Académique Documents
Professionnel Documents
Culture Documents
Abstract—Nowadays,with the competition and pool market.One is based on the optimal power flow (OPF)
optimization of resource’s allocation being program which considers both the economic dispatch and the
stability,but the heavy computation limits its application in
introduced into the power market, the problem of real-time congestion management. The other is security
transmission congestion also emerges. In power correction in generation scheduling based on market clearing
systems,lines and transformers transmiss energy price,that is sensitivity analysis method.When there exists
which is a comprehensive reflection of the active transmission congestion in the system, according to the
power and reactive power, thus the causes of sensitivity method,the Independent System Operator (ISO)
not only can quickly judge the generator or load which can
congestion should include the active and reactive participate in the adjustment but also can determine the
power.The results of sensitivity analysis method adjustment capacity.Thus,the method can be used for
may be inaccurate because only the effect of active real-time congestion management.
power is considered. A new congestion management In essence,the sensitivity method is based on power
method which considers the linkage characteristic flow equations’s Taylor series expansion.It is an approximate
quantitative method because the higher order infinitesimal is
of active and reactive power is proposed in this ignored. In addition,it ignores the relationships among
paper.When there exists congestion, the analytical control variables and regards each control variable is
relationships between the line power and generator independent of one another.If the influence of active power
outputs can be obtained by power flow is only considered,whereas other electrical parameters’
tracing.Then the power vectorgraph could be made influence is neglected in congestion management,the results
may be not accurate.
and congesiton can be eliminated effectively by Each line power can be obtained by power flow tracing
adjusting relevant power components in four based on power component theory.Then the distribution of
quadrants.The correctness and effectiveness of the the generator power can also be determined.Thus the power
new method can be verified by a numerical component vectors of each line can be represented visually
example. and be adjusted in four quadrants.A new method for
real-time congestion management is proposed in this paper.
Index Terms—transmission congestion management, II. CONGESTION MANAGEMENT MODEL
energy, sensitivity, power flow tracing, power
component. A.Power flow tracing
The analytical relationships between the line power and
I. INTRODUCTION each generator output can be obtained by power flow
tracing.
From the 80s last century, many countries in the world q q
¦ Sijinkks ¦G
have carried out reform of electric power industry. With the
further development of the reform,a liberal power market Sijin ij kks Skks (k G ) ˄ϭ˅
requests the freedom of competition,but the limited k 1 k 1
transmission capacity limits this freedom greatly.
Due to the heat capacity of the transmission line and the The ratio of each power component and each generator
stability of the system,transmission congestion will occur output is shown as following.
when the power reaches or exceeds the limit of the
transmission capacity[1]. As a result,it may result in Sijiinj kks
preventing new contracts, infeasibility in existing and new Gij ksk , k G ˄Ϯ˅
contracts, price monopoly in some regions of power systems Sksk
and damage to system components[2]. Therefore, an effective
transmission congestion management is very important to Where
the safe operation of the power system and the long-term
stable development of the power market. Sijin is the power of line i-j;
There are two kinds of congestion management in the
Fig. 1 Schematic diagram of transmission capacity
A circle whose radius is determined by transmission
capacity limit S is shown in Fig. 1,and coordinate origin
O is the circle center.The two vectors Smin
i Pmini jQmax
and Smax Pmax jQmin can also be expressed in the
figure.The shadow area in circle shown in Fig. 1 is the
P59 P59
671&
M
'PG 2 'PL 9
M M
M
S59m2 s S59m9 L
M
;ϳͿ
0.7638 0.7
M
M
0.0706
M M
0.4598 (0.4434)
M
M
M
M
M If the effect of active power is only considered, the
M reduction amount should be 0.0706.The power of line 5-9 is
M
0.7001 – j0.0100 after reducing the generator output G2 and
M M load L9. Although congestion situation is alleviated, the
M
M obstruction phenomenon is not eliminated completely,so it
needs to be adjusted once more.
M B.The method proposed in this paper
Table Ċ is the allocation of generator outputs for line
5-9 by using power flow tracing method. Power component
vectorgraph of Line 5-9 can be made according to these data
(as shown in Fig. 3) and generators which need adjusting can
M
be determined rapidly.In addition, the adjustment amount
could be caculated by (5).
Fig. 2 IEEE 9 bus system TableĊ.The Allocation of Injection Power for Line 5-9(p.u.)
Fig. 2 is the network connection diagram,and the
electrical parameters are shown in [4]. Table ĉ is the
transmission capacity of IEEE 9 bus system and the results
of power flow trcaing. It’s obvious that line 5-9 is blocked.
Tableĉ.Injection Power of Every Line (p.u.)
IV. CONCLUSION
REFERENCES
[1]Harry Singh, Shangyou Hao,Alex Papalexopoulos.Transmission
Fig. 3 Initial vectorgraph of Line 5-9 congestion management in competitive electricity markets.IEEE
Trans on Power System,1998,13(2).
[2] Ashwani Kumar,S.C. Srivastava,S.N. .Singh.A zonal
congestion management approach using ac transmission
congestion distribution factors[J]. Electrical power systems
research, 2004, 72:85-93.
actual power S59 [3] Khani, Hadi,Dadash Zadeh, Mohammad R. Transmission
O congestion relief using privately owned large-scale energy
storage systems in a competitive electricity market. IEEE
Transactions on Power Systems, April 3, 2015
[4] Sasiraja, R.M.,Kumar, V.S., Ponmani, S. An elegant
emergence of optimal siting and sizing of multiple
distributed generators used for transmission congestion relief.
Turkish Journal of Electrical Engineering & Computer
Fig. 4 Vectorgraph of Line 5-9 after adjustment Sciences, v 23, n 6, p 1882-95, 2015
The power of line 5-9 is 0.6995 + j0.0038 after [5] Hyman L S . Transmission , congestion , pricing and
adjustment,as shown in Fig. 4 .The congestion can be incentives .IEEE Power Engineering Review , 1999( 8) : 4̚
eliminated completely under the premise of not reducing 10Narayan
load. [6]S R . Transmission loss and congestion cost
The comparasion of the results by using two methods is allocation—— an approach based on responsibility. IEEE
shown in Table ċ. Trans on Power Systems, 2000, 15( 4) : 1401̚1409
Table ċ. Comparasion of the results by using two [7]Galiana F D, Conejo J A, Kockar I. Incremental
transmission loss allocation under pool dispatch. IEEE T
methods rans on Power Systems, 2002, 17( 1) : 26̚33
[8] Zhong, Haiwang, Xia, Qing,Ding, Maosheng, Ning, Bo.
Transmission congestion management method based on
coupon incentive mechanism[J]. Power System Technology.
2013: 1291-1297
[9]Ming Gan,Kaigui Xie ,Chunyan Li . Transmission
congestion evaluation of power systems using
non-sequential Monte Carlo simulation technique
International Journal of Energy Sector Management, v 6, n
1, p 50-64, April 2012
[10] Gurgur, Cigdem Z. Design of power purchase under
transmission congestion. International Journal of Energy
Sector Management, v 6, n 1, p 50-64, April 2012