railing, 4.5 m in length kg 64.375 145.789 9385.160

Channel post 150x75x5 mm,


Unskilled md 0.786 377.28 1.8 m long, 2 Nos @ 16.4 kg
480.00 per meter kg 64.940 81.079 5265.270

Spacer 150x75x5mm channel


0.33 m long, 3 Nos. @16.4 kg
per meter kg 11.906 81.079 965.320

Nuts and bolts kg 2.000 200.000 400.000


Add 25% of material for
fabrication 100.000
Hot dip galvanization type I as
per AASHTO 180-12 kg 131.610 55.079 7248.940

Excavation Cum 0.269 0.000 0.000

M20 grade concrete Cum 0.269 Unit : 1 m3 9957.750

Sub total of A = 681.85 Sub total of B = 33322.44

Sub total of A +B + C = 34049.29 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


45 of 664

RATE ANALYSIS
Description of works:
Supplying and applying Thermoplastic Paint for Road marking including cleaning,watering,brooming etc. al
Spec. cl. No: 1502

Labour (A) Material (B)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.02.a Skilled md 0.660 775.00 511.50 Thrmoplastic paint kg 50.000 170.00 8500.00

Unskilled md 1.660 480.00 796.80 Glass beads kg 3 154.00 462.00

Lp Gas kg 7.5 115 862.50

Sub total of A = 1308.30 Sub total of B = 8962.00

Sub total of A +B + C = 11458.60 Contractor's overhead expenses 15% =

Prepared By Checked By Approved By


46 of 664
Government of Nepal
f Physical Infrastructure and Transport
Department of Roads
0.00

ATE ANALYSIS
surface and disposal 10 m.
Unit : 1 m2

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plants % 3.00 0.33

Sub total of C = 0.33


1.71 Rate = 13.08

ckpiling the reusable materials and diposal of usable materials within 50 m lead for
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plants % 3.00 21.32

Sub total of C = 21.32

Prepared By Checked By Approved By


47 of 664

ATE ANALYSIS
109.81 Rate = 841.88

ckpiling the reusable materials and diposal of usable materials within 50 m lead for
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plants % 3.00 34.28

Sub total of C = 34.28


176.55 Rate = 1353.58

ckpiling the reusable materials and diposal of usable materials within 50 m lead for
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plants % 3.00 47.96

Sub total of C = 47.96


247.01 Rate = 1893.72

Prepared By Checked By Approved By


48 of 664

ATE ANALYSIS
ckpiling the reusable materials and diposal of usable materials within 50 m lead for
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plants % 3.00 34.72

Sub total of C = 34.72


178.83 Rate = 1371.05

.
Unit : 1 rm.

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 5.99

Sub total of C = 5.99


30.86 Unit Rate = 236.60

.
Unit : 1 rm.

Prepared By Checked By Approved By


49 of 664

ATE ANALYSIS
Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 11.75

Sub total of C = 11.75


60.53 Unit Rate = 464.03
ing out the required operations necessary to complete the work (SS/SP-201).
Unit : 1 m2

Equipment (C)

Type Unit Qty. Rate Amount

Motorg\ Grader 125-175 HP with effective


0.0022 1600 3.52
blade length=2.5m and 0.3m of overlap
hr

Sub total of C = 3.52


1.07 Unit Rate = 8.17

materials and disposal of reusable materials within 50m lead.


Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


50 of 664

ATE ANALYSIS
Tools and plant 3.00% of L.C. 16.72

Sub total of C = 16.72


86.13 Unit Rate = 660.35

Prepared By Checked By Approved By


51 of 664

ATE ANALYSIS
epholes complete in place as per specification.
Unit : 50 m

Equipment (C)

Type Unit Qty. Rate Amount

Generator (<2kva) hr. 8.00 150.00

Screw Jack hr. 8.00 20.00


electric heating plate hr. 8.00 20.00

Sub total of C = 0.00


2289.75 Rate (50 m)= 17554.75

Rate (1 m ) 351.10

with or without collars jointed with stiff mixture of cement mortar in the proportion of
Unit : 1 rm

Equipment (C)

Type Unit Qty. Rate Amount

Ballies, crow, bars, chain , pulleys , block


3.00% of total cost 239.52
and ropes etc.

Sub total of C = 239.52


1233.54 Unit Rate = 9457.15

Prepared By Checked By Approved By


52 of 664

ATE ANALYSIS
with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1
Unit : 1 rm

Equipment (C)

Type Unit Qty. Rate Amount

Ballies, crow, bars, chain , pulleys , block


3.00% of total cost 378.80
and ropes etc.

Sub total of C = 378.80


1950.85 Unit Rate = 14956.50

Prepared By Checked By Approved By


53 of 664

ATE ANALYSIS
il including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification.
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 14.40

Sub total of C = 14.40


74.16 Unit Rate = 568.56

m and lift upto 1.5 m etc. all complete as per specification.


Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 39.60

Sub total of C = 39.60


203.94 Unit Rate = 1563.54

m and lift upto 1.5 m etc. all complete as per specification.


Unit : 1 m3

Prepared By Checked By Approved By


m and lift upto 1.5 m etc. all complete as per specification. 54 of 664

ATE ANALYSIS Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 172.80

Sub total of C = 172.80


889.92 Unit Rate = 6822.72

Prepared By Checked By Approved By


55 of 664

ATE ANALYSIS
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Bulldozer hr 0.00440 1800.00 7.92

Sub total of C = 7.92


3.68 Unit Rate = 28.20

Unit : 1 m3
Equipment (C)
Type Unit Qty. Rate Amount

Bulldozer hr 0.00660 1800.00 11.88

Sub total of C = 11.88


5.12 Unit Rate = 39.23

Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Bulldozer hr 0.00660 1800.00 11.88

Prepared By Checked By Approved By


56 of 664

ATE ANALYSIS
Sub total of C = 11.88
5.96 Unit Rate = 45.70

90% Equipment)
Unit : 1 m3

11.09 Unit Rate = 85.05

Prepared By Checked By Approved By


57 of 664

ATE ANALYSIS
uipment)
Unit : 1 m3

25.00 Unit Rate = 191.66

uipment)
Unit : 1 m3

94.36 Unit Rate = 723.41

e disposal of materials all complete. (SS/SP - 900) (Weighted rate)


Unit : 1 m3
Rate Weighted Rate

Prepared By Checked By Approved By


58 of 664

ATE ANALYSIS
723.41

191.66 90.38

85.05

exceeding 150 mm compacted depth, watering and haulage 10 m etc. all complete as per
Unit : 1 m3

Unit Rate = 120.27

Prepared By Checked By Approved By


59 of 664

ATE ANALYSIS
elevant lift and disposal upto 20m.
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 28.80

Sub total of C = 28.80


148.32 Unit Rate = 1137.12

safe disposal of materials all complete usng Equipment (average rate) Unit : 1 m3
Rate Average Rate
28.20

39.23 37.71

45.70

nd safe disposal of materials all complete (10% Manual and 90% Equipment)
Unit : 1 m3

Prepared By Checked By Approved By


60 of 664

ATE ANALYSIS
Unit Rate = 147.65

ved filler material including compaction and watering etc complete,lead 10 m


Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 16.41


Sub total of C = 16.41
246.42 Unit Rate = 1889.25

Prepared By Checked By Approved By


61 of 664

ATE ANALYSIS
compaction and watering etc complete,lead 10 m
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Tools and plant 3.00% of L.C. 16.41

Sub total of C = 16.41


84.54 Unit Rate = 648.15

upto 50m (by machine)


Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Wheel Loader hr. 0.0084 1000 0.01

Transporatation cost 1 145.38 145.38

Sub total of C = 145.39


24.06 Unit Rate = 184.47

Prepared By Checked By Approved By


62 of 664

ATE ANALYSIS
rks (filling or cutting depth of 10 to 20 cm) in common soil.
Unit : 1 m2

Equipment (C)

Type Unit Qty. Rate Amount

Grader (75 hp) hr 0.040 1600.00 64.00

Roller 8-10t hr 0.017 500.00 8.50

17.00 64.00
19.60 Unit Rate = 30.05

Prepared By Checked By Approved By


63 of 664

ATE ANALYSIS
rks (filling or cutting depth of 10 to 20 cm) in gravel & boulder mixed soil.
Unit : 1 m2

Equipment (C)

Type Unit Qty. Rate Amount

Tools and Plant 3% of LC 4.32

Sub total of C = 4.32


22.25 Unit Rate = 170.57

on of natural sand gravel subbase grading as per table 12.1 of standard specification lead upto
Unit : 1 m 3

Equipment (C)

Type Unit Qty. Rate Amount

Grader hr 0.0220 1600.00 35.20

Vibrator Rolller hr 0.0220 700.00 15.40

Water bowser hr 0.0380 550.00 20.90

Loader hr 0.0110 1000.00 11.00

Sub total of C = 82.50


214.83 Unit Rate = 1647.00
Unit : 1 m3
on of natural sand gravel subbase grading as per table 12.1 of standard specification lead upto
cluding cleaning the road surface using wire, brushes, broom etc. before applying prime coat.
Unit : 1 lit.

Prepared By Checked By Approved By


64 of 664

ATE ANALYSIS
Equipment (C)

Type Unit Qty. Rate Amount

Boiler hr 0.0025 180 0.45

Sprayer hr 0.0025 260.00 0.65

Air compresser hr 0.0030 250.00 0.75

Sub total of C = 1.85


24.44 Unit Rate = 187.39

Prepared By Checked By Approved By


65 of 664

ATE ANALYSIS
on of crusher run materials for base course with lead up to 10 m (1202)
Unit : 1 m 3
Equipment (C)
Type Unit Qty. Rate Amount

Grader hr 0.0330 1600.00 52.80

Vibrator Rolller hr 0.0330 700.00 23.10

Water bowser hr 0.0330 550.00 18.15

Stone crusher hr 0.0650 155.00 10.07

Loader hr 0.0110 1000.00 11.00

Sub total of C = 115.12


373.78 Unit Rate = 2865.65

dressing using river gravels(grits), shingles or broken stone chips including compaction,
Unit : 1 ltr

Equipment (C)

Type Unit Qty. Rate Amount

Boiler hr 0.0025 180.00 0.45

Distributor hr 0.0025 1300.00 3.25

Air Compressor hr 0.0025 250.00 0.62

Prepared By Checked By Approved By


66 of 664

ATE ANALYSIS
Sub total of C = 4.32
22.33 Unit Rate = 171.18

dressing using river gravels(grits), shingles or broken stone chips including compaction,
Unit : 1 ltr

Equipment (C)
Type Unit Qty. Rate Amount

Tools and plants 3% of 0.04

labour costs

Sub total of C = 0.04


13.60 Unit Rate = 104.27

Prepared By Checked By Approved By


67 of 664

ATE ANALYSIS
dressing using river gravels(grits), shingles or broken stone chips including compaction,
Unit : 1 ton

Equipment (C)

Type Unit Qty. Rate Amount

Chips spreader hr 0.1000 300.00 30.00

Tyred Roller hr 0.2000 1200.00 240.00

Sub total of C = 270.00


206.13 Unit Rate = 1580.36

a. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel
Unit : 1 no.
cm rectangular shaped sign(single post)
Equipment (C)

Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


68 of 664

ATE ANALYSIS

Sub total of C = 0.00


429.74 Unit Rate = 3294.65

0 repeated times

Prepared By Checked By Approved By


69 of 664

ATE ANALYSIS
a. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel
Unit : 1 no.
nd two or more post.
Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


1258.96 Unit Rate = 9652.04

Unit : 1 m.
aning, watering, brooming etc. all complete (10cm. wide strip)
ation, back filling, painting and writing etc. all complete as per specification
Unit : 1 no.

Equipment (C)

Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


70 of 664

ATE ANALYSIS

Sub total of C = 0.00


331.04 Unit Rate = 2537.96

Prepared By Checked By Approved By


71 of 664

ATE ANALYSIS
ation, back filling, painting and writing etc. all complete as per specification
Unit : 1 no.

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


752.47 Unit Rate = 5768.93

st including excavation, back filling, painting and erection etc. all complete as per drawing.
Unit : 1 no.

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00

Prepared By Checked By Approved By


72 of 664

ATE ANALYSIS
145.07 Unit Rate = 1112.17

ssary supports and removing after completion for foundation and footings
Unit : 10 m2

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


685.87 Rate (10 m2) = 5258.36

Unit Rate (1 m2) = 525.84

Prepared By Checked By Approved By


73 of 664

ATE ANALYSIS
or the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all complete as per
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

mixer (0.28/ 0.20 m3 ) hr 0.60 470 282.00

vibrator hr 0.25 100 25.00

of Cost of
Mix Design and Quality Control 2.50% 195.16
concrete

Sub total of C = 502.16


1200.27 Unit Rate = 9202.05

e for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc.
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

mixer (0.28/ 0.20 m3 ) hr 0.60 470 282.00

vibrator hr 0.25 100 25.00

of Cost of
Mix Design and Quality Control 2.50% 211.88
Prepared By Checked By
concrete Approved By
74 of 664

ATE ANALYSIS of Cost of


Mix Design and Quality Control 2.50% 211.88
concrete

Sub total of C = 518.88


1303.11 Unit Rate = 9990.50

Prepared By Checked By Approved By


75 of 664

ATE ANALYSIS
or the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all complete as per
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

mixer (0.28/ 0.20 m3 ) hr 0.60 470 282.00

vibrator hr 0.25 100 25.00

of Cost of
Mix Design and Quality Control 2.50% 242.87
concrete

Sub total of C = 549.87


1493.66 Unit Rate = 11451.41

Unit : 1 m3
or the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all complete as per

ncluding cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per
Unit : 1 mt.

Equipment (C)

Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


76 of 664

ATE ANALYSIS
Sub total of C = 0.00
16622.15 Unit Rate = 127436.46

and upto 16 mm) including cutting, bending, binding, fixing in position and lead 30m. etc. all
Unit : 1 mt.

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


16026.82 Unit Rate = 122872.27

Prepared By Checked By Approved By


77 of 664

ATE ANALYSIS
) including cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per
Unit : 1 mt.

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00

15446.78 Unit Rate = 118425.30

n and lead 30m. etc. all complete as per specification and drawing.(2000)
Unit : 1 mt
Rate Average Rate Average
127436.46

122872.27 122911.34 122911.34

118425.30

Unit : 1 box
gluding stretching,
in position forming
including compartments;
stretching, forming tying with bracing
compartments; wires
tying withand tie wires;
bracing wirestying down
and tie the
wires;
on boxesin/ gabion
boulder mattresses
boxesetc. including dressing,
/ mattresses beding,
etc. including bondingbeding,
dressing, and allbonding
transporation
and allas per Unit : 1 box

Equipment (C)

Prepared By Checked By Approved By


78 of 664

ATE ANALYSIS
Type Unit Qty. Rate Amount

Sub total of C = 0.00


1969.30 Unit Rate = 15097.95

Prepared By Checked By Approved By


79 of 664

ATE ANALYSIS
in position including stretching, forming compartments; tying with bracing wires and tie wires;
boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all
Unit : 1 box

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


1330.57 Unit Rate = 10201.04

g in position including stretching, forming compartments; tying with bracing wires and tie wires;
boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all
Unit : 1 box

Equipment (C)

Prepared By Checked By Approved By


80 of 664

ATE ANALYSIS
Type Unit Qty. Rate Amount

Sub total of C = 0.00


1042.96 Unit Rate = 7996.02

n including stretching, forming compartments; tying with bracing wires and tie wires; tying
n boxes / mattresses etc. including dressing, beding, bonding and all transporation as per Unit : 1 m3

Prepared By Checked By Approved By


81 of 664

ATE ANALYSIS
s per specification along with reuse of stones/rubbles from existing ones.as per Engineers

Unit : 1 m2

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


208.18 Unit Rate : 1596.02

30m
Unit : 1 m2

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


24.26 Unit Rate : 186.02

Prepared By Checked By Approved By


82 of 664

ATE ANALYSIS
nd 40% boulders/stones as per specification Lead 30m, lift 1.5m , using concrete mixer and
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Concrete mixer ( 0.28 / 0.20 m3 ) hr. 0.50 470 235.00

Concrete vibrator hr. 0.10 100 10.00

Sub total of C = 245.00


1063.65 Unit Rate = 8154.67

nd 40% boulders/stones as per specification Lead 30m, lift 1.5m , without using concrete
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


83 of 664

ATE ANALYSIS

Sub total of C = 0.00


1026.01 Unit Rate = 7866.08

Prepared By Checked By Approved By


84 of 664

ATE ANALYSIS
ete and 30% boulders/stones as per specification. Lead 30m, lift 1.5m using concrete mixer
Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Concrete mixer ( 0.28 / 0.20 m3 ) hr. 0.50 470 235.00

Concrete vibrator hr. 0.10 100 10.00

Sub total of C = 245.00


1042.36 Unit Rate = 7991.41

nd 30% boulders/stones as per specification Lead 30m, lift 1.5m , without using concrete
Unit : 1 m3

Prepared By Checked By Approved By


85 of 664

ATE ANALYSIS
Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


1165.84 Unit Rate = 8938.09

Prepared By Checked By Approved By


86 of 664

ATE ANALYSIS
e foundation all complete.

Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Sub total of C = 0.00


395.85 Unit Rate : 3034.83

t mortar [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc.


, mortar 35% Unit : 1 m3

Equipment (C)

Type Unit Qty. Rate Amount

Concrete mixer (0.28/0.2 m3) hr. 0.15 470 70.50

Prepared By Checked By Approved By


87 of 664

ATE ANALYSIS
Sub total of C = 70.50
1267.48 Unit Rate = 9717.35

Prepared By Checked By Approved By


88 of 664

ATE ANALYSIS
ckness.
Unit : 10 m2.

Equipment (C)

Type Unit Qty. Rate Amount

Boiler hr 0.0700 180 12.60

Roller hr 0.0700 500.00 35.00

Sprayer hr 0.0700 260.00 18.20

Agg. Spreader hr 0.0700 300.00 21.00

Sub total of C = 86.80


839.49 Rate (10m2) = 6436.11

Unit Rate(1 m2) = 643.61

g of 3.43mm thick corrugated sheet metal beam rail, 70cm above road/ground level,fixed on
c/c,1.8m high,1.1m below ground/road level,all steel paetsand fitment to be galvanized by hot
al beam rail to be fixed on the vertical post with a spacer of chaneel section 150*75*5mm Unit : 4.5m

Equipment (C)

Type Unit Qty. Rate Amount

Prepared By Checked By Approved By


89 of 664

ATE ANALYSIS

Tractor-Trolly Hr 0.1 450 45

Sub total of C = 45.00


5107.39 Unit Rate = 39156.68

Unit Rate per meter= 8701.48

Prepared By Checked By Approved By


90 of 664

ATE ANALYSIS
g including cleaning,watering,brooming etc. all complete Unit : 10 m2.

Equipment (C)

Type Unit Qty. Rate Amount

Compresser hr 2.33 250 582.5

Sprayer hr 2.33 260 605.8

Sub total of C = 1188.30


1718.79 Unit Rate = 13177.39

Unit rate per m2 1317.739

Prepared By Checked By Approved By


Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

RATE ANALYSIS FOR MAINTENANCE WORKS

Name of the road:…………………………….


Chainage:0+000 to ….
RA No. : 1
Description of item : Carrying out the routine maintenance of the existing road during Defect Liability Period.

Unit:

Resources
Norms Specificatio
Labour (A) Materials (B) Equipment (C)
activity n Clause
Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount Category Unit Quantity

DoR 107 Unskilled md 1.000 480.00 480.00 tools 12 % of labour cost

Sub - total (A) 480.00 Sub - total (B) 0.00 Sub total (c)

NB: As per DoR Maintenace Norms Direct Cost (A+B+C) = NRs.

Contractor's Overhead @ 15 % of (A+B+C) = NRs.

Total Item Rate = NRs.

Say NRs. per 3km/day X= 552.00

NRs. Per1km/Day Y=X/3= 184.00

Say NRs. per 1km/month Z=Y*30= 5520.00


RA No. : 2
Description of item : Carrying out the routine maintenance of the existing road during the construction Period
Unit:
Resources
Norms Specificatio
Labour (A) Materials (B) Equipment (C)
activity n Clause
Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount Category Unit Quantity
DoR 107 Unskilled md 1.000 480.00 480.00 tools 12 % of labour cost

Sub - total (A) 480.00 Sub - total (B) 0.00 Sub total (c)
NB: As per DoR Maintenace Norms Direct Cost (A+B+C) = NRs.
Contractor's Overhead @ 15 % of (A+B+C) = NRs.
Total Item Rate = NRs.
Say NRs. per 2km/day X= 552.00
NRs. Per1km/Day Y=X/2= 276.00
Say NRs. per 1km/month Z=Y*30= 8280.00
3.00 km/day

Equipment (C)

Rate Amount

12 % of labour cost 0.00

0.00

480.00

B+C) = NRs. 72.00

552.00

2.00 km/day

Equipment (C)
Rate Amount
12 % of labour cost 0.00

0.00
480.00
B+C) = NRs. 72.00
552.00
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

Chart for collection of materials


Activity Labour
S.N. Description Unit Amount
no Type Unit Qty. Rate
Collection and seiving gravel including stacking within
1 8.01.02
10m. Hauling distance.
a ( 5 - 70 mm size) m3 Unskilled md 2 480 960.00
b ( 5 - 40 mm size) m3 Unskilled md 3.2 480 1536.00
c ( 5 - 20 mm size) m3 Unskilled md 4.7 480 2256.00
d ( 5 - 8 mm size) m3 Unskilled md 8 480 3840.00
Collection of rubble of required size, hauling
2 m3 8.01.03 Unskilled md 1.4 480 672.00
distance10m. and stacking.
Collection and seiving sand within 10m. hauling
3 8.01.04
distance.
a ( Quarry output less than 33%) m3 Unskilled md 4 480 1920.00
b ( Quarry output 33 - 66 %) m3 Unskilled md 3 480 1440.00
c ( Quarry output more than 66%) m3 Unskilled md 1.43 480 686.40
Collection, quarring and seiving sand in hilly areas
4 m3 8.01.05 Unskilled md 1.5 480 720.00
within 10m. hauling distance.
5 Washing broken stone, gravel and sand. m3 8.01.07 Unskilled md 1.5 480 720.00
6 Washing rubble m3 8.01.08 Unskilled md 0.4 480 192.00
Breaking stones including Collection, seiving and
7 8.02.01
stacking within 10m.
a ( 70 - 100 mm size) m3 Unskilled md 6 480 2880.00
b ( 40 - 70 mm size) m3 Unskilled md 8 480 3840.00
c ( 20 - 40 mm size) m3 Unskilled md 12 480 5760.00
d ( 10 - 20 mm size) m3 Unskilled md 18 480 8640.00
e ( 5 - 10 mm size) m3 Unskilled md 25 480 12000.00
Making rubbles of required size including breaking with
8 m3 8.02.03 Unskilled md 5.5 480 2640.00
distance 10m. and stacking.
Transportation of water by manpower including
9 1000 lit 8.03.17 Unskilled md 0.47 480 225.60
loading, hauling, unloading and stacking.

Prepared by: Checked by: Approved by:


Government of Nepal
of Physical Infrastructure and Transport
Department of Roads
0.00

rt for collection of materials


Remarks

Prepared by: Checked by: Approved by:


Norms for collection of materials by machine
DOR Norms
Activity Spec Material Equipments
S.N. Description Unit
no No. Type Unit Qty. Rate Amount Type Unit Qty. Rate
Collection of Sand from river by 807
1 Bulldozer,Loader and Screening Plant including 808
haulage upto 20m: 809

a Quarry capacity 31% to 60%


m3 Diesel Ltr 0.7935 68.14 Bull Dozer 100-150 HP Hr 0.0193 1800.00

Wheel Loader 1.5-2


Hr 0.031 1200.00
m3 bucket
Screening Plant
Hr 0.031 100.00
40t/m3
Total

Collection of Gravel from a quarry by


2 Bulldozer,Loader and Screening Plant including
haulage upto 20m:
a Gravel size:5-70mm up
m3 Diesel Ltr 0.56495 68.14 Bull Dozer 100-150 HP Hr 0.0087 1800.00

Wheel Loader 1.5-2


Hr 0.0278 1200.00
m3 bucket
Screening Plant
Hr 0.0139 100.00
40t/m3
Total

a Gravel size:5-40mm up
m3 Diesel Ltr 0.7456 68.14 Bull Dozer 100-150 HP Hr 0.0115 1800.00

Wheel Loader 1.5-2


Hr 0.0367 1200.00
m3 bucket
Screening Plant
Hr 0.0183 100.00
40t/m3
Total
Norms for collection of materials by machine
DOR Norms
Activity Spec Material Equipments
S.N. Description Unit
no No. Type Unit Qty. Rate Amount Type Unit Qty. Rate
a Gravel size:5-20mm up
m3 Diesel Ltr 1.1298 68.14 Bull Dozer 100-150 HP Hr 0.0174 1800.00

Wheel Loader 1.5-2


Hr 0.0556 1200.00
m3 bucket
Screening Plant
Hr 0.0278 100.00
40t/m3
Total

a Gravel size:40-70mm up
m3 Diesel Ltr 2.2596 68.14 Bull Dozer 100-150 HP Hr 0.0348 1800.00

Wheel Loader 1.5-2


Hr 0.1112 1200.00
m3 bucket
Screening Plant
Hr 0.1112 100.00
40t/m3
Total

a Gravel size:70-100mm up
m3 Diesel Ltr 5.0841 68.14 Bull Dozer 100-150 HP Hr 0.0783 1800.00

Wheel Loader 1.5-2


Hr 0.2502 1200.00
m3 bucket
Screening Plant
Hr 0.2502 100.00
40t/m3
Total
nts Total
Amount Amount

88.81

37.20

3.10

129.11

54.16

33.36

1.39

88.91

71.51

44.04

1.83

117.38
nts Total
Amount Amount
108.30

66.72

2.78

177.80

216.61

133.44

11.12

361.17

487.37

300.24

25.02

812.63
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TRANSPORTATION RATES FOR HAULAGE OF SOIL AT DISPOSAL SITES


Name of the road:…………………………….
Transportation by Truck
Speed of Truck: 10 km/hr Average Speed of the Vehicle in the EW/G Roads 20 km/hr Average Speed of the Vehicle in Black T
Capacity of truck: 8 tons
Specification clause no: 800
Activity No: 8.04.03

1.a. Excavated earth work (Soil Material) Average Speed of the Vehicle in E/W Road = 10 km/hr In Black Top = 20
Unskilled labour skilled labour Diesel Truck
Description
unit Quantity Rate Amount unit Quantity Rate Amount unit Quantity Rate Amount unit Quantity
First one km md 0.4 480.00 192 ltr 0.40 89.38 35.75 hr 0.14
First two km md 0.4 480.00 192 ltr 0.80 89.38 71.50 hr 0.17
First three km md 0.4 480.00 192 ltr 1.20 89.38 107.26 hr 0.20
First four km md 0.4 480.00 192 ltr 1.60 89.38 143.01 hr 0.23
First five km md 0.4 480.00 192 ltr 2.00 89.38 178.76 hr 0.26

RA No. : 31
Description of item : Haulage of excessive cut materials using Machinary beyond 1 km length

Unit:
Resources
Specificatio
Norms activity Labour (A) Materials (B) Equipment (C)
n Clause
Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount Category Unit Quantity

Transportation cost up to 1 km 1.0000


8.04.03 1(a) Transporatation cost up to 2km 1.0000

Sub - total (A) 0.00 Sub - total (B) 0.00 Sub total (c)
NB: Transportation Cost As per clause 8.04.03 1(a) as shown in transportation rate chart for additional km/cum Direct Cost (A+B+C) = NRs.
Contractor's Overhead @ 15 % of (A+B+C) = NRs.
The rate has been calculated by deducting total transportation cost from origin up to two km and up to 1km respectively , to find out the haulage cost
beyond 1 km. Total Item Rate = NRs.
Say NRs. per cu.m. 57.00
peed of the Vehicle in Black Tops 40 km/hr

km/hr Unit :1 cu.m


Truck
Cost Remark
Rate Amount
450.00 63.00 290.75
450.00 76.50 340.00 49.25
450.00 90.00 389.26 49.26
450.00 103.50 438.51 49.25
450.00 117.00 487.76 49.25

1.00 cu.m.

Equipment (C)
Rate Amount

290.75 290.75
340.00 340.00

49.25
49.25
B+C) = NRs. 7.39
56.64
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

Transportation Analysis of Construction Materials :


Labour Rate Fuel per ltr.
Unskilled 480 Truck Rate
Skilled 775 Truck capactiy

Labour
Earthen Km Gravel Km Blacktop Km Total Travel Fuel
Material Type Unit
(10 kmph) (20 Kmph) (40 kmph) Time (T) Coefficient
Unskilled Skilled
1)Excavated earth work
a)Soil Material m3 0.00 0.00 0.40 0.00 2.00
b)Rock Material m3 0.00 0.50 0.00 2.30
2) Sand m3 1.00 20.00 2.00 2.30 0.30 0.00 1.70
3) Gravel, river shingle, broken stone aggregates,
and bats.
a) Gravel m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10
b) River shingle m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10
c) Broken stone aggregates m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10
d) Brick bats m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10
4) Boulder, Cobbles, quarry stone m3 1.00 20.00 2.00 2.30 0.50 0.00 2.70
5)Dressed Stone m3 1.00 20.00 2.00 2.30 0.60 0.00 2.60
6)Bricks 1000 nos 25.00 120.00 8.50 0.60 0.00 4.00
7)Cement t 25.00 120.00 8.50 0.40 0.00 1.50
8)Reinforcement Steel and gabion wire t 25.00 120.00 8.50 0.60 0.00 1.50
Machine made gabion wire t 25.00 120.00 8.50 1.00 0.00 2.60
gabion wire t 25.00 120.00 8.50 0.60 0.00 1.50
9) Bitumen 1000 lit 25.00 120.00 8.50 1.00 0.00 2.60
10) GI, CI, Pipe and fittings t 25.00 120.00 8.50 1.00 0.00 1.50
11)Timber for temporary works m3 25.00 120.00 8.50 0.30 0.00 1.40
12) Fabricated Structural Timber m3 25.00 120.00 8.50 0.50 0.00 2.00
13) Fabricated Structural Steel t 25.00 120.00 8.50 4.00 0.40 1.50

Prepared By Checked By Recommended By Approved By


14)RCC Precast Element t 25.00 120.00 8.50 1.00 0.00 1.50
15)Equiptment & accessoriesetc. requiring careful
truck 25.00 120.00 8.50 20.00 4.00 13.00
handling
16) RCC hume pipe
a) 900mm dia m 25.00 120.00 8.50 0.40 0.04 0.78
b) 750 mm dia m 25.00 120.00 8.50 0.33 0.03 0.69
c) 600mm dia m 25.00 120.00 8.50 0.25 0.02 0.60
17) Water 1000 lit 25.00 120.00 8.50 0.10 0.01 1.50
18) Petrol / Diesel / Kerosene 1000 lit 25.00 120.00 8.50 0.10 0.01 1.50
Fuel =Total Travel Time (T)*Fuel Coefficient
Truck, Hr.=Truck Coefficient *(Total Travel Time (T)+Load / Unload Time)
Total Transportation Cost per unit = Labour, md. * Labour Rate + Fuel, Ltr.* Fuel Rate + Truck, Hr.* Truck Rate

Prepared By Checked By Recommended By Approved By


erials :
89.38
450
8 mt

Total
Fuel, Truck Load / Unload Truck,
Transportation Remarks
Ltr. Coefficient Time Hr.
Cost per unit

0.00 0.15 0.75 0.11 0.00


0.00 0.18 0.75 0.14 0.00
3.91 0.13 0.75 0.40 673.47

4.83 0.16 0.75 0.49 892.20


4.83 0.16 0.75 0.49 892.20
4.83 0.16 0.75 0.49 892.20
4.83 0.16 0.75 0.49 892.20
6.21 0.21 0.75 0.64 1083.04
5.98 0.20 0.75 0.61 1096.99
34.00 0.31 0.75 2.87 4618.42
12.75 0.12 0.75 1.11 1831.09
12.75 0.12 0.75 1.11 1927.09
22.10 0.20 0.75 1.85 3287.79
12.75 0.12 0.75 1.11 1927.09
22.10 0.20 0.75 1.85 3287.79
12.75 0.12 0.75 1.11 2119.09
11.90 0.11 0.75 1.02 1666.62
17.00 0.15 1.25 1.46 2416.46
12.75 0.12 1.25 1.17 3896.09

Prepared By Checked By Recommended By Approved By


12.75 0.12 0.75 1.11 2119.09
110.50 1.00 1.75 10.25 27188.99

6.63 0.06 1.75 0.62 1094.58


5.87 0.06 1.75 0.62 985.31
5.10 0.05 1.75 0.51 820.83
12.75 0.12 0.50 1.08 1681.34
12.75 0.12 0.50 1.08 1681.34

Prepared By Checked By Recommended By Approved By


Page 20
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

1) District rate : Materials


Collection Transportation Total Rate
S.N. Description Unit District Rate (D)
Rate (C) Rate ( Tp ) ( C + R + Tp)
1 Gravel
1.a ( 5 - 70 mm ) m3 88.91 892.20 981.11
1.b ( 5 - 40 mm) m3 117.38 892.20 1009.58
1.c ( 5 - 20 mm) m3 177.80 892.20 1070.00
1.d ( 5 - 10 mm) m3 177.80 892.20 1070.00
2 Broken Aggregates
2.a ( 70 - 100 mm) m3 812.63 892.20 1704.83
2.b ( 40 - 70 mm) m3 361.17 892.20 1253.37
2.c ( 20 - 40 mm) m3 1200.00 117.38 892.20 1009.58
2.d ( 10 - 20 mm) m3 1500.00 177.80 892.20 1070.00
2.e ( 5 - 10 mm) m3 1000.00 177.80 892.20 1070.00
3 Sand m3 129.11 673.47 802.58
4 Brick nos. 11.00 4.62 15.62
5 Wood
5.a wood Local m3 33000.00 1666.62 34666.62
5.b Sal wood m3 136000.00 1666.62 137666.62
6 Stone dust m3 500.00 500.00
7 Rubble m3 812.63 1083.04 1895.67
8 Cement mt. 14500.00 1831.09 16331.09
9 Water lt. 0.23 1.68 1.91
10 Bitumen 80/100 lit. 95.00 3.29 98.29
11 Reinforcement (Tor Steel)
11.a 8 mm dia mt. 77000.00 1927.09 78927.09
11.b 10 - 22 mm dia mt. 77000.00 1927.09 78927.09
11.c 25 - 32 mm dia mt. 77000.00 1927.09 78927.09
11.d 4.75 - 7 mm dia mt. 80000.00 1927.09 81927.09
12 Binding Wire kg 100.00 1.93 101.93
Machine made gabion wire Sq.m 283.00 0.00 283.00
13 G.I Wire heavy coated
13.a 8 gauge kg 90.00 1.93 91.93
13.b 10 gauge kg 90.00 1.93 91.93
13.c 12 gauge kg 92.00 1.93 93.93
14 RCC Hume Pipes
14.c 600 mm diameter m 6280.00 820.83 7100.83
14.e 900 mm diameter m 10320.00 1094.58 11414.58
15 Jute kg 100.00 0.00 100.00
16 Nails kg 110.00 0.00 110.00
17 Ply wood
17.a plywood 3 mm m2 217.39 7.25 224.64
17.b plywood 4 mm m2 217.39 9.67 227.06
17.c plywood 6 mm m2 380.43 14.50 394.93
17.d plywood 8 mm m2 423.91 19.33 443.24
17.e plywood 10 mm m2 489.13 24.16 513.29
17.f plywood 12 mm m2 652.17 29.00 681.17
17.g plywood 20 mm m2 815.22
18 Road Paint lit. 450.00 450.00
19 Enamel Paint lit. 550.00 550.00
20 Lime kg 22.00 22.00

Prepared By Checked By Approved By


Page 21

1) District rate : Materials


Collection Transportation Total Rate
S.N. Description Unit District Rate (D)
Rate (C) Rate ( Tp ) ( C + R + Tp)
21 Gum/Fevicol kg 336.00 336.00
22 Snow cem kg 96.00 96.00
23 Primer lit. 360.00 360.00
24 Steel Plate(2 mm ) Sq. m 635.00 635.00
25 Steel tube(50 mm dia GI) Rm 555.00 555.00
26 GI Pipe Medium Class
26.a 38 mm m 340.00 7.63 347.63
26.b 50 mm m 467.00 10.81 477.81
26.c 75 mm m 741.00 18.08 759.08
26.d 100 mm m 1100.00 26.49 1126.49
27 HDPE 110mm m 230.00 230.00
29 Geotextile m2 128.00 128.00
31 Round Aggregates
(Used in Analysis) 70 to 100 mm m3 960.00 892.20 1852.20
40 to 70mm m3 960.00 892.20 1852.20
20 to 40 mm m3 960.00 892.20 1852.20
10 to 20 mm m3 960.00 892.20 1852.20
10 mm and down m3 960.00 892.20 1852.20
32 Earth m3 300.00 0.00 300.00
Anti-stripping agent kg 325.00
33 Tarfelt m2 156.52 156.52
2) District Rate : Labour
S.N. Description Unit District Rate Remarks
1 Skilled md 775.00
2 Unskilled (Labour) md 480.00
3 Blaster md Bajhang
4 Road Supervisor md 570.00
5 Road Length Worker md 570.00

3) District Rate : Fuel and Lubricant


S.N. Description Unit District Rate Lead According to latest updates of NOC
1 Diesel lit. 89.38
2 Kerosene lit. 89.38
3 Petrol lit. 100.88

4) DOR's Equipment Hire Rate


Operator's DOR Hire
S.N. Description Unit Allowance rate
1 Truck ( 3 tonnes) hr. 250.00
2 Truck ( 5 tonnes) hr. 300.00
3 Truck ( 8 tonnes) hr. 450.00
4 Grader ( 75 HP) hr. 1600.00
5 Pump 10cm dia hr. 200.00
6 Vibrating Roller ( 8 - 10 ton) hr. 700.00
7 3 Wheel roller hr. 500.00
8 Water bowser hr. 550.00
9 Loader Wheel hr. 1000.00
10 Boiler hr. 180.00
11 Sprayer Emulsion hr. 260.00
12 Air compressor hr. 250.00
13 Hand Sprayer hr. 250.00

Prepared By Checked By Approved By


Page 22

1) District rate : Materials


Collection Transportation Total Rate
S.N. Description Unit District Rate (D)
Rate (C) Rate ( Tp ) ( C + R + Tp)
14 Aggregate Spreader hr. 300.00
15 Pneumatic Tyred Roller hr. 1200.00
16 mixer hr. 470.00
17 Vibrating needle hr. 100.00
18 Blasting machine hr. 1400.00
19 Generator hr. 150.00
20 Screw Jack hr.
21 Electric Heating Plate hr.
22 Bitumen Distributor hr. 1300.00
23 Chip Spreader hr. 300.00
24 Tractor hr. 300.00
25 Asphalt plant hr. 400.00
26 Asphalt mixer hr. 1000.00
27 Asphalt paver hr. 1400.00
28 Excavator hr. 1800.00
29 Stone Crusher hr. 155.00

Prepared By Checked By Approved By


Page 23

Remarks

Collection by machine
Collection by machine
Collection by machine
Collection by machine

Collection by machine
Collection by machine
Collection by machine
Collection by machine
Collection by machine
Collection by machine
Kailali

Bajhang
Kailali
Kailali
Collection by machine
Kailali
Kailali
Kailali

Kailali
Kailali
Kailali
Kailali
Kailali
Kailali

Kailali
Kailali
Kailali

Kailali
Kailali
Kailali
Kailali

Kailali
Kailali
Kailali
Kailali
Kailali
Kailali

Kailali
Kailali
Kailali

Prepared By Checked By Approved By


Page 24

Remarks

Kailali
Kailali
Kailali
Kailali
Kailali

Kailali
Kailali
Kailali
Kailali
Kailali
Kailali

collection
collection
collection
collection
collection
Kailali

est updates of NOC

Prepared By Checked By Approved By


Earthwork Calculation for Roadway Structure

Earthwork Calculation

Err:509
Err:509

Earthwork in Roadway including drain Structure E/W for Retaining wall / Gabion Road Way Cutting
Excess
Pro.
filling
ge

Length Length
a

Road way Cutting Filling Cutting Back filling BMS Soft Ro


in

(m)
ha
C

Av area Av area Area


Area (m2)
(m2)
Volume (m3) Area (m2)
(m2)
Volume (m3) Volume (m3) L (m) Area (m2) Vol (m3) Vol (m3) Volume (m3)
(m2) % %

Total

25 of 664
Earthwork Calculation for Roadway Structure

Total Length (Km): 38.4

Road Way Cutting Soil type

ks
ar
Soft Rock Hard Rock

em
R
Volume (m3) Volume (m3)
%

26 of 664
Gabion Retaining Breast Structure Quantity Calculation
Err:509

Err:509
District: Dhadhing
Structure quantity
Chainage Gabion Retaining wall Gabion Retaining Wall
Total Volume Geotextile(m
Length (m) Left side Right side (m3) 2)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

- 6.00 17.00 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- 2.00 3.00 - - -
- 2.00 3.00 - - -
- 2.00 3.00 - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- - - -
- - - -
- - - -
- - - -
- 1.00 1.00 - - -
- 5.00 12.50 - - -
- - - -
- 1.00 1.00 - - -
- - - -
- - - -
- - - -
- - - -
- 2.00 3.00 - - -
- - - -
- - - -
- 3.00 5.50 - - -
- 8.00 27.50 - - -
- 7.00 22.00 - - -
- 3.00 5.50 - - -
- - - -
- - - -
- 10.00 40.00 - - -
- 10.00 40.00 - - -
- 6.00 17.00 - - -
Gabion Retaining Breast Structure Quantity Calculation
Err:509

Err:509
District: Dhadhing
Structure quantity
Chainage Gabion Retaining wall Gabion Retaining Wall
Total Volume Geotextile(m
Length (m) Left side Right side (m3) 2)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 1.00 1.00 - - -

10.00 0.00 0.00 0.00 0.00


ok
n

Remarks
n

Remarks
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Err:509

Err:509

Component: RCC Causeway


Detailed of Quantity
S.N. Description No Length Breadth Height Quantity Unit Remarks
1 Earth work
a Causeway portion 10.00 8.00 0.80 64.00
b wall @ u/s 10.00 0.60 0.20 1.20
c ret wall @ d/s 10.00 0.60 1.00 6.00
d Apron @ d/s 10.00 3.00 0.80 24.00
e ret wall to apron@ d/s 10.00 0.60 1.00 6.00
101.2

2 Stone Pitching
a Causeway portion 10.00 8.00 0.20 16.00
b Apron @ d/s 10.00 3.00 0.20 6.00
22.00

3 PCC ( M15) 10.00 8.00 0.10 8.00


4 Concrete ( M20) 10.00 8.00 0.20 16.00

5 Reinforcement Steel @ 0.8% of RCC 1004.80

6 Masonry Wall
a wall @ u/s 10.00 0.60 1.00 6.00
b ret wall @ d/s 10.00 1.00 1.50 15.00
c ret wall to apron@ d/s 10.00 0.60 1.00 6.00
27.00
7 Formwork 36.00 0.30 10.80

8 Back filling 10.00 0.60 0.50 3.00


10.00 0.60 0.50 3.00
6.00

GeoCom Nepal Consult Pvt.Ltd 31 of 664


Individual Group
Initial Group Final
S.N. startindex endindex checkbox checkbox
Condition Condition Condition
number number
1 0 6 13 1 0 201
2 0 14 21 0 58
3 1 22 29 1 60
4 0 30 37 0 6
5 0 38 45 0 7
6 0 46 53 0 8
7 0 54 61 0 9
8 0 62 69 0 203
9 0 70 77 0 204
10 0 78 85 0 205
11 0 86 93 0 206
12 0 94 101 0 207
13 0 102 109 0 208
14 0 110 118 0 209
15 0 119 127 0 210
16 0 128 136 0 211
17 1 137 145 1 212
18 0 146 154 0 213
19 0 155 164 0 214
20 0 165 173 0 215
21 0 174 190 0 216
22 1 191 200 1 217
23 1 201 211 1 1 218
24 0 212 223 0 219
25 0 224 235 0 220
26 1 236 247 1 221
27 1 248 256 1 1 222
28 1 257 265 1 223
29 1 266 346 1 10
30 1 347 355 1 69
31 1 356 364 1 70
32 1 365 405 1 224
33 0 406 416 0 225
34 1 417 435 1 226
35 0 436 444 0 227
36 0 445 453 0 228
37 0 454 462 0 229
38 0 463 471 0 230
39 0 472 482 0
40 0 483 493 0
41 0 494 504 0
42 0 505 515 0
43 0 516 542 0
44 1 543 551 1
45 1 552 560 1 231
46 0 561 569 0 232
47 0 570 578 0 233
48 0 579 587 0 234
49 0 588 609 0 235
50 0 610 618 0 236
51 0 619 627 0 237
52 0 628 638 1 0 238
53 0 639 649 0 239
54 0 650 660 0 240
55 1 661 671 1 241
56 0 672 679 0 242
57 1 680 690 1 1 243
58 0 691 710 0 244
59 0 711 722 0 245
60 0 723 731 0 246
61 0 732 743 0 247
62 0 744 753 0 248
63 0 754 766 0 249
64 0 767 776 0 250
65 0 777 788 0 251
66 0 789 799 0 252
67 0 800 811 0 253
68 0 812 822 0 254
69 0 823 834 0 255
70 0 835 844 0 256
71 0 845 855 0 0 257
72 0 856 867 0 277
73 0 868 878 0 259
74 0 879 888 0 260
75 0 889 899 0 261
76 0 900 910 0 262
77 0 911 920 0 263
78 0 921 930 0 264
79 0 931 941 0 265
80 0 942 955 0 266
81 0 956 969 0 267
82 0 970 983 0 268
83 0 984 996 0 269
84 0 997 1010 0 270
85 0 1011 1024 0 271
86 0 1025 1038 0 272
87 0 1039 1049 0 273
88 0 1050 1063 0
89 1 1064 1157 1 1 66
90 1 1158 1170 1 278
91 0 1171 1180 0 279
92 0 1181 1190 0 280
93 0 1191 1203 0 281
94 0 1204 1216 0 282
95 0 1217 1228 0 283
96 1 1229 1240 1 1 285
97 0 1241 1252 0 286
98 0 1253 1264 0 287
99 0 1265 1275 0
100 0 1276 1288 0
101 0 1289 1300 0
102 0 1301 1312 0
103 0 1313 1323 0 288
104 0 1324 1334 0 289
105 0 1335 1345 0 290
106 0 1346 1356 0 291
107 0 1357 1365 0
108 0 1366 1374 0 0 292
109 0 1375 1383 0
110 0 1384 1398 1 0 293
111 1 1399 1414 1 294
112 1 1415 1430 1 295
113 1 1431 1445 1 296
114 1 1446 1460 1 297
115 0 1461 1473 0 298
116 0 1474 1487 0 299
117 0 1488 1501 0 300
118 0 1502 1514 0 301
119 0 1515 1527 0 302
120 0 1528 1543 0 303
121 0 1544 1559 0 304
122 0 1560 1574 0 305
123 0 1575 1589 0 306
124 0 1590 1604 0 307
125 0 1605 1619 0 308
126 0 1620 1632 0 309
127 0 1633 1645 0 310
128 0 1646 1658 0 311
129 1 1659 1668 1 312
130 1 1669 1678 1 313
131 1 1679 1695 1 314
132 0 1696 1806 1 0 315
133 0 1807 1817 0
134 1 1818 1826 1
135 0 1827 1842 0 316
136 0 1843 1856 0 317
137 0 1857 1872 0 318
138 0 1873 1886 0 319
139 0 1887 1898 0 0
140 0 1899 1910 0
141 1 1911 1920 1
142 0 1921 1930 1 0 320
143 0 1931 1943 0 321
144 0 1944 1957 0 322
145 0 1958 1970 0 323
146 0 1971 1982 0 324
147 1 1983 1994 1 325
148 0 1995 2006 0 326
149 0 2007 2019 0 327
150 0 2020 2032 0 328
151 0 2033 2045 0 329
152 0 2046 2058 0 330
153 0 2059 2071 0 331
154 0 2072 2084 0 332
155 0 2085 2095 0 0 333
156 0 2096 2107 0
157 0 2108 2119 0
158 0 2120 2132 0
159 0 2133 2142 0 0 334
160 0 2143 2152 0 335
161 0 2153 2162 0 336
162 0 2163 2176 0 337
163 0 2177 2185 0 0 338
164 0 2186 2194 0 339
165 0 2195 1889 0 340
Specification
S.N. Norms No
Clause No.
ACTIVITY GROUP 2 : SITE
A
CLEARANCE

1 2.01.a 201

2 2.01.b 201

3 2.02 201

4 2.03 201

5 2.04.a 201

6 2.04.b 201

7 2.04.c 201

8 2.04.d 201

9 2.04.e 201

10 2.04.f 201

11 2.05 201,909

12 2.06 201,1003

13 2.07 201,2800

14 2.08.01 202

15 2.08.02 202
Specification
S.N. Norms No
Clause No.

16 2.08.03 202

17 2.08.05 202

18 2.15.a 202

19 2.15.b 202

20 2.17.i 202

21 2.17.ii 202

22 2.18 202

ACTIVITY GROUP 7 : PIPE


DRAINS, PIPE CULVERTS
B
AND CONCRETE
CHANNELS

23 7.01.a 701

24 7.02.i 701

25 7.02.ii 701

26 7.02.iii 701

ACTIVITY GROUP 9 :
C
EARTHWORKS

27 9.01.a 905

28 9.01.b 905

29 9.01.c 905

30 9.02.a 905

31 9.02.b 905

32 9.02.c 905
Specification
S.N. Norms No
Clause No.

33 9.05.a 909

34 9.05.b 909

35 9.07.01.a 907

36 9.07.01.b 907

37 9.07.01.c 907

38 9.07.01.d 907

39 9.07.1.a 907

40 9.07.01.b 907

41 9.07.01.c 907

42 9.07.01.d 907

43 9.07.01.e 907

44 9.10.a 908

45 9.10.a 908

46 9.10.b 908

47 9.10.c 908

48 9.10.d 908

49 9.11.a 908

50 9.11.b 908

51 9.11.c 908
Specification
S.N. Norms No
Clause No.
ACTIVITY GROUP 10 : SUB
C
GRADES

52 10.01 1003

53 10.02 1003

54 10.03 1003

55 10.05.a 1003

56 10.05.b 1003

ACTIVITY GROUP 12 :
C
SUB-BASE, BASE

57 12.01 1201

58 12.02 1201

59 12.03 1202

60 12.04 1202

61 12.05 1202

62 12.06 1202

63 12.07 1202

64 12.08 1202

65 12.09 1203

66 12.10 1203

67 12.11 1203

68 12.12 1203

69 12.13 1205

70 12.14 1205
Specification
S.N. Norms No
Clause No.
ACTIVITY GROUP 13 :
C BITUMINOUS SURFACE
AND BASE COURSE

71 13.01 1301, 1302

72 13.02 1301, 1302

73 13.03 1301, 1302

74 13.04 1301, 1302

75 13.05.01 1301, 1303

76 13.05.02 1301, 1303

77 13.05.03 1301, 1303

78 13.05.04 1301, 1303

79 13.05.05 1301, 1303

80 13.06.01 1301, 1304


81 13.06.02 1301, 1304
82 13.06.03 1301, 1304
83 13.07 1301, 1305

84 13.08.01 1301, 1306

85 13.08.02 1301, 1306

86 13.08.03 1301, 1306


87 13.09 1307, 1308
88 13.1 1307, 1308
ACTIVITY GROUP 15 :
TRAFFIC SIGNS AND ROAD
MARKING

89 15.01.a 1501

90 15.01.b 1501
Specification
S.N. Norms No
Clause No.

91 15.02.a 1502

92 15.02.b 1502

93 15.03.a 1503

94 15.03.b 1503

95 15.04 1504

ACTIVITY GROUP 18 :
FASLEWORK, FORMWORK
& SURFACE FINISH FOR
CONCRETE STRUCTURES

96 18.01 1804, 1805

97 18.02.1.a.i 1804, 1805

98 18.02.1.a.ii 1804, 1805

99 18.02.1.a.iii 1804, 1805

100 18.02.02.a.i 1804, 1805

101 18.02.02.a.ii 1804, 1805

102 18.02.02.a.iii 1804, 1805

103 18.04.a 1804, 1805

104 18.05.a 1804, 1805

105 18.08.1.a.ii 1803

106 18.08.2.a.ii 1804, 1805


Specification
S.N. Norms No
Clause No.
ACTIVITY GROUP 19 :
BEARINGS AND
EXPANSION JOINTS
(BRIDGES, SLABS ETC.)

107 19.01 1901

108 19.02 1901

109 19.02 1901

ACTIVITY GROUP 20 :
CONCRETE FOR
STRUCTURES

110 20.01.a.01 2000

111 20.01.a.02 2000

112 20.01.a.03 2000

113 20.01.a.04 2000

114 20.01.a.05 2000

115 20.01.b.01 2000

116 20.01.b.02 2000

117 20.01.b.03 2000

118 20.01.b.04 2000

119 20.01.b.05 2000

120 20.02.a.i 2000

121 20.02.a.iii 2000


Specification
S.N. Norms No
Clause No.

122 20.02.a.iii 2000

123 20.02.a.iv 2000

124 20.03.a.ii 2000

125 20.03.a.ii 2000

126 20.06.b.1 2000

127 20.06.b.02 2000

128 20.06.b.03 2000

129 20.07.01 2000

130 20.07.02 2000

131 20.07.03 2000

ACTIVITY GROUP 24 :
MISCELLANEOUS
STRUCTURES

132 24.02.01 2401

2403(5),
133 24.04
2406 -5(b)

134 24.09 2404,3110

135 24.14.01.a 2406; 2, 4

136 24.14.01.b 2406; 2, 4

137 24.14.02.a 2406; 2, 4

138 24.14.02.b 2406; 2, 4


Specification
S.N. Norms No
Clause No.
ACTIVITY GROUP 25 :
BRICKWORKS FOR
STRUCTURES

139 25.02.b 2502,3,4,5,7

140 25.06.b 2502,2510

ACTIVITY GROUP 26 :
MASONRY WORK FOR
STRUCTURES

141 26.01, 6.05 old 2602, 2603

142 26.01 2602, 2603, 2068

143 26.03.a 2602, 2603, 2607

144 26.03.b 2602, 2603, 2607

145 26.03.c 2602, 2603, 2607

146 26.04.a 2607

147 26.04.b 2607

148 26.04.c 2607

149 26.05.a 2600

150 26.05.b 2600

151 26.05.c 2600

152 26.07.a 2602, 2603, 2610

153 26.07.b 2602, 2603, 2610


Specification
S.N. Norms No
Clause No.

154 26.07.c 2602, 2603, 2610

ACTIVITY GROUP 27 :
REPAIR OF STRUCTURES

155 27.07 2713

156

157

158

ACTIVITY GROUP 29 :
MAINTENANCE WORKS

159 29.01 2902

160 29.02 2903

161 29.03 2904

162 29.04.b.i 2905

ACTIVITY GROUP 31:


MISCELLANEOUS WORKS
163 31.01.a 3105
164 31.01.b 3105
165 31.01.c 3105
Rate
Description Unit
( NRs.)

Clearing and grubbing of forest including uprooting, carrying and disposing of


vegetation, grass, bush, spaling and trees of girth upto 300 mm (measured at
a height of 1m above the ground level), lead 10m for (a) Trees and spaling m2 17.05
less than 15 numbers per 100 sq. m.

Clearing and grubbing of forest including uprooting, carrying and disposing of


vegetation, grass, bush, spaling and trees of girth upto 300 mm (measured at
a height of 1m above the ground level), lead 10m for (a) Trees and spaling m2 22.74
more than 15 numbers per 100 sq. m.

Clearing of grass, removing roots breaking sods, levelling the surface and
disposal 10 m.
m2 13.08

Feeling and uprooting of bamboo, clearing the area, stacking of bamboo, and
disposing of wastes to 10 m. (Voulme of the excavated area should be m3 1591.97
measured)

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
serviceable materials to 10m distance and back filling the depression/pits. (a)
no 523.07
above 300 mm to 600 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
serviceable materials to 10m distance and back filling the depression/pits. (b)
no 1989.96
above 600 mm to 900 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
serviceable materials to 10m distance and back filling the depression/pits. (c)
No 5543.46
above 900 mm to 1800 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
serviceable materials to 10m distance and back filling the depression/pits. (d)
No 9096.96
above 1800 mm to 2400 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
serviceable materials to 10m distance and back filling the depression/pits. (e)
No 22742.40
above 2400 mm to 3000 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
serviceable materials to 10m distance and back filling the depression/pits. (e)
No 44751.35
above 3000 mm.

Dressing and levelling of the construction surface including cutting and filling
of small undulation.
m2 5.68

Excavation of top soil (sub grade) and carrying away from construction site,
lead 10m and thickness upto 100mm.
m2 90.97

Spreading, shaping and light compacting of top soil on slopes. m2 28.43

Dismantling Bridge, culvert and other structures including stockpiling the


reusable materials and diposal of usable materials within 50 m lead for m3 841.88
(a) Plain cement concrete, 1:4:8 or leaner mix

Dismantling Bridge, culvert and other structures including stockpiling the


reusable materials and diposal of usable materials within 50 m lead for m3 1353.58
(b) Plain cement concrete, 1:3:6 or richer mix
Rate
Description Unit
( NRs.)
Dismantling Bridge, culvert and other structures including stockpiling the
reusable materials and diposal of usable materials within 50 m lead for m3 1893.72
(c) Reinforced cement concrete work

Dismantling Bridge, culvert and other structures including stockpiling the


reusable materials and diposal of usable materials within 50 m lead for m3 1371.05
(e) Random rubble masonry in cement mortar

Excavation of metalled road and removal of all materials including soling


and screening, sorting out reusable materials and disposing unusable
materials upto 20m lead
m3 515.19
(a) Water bound macadam materials including soling / sub-base.

Excavation of metalled road and removal of all materials including soling


and screening, sorting out reusable materials and disposing unusable
materials upto 20m lead
m3 1385.09
(b)Bitumenous Materials

Dismantling of RCC pipes (excluding excavation and refilling).


i) upto 600 mm dia.
m 236.60

Dismantling of RCC pipes (excluding excavation and refilling).


ii) above 600 mm dia.
m 464.03

Dismantling gabion works including stockpiling the reusable materials and


disposal of reusable materials within 50m lead.
m3 660.35

Providing, jointing and laying HDP pipes (110 mm/125mm outer diameter)
with or without collar etc. complete in place as per specification.
m 351.10

Proving and laying RCC pipes of diameter 600 mm (internal) with or without
collars jointed with stiff mixture of cement mortar in the proportion of m 9457.15
1 : 2 ( 1 cement : 2 fine sand ) , lead upto 100m.

Proving and laying RCC pipes of diameter 750 mm (internal) with or without
collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 m 12202.68
cement : 2 fine sand ) , lead upto 100m.

Proving and laying RCC pipes of diameter 900 mm (internal) with or without
collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 m 14956.50
cement : 2 fine sand ) , lead upto 100m.

Road way excavation in soft soil including disposal upto 10 m and lift upto
1.5 m etc. all complete as per specification.
m3 426.42

Road way excavation in Hard soil / Gravel / Boulder mixed soil including
disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification.
m3 568.56

Road way excavation in Soft rock including disposal upto 10 m and lift upto
1.5 m etc. all complete as per specification.
m3 1563.54

Earthwork excavation in soft soil for drain and trenches including shoring,
struting, bracing, sheeting and disposal upto 10 m and lift upto 1.5 m etc. all m3 511.7
complete as per specification

Earthwork excavation in Hard soil/Gravels/Boulder mixed soil for drain and


trenches including shoring, struting, bracing, sheeting and disposal upto 10 m3 852.84
m and lift upto 1.5 m etc. all complete as per specification

Earthwork excavation in soft rock for drain and trenches including shoring,
struting, bracing, sheeting and disposal upto 10 m and lift upto 1.5 m etc. all m3 1705.68
complete as per specification
Rate
Description Unit
( NRs.)
Formation of embankment including compaction in layers not exceeding 150
mm compacted depth, watering and haulage 10 m etc. all complete as per m3 972.96
specification (i)manual methods

Formation of embankment including compaction in layers not exceeding 150


mm compacted depth, watering and haulage 10 m etc. all complete as per m3 45.56
specification (ii)using equipments.

Excavation for foundation through all types of soil including relevant lift and
disposal upto 20m. m3 1137.12
(a) Depth upto 1.5 m

Excavation for foundation through all types of soil including relevant lift and
disposal upto 20m. m3 1705.68
(b) Depth 1.5 m upto 3 m

Excavation for foundation through all types of soil including relevant lift and
disposal upto 20m. m3 2274.24
(c) Depth upto 3m upto 4.5 m

Excavation for foundation through all types of soil including relevant lift and
disposal upto 20m. m3 2700.66
(d) Depth 4.5 m upto 6 m

Underwater Excavation for foundation through all types of soil including


relevant lift and disposal upto 20m and dewatering. m3 1364.54
(a) Depth upto 1.5 m

Underwater Excavation for foundation through all types of soil including


relevant lift and disposal upto 20m. m3 2729.09
(b) Depth 1.5 m upto 3 m

Underwater Excavation for foundation through all types of soil including


relevant lift and disposal upto 20m. m3 4321.06
(c) Depth upto 3m upto 4.5 m

Underwater Excavation for foundation through all types of soil including


relevant lift and disposal upto 20m. m3 5131.25
(d) Depth 4.5 m upto 6 m

Underwater Excavation for foundation through all types of soil including


relevant lift and disposal upto 20m. m3 6670.62
(d) Depth 6.0m upto 7.0 m

Backfilling in layers in foundation pits,trenches etc with approved filter


material including compaction and watering etc complete,lead 10 m m3 1889.25
a) Depth of foundation upto 1.5m

Backfilling in layers in foundation pits,trenches with common


excavated material etc including compaction and watering etc m3 648.15
complete,lead 10 m
a) Depth of foundation upto 1.5m

Backfilling in layers in foundation pits,trenches etc including compaction and


watering etc complete,lead 10 m m3 921.06
b) Depth of foundation 1.5 m upto 3m

Backfilling in layers in foundation pits,trenches etc including compaction and


watering etc complete,lead 10 m m3 1193.98
c) Depth of foundation upto 3m upto 4.5 m.

Backfilling in layers in foundation pits,trenches etc including compaction and


watering etc complete,lead 10 m m3 1466.88
d) Depth of foundation 4.5 m upto 6m.

Excavation and disposal of slides manually haulage distance upto 50m


a)Soft soil
m3 341.14

Excavation and disposal of slides manually haulage distance upto 50m


b) Hard soil
m3 454.85

Excavation and disposal of slides manually haulage distance upto 50m


c)Soft Rock
m3 909.70
Rate
Description Unit
( NRs.)

Subgrade construction and preparation of formation in cutting (other than


rock excavation) including disposal of material upto10m .
m3 115.3

Subgrade construction, preparation and formation of subgrade in rock


cutting with regulating course of natural materials.
m3 377.15

Subgrade construction with loose untreated materials; preparation and


formation of subgrade in fill areas.
m3 377.15

Preparation of sub-grade for rehabilitation or other similar works (filling or


cutting depth of 10 to 20 cm) in common soil.
m2 30.05

Preparation of sub-grade for rehabilitation or other similar works (filling or


cutting depth of 10 to 20 cm) in gravel & boulder mixed soil.
m2 170.57

Providing, laying, spreading, watering, levelling and compaction of natural


sand gravel subbase grading as per table 12.1 of standard specification lead m3 1647.00
upto 10m.

Providing, laying, spreading, watering, levelling and compaction of natural


sand gravel subbase grading as per table 12.1 of standard specification lead m3 2113.33
upto 10m (for manual works).

Providing, laying, spreading, watering, levelling and compaction of crusher


run materials for subbase course grading SB1* lead upto 10m.
m3 3048.41

Providing, laying, spreading, watering, levelling and compaction of crusher


run materials for subbase course grading SB1* lead upto 10m. m3 2367.06
( for manual works)

Providing, laying, spreading, watering, levelling and compaction of crusher


run materials for subbase course grading SB2*lead upto 10m. m3 1712.12
(for machine works)

Providing, laying, spreading, watering, levelling and compaction of crusher


run materials for subbase course grading SB2*lead upto 10m. m3 2371.66
(for manual works)

Providing, laying, spreading, watering, levelling and compaction of crusher


run materials for base course lead upto 10m. m3 2865.65
(a) Machine works

Providing, laying, spreading, watering, levelling and compaction of crusher


run materials for base course lead upto 10m. m3 3506.40
(b) For manual works.

Providing, laying, spreading, watering, levelling and compaction of


waterbound Macadam base course class D1* grading 1 or grading 2 lead m3 1870.21
upto 10m.

Providing, laying, spreading, watering, levelling and compaction of


Waterbound macadam subbase course class E1* lead upto 10 m m3 2584.95
(b) Manual works.

Providing, laying, spreading, watering, levelling and compaction of


waterbound Macadam base course class D1* grading 1 or grading 2 lead
upto 10m.
m3 1907.56
(a) Machine works

Providing, laying, spreading, watering, levelling and compaction of


waterbound Macadam base course class D1* grading 1 or grading 2 lead
upto 10m.
m3 2592.01
(B) Manual works

Providing, laying, spreading, watering, levelling and compaction of natural


sand gravel wearing course class -1 / class -2 lead upto 10m. For machine m3 1654.51
works

Providing, laying, spreading, watering, levelling and compaction of natural


sand gravel wearing course class -1/class -2 lead upto 10m for manual m3 2464.21
works.
Rate
Description Unit
( NRs.)

Providing and spraying bituminous tack coat MC30/MC70 including cleaning


the road surface using wire, brushes, broom etc. before applying tack coat.
Ltr 187.39

Providing and spraying bituminous tack coat MC30/MC70 including cleaning


the road surface using wire, brushes, broom etc. before applying tack coat, Ltr 163.93
using manual methods.

Providing and spraying bituminous prime coat MC30/MC70 including


cleaning the road surface using wire, brushes, broom etc. before applying Ltr 187.39
prime coat.

Providing and spraying bituminous prime coat MC30/MC70 including


cleaning the road surface using wire, brushes, broom etc. before applying Ltr 163.93
prime coat, using manual methods.

Laying of single / double / multiple bituminous coats for surface dressing


using river gravels, shingles or broken stone chips including compaction Ltr 171.18
I) Bituminous binder for surface dressing( mass work).

Laying of single / double / multiple bituminous coats for surface dressing


using river gravels, shingles or broken stone chips including compaction Ltr 179.38
I) Bituminous binder for surface dressing( Patch work).

Laying of single / double / multiple bituminous coats for surface dressing


using river gravels, shingles or broken stone chips including compaction -- II) Ltr 104.26
Cutter for bitumen grade 80/100.

Laying of single / double / multiple bituminous coats for surface dressing


using river gravels, shingles or broken stone chips including compaction -- III) Mt 2089.35
Chipping for surface dressing for 1st coat size or second coat size.

Laying of single / double / multiple bituminous coats for surface dressing


using river gravels, shingles or broken stone chips including compaction -- m3 0
IV) Production of percorated chipping.

Providing and laying semi-grouting with compaction 50mm thickness. m2 836.59


Providing and laying semi-grouting with compaction 75mm thickness. m2 1095.47
Providing and laying full grouting with compaction 50 mm thicknes. m2 1063.68
Providing and laying sand seal. m2 115.09

Providing, mixing and laying slurry seal with fine slurry mix. m2 181.06
Providing, mixing and laying slurry seal with normal slurry mix. m2 202.34
Providing, mixing and laying slurry seal with coarse slurry mix. m2 235.75
Providing, mixing, laying and compaction of premix carpet. m3 15373.13
Providing, mixing, and laying asphalt concrete with compaction. m3 18067.34

Supplying and erecting traffic sign in place including 50mm dia. Steel tube,
2mm. thick steel plate, cement concrete, painting, writing and supporting
steel angle nut and bolit etc. complete a) 60cm. Dia. Circular, 60cm.
no 2384.33
equilateral traingle and 60cm.x 45cm. rectangular shaped sign (single post).

Supplying and erecting traffic sign in place including 50mm dia. Steel tube,
2mm. thick steel plate, cement concrete, painting, writing and supporting
steel angle nut and bolit etc. complete b) 1.2m.x 0.75m. Size bigger traffic no 9652.04
sign with back support and two or more post.
Rate
Description Unit
( NRs.)
Supplying and applying paint for Road marking including cleaning, watering,
brooming etc. all complete (10cm. wide strip) m 27.16
a) Two coats over old painted surface

Supplying and applying paint for Road marking including cleaning, watering,
brooming etc. all complete (10cm. wide strip) m 47.13
b) More than two coats over new bitumin surface

Supplying and placing R.C.C. kilometer post including excavation, back


filling, painting and writing etc. all complete as per specification no 2537.96
a) Standard KM post placed at each kilometer.

Supplying and placing R.C.C. kilometer post including excavation, back


filling, painting and writing etc. all complete as per specification no 5768.93
b) Bigger kilometer post (placed at each 5 km.)

Supplying and fixing in place R.C.C. delineator and guard post including
excavation, back filling, painting and erection etc. all complete as per no 1112.17
drawing.

Providing , Preparing and Installing form work including necessary supports


and removing after completion for foundation and footings m2 525.84
(a) using timber ( soft wood) - Class F1 finish.

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For Vertical plain surface [class F2 finish] m2 563.19
height upto 3 m

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For Vertical plain surface [class F2 finish] m2 677.83
height upto 3 m upto 6m.

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For Vertical plain surface [class F2 finish] m2 843.42
height upto 6 m upto 9m.

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For Vertical curved surface [class F2 finish] m2 764.07
height upto 3.0 m.

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For Vertical curved surface [class F2 finish] m2 905.31
height 3.0 m upto 6.0 m.

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For Vertical curved surface [class F2 finish] m2 1137.38
height 6.0 upto 9.0m.

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For slab structure [class F2 finish] using m2 688.85
timber planks. (Falsework not included)

Providing , Preparing and Installing form work including necessary supports


and removing after completion ---For slab and beam structure [class F2 m2 1028.42
finish] using timber planks. (Falsework not included)

Providing, and assembling in position falsework for the construction of RCC


superstructure and removal after completion including necessary design and
drawings as per specification. m2 3167.87
A) For Slabs and Box culverts , using timber for height 2m ~ 4m

Providing, and assembling in position falsework for the construction of RCC


superstructure and removal after completion including necessary design and
drawings as per specification.
m2 3093.12
A) For RCC beam bridges , using timber for height 0m ~ 3m
Rate
Description Unit
( NRs.)

Providing and fixing in positions, 100 mm diameter drainage spouts with


necessary hardware.
nos 1425.00

Providing and installing Expansion Joints and tarfelt sheet including all
necessaary axilliary and incidental works etc. complete as per drawing and rm 18089.5
specification.

Providing and fixing in positions,reinforced elastomeric bearing pad per


drawing and instructions. nos 31625.00

Providing and placing machine mixed M10/40 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 9202.05
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M15/40 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 9990.5
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M20/40 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 11239.76
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M20/20 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 11451.41
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M25/20 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 13199.3
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M10/40 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 10643.03
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M15/40 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 11404.48
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M20/40 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 12793.44
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M20/20 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 13033.65
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M25/20 cement concrete for the
foundation and footing etc. including compaction, curing, testing and lead m3 14063.72
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M15/40 cement concrete for abutment,
pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 14316.93
complete as per specification and drawing.

Providing and placing machine mixed M20/40 cement concrete for abutment,
pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 15547.02
complete as per specification and drawing.
Rate
Description Unit
( NRs.)
Providing and placing machine mixed M20/20 cement concrete for abutment,
pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 15740.10
complete as per specification and drawing.

Providing and placing machine mixed M25/20 cement concrete for abutment,
pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 16697.67
complete as per specification and drawing.

Providing and placing machine mixed M20/20 cement concrete for the
superstructure, deckslab, girder etc. including compaction, curing, testing m3 13139.97
and lead 30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M25/20 cement concrete for


superstructure, deckslab, girder, etc. including compaction, m3 15070.57
curing, testing and lead 30m. etc. all complete as per specification and
drawing.

Providing and placing manually mixed non structural cement concrete


[ cement (1): sand (4) : aggregate (8) ] including compaction, curing, testing m3 9293.73
and lead 30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed non structural cement concrete


[ cement (1): sand (3) : aggregate (6) ] including compaction, curing, testing m3 10303.69
and lead 30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed non structural cement concrete


[ cement (1): sand (2) : aggregate (4) ] including compaction, curing, testing m3 12421.41
and lead 30m. etc. all complete as per specification and drawing.

Providing and laying Reinforcement ( diameter upto 8 mm) including cutting,


bending, binding, fixing in position and lead 30m. etc. all complete as per mt 127436.46
specification and drawing.

Providing and laying Reinforcement ( diameter above 8 mm and upto 16


mm) including cutting, bending, binding, fixing in position and lead 30m. etc. mt 122872.27
all complete as per specification and drawing.

Providing and laying Reinforcement ( diameter above 16 mm) including


cutting, bending, binding, fixing in position and lead 30m. etc. all complete mt 118425.3
as per specification and drawing.

Fabrication of hexagonal mesh type 100mm x 120 mm Gabion boxes /


mattresses with diapharagms, with binding wire 12 swg, mesh wire 10 swg
and selvedged wire 7 swg , including rolling, cutting and weaving ;
assembling Gabion boxes mattresses, palcing in position including
stretching, forming compartments; tying with bracing wires and tie wires; box 3365.99
tying down the lid complete; and providing and filling stone / boulder in
gabion boxes / mattresses etc. including dressing, beding, bonding and all
transporation as per specification.

Providing and laying grouted stone pitching in protection work with stone size
not less than 0.01 m3 and cement : sand motar (1:3) lead 30m, lift 1.5m
m3 8522.12

Providing, laying and fixing of Geo-textile (filter fabrics), lead 30m m2 186.02
Providing and placing concrete with 60% M 15/40 concrete and 40%
boulders/stones as per specification Lead 30m, lift 1.5m , using concrete m3 8154.67
mixer and vibrator.
Providing and placing concrete with 60% M 15/40 concrete and 40%
boulders/stones as per specification Lead 30m, lift 1.5m , without using m3 7866.08
concrete mixer and vibrator.

Providing and placing plum-concrete with 70% M 15/40 concrete and 30%
boulders/stones as per specification. Lead 30m, lift 1.5m using concrete m3 7991.41
mixer and vibrator.

Providing and placing concrete with 70% M 15/40 concrete and 30%
boulders/stones as per specification Lead 30m, lift 1.5m , without using m3 8938.09
concrete mixer and vibrator.
Rate
Description Unit
( NRs.)

Providing and laying brick masonry in manual mixed cement mortar including
preparation of mortar as per specification, lead 30 m.
m3 15107.98

Providing and applying 20mm thick cement plaster including mortar mixing,
scaffolding, curing etc. complete as per specification lead 30 m (manual m2 406.30
mixing)

Providing, laying and levelling of dry stone masonry works in the foundation
all complete.
m3 3034.83

Providing and laying dry stone masonry (coursed rubble) including dressing
etc. complete as per specification, lead 30m.
m3 4791.62

Providing and laying Random rubble stone masonry in cement mortar


[ cement(1) : sand(3)] including scaffolding, curing, preparation of mortar etc. m3 10412.8
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


[ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. m3 9717.35
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


[ cement(1) : sand(6)] including scaffolding, curing, preparation of mortar etc. m3 8774.71
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


[ cement(1) : sand(3)] including scaffolding, curing, preparation of mortar etc. m3 10803.26
complete, masoned height 0-5m, lead 30m (manual mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


[ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. m3 10138.33
complete, masoned height 0-5m, lead 30m (manual mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


[ cement(1) : sand(6)] including scaffolding, curing, preparation of mortar etc. m3 9165.17
complete, masoned height 0-5m, lead 30m (manual mixing), mortar 35%

Providing and laying Coursed rubble stone masonry in cement mortar


[ cement(1) : sand(3)] including scaffolding, curing, preparation of mortar etc. m3 10878.68
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 30%

Providing and laying Coursed rubble stone masonry in cement mortar


[ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. m3 10213.75
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 30%

Providing and laying Coursed rubble stone masonry in cement mortar


[ cement(1) : sand(6)] including scaffolding, curing, preparation of mortar etc. m3 9240.58
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 30%

Providing, mixing, and Pointing cement mortar over rubble masonry works in
cement mortar [ cement(1) : sand(1)] including scaffolding, curing,
preparation of mortar etc. complete, masoned height 0-5m, lead 30m
m2 299.40
(machine mixing).

Providing, mixing, and Pointing cement mortar over rubble masonry works in
cement mortar [ cement(1) : sand(2)] including scaffolding, curing,
preparation of mortar etc. complete, masoned height 0-5m, lead 30m
m2 261.16
(machine mixing).
Rate
Description Unit
( NRs.)
Providing, mixing, and Pointing cement mortar over rubble masonry works in
cement mortar [ cement(1) : sand(3)] including scaffolding, curing,
preparation of mortar etc. complete, masoned height 0-5m, lead 30m
m2 241.83
(machine mixing).

Removal of old paints by sand blasting, cleaning and repairing of metal


surfaces for the application of new paints as per specification. m2 1327.01

Double coat whitewash on new surface including supply of materials all


complete
m2 39.45

Single coat whitewash on old surface including supply of materials all


complete m2 26.11

Single coat enamel paint/ readymade emulsion paint with primer including
supply of materials all complete.
m2 233.63

Restoration of rain cuts in embankment slopes including watering and


compaction etc. all complete lead 10 m.
m3 518.21

Maintenance of earthen shoulders by making irregularities even to the


required level including watering and compaction etc. all complete lead 10m.
m2 132.07

Maintenance of gravel shoulders and gravel carriageway by repairing pot


holes and making iregularities even to the required level including watering m2 322.21
and compaction etc. all complete lead 10m.

Repair of potholes and damaged bituminous surface including cleaning,


brooming, and rolling etc all complete using hot premix material for 20mm m2 538.81
shallow patching.

Providing and installing Railing including Railing Posts -- 100 mm dia m 1567.5
Providing and installing Railing including Railing Posts -- 50 mm dia m 664.86
Providing and installing Railing including Railing Posts -- 38 mm dia m 483.71