Vous êtes sur la page 1sur 3

UC Irvine Bren Hall 2007 RENO COMPETITION

CONCRETE ESTIMATE

LABOR MATERIAL EQUIPMENT/OTHER CUMULATIVE


PARAMETER / ITEM OF WORK QUANTITY UNIT $/UNIT SUBTOTAL $/UNIT SUBTOTAL $/UNIT SUBTOTAL TOTAL

GENERAL CONDITIONS
Field Trailer mo $0 $0 $0 $0
Crane Mobilization and Freight 1 lsum $0 $0 $0 $0
Crane w/ Operator for the Walls and Decks mo $0 $0 $0 $0
Conex mo $0 $0 $0 $0
Misc. Small Tools and Equipment mo $0 $0 $0 $0
Concrete Equipment - Forklift mo $0 $0 $0 $0
Concrete Equipment - Compressor mo $0 $0 $0 $0
Concrete Area Superintendent w/ All Costs mo $0 $0 $0 $0
Field Engineer w/ All Costs mo $0 $0 $0 $0
Field Engineering Equipment mo $0 $0 $0 $0
Part Time Survey Rodman mo $0 $0 $0 $0
Perimeter Rails at the Roof (w/ Section #3) w/ GC's
Opening Protection at the Roof (w/ Section #3) w/ GC's
Water, Ice, & Cups mo $0 $0 $0 $0
TOTAL GENERAL CONDITIONS = $0 $0 $0 $0

FOUNDATIONS
Excavation and Grading - w/ Grading Subcontractor w/ Grading
A102
Footings and Continuous Wall Footings
Footings
Forms at Elevator Pit 546 sf $0 $0 $0 $0
Place at Elevator Pit 16 cy $0 $0 $0 $0
Place Footings cy $0 $0 $0 $0
Finish Footings sf $0 $0 $0 $0
Cure Footings sf $0 $0 $0 $0
Continuous Wall Footings
Continuous Footing Edge Forms 4,533 sf $0 $0 $0 $0
Rebar Templates 1,401 lf $0 $0 $0 $0
Place Footings cy $0 $0 $0 $0
Finish Continuous Wall Footings sf $0 $0 $0 $0
Cure Continuous Wall Footings sf $0 $0 $0 $0
Reinforcing Steel - w/ Reinforcing Subcontractor w/ Reinforcing
TOTAL FOUNDATIONS = $0 $0 $0 $0

SLABS
UC Irvine Bren Hall 2007 RENO COMPETITION
CONCRETE ESTIMATE

LABOR MATERIAL EQUIPMENT/OTHER CUMULATIVE


PARAMETER / ITEM OF WORK QUANTITY UNIT $/UNIT SUBTOTAL $/UNIT SUBTOTAL $/UNIT SUBTOTAL TOTAL
A203
Slab on grade areas
Chamfer 5,050 lf $0 $0 $0 $0
Place 460 cy $0 $0 $0 $0
Finish 24,415 sf $0 $0 $0 $0
Protect and Cure 24,415 sf $0 $0 $0 $0

B308
Structural Slab (Levels 2, 3, 4, 5, 6)
Beam Soffit Forms incl. Shoring (Beam Bottom) sf $0 $0 $0 $0
Beam Side Forms sf $0 $0 $0 $0
Slab Form including Shoring sf $0 $0 $0 $0
Slab Edge Forms sf $0 $0 $0 $0
Depressed Slab 1,400 lf $0 $0 $0 $0
Drop Panel Edge Forms 825 sf $0 $0 $0 $0
Chamfer Strip 4,296 lf $0 $0 $0 $0
Place Slabs cy $0 $0 $0 $0
Finish Slabs sf $0 $0 $0 $0
Protect and Cure Slabs sf $0 $0 $0 $0
Roof Deck Concrete
Place D1 Floor Mix Lt Wt cy $0 $0 $0 $0
Finish D1 Floor Mix sf $0 $0 $0 $0
Protect and Cure D1 Floor Mix sf $0 $0 $0 $0
Reinforcing Steel - w/ Reinforcing Subcontractor w/ Reinforcing
TOTAL Slabs = $0 $0 $0 $0

B308 COLUMNS AND WALLS


Level 1 Walls and Columns

Form Shear Walls and Exterior Walls 19,570 sf $0 $0 $0 $0

Form Wall Bulkheads 1,610 sf $0 $0 $0 $0

Place Shear Walls and Exterior Walls 470 cy $0 $0 $0 $0

Form Column Forms 2,300 sf $0 $0 $0 $0

Place Columns 40 cy $0 $0 $0 $0

Level 2 through 5 Walls and Columns

Form Shear Walls and Exterior Walls sf $0 $0 $0 $0

Form Wall Bulkheads sf $0 $0 $0 $0


UC Irvine Bren Hall 2007 RENO COMPETITION
CONCRETE ESTIMATE

LABOR MATERIAL EQUIPMENT/OTHER CUMULATIVE


PARAMETER / ITEM OF WORK QUANTITY UNIT $/UNIT SUBTOTAL $/UNIT SUBTOTAL $/UNIT SUBTOTAL TOTAL

Place Shear Walls and Exterior Walls cy $0 $0 $0 $0

Form Column Forms sf $0 $0 $0 $0

Place Columns cy $0 $0 $0 $0
Form Window Sill Walls (Levels 2, 3, 4, 5) sf $0 $0 $0 $0
Place Window Sill Walls cy $0 $0 $0 $0
Finish Window Sill Walls sf $0 $0 $0 $0
Form Parapet (Level 6) sf $0 $0 $0 $0
Place Parapet cy $0 $0 $0 $0
Finish Parapet sf $0 $0 $0 $0
Reinforcing Steel - w/ Reinforcing Subcontractor w/ Reinforcing
TOTAL Slabs = $0 $0 $0 $0

B308 MISCELLANEOUS
Stair Pans and Landings
Place Stair Pans and Landings 24 cy $0 $0 $0 $0
Finish Stair Pans and Landings 2,100 sf $0 $0 $0 $0
Protect and Cure Stair Pans and Landings 2,100 sf $0 $0 $0 $0

Mechanical Pads
Form Mechanical Pads 214 sf $0 $0 $0 $0
Place Mechanical Pads 16 cy $0 $0 $0 $0
Finish Mechanical Pads 690 sf $0 $0 $0 $0
Cure Mechanical Pads 690 sf $0 $0 $0 $0
All Reinforcing Steel - w/ Reinforcing Subcontractor w/ Reinforcing
TOTAL Misc = $0 $0 $0 $0

TOTAL COST OF WORK $0 $0 $0 $0

FEE 0.0% $0 $0 $0 $0

GRAND TOTAL CONCRETE WORK $0 $0 $0 $0