SUBJECT: JOB SAFETY ANALYSIS POLICY ­ PVD Doc Ref: P1.04.

09

ISSUE No REVISION No: REVISION DATE:


PV Drilling

01 00 1­Aug­2011

Rig JSA Number E Permit To Work Required: PTW(Cold) PTW(Hot)

PV DRILLING III PV DRILLING III­DR­115

Job name:Slip new drill­line on blocks Number of Personnel Required For Job: Date: 4/6/2015 Signed Rig Sup./PIC:

USE THE HAZARD ASSESSMENT PROMPT (if prompt ticked­must be included in Hazards and Controls involved on below assessment)

X Hard hat Disposable coverall X Use of ladder MSDS Well control procedures agreed

Gloves (heat resistant/other) Safety goggles X Fall protection/ Safety Harness Gas test Third party involved

X Impact Glove Safety shields X Signs/barriers Rescue plan required Fire­fighting equipment

X Safety boots/shoe (rubber) X Hearing protection Environment Hazards Reviewed Simultaneous operations (SIMOPS) Isolations required

X Safety glasses Dust mask X Weather reports discussed X Communication (Radio/Banksman)

Task  Initial Risk Residual Risk


Hazards
(Sequence Of Controls 
No. What Are The Potential Hazards? (How Can People Be Rating Rating
Basic Job (Controls Put In Place To Reduce Potential Hazards?)
Hurt, Equipment Damaged& Environment Pollution)
Steps?)
L S R L S R

1 Check & 2 1 2 1 1 1
confirm that Swivel Joint of Snake becomes caught / snagged on
there is Jumper Bar fitted to the Crown Sheaves causing the snake Survey & Measure the Clearance on Jumper Bars at the Crown.
clearance for to slip off / part at swivel & ends of Drill Lines to fall to Drill Jumper Bars to be remove if required prior to starting task to reeve
the snake to Floor below. Swivel Joint of Snake becomes caught / on New Drill Line if there is a risk of Snake becoming caught at any
run below the snagged & unable to pass through sheave guards on point. Check & confirm the Snake is the Correct size for the Drill
jumper bars on Traveling Block causing the snake to slip off / part at swivel Line before starting job. Refer to JSA DR­RF­078 for slip ­ cut
the crown & ends of Drill Lines to fall to Drill Floor below. procedure.
sheave
assembly

2 Gather all 2 3 6 1 3 3
Tools &
Equipment to Tools being used when working at height not fitted with All Tools & Equipment to be used in task to be fitted with Safety
be used in Safety Lanyards with risk of becoming a dropped object. Lanyards for working at height to reduce risk of dropped object.
task to install
new drill line.

3 Hold Pre­Job 2 3 6 1 3 3
Safety
Meeting with
all personnel Ensure that all personnel to be involved in the job task fully
Personnel involved in the task to snake new drill line onto
that are to be understand what is required & where they will be positioned during
draw works drum fail to understand task & hazards.
involved in the the operation.
operation to
spool new drill
line

4 Attach snake 2 3 6 1 3 3
Snake is not fully seat against the ends of the drill line
to be used to Only a competent person is to secure the Snake into Place.
allowing wire cage of snake to fail. Snake is not secured
both old & Locking Wire or Steel Bands (Bandit) to be used to secure the
into place correctly using locking wire so ends are loose &
new ends of loose ends of the snake onto Drill Line.
drill line wire can slip out
the drill line.

5 Place barrier 2 3 6 1 3 3
tape across all
entrance
points on the Work area is not Barriered off allowing access to Cantilever Personnel not involved in the task of Spooling on New Drill Line
cantilever & & Drill Floor from personnel not involved in the job task. are then kept out of the work area & any risk of dropped objects
drill floor to
prevent
access to area

6 Hang Off 2 3 6 1 3 3
Traveling
Block or Set
the Traveling Risk of dropped Shackle Pin or Nut when hanging off Experianced Floorman to carry out task who is compertant for man
Block on Rig Traveling Block. riding & understands what is required.
Floor if Top
Drive has
been laid out.

7 Remove 2 3 6 1 3 3
Wraps off Pinch points for hands & fingers when removing wraps Check all Radios are operating & have new batteries fitted before
Dead Man & from Dead Man anchor point. Lack of communication starting operation. Carry out Radio Check to confirm that personnel
Begin between personnel sited in the derrick at the Crown, sited in Derrick can hear & understand Toolpusher to control / give
operation to Monkey Board, Driller & Man operating the spooler, such instructions on the speed that Drill Line is to be Run / Spooled at.
Pull new drill as Radio Fails. Draw Works pulling the Drill Line through at 2x Men to be posted at Crown FWD / AFT to watch the Snake &
line through a uncontrolled speed. Snake parts when going into Drill Line as it breaks over the top of the Sheave & when it
crown & Sheave at crown or when it breaks over on top of the changes direction to the fast line sheave. Man to be posted at the
traveling block Sheave. Snake becomes caught / hangs up causing Drill Monkey Board to monitor the Drill as it passes through the guide
assembly's to Line to part as it goes through Traveling Block sheaves leading to crown.
Draw Works.

8 Snake is to be 2 3 6 1 3 3
checked that it
Men located at the Crown to check / monitor the Snake as it
is secure each
passes over sheave or Changes Direction from the Traveling Block
time it goes
Snake can part come loose changing direction from the to the Fast Line Sheave. Men located at the Crown to keep Driller /
over the Crown / Traveling Sheaves to the Fast Line Sheave. Drill Toolpusher informed at all times via Radio of any observations /
sheaves at the Line can part & fall to rig floor. Concerns. Area below on Rig Floor to be clear off all personnel at
crown & when these times in case Snake pulls off or Parts causing ends of Drill
it passes Line to fall to the deck below.
through
traveling block.

9 New Drill Line 2 3 6 1 3 3
is to be
secured using
chain to hold it Not enough new drill­line has been pulled through for tail Make sure to have minimum 2 wraps of new line on draw works,
in place before to attach to draw works. New drill­line not correctly secured, before securing. Use chain to anchor/secure new drill­line on rig
removing Pinch points slipping old drill­line off drum. Burrs on drill­ floor so it cannot slide back. Reverse draw works and remove
snake & & line. Trip hazards. snake. Slip old drill­line off & cut into sections with cutting torch.
running off Old Good comms and body positioning. Watch lowering drill­line out V­
Drill Line from door, make sure not go over handrail.
Draw Works
Drum.

10 New Drill Line 2 3 6 1 3 3
Impact Style Gloves to be used when installing new Drill Line.
is to be Personnel to remove Safety Harnesses & lanyards if worn when
secured into Pinch points, working by draw works, lack of comms with working around rotating equipment to prevent lanyards getting
place with driller. Moving parts with no guards. caught in draw works. Line of sight to be maintain with driller to
draw works communicate what is required at any point ie: Stop
clamp,

11 Slip New Drill 2 3 6 1 3 3
Line onto Pinch Points for hand & Fingers when installing Clamp on
Draw Works Draw Works for New Drill Line. Personnel caught in Refer to JSA DR­RF­078 for slip ­ cut procedure.
following JSA unguarded rotating equipment.
for Slip & Cut
DR­RF­078 .

12 Re­Install 2 3 6 1 3 3
Jumper Bars if Tools dropped while working at height when re­installing All Tools & Equipment to be used in task to be fitted with Safety
removed on the sheave guards on the Traveling Block. Risk of Hand Lanyards for working at height to reduce risk of dropped object.
sheaves at the Injury from Pinch Points.
Crown.

13 All Tools & 2 3 6 1 3 3
Equipment
All Tools used for reinstalling jumper bars at crown & guards on
used in Tools & Equipment used during operation left at work site traveling block to be accounted for & returned to the correct
operation to at Crown / travelling block with risk of dropped objects.
locations ready for use
be cleaned &
put away.

14 Barrier tape to 1 1 1 1 1 1
be removed at
all entrance
points on the Barriers not removed on complition of job blocking off All barriers installed / put in place while installing new drill line to be
cantilever &
access to areas removed when task has been completed & safe to do so.
drill floor to
allow access
to area as job
is complete

BASIC JOB STEP WHO PERFORM TASK? WHO SUPERVISES TASK? TOOLS REQUIRED?

Remove Jumper Bars & Guards on Traveling Block

Installing Snake to Ends of Drill Line & Securing in place

Reinstalling Jumper Bars & Guards on Traveling Block

PERSONAL INVOLVED

NAME POSITION COMPANY SIGNATURE NAME POSITION COMPANY SIGNATURE

Vous aimerez peut-être aussi